Loading...
HomeMy WebLinkAbout20181357 Ver 1_Updated THPO_201810091 Joey Lawler From:Caitlin Rogers <caitlinh@ccppcrafts.com> Sent:Wednesday, August 8, 2018 12:17 PM To:Joey Lawler Subject:Re: PSNC South Point Road HDD Project 2016-8-17 Mr. Lawler, The Catawba have no concerns with the changes to the project. If you need anything else let me know. Thanks Caitlin On Fri, Aug 3, 2018 at 7:54 AM, Joey Lawler <JLawler@smeinc.com> wrote: Good morning Ms. Totherow: This correspondence is in regard to the PSNC Energy (PSNC) South Point Road HDD Project. PSNC is planning to install a natural gas pipeline beneath the Duke Energy Plant Allen discharge canal at South Point Road near the Town of Belmont, Gaston County, North Carolina (FERC Project No. 2232). The new pipeline will be installed beneath the canal by horizontal directional drill (HDD) to avoid impacts, and will connect existing natural gas lines located along South Point Road on either side of the canal. Information regarding the project was originally provided to you for review on August 3, 2016. The Catawba Indian Nation provided a response letter on August 22, 2016 (see attached). The original HDD location was designed to closely parallel the west side of South Point Road the bridge over the canal. However, since the time of our original submittal to you, PSNC discovered that the North Carolina Department of Transportation (NCDOT) planned to conduct work at the bridge that would conflict with the proposed natural gas pipeline location. Accordingly, construction of the project was delayed, and the HDD was re-designed to cross a portion of the canal approximately 100 feet further west of the location originally proposed. PSNC also plans to reduce the dimeter of the proposed pipeline from 8 inches to 6 inches. The original and revised locations of the proposed HDD are depicted on a portion of the Belmont, N.C. (1997) USGS Topographic Quad Sheet (Figure 2) and a 2014 Aerial Photograph (Figure 2). A profile of the proposed HDD segment dated February 5, 2018 is also attached. No impacts to Lake Wylie, the discharge canal, adjacent streams, wetlands or other jurisdictional waterbodies are anticipated. 2 We are providing this information in order for you to provide any additional comments you may have beyond those already provided in connection with the original project submittal. Any response you may have may be provided by email if you prefer. Thank you for your time, and please do not hesitate to contact S&ME at 704.523.4726 if you need additional information. Joey Lawler, PWS Natural Resources Project Manager S&ME 9751 Southern Pine Blvd. Charlotte, NC 28273 O: 704.523.4726 M: 704.604.6474 www.smeinc.com LinkedIn | Twitter | Facebook This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email. -- Caitlin Rogers Catawba Indian Nation Tribal Historic Preservation Office 1536 Tom Steven Road 3 Rock Hill, SC 29730 803-328-2427 ext. 226 Caitlinh@ccppcrafts.com *Please Note: We CANNOT accept Section 106 forms via e-mail, unless requested. Please send us hard copies. Thank you for your understanding*