Loading...
HomeMy WebLinkAboutNCG170411_Name-Owner Change Form_10/8/2018Environmental Quakry I. Permit Information I. Please enter the permit number for which the change is requested. NPDES Stormwater Individual Permit #: NC SX XX XX X -OR- General Permit Certificate of Coverage (COC) #: NCG170411 Use this link to check the permit contact information that is currently in our database. II. Permit Status 11. Permit status prior to requested change. a. Permit issued to: Mocaro Dyeing and Finishing Inc Conpany�Jane b. Person legally responsible for permit: First name:* Middle name Jody Title: Permit holder's mailing address:* Phone #:* 704- 878- 6645 c. Facility name:* d. Facility address:* Fax #: Last name:* Austin Street Address PO Box 6689 Address Line 2 City State / Rovince / Fbgion Statesville NC Fbstal / Zip Code Country 28687 USA Mocaro Dyeing and Finishing Inc Street Address 2201 Mocaro Dr Address Line 2 City State / Rovince / Pegion Statesville NC Fbstal / Zip Code Country 28677 USA e. Facility contact person (prior to change, optional): First name: Middle name: Last name: Phone #: III. Requested Change Information 111. Please provide the following for the requested change (revised permit). a. Request for changes is a result r Change in ownership of facility of: * r Name Change of the facility or owner b. Permit to be issued to: SDFC,LLC Company Nacre c. Person to be legally responsible for permit: First name:* Middle name: Last name:* Lance Dunn Title: Permit holder's mailing address:* Street Address 2201 Mocaro Dr Address Line 2 Oty State / F rovince / Fbgion Statesville NC Wstal / Zip Code Country 28677 USA Phone #:* 70487 86645 d. Faciltiy name: * Email address:* lance@s ynergydf c.com SDFC, LLC Is the FACILITY contact different than the person legally responsible above?* r Yes r No IV. Permit Contact Information Is the PERMIT contact different than the person legally responsible above? f Yes r No V. Permit Facility Activities V. Will the permitted facility continue to conduct the SAME industrial activities conducted prior to this ownership or name change:* r Yes r No VI. Signature In the case of an ownership change request, certifications must be signed by both the permit holder prior to the change and the new applicant. For a name change request, the signed Permittee's Certification is sufficient. This completed application is required for both name change and/or ownership change requests. North Carolina General Statute 143 - 215.6 b (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Permittee Certification: I attest that this application for a name and/or ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed, or if all required supporting information is not included, this application will be considered incomplete. Permittee Signature jP r dui Fbrrrit-holder prior to the ownership change, or permt-holder authorizing the narre change Will another person need to complete or sign this form before it can be submitted? No problem! Simply CLICK the "Save as Draft" button below and send the URL link to the other party to access the form. Questions? Call Laura Alexander at (919) 707-3640 or e-mail her at laura.alexander@ncdenr.gov. Initial Review Project ID:* NCG170411