CERTIFIED MAIL 7013-1710-0002-1922-2460
RETURN RECEIPT REQUESTED
August 21, 2018
Ms. Allison Kemp-Sullivan
Miles Annas Cooling Tower
438 Academy Street, BB Dougherty Administration
Boone, NC 28608
SUBJECT: Compliance Evaluation Inspection and Notice of Deficiency
NOD Tracking Number: NOD-2018-PC-0263
Miles Annas Cooling Tower (Appalachian State University)
NPDES Permit No. NCG500671
Watauga County
Dear Ms. Kemp-Sullivan,
On August 1, 2018, Kelli Park and Gary Hudson, of this office, met with Daniel
Gryder, Appalachian State Engineer, to perform a Compliance Evaluation Inspection on
the Milles Annas Cooling Tower. This type of inspection consists of two basic parts: a
file review and an on-site inspection of the treatment facility. The attached Environmental
Protection Agency inspection form notes the areas that were evaluated for this inspection.
The findings and observations are outlined below:
I. Permit
The NPDES permit became effective December 16, 2014. The annual fee was paid each
year since then, and is currently not due again until November 30, 2018. The facility did
not have a copy of the permit available during the inspection, however Mr. Gryder emailed
Miss Park a copy of the Certificate of Coverage and permit after the inspection. It is
required that a copy of the Certificate of Coverage as well as the permit is available on
site.
Q
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1450 Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27103
336.776.9800
Miles Annas Cooling Tower,August 2,2018
II. Self-Monitoring Program •
According to the General Permit, the facility should be monitoring the flow of the discharge
from the plant, temperature, total residual chlorine, oil and grease, pH, and chemical
oxygen demand semi-annually.
This monitoring is not being done. Steps need to be made to begin monitoring these
parameters as soon as possible. Once they have been measured please send a copy of
the results to Miss Park.
III. Records/Reports ,
Mr. Gryder emailed Miss Park the recent conductivity, pH, and hardness data that the
plant has monitored for from May 2018 to July 2018. Conductivity and hardness do not
have limits specified in the permit. pH, however, was in compliance with the permit limits.
IV. Flow Measurement
The flow is intermittent out of the plant and is discharged from the basin of the cooling
tower. The basin is drained and rinsed with fresh water 3-5 times a year. Discharge
typically occurs at the end of cooling season, typically in the fall/winter once there,is no
more air conditioning use.
All other drainage is blowdown discharge done by the mechanical room and discharged
into a sanitary sewer. These drainages are typically much smaller than at the end of
cooling season. The engineers are considering ways to reroute the waste discharge to
the sanitary sewer in the future.
There is no flow measurement out of the plant. In accordance with the permit, the flow
needs to be estimated and reported semi-annually.
V. Operations and Maintenance
The cooling tower and mechanical building appeared to be well maintained and operated.
Operators are not required to maintain the Miles Annas Cooling Tower, as specified in
the permit. Mechanics keep it operational.
VI. Facility Site Review
The cooling tower is located next to a small parking lot behind the Student Union building
on Appalachian State University's campus. The general public could walk up to the
cooling tower. There is a control/mechanical room nearby the cooling tower that has
restricted access.
2
Miles Annas Cooling Tower,August 2,2018
3
VII. Effluent/Receiving Waters
The effluent from the facility was not seen the day of inspection. Effluent is,discharged
into an unnamed tributary to Boone Creek, class C; trout waters in the New River basin.
The effluent is discharged underground from the plant to the receiving stream, but it was
reported to be consistently clear.
VIII. Conclusions
Please work to correct the deficiencies in sections 1 and 2. If you wish to provide
additional information regarding the noted violations, request technical assistance, or
discuss overall compliance please respond in writing within 10 business days after receipt
of this Notice.
Please reply in writing to this letter within 30 calendar days of receiving it. Your written
reply should address each of the noted deficiencies and provide a corrective action plan
along with an implementation/completion schedule to remediate them. A review of your
response will be considered along with any additional information provided.
Please be aware that violations of your NPDES permit, or the NC statutes and regulations
under which it is promulgated, are subject to fines of up to$25,000 per day, per violation,
as set forth in NC General Statute (NCGS) 143-215.6A, Enforcement Procedures, Civil
Penalties. If we do NOT receive your written reply within 30 calendar days of your receipt
of this notice, we may draft an enforcement case for the noted deficiencies/violations.
Sincerely,
Sherri V. Knight, P.E.
Regional Supervisor
Water Quality Regional Operations
Division of Water Resources
Attachments: BIMS EPA Water Compliance Inspection Report
cc: Central Files
WSRO
CNPDES-tiff
3
United States Environmental Protection Agency Form Approved
E PA Washington,D C 20460 OMB No 2040-0057
Water Compliance Inspection Report Approval expires 6-31-98
Section A National Data System Coding(i.e,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector - Fac Type
1 [ 2 I� I 3 I NCG500671 I11 , 12 I 18/08/02 117 18 I L I 19 s 201 I
2111/1111 1111111111111111111111111 11111111111 166
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA -Reserved-
67 I
Reserved-671 I 70I I 71 I I 72 LJ 731
I 174 751 1 1 1 1 1 1 180
Section B Facility Data LJ
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 11 30AM 18/08/02 16/04/26
Miles Annas cooling tower '
Exit Time/Date Permit Expiration Date
614 Howard St
12 30PM 18/08/02 20/07/31
Boone NC 286082050
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
///
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
Allison Kemp-Sullivan,438 Academy St Boone NC 28608//828262662/8282627200
No
Section C Areas Evaluated During Inspection(Check only those areas evaluated)
• Permit • Operations&Maintenance El Records/Reports El Facility Site Review
Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date i Q
Kelli A Park ' WSRO WQ//336-776-9689/ 11K1 `C.�
4a../ecItt,e__________
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete
Page# 1
v
NPDES yr/mo/day Inspection Type 1
31 NCG500671 111 121
18/08/02 I17 18 LI
Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
Page# 2
Permit. NCG500671 Owner-Facility. Miles Annas cooling tower
Inspection Date: 08/02/2018 Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • ❑ ❑ 0
Does the facility analyze process control parameters,for ex MLSS, MCRT, Settleable 0 ❑ • El
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment _
Permit Yes No NA NE
(If the present permit expires in 6 months or less) Has the permittee submitted a new El ❑ • El
application?
Is the facility as described in the permit? • 0 0 0
#Are there any special conditions for the permit? • ❑ ❑ El
Is access to the plant site restricted to the general public? ❑ • El El
Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑
Comment Daniel Gryder(engineer) sent Kelll their data monitoring for hardness, pH, and conductivity.
The general permit was sent as well Cooling tower stucture is on campus and the public
can go up to it, however the mechanical room has restricted access