HomeMy WebLinkAbout20181194 Ver 1_more information received_20181005Homewood, Sue
From: Jennifer Robertson <jrobertson@atlasenvi.com>
Sent: Friday, October 5, 2018 3:33 PM
To: Homewood, Sue
Cc: Jeff Orsborn; danlacz@silvermangroup.net
Subject: RE: [External] RE: SAW -2018-00162 SL Horton, LLC, Charlotte Intermodal Logistics
Center (Notice of Incomplete Application)
Attachments: 09 NC DWQ form 3 CH 2O0.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an
attachment to Report Spam.<mailto:report.spam@nc.gov>
Sue,
Yes, the City will be reviewing and approving the SMP. Attached is a DWR stream form for the intermittent stream (CH
200).
Thank you,
Jennifer L Robertson, President
ATLAS Environmental, Inc.
712 English Tudor Lane
Charlotte, NC 28211
(704) 512-1206 office
(828) 712-9205 mobile
www.atlasenvi.com
Offices in Asheville and Charlotte
-----Original Message -----
From: Homewood, Sue <sue.homewood@ncdenr.gov>
Sent: Friday, October 5, 2018 2:23 PM
To: Jennifer Robertson <jrobertson@atlasenvi.com>
Subject: RE: [External] RE: SAW -2018-00162 SL Horton, LLC, Charlotte Intermodal Logistics Center (Notice of Incomplete
Application)
Jennifer,
Can you please confirm that the City will be reviewing the proposed Stormwater Management Plan. Also, would you
please submit a DWR stream form for the channel to be impacted so that we have documentation to support the
intermittent call.
Thanks,
Sue Homewood
Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
1
Sue.Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed
to third parties.
-----Original Message -----
From: Jennifer Robertson <jrobertson@atlasenvi.com>
Sent: Wednesday, October 3, 2018 4:41 PM
To: Homewood, Sue <sue.homewood@ncdenr.gov>
Subject: RE: [External] RE: SAW -2018-00162 SL Horton, LLC, Charlotte Intermodal Logistics Center (Notice of Incomplete
Application)
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an
attachment to Report Spam.<mailto:report.spam@nc.gov>
Sue,
I just copied you on the response time extension to David since he copied you on his original email. Unless you need to
put the project on hold until you get our response to his email I am not requesting a voluntary hold. As long as you have
all of the information you need to continue your review please do.
Thank you,
Jennifer L Robertson, President
ATLAS Environmental, Inc.
712 English Tudor Lane
Charlotte, NC 28211
(704) 512-1206 office
(828) 712-9205 mobile
www.atlasenvi.com
Offices in Asheville and Charlotte
-----Original Message -----
From: Homewood, Sue <sue.homewood@ncdenr.gov>
Sent: Wednesday, October 3, 2018 4:37 PM
To: Jennifer Robertson <jrobertson@atlasenvi.com>
Subject: RE: [External] RE: SAW -2018-00162 SL Horton, LLC, Charlotte Intermodal Logistics Center (Notice of Incomplete
Application)
Jennifer,
Just to be clear, based on this are you also requesting that DWR place your application on voluntary hold until you have
submitted this information?
Thanks,
Sue Homewood
Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue. Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed
to third parties.
-----Original Message -----
From: Jennifer Robertson <jrobertson@atlasenvi.com>
Sent: Wednesday, October 3, 2018 3:57 PM
To: Shaeffer, David Leigh (Dave) CIV USARMY CESAW (US) <David.L.Shaeffer@usace.army.mil>
Cc: danlacz@silvermangroup. net; Homewood, Sue <sue.homewood@ncdenr.gov>; Johnson, Alan
<alan.johnson@ncdenr.gov>
Subject: [External] RE: SAW -2018-00162 SL Horton, LLC, Charlotte Intermodal Logistics Center (Notice of Incomplete
Application)
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an
attachment to Report Spam.<mailto:report.spam@nc.gov>
David,
We are still working on the response to your email below. I am requesting an extension of the 30 days until the close of
business on October 5, 2018 (Friday). I think I will have the response completed tonight for Dan and the project
engineer to review but I am in the field most of the day tomorrow.
Thank you,
Jennifer L Robertson, President
ATLAS Environmental, Inc.
712 English Tudor Lane
Charlotte, NC 28211
(704) 512-1206 office
(828) 712-9205 mobile
www.atlasenvi.com
Offices in Asheville and Charlotte
-----Original Message -----
From: Shaeffer, David Leigh (Dave) CIV USARMY CESAW (US) <David.L.Shaeffer@usace.army.mil>
Sent: Tuesday, September 4, 2018 4:22 PM
To: Jennifer Robertson <jrobertson@atlasenvi.com>
Cc: danlacz@silvermangroup. net; Homewood, Sue <sue.homewood@ncdenr.gov>; 'Johnson, Alan NCDWR'
<alan.johnson@ncdenr.gov>
Subject: SAW -2018-00162 SL Horton, LLC, Charlotte Intermodal Logistics Center (Notice of Incomplete Application)
Ms. Robertson,
On August 24, 2018, we received the application you submitted on behalf of Mr. Dan Lacz of SL Horton LLC to grade and
place fill material in 0.017 acre of wetlands, 115 linear feet of stream, and 1.009 acres of open water to facilitate the
construction of a commercial warehousing and distribution center in Charlotte, Mecklenburg County, North Carolina. I
have completed my initial review of the application and I have determined that it is incomplete. The following
information is necessary to complete this application:
a. In accordance with 33 CFR 325.1(d)(2), all activities which the applicant plans to undertake which are reasonably
related to the same project for which a DA permit would be required should be included in the same permit application.
District engineers should reject, as incomplete, any permit application which fails to comply with this requirement. For
example, a permit application for a marina will include dredging required for access as well as any fill associated with
construction of the marina.
It is appears from the plans submitted with the application that Horton Road would be improved to provide adequate
access to the project site. If this is the case, please revise the delineation of waters and plans as appropriate to include
this area. Additionally, a map showing the sewer alignment was included with the permit application. However, it is
unclear from the application why impacts associated with this line were not included in this permit application. Please
provide a delineation of the sewer line alignment and revise the project plans and impact amounts to include all impacts
to waters of the U.S. associated with this line. Alternatively, please provide a detailed rationale of why the sewer line
should be considered separately from this project. This rationale should discuss the funding source of the sewer line,
who would build the line, what other project would use the line (if any), when the other projects would be built, and the
status of other the state/local authorization required to build the other projects.
Please provide the information requested above in ONE consolidated response within 30 -days of the date of this
correspondence. If you do not respond within 30 -days, the application will be administratively canceled. Please contact
me via telephone or e-mail if you have questions.
Sincerely,
David L. Shaeffer
Project Manager/Geographer
U.S. Army Corps of Engineers
Charlotte Regulatory Office
Desk: 704-510-1437
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
NC DWO Stream Identification Form Version 4.11
Date: 10/03/2017Horton
Road3
Pro'ect/Site:ID Form #2 CH 200
1
Latitude: 5. 825
Evaluator: J Sinclair A Baggarley
county: Mecklenburg
Longitude: -80.9712
Total Points:
Stream Determination (circle one)
Other Charlotte West
Stream is at least intermittent 22.5
if >_ 19 or perennial if >_ 30*
Ephemeral Interf,ittent Perennial
V
e.g. Quad Name:
A. Geomorphology (Subtotal = 13.5 )
Absent
Weak
Moderate
Strong
1"Continuity of channel bed and bank
0
1
2
3
2. Sinuosity of channel along thalweg
0
1
2
3
3. In -channel structure: ex. riffle -pool, step -pool,
ripple -pool sequence
0
1
2
3
4. Particle size of stream substrate
0
1
2
3
5. Active/relict floodplain
0
1
2
3
6. Depositional bars or benches
0
1
2
3
7. Recent alluvial deposits
0
1
2
3
8. Headcuts
0
1
2
3
9. Grade control
0
0.5
1
1.5
10. Natural valley
0
0.5
1
1.5
11. Second or greater order channel
No
= 0
Yes = 3
Sketch:
-artificial ditches are not rated; see discussions in manual
B. Hvdroloav (Subtotal = 4.S )
12. Presence of Baseflow
0
1
2
3
13. Iron oxidizing bacteria
0
1
2
3
14. Leaf litter
1.5
1
0.5
0
15. Sediment on plants or debris
0
0.5
1
1.5
16. Organic debris lines or piles
0
1 0.5
1 1
1.5
17. Soil -based evidence of high water table?
0
No = 0
Yes = 3
1.5
C. Bioloav (Subtotal = 4.S 1
18. Fibrous roots in streambed
3
2
1
0
19. Rooted upland plants in streambed
3
2
1
0
20. Macrobenthos (note diversity and abundance)
0
1
2
3
21. Aquatic Mollusks
0
1
2
3
22. Fish
0
0.5
1
1.5
23. Crayfish
0
0.5
1
1.5
24. Amphibians
0
0.5
1
1.5
25. Algae
0
0.5
1
1.5
26. Wetland plants in streambed
FACW = 0.75;
OBL = 1.5 Other = 0
*perennial streams may also be identified using other methods. See p. 35 of manual.
Notes:
Sketch:
2
2
2
1
1
2
1
2
0.5
1
0
0.5
1
1
0
2
1
1
0
0
0.5
0
0
0