Loading...
HomeMy WebLinkAboutNC0021423_Authorization to Construct_20181015ROY COOPER NORTH CAROLINA Governor Environmental Quality HCHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director October 15, 2018 Mr. Richard Canipe Town Manager Town of Spruce Pine PO Box 189 Spruce Pine, North Carolina 28777 SUBJECT: Dear Mr. Canipe: Authorization to Construct A to C No. 021423A02 Town of Spruce Pine Spruce Pine WWTP NPDES Permit No. NCO021423 A letter of request for an Authorization to Construct was received October 03, 2018, by the Division of Water Resources (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 2.0 MGD Spruce Pine WWTP, with discharge of treated wastewater into the North Toe River in the French Broad River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Installation of a new step screen with a capacity of 7.2 MGD at peak hourly now with a screw compacter, piping and controls; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO021423 issued effective July 01. 2017, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0021423. It is the Owner's responsibility to ensure that the as -constructed project meets the requirements of all applicable regulations and statutes, the ATC Permit Application package, and all of the requirements contained herein. Failure to comply may result in penalties in accordance with North Carolina General Statute § 143-215.6A through § 143-215.6C. e:-�e NORTH CAROUNAREQ> Depvf . F.Vb..ff.1 lQmfu� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611 919.707.3601 Mr. Richard Canipe, Town Manager October 15, 2018 Page 2 of 3 The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional'or replacement wastewater treatment or disposal facilities. The Asheville Regional Office, telephone number 828-296-4500, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on -site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit and the ATC Permit Application package. Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T1 5A: 8G.0202. A copy of the project plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. hi addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Page 2 of 3 Mr. Richard Canipe, Town Manager October 15, 2018 Page 3 of 3 Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. The issuance of this ATC does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which maybe imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Bing Bai at telephone number (919) 707-3610. Sincerely, -/;-Linda Culpepper Interim Director, Division of Water Resources With Engineer's Certificate attached: cc: DWR Asheville Regional Office, Water Quality Programs Central Files ecopy: Joseph W. McGougan, P.E. MBD Consulting Engineers, P.A. Email: jmcgougan@mbd-eng.com NPDES File Without Engineer's Certificate attached: cc: Mitchell County Health Page 3 of 3 Town of Spruce Pine Spruce Pine WWTP Authorization to Construct No. 021423A02 Issued October 15, 2018 NPDES Permit No. NC0021423 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Spruce Pine Wastewater Treatment Plant, located in Mitchell County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of a new step screen with a capacity of 7.2 MGD at peak hourly flow with a screw compacter, piping and controls; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the ` Authorization to Construct Permit Application package. Signature Date Registration No. Mail this Certification to: Attn: Bing Bai Complex Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617