Loading...
HomeMy WebLinkAboutNC0050610_Compliance Evaluation Inspection_20180723 74, r . ° fi y��p;yam NORTH'CAROLI NA COOPEkdtmcnor rtt0 RECE9VED1DEf��DWR secniari AUG 0 7 2018 Water Resources Permitting Section CERTIFIED MAIL 7013-1710-0002-1922-2484 RETURN RECEIPT REQUESTED July 23, 2018 Mr. Jadd Brewer Water Quality Utilities, Inc. P.O. Box 384 Banner Elk, NC 28605-0384 SUBJECT: Compliance Evaluation Inspection and Notice of Violation NOV Tracking Number: NOV-2018-PC-0231 The Ponds WWTP NPDES Permit No. NC0050610 Watauga County Dear Mr. Brewer: On June 27, 2018, Kelli Park and Gary Hudson, of this office, met with Brandon Hughes, ORC, to perform a Compliance Evaluation Inspection on The Ponds wastewater treatment system. This type of inspection consists of two basic parts: an in-office file review and an on-site inspection of the treatment facility. The attached EPA inspection form notes the areas that were evaluated for this inspection. The findings and observations are outlined below: I. Permit The NPDES permit became effective December 1, 2017 and expires September 30, 2022. The facility had a copy of the current permit available during the inspection. II. Self-Monitoring Program A review of the monthly discharge monitoring reports (DMR) for the period January 2017 through November 2017 showed that the facility was in compliance with all permit limits Y� fY� beNiene North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 West Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105 336 776 9800 The Ponds WWTP,NPDES Permit No.NC0050610 1,a Compliance Evaluation Inspection July 11,2018 with the exception of one daily maximum Fecal Coliform violation on May 18, 2017 of 2,900 colonies per 100 milliliters, (#/100m1). Regarding the permit monitoring requirements, it was noted that all sampling was performed per the frequencies specified in the permit. Brandon Hughes does all sampling for the facility, and the laboratory analysis is performed by Water Quality Utilities, Inc III. Flow Measurement The flow meter was calibrated in July of 2017. It needs to be calibrated before August 1, 2018. Please send Miss Park a copy of the meter's calibration certification immediately upon completion IV. Operations and Maintenance The wastewater treatment plant appeared clean, however the walkways were rusted and weak. Holes in the metal and rotted plywood were noted during the visit. Replacement or reinforcement should be completed for safety purposes. V. Facility Site Review Most of the components of the 0.076 million gallons per day facility appeared to be functioning properly. The aeration basin had a light brown color and a good earthy odor. Although the dissolved oxygen (DO) wasn't measured during the inspection, Mr. Hughes indicated the aeration basin (AB) normally runs at about 0.8 milligrams per liter (mg/I). Please note a preferable range for DO in the AB is 1.0-3.0 mg/I. The effluent from the treatment plant was clearly turbid and discharging solids into the stream. At the time of the inspection the wastewater treatment plant appeared to have an overaccumulation of solids, possibly due to the lack of proper solids management and not enough being removed from the plant. Our office highly recommends pumping the digester more frequently. The sludge blanket in the secondary clarifier (SC) was about half of the sidewall depth. The acceptable level is approximately a quarter of the sidewall depth. Solids were floating on the surface of the SC as well, leading to their discharge into the stream. The ultra violet light (UV) intensity meter reading was flashing, suggesting that the unit needs to be assessed for proper function. This could also be due to floating solids in the effluent disrupting the reading. VI. Records/Reports The visitation log is on site showing visitation times and plant conditions. Chain of custody forms and calibration records are in good order. All the required monitoring was performed per the frequencies specified in the NPDES permit. When checking the DMRs and bench sheets, Ms. Park found that three ammonia results were not properly transcribed to the DMRs. These values are listed in the table below. While these numbers are still in compliance, diligence should be used when reporting analyzed values. The Ponds WWTP,NPDES Permit No.NC0050610 Compliance Evaluation Inspection July 11,2018 Date Bench Sheet (mg/I) Reported (mg/I) August 17, 2017 1.16 1.12 August 24, 2017 4.99 2.43 August 29, 2017 9.13 4.13 VII. EffluentlReceivinq Waters The effluent from the facility was not clear the day of the inspection. Turbid effluent and solids were being discharged into the Watauga River, class B; trout; high quality waters in the Watauga river basin. Please work to correct the deficiencies in paragraphs 4 through 7. Overall, the plant must be better maintained and more should be invested in the plant's proper upkeep. Please reply in writing to this letter within 30 business days of receiving it. Your written reply should address each of the noted deficiencies and provide a corrective action plan along with an implementation/completion schedule to remediate them. Please be aware that violations of your NPDES permit, or the NC statutes and regulations under which it is promulgated, are subject to fines of up to$25,000 per day, per violation, as set forth in NC General Statute (NCGS) 143-215.6A, Enforcement Procedures, Civil Penalties. If we do NOT receive your written reply within 30 business days of your receipt of this notice, we may draft an enforcement case for the noted deficiencies/violations. If you have any questions regarding the inspection or this report, please contact Kelli Park or me at (336) 776-9800. Sincerely, Sherri V. Knight, P.E. Regional Supervisor Water Quality Regional Operations Division of Water Resources Attachments: BIMS EPA Water Compliance Inspection Report cc: Central Files WSRO NPDES Unit