Loading...
HomeMy WebLinkAboutNC0021491_Authorization to Construct_20181008 ���r'aFHO %fi fi��, /i ?iy' s 12766d ;wLrsn,s „ ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretory LINDA CULPEPPER Interim Director October 8, 2018 Mr. Leonard Barefoot Interim Town Manager Town of Mocksville 171 South Clement Street Mocksville,North Carolina 27028 SUBJECT: Authorization to Construct A to C No. 021491A02 Town of Mocksville Dutchman Creek WWTP NPDES Permit No.NC0021491 Dear Mr. Barefoot: A letter of request for an Authorization to Construct was received June 29, 2018, by the Division of Water Resources (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 0.98 MGD Dutchman Creek WWTP, with discharge of treated wastewater into the Dutchman Creek in the Yadkin-Pee Dee River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Installation of new headworks consisting of one(1)new mechanical bar screen and one(1) new manual bar screen with capacity to handle 3`.43 MGD at peak hourly flow each; installation of new splitter box; installation of two (2) new 60 ft diameter by 14 ft side water depth circular clarifiers; construction of new sludge pump station consisting of four (4) new 230 GPM 7.5 HP submersible RAS pumps and two (2) new 125 GPM 3 HP submersible WAS pumps; installation of two (2) new 122 GPM 10 HP scum pumps; demolition of existing sludge drying bed; construction of one (1) new sludge thickening building; installation of one (1) new rotary drum thickener rated for 59 dry lb/hour; installation of one(1)new 253,662 gallons aerobic sludge digester;installation of three(3) new positive displacement blowers with a minimum flow of 516 CFM at 6 psi each; installation of new polymer feed system consisting of two (2) new 0.008 GPM diaphragm polymer feed pumps and two (2) new 55 gallons polymer storage tanks; construction of two (2) sludge loading stations; installation of all required pipe and controls; demolition of two (2) existing clarifiers and decommissioning of third existing clarifier; demolition of �DEQ�NORTH CAROLINA Deportment al Environmental Duality North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11611 Mail Service Center I Raleigh,North Carolina 27699-1611 919.707.3601 Mr. Leonard Barefoot,Interim Town Manager October 8, 2018 Page 3 of 3 weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the project plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. The issuance of this ATC does not preclude the Permittee from complying with any and all statutes,rules,regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Bing Bai at telephone number(919) 707-3610. Sincerely, BP1'",P2-> - i'Linda Culpepper Interim Director, Division of Water Resources With Engineer's Certificate attached: cc: DWR Winston-Salem Regional Office, Water Quality Programs Central Files ecopy: Charles A. Willis, P.E. Willis Engineers Email: chuck@willisengineers.corn NPDES File Without Engineer's Certificate attached: cc: Davie County Health DWI/Trupti Desai =D_EQ)NORTH GARQI,�NA Depalme'rtol ronmmtnl OuN(ry North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11611 Mail Service Center I Raleigh,North Carolina 27699-1611 919.707.3601 Town of Mocksville Dutchman Creek WWTP • NPDES No. NC0021491 Authorization to Construct No. 021491A02 Issued October 8,2018 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina,having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Dutchman Creek WWTP, located in Davie County,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of new headworks consisting of one (1)new mechanical bar screen and one(1)new manual bar screen with capacity to handle 3.43 MGD at peak hourly flow each; installation of new splitter box; installation of two (2)new 60 ft diameter by 14 ft side water depth circular clarifiers; construction of new sludge pump station consisting of four(4)new 230 GPM 7.5 HP submersible RAS pumps and two (2)new 125 GPM 3 HP submersible WAS pumps; installation of two (2) new 122 GPM 10 HP scum pumps; demolition of existing sludge drying bed; construction of one (1)new sludge thickening building; installation of one (1)new rotary drum thickener rated for 59 dry lb/hour; installation of one (1)new 253,662 gallons aerobic sludge digester; installation of three (3) new positive displacement blowers with a minimum flow of 516 CFM at 6 psi each; installation of new polymer feed system consisting of two (2)new 0.008 GPM diaphragm polymer feed pumps and two (2)new 55 gallons polymer storage tanks; construction of two (2) sludge loading stations; installation of all required pipe and controls; demolition of two (2) existing clarifiers and decommissioning of third existing clarifier; demolition of existing sludge pump stations; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No._ Date / 7 Mail this Certification to: Attn: Bing Bai ��Q� Complex Permitting Unit ' ' DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh,NC 27699-1617