HomeMy WebLinkAbout10.09.2018 INSERT 2A - IFC REV 0 CUMBERLAND SPREAD 10A PCSWDRAWING PATH: Q:\7235\17\008 Dominion - ACP Contractor Yards\sy10A\CUMBERLAND PCSW2.DWGDRAWING NUMBER
PROJECT NUMBER BYDESCRIPTIONDATENO.CHKAPV9751 SOUTHERN PINE BLVD
CHARLOTTE, NC 28273
(704) 523-4726
ENGINEERING FIRM
LICENSE NUMBER: F-0176
PROPOSED CONTRACTOR YARD (CY 10-A)ATLANTIC COAST PIPELINE PROJECTCUMBERLAND COUNTY, NORTH CAROLINA7235-17-008
2A 5STORMWATER WETLAND - LANDSCAPE PLANSTORMWATER WETLAND 222
SCALE 1"=10'
STORMWATER WETLAND 221
SCALE 1"=20'
WETLAND BOUNDARY
PLANTING DESIGNATIONS
PLANTING SPECIES ID
TEMPORARY INUNDATION ZONE
SHALLOW WATER ZONE MHK0CJSLEGEND 10/08/20181
JRH1
1
1
1
1
4
4
5
2
5
5
3
3
3
3
6
6
3
1
1 1
1
1 1
1
3
3
3 3
3
4
6
5
2
2
5
4
4
6
FOREBAY
FOREBAY
FOREBAY
FOREBAY
DEEP POOL
DEEP POOL
#
PLANTING NOTE:
1.PLANTINGS SHALL BE PLANTED ON 2-FOOT CENTERS IN ROWS IN THE DESIGNATED AREAS AS SHOWN
BELOW. PLANTING SPECIES ID NUMBERS ARE REPRESENTED IN THE DESIGNATED AREAS.
DEEP
POOL
DEEP POOL
DEEP
POOL
NOTES:
1.THE SHALLOW WATER ZONE SHALL BE PLANTED
AT A MINIMUM DENSITY OF 50 HERBACEOUS
PLANTS PER 200 SQUARE FEET (EQUIVALENT TO 2
FOOT ON CENTER SPACING).
2.THE TEMPORARY INUNDATION ZONE SHALL BE
PLANTED ACCORDING TO ONE OF THE
FOLLOWING OPTIONS:
(a)50 HERBACEOUS PLANTS PER 200 SQUARE
FEET (EQUIVALENT TO 2-FOOT ON CENTER
SPACING);
(b)EIGHT SHRUBS PER 200 SQUARE FEET
(EQUIVALENT TO 5 FOOT ON CENTER
SPACING); OR
(c)ONE TREE AND 40 GRASS-LIKE HERBACEOUS
PLANTS PER 100 SQUARE FEET
3.NO WOODY PLANT MATERIALS WILL BE
INSTALLED IN EMBANKMENTS OR MAINTAINED
ACCESS AREAS.
4.NO CATTAILS SHALL BE PLANTED IN THE
WETLAND.
5.PLANTING SHALL BE INSTALLED SEVERAL WEEKS
PRIOR TO THE FIRST FROST.
6.PLANT MATERIAL, SPECIES, SIZE, PLANTING
FORMS, AND LOCATIONS SUBJECT TO CHANGE
BASED ON AVAILABILITY AND FIELD CONDITIONS
AT THE TIME OF PLANTING. PLANT MATERIAL
SPECIES, PLANTING FORMS, QUANTITIES, AND
SIZES ARE SPECIFIED IN TABLE 1 AND 2.
7.IMMEDIATELY FOLLOWING CONSTRUCTION OF
THE STORMWATER WETLAND, BI-WEEKLY
INSPECTIONS WILL BE CONDUCTED AND
WETLAND PLANTS WILL BE WATERED BI-WEEKLY
UNTIL VEGETATION BECOMES ESTABLISHED
(COMMON SIX WEEKS).
8.NO PORTION OF THE STORMWATER WETLAND
WILL BE FERTILIZED AFTER THE FIRST INITIAL
FERTILIZATION THAT IS REQUIRED TO ESTABLISH
THE WETLAND PLANTS.
9.PLANTING AREA SHALL BE INSPECTED IN 12
MONTHS AND SUPPLEMENTARY PLANTS WILL BE
PLANTED TO REPLENISH LOSSES.
TWO PLANTING MATERIAL SOURCES:
MELLOW MARSH FARM, INC.
1312 WOODY STORE ROAD
SILER CITY, NC 27344
PHONE: (919) 742-1200
FAX: (919) 742-1280
HTTPS://MELLOWMARSHFARM.COM/
CAROLINA WETLAND SERVICES
NATIVE PLANT NURSERY
CAROLINA WETLAND SERVICES
550 E WESTINGHOUSE BLVD
CHARLOTTE, NC 28273
TEL: 704-527-1177
FAX: 704-527-1133
HTTP://WWW.CWS-INC.NET/NATIVE-PLANT-NURSERY/ISSUED FOR CONSTRUCTION