HomeMy WebLinkAbout20181108 Ver 1_Stormwater Permit No SW7180801_20180927ROY COOPER
Governor
MICHAEL S.REGAN
Secretary
WILLIAM E. (TOBY) VINSON, JR
Interim Director
TJ's Land Development, LLC
Attn: Mr. Tobin J. Tetterton, Sr
PO Box 125
Pantego, NC 27860
Dear Mr. Tetterton:
NORTH CAROLINA
Environmental Quality
September 27, 2018
Subject: Stormwater Permit Exclusion - Redevelopment
Stormwater Project No. SW7180801
CAMA for TJ's Marina & Boat Yard
Beaufort County
On July 12, 2018, the Washington Regional Office of the Division of Energy, Mineral, and
Land Resources received a copy of your CAMA application for the subject project located at 785
East Pantego Street in Belhaven, NC. After discussions with your consultant, Mr. Joe Lassiter,
additional information was provided by email confirming that the proposed new development for
the travel lift, washdown area and associated parking would be located over existing impervious
areas. Also, in reviewing our files, we see that you have already obtained coverage for the marine
industrial activities under NC General Permit NCG190101. Based on your application and the
supporting documents, it has been determined that the project proposes activities that are excluded
from State Stormwater permitting requirements as set forth in stormwater rules under Title 15A
NCAC 2H.1000.
Therefore, the Division of Energy, Mineral, and Land Resources is hereby providing
confirmation that the subject project is excluded from State Stormwater permitting requirements
under the following conditions: 1) The project must be constructed as shown on the plans
submitted to this Office; 2) The project proposes no net increase in impervious coverage; and 3)
The proposed stormwater controls provide equal or better protection of surface waters than the
existing stormwater control.
Under Section .1003(b) of the stormwater rules, the entire common plan of development
must be permitted. Therefore, any future development or changes to the proposed development,
including but not limited to, the locations of the built -upon area and construction of additional
built -upon area, may require approval or a Stormwater Management permit application and permit
issuance from the Division of Energy, Mineral, and Land Resources prior to any construction. Any
construction on the site prior to receipt of the required approval or permit will constitute a
violation of Title 15A NCAC 2H.1000, and may result in the initiation of appropriate enforcement
action.
D Q�
North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
Washington Regional office 1943 Washington Square Mall I Washington, North Carolina 27889
252.946.6481
TJs Land Development, LLC
September 27, 2018
Page Two
Please keep in mind that this determination does not affect your legal obligation to obtain
other permits and approvals which may be required by Federal, State, or local government agency
rules or laws. If you have any questions, or need additional information concerning this matter,
please contact this office at (252) 946-6481.
Sincerely,
: �— r Y
Samir Dumpor, PE
Regional Engineer
cc: Greg Bodnar, DCM, Morehead City
Joe Lassiter, 111 St. Clair Rd, Kill Devil Hills, NC 27948
jAfARO
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Washington Regional Office 1943 Washington Square Mall I Washington, North Carolina 27889
252.946.6481