Loading...
HomeMy WebLinkAbout20052205 Ver 1_Complete File_20051214x`11/ Q Project No. Apphcant: Project Name: ` 1 1 I rILe- Wa -D iiCe OC 13s Liar,C:- 0Aolate'? et.a„4 N cu17 to . , ? Old / Certificate of Completion Upon completion of .all wor,c approv°d within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, t,jd applicant is required to return this ce^iticate to the 401 ?'et Division. of ti?'ater Qi a[ity. 1650 flail Ser;ic_ Cen .r. Rale:y,a_, , 27699-16-50. ..`??_?Ianw unit. - " : rh Carolina the applicant. t; :e applicant's ,ham NC, This form may be returned to DWQ by those. au,, t,i1Z?d' agent. Or the preject engineer. It is not necessar/ to send certificates from ail of -4,PP cant's Certification used jn the observation 4the construction suchr that sthee construction ewao ob ??b?tiC?, be bua( compliance and intent of the =101 Water ,Quality and diliaence was uhtn substantial and other suppcrtina- materials: ,Quality Certification and Buffer Rules, the approved plans andsr^ecifications 1 Signature: Date: { 9 0 Agent's CertifIcation I, used in the observation of the construction suchr thatsthe constriction best observedtjtos, be due 'built care and dilige withinsubstantial compliance and intent of the 401 Water )Quality Certification and Buffer Rules, the approved plans and sp cat ecificat was and other supporting materials. i , Signature: Date: If this project was designed by a, Certified Professional I. , a duly registered Professional _ Landscape Architect, Surveyor. etc.) in the , ' as A. arna, having Z been authorized to observe (periodicall;r, Wee ly. full time) the construction of thejp o e tcy for f the oPermiuoli hereby state that th ?i (p Engineer, and diligence was used in the observation of the construction such that tit in e construction was observed toibeibuilt wica substantial compliance and intent o the ?t01 Water Quality Certification and Buffer Rules, the a roy;d fa n -thin specifications, and others uortinc pp p la f PF J materials. Signature: Registration No. Date 6 Z006 I ,???,, ?; ,? r??I'J 5 iO:taWAT?R BFtAhiGH .,-a.Ati4AI,Ali 11 vL 4...u 111 iItLIf)n COL.,- "1: -1'k _ alp ,t ------------ F warF r' O?? RpG Michael F. Easley, Governor William G. Ross Jr., Secretary t-- North Carolina Department of Environment and Natural Resources D 'C Alan W. Klimek, P.E. Director Division of Water Quality January 4, 2006 DWQ Project # 05-2205 McDowell County Van Harold Davis 160 Old Highway 10 West Marion, NC 28752 o C?bg C Subject Property: Sunset POint /Section 1 /Lot #15 & 16 Big Tree Way, Marion, NC 28752 JOIN 1 l 2oo6 Approval of 401 Water Quality Certification with Additional ConditiagR. WArEf? QUALITY *E`f1ANDSMD STORMWATER BRANCH Dear Mr. Davis: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 499 linear feet of shoreline for the purpose of stabilization at the subject property, as described within your application received by the N.C. Division of Water' Quality (DWQ) on December 14, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3492 (GC3492). The Certification(s) allows you to use Permit(s) NW30 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and buffer regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall;expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for`this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h).', This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: i' 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-6893 / Internet: htt :1/h2o.enr. state.nc.us/ncvvetlands No`s Carolina Naturally An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper f Van Harold Davis Page 2 of 4 January 4, 2006 9. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved (Units) Plan Location or Reference Shoreline 499 linear feet A 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. r Van Harold Davis Page 3 of 4 January 4, 2006 4. No Sediment & Erosion; Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion ofiall work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Riprap Installation All banks shall be laid back at a 2:1 (length : height) slope and riprap applied at the water / land interface (at full pool). Riprap shall be placed as a linear protective measurel'upon the regarded slopes. Stone used in stabilization shall be a random size, varying from Class B riprap up to 6 feet in diameter to provide additional wildlife habitat. All exposed soils above the Riprap stabilized area shall be replanted ?'in accordance with the attached Guidelines for Riparian Buffer Restoration'. This authorization shall in no way be construed as allowing the installation of a bulkhead or seawall. 7. Heavy Equipment Heavy equipment should be operated from the bank whenever possible. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. Equipment used in stream channel must be clean, new or low hour equipment. 8. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not ire-concentrate before being discharged. If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. T Van Harold Davis Page 4 of 4 January 4, 2006 9. Catawba Buffer Tree Protection No trees shall be removed from Zone 1 of the Catawba Buffer unless they are directly within the construction access corridor. If trees are removed, forested vegetation shall be re-established within the construction access or other temporary impact area occurring in the protected buffer zone within the next growing season following construction of the project. 10. Disturbed banks and a 25-foot vegetated zone, must be restored along the shoreline to natural riparian conditions with native trees and shrubs (e.g., silky dogwood, rhododendron, dog hobble, red maple, silky willow, tag alder, black willow, sycamore) to provide long-term bank stability and stream shading. Note, silky dogwood, silky willow and black willow can be planted as live stakes collected during the dormant growing season. Cuttings should be randomly planted on four (4) foot centers from the waters edge to the top of the bank. Trees should be planted on ten (10) to twelve (12) foot centers. Stream banks in these areas should also be seeded with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. 10. No Impacts Beyond those in Application No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre- construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 12. Deed Restrictions Deed Restrictions or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. V Van Harold Davis Page 5 of 4 January 4, 2006 If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days"of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of'; Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the, review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-733-9721 or Mr. Kevin Barnett in the DWQ Asheville Regional Office at either Kevin. BarnettCa?ncmail.net or at 828-296-4657. Sincerely, Alan W. Klimek, P.E., Director Division of Water Quality AW K/khb Enclosures: GC 3373 Certificate of Completion cc: Mrs. Sue Harmon Permits Etc. Post Office Box 234 Boiling Springs, NC 28017 USACE Asheville Regulatory Field Office DWQ 401 Central Office DLR Asheville Regional Office File Copy Central Files Filename: 05-2205. Davis. SunsetPoint.WQ3492.Approval Triage Check List Date: 12/19/05 Project Name: Van Harold Davis, Lots 15 & 16 DWQ #:05-2205 County: McDowell Kevin Barnett, Asheville Regional Office To: 60-day Processing , Time: 12/14/05 to 2/12/06 i From: Cyndi Karoly Telephone: (919) 733-9721 The file attached is being forwarded to you for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination Wetland determination; and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy ? Is the application consistent with pre-application meetings? ? Cumulative impact concern ? ' Comments: As per our discussion regarding revision of the triage and delegation processes, please review the attached file. Note that you are the first reviewer, so this file will need to be reviewed for administrative as well as technical details. If you elect to place this project on hold, please ask the applicant to provide; your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim procedure as we slowly transition "to electronic applications. Please apprise me of any complications you encounter, whether related to workload, processing times, or lack of a "second reviewer" as the triage process in Central had previously provided. Also, if you think of ways to improve this process, especially so that we can plan for the electronic applications, let me know. Thanks! 0 0 5 2 2 0 5 The following is an abbreviated application form for those applying for a 401 Water Quality Certification to impact FERC'(Federal Energy Regulatory Commission) regulated lake shore or bottom under the U.S. Army Corps of Engineers Permit GP30. This Application cannot be used for wetland or stream impacts. Please provide seven (7) copies of this application and supporting information as well as a non-refundable application fee to the Division of Water Quality of $200.00 for impacts of to lake bottom of less than 1 acre and $475.00 for impacts to lake bottom of greater or equal to 1 acre. Applications should be sent to: Division of Water Quality Wetlands Unit 1650 Mail Service Center" Raleigh, NC 27699-1650 L Applicant Information ation 1. Owner/Applicant Information Name: Mailing Address: Telephone Number: MR. VAN HAROLD DAVIS 01 1?C ark r !r-. A 4 2005 160 OLD HIGHWAY 10 WEST i, iMARION, NC 28752 828-652-5257 Fax Number: I' E-mail Address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) iMRS. SUE HARMON Name: Company Affiliation: 1? PERMITS, ETC. Mailing Address: POST OFFICE BOX 234 BOILING SPRINGS, NC 28017 Telephone Number: i 704-434-0706 Fax Number: 704-434-7100 E-mail Address: _permitsetc@carolina.rr.com II. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. You may use the diagram below to make a hand sketch of your project. Also, see the example below for guidance. Both the vicinity map and site plan must include a scale and north arrow. The footprints of all buildings, impervious surfaces, or other facilities must be included. VANHAROLD DAVIS 1. Location County: MCDOWELL Nearest Town: Subdivision name or site address (include phase/lot number) MARION SUNSET POINT / SECTION 1 / LOTS 15 & 16 (BIG TREE WAY, MARION, NC 28752) Directions to site please include road numbers, landmarks, etc. (This is not necessary if an adequate vicinity map is included): : FROM MARION TAKE HWY 221 NORTH / TL ON HANKINS RD. / TL ON LAKE JAMES RD. / TR ON SUNSET POINT PARKWAY / TL ON BIG TREE WAY 2. Describe the existing land use or condition of the site at the time of this application: LOT #15 AND LOT #16 ARE BOTH VACANT, WOODED LAKE LOTS. 3. Property size (acres): 2.39 ACRES (TOTAL OF BOTH LOTS) j 4. Nearest body of water (stream/river/sound/ocean/lake): _LAKE JAMES 5. Describe the purpose`of the proposed work: TO STABILIZE 499 FEET OF ERODING BANK ALONG THE, SHORELINE OF LOTS #15 AND #16 BY APPLYING RIPRAP. THE RIPRAP WILL VARY IN HEIGHT FROM 3-6 FEET. 6. List the type of equipment to be used to construct the project: A SMALL FRONT- END LOADER AND BAND TOOLS 7. Amount of impact (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level in square feet or acres: 2 FT. X 499 FT. = 998 SQUARE FEET 8.a. Amount of impact (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level and 50 feet land-ward in square feet or acres: 4 FT. X 499 FT. + 8 FT. X 50 FT. (CONSTRUCTION PATHWAY) _ 1996 SQ. FT. + 400 SQ. FT. = 2396 SQUARE FEET 8.b. Please describe vegetation above the normal pool lake level and 50 feet landward to be impacted (number of trees for instance): FIVE TREES GREATER THAN 6" IN DIAMETER AND 9 TREES LESS THAN 6" IN DIAMETER WILL BE REMOVED TO COMPLETE THIS PROJECT. THE TREES WILL BE REPLACED USING THE GUIDELINES OF THE LAKE JAMES PROTECTION ORDINANCE OF MCDOWELL COUNTY. ANY REMAINING DISTURBED AREA WILL HAVE MULCH APPLIED TO IT. f 1' n _ /-.0 14- e.i _ 11.1 1 „t- ApplicandAgent's Signature! Date ' (Agent's signature is valid only if an authorization letter from the applicant is provided.) ?/iu? ?.rvld 1 v?"5 i Lake (Full Pond) j i Full Pond Shoreline . Ri C' 4.99' Cleared rot PooLrj517i,u.J n I)aHxw" wig, rd ?lcu? ?4ar?ld U?v6 Yat? I r00 4vy lan Please applloximately sketch the following info as 1U xthis pit) (please provide dimensions for each Isuch ft. 100 : dimensions) •_ 1) All proposed vegelelon clawing (provide ocation of rip rap or 1111 to be placed above the MNOMO Pool" elevation z) L or nil to be placed below the No 3) Locadon'of rip rap proposed structures such as buildings, retal*g 4) The location of any walls, docks, etc. 5) The location of any excavation or dredging below the "Normal 'Pool" elevation; 6) Locadon,,of construction access corridors, Y 1 ---- vu?n trtC? ?'o??V i 5 ?unsei? Vbir& Sec+ion 1 1 dots 15 ?- IMPACT MINIMIZATION ZONE L133 L135 047 J to o L141 ?' N o 9 mLn O 3 L L1 L102?, / `R 1.53 AC v k?S 029>2S 1 8 C? <7?s? ? ooh r L98 b F ?9 I 1.63 AC Og 19 C7? (? Oppp 1.61 AC L89 1.36 AC ,°L? p?' ?? 11 L71 moo. s?9 0% 16 ° ?X9??• ^?? 21 Lrsr h -•? 1.30 A f1GJ' tiy?t'r• ?' / 2.09 AC LAKE JAMES <>?, ?` V • o?'tS , '?? ,`fie,. ' ?6'` ro5 widc X 50' , ??kryo??ry 15 ,4, ?° >x 9 AC ConS?r?iGtion Ih - ,yon' 1.0 wvi `' ?ti tik 14 4 ?,, 2.19 A( 0.75 AC 1,1 po \ S F r PR/ Vq 59 ,I ' .?. 1.02 AC ?'y 28 C9 L57 ?v ?y. 12 IL9 h te_ ~p 'F L55 A C8? ' ?h?•`p ` 0.80 AC L51 190.92' 124.10' L52 Cl g e9 L50 N01'40'E 315.02' L30 p 1.36 AC 31 o -(? ^?? a 50' CoL+a,wba Riga rian .VufAr 1.20 Ac '' L45 3.00' ?IK 1.15 AC C 1 c0 1-40 ( U L143 S33'02'36"W 53.44' L171 S61'08'35"E 4 L115 SUYJO?.." Li 44 S17`i6'S4"W 48.23' L172 S74'59'38'W 1 L116 S32'55"22 E Ll45 S16'30'14"W 30.50' L173 N86'30'09"W ' 1414, L117 S51'30 01 W; 12.58, L146 S08'43'50"W 56.75' L174 N I Ol 4'03"W 2 L118 S05'34'35 E 16.80, L147 S14'43'24"W 48.96' L175 N10'31 41"W ' L119 N71'37 21 W, 10.15, L148 N76'29'17"E 64.76' Ll76 N20'52'36"E L120 N78'24 07"W'' 55.42 L149 N82'13'02"E 63.95' L177 N35'12'32'E 5 1171 MAnl1r,'FO'WI L1 A'S' ..._ ,._..._...".. ._.. __. 117A W) v4A'i["G' A Marion area, NC Van Harold Davis 126 Pisa al FoP Lon `~\ 1661 Sunset Pont 166 Section 1 / Lois 15 & 16 Marion, NC 28752 Lattl de 35.74989 Lomibide -8194146 3 126 .z . r 1562 126 X1601 1636 J O M1 0.5 1 1.5 2 2.5 Copyright O 1988.2001 Microsoft Corp. and/or its suppliers. All rights reserved. http://www.microsof com/streets a Copyright 2000 by Geographic Data Technology, Inc. All rights reserved. O 2000 Navigation Technologies. All rights reserved. This data includes information taken with permission from Canadian authorities 0 Her Majesty the Queen in Right of Canada. 0 Copyright 2000 by Compusearch Micromarketing Data and Systems Ltd. DUKE POWER LAKE MANAGEMENT, EC12-Q P O BOX 1006 CHARLOTTE, NC 28201-1006 704-382-1567 or TOLL FREE 1-800-443-5193 APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. PLEASE SUBMIT APPLICATION AND APPROPRIATE DUKE POWER FILING FEE, PAYABLE TO DUKE POWER, TO ABOVE ADDRESS. I'. Applicant Information A. Name VAN HAROLD DAVIS B. Mailing Address 160 OLD HWY 10 WEST, MARION, NC 28752 1 C. Telephone: 828-652-5257 IL Location of Proposed Projecit A. Lake LAKE JAMES B. Street Address BIG TREE WAY C. County MCDOWELL D. City, town, community or landmark MARION E. Section _1_ Lot # 15 & 16 Subdivision SUNSET POINT F. Directions to property by road FROM MARION TAKE HWY 221 NORTH / TL ON HANKINS RD./ TL ON LAKE JAMES RD. / TR ON SUNSET POINT PARKWAY / TL ON BIG TREE WAY G. Latitude and longitude far the project site -LATITUDE 35.74989 LONGITUDE -81.94146 H. Please submit a map showing the coordinates or a detailed map (USGS.quad map, city map, etc.) showing the exact location of the project site. (NOTE: Latitude/ longitude coordinates can be found on internet site, www.mapsonus.com. 13L Description of Project A. B. C. Length of wall 499 LINEAR FEET Material RIPRAP Distance from property line/shoreline-WILL FOLLOW EXISTING SHORELINE, IV. Intended Use of Project Area A. Private YES I' B. Commercial V. Applicant Signature 44A ny Date 40e-C-1 O Agent Signature Phone :11)4 - ?-C17DG? Faa l /C7D i?rm i f5. A COPY OF THE COMPLETED; APPLICATION WITH A ROAD MAP SHOWING LOCATION OF THE PROPERTY MUST BE SUBMITTED TO: US ARMY CORPS OF ENGINEERS, 151 PATTONAVE. - ROOM 208, ASHEVILLE, NC 28801-5006 i A COPY OF THE DUKE POWER APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA" AND SEVEN (7) COPIES OF THE COMPLETED "NC DIVISION OF WATER QUALITY PRE- CONSTRUCTION NOTIFICATION APPLICATION" MUST BE SUBMITTED WITH THE DIVISION OF WATER QUALITY APPLICATION FEE TO: NC DIVISION OF WATER QUALITY ATTENTION:. . JO HN D OR NE Y PARKVIEW BLDG., 2321 CRABTREE BLVD. RALEIGH, NC 27604 919-733-1786 12/06/05ssb Van Harold Davis Sunset Point Lots 15 & 16 - f, 0 0 52 20 5 The following is an abbreviated application form for those applying for a 401 Water Quality Certification to impact FERC;(Federal Energy Regulatory Commission) regulated lake shore or bottom under the U.S. Army Corps of Engineers Permit GP30. This Application cannot be used for wetland or stream impacts. Please provide seven (7) copies of this application and supporting information as well as a non-refundable application fee to the Division of Water Quality of $200.00 for impacts of to lake bottom of less than 1 acre and $475.00 for impacts to lake bottom of greater or equal to 1 acre. Applications should be sent to; IDivision of Water Quality Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 L Applicant Information 1. Owner/Applicant Information Name: Mailing Address: Telephone Number: E-mail Address: 8D ? p 44 ?t J: U?C ?Ci?rr ., f tJ MR. VAN HAROLD DAVIS v„ v 160 OLD HIGHWAY 10 WEST .r, MARION, NC 28752 828-652-5257 Fax Number: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: MRS. SUE HARMON Company Affiliation: Mailing Address: [PERMITS, ETC. [POST OFFICE BOX 234 BOILING SPRINGS, NC 28017 Telephone Number: 704434-0706 Fax Number: 704434-7100 E-mail Address: permitsetc@carolina.rr.com IL Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. You may use the diagram below to make a hand sketch of your project. Also, see the example below for guidance. Both the vicinity map and site plan must include a scale and north arrow. The footprints of all buildings, impervious surfaces, or other facilities must be included. VAN HAROLD DAVIS Location County: MCDOWELL Nearest Town: Subdivision name or site address (include phase/lot number) LOTS 15 & 16 (BIG TREE WAY, MARION, NC 28752)_ MARION SUNSET POINT / SECTION 1 / Directions to site please include road numbers, landmarks, etc. (This is not necessary if an adequate vicinity map is included): FROM MARION TAKE HWY 221 NORTH / TL ON HANKINS RD. / TL ON LAKE JAMES ORD. / TR ON SUNSET POINT PARKWAY / TL ON BIG TREE WAY I 2. Describe the existing land use or condition of the site at the time of this application: LOT #15 AND LOT #16 ARE BOTH VACANT, WOODED LAKE LOTS. 3. Property size (acres): 2.39 ACRES (TOTAL OF BOTH LOTS) 4. Nearest body of water (stream/river/sound/ocean/lake): LAKE JAMES 5. Describe the purpose of the proposed work: TO STABILIZE 499 FEET OF ERODING 6 7. 8.a. BANK ALONG THE SHORELINE OF LOTS #15 AND #16 BY i RIPRAP WILL VARY IN HEIGHT FROM 3-6 FEET. List the type of equipment to be used to construct the project: END LOADER AND HAND TOOLS _A SMALL FRONT- Amount of impact (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake lev Il in square feet or acres: 2 FT. X 499 FT. = 998 SQUARE FEET Amount of impact (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level and 50 feet land-ward in square feet or acres: 4 FT. X 499 FT. + $'FT. X 50 FT. (CONSTRUCTION PATHWAI) = 1996 SQ. FT. + 400 SQ. FT. = 2396 SQUARE FEET 8.b. Please describe vegetation above the normal pool lake level and 50 feet landward to be impacted (number of trees for instance): FIVE TREES GREATER THAN 6" IN DIAMETER AND 9 TREES LESS THAN 6" IN DIAMETER WILL BE REMOVED TO COMPLETE THIS PROJECT. THE TREES WILL BE REPLACED USING THE GUIDELINES OF THE LAKE JAMES PROTECTION ORDINANCE OF MCDOWELL COUNTY. ANY REMAINING DISTURBED WILL HAVE MULCH APPLIED TO IT. Applican Agent's Signature) Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) APPLYING RIPRAP. THE V rv Id f Lake (Full Pond) Full Pond Shoreline 4i9' CIeareci r- Abode rul t Po°I (,OO1 i,u.J n I)aN\w" Lam $ - T _ 5p 1 ' ul)??ce, 5d' ion y _ rd Lu DareW Davis YQn ?,rnid ?uti vai, Please approximatety sketch the following information on this plan lease provide dimensions for each (tern, such as 10? x 100 ft): 1) AJI proposed vegetation clearing (provide dimen o) 2 Location;of rip rap or fill to be placed above the 'Normal Pool" elevation 3) Location; of rip rap or fill to be placed below the 4) The location of any proposed structures such as buildings, retal*g walls. docks, etc, 5 The location of any excavation or dr?dging below the "Normal Pool' elevation!; 6) Locadon,of construction access corridors, i 3 f ' n i ,---? scaly - ?'' = I So' Van Rarold Da-V15 5unseit Poinf 5ecfion I Ad5 15 ? 1 IMPACT MINIMIZAnON ZONE 106 L133 L135 C14j V z to -1 to 0 0 L14' N (9 1 9 r*i „ .1\ L N J, 2 O ?? L l L102?` / `R 1.53 AC L98 L89 m o+ LAKEJAMES 9wdc x 50' L°" 9 Construction Wh .-- c ??s T??9> 18 0 b0F 2 'S1.63 AC ph 19 ?7? <?3 C?? hpOp 17 s' •> 1.61 AC 1 1.36 AC !0? O? / ^h u L71 S,9'`282'k116 0 '?9?? ^^"? / 21 CIS] ?G h L 1.30 A `QS- ?. yX ?r• / 2.09 AC tiro 15 •? 1.09 AC s :cP po V. Davi 14 2.19 A 0.75 AC p0\ S FT PRIV, - - po 4??,y9 c,?? ors REEr l rY 59 L63 6 0? @13 oil ? -? 1.02 AC 28 C9 L57 0 L55 O Ao? ?hh' 12 / 0.80 AC L51 190.92' 124.10' L52 C1 9 L50 N 01 40 E 315.02 L30 1.36. AC 31 0? 5o C'a?'awba Riparian Uuf"1?r 1.20 Ac L45 3.00' hp^? .?0?_ 1.15 AC C 1 c? Xj ?~j L40 L J? i L143 S33'02'36"W 53.44 Li 71 S61 *08'35'E L115 SUZ ?a?? . L144 S17'16'54"W 48.23' Li 72 S74'59'38'W L118 S32'55 22'E w.... " L173 N86'30'09'W L117 S51'30'01*W'' 12.58 L1 L1 46 6 4 S S088*'4343 '504"W W 5630..7550' L174 N1Ol4'03'W L118 S05'34 35 E 16.80 L147 S14'43'24"W 48.96' L175 N10'31 41 "W L119 N71'37'21'W 10.15' L148 N76'29'17"E 64.76' L176 N20'52'36"E L120 N78-24-07:W 55.42' L149 N82'13'02"E 63.95' L177 N35'12'32"E 1171 mAwnr"Ao"W I, Li Fi' I17A N7Z'LR'1L?G' Marion area, NC Van Harold Davis \ 1236 (/?7 6 Pisa al Fo! Lon 166 '•••. SurgetPon1??A+l? 1281 (166 MSec bon arion, I / 2Lots 15 8752 & 16 ` ?- LaYb-de 35.74989 r LonaMide -81.94145 126 ?`;Ilp f? 1662 _ ?- X1688 1648` s'° ?•? ,.._ •?/? 126 .V X1601 i ?' 1 ? ?C 1636 ? i ------- : ?? ?---? .•-._ 0 mi 0.5 1 1.5 2 2.5 Copyright O 1 W&2001 Microsoft Corp. and/or its suppliers. All rights reserved. http:ltwww.microsoflcom/streets a Copyright 2000 by Geographic Data Technology, Inc. All rights reserved. O 2000 Navigation Technologies. All rights reserved. This data includes information taken with permission from Canadian authorities O Her Majesty the Queen in Right of Canada. O Copyright 2000 by Compusearch Micromarkebng Data and Systems Ltd. I DUKE POWER LAKE MANAGEMENT, EC12-Q P O BOX 1006 CHARLOTTE, NC 28201-1006 704-382-1567 or TOLL FREE 1-800-443-5193 APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. PLEASE SUBMIT APPLICATION AND APPROPRIATE DUKE POWER FILING FEE, PAYABLE TO DUKE POWER, TO ABOVE ADDRESS. L Applicant Information A. Name VAN HAROLD DAVIS B. Mailing Address 160 OLD HWY 10 WEST, MARION, NC 28752 C. Telephone: 828-652-5257 IL Location of Proposed Project A. Lake LAKE JAMES B. Street Address BIG TREE WAY C. CountyMCDOWELL D. City, town, community or landmark MARION E. Section _1_ Lot # 15 & 16 Subdivision SUNSET POINT F. Directions to property by road FROM MARION TAKE HWY 221 NORTH / TL ON HANKINS RD./ TL ON LAKE JAMES RD. / TR ON SUNSET POINT PARKWAY / TL ON BIG TREE WAY G. Latitude and longitude for the project site -LATITUDE 35.74989 LONGITUDE -81.94146 H. Please submit a map showing the coordinates or a detailed map (USGS.quad map, city map, etc.) showing the exact location of the project site. (NOTE: Latitude/ longitude coordinates can be found on internet site, www.mansonus.com. j III. Description of Project A. Length of wall 499 LINEAR FEET B. Material RIPRAP C. Distance from property line/shoreline-WELL FOLLOW EXISTING SHORELINE IV. Intended Use of Project Area A. Private YES B. Commercial V. Applicant Signature )_11A In./ A Date O C5- 3 -'1?dU Agent Signature Phone 164 [ -(l" L(a Fax q0tf • A COPY OF THE COMPLETED; APPLICATION WITH A ROAD MAP SHOWING LOCATION OF THE PROPERTY MUST BE SUBMITTED TO: US ARMY CORPS OF ENGINEERS, 151 PATTONAVE. -ROOM 208, ASHEVILLE, NC 28801-5006 • A COPY OF THE "DUKE POWER APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA" AND SEVEN (7) COPIES OF THE COMPLETED "NC DIVISION OF WATER QUALITY PRE- CONSTRUCTION NOTIFICATION APPLICATION"MUST BE SUBMITTED WITH THE DIVISION OF WATER QUALITY APPLICATION FEE PTO: NC DIVISION OF WATER QUALITY ATTENTION:. JOHNDORNEY P4RKV1EW BLDG., 2321 CRABTREE BLVD. RALEIGH, NC 27604 919-733-1786 12/06/05ssb Van Harold Davis Sunset Point Lots 15 & 16