Loading...
HomeMy WebLinkAbout20181108 Ver 1_Stormwater Permit No SW7180801_20180927ROY COOPER Governor MICHAEL S.REGAN Secretary WILLIAM E. (TOBY) VINSON, JR Interim Director TJ's Land Development, LLC Attn: Mr. Tobin J. Tetterton, Sr PO Box 125 Pantego, NC 27860 Dear Mr. Tetterton: NORTH CAROLINA Environmental Quality September 27, 2018 Subject: Stormwater Permit Exclusion - Redevelopment Stormwater Project No. SW7180801 CAMA for TJ's Marina & Boat Yard Beaufort County On July 12, 2018, the Washington Regional Office of the Division of Energy, Mineral, and Land Resources received a copy of your CAMA application for the subject project located at 785 East Pantego Street in Belhaven, NC. After discussions with your consultant, Mr. Joe Lassiter, additional information was provided by email confirming that the proposed new development for the travel lift, washdown area and associated parking would be located over existing impervious areas. Also, in reviewing our files, we see that you have already obtained coverage for the marine industrial activities under NC General Permit NCG190101. Based on your application and the supporting documents, it has been determined that the project proposes activities that are excluded from State Stormwater permitting requirements as set forth in stormwater rules under Title 15A NCAC 2H.1000. Therefore, the Division of Energy, Mineral, and Land Resources is hereby providing confirmation that the subject project is excluded from State Stormwater permitting requirements under the following conditions: 1) The project must be constructed as shown on the plans submitted to this Office; 2) The project proposes no net increase in impervious coverage; and 3) The proposed stormwater controls provide equal or better protection of surface waters than the existing stormwater control. Under Section .1003(b) of the stormwater rules, the entire common plan of development must be permitted. Therefore, any future development or changes to the proposed development, including but not limited to, the locations of the built -upon area and construction of additional built -upon area, may require approval or a Stormwater Management permit application and permit issuance from the Division of Energy, Mineral, and Land Resources prior to any construction. Any construction on the site prior to receipt of the required approval or permit will constitute a violation of Title 15A NCAC 2H.1000, and may result in the initiation of appropriate enforcement action. D Q� North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Washington Regional office 1943 Washington Square Mall I Washington, North Carolina 27889 252.946.6481 TJs Land Development, LLC September 27, 2018 Page Two Please keep in mind that this determination does not affect your legal obligation to obtain other permits and approvals which may be required by Federal, State, or local government agency rules or laws. If you have any questions, or need additional information concerning this matter, please contact this office at (252) 946-6481. Sincerely, : �— r Y Samir Dumpor, PE Regional Engineer cc: Greg Bodnar, DCM, Morehead City Joe Lassiter, 111 St. Clair Rd, Kill Devil Hills, NC 27948 jAfARO North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Washington Regional Office 1943 Washington Square Mall I Washington, North Carolina 27889 252.946.6481