Loading...
HomeMy WebLinkAbout20181357 Ver 1_PCN Form Submission_10/5/2018 9:06 AMDR 02*10n of Water R"Ourc" Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance into the review process?* r Yes r No Is this project a public transportation project?* r Yes r No aarxJe only if needed. BIMS # Assigned 20181357 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Alan Johnson:eads\adjohnson1 Information for Initial Review 1a. Name of project: South Point Road HDD Project 1a. Who is the Primary Contact?* Joey Lawler 1 b. Primary Contact Email:* jlawier@smeinc.com Date Submitted 10/5/2018 Nearest Body of Water Catawba River (Lake Wylie below 570 elevation) - NC portion (11-(123.5)) Basin Catawba Water Classification WS -V, B Site Coordinates Latitude: Longitude: 35.189330 -81.021631 A. Processing Information County (or Counties) where the project is located: Gaston Is this project a public transportation project?* r Yes r No 1a. Type(s) of approval sought from the Corps: F Section 404 Permit (wetlands, streams and waters, Clean Water Act) rJ Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1 b. What type(s) of permit(s) do you wish to seek authorization? P Nationwide Permit (NWP) F- Regional General Permit (RGP) r- Standard (IP) Version# * 1 Reviewing Office* Mooresville Regional Office - (704) 663-1699 1c. Primary Contact Phone:* (704)604-6474 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: P 401 Water Quality Certification - Regular F Non -404 Jurisdictional General Permit F Individual Permit 12 - Utility Lines 1e. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: F 401 Water Quality Certification - E)press F Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 19. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? Owner 9 Applicant (other than owner) Is there an Agent/Consultant for this project? O Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Duke Energy Corporation 2b. Deed book and page no.: 2681/0586 2c. Responsible party: PSNC Energy Lake Services - Ron Lawson 2d. Address Street Address 422 Church Street Address Line 2 City Charlotte Postal / Zip Code 28242 2e. Telephone Number: (704)382-7669 2g. Email Address:* Ronald. Lawson@duke-energy.com 3. Applicant Information (if different from owner) 3a. Applicant is: State/ Rovinoe / Fiejion NC Country USA 2f. Fax Number: r Yes r No rYes rNo C Agent C Other Utility Company F other please specify. 3b. Name: Aaron Schwartz, PE 3c. Business Name: PSNC Energy 3d. Address Street Address 800 Gaston Road Address Line 2 city Gastonia Postal / Zip Code 28056 3e. Telephone Number: (704)834-6621 3g. Email Address:* aaron.schwartz@scana.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town: Belmont 2. Project Identification 2a. Property Identification Number: 3592779988 2c. Project Address Street Address West side of South Point Road near bridge Address Line 2 CRY Belmont Fastal / Zip (ode 28012 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Catawba River (Lake Wylie below 570 elevation) - NC portion (114123.5)) 3b. Water Resources Classification of nearest receiving water:* WS -V, B 3c. What river basin(s) is your project located in?* Catawba 3d. Please provide the 12 -digit HUC in which the project is located. 03050101 4. Project Description and History State / Province / legion NC (burry USA 3f. Fax Number: 2b. Property size: 0.087 Acre in Project Area State / Province / Ri3gbn NC (burry USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The new 6 -inch diameter pipe will be installed beneath the Plant Allen discharge canal, which drains to Lake Wylie. The HDD entry point is located within high ground in the NCDOT right-of-way along South Point Road on the south side of the canal, and the exit point is located in a high ground area in Duke Energy's existing, regularly -maintained electric transmission line easement on the north side of the canal. Land use in the vicinity of the project corridor consists primarily of a mix of undeveloped woodland and scattered residential development. 4b. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* F Yes r No r Unknown 4c. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW -0000-00000). SAW -2016-01588 Project History Upload SAW -2016-01588 NWP12 Verification (12-7-2016).pdf 541.01 KB 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) 2 - TOPO.pdf 609.82KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 3 - SOILS.pdf 525.5KB 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 50 4h. Explain the purpose of the proposed project:* The purpose of the proposed project is to conned two separate segments of PSNC's existing gas line that currently terminate along Point Road on either side of the Duke Plant Allen discharge canal. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* An approArnately 1,248 -foot segment of the pipe wall be installed by horizontal directional drill (HDD) beneath the canal within a new 50 -foot wide easement.The canal originates at the Duke Energy plant located to the east and ultimately drains to Lake Wylie, which is located approximately 3,700 feet southwest of the crossing location. The pipe will be installed appropmately 40 feet below the bed of the canal. The easement in adjacent high ground areas will remain undisturbed, with no tree clearing required. 4j. Please upload project drawings for the proposed project. E-1547 6in HDD Bore Profile Hot Hole South Point Rd.pdf 1010.07KB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* F Yes r" No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified F Unknown r WA Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Joey Lawler SME, Inc. 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. The eAsting discharge canal is the only jurisdictional feature present and subject to this Section 10 Permit. Because the canal or any other streams or waterbodies Will not be affected, the applicant does not require approved or preliminary JD is not necessary. SM. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? N/A D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r- Wetlands r- Streams -tributaries r- Buffers r- Open Waters r- Pond Construction E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The pipe was designed to be installed by HDD, avoiding impacts entirely. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: In addition to pipe installation by HDD, high ground portions of the easement will remain unaffected. HDD entry and exit points are located well away from the jurisdictional boundary. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: The project will not affect riparian buffers. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* C Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No Comments: The project will not involve the addition of new impervious surface. G. Supplementary Information kl") 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B.0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. Purpose of project is to connect the ends of two emsting gas lines located in close prommity. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* ryes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* r Yes f No What Federal Agency is involved? FERC - applicable regulations administered by Duke Energy f Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? See attached letters Consultation Documentation Upload NCWRC Response.pdf 104.36KB Updated NCNHP Report.pdf 718.18KB FWS.pdf 39.53KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* https://www.fisheries. noaa.gov/resource/map/essential-fish-habitat-mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* See attached letters 7c. Historic or Prehistoric Information Upload ER 16-1415.pdf 100.95KB Updated THPO.pdf 104.58KB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: The project will require a floodplain development permit from Gaston County prior to construction. 8c. What source(s) did you use to make the floodplain determination?* http://wAw.ncfloodmaps.com and correspondence with Gaston County Planning Department. Miscellaneous Comments Miscellaneous attachments not previously requested. 1 - VICINITY.pdf 428.5KB Cover Letter.pdf 138.07KB Frac-Out Plan.pdf 99.4KB Photos1.pdf 239.3KB Signature * rJ By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Joey Lawler Signature Sign Date 10/5/2018 S&ME, Inc. | 9751 Southern Pine Boulevard | Charlotte, NC 28273 | p 704.523.4726 | f 704.525.3953 | www.smeinc.com October 5, 2018 U.S. Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 Attention: Catherine M. Janiczak Regulatory Specialist Reference: Pre-Construction Notification PSNC South Point Road HDD Belmont, North Carolina SAW 2016-01588 S&ME Project No. 7435-16-006 Dear Ms. Janiczak: On behalf of PSNC Energy – a SCANA Company (PSNC), S&ME, Inc. (S&ME) hereby submits this Pre- construction Notification (PCN) for the project referenced above. The project will involve installation of a 6-inch diameter natural gas transmission pipeline beneath a navigable waters of the United States by horizontal directional drill (HDD). The project was originally authorized under Nationwide Permit (NWP) No. 12 on December 7, 2016 (SAW-2016-01588). However, construction of the project was delayed and since that time, the original permit authorization has expired. This project originally entailed installation of the new segment of natural gas pipeline within right-of-ways owned by the North Carolina Department of Transportation (NCDOT) along the west side of South Point Road in Belmont, Gaston County, North Carolina. Plans by NCDOT to replace the South Point Road Bridge necessitated the construction delay and subsequent re-design of the proposed crossing location. To avoid conflicts with the proposed NCDOT work, the HDD was redesigned to cross the canal approximately 100 feet west of its original location. A copy of this PCN is being provided to NCDWR as a courtesy. The current project will involve no permanent or temporary impacts to regulated surface waters or wetlands. In support of this application, the following accompanying information has been submitted through the N.C. Division of Water Resources (NCDWR) On-line PCN website (https://edocs.deq.nc.gov/Forms/Pre- Construction_Notification_Form): Figures: Site Vicinity Map (Figure 1), USGS Topographic Map (Figure 2), Gaston County Soils Exhibit (Figure 3) and Aerial Orthoimagery Exhibit (Figure 4) Completed Online Pre-Construction Notification (PCN) Site Photographs Original Permit Letter and Authorization to Act as Agent Proposed 6” HDD Bore Profile Exhibit (Drawing No. E-1547) Updated Agency Scoping Responses Inadvertent Return Response Plan Pre-Construction Notification S&ME Project No. 7435-16-006 PSNC South Point Road HDD October 5, 2018 2 For purposes of this permit submittal, the “Project Area” is limited to an approximately 0.087-acre portion of PSNC’s proposed 50-foot wide easement that crosses the Duke Energy Plant Allen discharge canal, aka “the Hot Hole” (Station 6+04.50 to 6+81.05 as depicted by the Proposed 6” HDD Profile Exhibit - Drawing E-1547). General Project Information The purpose of the proposed project is to connect two separate segments of PSNC’s existing gas line that currently terminate along Point Road on either side of the Duke Plant Allen discharge canal. An approximately 1,248-foot segment of the pipe will be installed by HDD within a new 50-foot wide easement that will remain undisturbed. The canal originates at the Duke Energy plant located to the east and ultimately drains to Lake Wylie, which is located approximately 3,700 feet southwest of the crossing location. The pipe will be installed approximately 40 feet below the bed of the canal. A Profile Drawing of the HDD is included as part of the accompanying information submitted with the online PCN. The new 6-inch diameter pipe will be installed beneath the Plant Allen discharge canal, which drains to Lake Wylie. The HDD entry point is located within high ground in the NCDOT right-of-way along South Point Road on the south side of the canal, and the exit point is located in a high ground area in Duke Energy’s existing, regularly-maintained electric transmission line easement on the north side of the canal. Land use in the vicinity of the project corridor consists primarily of a mix of undeveloped woodland and scattered residential development. The subject waterbody is considered part of Lake Wylie below the 570-foot elevation contour (Class WS-V, B). Jurisdictional Areas On August 2, 2018, S&ME conducted a field review of the proposed project area to identify jurisdictional surface waters located within portions of the project area subject to disturbance. S&ME followed the procedures set forth in the 1987 U.S. Army Corps of Engineers Wetlands Delineation Manual and the Eastern Mountains and Piedmont Region Supplemental Guidance. Field conditions were documented using USACE Routine Wetland Determination Data Forms, as appropriate. The field review also included identification of tributaries (streams or jurisdictional ditches) within the project area. Waters of the U.S. within the project area are limited to an approximately 0.87-acre portion of the aforementioned canal, which is considered part of the Lake Wylie impoundment rather than a free-flowing tributary. No other streams, wetlands, or regulated surface waters were observed within the review area. Protected Species To comply with applicable sections of the Endangered Species Act (ESA) of 1973 (16 USC 1531-1543), an Information Request was originally submitted to the U.S. Fish and Wildlife Service (USFWS) on August 3, 2016. The USFWS responded on September 7, 2016 and stated that they did not believe that the project will have any effect on federally listed species, and that therefore, the requirements under section 7(c) of the Endangered Species Act are fulfilled. As an update, S&ME reviewed the online database of, the North Carolina Natural Heritage Program (NCNHP) on August 8, 2018. There are no NHP records of federally- protected species in the vicinity of the proposed project. Copies of the USFWS correspondence and the updated NCNHP database report are included with the information submitted with the online PCN. Pre-Construction Notification S&ME Project No. 7435-16-006 PSNC South Point Road HDD October 5, 2018 3 Historic And Archaeological Resources An Information Request was originally submitted to the North Carolina Department of Cultural Resources State Historic Preservation Office (NC SHPO) on August 3, 2016. The NC SHPO responded on September 1, 2016 and stated that there are no known archaeological sites within the proposed project area, and based on their knowledge of the area, it is unlikely that any archaeological resources that may be eligible for inclusion in the National Register of Historic Places will be affected by the project. They therefore recommend that no archaeological investigation be conducted in connection with this project. They further stated that although the South Point Road Bridge (Bridge 22 - GS 1326) is eligible for listing in the National Register of Historic Places and is located near the project area, it is anticipated the undertaking will not affect the historic property. After soliciting comment on the revised route, an updated letter from SHPO was received on September 4, 2018. The SHPO were aware of no historic resources which would be affected by the revised project, and had no comment. Copies of the SHPO correspondence are included as part of the accompanying information submitted with the online PCN. Avoidance And Minimization The project avoids impacts to waters of the U.S. by installing the new pipe by HDD. As the HDD entry and exit points are located well away from the discharge canal, potential impacts resulting from erosion or disturbance from construction activities are unlikely. Other than the HDD exit and entry points, which will be located in high ground, no vegetation removal or land disturbance within the new easement will be required. Appropriate erosion and sediment control measures outlined in the most recent version of the "North Carolina Erosion and Sedimentation Control Planning and Design Manual" and approved by the local governing authority shall be installed around the HDD entry and exit points. The measures will be in compliance with specifications governing the proper design, installation, operation and maintenance of such Best Management Practices (BMPs) to comply with the appropriate turbidity water quality standard. Following completion of the drill, the affected upland entry and exit work areas will be restored to their original grade and contour. In the event that during performance of the HDD, an inadvertent return of drilling fluid to regulated surface waters is detected, the contractor will follow the Inadvertent Return Response Plan and the USACE will be contacted within 48 hours. A copy of the plan is included as part of the accompanying information submitted with the online PCN. As proposed, the project does not require pre-construction written approval from the NC Division of Water Resources, nor will it affect protected riparian buffers associated with the Catawba River and the appropriate portions of Lake Wylie. Pre-Construction Notification S&ME Project No. 7435-16-006 PSNC South Point Road HDD October 5, 2018 4 Closing By copy of this correspondence and completed PCN, we are requesting your written concurrence with this permit application. If you have questions or need additional information, please feel free to contact us at 704.523.4726. Sincerely, S&ME Joey Lawler, P.W.S. Project Manager Senior Review by Jason Reeves, PE Attachments cc. Jonathan Merrell, PE - PSNC Aaron Schwartz, PE – SCANA AGENT AUTHORIZATION FORM Date: ! t Pro ect intormation S&ME Project Name: PSNC South Point Road HDD Project Type of Project: Gasline installation Location: South Point Road at bridge over Duke Energy Plant Allen discharge canal Property owner/Kep intormation Business Name: SCANA, Corporate Environmental Services Mailing Address: 220 Operation Way, MC C221 City, State, Zip Code: Cayce SC 29033 Telephone No. (803) 217-7112 Contact: Aaron Schwartz, PE - Engineer IV Haent information Business Name Street Address: City, State, Zip: Telephone No. Contact: S&ME, Inc. 9751 Southern Pine Blvd Charlotte, NC 28273 704.523.4726 Joey Lawler, PWS Authorization: I, AA Qe N Seaw t ft- Z on behalf of SCANA Services hereby authorize S&ME, Inc. to act as agent with the US Army Corps of Engineers, the NC Department of Environmental Quality and other relevant agencies/entities pursuant to communications, coordination and obtaining the necessary Environmental permits, as applicable, related to the above -referenced project. Signature: S&ME, INC. / 9751 Southern Pine Blvd / p 704.523.4726 f704.525.3953 / www.smeinc.com U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2016-01588 County: Gaston U.S.G.S. Quad: NC-Belmont GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: PSNC Energy Aaron Schwartz Address:800 Gaston Road Gastonia, North Carolina, 28056 Telephone Number: 704-834-6621 E-mail: aaron.schwartz@scana.com Size (acres) 0.027 Nearest Town Belmont Nearest Waterway Catawba River/Lake Wylie River Basin Santee USGS HUC 03050102 Coordinates Latitude: 35.1894 Longitude: -81.0213 Location description: The project area is located 650 feet north of the intersection of Southpoint Road and Plant Allen Road. Description of projects area and activity: This verification authorizes the installation of an 8-inch diameter gas pipeline 30-foot below the Plant Allen discharge canal by means of horizontal direction drill. The Plant Allen discharge canal is part of Lake Wylie, an impoundment of the Catawba River and a navigable water of the United States. Applicable Law(s): Section 404 (Clean Water Act, 33 USC 1344) Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Nationwide/General Permit Number: Nationwide Permit 12. Utility Line Activities SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 10/11/2016, and the enclosed plans Drawing E-1547 dated 6/8/2016. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit’s expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact David L. Shaeffer at 704-510-1437 or david.l.shaeffer@usace.army.mil. Corps Regulatory Official: _____________________________________________________ Date: 12/7/2016 Expiration Date of Verification:3/18/2017 Digitally signed by SHAEFFER.DAVID.LEIGH.1260750573 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=SHAEFFER.DAVID.LEIGH.1260750573 Date: 2016.12.07 13:00:22 -05'00' SAW-2016-01588 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Copy furnished: Agent: S&Me, Inc. Joey Lawler Address:9751 Southern Pines Boulevard Charlotte, North Carolina, 28723 Telephone Number: 704-523-4726 E-mail: jlawler@smeinc.com Action ID Number: SAW-2016-01588 County: Gaston Permittee: PSNC Energy, Aaron Schwartz Project Name: PSNC Energy South Point Road HDD Date Verification Issued: 12/7/2016 Project Manager: David L. Shaeffer Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David L. Shaeffer Asheville Regulatory Office U.S Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. _______________________________________ ______________________ Signature of Permittee Date Site Map n. t.s. PIT BiBT Tw UtMflW L25 S trot'S2'E 26.24' s fnrn'F se.J2'L26 S I7VI'32'E 27.59' La S 097r43'£>e&2S'L27 s iroi'52'E 1313' L9 S 06'32'S2'e 5X02'L29 S t7VI'52'E 49.24' uo S 077SX>4'£6a48'129 s iroi'52'E 36.91' Itt S orx'49'£57.2S'L30 S f7Vf'32'E 55.02' LI2 S 0r*4-X'C 61.99'L3I S I6'4654-E 4596' UJ s orto-ge-E 36.^'L32 S 00722r w 19.62' L14 S 0979'4«-£56.62 133 S 46.06' LtS s 14'46'44'E 54.J8-L34 S 13T9'29'E 56.39' IIS S IJJ27r E st.sr L35 S IO-5r34-E 55.09' U?S 2SS4'Sr E 3S0S'LM S0r2925'e 59.50' LtS S ia-S4-42'E J3.S4-132 S 041127-E 6a60' L'9 S irOV52'E usr L39 s ooirsa'w 6073' L20 S ITVfK'E 45.x-L39 S 04'40'5r W 303r L2I S iroV52'E 29.96'L40 s onrsT"w 2198' L23 S ir0fS2'E 29.63'L4I S 0r33'09'W 41.ir L23 s rrof32-E 23.46'L42 S IIV6'24'W 59.04' L24 S iroi'52'E 14.62'L43 S I379'09'W 59.72' L2S s irovxf E 26.24'L44 S I4xa04'w 60.03' SOUTH POINT TO - 60' PliillC R BRIOCX SOUTH - 60'PUBLIC R/W LEGEND =PROPOSED 12"STEEL PIPELINE TO BE INSTALLED BY DIRECTIONAL BORE METHOD = PROPOSED 12"STEEL PIPELINE TO BE INSTALLED BY TRENCH =PROPERTY LINE =SURROUNDING PROPERTY LINE =RIGHT-OF-WAY =FENCE LINE fiber OPTIC CABLE GUARD RAIL POWER LINE '—SANITARY SERWER WATER LINE CB =CATCH BASIN EIP =EXISTING IRON PIN FH =»FIRE HYDRANT IPS =IRON PIN SET MB =>MAIL BOX SBR = SOUTHER BELL RISER / SSV =SANITARY SEWER f / 4--21/B BOfcmenRr . Iff***#.\ I \ 1 \ i / / / / / / / / / / —^^.11-III!-»•••IW l.t -»I llllllllllllllllllllllllllillilillllllllllllllllllll; BILL OF MATERIAL QUAMTTTY SIZE DESCRIPTION 1518'^ WT.APUL X-S2. ERW, FBE W/POWERCRETE rmi #38383 ADDITIONAL NOTES 1. MAW SHALL BE MSTALLEO USING EMRECnONAL BORE METTOD. 2. ESTIMATEDPULL FORCE ON PRODUCT PIPE -35,009 LBF. 3.MAXIIMUM AaOWABLE PULL FORCE ON PRODUCT PIPE -68,229 LBF. 4.PROPOSED MAIN NOT INSTALLED BY BORE SHALL BE BURIED AT A MINIMUM OF 3 FEET DEEP. 5. NO STRUCTURES INVOLVED. 6. MAIN SHAa BE FABRICATED AND LAID OUT IN ONE CONTINUOUS PIPE LENGTH SUCH THAT PUU BACK WRl BE CONDUCTED DURING A SINGLE OPERATION. PROFILE VIEW 1"-60'VERTICALrrNuriLCviewhqrizoNTAL 7. A MWIMUM OF 48 HOURS PRIOR TO CONSTRUCTION CALL NC 0NE-CALLAT811 FOR OTHER imLTTY LOCATIONS. 8.ADOmONAL MATERIALS NOT SHOWN ON THIS DRAWING WILL BE NEEDED m ORDER TO COMPLETE THIS PROJECT. 9. FOR QUESTIONS CONCERNING THIS PROJECT,PLEASE CONTACT FRANK CRAIG AT 704 8104116 ^PSNC ENERGY.^ ASCAHAGomnwr Knc^.tMiow. CalM)ra|<u«|. PROPSED 8"HDD BORE PROFILE THE HOT HOLE ON SOUTH POINT RD. ^BELMONT.NC DRAWN BY- J.MERRLL DRAWING NO. CHECKED BY- F.CRAIG APPROVED BY- B.AYCOCK E-1547 DATE-6W16 SCALE-I'-eC SHEET 1 of 1 Date Taken: 08.03.18 Checked by: Taken by: JoL SITE PHOTOGRAPHS PSNC ENERGY SOUTH POINT ROAD HDD GASTON COUNTY, NC Project No.: 7435-16-006 PH 06 Photo Page 1 of 1 Photo 1. View of HDD entry area near the intersection of South Point Road and Pant Allen Road.. Photo 2. View of the HDD exit point on the south side of Canal Drive. Photo 5. View of the Duke Energy Plant Allen discharge canal facing south from the top of the South Point Road bridge. Photo 4. View taken from HDD path facing east towards the South Point Road Bridge.Photo 3. View of the HDD path facing south. ^_ SCALE: DATE: PROJECT NUMBER FIGURE NO. 11 " = 2,000 ' 9-27-18 7435-16-006PSNC SOUTHPOINT ROAD HDDBELMONT, NCDrawing Path: T:\Projects\2016\Energy\7435-16-006 PSNC Projects West\Ph 06 - South Point Road\Other_Info\2018 LINE CROSSING\UPDATED SECTION 10 PERMIT\JD - VICINITY.mxd plotted by JLawler 09-27-20180 1,000 2,000(FE ET) SITE VICINITY EXHIBIT ³ REFERENCE:GIS BASE LAYERS WERE OBTAINED FROM ESRI AND COUNTY GIS DATA. THIS MAP IS FORINFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED AREAPPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATEDOTHERWISE.^_= SITE LOCATION HORIZONTAL DIRECTIONAL DRILL SCALE: DATE: PROJECT NUMBER FIGURE NO. 21 " = 1,000 ' 9-27-18 7435-16-006PSNC SOUTHPOINT ROAD HDDBELMONT, NCDrawing Path: T:\Projects\2016\Energy\7435-16-006 PSNC Projects West\Ph 06 - South Point Road\Other_Info\2018 LINE CROSSING\UPDATED SECTION 10 PERMIT\JD - TOPO.mxd plotted by JLawler 09-27-20180 1,000 2,000(FE ET) USGS TOPOGRAPHIC MAP EXHIBIT ³ REFERENCE:GIS BASE LAYERS WERE OBTAINED FROM ESRI AND COUNTY GIS DATA. THIS MAP IS FORINFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED AREAPPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATEDOTHERWISE. HORIZONTAL DIRECTIONAL DRILL SCALE: DATE: PROJECT NUMBER FIGURE NO. 31 " = 500 ' 9-27-18 7435-16-006PSNC SOUTHPOINT ROAD HDDBELMONT, NCDrawing Path: T:\Projects\2016\Energy\7435-16-006 PSNC Projects West\Ph 06 - South Point Road\Other_Info\2018 LINE CROSSING\UPDATED SECTION 10 PERMIT\JD - SOILS.mxd plotted by JLawler 09-27-20180 1,000 2,000(FE ET) GASTON COUNTY SOILS EXHIBIT ³ REFERENCE:GIS BASE LAYERS WERE OBTAINED FROM ESRI AND COUNTY GIS DATA. THIS MAP IS FORINFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED AREAPPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATEDOTHERWISE. FHOPEN DRAI N DI TCHGVR GT TS A T T PA DATTBOX BOXATTCO O P EN DRA IN D IT CH30"CMPINV.= INV.=18"CMPINV.=UPUPGUYGUY FIRESTATIONSIGNWEIGHTSIGNSBR18"CMP648.73' OPEN DRAIN DITCHSIGNTRUCK UPUPUPUPGUYSIGN PARKING NOICING SIGN BRIDGE GUYTELCOMBOXINV.=644.74' 647.43' 643.91' INV.= 645.57' GRATE 646.83'INV.= 17 " H ICKORY BRIDGE R/W R/W R/WR/WPLANT ALLEN RDPID# 221352PLANT ALLEN STEAM STATIOND.B. 2681 PG. 586 D.B. 2681 PG. 586 PLANT ALLEN STEAM STATION PID# 221352 667.65'GUARD RAIL GUARD RAIL GUARD RAIL GUARD RAIL 60' PUBLIC R/WEDGE OF WATEREDGE OF WATER100 YEAR FLOODPER N.C. FEMA100 YEAR FLOODPER N.C. FEMASOUTH POINT RD. - 60' PUBLIC R/W UPTRANSMISSIONTOWER-1+33.75-1+19.52-0+99.92-0+80.42-0+73.31-0+66.92-0+60.02-0+33.97-0+24.87-0+11.970+000+50.010+74.651+27.151+49.791+92.231+95.961+99.922+04.672+07.852+16.832+30.362+39.582+50.122+60.462+67.032+79.942+99.853+25.003+50.023+60.503+64.473+93.013+95.183+99.884+17.764+47.864+50.064+56.255+00.115+34.205+47.145+50.095+68.335+72.076+34.736+48.926+51.427+45.907+99.968+17.098+22.938+33.638+49.998+70.068+72.588+75.588+81.718+96.259+00.079+50.079+86.159+95.59+99.8410+10.3210+49.8610+70.7410+99.9111+50.211+99.8312+20.6912+32.2312+50.1412+67.1812+91.7712+99.9413+35.4813+62.7715"CMP CHAIN LINKFENCECHAIN LINKFENCEWOODS LINEWOODS LINE REF.: NAD 83N.C. GRIDN 4 7°3 6'5 1" E 1 0 1.0 1' TIE T O C P # 4 -0+49.890+99.886+04.506+81.057+00.257+50.00560 570 0+100+200+300+400+500+600+700+800+901+001+101+201+301+401+501+601+701+801+902+002+102+202+302+402+502+602+702+802+903+003+103+203+303+403+503+603+703+803+904+004+104+200+004+304+404+504+604+704+804+905+005+105+205+305+405+505+605+705+805+906+006+106+206+306+406+506+606+706+806+907+007+107+207+307+407+507+607+707+807+908+008+108+208+308+408+508+608+708+808+909+009+109+209+309+409+509+609+709+809+90520 530 540 550 580 590 600 610 620 630 640 650 660 670 680 10+0010+1010+2010+3010+4010+5010+6010+7010+8010+9011+0011+1011+2011+3011+4011+5011+6011+7011+8011+9012+0012+1012+2012+3012+4012+5012+6012+7012+8012+9013+0013+1013+2013+3013+40510 560 570 520 530 540 550 580 590 600 610 620 630 640 650 660 670 680 510 500 5001+49.79 Elev:672.721+27.15 Elev:673.700+99.88 Elev:674.690+74.65 Elev:675.630+50.01 Elev:676.510+00 Elev:678.331+92.23 Elev:671.411+95.96 Elev:670.651+99.92 Elev:670.382+04.67 Elev:670.592+07.85 Elev:671.212+67.03 Elev:663.202+60.46 Elev:657.932+50.12 Elev:657.022+39.58 Elev:658.262+30.36 Elev:657.662+16.83 Elev:670.572+79.94 Elev:667.742+99.85 Elev:666.863+25 Elev:666.973+93.01 Elev:663.073+95.18 Elev:662.883+50.02 Elev:665.353+60.5 Elev:665.373+64.47 Elev:664.163+99.88 Elev:660.154+17.76 Elev:648.124+47.86 Elev:630.044+50.06 Elev:630.014+56.25 Elev:629.615+00.11 Elev:607.395+34.2 Elev:588.759+00.07 Elev:642.058+96.25 Elev:640.898+75.58 Elev:642.968+72.58 Elev:643.108+70.06 Elev:642.938+81.71 Elev:641.128+49.99 Elev:633.538+33.63 Elev:627.928+22.93 Elev:626.758+17.09 Elev:627.097+99.96 Elev:619.877+50 Elev:594.207+45.9 Elev:592.027+00.25 Elev:580.226+81.05 Elev:565.636+51.42 Elev:573.006+48.92 Elev:572.696+34.73 Elev:572.866+04.5 Elev:580.675+72.07 Elev:580.065+68.33 Elev:580.395+50.09 Elev:580.985+47.14 Elev:581.19-0+11.97 Elev:679.29-0+24.87 Elev:679.04-0+33.97 Elev:680.0113+35.48 Elev:665.9112+67.18 Elev:667.9812+50.14 Elev:668.0112+32.23 Elev:666.4712+20.69 Elev:665.9712+99.94 Elev:665.1012+91.77 Elev:665.4311+99.83 Elev:663.5111+50.2 Elev:658.2310+99.91 Elev:655.1110+70.74 Elev:653.1910+49.86 Elev:649.6710+10.32 Elev:643.899+99.84 Elev:643.529+95.5 Elev:643.359+86.15 Elev:643.969+50.07 Elev:643.33-0+10-0+20-0+30-0+4040'-0"ELEV. = 677.29STA. 0+28.88PIPE SIDESTA. 0+40.02 TIE-INELEV. = 560.58STA. 4+10.58PT. OF CURVATUREELEV. = 525.63STA. 6+44.48AP DEPTH 47'-1 3/8"PT. OF TANGENTELEV. = 525.63STA. 7+20.04PT. OF CURVATUREAP DEPTH 59'-2 3/4"ELEV. = 560.58STA. 9+53.94AP DEPTH 82'-9 3/4"PT. OF TANGENT17 DEGREE 82'-9 3/4 "59'-7 7/8 "47'-1 3/8 "92'-6"ELEV. = 665.26PIPE SIDE17 DEGREE STA. 12+88.26 TIE-IN399'-1 7/8 "358'-0" 75'-6 3/4 " LENGTH = 237'-4 3/8" CURVATURE = 800' RADIUS OF LENGTH = 237'-4 3/8" CURVATURE = 800' RADIUS OF R DRAWING NO.NO.DESCRIPTIONDATER E V I S I O N S Know what'sbelow. before you dig.Call R SIZE D E S C R I P T I O NITEM BILL OF MATERIAL QUANTITY 1 ADDITIONAL NOTES 1. MAIN SHALL BE INSTALLED USING DIRECTIONAL BORE METHOD. A SINGLE OPERATION. PIPE LENGTH SUCH THAT PULL BACK WILL BE CONDUCTED DURING 4. PROPOSED MAIN NOT INSTALLED BY BORE SHALL BE BURIED AT A 5. NO STRUCTURES INVOLVED. 6. MAIN SHALL BE FABRICATED AND LAID OUT IN ONE CONTINUOUS MINIMUM OF 3 FEET DEEP. 2. ESTIMATED PULL FORCE ON PRODUCT PIPE = 35,009 LBF. NEEDED IN ORDER TO COMPLETE THIS PROJECT. 7. A MINIMUM OF 48 HOURS PRIOR TO CONSTRUCTION CALL NC 8. ADDITIONAL MATERIALS NOT SHOWN ON THIS DRAWING WILL BE 9. FOR QUESTIONS CONCERNING THIS PROJECT, PLEASE CONTACT ONE-CALL AT 811 FOR OTHER UTILITY LOCATIONS. FRANK CRAIG AT 704 810-3116 .219 WT, API-5L X-52, ERW, FBE W/POWERCRETE ITEM #34635 PIPE TEST PRESSURE SPECIFICATIONSDURATION: MINIMUM PRESSURE: MAXIMUM PRESSURE: WATER2000 PSIG2640 PSIGTYPE: 8 HOURSSITE 6"1,233' 3. MAXIMUM ALLOWABLE PULL FORCE ON PRODUCT PIPE = 68,229 LBF. E-1547 SHEET 1 of 1 DRAWN BY- J. MERRILL CHECKED BY- F. CRAIG APPROVED BY- B. AYCOCK THE HOT HOLE ON SOUTH POINT RD. PROPSED 6" HDD BORE PROFILE BELMONT, NC SCALE- 1" = 50'DATE- 9/25/18 SOUTH POINT RD. - 60' PUBLIC R/W R/W R/W R/W R/W R /W R/WR/W PRELIMINARY DRAWING 1"=50' VERTICAL 1"=50' HORIZONTAL PROFILE VIEW = WATER LINE = GUARD RAIL = FENCE LINE = RIGHT-OF-WAY = SURROUNDING PROPERTY LINE = PROPERTY LINE LEGEND = POWER LINE = FIBER OPTIC CABLE = SANITARY SERWER CB = CATCH BASIN IPS = IRON PIN SET EIP = EXISTING IRON PIN CM = CONC. MONUMENT FH = FIRE HYDRANT MB = MAIL BOX SBR = SOUTHER BELL RISER SSV = SANITARY SEWER WV = WATER VALVE = PROPOSED 6" STEEL PIPELINE TO BE INSTALLED BY DIRECTIONAL BORE METHOD = PROPOSED 6" STEEL PIPELINE TO BE INSTALLED BY TRENCH ELEV. = 673.883'-0"3'-0"AP DEPTH 92'-6"ELEV. = 662.80STA. 12+96.3029'-3" North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Roy Cooper Office of Archives and History Secretary Susi H. Hamilton Deputy Secretary Kevin Cherry Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephone/Fax: (919) 807-6570/807-6599 September 4, 2018 Joey Lawler S&ME, Inc. 9751 Southern Pine Boulevard Charlotte, NC 28273 Re: Amended Plan to Install PSNC Energy Natural Gas Pipeline, South Point Road, Belmont, Gaston County, ER 16-1415 Dear Mr. Lawler: Thank you for your email of August 2, 2018, concerning the above project. We have conducted a review of the project and are aware of no historic resources which would be affected by the project. Therefore, we have no comment on the project as proposed. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation’s Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill-Earley, environmental review coordinator, at 919-807-6579 or environmental.review@ncdcr.gov. In all future communication concerning this project, please cite the above referenced tracking number. Sincerely, Ramona M. Bartos Inadvertent Return Response Plan PSNC Energy South Point Road HDD S&ME Project No. 7435-16-006 Introduction Prior to initiating construction activities, PSNC and the Project Engineer will confirm that the construction contractor and involved personnel are made aware of and understands the permit and its requirements, including relevant special conditions of the permit, monitoring of the project required by the permit, implementation of this Response Plan and implementation of Best Management Practices (BMP) during phases of construction that are designed to prevent release of sediment or deleterious substances into the lake. Additionally, jurisdictional boundaries of the lake within the project area will be demarcated in the field. As excavation of the bore pits will occur well away from the lake, silt fencing will be established around the work areas by the contractor prior to any other land disturbing activities on site. Monitoring Monitoring the project site during all phases of construction will be conducted by the contractor and the Project Engineer. The contractor will visually inspect the project site twice daily (AM & PM) for compliance with best management practices (BMPs) and monitor that work is proceeding as permitted, and conditions are such that problems are not anticipated, and an inadvertent release of drilling fluid has not occurred. The Project Engineer will also monitor the project site during drilling operations. Inspection logs will be maintained on-site, and will contain the date and time of inspections and will note problems, potential problems or other items of interest. Actions occurring on-site that cause problems with the work, or a temporary stop in work, will be noted in the log. Daily photographs will also document the progress of work, the integrity of sediment control measures and compliance with permit conditions. Stop Work Upon discovery of a release by the contractor, or notification by the Project Engineer that a release of material or deleterious matter with potential for impacts to the lake has occurred, the contractor will immediately stop work. An exception to an immediate cessation of construction activities may be warranted if such stoppage could result in unsafe conditions for workers on-site, or if stopping work would risk loss of the bore hole, or potentially result in more harm to the environment than continuing work. However, containment and notification of such a release will immediately occur. Containment The contractor, under the supervision of the project engineer, will immediately implement measures to contain the release of sediment or other deleterious substance into the lake. Containment measures may include silt fencing and sediment tube installation. Inadvertent Return Response Plan October 5, 2018 PSNC Energy South Point Road HDD S&ME Project No. 7435-16-006 2 Contact Once a release is discovered by the contractor, the project engineer or the owner’s representative, shall notify the United States Army Corps of Engineers (USACE) and the NC Division of Water Resources (NCDWR), and the Permittee will be notified by the most-timely means possible, generally within 24-48 hours. Clean Up The contractor, project engineer and Permittee will coordinate with the USACE & NCDWR to determine the most effective method of cleaning up the affected area(s) and appropriate methods for disposing of sediment or deleterious substance. Restoration The contractor, Project Engineer and Permittee will consult and coordinate with USACE and NCDWR to determine the most effective and efficient means of restoring the site, including stabilizing and re-vegetating as appropriate.