HomeMy WebLinkAbout20060095 Ver 1_COMPLETE FILE_20060117!?n Michael F. Easley, Cuvcrnur
\O ` y William G. Russ Jr., Secretary
?1 r North Carolina Department of Lnvinnuncut and Natural Resources
-i
Alan W. Klimek, P.E. Director
Division ol'Water Quality
February 24, 2006
DWQ Project # 06-0095
Buncombe County
Monica Schwalbach, Acting Forest Supervisor
National Forests in North Carolina
Post Office Box 2750 V r?
Asheville NC 28802- ?J
2750 MAR 6 2006
Subject Property: Bill Moore Creek Stabilization DENR-WATER QUALITy
I.IETLA&DS MID STOMAVATER BRANCH
Approval of 401 Water Quality Certification with Additional Conditions
Dear Mrs. Schwalbach:
You have our approval, in accordance with the attached conditions and those listed
below, to place fill within or otherwise impact 40 linear feet of streams for the purpose of
stabilization at the subject property, as described within your application received by the
N.C. Division of Water Quality (DWQ) on January 17, 2006. After reviewing your
application, we have decided these impacts are covered by General Water Quality
Certification Number(s) 3495 (GC3495). The Certification(s) allows you to use
Nationwide Permit(s) 13 / 27 when issued by the US Army Corps of Engineers
(USACE). In addition, you should obtain or otherwise comply with any other required
federal, state or local permits before you go ahead with your project including (but not
limited to) Erosion and Sediment Control, Non-discharge, and stormwater regulations.
Also, this approval to proceed with your proposed impacts or to conduct impacts
to waters as depicted in your application shall expire upon expiration of the 404
or CAMA Permit.
This approval is for the purpose that you described in your application. If you change
your project beyond this approval, you must notify us and you may be',required to send
us a new application. If the property is sold, the new owner must be given a copy of this
Certification and approval letter and is thereby responsible for complying with all
conditions. If total fills for this project (now or in the future) exceed one acre of wetland
or 150 linear feet of stream, compensatory mitigation may be required as described in
15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in
the attached certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
401 Wetlands Certification Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733.1766 / FAX 919-733-6893/ Internet: httpl/h2o enr.state.nc.us/ncwetlands
An Equal Opportunity/Affirmative Action Employer -501.6 Recycled110% Post Consumer Paper
15111 I'VloorCl rock
llagc2 of '5
Pcbruary 24, 2006
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific
and general conditions of this Certification (or Isolated Wetland Permit) are met.
No other impacts are approved including incidental impacts:
Amount
Approved (Units) Plan Location or Reference
Stream 40 feet Bill Moore Creek
2. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all
specifications governing the proper design, installation and operation and
maintenance of such Best Management Practices in order to protect surface
waters standards:
a. The erosion and sediment control measures for the project must be
designed, installed, operated, and maintained in accordance with the most
recent version of the North Carolina Sediment and Erosion Control Planning
and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and
erosion control measures must be such that they equal, or exceed, the
requirements specified in the most recent version of the North Carolina
Sediment and Erosion Control Manual. The devices shall be maintained on
all construction sites, borrow sites, and waste pile (spoil) projects, including
contractor-owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be
designed, installed, operated, and maintained in accordance with the most
recent version of the North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the
reclamation in accordance with the requirements of the Sedimentation
Pollution Control Act.
3. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian
areas beyond the footprint of the impacts depicted in the Pre-Construction
Notification. All construction activities, including the design, installation, operation,
and maintenance of sediment and erosion control Best Management Practices,
shall be performed so that no violations of state water quality standards, statutes,
or rules occur.
4. No Sediment & Erosion Control Measures w/n Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters
to the maximum extent practicable. If placement of sediment and erosion control
Bill NluureCrcck
Pa-c3 oP5
February 24, 2006
devices in wetlands and waters is
natural grade restored within six
Resources has released the project.
unavoidable, they shall be removed and the
months of the date that the Division of Land
5. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification
or applicable Buffer Rules, and any subsequent modifications, the applicant is
required to return the attached certificate of completion to the 401/Wetlands Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC,
27699-1650.
6. Sediment and erosion control measures must be implemented prior to construction
and maintained on the sites to minimize sediment in downstream areas. Seeding for
a temporary cover of wheat, millet, or similar annual grain or permanent herbaceous
cover should occur on all bare soil within five (5) days of ground disturbing activities
to provide long-term erosion control. The projects should be accomplished in stages
instead of leaving large tracts exposed to further storm events. Erosion control
matting should be used in conjunction with appropriate seeding on disturbed soils in
steep slope and riparian areas. Matting should be secured in place with staples,
stakes, or, wherever possible, live stakes of native trees. Straw mulch and tall
fescue should not be used in riparian areas. In addition, because of an anticipated
difficulty in establishing ground cover during the winter, reseeding should be
conducted, as necessary, in the spring-time with a native annual and perennial seed
mix with a temporary nursery crop of wheat, millet or other grain.
7. Only clean, large, angular rock, large woody material, or other natural stream design
materials and techniques should be used for bank stabilization. Rock should not be
placed in the stream channel in a manner that constricts stream flow or that will
impede aquatic life movements during low flow conditions. Filter cloth should be
placed behind large rock that is used for bank stabilization. Properly designed rock
vanes should be constructed wherever appropriate on bank stabilization and
channel realignment stream reaches to improve channel stability and to improve
aquatic habitat. Root wads should be installed low enough in the bank so that a
significant portion (at least one-third) the root wad is inundated during normal flows.
Should large, angular rock, large woody material, or other natural stream design
materials and techniques not be sufficient for long term stability of the stream and
adjacent roadway, and concrete be incorporated into the design, measures which
would prevent surface waters from coming into contact with live concrete.
8. The channel should be restored to a more stable condition. However, under no
circumstances should river rock, sand or other materials be dredged from the
stream channel under authorization of this permit except, if necessary, in the
immediate vicinity of the eroding banks for the explicit purpose of anchoring
stabilizing or flow/grade control structures or for reestablishing the natural and more
stable stream channel dimensions. Stream bed materials are unstable in flowing-
water situations and are unsuitable for bank stabilization. In stream dredging has
catastrophic effects on aquatic life and disturbance of the natural form of the stream
channel can cause downstream erosion problems. The natural dimension, pattern,
and profile of the stream upstream and downstream of the permitted area should not
be modified by widening the stream channel or changing its depth. No backfilling
of stream bed materials is allowed under this authorization.
Bill NloureCreek
Paget of 5
February 21, 2006
9. Stabilization measures should only be applied on or near existing erosion sites,
leaving other stable stream bank areas in a natural condition. Grading and
backfilling should be minimized and tree and shrub growth should be retained where
possible to ensure long term availability of stream bank cover for aquatic life and
wildlife. Backfill materials should be obtained from upland sites except in cases
where excess stream bed materials are available. Berms should not be permitted
because they block the floodplain, constrict and accelerate flood flows, and often fail
and sometimes impede drainage during large flood events.
10. Repairs to eroded banks should be conducted in a dry work area. Sandbags or
other clean diversion structures should be used to minimize excavation in flowing
water. Channel realignments should be constructed by excavating the new channel
from downstream to upstream before connecting it to the old channel.
11. Heavy equipment should be operated from the bank whenever possible. All
mechanized equipment operated near surface waters should be inspected and
maintained regularly to prevent contamination of stream waters from fuels,
lubricants, hydraulic fluids or other toxic materials. Equipment used in stream
channel must be clean, new or low hour equipment. Exposure of equipment to
surface waters must be minimized to the maximum extent possible.
12. Disturbed stream banks and a 25-foot vegetated zone must be restored along the
construction sites to natural riparian conditions with native trees and shrubs (e.g.,
silky dogwood, rhododendron, dog hobble, red maple, silky willow, tag alder, black
willow, sycamore) to provide long-term bank stability and stream shading. Note,
silky dogwood, silky willow and black willow can be planted as live stakes collected
during the dormant growing season. Cuttings should be randomly planted on four
(4) foot centers from the waters edge to the top of the bank. Trees should be planted
on ten (10) to twelve (12) foot centers. Stream banks in these areas should also be
seeded with a native annual and perennial seed mix with a temporary nursery crop
of wheat, millet or other grain. Replanting of vegetation within disturbed areas
located within 30 feet of the streambank associated with any land disturbing activity,
repair, replacement and/or maintenance must be done in a manner consistant with
the Guidelines for Riparian Buffer Restoration immediately following construction.
(Please see attached.)
13. If pasture along the stream is to be used for grazing, a fence must be constructed
outside of the riparian zone and the stream to prevent livestock from entering these
areas.
14. Diffuse Flow
All constructed stormwater conveyance outlets shall be directed and maintained
as diffuse flow at non-erosive velocities through the protected riparian zones
such that it will not re-concentrate before discharging into a stream. If this is not
possible, it may be necessary to provide stormwater facilities that are considered
to remove nitrogen. This may require additional approval from this Office.
15. Turbidity Standard
The turbidity standard of 25 NTUs (Nephelometric Turbidity Units) shall not be
exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and
erosion control practices must be used to meet this standard.
Lull NloorcUreck
Pa"C 5 0f5
February 24, 2006
16. No Sediment and Erosion Control Measures in Wetlands
Sediment and erosion control measures shall not be placed in wetlands or waters
to the maximum extent practicable. If placement of sediment and erosion control
devices in wetlands and waters is unavoidable, they shall be removed and the
natural grade restored within six months of the date that the Division of Land
Resources or locally delegated program has released the project.
Violations of any condition herein set forth may result in revocation of this Certification
and may result in criminal and/or civil penalties. The authorization to proceed with your
proposed impacts or to conduct impacts to waters as depicted in your application and
as authorized by this Certification, shall expire upon expiration of the 404 or CAMA
Permit.
If you do not accept any of the conditions of this Certification (associated with the
approved wetland or stream impacts), you may ask for an adjudicatory hearing. You
must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition, which conforms to Chapter 150B of the North Carolina General
Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,
N.C. 27699-6714. This certification and its conditions are final and binding unless you
ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of
the Clean Water Act. If you have any questions, please telephone Mr. Kevin Barnett in
the DWQ Asheville Regional Office at 828-296-4657.
Sincerely,
Alan W. Klimek,'P.E., Director
Division of Water Quality
AWK/khb
Enclosures: GC 3495
Certificate of Completion
Guidelines for Riparian Buffer Restoration
cc: Brady N. Dodd,
US Forest Service
Post Office Box 2750
Asheville, NC 28802-2750
USACE Asheville Regulatory Field Office
DWQ 401 Central Office
DLR Asheville Regional Office
David McHenry, NC Wildlife Resources Commission
File Copy
Central Files
Filename: 06-0095. USFS. Bil[MooreCreek.Approval
Triage Check List
Date: 1/19/06 Project Name: Bill Moore Creek Stabilization
DWQ #:06-0095
County: Buncombe
Kevin Barnett, Asheville Regional Office
To:
60-day Processing Time: 1/17/06 to 3/18/06 -
From: Cyndi Karoly Telephone: (919) 733-9721
The file attached is being forwarded to you for your evaluation.
Please call if you need assistance.
? Stream length impacted
? Stream determination
Wetland determination and distance to blue-line surface waters on USFW topo maps
? Minimization/avoidance issues
? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
? Pond fill
Mitigation Ratios
? Ditching
? Are the stream and or wetland mitigation sites available and viable?
? Check drawings for accuracy
Is the application consistent with pre-application meetings?
Cumulative impact concern
El
Comments: As per our discussion regarding revision of the triage and delegation processes,
please review the attached file. Note that you are the first reviewer, so this file will need to be
reviewed for administrative as well as technical details. If you elect to place this project on hold,
please ask the applicant to provide your requested information to both the Central Office in
Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim
procedure as we slowly transition to electronic applications. Please apprise me of any
complications you encounter, whether related to workload, processing times, or lack of a "second
reviewer" as the triage process in Central had previously provided. Also, if you think of ways to
improve this process, especially so that we can plan for the electronic applications, let me know.
Thanks!
00 f •7 . .
A". United States
er?s Department of
Agriculture
Forest National Forests in 160A Zillicoa Street
Service North Carolina P.O. Box 2750
Asheville, NC 28802
Cyndi Karoly
North Carolina Division of Water Quality
401/Wetlands Unit
1650 Mail Service Center
Raleigh, NC
27699-1650
Dear Ms. Karoly,
File Code:
Date:
20000005
2530-3
January 4, 2006
o@ _
JAN 1 7 2006
UENR Vrt?(ER QUAt IT Y NCH
V{EWitlos N@ STORTIfdr,ATER Epj+'
This letter is to request Section 401 Water Quality Certification from the North Carolina Division
of Water Quality for U.S. Forest Service project: Bill Moore Creek Tributary Stream Stabilization
Project (VWP19). Located within the Pisgah National Forest in Buncombe County, North
Carolina, this project is situated on a headwater tributary to Bill Moore Creek of the French Broad
River Basin. Due to the storm events of 2004, the channel diverted down an old roadbed and
streambed scour occurred.
The intent of this project is to restore streamflow back to the original channel and stabilize
streambed erosion through the following tasks:
• Relocate the channel across the old roadbed by removing stream-deposited material from
the original flow path using handtools.
• Stabilize eroding streambed (headcut) sites by hand placing rock and woody debris at the
base of the headcuts.
The contractor will be directed to do the following related to sediment and erosion control:
• Construction will take place between April 16 and October 14, outside of the period for
brown and rainbow trout spawning.
• Work activities would not be scheduled on rain days.
• Minimize the degree and extent of disturbed areas.
• Stabilize any disturbed area along the stream and channel bank at the end of each workday.
• Stabilize channel banks with temporary and permanent seeding as well as straw mulch or
biodegradable and certified weed-free erosion control matting as work is completed.
Enclosed are the following materials:
• 5 copies of the PCN, application for 404 permit (Nationwide Permit #27).
• 5 copies of the vicinity map for the project.
• A check made payable to the Division of Water Quality for $200.00.
S
Caring for the Land and Serving People Printed on Recyded Paper
i°M?
If you require any additional information, please contact me at 828-257-4214.
Sincerely,
Brady N. Dodd
Forest Hydrologist
cc: NC Storm Recovery Team
At
Office Use Only: Form Version May 2002
o(300 5
USACE Action ID No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
I. Processing
1. Check all of the approval(s) requested for this project:
X Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
X 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide Permits 3 & 13
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here:
II. Applicant Information
?a? 2006
1. Owner/Applicant Information JAN
Name: Monica Schwalbach ( Acting Forest Suycrvisgo _VdATERGO?''`??r yci?
?? gl?f?g{tR ?-„
Mailing Address: U.S. Forest Service e,?DSAt1D
National Forests in North Carolina
P.O. Box 2750
Asheville, NC 28802-2750
Telephone Number: 828-257-4200 Fax Number: 828-257-4263
E-mail Address:
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Brady N. Dodd (Forest Hydrologist)
Company Affiliation:
Mailing Address: U.S. Forest Service
National Forests in North Carolina
P.O. Box 2750
Asheville, NC 28802-2750
Telephone Number: 828-257-4214 Fax Number: 828-257-4263
E-mail Address: bdodd(a)fs.fed.us
Page 5 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Bill Moore Creek Tributary Headcut Stabilization
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Buncombe Nearest Town: Enka, NC
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): I-40 west to exit 44 then south on
Highway 112. Go past New Morgan Hill Hill Church and turn south on Bill Moore Ck. Road
(known locally as Reeves Cove). Turn southeast on unnamed lane to Threadway residence.
Access to the project area is through Threadway private land. Take foot trail '/2 mile to
intersection of old road. Headcuts are located at intersection with old road and unnamed
tributaries that intersect the road.
5. Site coordinates, if available (UTM or Lat/Long): N/A
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres):
7. Nearest body of water (stream/river/sound/ocean/lake): Bill Moore Creek
8. River Basin: French Broad
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at littp://li2o.enr.state.ne.us/adinin/neaps/.)
Page 6 of 12
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: As a result of the September 2004 hurricane flood events the
unnamed tributaries to Bill Moore Ck. at the intersection of an old road have cut over the
road fill. There are no culverts to pass the water through the road bed. These head cuts are
approximately 2 ft in depth
10. Describe the overall project in detail, including the type of equipment to be used: The intent
of this proposed project is to stabilize the head cuts to minimize erosion and sedimentation
into Bill Moore Ck. downstream. This will be accomplished by hand crews installing
drainage on the road and placing rock or woody debris from the surrounding area into the
head cut.
11. Explain the purpose of the proposed work: The intent is to stabilize the head cuts to minimize
erosion and sedimentation into Bill Moore Ck. downstream.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe pen-nits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
Page 7 of 12
k A
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, pennanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: Impacts to the tributaries to Bill
Moore Creek are expected to be minimal due to the nature of the handwork. A temporary
increase in turbidity can be expected as rock and woody debris are placed into the head cuts.
Positive impacts are expected as the sites stabilize as a result of the proposed work.
2. Individually list wetland impacts below: N/A
Wetland Impact
Site Number
indicate on ma)
Type of Impact* Area of
Impact
acres Located within
100-year Floodplain**
(es/no Distance to
Nearest Stream
(linear feet
Type of Wetland***
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps arc available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://www.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (detennination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: N/A
Total area of wetland impact proposed: N/A
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact Length of Average Width Perennial or
Site Number Type of Impact* Impact Stream Name** of Stream Intermittent?
indicate on ma) (linear feet) Before Impact (please secif
Page 8 of 12
jr
Site 1 Moving flow
back to channel 20 Tributary to Bill Moore
Creek 4 Perennial
Site 2 Armoring
headcuts 20 Tributary to Bill Moore
Creek 4 Perennial
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usgs. ov. Several intemet sites also allow direct download and printing of USGS':maps (e.g., w\vw.topozone.com,
www.mapgucst.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 40 feet
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
Open Water Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres
Name of Waterbody (if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation N/A
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stonnwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Page 9 of 12
P
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
These unnamed tributaries probably do not support a fishery but may provide rearing habitat.
Therefore, work will be conducted outside of the spawning period of October thru April. Work
will not be conducted on rainy days or during periods of high flow.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - hi accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
littl2:Hli2o.enr.stateaZC.tis/ncwetlands/strnl,t,ide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
Page 10 of 12
.R ,
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at littLi://li2o.cnr.stite.iic.us/wrii/iiidcx.fitni. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A'
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes X No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for enviromnental documentation.
Yes X No ?
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No X
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Page 11 of 12
r 1?
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No X If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
N/A
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
N/A
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No X
Page 12 of 12
+ - - vA
Is this an after-the-fact permit application?
Yes ? No X
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applic, nt/Agent's Signature ate
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 13 of 12
i
/r' 7+ _«'?• '-- ,. ,1--'1 - , -:.lr- •?' '•'.3. ?r` 1 r :?. `, ?''_ :?-`^-h'rr. ?l ?l: •.???,-_'•`?;_ ai?i.L'7ai i?-Ir a-?.? _?; ?.t>????a
+ ji 'I ?t'?? /'`• J `'I ,?'? {?Ilr 1 _ •f` ^ f ~l ?+? .?. ---_-_ 7•'.,. Illr I? G• `f II 1
?•'._ I , 1?`-'..5'-kt•=/s''•-'4 .. ,7? r a je dU.F'iilt-f?{7''
I F +` r .? ? I ?. I
Bill Moore Creek Tributary Stream
'.L.1..'"r t Stabilization Project'(VWP.19)
Vicinity Map
I 5II
' .K?' `J. Jv ?' I ? I ?,I , wv. "'l .?? ?- ?,/?.• • '??"f I, I I y -- ,f?',.' 4' ? : '','? , ?= ?1,' ? I''?`' ' ' r ~ +i
%r' J1 ? ??yy,~ ]? _ ? I t'y Lltil ., ?11 r`'?l f{rr`??r.•!' .f'.., 1 ?? r _ - _,'?- .-?
I'
?. ` .,',' r f ' r ?r - ti `? ', '. f.J', I (? .'?.Y ' : I r rJ p r.a•? 4-?` ' r ?. ?? y"
?r -7-'??' ? ? ?',f?- 1 '-_- - k-` ?! 'y'', '• 'i. J x•115 r? 0''1. ?++?{I+
v 1 ?- }?t?' •+
I
Af f. ti I lj?? 1 ?t
r•}- - ? ?iJ..? ,?? I.- ?~t t' ?ti'I '_ -. •-_ ,??, I`Ir I 'fr :{ r -??ti`?,-r ? J., :? - r• !'1I 1•.I - ! Il,?rrJ?_I ? ?'
- ? .f^`' .. \ ,_: 1. 1 ' y r ? , _ i?1,' r •i . ? 'i 31'- ?r ?ry?t`vf _1 , ' ? r_..{v' -I i ~ -? ! ??
{7.???_?rr??._.11' rf _ ?\ `? j?rIr? r. '!J: ':f•? Il l.?il, •`5. p?,, ?• - .-{.i_:'1' f?(.~ :l:rl-?=1• _ - __
N
r` n
L--
?,'?' /r `rr'. ^I+f'? ?,?.± •5? - ', .
1. .?'f-T ? J ii, - •a ?'c Y'`'??•_-y'`??II I, ?i?Il•'- -'1 -- - - _ irk-_rr;r ,1 ?ti?Lr _ yY r _
, = r--•-' - - - 'lyl I ,r
' jII',?`? ? J,- ? ?•`_? ` I r ,},J???.';rt 1, I' 14_ .II' r.,l
SR3439 c-
1 7: tl? '7-•- .. },?%? t '??`-. 1 r ?'' L r Jp. , ?, `??-T' ,!/F , r' `, - ? ?-.+? ,'i.?',G-_ I' ' 1.1 `ll? ( ? ????- i .%-? r ? ?
i04 -,? ??F _?r'•_ _- '>: ..r - ,I'? Ir! \ y-'r?,l _ I'I1 'J '?•t1 ?I'._ -?+,_ mil 1; it r{{•'yi#.?.? '_"'r.{ 65{I
i r.? ?' ? ?? {' _ ,?I? \ ??rti,l >_'1 `•~li.'I _ - FSR 5096 J rte. _ .'t_ ?r14 I S , 5, v ',•?.^ :?? r'' -C
Iii '? ' r '`•) f '`? +? .5', ,? 1 ? ' \ ?? _
r•••r-"'y I ' 1 ' r^. i ? ? ?`?• r I? ? ? 'ti , t .•?'""'?L;-,. ?+
g"4
I ?4t ? ! ? 'I`f ? .I? rr}}1l,5?'^• f - --?"? ' ? _ ? rV.?' I .? .....?..r r?l)1?11111:5 114' `• ??
+ •.i ?.-, _?.ti' ,'•r'j.`? 'r,%?l. _-_ ??I'_4, ' •'j.''r 5'1r'? I f - - -~?`',?` I'r ?.?..?' -1` I',/• ? ?'rl? I ??? II -? ? ,'_'y
- ?f _'I--:'.?i+ : I?? _---'?'rjF J I Ir'ir? r+ .. I i, ??fr + r? ?_ ?, } t t -'?"•-.._.,
' r? i. '1 ilr :. ,:? _. 1 _? =./J!?`1"- -' 'l •,,`.t?{ ?5i!11i1 _ ? • ? ?, a' 1? '????ti
r ! , r - f , 1 ?J I Y,L. r , J I' r? F? L y`,•L I =i'rl ?] r t I r
?I CC?? 'ti'[• C- ll J 1.
i+• ?'?, ifl r ?, ntr I - r f I I1 ..i' ,-__ '?7p; --? V.••., 1' O
Irr •r' i' r ? 1 .,Y?. , IT`?/.f???,?,_t ?'?
Air
'???u •,1.`i f 1 1 -: rr?'fr;_ _`?? ?.' .1 ?% ???Y 4.It_ r° r r' ,,y-?' I ''.. ? ?
,jr,??; ?/ I ??'1 r _ 1r: ??
Approximate
??? ,, 1 1 r"r; l j!`f ,Tlv?? r? +'_+r 'tf ++r.?5 i lr^': ` ;i 1.I / location of access road
III , ,'.I ( Ir?' , ? '1• ' ?i-?ti +I . r? , r'1''.I'S`A^ 1. J -_ r , _.;: ? ?? ? V J f \? ? 4? ??
1 rll li???111 •??r?j ,-'-+, S?,,r`, }?.?-.- ? ? IJ r I ?'? "?~-?'l r' 1? ? ? Site 2
Site 2
• •1 - I
Site 'i Site 1
?? '. ,? •
Irr I ?.f_•? -._- ? \II ?? ?1'!'...F,?r:•ir_' ? !I:t;- t'. ; t'? •1`' ',pct'!' ?-.t•i+ ' .7 :' t a' J? ??" ?_ ? ? ? ?''? ? ? ~kti.., i(
? .` 1 .? ?.''a' ?'\:.. ''w';>j ;_;' ','•ViY •~1?" ` / I; II f ?s..i,. f(I l f 1
- ~?• f_..l' I:-• i r`-•11,y?? L 5?:? ?. 1 Y: ?'`? 1 ' '^?``r I' I ? ll I 'r I!? ?J r ? ! ?.? '1`??`??' 1? f? ? r"a ? ? --? 1
i1 `l l_-? - Isd ti . y, .. 1-?' II /.•w, II ! I 1 II r .? .s??•
_ . ?-?, s ??::- . , -?- :?• _ 1 ' S /Ifs'
Y -.?.7.'.i?\''_'?_?.-.?-=?:.?„t.?;ir_..?: _ s:.= .,.. ?.?.._?J..:i=.:`r.:-:.. '?' r. . •I: I Ilca. %"1
Office Use Only: Fonn Version May 2002
0 0 0 0 0 5
0
USACE Action ID No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
Check all of the approval(s) requested for this project:
X Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
X 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide Permits 3 & 13
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division zs? nt Area of
Environmental Concern (see the top of page 2 for further l t m , 1Applicant Information JAN 1 7 2006
DENR - WATER QUALITY
1. Owner/Applicant Information WETWiDS A0 STORLMATER ERMCH
Name: Monica Schwalbach ( Acting Forest Supervisor)
Mailing Address: U.S. Forest Service
National Forests in North Carolina
P.O. Box 2750
Asheville, NC 28802-2750
Telephone Number: 828-257-4200 Fax Number: 828-257-4263
E-mail Address:
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Brady N. Dodd (Forest Hydrologist)
Company Affiliation:
Mailing Address: U.S. Forest Service
National Forests in North Carolina
P.O. Box 2750
Asheville, NC 28802-2750
Telephone Number: 828-257-4214 Fax Number: 828-257-4263
E-mail Address: bdodd a fs.fed.us
Page 5 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project:Bill Moore Creek Tributary Headcut Stabilization
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN):
4. Location
County: Buncombe Nearest Town: Enka, NC
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): I-40 west to exit 44 then south on
Highway 112. Go past New Morgan Hill Hill Church and turn south on Bill Moore Ck. Road
(known locally as Reeves Cove). Turn southeast on unnamed lane to Threadwav residence.
Access to the project area is through Threadwav private land. Take foot trail '/2 mile to
intersection of old road. Headcuts are located at intersection with old road and unnamed
tributaries that intersect the road.
5. Site coordinates, if available (UTM or Lat/Long): N/A
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres):
7. Nearest body of water (stream/river/sound/ocean/lake): Bill Moore Creek
8. River Basin: French Broad
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at littp://li2o.cnr.st ite.nc.us/admin/maps/.)
Page 6 of 12
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: As a result of the September 2004 hurricane flood events the
unnamed tributaries to Bill Moore Ck. at the intersection of an old road have cut over the
road fill. There are no culverts to pass the water through the road bed. These head cuts are
approximately 2 ft. in depth.
10. Describe the overall project in detail, including the type of equipment to be used: The intent
of this proposed project is to stabilize the head cuts to minimize erosion and sedimentation
into Bill Moore Ck. downstream. This will be accomplished by hand crews installing
drainage on the road and placing rock or woody debris from the surrounding area into the
head cut.
11. Explain the purpose of the proposed work: The intent is to stabilize the head cuts to minimize
erosion and sedimentation into Bill Moore Ck. downstream.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe pen-nits issued for prior segments of the same T.I.P. project, along with
construction schedules.
N/A
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
N/A
Page 7 of 12
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: Impacts to the tributaries to Bill
Moore Creek are expected to be minimal due to the nature of the handwork. A temporary
increase in turbidity can be expected as rock and woody debris are placed into the head cuts.
Positive impacts are expected as the sites stabilize as a result of the proposed work.
2. Individually list wetland impacts below: N/A
Wetland Impact
Site Number
indicate on ma)
Type of Impact* Area of
Impact
acres Located within
100-year Floodplain**
(es/no Distance to
Nearest Stream
(linear feet)
Type of Wetland***
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps arc available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://wwNv.fcma.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (detennination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: N/A
Total area of wetland impact proposed: N/A
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact Length of Average Width Perennial or
Site Number Type of Impact* Impact Stream Name** of Stream Interinittcnt?
indicate on ma (linear feet Before Impact (please secif
Page 8 of 12
Site 1 Moving flow
back to channel 20 Tributary to Bill Moore
Creek 4 Perennial
Site 2 Armoring
headcuts 20 Tributary to Bill Moore
Creek 4 Perennial
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usgs. 'ov. Several intcmct sites also allow direct download and printing of USGS maps (e.g., www.topozonc.com,
www.map(juest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 40 feet
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
Open Water Impact
Site Number
(indicate on ma
Type of Impact* Area of
Impact
acres Name of Watcrbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.
List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
Pond Creation N/A
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream
Describe the method of construction (e.g., dam/embankment, excavation,
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
? wetlands
installation of
Page 9 of 12
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
These unnamed tributaries probably do not support a fishery but may provide rearing habitat.
Therefore, work will be conducted outside of the spawning period of October thru April. Work
will not be conducted on rainv davs or durina periods of hieh flow.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic enviromnent are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
littp:Hli2o.enr.state.nc.us/ncwetlands/stnn.?ide.litml.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
Page 10 of 12
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at littp://li2o.enr.st ite.ne.us/wrp/index.htni. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A'
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes X No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes X No ?
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No X
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Page 11 of 12
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No X If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet Multiplier Required
Mitigation
1 3
2 1.5
Total
Gone 1 extends out JU teet perpendicular trom near bank of channel; Gone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260.
N/A
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
N/A
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No X
Page 12 of 12
Is this an after-the-fact permit application?
Yes ? No X
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applic• nt/Agent's Signature ate
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 13 of 12
?`R ',?: '? + ?• ? ti ? s i ?;i r-.-:i is a ,`...
?' ti _ - _ `?X?7= -;fir' '.,r ?_? = - --= r: "-• ., - p;-,z~-+'i ? I ?'-_'r'(. _-- y ;? ?1??-:?
k.`Q_;.'- - 's }'. t?! ?' ?: -''.. .• J I rlt.F?(?? 1 ??J-" . _ ;% - .,!?,i''?• -'?•_? k, ?, ? '.7I,', _f l' 1'„??II Sir ?'_f.. -1 Ii --
`,.,•'?.
Bill Moore Creek Tributary Stream
r ? J V fff f''^ .?-xr? - .?';??-•,? '' ,- I, i : ri.,'-' e'
Stabilization Project (VWP.19)
t.??rY?.'. ?-??? Y .I '?Jr` •l f?k..ti - '''L^r' rr ?' - ` -S- j f' r _ _ ?
?ri
11 Vicinity Map
:?c11 ?•?;'? I ''1 I' _ .r r ._ y ?f :•'Y,?r ? it ? __ • r'r ,? • ?I : ``,fir _ ,l' ? ? ,
?'?t ' ? • ;' J? ?•r_ ?!r_' J? __ ? _ ?, '. t t ?'.i I'. I i I f -?- .' J ? . ? r r ? _ ?.?•r- ,?.-• i ??? < r _ '/
_74,4 M
'???••air-?'I-
'`
•sf, ?? f_ '"- -, I -'-? ;?': `' ''??' I Ill?.'i:? 1 Rr Ijl \ ..;t? '':•`., - _ Ir, "',? .j ,_-`. - _?.??rtfr<; _ _ ?I-?--?::?-mot i ••• Z a.1
IF+- ?`.?.r'? 5 ,'?'' -ls,.• ;.?• r-•'?' `.`•+ ,I,;?Y' `.+,'`?. - - ?., la - _ - ill ?? ^'o< r
`'t ?-/I?ri Jf-•-_ 11.1YI I:??'-?? } \'s _- _ '1j-;'I??'l.?l l \ •'+. +i -_- ?i,l? _ ./f? ? r _ _.? •???1?+7'??`??"F''{?"?" ?= IV tai ? ??
/?. _'1 '• ?I i .•,,-! 5? _ = rr?J} ?il l; I,I -T: +t t? ,? - _? „ _ 'r? _1``: ;`:..`-?~- ..t'r •l r "-~ n?
'I
J_• 't? ?-^ _'?rf? ??; r ?1 ?`',i ? ti? ?{' fr`-- Mfr l??f '11 :1 _ r-_- - -y'I?I II1 ="-y }. ,!' _? ?-f7 N t°??
. 1?L -`~ ? ? .U *?5 X . I ' ?i r .• ? s?? 'r{?-• I li- _ ?il, I J I r J ?,-i I I ? _ - -Y _, a
} `r,.n\'t4. '-,. 1 r '. _ , r r• I': r ,??- .Jg %l,•-•? :
? r 6)
•. _ ?.,- ,' '? ' ( •'IIII. (-?-rc + ['v?
'1^_ •'?-j `_?= 7rrr 'I - 1.,r s ?
?f
?• ,? ?Q?_% ,i f` rli: __ `s rl, 4rr l ?` ,- I?i.1„?-?`. f .' `;1, ?I 4-_- r?ht ll- __ K? ?,i •''t!`,,,?""?i? 'L'??? :J:" i
?;' '?.rrr^ %fJ`-,?r, _ `•„''? \ i'L r.,It -- ?.'r'I.' = `I FSP5096 I r-` •'_;;t I,t?'?'I ;? : .- '?1
i? };t ?,'r` _-- • I I rj ???' ?-t ',+fi`•Ij?j?1 ?'.` ? . - _ ?? I ?'-t`'?" __ ? _r I I'?} 1 ti's ?r ?.,_?
?
,iJ ?r =-?? -r`? - r--`'1I1?`r> 1. r F?',5?'?;; '--''I r I`.I` -? « -r• ?'I rrtt 1`L"5`i. I uF'`'i
?? :--.}_`?s ,'t???. ??ltJ ^? ?~- It?l?? ?•?' r 111`}?'r {t;,r
J
J 91
1r?.1.1. JI h-4?1: ..! '? ., ??, ?7? _.-111 r - -? '>? ?•Y'•- _ +,? a
tl it r ?}' r F f • f f 1 ?' •;'??? ' `4 \ ??.-- ''•'•!_.? f 1 `f I ? :-? '? ? I a_ ? _ y? ? ?'+...)
;Ir,':I',+('? 'I - _ ,i. -_ ?1_iT'n'ri/J?? c' %? / ,}`.? 0 I `l.
Approximate
_ ?L? location of access road
r ,.
•L~ T r
?!' '1 ' r -?•? i r? - '? s''t iti'.5?` r'1r
-
1, l I k. ! _ t =_ J _ /_ 1 •?_- '? ?r ` \ 5fr^?
fllu?r,rlrty titi-1 a?` ./ 7;ti, i 'I r `}_lr Site 2
Site L ? •?•'? I .I?'`?e', • -- I -?--}? ? ? ` f r, ?, ti
1 's .I'?:. '%' -????? ; .'' ` •;? l t.
r I -' -•J i ;r \?t Y! Site e ;
'r.,•I??y,? („ ` : .,:;;.r:•. =? Site 1 t.? ,` l f
r: I F-,-• -.s'?,I?--.?41 +T ;r IItl11,1? ! 1 t''ir;r? -_'ti?ir /?•r-ti 1,.- ??-. t?1 'y"
C"Fy J ? •£-t • ? ? ? I. r?.ti..,:?s' ? y r 1 ` ? ? ? !r' "?? ? ? ? k??'?
71,? '' li4 L -•'?.5;'?. II. F Iti_r.?J?
_ r r y r? ' ~ ~ 1 5 I ;1 1 ( ?`l ::: j ?J?l r-V1 u r \? +?
_ _ F--?_ t ??',•r:-?;,? ? II +sl i ~?vSY` I t`,v*', ti (.'? I'rlrltl? ?S 4 fit/-_-- ?,( ", : r j { ?\ ?a? t
- ~-i ?.~_ •'' _?\??r -. ?'-, `l,r ? lr>_ ' L1? fj'?` r.l ' } -'•J -Sf?J ? y .r•
- ?- • r•?`i 1, ?-.'?. ` (?,,?? ? - ? , ?, ?. (.. :', 21_y ??, 1 ? ? 11`j I} iiJ ' ? j+ ??4 4 ???'ti j(j+r? ?
,? - ? _?r: ,11111 '? :i-I?' •?.:?I •:,1';:i';. _?;,!•LL?r?+},.I ?1 - J ? -? ? ?`?, ! ?-1 i v,. I ?,?'? ? .
- j, t•- i,1 L ! iL. i tLLSiu -' i= = .iti t :.i4