Subject: Compliance Evaluation Inspection Report
NPDES Permit#NC0078271
Betsy Jeff Penn 4H Center WWTP, Rockingham County
Dear Ms. Hopper:
On July 16, 2018, Paul DiMatteo of the Division of Water Resources(Division),Winston-Salem Regional Office,
conducted a Compliance Evaluation Inspection of the above referenced wastewater treatment system.Jeff Johnson
Operator in Responsible Charge (ORC), and William Amos, backup-ORC,were present for the inspection.This type of
inspection consists of two basic parts: an on-site inspection of the facility and a review of facility files and self-
monitoring data. Observations from each area of the inspection are summarized below.
Site Review
1. Permit
The current permit became effective on June 1, 2017 and expires on April 30, 2022. Permitted septic tanks,
effluent filters, an E-Z Treat System with three pod zones, and ultraviolet disinfection.
2. Facility Site Review
The facility was as described in the permit.The facility is permitted to discharge a monthly average of 13,100
gallons per day(gpd);typical daily discharge is approximately 2,450 gpd.An automatically activated standup
generator is available that Mr.Johnson said can power the entire plant.
3. Operation and Maintenance
The plant is operated as required.All operators are properly designated and hold adequate certifications.
The facility appeared to be well operated and managed. Mr.Johnson reported that clogged filtration spray
nozzles accounted for a significant amount of operating time.
E.11..ill."—TEW).
NORTH CAFIOUNA
olio
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1450 Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27103
336.776.9800
e a
4. Flow Measurement
Effluent flow is measured using a positive displacement type flow meter. Mr.Johnson checks the calibration
yearly by measuring against the 45 degree v-notch weir on the UV disinfection system.
5. Effluent/Receiving Waters
The effluent is discharged to Carroll Creek,class C waters in the Roanoke River Basin.A path to the outfall
was available and there was no visible impact to the receiving stream.
Documentation Review
6. Records/Reports
Discharge Monitoring Reports (DMRs) and lab data are maintained according to the permit. DMRs include all
permit parameters; Copies of DMRs,operator visitation logs,daily operation sheets, maintenance reports,
lab reports and Chain-of-Custody forms were available for review during the inspection.
7. Self-Monitoring Program
A review of DMRs from August 2015 through June 2018 showed no actioned violations, and a comparison of
submitted data with bench sheets revealed no errors or concerns.
8. Laboratory
The facility analyzes field parameters at its on-site laboratory under certification#5556. Non-field analysis is
performed by Pace Analytical in Eden, certification#633. Copies of all laboratory documentation were
readily available. Procedures for analyzing field parameters including required calibrations appeared
acceptable.
9. Sludge Handling/Disposal
All septic tanks and the cafeteria's grease trap are emptied annually by Billingsly Septic Tank Company. Mr.
Johnson said that the invoices are sent to the university system and copies are not retained on site. Please
be sure to retain copies of these invoices for facility records.
We appreciate the efforts made to effectively operate and maintain this treatment facility. If you should have
any questions, please do not hesitate to contact Paul DiMatteo at(336)776-9691 or our office at(336)776-9800.
Sincerely,
-ett(m:v• 1 -"-"e12/-
Sherri V. Knight, P.E., Regional Supervisor
Water Quality Regional Operations Section
Winston-Salem Regional Office
Division of Water Resources, NCDEQ
Enclosures—Inspection Report and Summary
CC: WQS Winston-Salem Regional Office
NPDES Compliance/Enforcement Unit
Central Files
D_E
No,.......,
IltlistmatofEnvironmental mtylyl
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1450 Hanes Mill Road Suite 300 I Winston-Salem,North Carolina 27103
336.776.9800
United States Environmental Protection Agency Fort Approved.
EPA Washington,D.C.20460 OMB No.2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A:National Data System Coding(i.e.,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 [ I 2 LI 3 I NC0078271 111 12 1 18/07/16 117 18 [ j
19 Ls]I 2011
211 I I I I I I 1 I I II I I I I I I I I I I I I I 1 I- I 11 I I I I I 'I I I I I I I 166
Inspection Work Days Facility Self-Monitonng Evaluation Rating B1 QA Reserved `
671 1 701 I 71 Li 72 12, I 731 I 174 75J 1 1 1 1 1 1 180
Section B:Facility Data LJ
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 10 00AM 18/07/16 17/06/01
Betsy Jeff Penn 4H Education
Exit Time/Date Permit Expiration Date
804 Cedar Ln
12 OOPM 18/07/16 22/04/30
Reidsville NC 27320
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
///
Jeffery L Johnson/ORC/336-264-4212/
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
Jeff A North,804 Cedar Ln Reidsville NC 27320//336-349-9445/3366340110
No
Section C.Areas Evaluated During Inspection(Check only those areas evaluated)
• Permit II Flow Measurement • Operations&Maintenance II Records/Reports
• Self-Monitoring Program El Sludge Handling Disposal • Facility Site Review II Effluent/Receiving Waters
II Laboratory
Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Paul DiMatteo WSRO WQ//336-776-9691/ ?/30/7412/r
1300•4--.0 bg/(AO.:;/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
01, Y KAA.t.W' 7/. 0/ 1 Y
EPA Form 3560-3(Rev 9-94)Previous ediOtions are obsolete
Page# 1
•
NPDES yr/mo/day Inspection Type 1
31 NC0078271 111 121 18/07/16 117 18 isj
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
Page# 2
Permit: NC0078271 Owner-Facility: Betsy Jeff Penn 4H Education
Inspection Date: 07/16/2016 Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • 0 0 0
Does the facility analyze process control parameters,for ex: MLSS, MCRT, Settleable 0 0 • 0
Solids, pH, DO, Sludge Judge,and other that are applicable?
Comment:
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new 0 0 • 0
application?
Is the facility as described in the permit? • 0 0 ❑
#Are there any special conditions for the permit? 0 • 0 0
Is access to the plant site restricted to the general public? 0 • 0 0
Is the inspector granted access to all areas for inspection? • • 0 0 0
Comment There was no gate, septic tank lids were not bolted down and the lids to the filter pods were
held down with padlocks. However, Mr. Johnson said that they have never had problems
with unauthorized access.
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit? • 0 0 0
Is all required information readily available,complete and current? • 0 ❑ 0
Are all records maintained for 3 years(lab.reg.required 5 years)? U 0 0 0
Are analytical results consistent with data reported on DMRs? • 0 0 0
- Is the chain-of-custody complete? • 0 0 0
Dates,times and location of sampling •
Name of individual performing the sampling •
Results of analysis and calibration •
Dates of analysis
Name of person performing analyses U
Transported COCs U
Are DMRs complete: do they include all permit parameters? • 0 0 0
Has the facility submitted its annual compliance report to users and DWQ? 0 0 • 0
(If the facility is=or>5 MGD permitted flow) Do they operate 24/7 with a certified operator 0 0 • 0
on each shift's
Is the ORC visitation log available and current's • ❑ 0 0
Is the ORC certified at grade equal to or higher than the facility classification? • ❑ 0 0
Is the backup operator certified at one grade less or greater than the facility classification'? • 0 0 0
Page# 3
c
Permit: NC0078271 Owner-Facility: Betsy Jeff Penn 4H Education
Inspection Date: 07/16/2018 Inspection Type: Compliance Evaluation
Record Keeping - Yes No NA NE
Is a copy of the current NPDES permit available on site? • ❑ 0 ❑
Facility has copy of previous year's Annual Report on file for review? 0 0 • 0
Comment:
Septic Tank Yes No NA NE
(If pumps are used) Is an audible and visual alarm operational? 0 0 0 U
Is septic tank pumped on a schedule? • 0 0 0
Are pumps or syphons operating properly? U 0 0 0
Are high and low water alarms operating properly? 0 0 0 •
Comment:
Sand Filters (Low rate) Yes No NA NE
(If pumps are used) Is an audible and visible alarm Present and operational? 0 0 0 U
Is the distribution box level and watertight? ❑ ❑ U ❑
Is sand filter free of ponding? • 0 0 0
Is the sand filter effluent re-circulated at a valid ratio? • 0 0 ❑
#Is the sand filter surface free of algae or excessive vegetation? U ❑ 0 0
#Is the sand filter effluent re-circulated at a valid ratio?(Approximately 3 to 1) • 0 0 0
Comment:
Disinfection -UV Yes No NA NE
Are extra UV bulbs available on site? U 0 ❑ 0
Are UV bulbs clean? U ❑ 0 0
Is UV intensity adequate? 0 ❑ ❑ U
Is transmittance at or above designed level? - 0 0 0 •
Is there a backup system on site? ❑ U 0 0
Is effluent clear and free of solids? U 0 0 0
Comment: There is no backup disinfection system, but can be recirculated if repairs need to be made.
Flow Measurement-Effluent Yes No NA NE
#Is flow meter used for reporting? • ❑ ❑ 0
Is flow meter calibrated annually? • 0 0 0
Is the flow meter operational? • ❑ ❑ 0
Page# 4
Permit: NC0078271 Owner-Facility: Betsy Jeff Penn 4H Education
Inspection Date: 07/16/2018 Inspection Type: Compliance Evaluation
Flow Measurement-Effluent Yes No NA NE
(If units are separated) Does the chart recorder match the flow meter? 0 0 • 0
Comment: A positive-displacement type flow meter is used for reporting. Mr. Johnson calibrates this
annually by comparing the reading to one taken manually at the 45 degree v-notch weir on
the UV system.
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained? • 0 0 0
Are the receiving water free of foam other than trace amounts and other debris? • 0 0 0
If effluent (diffuser pipes are required) are they operating properly? 0 0 • 0
Comment:
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? 0 0 • ❑
Is sample collected below all treatment units? • 0 0 0
Is proper volume collected? 0 0 0 •
Is the tubing clean'? 0 0 U ❑
#Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees 0 0 0
II
Celsius)?
Is the facility sampling performed as required by the permit(frequency,sampling type 0 0 0 •
representative)?
Comment: Samples are collected lust after disinfection.
Laboratory Yes No NA NE
Are field parameters performed by certified personnel or laboratory'? • 0 0 0
Are all other parameters(excluding field parameters) performed by a certified lab? • 0 0 0
#Is the facility using a contract lab? ❑ II 0 ❑
#Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees 0 0 0 II
Celsius)'
Incubator(Fecal Coliform)set to 44.5 degrees Celsius+/-0.2 degrees? 0 0 0 •
Incubator(BOD)set to 20.0 degrees Celsius+/-1.0 degrees? 0 0 0 •
Comment: