HomeMy WebLinkAboutNC0070408_Compliance Evaluation Inspection_20180821 / -114(tra,.'N)
:ner-Tri:. t:.
RECE1VEDIDENPJDWR
ROY COOPER NORTH CAROLINA SEP 0 5 2018
Governor Environmental Quality
MICHAEL S.REGAN Water Resourcesn
Secretary Permitting
LINDA CULPEPPER
Interim Director
August 21, 2018
Mr. Charles E. Clement
Clevon Woods Association
756 West King St
Boone, NC 28607
SUBJECT: Compliance Evaluation Inspection
Art Plaza WWTP
NPDES Permit No. NC0070408
Watauga County
•t
Dear Mr. Clement,
Kelli Park and Gary Hudson, of this office, met with you on August 1st, 2018, and
then performed a Compliance Evaluation Inspection on the proposed Art Plaza
wastewater treatment system on August 2nd, 2018. The attached Environmental
Protection Agency inspection form notes the areas that were evaluated for this inspection.
The findings and observations are outlined below:
I. Permit
The NPDES permit expired on September 30, 2017. A permit renewal application was
received by the North Carolina Department of Environmental Quality (NCDEQ) on May 8,
2017. The NCDEQ Compliance and Expedited Permitting Unit sent you a request for
additional information on December 14, 2017. Please reference this letter for guidance
on the renewal process.
II. Facility Site Review
Miss Park and Mr. Hudson confirmed during the visit on August 2nd that the facility has
not been built yet.
There are some used package plant parts being stored on top of the site. They are not
currently in use.
, D.ECt?)
.......t......„\,..„
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1450 Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27103
336.776.9800
Art Plaza WWTP,August 2,2018
IX. Conclusions
If you have any questions regarding the inspection or this report, please contact Kelli Park
or me at (336) 776-9800.
Sincerely,
Sherri V. Knight, P.E.
Regional Supervisor
Water Quality Regional Operations
Division of Water Resources
Attachments: BIMS EPA Water Compliance Inspection Report
cc: Central Files
WSRO
P11'DES Unit
2
ii
United States Environmental Protection Agency Form Approved
EPA Washington,D C 20460 OMB No.2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A National Data System Coding(i.e.,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
11,i 1 2 I L I 3 I NC0070408 111 12 I 18/08/02 117 18 (1:..L1 19 Li I 20 I I
21111111 1111111111111111111111111 11111111111 r6
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA — -Reserved
671 1 70 I I 711 I 72i 731 1 174 751 1 1 1 1 1 1 1 l80
Section B Facility Data LJ
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 01 30PM 18/08/02 15/11/01
Art Plaza WWTP
Exit Time/Date Permit Expiration Date
NC Hwy 105
Boone NC 28607 01 45PM 18/08/02 17/09/30
' Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
///
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
Charles E Clement,756 W King St Boone NC 28607//828-264-6411/8282645424
No
Section C Areas Evaluated During Inspection(Check only those areas evaluated)
• Permit El Facility Site Review
Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date I
Gary Hudson Division of Water Quality//336-776-9694, Y l2.teR1 `v
Kelli A ar �� fi
WSRO WQ//336-776-9689/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete
Page# 1
NPDES yr/mo/day Inspection Type 1
31 NC0070408 111 121 18/08/02 117 18 Li
Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
Page# 2
i
r
Permit. NC0070408 Owner-Facility Art Plaza WWTP
Inspection Date: 08/02/2018 Inspection Type- Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less) Has the permittee submitted a new 0 0 • 0
application?
Is the facility as described in the permit? 0 0 • 0
#Are there any special conditions for the permit? 0 0 0 •
Is access to the plant site restricted to the general public? 0 0 • 0
Is the inspector granted access to all areas for inspection? • 0 0 0
Comment This plant has not been built The owner is in the process of getting a new permit and plans
to begin construction once the new permit has been approved. Currently there are parts of a
package plant sitting above ground on the site
Page# 3