Loading...
HomeMy WebLinkAbout20181368 Ver 1_Request for more information_20181012Strickland, Bev From: Homewood, Sue Sent: Friday, October 12, 2018 2:05 PM To: Icarson dellinger' Cc: William.A.Elliott@usace.army.mil Subject: Surry-Yadkin 100 kv line project Hi Carson, I'd like to schedule a site visit to see the ephemeral, intermittent and maybe 1-2 perennial streams along this proposed project. These are the days I have available: 10/23, 10/31, 11/5, 11/6, 11/8. Would any of these work for you? In addition here are some comments/concerns with the application as submitted: 1. 1 thought we had talked about this over the phone but I don't see anything in the application about it: We need a justification for why the permanent impacts are needed for maintenance access, not just why maintenance is needed on a utility line, but why the corridor can't be accessed from multiple locations that would avoid all or some of these crossings. Also, we need to know why ford type crossings aren't feasible as they would allow for a more normal stream flow/function but still provide stable structure for irregular equipment crossing/access. 2. The plan sheets that were submitted call for 30' culverts and your PCN states 20' culverts. 3. The culvert details clearly call for riprap above and below the culvert (although I can't see where the length for the dissipater below the culvert is specified) and these haven't been accounted for in the PCN. 4. The temporary impacts for dewatering haven't been accounted for/shown on the drawings or within the PCN however they are clearly spelled out in the culvert details. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.