Loading...
HomeMy WebLinkAboutLindsay Meadows - 2018-09-05 Lindsay Meadows - SW Management Report Storm Water Management Plan Lindsay Meadows Subdivision September 5, 2018 Project No. AMH17004 Storm Water Management Plan Lindsay Meadows Subdivision June 28, 2018 Cardno, Inc. Project Information i Storm Water Managerment Plan Project Information Prepared for AMH Development, LLC Project Name Lindsay Meadows Subdivision Project Number AMH17004 Project Manager Robert L. Cash, PE Date June 28, 2018 Prepared for: AMH Development, LLC 18805 W. Catawba Ave., Suite 102 Cornelius, NC 28031 Prepared by: Cardno, Inc. 9800 Southern Pine Boulevard, Suite I, Charlotte, NC 28273 USA Storm Water Management Plan Lindsay Meadows Subdivision June 28, 2018 Cardno, Inc. Table of Contents ii Storm Water Management Plan Table of Contents Executive Summary ................................................................................................................... iii 1 Introduction and General Information .............................................................................. 1 1.1 Introduction .......................................................................................................................... 1 1.2 Description of Property ........................................................................................................ 1 1.3 Floodplain Information ......................................................................................................... 1 1.4 Project Site Soils Information .............................................................................................. 1 1.5 Compliance with Regulations .............................................................................................. 1 2 Hydrologic Analysis ........................................................................................................... 2 2.1 Methodology and Criteria .................................................................................................... 2 2.2 Existing Condition ................................................................................................................ 2 2.3 Proposed Condition ............................................................................................................. 2 2.4 Impervious Surfaces ............................................................................................................ 2 3 Water Quality ...................................................................................................................... 2 4 Hydraulic Analysis ............................................................................................................. 3 4.1 Hydraulic Methodolgy and Criteria ...................................................................................... 3 4.2 Storm Drain Analysis ........................................................................................................... 3 4.3 Onsite Detention .................................................................................................................. 3 5 Summary Tables ................................................................................................................ 3 6 Conclusions and Recommendation ................................................................................. 4 7 References .......................................................................................................................... 5 Appendices Appendix A Figures Appendix B Hydrologic Analysis Appendix C Hydraulic Analysis Appendix D Reference Material Appendix E Stormwater Design Plans Storm Water Management Plan Lindsay Meadows Subdivision June 28, 2018 Cardno, Inc. Executive Summary iii 2018_00-00_Lindsay Meadows_SW Management Report Executive Summary AMH Development, LLC is proposing to develop a new residential community on Kensington Drive, in Waxhaw, North Carolina. This residential development is located on a parcel of approximately 17.4 acres and includes 17 single-family homes. The residential development will include the construction of roadways and infrastructure and includes the design of a sand filter as a detention and water quality BMP. A storm water management plan has been developed to mitigate the impacts upon the watershed for the project area. A storm drain system will be constructed to direct runoff throughout the development. This storm drain system of storm pipe and one sand filter will accept onsite runoff and allow offsite drainage to flow through the project site. This runoff will be directed towards the historic flow paths running through our project site and into Twelve Mile Creek. The proposed best management practice (BMP) mentioned above will be constructed, as part of the storm drain system, to assure that storm water runoff amounts post project will be less than or equal to pre- development levels and that the appropriate water quality volumes are treated. Storm Water Management Plan Lindsay Meadows Subdivision June 28, 2018 Cardno, Inc. Introduction and General Information 1 Storm Water Management Plan 1 Introduction and General Information 1.1 Introduction AMH Development, LLC is proposing to develop a new residential community on the south side of Kensington Drive, in Waxhaw, North Carolina. This residential development covers approximately 17.4 acres and includes 17 single-family homes with minimum lot size of 12,000 SF. This storm water management plan presents detailed hydrologic and hydraulic analyses for the existing and proposed development. 1.2 Description of Property In general, the subject site is located on the south side of Kensington Drive, in Waxhaw, North Carolina. See Figure 1, Location Map found in Appendix A. The project site consists of one parcel, approximately 17.4 acres. The P.I.D. Number for the site is 06192007. The site is bounded by Kensington Drive to the North, Waxhaw-Marvin Road to the West, Twelve Mile Creek to the south, and the Union County Waste Water Plant to the east. Topographic information for this project was gathered from aerial and field topographic survey completed by GPA, Inc. The site, in general, exists in an undeveloped condition, having mostly wooded areas. The site steeply slopes to the south towards the Twelve Mile Creek. The property is located in the Twelve Mile Creek drainage basin and the Catawba River Basin Watershed. 1.3 Floodplain Information The Federal Emergency Management Agency (FEMA), Flood Insurance Rate Map (FIRM), Community Panel Number 3710446400J, effective October 16, 2008, designates that the site is within ‘Zone X’ and Zone “AE” with a base flood elevation of 506. Zone ‘X’ is described as an area determined to be outside the 0.2% annual chance floodplain. The most current panel has been used in this study. See Figure 2, FIRM in Appendix A. 1.4 Project Site Soils Information The project site’s soils are predominantly soil group B, with soil groups more specifically defined below:  TbB2 – Tarrus gravelly silty clay loam, 2 to 8 percent slopes, moderately eroded. (Group B)  TbC2 – Tarrus gravelly silty clay loam, 8 to 15 percent slopes, moderately eroded. (Group B)  ChA – Chewacla silt loam, 0 to 2 percent slopes, frequently flooded. (Group A soils report generated from the Web Soil Survey has been provide in Appendix D. 1.5 Compliance with Regulations The methodologies utilized in the preparation of this study comply with the latest edition of the Town of Waxhaw Storm Water Drainage Manual. Storm Water Management Plan Lindsay Meadows Subdivision June 28, 2018 Cardno, Inc. Hydrologic Analysis 2 Storm Water Management Plan 2 Hydrologic Analysis 2.1 Methodology and Criteria Hydrologic methodologies used in this study are in accordance with those methodologies found in Waxhaw Stormwater Manual. HydroCAD computer software package was used to determine the hydrology for the project site. Precipitation values for the 24-hour storm events were established based upon point precipitation frequency estimates from the NOAA website. These values were used to establish the rainfall parameters within the HydroCAD software. Hydrologic calculations can be found in Appendix B. Reference Material used in the hydrologic calculations can be found in Appendix D. 2.2 Existing Condition The existing site is completely undeveloped and wooded.The project site is composed of basin areas that discharge into the Twelve Mile Creek. All of the basins discharge at different locations according to the existing drainage patterns. Two basins from the north side of Kensington Drive discharge onto the site via cross storm drain pipe. This will remain in the proposed condition, with the discharge bypassing the proposed system and draining into the Twelve Mile Creek as in the existing condition. The full watershed area has been analyzed for both the existing and proposed condition. The proposed onsite BMP was included in the post condition analysis. Additionally, refer to Pre Development Tributary Map Sheet 1 of 2 in Appendix E, for the existing condition drainage basin boundaries and associated travel time pathway designations. 2.3 Proposed Condition In general, the proposed site retains the existing drainage patterns. Most of the developed area will be collected and directed to the proposed sand filter through the storm sewer system. The backs of lots on the south side of Bentley Park Drive will drain to the south towards Twelve Mile Creek. An area on the east side will not be improved and will retain the existing drainage patterns. Additionally, refer to Post Development Tributary Map Sheet 2 of 2 in Appendix E, for the proposed condition drainage basin delineations. 2.4 Impervious Surfaces During existing conditions, the percentage of impervious surfaces on site is approximately 0.00%. Upon completion of our project site, the percentage of impervious surfaces increases to approximately 15.34%. This represents an increase of approximately 15.34%. 3 Water Quality A water quality protection volume was calculated for each basin using the procedures outlined in the North Carolina DEQ Stormwater Design Manual. One BMP has been designed to treat the runoff from the 1-inch storm event for the site. A sand filter will be proposed to filter the requirements, and receives a drainage area of 5.646 acres. A rainfall depth was found for the Storm Water Management Plan Lindsay Meadows Subdivision June 28, 2018 Cardno, Inc. Hydraulic Analysis 3 Storm Water Management Plan basin in HydroCAD, which produced the water quality protection volume calculated. HydroCAD was then used to size the basins and determine the WQv elevation for each BMP. To allow for capture and pretreatment of first flush materials, the sand filter includes a forebay area damned by riprap impediments. The required forebay volume was calculated using the water quality protection volumes. 4 Hydraulic Analysis 4.1 Hydraulic Methodolgy and Criteria Excel spreadsheets based upon standard hydraulic design criteria have been used for storm sewer calculations. Hydraulic calculations can be found in Appendix C. Reference Material used in the hydraulic calculations can be found in Appendix D. 4.2 Storm Drain Analysis A storm sewer system has been designed to direct a majority of the storm runoff generated from the proposed impervious surfaces. This storm sewer directs runoff towards the onsite BMP for the site. The storm sewer system was designed based upon runoff totals for the 10-year storm event using the rational method. Refer to the Storm Drain reports located in Appendix C and the Post Storm Sewer Tributary Map, in Appendix E, for the proposed storm sewer layout and associated drainage basin delineations. 4.3 Onsite Detention The runoff produced during proposed conditions was analyzed using seven onsite drainage basins. Detention amounts for the project were provided to mitigate any increase in runoff for the project during the two, and 10-year storm events. The detention basin has been designed with multi-stage outlet control structures to control runoff volumes up to the 50-year storm event. Emergency spillways have been provided at each detention basin to allow for passage of larger storm events. Rip rap aprons have been provided for outlet pipes to dissipate storm water discharges. 5 Summary Tables The following table summarizes the storm water discharges for each side of the site for the existing and proposed site conditions. Storm Water Management Plan Lindsay Meadows Subdivision June 28, 2018 Cardno, Inc. Conclusions and Recommendation 4 Storm Water Management Plan  Basin Q2 (cfs) Q10 (cfs)   Existing        Existing Site   14.23  41.05   Proposed        Proposed Site   13.49  37.73  6 Conclusions and Recommendation As detailed in this report, the Lindsay Meadows Subdivision complies with all state and local ordinances. No adverse impacts are expected either upstream or downstream of the subject site. Cardno recommends that the project be constructed as proposed. Storm Water Management Plan Lindsay Meadows Subdivision June 28, 2018 Cardno, Inc. References 5 Storm Water Management Plan 7 References HydroCAD Version 10.00-19, Copyright 2016, HydroCAD Software Solutions, LLC Web Soil Survey, Copyright 2017, USDA, Natural Resources Conservation Service NOAA Atlas 14, Volume 2, Version 3, Copyright 2017, NOAA, National Weather Service North Carolina Department of Environmental Quality Storm water BMP Manual, Revised 1/3/2017 Town of Waxhaw Stormwater Design Manual, Version 2.0, Updated April 22, 2009 June 28, 2018 Cardno, Inc. A-1 Storm Water Management Plan Lindsay Meadows Subdivision APPENDIX FIGURES Appendix A Storm Water Management Plan Figures Lindsay Meadows Subdivision June 28, 2018 Cardno, Inc. A-1 Storm Water Management Plan Appendix A Figures A.1 Figure 1 – Vicinity Map A.2 Figure 2 – FEMA FIRMETTE VICINITY MAP NOT TO SCALE TOWN OF WAXHAW, UNION COUNTY, NC PROJECT SITE WA X H AW -M A R V I N RD KEN SI N G T O N D R TWEL V E M I L E C R E E K KENS I N G T O N D R June 28, 2018 Cardno, Inc. B-1 Storm Water Management Plan Lindsay Meadows Subdivision APPENDIX HYDROLOGIC ANALYSIS Appendix B Storm Water Management Plan Hydrologic Analysis Lindsay Meadows Subdivision June 28, 2018 Cardno, Inc. B-1 Storm Water Management Plan Appendix B Hydrologic Analysis B.1 HydroCAD Calculations – Existing B.2 HydroCAD Calculations – Proposed B.3 Water Quality Volume Calculations EX A (new Subcat) EX B (new Subcat) EX C (new Subcat) EX D (new Subcat)EX E (new Subcat) EX Existing Routing Diagram for Lindsay Meadows Prepared by {enter your company name here}, Printed 6/25/2018 HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Subcat Reach Pond Link Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 2HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Time span=5.00-96.00 hrs, dt=0.05 hrs, 1821 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=6.034 ac 0.00% Impervious Runoff Depth=0.36"Subcatchment EX A: (new Subcat) Flow Length=282' Tc=15.1 min CN=55 Runoff=1.48 cfs 0.182 af Runoff Area=5.356 ac 25.00% Impervious Runoff Depth=1.04"Subcatchment EX B: (new Subcat) Flow Length=774' Tc=16.4 min CN=70 Runoff=6.43 cfs 0.464 af Runoff Area=5.199 ac 5.24% Impervious Runoff Depth=0.68"Subcatchment EX C: (new Subcat) Flow Length=455' Tc=18.0 min CN=63 Runoff=3.37 cfs 0.296 af Runoff Area=1.315 ac 25.00% Impervious Runoff Depth=1.04"Subcatchment EX D: (new Subcat) Flow Length=1,240' Tc=20.6 min CN=70 Runoff=1.38 cfs 0.114 af Runoff Area=7.358 ac 2.34% Impervious Runoff Depth=0.43"Subcatchment EX E: (new Subcat) Flow Length=933' Tc=20.9 min CN=57 Runoff=2.06 cfs 0.267 af Inflow=14.23 cfs 1.323 afReach EX: Existing Outflow=14.23 cfs 1.323 af Total Runoff Area = 25.262 ac Runoff Volume = 1.323 af Average Runoff Depth = 0.63" 91.64% Pervious = 23.149 ac 8.36% Impervious = 2.113 ac Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 3HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment EX A: (new Subcat) Runoff = 1.48 cfs @ 12.13 hrs, Volume= 0.182 af, Depth= 0.36" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Yr Rainfall=3.55" Area (ac) CN Description 6.034 55 Woods, Good, HSG B 6.034 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.8 150 0.1200 0.18 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 1.3 132 0.1230 1.75 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 15.1 282 Total Subcatchment EX A: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)1 0 Type II 24-hr 2 Yr Rainfall=3.55" Runoff Area=6.034 ac Runoff Volume=0.182 af Runoff Depth=0.36" Flow Length=282' Tc=15.1 min CN=55 1.48 cfs Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 4HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment EX B: (new Subcat) Runoff = 6.43 cfs @ 12.10 hrs, Volume= 0.464 af, Depth= 1.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Yr Rainfall=3.55" Area (ac) CN Description 5.356 70 1/2 acre lots, 25% imp, HSG B 4.017 75.00% Pervious Area 1.339 25.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.6 150 0.0830 0.24 Sheet Flow, Grass: Dense n= 0.240 P2= 3.55" 5.1 212 0.0190 0.69 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.1 123 0.1070 30.87 218.18 Pipe Channel, RCP_Round 36" 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 Concrete pipe, bends & connections 0.6 289 0.1110 8.39 134.31 Channel Flow, Area= 16.0 sf Perim= 35.0' r= 0.46' n= 0.035 Earth, dense weeds 16.4 774 Total Subcatchment EX B: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)7 6 5 4 3 2 1 0 Type II 24-hr 2 Yr Rainfall=3.55" Runoff Area=5.356 ac Runoff Volume=0.464 af Runoff Depth=1.04" Flow Length=774' Tc=16.4 min CN=70 6.43 cfs Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 5HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment EX C: (new Subcat) Runoff = 3.37 cfs @ 12.14 hrs, Volume= 0.296 af, Depth= 0.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Yr Rainfall=3.55" Area (ac) CN Description 4.654 60 Woods, Fair, HSG B 0.545 89 Paved roads w/open ditches, 50% imp, HSG B 5.199 63 Weighted Average 4.926 94.76% Pervious Area 0.272 5.24% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.7 150 0.0860 0.16 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 2.3 305 0.1920 2.19 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 18.0 455 Total Subcatchment EX C: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)3 2 1 0 Type II 24-hr 2 Yr Rainfall=3.55" Runoff Area=5.199 ac Runoff Volume=0.296 af Runoff Depth=0.68" Flow Length=455' Tc=18.0 min CN=63 3.37 cfs Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 6HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment EX D: (new Subcat) Runoff = 1.38 cfs @ 12.15 hrs, Volume= 0.114 af, Depth= 1.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Yr Rainfall=3.55" Area (ac) CN Description 1.315 70 1/2 acre lots, 25% imp, HSG B 0.986 75.00% Pervious Area 0.329 25.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.8 150 0.0730 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 1.5 139 0.0900 1.50 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.2 99 0.0250 9.40 16.61 Pipe Channel, RCP_Round 18" 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, bends & connections 1.0 376 0.0550 6.15 98.32 Channel Flow, Area= 16.0 sf Perim= 33.0' r= 0.48' n= 0.035 Earth, dense weeds 1.1 476 0.0700 6.93 110.92 Channel Flow, Area= 16.0 sf Perim= 33.0' r= 0.48' n= 0.035 Earth, dense weeds 20.6 1,240 Total Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 7HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Subcatchment EX D: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)1 0 Type II 24-hr 2 Yr Rainfall=3.55" Runoff Area=1.315 ac Runoff Volume=0.114 af Runoff Depth=1.04" Flow Length=1,240' Tc=20.6 min CN=70 1.38 cfs Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 8HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment EX E: (new Subcat) Runoff = 2.06 cfs @ 12.20 hrs, Volume= 0.267 af, Depth= 0.43" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Yr Rainfall=3.55" Area (ac) CN Description 7.013 55 Woods, Good, HSG B 0.345 89 Paved roads w/open ditches, 50% imp, HSG B 7.358 57 Weighted Average 7.185 97.66% Pervious Area 0.173 2.34% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.1 150 0.0810 0.16 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 3.7 307 0.0780 1.40 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 1.1 476 0.0700 6.93 110.92 Channel Flow, Area= 16.0 sf Perim= 33.0' r= 0.48' n= 0.035 Earth, dense weeds 20.9 933 Total Subcatchment EX E: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)2 1 0 Type II 24-hr 2 Yr Rainfall=3.55" Runoff Area=7.358 ac Runoff Volume=0.267 af Runoff Depth=0.43" Flow Length=933' Tc=20.9 min CN=57 2.06 cfs Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 9HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Reach EX: Existing [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 25.262 ac, 8.36% Impervious, Inflow Depth = 0.63" for 2 Yr event Inflow = 14.23 cfs @ 12.13 hrs, Volume= 1.323 af Outflow = 14.23 cfs @ 12.13 hrs, Volume= 1.323 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Reach EX: Existing Inflow Outflow Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=25.262 ac 14.23 cfs14.23 cfs Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 10HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Time span=5.00-96.00 hrs, dt=0.05 hrs, 1821 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=6.034 ac 0.00% Impervious Runoff Depth=1.07"Subcatchment EX A: (new Subcat) Flow Length=282' Tc=15.1 min CN=55 Runoff=7.04 cfs 0.539 af Runoff Area=5.356 ac 25.00% Impervious Runoff Depth=2.17"Subcatchment EX B: (new Subcat) Flow Length=774' Tc=16.4 min CN=70 Runoff=14.16 cfs 0.969 af Runoff Area=5.199 ac 5.24% Impervious Runoff Depth=1.62"Subcatchment EX C: (new Subcat) Flow Length=455' Tc=18.0 min CN=63 Runoff=9.38 cfs 0.704 af Runoff Area=1.315 ac 25.00% Impervious Runoff Depth=2.17"Subcatchment EX D: (new Subcat) Flow Length=1,240' Tc=20.6 min CN=70 Runoff=3.06 cfs 0.238 af Runoff Area=7.358 ac 2.34% Impervious Runoff Depth=1.20"Subcatchment EX E: (new Subcat) Flow Length=933' Tc=20.9 min CN=57 Runoff=8.24 cfs 0.737 af Inflow=41.05 cfs 3.186 afReach EX: Existing Outflow=41.05 cfs 3.186 af Total Runoff Area = 25.262 ac Runoff Volume = 3.186 af Average Runoff Depth = 1.51" 91.64% Pervious = 23.149 ac 8.36% Impervious = 2.113 ac Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 11HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment EX A: (new Subcat) Runoff = 7.04 cfs @ 12.10 hrs, Volume= 0.539 af, Depth= 1.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr Rainfall=5.18" Area (ac) CN Description 6.034 55 Woods, Good, HSG B 6.034 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.8 150 0.1200 0.18 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 1.3 132 0.1230 1.75 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 15.1 282 Total Subcatchment EX A: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)7 6 5 4 3 2 1 0 Type II 24-hr 10 Yr Rainfall=5.18" Runoff Area=6.034 ac Runoff Volume=0.539 af Runoff Depth=1.07" Flow Length=282' Tc=15.1 min CN=55 7.04 cfs Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 12HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment EX B: (new Subcat) Runoff = 14.16 cfs @ 12.09 hrs, Volume= 0.969 af, Depth= 2.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr Rainfall=5.18" Area (ac) CN Description 5.356 70 1/2 acre lots, 25% imp, HSG B 4.017 75.00% Pervious Area 1.339 25.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.6 150 0.0830 0.24 Sheet Flow, Grass: Dense n= 0.240 P2= 3.55" 5.1 212 0.0190 0.69 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.1 123 0.1070 30.87 218.18 Pipe Channel, RCP_Round 36" 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 Concrete pipe, bends & connections 0.6 289 0.1110 8.39 134.31 Channel Flow, Area= 16.0 sf Perim= 35.0' r= 0.46' n= 0.035 Earth, dense weeds 16.4 774 Total Subcatchment EX B: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 10 Yr Rainfall=5.18" Runoff Area=5.356 ac Runoff Volume=0.969 af Runoff Depth=2.17" Flow Length=774' Tc=16.4 min CN=70 14.16 cfs Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 13HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment EX C: (new Subcat) Runoff = 9.38 cfs @ 12.12 hrs, Volume= 0.704 af, Depth= 1.62" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr Rainfall=5.18" Area (ac) CN Description 4.654 60 Woods, Fair, HSG B 0.545 89 Paved roads w/open ditches, 50% imp, HSG B 5.199 63 Weighted Average 4.926 94.76% Pervious Area 0.272 5.24% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.7 150 0.0860 0.16 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 2.3 305 0.1920 2.19 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 18.0 455 Total Subcatchment EX C: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 10 Yr Rainfall=5.18" Runoff Area=5.199 ac Runoff Volume=0.704 af Runoff Depth=1.62" Flow Length=455' Tc=18.0 min CN=63 9.38 cfs Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 14HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment EX D: (new Subcat) Runoff = 3.06 cfs @ 12.14 hrs, Volume= 0.238 af, Depth= 2.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr Rainfall=5.18" Area (ac) CN Description 1.315 70 1/2 acre lots, 25% imp, HSG B 0.986 75.00% Pervious Area 0.329 25.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.8 150 0.0730 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 1.5 139 0.0900 1.50 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.2 99 0.0250 9.40 16.61 Pipe Channel, RCP_Round 18" 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, bends & connections 1.0 376 0.0550 6.15 98.32 Channel Flow, Area= 16.0 sf Perim= 33.0' r= 0.48' n= 0.035 Earth, dense weeds 1.1 476 0.0700 6.93 110.92 Channel Flow, Area= 16.0 sf Perim= 33.0' r= 0.48' n= 0.035 Earth, dense weeds 20.6 1,240 Total Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 15HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Subcatchment EX D: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)3 2 1 0 Type II 24-hr 10 Yr Rainfall=5.18" Runoff Area=1.315 ac Runoff Volume=0.238 af Runoff Depth=2.17" Flow Length=1,240' Tc=20.6 min CN=70 3.06 cfs Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 16HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment EX E: (new Subcat) Runoff = 8.24 cfs @ 12.16 hrs, Volume= 0.737 af, Depth= 1.20" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr Rainfall=5.18" Area (ac) CN Description 7.013 55 Woods, Good, HSG B 0.345 89 Paved roads w/open ditches, 50% imp, HSG B 7.358 57 Weighted Average 7.185 97.66% Pervious Area 0.173 2.34% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.1 150 0.0810 0.16 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 3.7 307 0.0780 1.40 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 1.1 476 0.0700 6.93 110.92 Channel Flow, Area= 16.0 sf Perim= 33.0' r= 0.48' n= 0.035 Earth, dense weeds 20.9 933 Total Subcatchment EX E: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)9 8 7 6 5 4 3 2 1 0 Type II 24-hr 10 Yr Rainfall=5.18" Runoff Area=7.358 ac Runoff Volume=0.737 af Runoff Depth=1.20" Flow Length=933' Tc=20.9 min CN=57 8.24 cfs Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 17HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Reach EX: Existing [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 25.262 ac, 8.36% Impervious, Inflow Depth = 1.51" for 10 Yr event Inflow = 41.05 cfs @ 12.11 hrs, Volume= 3.186 af Outflow = 41.05 cfs @ 12.11 hrs, Volume= 3.186 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Reach EX: Existing Inflow Outflow Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=25.262 ac 41.05 cfs41.05 cfs A (new Subcat) C (new Subcat) E (new Subcat) E2 (new Subcat) E3 (new Subcat) PR BPR D (new Subcat) PRP Proposed 16P (new Pond) Routing Diagram for Lindsay Meadows Prepared by {enter your company name here}, Printed 6/25/2018 HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Subcat Reach Pond Link Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 2HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Time span=5.00-96.00 hrs, dt=0.05 hrs, 1821 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=6.034 ac 0.00% Impervious Runoff Depth=0.36"Subcatchment A: (new Subcat) Flow Length=282' Tc=15.1 min CN=55 Runoff=1.48 cfs 0.182 af Runoff Area=4.006 ac 13.57% Impervious Runoff Depth=0.78"Subcatchment C: (new Subcat) Flow Length=323' Tc=9.7 min CN=65 Runoff=4.31 cfs 0.260 af Runoff Area=5.658 ac 38.38% Impervious Runoff Depth=1.34"Subcatchment E: (new Subcat) Tc=5.0 min CN=75 Runoff=13.59 cfs 0.631 af Runoff Area=2.551 ac 0.00% Impervious Runoff Depth=0.36"Subcatchment E2: (new Subcat) Flow Length=623' Tc=22.9 min CN=55 Runoff=0.48 cfs 0.077 af Runoff Area=0.342 ac 39.62% Impervious Runoff Depth=1.98"Subcatchment E3: (new Subcat) Tc=6.0 min CN=84 Runoff=1.16 cfs 0.056 af Runoff Area=5.356 ac 25.00% Impervious Runoff Depth=1.04"Subcatchment PR B: Flow Length=774' Tc=16.4 min CN=70 Runoff=6.43 cfs 0.464 af Runoff Area=1.315 ac 25.00% Impervious Runoff Depth=1.04"Subcatchment PR D: (new Subcat) Flow Length=1,199' Tc=20.1 min CN=70 Runoff=1.40 cfs 0.114 af Inflow=13.49 cfs 1.784 afReach PRP: Proposed Outflow=13.49 cfs 1.784 af Peak Elev=509.32' Storage=15,795 cf Inflow=13.59 cfs 0.631 afPond 16P: (new Pond) Outflow=0.47 cfs 0.631 af Total Runoff Area = 25.262 ac Runoff Volume = 1.784 af Average Runoff Depth = 0.85" 82.11% Pervious = 20.743 ac 17.89% Impervious = 4.519 ac Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 3HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment A: (new Subcat) Runoff = 1.48 cfs @ 12.13 hrs, Volume= 0.182 af, Depth= 0.36" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Yr Rainfall=3.55" Area (ac) CN Description 6.034 55 Woods, Good, HSG B 6.034 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.8 150 0.1200 0.18 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 1.3 132 0.1230 1.75 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 15.1 282 Total Subcatchment A: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)1 0 Type II 24-hr 2 Yr Rainfall=3.55" Runoff Area=6.034 ac Runoff Volume=0.182 af Runoff Depth=0.36" Flow Length=282' Tc=15.1 min CN=55 1.48 cfs Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 4HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment C: (new Subcat) Runoff = 4.31 cfs @ 12.03 hrs, Volume= 0.260 af, Depth= 0.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Yr Rainfall=3.55" Area (ac) CN Description 0.823 75 1/4 acre lots, 38% imp, HSG B 2.721 58 Woods/grass comb., Good, HSG B 0.462 89 Paved roads w/open ditches, 50% imp, HSG B 4.006 65 Weighted Average 3.462 86.43% Pervious Area 0.544 13.57% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.4 125 0.2160 0.22 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 0.3 198 0.1570 10.38 166.12 Channel Flow, Area= 16.0 sf Perim= 33.0' r= 0.48' n= 0.035 Earth, dense weeds 9.7 323 Total Subcatchment C: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)4 3 2 1 0 Type II 24-hr 2 Yr Rainfall=3.55" Runoff Area=4.006 ac Runoff Volume=0.260 af Runoff Depth=0.78" Flow Length=323' Tc=9.7 min CN=65 4.31 cfs Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 5HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment E: (new Subcat) [49] Hint: Tc<2dt may require smaller dt Runoff = 13.59 cfs @ 11.96 hrs, Volume= 0.631 af, Depth= 1.34" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Yr Rainfall=3.55" Area (ac) CN Description 5.477 75 1/4 acre lots, 38% imp, HSG B 0.181 89 Paved roads w/open ditches, 50% imp, HSG B 5.658 75 Weighted Average 3.486 61.62% Pervious Area 2.172 38.38% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment E: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 2 Yr Rainfall=3.55" Runoff Area=5.658 ac Runoff Volume=0.631 af Runoff Depth=1.34" Tc=5.0 min CN=75 13.59 cfs Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 6HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment E2: (new Subcat) Runoff = 0.48 cfs @ 12.25 hrs, Volume= 0.077 af, Depth= 0.36" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Yr Rainfall=3.55" Area (ac) CN Description 2.551 55 Woods, Good, HSG B 2.551 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.6 150 0.0440 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 1.5 162 0.1320 1.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.8 311 0.0580 6.31 100.97 Channel Flow, Area= 16.0 sf Perim= 33.0' r= 0.48' n= 0.035 Earth, dense weeds 22.9 623 Total Subcatchment E2: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Type II 24-hr 2 Yr Rainfall=3.55" Runoff Area=2.551 ac Runoff Volume=0.077 af Runoff Depth=0.36" Flow Length=623' Tc=22.9 min CN=55 0.48 cfs Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 7HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment E3: (new Subcat) Runoff = 1.16 cfs @ 11.97 hrs, Volume= 0.056 af, Depth= 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Yr Rainfall=3.55" Area (ac) CN Description 0.271 89 Paved roads w/open ditches, 50% imp, HSG B 0.071 65 Woods/grass comb., Fair, HSG B 0.342 84 Weighted Average 0.207 60.38% Pervious Area 0.136 39.62% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment E3: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)1 0 Type II 24-hr 2 Yr Rainfall=3.55" Runoff Area=0.342 ac Runoff Volume=0.056 af Runoff Depth=1.98" Tc=6.0 min CN=84 1.16 cfs Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 8HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment PR B: Runoff = 6.43 cfs @ 12.10 hrs, Volume= 0.464 af, Depth= 1.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Yr Rainfall=3.55" Area (ac) CN Description 5.356 70 1/2 acre lots, 25% imp, HSG B 4.017 75.00% Pervious Area 1.339 25.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.6 150 0.0830 0.24 Sheet Flow, Grass: Dense n= 0.240 P2= 3.55" 5.1 212 0.0190 0.69 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.1 123 0.1070 30.87 218.18 Pipe Channel, RCP_Round 36" 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 Concrete pipe, bends & connections 0.6 289 0.1110 8.39 134.31 Channel Flow, Area= 16.0 sf Perim= 35.0' r= 0.46' n= 0.035 Earth, dense weeds 16.4 774 Total Subcatchment PR B: Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)7 6 5 4 3 2 1 0 Type II 24-hr 2 Yr Rainfall=3.55" Runoff Area=5.356 ac Runoff Volume=0.464 af Runoff Depth=1.04" Flow Length=774' Tc=16.4 min CN=70 6.43 cfs Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 9HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment PR D: (new Subcat) Runoff = 1.40 cfs @ 12.15 hrs, Volume= 0.114 af, Depth= 1.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Yr Rainfall=3.55" Area (ac) CN Description 1.315 70 1/2 acre lots, 25% imp, HSG B 0.986 75.00% Pervious Area 0.329 25.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.8 150 0.0730 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 1.5 139 0.0900 1.50 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.2 99 0.0250 9.40 16.61 Pipe Channel, RCP_Round 18" 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, bends & connections 1.1 511 0.0180 7.98 14.09 Pipe Channel, RCP_Round 18" 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, bends & connections 0.5 300 0.1380 9.73 155.75 Channel Flow, Area= 16.0 sf Perim= 33.0' r= 0.48' n= 0.035 Earth, dense weeds 20.1 1,199 Total Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 10HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Subcatchment PR D: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)1 0 Type II 24-hr 2 Yr Rainfall=3.55" Runoff Area=1.315 ac Runoff Volume=0.114 af Runoff Depth=1.04" Flow Length=1,199' Tc=20.1 min CN=70 1.40 cfs Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 11HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Reach PRP: Proposed [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 25.262 ac, 17.89% Impervious, Inflow Depth = 0.85" for 2 Yr event Inflow = 13.49 cfs @ 12.07 hrs, Volume= 1.784 af Outflow = 13.49 cfs @ 12.07 hrs, Volume= 1.784 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Reach PRP: Proposed Inflow Outflow Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=25.262 ac 13.49 cfs13.49 cfs Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 12HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond 16P: (new Pond) Inflow Area = 5.658 ac, 38.38% Impervious, Inflow Depth = 1.34" for 2 Yr event Inflow = 13.59 cfs @ 11.96 hrs, Volume= 0.631 af Outflow = 0.47 cfs @ 14.20 hrs, Volume= 0.631 af, Atten= 97%, Lag= 134.3 min Primary = 0.47 cfs @ 14.20 hrs, Volume= 0.631 af Routing by Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 509.32' @ 14.20 hrs Surf.Area= 7,036 sf Storage= 15,795 cf Plug-Flow detention time= 794.2 min calculated for 0.630 af (100% of inflow) Center-of-Mass det. time= 794.8 min ( 1,643.2 - 848.4 ) Volume Invert Avail.Storage Storage Description #1 506.50' 38,677 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 506.50 4,234 0 0 507.50 5,175 4,705 4,705 508.50 6,172 5,674 10,378 509.50 7,225 6,699 17,077 510.50 8,335 7,780 24,857 511.50 9,502 8,919 33,775 512.00 10,107 4,902 38,677 Device Routing Invert Outlet Devices #1 Primary 503.50'18.0" Round Culvert L= 70.0' Ke= 0.500 Inlet / Outlet Invert= 503.50' / 502.80' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.77 sf #2 Device 1 503.50'4.0" Vert. Orifice/Grate C= 0.600 #3 Device 2 506.50'Sand Filter Head (feet) 0.00 0.05 0.10 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 4.00 Disch. (cfs) 0.000 0.091 0.092 0.097 0.105 0.113 0.122 0.130 0.138 0.146 0.154 0.219 #4 Device 1 509.00'6.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 510.50'24.0" x 24.0" Horiz. Orifice/Grate X 0.80 C= 0.600 Limited to weir flow at low heads #6 Primary 510.75'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.47 cfs @ 14.20 hrs HW=509.32' (Free Discharge) 1=Culvert (Passes 0.47 cfs of 19.06 cfs potential flow) 2=Orifice/Grate (Passes 0.18 cfs of 1.00 cfs potential flow) 3=Sand Filter (Custom Controls 0.18 cfs) 4=Orifice/Grate (Orifice Controls 0.29 cfs @ 1.82 fps) 5=Orifice/Grate ( Controls 0.00 cfs) 6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 2 Yr Rainfall=3.55"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 13HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond 16P: (new Pond) Inflow Primary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=5.658 ac Peak Elev=509.32' Storage=15,795 cf 13.59 cfs 0.47 cfs Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 14HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Time span=5.00-96.00 hrs, dt=0.05 hrs, 1821 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=6.034 ac 0.00% Impervious Runoff Depth=1.07"Subcatchment A: (new Subcat) Flow Length=282' Tc=15.1 min CN=55 Runoff=7.04 cfs 0.539 af Runoff Area=4.006 ac 13.57% Impervious Runoff Depth=1.77"Subcatchment C: (new Subcat) Flow Length=323' Tc=9.7 min CN=65 Runoff=10.69 cfs 0.592 af Runoff Area=5.658 ac 38.38% Impervious Runoff Depth=2.60"Subcatchment E: (new Subcat) Tc=5.0 min CN=75 Runoff=26.41 cfs 1.224 af Runoff Area=2.551 ac 0.00% Impervious Runoff Depth=1.07"Subcatchment E2: (new Subcat) Flow Length=623' Tc=22.9 min CN=55 Runoff=2.28 cfs 0.228 af Runoff Area=0.342 ac 39.62% Impervious Runoff Depth=3.44"Subcatchment E3: (new Subcat) Tc=6.0 min CN=84 Runoff=1.97 cfs 0.098 af Runoff Area=5.356 ac 25.00% Impervious Runoff Depth=2.17"Subcatchment PR B: Flow Length=774' Tc=16.4 min CN=70 Runoff=14.16 cfs 0.969 af Runoff Area=1.315 ac 25.00% Impervious Runoff Depth=2.17"Subcatchment PR D: (new Subcat) Flow Length=1,199' Tc=20.1 min CN=70 Runoff=3.10 cfs 0.238 af Inflow=37.73 cfs 3.887 afReach PRP: Proposed Outflow=37.73 cfs 3.887 af Peak Elev=510.53' Storage=25,109 cf Inflow=26.41 cfs 1.224 afPond 16P: (new Pond) Outflow=2.77 cfs 1.224 af Total Runoff Area = 25.262 ac Runoff Volume = 3.887 af Average Runoff Depth = 1.85" 82.11% Pervious = 20.743 ac 17.89% Impervious = 4.519 ac Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 15HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment A: (new Subcat) Runoff = 7.04 cfs @ 12.10 hrs, Volume= 0.539 af, Depth= 1.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr Rainfall=5.18" Area (ac) CN Description 6.034 55 Woods, Good, HSG B 6.034 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.8 150 0.1200 0.18 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 1.3 132 0.1230 1.75 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 15.1 282 Total Subcatchment A: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)7 6 5 4 3 2 1 0 Type II 24-hr 10 Yr Rainfall=5.18" Runoff Area=6.034 ac Runoff Volume=0.539 af Runoff Depth=1.07" Flow Length=282' Tc=15.1 min CN=55 7.04 cfs Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 16HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment C: (new Subcat) Runoff = 10.69 cfs @ 12.02 hrs, Volume= 0.592 af, Depth= 1.77" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr Rainfall=5.18" Area (ac) CN Description 0.823 75 1/4 acre lots, 38% imp, HSG B 2.721 58 Woods/grass comb., Good, HSG B 0.462 89 Paved roads w/open ditches, 50% imp, HSG B 4.006 65 Weighted Average 3.462 86.43% Pervious Area 0.544 13.57% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.4 125 0.2160 0.22 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 0.3 198 0.1570 10.38 166.12 Channel Flow, Area= 16.0 sf Perim= 33.0' r= 0.48' n= 0.035 Earth, dense weeds 9.7 323 Total Subcatchment C: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 10 Yr Rainfall=5.18" Runoff Area=4.006 ac Runoff Volume=0.592 af Runoff Depth=1.77" Flow Length=323' Tc=9.7 min CN=65 10.69 cfs Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 17HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment E: (new Subcat) [49] Hint: Tc<2dt may require smaller dt Runoff = 26.41 cfs @ 11.96 hrs, Volume= 1.224 af, Depth= 2.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr Rainfall=5.18" Area (ac) CN Description 5.477 75 1/4 acre lots, 38% imp, HSG B 0.181 89 Paved roads w/open ditches, 50% imp, HSG B 5.658 75 Weighted Average 3.486 61.62% Pervious Area 2.172 38.38% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment E: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 10 Yr Rainfall=5.18" Runoff Area=5.658 ac Runoff Volume=1.224 af Runoff Depth=2.60" Tc=5.0 min CN=75 26.41 cfs Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 18HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment E2: (new Subcat) Runoff = 2.28 cfs @ 12.20 hrs, Volume= 0.228 af, Depth= 1.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr Rainfall=5.18" Area (ac) CN Description 2.551 55 Woods, Good, HSG B 2.551 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.6 150 0.0440 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 1.5 162 0.1320 1.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.8 311 0.0580 6.31 100.97 Channel Flow, Area= 16.0 sf Perim= 33.0' r= 0.48' n= 0.035 Earth, dense weeds 22.9 623 Total Subcatchment E2: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)2 1 0 Type II 24-hr 10 Yr Rainfall=5.18" Runoff Area=2.551 ac Runoff Volume=0.228 af Runoff Depth=1.07" Flow Length=623' Tc=22.9 min CN=55 2.28 cfs Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 19HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment E3: (new Subcat) Runoff = 1.97 cfs @ 11.97 hrs, Volume= 0.098 af, Depth= 3.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr Rainfall=5.18" Area (ac) CN Description 0.271 89 Paved roads w/open ditches, 50% imp, HSG B 0.071 65 Woods/grass comb., Fair, HSG B 0.342 84 Weighted Average 0.207 60.38% Pervious Area 0.136 39.62% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment E3: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)2 1 0 Type II 24-hr 10 Yr Rainfall=5.18" Runoff Area=0.342 ac Runoff Volume=0.098 af Runoff Depth=3.44" Tc=6.0 min CN=84 1.97 cfs Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 20HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment PR B: Runoff = 14.16 cfs @ 12.09 hrs, Volume= 0.969 af, Depth= 2.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr Rainfall=5.18" Area (ac) CN Description 5.356 70 1/2 acre lots, 25% imp, HSG B 4.017 75.00% Pervious Area 1.339 25.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.6 150 0.0830 0.24 Sheet Flow, Grass: Dense n= 0.240 P2= 3.55" 5.1 212 0.0190 0.69 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.1 123 0.1070 30.87 218.18 Pipe Channel, RCP_Round 36" 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 Concrete pipe, bends & connections 0.6 289 0.1110 8.39 134.31 Channel Flow, Area= 16.0 sf Perim= 35.0' r= 0.46' n= 0.035 Earth, dense weeds 16.4 774 Total Subcatchment PR B: Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 10 Yr Rainfall=5.18" Runoff Area=5.356 ac Runoff Volume=0.969 af Runoff Depth=2.17" Flow Length=774' Tc=16.4 min CN=70 14.16 cfs Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 21HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment PR D: (new Subcat) Runoff = 3.10 cfs @ 12.14 hrs, Volume= 0.238 af, Depth= 2.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr Rainfall=5.18" Area (ac) CN Description 1.315 70 1/2 acre lots, 25% imp, HSG B 0.986 75.00% Pervious Area 0.329 25.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.8 150 0.0730 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 1.5 139 0.0900 1.50 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.2 99 0.0250 9.40 16.61 Pipe Channel, RCP_Round 18" 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, bends & connections 1.1 511 0.0180 7.98 14.09 Pipe Channel, RCP_Round 18" 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, bends & connections 0.5 300 0.1380 9.73 155.75 Channel Flow, Area= 16.0 sf Perim= 33.0' r= 0.48' n= 0.035 Earth, dense weeds 20.1 1,199 Total Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 22HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Subcatchment PR D: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)3 2 1 0 Type II 24-hr 10 Yr Rainfall=5.18" Runoff Area=1.315 ac Runoff Volume=0.238 af Runoff Depth=2.17" Flow Length=1,199' Tc=20.1 min CN=70 3.10 cfs Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 23HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Reach PRP: Proposed [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 25.262 ac, 17.89% Impervious, Inflow Depth = 1.85" for 10 Yr event Inflow = 37.73 cfs @ 12.07 hrs, Volume= 3.887 af Outflow = 37.73 cfs @ 12.07 hrs, Volume= 3.887 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Reach PRP: Proposed Inflow Outflow Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=25.262 ac 37.73 cfs37.73 cfs Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 24HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond 16P: (new Pond) [95] Warning: Outlet Device #3 rise exceeded Inflow Area = 5.658 ac, 38.38% Impervious, Inflow Depth = 2.60" for 10 Yr event Inflow = 26.41 cfs @ 11.96 hrs, Volume= 1.224 af Outflow = 2.77 cfs @ 12.39 hrs, Volume= 1.224 af, Atten= 90%, Lag= 26.1 min Primary = 2.77 cfs @ 12.39 hrs, Volume= 1.224 af Routing by Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 510.53' @ 12.39 hrs Surf.Area= 8,370 sf Storage= 25,109 cf Plug-Flow detention time= 465.4 min calculated for 1.223 af (100% of inflow) Center-of-Mass det. time= 466.2 min ( 1,295.2 - 829.1 ) Volume Invert Avail.Storage Storage Description #1 506.50' 38,677 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 506.50 4,234 0 0 507.50 5,175 4,705 4,705 508.50 6,172 5,674 10,378 509.50 7,225 6,699 17,077 510.50 8,335 7,780 24,857 511.50 9,502 8,919 33,775 512.00 10,107 4,902 38,677 Device Routing Invert Outlet Devices #1 Primary 503.50'18.0" Round Culvert L= 70.0' Ke= 0.500 Inlet / Outlet Invert= 503.50' / 502.80' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.77 sf #2 Device 1 503.50'4.0" Vert. Orifice/Grate C= 0.600 #3 Device 2 506.50'Sand Filter Head (feet) 0.00 0.05 0.10 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 4.00 Disch. (cfs) 0.000 0.091 0.092 0.097 0.105 0.113 0.122 0.130 0.138 0.146 0.154 0.219 #4 Device 1 509.00'6.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 510.50'24.0" x 24.0" Horiz. Orifice/Grate X 0.80 C= 0.600 Limited to weir flow at low heads #6 Primary 510.75'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=2.75 cfs @ 12.39 hrs HW=510.53' (Free Discharge) 1=Culvert (Passes 2.75 cfs of 21.23 cfs potential flow) 2=Orifice/Grate (Passes 0.22 cfs of 1.10 cfs potential flow) 3=Sand Filter (Custom Controls 0.22 cfs) 4=Orifice/Grate (Orifice Controls 2.42 cfs @ 4.84 fps) 5=Orifice/Grate (Weir Controls 0.11 cfs @ 0.45 fps) 6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 10 Yr Rainfall=5.18"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 25HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond 16P: (new Pond) Inflow Primary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=5.658 ac Peak Elev=510.53' Storage=25,109 cf 26.41 cfs 2.77 cfs Type II 24-hr 50 Yr Rainfall=7.01"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 26HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Time span=5.00-96.00 hrs, dt=0.05 hrs, 1821 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=6.034 ac 0.00% Impervious Runoff Depth=2.13"Subcatchment A: (new Subcat) Flow Length=282' Tc=15.1 min CN=55 Runoff=15.60 cfs 1.071 af Runoff Area=4.006 ac 13.57% Impervious Runoff Depth=3.11"Subcatchment C: (new Subcat) Flow Length=323' Tc=9.7 min CN=65 Runoff=19.08 cfs 1.038 af Runoff Area=5.658 ac 38.38% Impervious Runoff Depth=4.16"Subcatchment E: (new Subcat) Tc=5.0 min CN=75 Runoff=41.77 cfs 1.961 af Runoff Area=2.551 ac 0.00% Impervious Runoff Depth=2.13"Subcatchment E2: (new Subcat) Flow Length=623' Tc=22.9 min CN=55 Runoff=5.15 cfs 0.453 af Runoff Area=0.342 ac 39.62% Impervious Runoff Depth>5.15"Subcatchment E3: (new Subcat) Tc=6.0 min CN=84 Runoff=2.89 cfs 0.147 af Runoff Area=5.356 ac 25.00% Impervious Runoff Depth=3.63"Subcatchment PR B: Flow Length=774' Tc=16.4 min CN=70 Runoff=23.90 cfs 1.619 af Runoff Area=1.315 ac 25.00% Impervious Runoff Depth=3.63"Subcatchment PR D: (new Subcat) Flow Length=1,199' Tc=20.1 min CN=70 Runoff=5.25 cfs 0.397 af Inflow=92.59 cfs 6.686 afReach PRP: Proposed Outflow=92.59 cfs 6.686 af Peak Elev=511.29' Storage=31,805 cf Inflow=41.77 cfs 1.961 afPond 16P: (new Pond) Outflow=27.83 cfs 1.961 af Total Runoff Area = 25.262 ac Runoff Volume = 6.686 af Average Runoff Depth = 3.18" 82.11% Pervious = 20.743 ac 17.89% Impervious = 4.519 ac Type II 24-hr 50 Yr Rainfall=7.01"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 27HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment A: (new Subcat) Runoff = 15.60 cfs @ 12.09 hrs, Volume= 1.071 af, Depth= 2.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 50 Yr Rainfall=7.01" Area (ac) CN Description 6.034 55 Woods, Good, HSG B 6.034 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.8 150 0.1200 0.18 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 1.3 132 0.1230 1.75 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 15.1 282 Total Subcatchment A: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 50 Yr Rainfall=7.01" Runoff Area=6.034 ac Runoff Volume=1.071 af Runoff Depth=2.13" Flow Length=282' Tc=15.1 min CN=55 15.60 cfs Type II 24-hr 50 Yr Rainfall=7.01"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 28HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment C: (new Subcat) Runoff = 19.08 cfs @ 12.02 hrs, Volume= 1.038 af, Depth= 3.11" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 50 Yr Rainfall=7.01" Area (ac) CN Description 0.823 75 1/4 acre lots, 38% imp, HSG B 2.721 58 Woods/grass comb., Good, HSG B 0.462 89 Paved roads w/open ditches, 50% imp, HSG B 4.006 65 Weighted Average 3.462 86.43% Pervious Area 0.544 13.57% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.4 125 0.2160 0.22 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 0.3 198 0.1570 10.38 166.12 Channel Flow, Area= 16.0 sf Perim= 33.0' r= 0.48' n= 0.035 Earth, dense weeds 9.7 323 Total Subcatchment C: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 50 Yr Rainfall=7.01" Runoff Area=4.006 ac Runoff Volume=1.038 af Runoff Depth=3.11" Flow Length=323' Tc=9.7 min CN=65 19.08 cfs Type II 24-hr 50 Yr Rainfall=7.01"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 29HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment E: (new Subcat) [49] Hint: Tc<2dt may require smaller dt Runoff = 41.77 cfs @ 11.96 hrs, Volume= 1.961 af, Depth= 4.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 50 Yr Rainfall=7.01" Area (ac) CN Description 5.477 75 1/4 acre lots, 38% imp, HSG B 0.181 89 Paved roads w/open ditches, 50% imp, HSG B 5.658 75 Weighted Average 3.486 61.62% Pervious Area 2.172 38.38% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment E: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 50 Yr Rainfall=7.01" Runoff Area=5.658 ac Runoff Volume=1.961 af Runoff Depth=4.16" Tc=5.0 min CN=75 41.77 cfs Type II 24-hr 50 Yr Rainfall=7.01"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 30HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment E2: (new Subcat) Runoff = 5.15 cfs @ 12.18 hrs, Volume= 0.453 af, Depth= 2.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 50 Yr Rainfall=7.01" Area (ac) CN Description 2.551 55 Woods, Good, HSG B 2.551 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.6 150 0.0440 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 1.5 162 0.1320 1.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.8 311 0.0580 6.31 100.97 Channel Flow, Area= 16.0 sf Perim= 33.0' r= 0.48' n= 0.035 Earth, dense weeds 22.9 623 Total Subcatchment E2: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)5 4 3 2 1 0 Type II 24-hr 50 Yr Rainfall=7.01" Runoff Area=2.551 ac Runoff Volume=0.453 af Runoff Depth=2.13" Flow Length=623' Tc=22.9 min CN=55 5.15 cfs Type II 24-hr 50 Yr Rainfall=7.01"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 31HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment E3: (new Subcat) Runoff = 2.89 cfs @ 11.97 hrs, Volume= 0.147 af, Depth> 5.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 50 Yr Rainfall=7.01" Area (ac) CN Description 0.271 89 Paved roads w/open ditches, 50% imp, HSG B 0.071 65 Woods/grass comb., Fair, HSG B 0.342 84 Weighted Average 0.207 60.38% Pervious Area 0.136 39.62% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment E3: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)3 2 1 0 Type II 24-hr 50 Yr Rainfall=7.01" Runoff Area=0.342 ac Runoff Volume=0.147 af Runoff Depth>5.15" Tc=6.0 min CN=84 2.89 cfs Type II 24-hr 50 Yr Rainfall=7.01"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 32HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment PR B: Runoff = 23.90 cfs @ 12.09 hrs, Volume= 1.619 af, Depth= 3.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 50 Yr Rainfall=7.01" Area (ac) CN Description 5.356 70 1/2 acre lots, 25% imp, HSG B 4.017 75.00% Pervious Area 1.339 25.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.6 150 0.0830 0.24 Sheet Flow, Grass: Dense n= 0.240 P2= 3.55" 5.1 212 0.0190 0.69 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.1 123 0.1070 30.87 218.18 Pipe Channel, RCP_Round 36" 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 Concrete pipe, bends & connections 0.6 289 0.1110 8.39 134.31 Channel Flow, Area= 16.0 sf Perim= 35.0' r= 0.46' n= 0.035 Earth, dense weeds 16.4 774 Total Subcatchment PR B: Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 50 Yr Rainfall=7.01" Runoff Area=5.356 ac Runoff Volume=1.619 af Runoff Depth=3.63" Flow Length=774' Tc=16.4 min CN=70 23.90 cfs Type II 24-hr 50 Yr Rainfall=7.01"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 33HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment PR D: (new Subcat) Runoff = 5.25 cfs @ 12.13 hrs, Volume= 0.397 af, Depth= 3.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 50 Yr Rainfall=7.01" Area (ac) CN Description 1.315 70 1/2 acre lots, 25% imp, HSG B 0.986 75.00% Pervious Area 0.329 25.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.8 150 0.0730 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.55" 1.5 139 0.0900 1.50 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.2 99 0.0250 9.40 16.61 Pipe Channel, RCP_Round 18" 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, bends & connections 1.1 511 0.0180 7.98 14.09 Pipe Channel, RCP_Round 18" 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, bends & connections 0.5 300 0.1380 9.73 155.75 Channel Flow, Area= 16.0 sf Perim= 33.0' r= 0.48' n= 0.035 Earth, dense weeds 20.1 1,199 Total Type II 24-hr 50 Yr Rainfall=7.01"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 34HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Subcatchment PR D: (new Subcat) Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)5 4 3 2 1 0 Type II 24-hr 50 Yr Rainfall=7.01" Runoff Area=1.315 ac Runoff Volume=0.397 af Runoff Depth=3.63" Flow Length=1,199' Tc=20.1 min CN=70 5.25 cfs Type II 24-hr 50 Yr Rainfall=7.01"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 35HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Reach PRP: Proposed [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 25.262 ac, 17.89% Impervious, Inflow Depth = 3.18" for 50 Yr event Inflow = 92.59 cfs @ 12.05 hrs, Volume= 6.686 af Outflow = 92.59 cfs @ 12.05 hrs, Volume= 6.686 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Reach PRP: Proposed Inflow Outflow Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=25.262 ac 92.59 cfs92.59 cfs Type II 24-hr 50 Yr Rainfall=7.01"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 36HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond 16P: (new Pond) [95] Warning: Outlet Device #3 rise exceeded Inflow Area = 5.658 ac, 38.38% Impervious, Inflow Depth = 4.16" for 50 Yr event Inflow = 41.77 cfs @ 11.96 hrs, Volume= 1.961 af Outflow = 27.83 cfs @ 12.03 hrs, Volume= 1.961 af, Atten= 33%, Lag= 4.5 min Primary = 27.83 cfs @ 12.03 hrs, Volume= 1.961 af Routing by Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 511.29' @ 12.03 hrs Surf.Area= 9,257 sf Storage= 31,805 cf Plug-Flow detention time= 311.8 min calculated for 1.960 af (100% of inflow) Center-of-Mass det. time= 312.7 min ( 1,128.4 - 815.6 ) Volume Invert Avail.Storage Storage Description #1 506.50' 38,677 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 506.50 4,234 0 0 507.50 5,175 4,705 4,705 508.50 6,172 5,674 10,378 509.50 7,225 6,699 17,077 510.50 8,335 7,780 24,857 511.50 9,502 8,919 33,775 512.00 10,107 4,902 38,677 Device Routing Invert Outlet Devices #1 Primary 503.50'18.0" Round Culvert L= 70.0' Ke= 0.500 Inlet / Outlet Invert= 503.50' / 502.80' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.77 sf #2 Device 1 503.50'4.0" Vert. Orifice/Grate C= 0.600 #3 Device 2 506.50'Sand Filter Head (feet) 0.00 0.05 0.10 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 4.00 Disch. (cfs) 0.000 0.091 0.092 0.097 0.105 0.113 0.122 0.130 0.138 0.146 0.154 0.219 #4 Device 1 509.00'6.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 510.50'24.0" x 24.0" Horiz. Orifice/Grate X 0.80 C= 0.600 Limited to weir flow at low heads #6 Primary 510.75'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=26.74 cfs @ 12.03 hrs HW=511.27' (Free Discharge) 1=Culvert (Passes 16.91 cfs of 22.45 cfs potential flow) 2=Orifice/Grate (Passes 0.22 cfs of 1.16 cfs potential flow) 3=Sand Filter (Custom Controls 0.22 cfs) 4=Orifice/Grate (Orifice Controls 3.19 cfs @ 6.38 fps) 5=Orifice/Grate (Orifice Controls 13.50 cfs @ 3.37 fps) 6=Broad-Crested Rectangular Weir (Weir Controls 9.83 cfs @ 1.90 fps) Type II 24-hr 50 Yr Rainfall=7.01"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 37HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond 16P: (new Pond) Inflow Primary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=5.658 ac Peak Elev=511.29' Storage=31,805 cf 41.77 cfs 27.83 cfs Basin 1 Sand Filter WQv Rainfall = 1 inch Total Area = 5.658 acres Impervious = 2.26 acres % Imp = 40% Rv = 0.05+(0.009I) Rv = 0.41 WQv = 0.193 ac‐ft WQv = 8404 cu‐ft Forebay Vol = 1681 cu‐ft (required) 1120.508 sf @ 1.5' high Filtration Media Surface Area Af = (WQv)(df)/[(k)(hf+df)(tf)] WQv 8404 cubic‐feet water quality volume Top of Sand 506.25 ft WQv Elev 507.41 ft hf 0.58 ft average height of water above surface of bed df 2.5 ft filter bed depth k 3.5 ft/day coefficient of permeability (3.5 feet/day) tf 2 days Af 974 square feet minimum required area of sand filter Af 2000 square feet area provided WQv Provided 17248 cubic‐feet Flow Rate Rating Curve Q = (Af)[3.5*(hf+df)]/df Sand filter surface elevation = 506.25 ft Water Quality Volume Elevation = 507.41 ft Area of Sand filter = 2000 sf df = 2.5 ft elev. flow (ft) (cfs) 506.50 0.000 506.55 0.091 506.60 0.092 506.75 0.097 507.00 0.105 507.25 0.113 507.50 0.122 507.75 0.130 508.00 0.138 508.25 0.146 508.50 0.154 510.50 0.219 E WQ MOD CN 18P (new Pond) Routing Diagram for Lindsay Meadows Prepared by {enter your company name here}, Printed 6/25/2018 HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Subcat Reach Pond Link Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 2HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pipe Listing (selected nodes) Line# Node Number In-Invert (feet) Out-Invert (feet) Length (feet) Slope (ft/ft) n Diam/Width (inches) Height (inches) Inside-Fill (inches) 1 18P 503.50 502.80 70.0 0.0100 0.013 18.0 0.0 0.0 Type II 24-hr WQV Rainfall=2.06"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 3HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Time span=5.00-96.00 hrs, dt=0.05 hrs, 1821 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=5.658 ac 38.38% Impervious Runoff Depth=0.41"Subcatchment E WQ: MOD CN Tc=5.0 min CN=75 Runoff=3.81 cfs 0.194 af Peak Elev=507.41' Storage=4,260 cf Inflow=3.81 cfs 0.194 afPond 18P: (new Pond) Outflow=0.12 cfs 0.194 af Total Runoff Area = 5.658 ac Runoff Volume = 0.194 af Average Runoff Depth = 0.41" 61.62% Pervious = 3.486 ac 38.38% Impervious = 2.172 ac Type II 24-hr WQV Rainfall=2.06"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 4HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment E WQ: MOD CN [49] Hint: Tc<2dt may require smaller dt Runoff = 3.81 cfs @ 11.98 hrs, Volume= 0.194 af, Depth= 0.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr WQV Rainfall=2.06" Area (ac) CN Description 5.477 75 1/4 acre lots, 38% imp, HSG B 0.181 89 Paved roads w/open ditches, 50% imp, HSG B 5.658 75 Weighted Average 3.486 61.62% Pervious Area 2.172 38.38% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment E WQ: MOD CN Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)4 3 2 1 0 Type II 24-hr WQV Rainfall=2.06" Runoff Area=5.658 ac Runoff Volume=0.194 af Runoff Depth=0.41" Tc=5.0 min CN=75 3.81 cfs Type II 24-hr WQV Rainfall=2.06"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 5HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E WQ: MOD CN Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 5.00 0.13 0.00 0.00 6.00 0.16 0.00 0.00 7.00 0.20 0.00 0.00 8.00 0.25 0.00 0.00 9.00 0.30 0.00 0.00 10.00 0.37 0.00 0.00 11.00 0.48 0.00 0.00 12.00 1.37 0.12 3.63 13.00 1.59 0.20 0.29 14.00 1.69 0.24 0.19 15.00 1.76 0.27 0.15 16.00 1.81 0.29 0.12 17.00 1.86 0.31 0.11 18.00 1.90 0.33 0.10 19.00 1.93 0.35 0.09 20.00 1.96 0.36 0.07 21.00 1.99 0.37 0.07 22.00 2.01 0.39 0.07 23.00 2.04 0.40 0.07 24.00 2.06 0.41 0.07 25.00 2.06 0.41 0.00 26.00 2.06 0.41 0.00 27.00 2.06 0.41 0.00 28.00 2.06 0.41 0.00 29.00 2.06 0.41 0.00 30.00 2.06 0.41 0.00 31.00 2.06 0.41 0.00 32.00 2.06 0.41 0.00 33.00 2.06 0.41 0.00 34.00 2.06 0.41 0.00 35.00 2.06 0.41 0.00 36.00 2.06 0.41 0.00 37.00 2.06 0.41 0.00 38.00 2.06 0.41 0.00 39.00 2.06 0.41 0.00 40.00 2.06 0.41 0.00 41.00 2.06 0.41 0.00 42.00 2.06 0.41 0.00 43.00 2.06 0.41 0.00 44.00 2.06 0.41 0.00 45.00 2.06 0.41 0.00 46.00 2.06 0.41 0.00 47.00 2.06 0.41 0.00 48.00 2.06 0.41 0.00 49.00 2.06 0.41 0.00 50.00 2.06 0.41 0.00 51.00 2.06 0.41 0.00 52.00 2.06 0.41 0.00 53.00 2.06 0.41 0.00 54.00 2.06 0.41 0.00 55.00 2.06 0.41 0.00 56.00 2.06 0.41 0.00 57.00 2.06 0.41 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 58.00 2.06 0.41 0.00 59.00 2.06 0.41 0.00 60.00 2.06 0.41 0.00 61.00 2.06 0.41 0.00 62.00 2.06 0.41 0.00 63.00 2.06 0.41 0.00 64.00 2.06 0.41 0.00 65.00 2.06 0.41 0.00 66.00 2.06 0.41 0.00 67.00 2.06 0.41 0.00 68.00 2.06 0.41 0.00 69.00 2.06 0.41 0.00 70.00 2.06 0.41 0.00 71.00 2.06 0.41 0.00 72.00 2.06 0.41 0.00 73.00 2.06 0.41 0.00 74.00 2.06 0.41 0.00 75.00 2.06 0.41 0.00 76.00 2.06 0.41 0.00 77.00 2.06 0.41 0.00 78.00 2.06 0.41 0.00 79.00 2.06 0.41 0.00 80.00 2.06 0.41 0.00 81.00 2.06 0.41 0.00 82.00 2.06 0.41 0.00 83.00 2.06 0.41 0.00 84.00 2.06 0.41 0.00 85.00 2.06 0.41 0.00 86.00 2.06 0.41 0.00 87.00 2.06 0.41 0.00 88.00 2.06 0.41 0.00 89.00 2.06 0.41 0.00 90.00 2.06 0.41 0.00 91.00 2.06 0.41 0.00 92.00 2.06 0.41 0.00 93.00 2.06 0.41 0.00 94.00 2.06 0.41 0.00 95.00 2.06 0.41 0.00 96.00 2.06 0.41 0.00 Type II 24-hr WQV Rainfall=2.06"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 6HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond 18P: (new Pond) Inflow Area = 5.658 ac, 38.38% Impervious, Inflow Depth = 0.41" for WQV event Inflow = 3.81 cfs @ 11.98 hrs, Volume= 0.194 af Outflow = 0.12 cfs @ 16.25 hrs, Volume= 0.194 af, Atten= 97%, Lag= 256.6 min Primary = 0.12 cfs @ 16.25 hrs, Volume= 0.194 af Routing by Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 507.41' @ 16.25 hrs Surf.Area= 5,093 sf Storage= 4,260 cf Plug-Flow detention time= 438.3 min calculated for 0.194 af (100% of inflow) Center-of-Mass det. time= 438.4 min ( 1,326.5 - 888.1 ) Volume Invert Avail.Storage Storage Description #1 506.50' 38,677 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 506.50 4,234 0 0 507.50 5,175 4,705 4,705 508.50 6,172 5,674 10,378 509.50 7,225 6,699 17,077 510.50 8,335 7,780 24,857 511.50 9,502 8,919 33,775 512.00 10,107 4,902 38,677 Device Routing Invert Outlet Devices #1 Primary 503.50'18.0" Round Culvert L= 70.0' Ke= 0.500 Inlet / Outlet Invert= 503.50' / 502.80' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.77 sf #2 Device 1 503.50'4.0" Vert. Orifice/Grate C= 0.600 #3 Device 2 506.50'Sand Filter Head (feet) 0.00 0.05 0.10 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 4.00 Disch. (cfs) 0.000 0.091 0.092 0.097 0.105 0.113 0.122 0.130 0.138 0.146 0.154 0.219 #4 Device 1 509.00'6.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 510.50'24.0" x 24.0" Horiz. Orifice/Grate X 0.80 C= 0.600 Limited to weir flow at low heads #6 Primary 510.75'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.12 cfs @ 16.25 hrs HW=507.41' (Free Discharge) 1=Culvert (Passes 0.12 cfs of 15.01 cfs potential flow) 2=Orifice/Grate (Passes 0.12 cfs of 0.81 cfs potential flow) 3=Sand Filter (Custom Controls 0.12 cfs) 4=Orifice/Grate ( Controls 0.00 cfs) 5=Orifice/Grate ( Controls 0.00 cfs) 6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr WQV Rainfall=2.06"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 7HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond 18P: (new Pond) Inflow Primary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)4 3 2 1 0 Inflow Area=5.658 ac Peak Elev=507.41' Storage=4,260 cf 3.81 cfs 0.12 cfs Type II 24-hr WQV Rainfall=2.06"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 8HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Hydrograph for Pond 18P: (new Pond) Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 5.00 0.00 0 506.50 0.00 7.50 0.00 0 506.50 0.00 10.00 0.00 0 506.50 0.00 12.50 0.44 3,151 507.19 0.11 15.00 0.15 4,184 507.40 0.12 17.50 0.11 4,231 507.41 0.12 20.00 0.07 3,982 507.36 0.12 22.50 0.07 3,583 507.28 0.11 25.00 0.00 2,952 507.15 0.11 27.50 0.00 1,993 506.95 0.10 30.00 0.00 1,091 506.75 0.10 32.50 0.00 246 506.56 0.09 35.00 0.00 5 506.50 0.00 37.50 0.00 0 506.50 0.00 40.00 0.00 0 506.50 0.00 42.50 0.00 0 506.50 0.00 45.00 0.00 0 506.50 0.00 47.50 0.00 0 506.50 0.00 50.00 0.00 0 506.50 0.00 52.50 0.00 0 506.50 0.00 55.00 0.00 0 506.50 0.00 57.50 0.00 0 506.50 0.00 60.00 0.00 0 506.50 0.00 62.50 0.00 0 506.50 0.00 65.00 0.00 0 506.50 0.00 67.50 0.00 0 506.50 0.00 70.00 0.00 0 506.50 0.00 72.50 0.00 0 506.50 0.00 75.00 0.00 0 506.50 0.00 77.50 0.00 0 506.50 0.00 80.00 0.00 0 506.50 0.00 82.50 0.00 0 506.50 0.00 85.00 0.00 0 506.50 0.00 87.50 0.00 0 506.50 0.00 90.00 0.00 0 506.50 0.00 92.50 0.00 0 506.50 0.00 95.00 0.00 0 506.50 0.00 Type II 24-hr WQV Rainfall=2.06"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 9HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Stage-Discharge for Pond 18P: (new Pond) Elevation (feet) Primary (cfs) 506.50 0.00 506.54 0.07 506.58 0.09 506.62 0.09 506.66 0.09 506.70 0.10 506.74 0.10 506.78 0.10 506.82 0.10 506.86 0.10 506.90 0.10 506.94 0.10 506.98 0.10 507.02 0.11 507.06 0.11 507.10 0.11 507.14 0.11 507.18 0.11 507.22 0.11 507.26 0.11 507.30 0.11 507.34 0.12 507.38 0.12 507.42 0.12 507.46 0.12 507.50 0.12 507.54 0.12 507.58 0.12 507.62 0.13 507.66 0.13 507.70 0.13 507.74 0.13 507.78 0.13 507.82 0.13 507.86 0.13 507.90 0.13 507.94 0.14 507.98 0.14 508.02 0.14 508.06 0.14 508.10 0.14 508.14 0.14 508.18 0.14 508.22 0.15 508.26 0.15 508.30 0.15 508.34 0.15 508.38 0.15 508.42 0.15 508.46 0.15 508.50 0.15 508.54 0.16 508.58 0.16 Elevation (feet) Primary (cfs) 508.62 0.16 508.66 0.16 508.70 0.16 508.74 0.16 508.78 0.16 508.82 0.16 508.86 0.17 508.90 0.17 508.94 0.17 508.98 0.17 509.02 0.18 509.06 0.20 509.10 0.22 509.14 0.26 509.18 0.30 509.22 0.34 509.26 0.39 509.30 0.44 509.34 0.50 509.38 0.56 509.42 0.62 509.46 0.69 509.50 0.75 509.54 0.82 509.58 0.90 509.62 0.97 509.66 1.05 509.70 1.13 509.74 1.22 509.78 1.30 509.82 1.39 509.86 1.48 509.90 1.57 509.94 1.66 509.98 1.76 510.02 1.85 510.06 1.93 510.10 2.01 510.14 2.08 510.18 2.14 510.22 2.21 510.26 2.27 510.30 2.33 510.34 2.39 510.38 2.44 510.42 2.50 510.46 2.55 510.50 2.60 510.54 2.82 510.58 3.17 510.62 3.61 510.66 4.13 510.70 4.71 Elevation (feet) Primary (cfs) 510.74 5.34 510.78 6.16 510.82 7.22 510.86 8.44 510.90 9.79 510.94 11.26 510.98 12.85 511.02 14.55 511.06 16.35 511.10 18.24 511.14 20.23 511.18 22.34 511.22 24.56 511.26 26.44 511.30 28.09 511.34 29.80 511.38 31.46 511.42 33.11 511.46 34.80 511.50 36.51 511.54 38.25 511.58 40.02 511.62 41.82 511.66 43.65 511.70 45.50 511.74 47.38 511.78 49.31 511.82 51.28 511.86 53.28 511.90 55.32 511.94 57.38 511.98 59.40 Type II 24-hr WQV Rainfall=2.06"Lindsay Meadows Printed 6/25/2018Prepared by {enter your company name here} Page 10HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 18P: (new Pond) Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 506.50 4,234 0 506.60 4,328 428 506.70 4,422 866 506.80 4,516 1,313 506.90 4,610 1,769 507.00 4,705 2,235 507.10 4,799 2,710 507.20 4,893 3,194 507.30 4,987 3,688 507.40 5,081 4,192 507.50 5,175 4,705 507.60 5,275 5,227 507.70 5,374 5,759 507.80 5,474 6,302 507.90 5,574 6,854 508.00 5,674 7,417 508.10 5,773 7,989 508.20 5,873 8,571 508.30 5,973 9,164 508.40 6,072 9,766 508.50 6,172 10,378 508.60 6,277 11,000 508.70 6,383 11,633 508.80 6,488 12,277 508.90 6,593 12,931 509.00 6,699 13,596 509.10 6,804 14,271 509.20 6,909 14,956 509.30 7,014 15,653 509.40 7,120 16,359 509.50 7,225 17,077 509.60 7,336 17,805 509.70 7,447 18,544 509.80 7,558 19,294 509.90 7,669 20,055 510.00 7,780 20,828 510.10 7,891 21,611 510.20 8,002 22,406 510.30 8,113 23,212 510.40 8,224 24,029 510.50 8,335 24,857 510.60 8,452 25,696 510.70 8,568 26,547 510.80 8,685 27,410 510.90 8,802 28,284 511.00 8,919 29,170 511.10 9,035 30,068 511.20 9,152 30,977 511.30 9,269 31,898 511.40 9,385 32,831 511.50 9,502 33,775 511.60 9,623 34,731 511.70 9,744 35,700 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 511.80 9,865 36,680 511.90 9,986 37,673 512.00 10,107 38,677 June 28, 2018 Cardno, Inc. C-1 Storm Water Management Plan Lindsay Meadows Subdivision APPENDIX HYDRAULIC ANALYSIS Appendix C Storm Water Management Plan Hydrologic Analysis Lindsay Meadows Subdivision June 28, 2018 Cardno, Inc. C-1 Storm Water Management Plan Appendix C Hydraulic Analysis C.1 Storm Sewer Design Calculations C.2 Storm Sewer Spread Calculations C.3 Rip Rap Outlet Calculations SHT1Project:Lindsay MeadowsJob No.:AH4R17004Revised:10Yr Design Stormn=0.012Intensity Reference:Revised:Cap.25 YEAR HYDRAULIC GRADE LINECumul Delta t Sum tFlowing % Full25 Yr Rainfall Discharge Slope Minor 25 Yr HGLIndex CA Min. Min. in/hr CFS FullIntensity Q % Lossesw/o minor lossesCB-13 9+06.91 0.09 0.090.60 5.005.00 6.70 0.36535.99 539.740.00 0.60 0.05 22.00 15 1.00% 5.7 7.0 5% OK2.31ft. cover7.58 0.41 0.0034 -536.993.75ft. depthokCB-12 8+84.91 0.13 0.22 0.60 0.06 5.06 6.68 0.88535.67 535.77 539.740.10 DROPmatch crown/0.1 min0.00 0.60 0.13 43.44 15 1.00% 5.7 7.0 13% OK2.53ft. cover7.56 1.00 0.0202 -536.674.07ft. depthokCB-11 8+41.47 0.04 0.26 0.60 0.13 5.19 6.64 1.04535.14 535.24 538.830.10 DROPmatch crown/0.1 min0.00 0.60 0.16 22.00 15 1.00% 5.7 7.0 15% OK2.15ft. cover7.52 1.18 0.0283 -536.143.69ft. depthokCB-7 8+19.47530.50 534.92 538.834.42 DROPmatch crown/0.1 min2.47ft. cover531.508.33ft. depthok0.00match crown/0.1 minCB-10 8+19.47 0.13 0.130.60 5.005.00 6.70 0.53531.92 539.740.00 0.60 0.08 28.90 15 1.00% 5.7 7.0 8% OK6.38ft. cover7.58 0.60 0.0073 -532.927.82ft. depthokCB-9 7+90.57 0.07 0.20 0.60 0.08 5.08 6.67 0.82531.53 531.63 535.350.10 DROPmatch crown/0.1 min0.00 0.60 0.12 81.03 15 0.50% 4.0 5.0 16% OK2.28ft. cover7.55 0.92 0.0174 -532.533.82ft. depthokCB-8 7+09.54 0.07 0.32 0.60 0.33 5.42 6.57 1.25531.02 531.12 535.350.10 DROPmatch crown/0.1 min0.04 0.60 0.19 83.88 15 0.50% 4.0 5.0 25% OK2.79ft. cover7.44 1.41 0.0404 -532.024.33ft. depthokCB-7 6+25.66 0.09 0.67 0.60 0.35 5.76 6.47 2.60530.50 530.60 538.830.10 DROPmatch crown/0.1 min0.26 0.60 0.40 77.75 15 0.50% 4.0 5.0 52% OK6.79ft. cover7.32 2.94 0.1756 -531.508.33ft. depthokCB-6 5+47.91 0.09 0.76 0.60 0.32 6.08 6.38 2.90530.01 530.11 537.710.10 DROPmatch crown/0.1 min0.00 0.60 0.45 138.49 15 2.01% 8.1 9.9 29% OK6.16ft. cover7.22 3.29 0.2192 -531.017.70ft. depthokCB-5 4+09.42 0.22 1.96 0.60 0.28 6.37 6.30 7.40526.88 527.23 532.010.35 DROPmatch crown/0.1 min0.98 0.60 1.17 155.30 18 1.00% 6.5 11.4 65% OK3.34ft. cover7.14 8.37 0.5386 -528.085.13ft. depthokCB-4 2+54.12 0.19 2.90 0.60 0.40 6.77 6.19 10.78525.23 525.33 530.180.10 DROPmatch crown/0.1 min0.75 0.60 1.74 46.77 18 4.47% 13.7 24.1 45% OK3.14ft. cover7.02 12.20 1.1440 -526.434.95ft. depthokCB-3 2+07.35 0.73 3.63 0.60 0.06 6.83 6.18 13.47523.04 523.14 527.930.10 DROPmatch crown/0.1 min0.00 0.60 2.18 163.96 18 9.00% 19.4 34.2 39% OK3.08ft. cover7.00 15.26 1.7881 -524.244.89ft. depthokCB-2 0+43.39 0.00 3.63 0.60 0.14 6.97 6.14 13.39507.79 508.29 512.790.50 DROPmatch crown/0.1 min0.00 0.60 2.18 43.39 24 0.40% 4.9 15.5 86% OK2.75ft. cover6.96 15.17 0.3811 -509.395.00ft. depthokFES-1 0+00.00507.62 510.330.00 DROPmatch crown/0.1 min0.46ft. cover509.22okmatch crown/0.1 min Dia. InTCTime Drainage AreaCSTORM SEWER COMPUTATION SHEETDate:By:8/10/18PFDChecked:Status OUT INStruc.Cumul.TribRemarksSlope% VelIntensityDes QLength ft.Struc.Sta.Union County NCW:\American Homes\Waxhaw\Civil\Design\Calculations\Stormwater\Storm Sewer\StmCalc Lindsay Meadows.xlsx 1 of 18/10/20182:21 PM SHT2Project:Lindsay MeadowsJob No.:AH4R17004Revised:10Yr Design Stormn=0.012Intensity Reference:Revised:Cap.25 YEAR HYDRAULIC GRADE LINECumul Delta t Sum tFlowing % Full25 Yr Rainfall Discharge Slope Minor 25 Yr HGLIndex CA Min. Min. in/hr CFS FullIntensity Q % Lossesw/o minor lossesCB-16 0+22.00 0.04 0.040.605.00 5.00 6.70 0.16534.19 535.35match crown/0.1 min0.00 0.60 0.02 22.00 15 1.00% 5.7 7.0 2% OK-0.28ft. cover7.58 0.18 0.0007 -535.191.16ft. depthokCB-8 0+00.00531.02 533.97 535.352.95 DROPmatch crown/0.1 min-0.06ft. cover532.024.33ft. depthokmatch crown/0.1 min CB-15 0+22.00 0.98 0.980.605.00 5.00 6.70 3.94527.45 532.01match crown/0.1 min0.00 0.60 0.59 22.00 15 1.00% 5.7 7.0 56% OK3.12ft. cover7.58 4.46 0.4036 -528.454.56ft. depthokCB-5 0+00.00526.88 527.23 532.010.35 DROPmatch crown/0.1 min3.34ft. cover528.085.13ft. depthokmatch crown/0.1 min CB-14 0+23.03 0.75 0.750.605.00 5.00 6.70 3.01526.65 530.19match crown/0.1 min0.00 0.60 0.45 23.03 15 1.00% 5.7 7.0 43% OK2.10ft. cover7.58 3.41 0.2364 -527.653.54ft. depthokCB-4 0+00.00525.23 526.42 530.181.19 DROPmatch crown/0.1 min2.32ft. cover526.434.95ft. depthokmatch crown/0.1 min CB-17 0+44.00 0.77 0.770.605.00 5.00 6.70 3.09506.22 509.13match crown/0.1 min0.00 0.60 0.46 44.00 15 0.50% 4.0 5.0 62% OK1.47ft. cover7.58 3.50 0.2492 -507.222.91ft. depthokFES-2 0+00.00506.00 508.000.00 DROPmatch crown/0.1 min0.56ft. cover507.00okmatch crown/0.1 min Checked:Status OutUnion County NCVelIntensityDes QLength ft.Dia. InTimeStruc.Sta.STORM SEWER COMPUTATION SHEETDate:By:8/10/18PFDIn Drainage AreaCRemarksSlope% TCStruc.Cumul.TribW:\American Homes\Waxhaw\Civil\Design\Calculations\Stormwater\Storm Sewer\StmCalc Lindsay Meadows.xlsx 1 of 18/10/20182:21 PM SHT3Project:Lindsay MeadowsJob No.:AH4R17004Revised:10Yr Design Stormn=0.012Intensity Reference:Revised:Cap.25 YEAR HYDRAULIC GRADE LINECumul Delta t Sum tFlowing % Full25 Yr Rainfall Discharge Slope Minor 25 Yr HGLIndex CA Min. Min. in/hr CFS FullIntensity Q % Lossesw/o minor lossesMH-26 7+63.27 0.61 0.610.6010.00 10.00 5.46 2.00541.26 544.560.00 0.60 0.37 34.07 15 1.00% 5.7 7.0 29% OK1.86ft. cover6.20 2.27 0.1047 -542.263.30ft. depthokMH-25 7+29.20 0.00 0.61 0.60 0.10 10.10 5.44 1.99539.72 540.92 546.181.20 DROPmatch crown/0.1 min0.00 0.60 0.37 166.97 15 1.00% 5.7 7.0 28% OK3.82ft. cover6.18 2.26 0.1039 -540.726.46ft. depthokMH-24 5+62.23 1.32 1.320.6010.00 10.00 5.46 4.31537.80 538.05 541.830.25match crown/0.1 min0.00 0.60 0.79 243.06 18 1.00% 6.5 11.4 38% OK2.32ft. cover6.20 4.89 0.1840 -539.004.03ft. depthokMH-23 3+19.17 0.00 1.32 0.60 0.63 10.63 5.34 4.22535.27 535.37 544.140.10 DROPmatch crown/0.1 min0.00 0.60 0.79 67.20 18 1.00% 6.5 11.4 37% OK7.06ft. cover6.07 4.79 0.1761 -536.478.87ft. depthokMH-22 2+51.97 0.00 1.32 0.60 0.17 10.80 5.31 4.19534.50 534.60 544.060.10 DROPmatch crown/0.1 min0.00 0.60 0.79 218.53 18 5.76% 15.5 27.4 15% OK7.75ft. cover6.03 4.76 0.1741 -535.709.56ft. depthokMH-21 0+33.44 5.36 6.67 0.60 0.24 11.04 5.27 21.09519.00 521.91 527.982.91 DROPmatch crown/0.1 min0.00 0.60 4.00 33.44 36 0.50% 7.2 51.2 41% OK4.36ft. cover5.99 23.96 0.1094 -521.408.98ft. depthokFES-20 0+00.00518.83 518.830.00 DROPmatch crown/0.1 minft. cover521.23ft. depthmatch crown/0.1 min match crown/0.1 min match crown/0.1 min match crown/0.1 min match crown/0.1 min match crown/0.1 min match crown/0.1 min match crown/0.1 min Union County NCDia. InTCStruc.Sta.STORM SEWER COMPUTATION SHEETDate:By:8/10/18PFDChecked:Status OUT INStruc.Cumul.TribTime Drainage AreaCRemarksSlope% VelIntensityDes QLength ft.W:\American Homes\Waxhaw\Civil\Design\Calculations\Stormwater\Storm Sewer\StmCalc Lindsay Meadows.xlsx 1 of 18/10/20182:22 PM Project:Lindsay MeadowsJob No.:AH4R17004GutterEoIndex(ft/ft) Cht 2ACB-15 CI Gutter Flow 1.02 4.00 0.65 2.65 Bypass 2.65 0.0190 0.0313 0.0417 0.6800 23 0.016 4.66 0.28 2.72 No BypassCB-14 CI Gutter Flow 0.73 4.00 0.65 1.90 1.90 0.0400 0.0313 0.0417 0.6800 28 0.016 3.57 0.21 2.13 No BypassCB-3 CI Sag 0.75 4.00 0.65 1.95 1.95 - 0.0313 0.0417 0.6800 "---" 0.016 3.22 0.19 1.93 0.02CB-6 CI Gutter Flow 0.09 4.00 0.65 0.23 0.00 0.23 0.0480 0.0313 0.0417 0.6800 30 0.016 1.57 0.09 0.58 No BypassCB-5 CI Gutter Flow 0.22 4.00 0.65 0.57 0.57 0.0190 0.0313 0.0417 0.6800 230.016 2.62 0.16 1.04 No BypassCB-4 CI Gutter Flow 0.19 4.00 0.65 0.49 0.49 0.0480 0.0313 0.0417 0.6800 300.016 2.08 0.12 0.93 No BypassCB-12 CI Gutter Flow 0.13 4.00 0.65 0.34 0.00 0.34 0.0190 0.0313 0.0417 0.6800 23 0.016 2.15 0.13 0.75 No BypassCB-13 CI Gutter Flow 0.09 4.00 0.65 0.23 0.00 0.23 0.0190 0.0313 0.0417 0.6800 23 0.016 1.87 0.11 0.60 No BypassCB-16 CI Gutter Flow 0.04 4.00 0.65 0.10 0.10 0.0260 0.0313 0.0417 0.6800 24 0.016 1.30 0.08 0.34 No BypassCB-10 CI Gutter Flow 0.19 4.00 0.65 0.49 0.49 0.0450 0.0313 0.0417 0.6800 29 0.016 2.11 0.13 0.91 No BypassCurb InletCurb InletCurb InletFlow TypeInlet Capacity (cfs)Weighted CTributary Area (Ac)Intensity (in/hr)Long. (ft/ft)Trans. (ft/ft)NSurface Q (cfs)Bypass Q (cfs)SlopeSPREAD COMPUTATION SHEETDate:By:8/10/18PFDCurb InletCurb InletChecked:K (Figure 5-1)T - Spread (ft)D - Depth (ft)Total Q (cfs)BypassQ (cfs)To InletMecklenburg County NCCommentsStruc.Struc.SumpCurb InletCurb InletCurb InletCurb InletCurb InletW:\American Homes\Waxhaw\Civil\Design\Calculations\Stormwater\Storm Sewer\SpreadCalc Lindsay Meadows.xlsx1 of 18/10/20182:23 PM Project:Lindsay MeadowsJob No.:GutterEoIndex(ft/ft) Cht 2ACB-8 CI Gutter Flow 0.09 4.00 0.65 0.23 Bypass 0.23 0.0260 0.0313 0.0417 0.6800 24 0.016 1.77 0.11 0.56 No BypassCB-9 CI Gutter Flow 0.07 4.00 0.65 0.18 0.18 0.0480 0.0313 0.0417 0.6800 300.016 1.43 0.09 0.50 No BypassCommentsQ (cfs)To InletCurb InletCurb InletT - Spread (ft)Struc.Struc.Flow TypeTributary Area (Ac)Intensity (in/hr)Weighted CD - Depth (ft)Inlet Capacity (cfs)BypassSurface Q (cfs)Bypass Q (cfs)Total Q (cfs)SlopeLong. (ft/ft)Trans. (ft/ft)K (Figure 5-1)NMecklenburg County NCChecked:SPREAD COMPUTATION SHEETDate:8/10/18By:PFDW:\American Homes\Waxhaw\Civil\Design\Calculations\Stormwater\Storm Sewer\SpreadCalc Lindsay Meadows.xlsx1 of 18/10/20182:23 PM June 28, 2018 Cardno, Inc. C-1 Storm Water Management Plan Lindsay Meadows Subdivision APPENDIX REFERENCE MATERIAL Appendix D Storm Water Management Plan Hydrologic Analysis Lindsay Meadows Subdivision June 28, 2018 Cardno, Inc. C-1 Storm Water Management Plan Appendix D Reference Material D.1 Web Soil Survey – Soils Group Report D.2 NOAA Precipitation Data Table Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Union County, North Carolina Lindsay Meadows - Waxhaw, NC Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/31/2018 Page 4 of 4