Loading...
HomeMy WebLinkAbout20180455 Ver 1_USACE Permit_20181005U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. SAW -2018-00383 County: Watauga GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Address: Telephone Number: Permittee: Address: Telephone Number: Justin Rogers P.O. Box 2403 Boone, NC 28607 282-964-0968 John Seldomridge 539 Versailles Drive Maitland, FL 32751 828-406-2363 Location description: The site is located at/near 76 I.J. Bingham Place, near Boone, NC. Coordinates are: 36.227139 - 81.620703. Description of projects area and activity: This permit authorizes placement of fill and culverts for a commercial development and concurrent restoration activities to include pipe/fill removal and planting activities. Permanent impacts authorized by this permit total 0.10 acre of wetland and 49 linear feet of an unnamed tributary to Brown Branch associated with fill material for storage units building pad and an entrance/access to the site. See Special Conditions below for restoration requirements associated with the unauthorized activities in stream channels and wetlands on the site as noted in our previous Notification of Unauthorized Activity dated February 26, 2018. 1. The existing culvert in Brown Branch and the remaining pipe upstream of the permitted 49 linear feet of the unnamed tributary to Brown Branch is to be removed and the streams restored to pre -construction conditions per the attached plans dated October 3, 2018 and the Corrective Action Plan dated March 8, 2018 (see enclosed map). Fill should also be removed from 0.03 acre wetland and remaining mechanically cleared wetland areas should be re -vegetated (see enclosed map). Restoration and planting activities should be completed by November 1, 2018. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number or Nationwide Permit Number: 39 SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions, above noted special conditions, and your submitted application and attached information dated March 8, 2018 and October 3, 2018. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide/regional authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide/regional permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide/regional permit. If the nationwide/regional permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide/regional permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide/regional permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide/regional permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Amanda Jones at 828-271-7980, ext. 4225 or amanda.jones@usace.army.mil. FUEMMELER.AMAND w,Grz,9 ',foo"o. °P ,q� Corps Regulatory Official: A.JONES.1242835090 Date: October 5, 2018 Amanda Jones Expiration Date of Verification: March 18, 2022 Determination of Jurisdiction: A. ® There are waters, including wetlands, on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑ There are waters, including wetlands, within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued . Action ID: SAW - Basis for Determination: See attached preliminary jurisdictional determination form. The site contains wetlands as determined by the 1987 Corps of Engineers Wetland Delineation Manual and the Regional Supplement to the Corps of Engineers Wetlands Delineation Manual: Eastern Mountain and Piedmont Region (version 2.0). These wetlands are adjacent to stream channels located on the property that exhibit indicators of ordinary high water marks. The stream channels on the property are known as Brown Branch and its unnamed tributaries. Brown Branch ultimately flows to the New River which eventually flow to the Atlantic Ocean via the Gulf of Mexico/Mississippi River. Remarks: Jurisdictional wetlands and stream channel locations/extent as depicted on Figure 7 of the Preliminary Jurisdictional Determination Request. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B and C above). This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by N/A. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. Digitally signed by FUEMMELER.AMAND NEM USLORUSANDAJOGovernmeM1242830ou=DoD90ou=PKI, Corps Regulatory Official: A. JONES.1242835090 cO=PU MMELERAMANDA.JONE5.1242835090 Date: 2018.10.05 11:52:29 -04'00' Amanda Jones Issue Date of JD: October 5, 2018 Expiration Date of JD: N/A Preliminary JD The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at http://corpsmgpu.usace.g,M.mil/cm_apex/f?p=136:4:0. CF: Michael Alberto, PE (via email) Sue Homewood, NC DWR (via email) Action ID Number: SAW -2018-00383 County: Watauga Permittee: Justin Rogers Project Name: Rogers Mechanical / Storage Buildings NWP 39 Date Verification Issued: October 5, 2018 Project Manager: Amanda Jones Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn.: Amanda Jones 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.gM.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Justin Rogers / John Seldomrid e File Number: 2018--00383 1 Date: October 5, 2018 Attached is: See Section below ❑ INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A ❑ PROFFERED PERMIT Standard Permit or Letter ofpermission) B ❑ PERMIT DENIAL C ❑ APPROVED JURISDICTIONAL DETERMINATION D ® PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.gM.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT I REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division, Attn.: Mr. Jason Steele, Administrative Appeal Review Officer Amanda Jones CESAD-PDO 151 Patton Avenue, Room 208 U.S. Army Corps of Engineers, South Atlantic Division Asheville, North Carolina 28801-5006 60 Forsyth Street, Room 10M 15 828-271-7980, ext. 4232 Atlanta, Georgia 30303-8801 Phone: 404 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportuni to participate in all site investigations. Date: Telephone number: Signature of appellant oragent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn.: Amanda Jones, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 PRELIMINARY JURISDICTIONAL DETERMINATION (JD) FORM U.S. Army Corps of Engineers BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PRELIMINARY JD: October 5, 2018 B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD: John Seldomridge 539 Versailles Drive Maitland, FL 32751 Justin Rogers P.O. Box 2403 Boone, NC 28607 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: CESAW-RG-A, 2018-00383 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: Boone, NC State: NC County/parish/borough: Watauga City: Boone Center coordinates of site (lat/long in degree decimal format): 36.227139 -81.620703 Universal Transverse Mercator: N/A Name of nearest waterbody: Brown Branch E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): 'Office (Desk) Determination. Date: 10/05/18 FieldDetermination. Date(s): Use the table below to document aquatic resources and/or aquatic resources at different sites TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION Site Centered Coordinates Estimated Amount Type of Aquatic Geographic Number (decimal degrees) of Aquatic Resource Resources Authority to Which in Review Area Aquatic Resource Latitude Longitude (linear feet or acre) "May Be" Subject Stream 36.227126 -81.620487 2041f ❑ Wetland ® Section 404 A ® Non -wetland Waters ❑ Section 10/404 Stream 36.226818 -81.620244 1361f ❑ Wetland ® Section 404 B ® Non -wetland Waters ❑ Section 10/404 Wetland 36.227281 -81.620507 0.27 ac ® Wetland ® Section 404 AA ❑ Non -wetland Waters ❑ Section 10/404 Wetland 36.226810 -81.620831 0.56 ac ® Wetland ® Section 404 BB ❑ Non -wetland Waters ❑ Section 10/404 Wetland 36.226660 -81.620188 0.01 ac ® Wetland ® Section 404 CC ❑ Non -wetland Waters ❑ Section 10/404 ❑ Wetland ❑ Section 404 0 Non -wetland Waters ❑ Section 10/404 1. The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA Data reviewed for preliminary JD (check all that apply) - Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ® Maps, plans, plots or plat submitted by or on behalf of preliminary JD requester: ® Data sheets prepared/submitted by or on behalf of preliminary JD requester. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rational: ❑ Data sheets prepared by the Corps: ❑ Wetland ❑ Section 404 ❑ Non -wetland Waters ❑ Section 10/404 ❑ Wetland ❑ Section 404 ❑ Non -wetland Waters ❑ Section 10/404 ❑ Wetland ❑ Section 404 ❑ Non -wetland Waters ❑ Section 10/404 ❑ Wetland ❑ Section 404 ❑ Non -wetland Waters ❑ Section 10/404 1. The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA Data reviewed for preliminary JD (check all that apply) - Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ® Maps, plans, plots or plat submitted by or on behalf of preliminary JD requester: ® Data sheets prepared/submitted by or on behalf of preliminary JD requester. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rational: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey (USGS) Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ® USGS map(s). Cite scale & quad name: Boone and Deep Gap ® Natural Resources Conservation Service (MRCS) Soil Survey. Citation: Watauga County, NC ❑ National wetlands inventory (NWI) map(s). Cite name: ❑ State/Local wetland inventory map(s): ❑ Federal Emergency Management Agency (FEMA) / Flood Insurance Rate Map (FIRM) maps: ❑ 100 -year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929) ® Photographs: ® Aerial (Name & Date): 2017 or ® Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: ❑ Applicable/supporting scientific literature: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. Digitally signed by FUEMMELER.AMAND FUEMMEL 835090 DM: US, -U.S.RGmemment, ou=DoD,, A.JONES.1242835090—FUEMMELER.MANDAJONES.1242835090 Date: 201810.051 1:53:29 -04'00' Amanda Jones, October 5, 2018 Signature and date of Regulatory s t a f f member completing preliminary JD Justin Church and John Seldomridge Signature and date of person requesting preliminary JD (REQUIRED, unless obtaining the signature is impracticable) Two copies of this Preliminary JD Form have been provided. Please sign both copies. Keep one signed copy for your record and return a signed copy to the Asheville Regulatory Field Office by mail or e-mail, US Army Corps of Engineers -Wilmington District Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. 1 (1) Vegetation restoration r, (5) Remove fill from wetland boundary 10 1 (6) Stabilize upland fill area f (5) Culvert removal �a"� REFERENCE: BACKGROUND GIS LAYER(S) PROVIDED BY NCDOT, DATED 2017. NOTE: JURISDICTIONAL WATERS OF THE U.S. WERE DELINEATED (FLAGGED IN THE FIELD), CLASSIFIED, AND MAPPED USING A SUB -FOOT CAPABLE GPS UNIT BY CWS, INC., ON MARCH 5, 2018. JURISDICTIONAL FEATURES HAVE NOT BEEN VERIFIED BY THE USACE. SCALE: DATE: 1 inch = 80 feet 3/26/2018 CWS PROJECT NO: DRAWN BY: 2018-0075 SAM COORDINATES: CHECKED BY: 36.227267, -81.620553 CAG ) (3) Stream bank planting 1 (2) Culvert removal [ Legend Project Limits (3.4 acres) Wetland Fill Impacts Herbaceous Wetland Temporary Impacts - Forested Wetland Temporary Impacts ® Wetland - Perennial Stream Intermittent Stream Fill — -- - Pipe Pipe to be Removed I I Roads Building Driveway Remedial Actions: (1) Vegetation restoration (2) Culvert removal (20 -ft) (3) Stream bank planting (4) Culvert removal (-71-ft) (5) Fill removal from wetland boundary (6) Stabilize upland fill area — 180 40 0 80 Feet FIGURE NO. Corrective Action Site Plan 6 Rogers Mechanical Storage Building Of CAROLINA Watauga County WETL.ANI) sERVIce5 Boone, North Carolina 6 C:\Users\Sean Martin\Desktop\Projects\Roger Mech Boone NC\CAP Plan.mxd Mabe D. Ward z Deed Book 99, Page 575 z — < Q PIN 2921-71-1908-000 Lj w w z c� z w z o water Z w Z (-) valves (� z z fire Z Q Q o N E hydrant Mabe Ward W 5 27 32 Deed Book 83, Page 443 J � w 5/8" RS PIN 2921-71-3894-000 > z tie — — U U~ (n oU Plat Book 9, Page 150 5/8 R \ 00, � z 0 �� 5/8" RS w Ln U \ o' �\ \ w I o EXISTING PERENNIAL STREAM ��`� , %W z o o \ Denise A. Card, Trustee ' Book of Records 1442, Pae 791 / 99 3 4 CE 6 g \p This document is released for PIN 2921 —61 —3752-000 the purpose of interim review under the authority of EXISTING 48X72" CMP C. Michael Alberto, BE 034996. \�I July 25, 2018. \ It not to be used for o construction or bidding purposes. I ; z 3:1 MAX SLOPE Lot 15 VEGETATED AND STABILIZED B n h a lit Farms, , EEC \ g � � � ► Book of Records 1572, Page 407 ��g ASPHALT CEMENT PAVEMENT Plat Book 9, Page 150 THIS DRAWING IS AN INSTRUMENT of PIN 2921-71-2681-000 SERVICE AND IS TO BE USED FOR \ THIS SPECIFIC PROJECT ONLY. ' 6'' \ , �• THE DRAWING SHALL NOT BE REPRODUCED IN WHOLE 18"0 CORRUGATED PLASTIC PIPE 49' LONG OR PART WITHOUT WRITTEN ,O PERMISSION FROM MICHAEL ALBERTO, P.E. PLLC \ \ STORAGE BUILDING ACCESS GATE 5\\ R g'�� / \ CURB BREAK FOR `�\ LODGER'S MECHANICAL o OUTLET TO SWALE \ \ \ LAY DOWN YARD \ �o \ , o \ 00 (PERMEABLE) LL U 2'-0" WIDE CURB U �\ DRAINAGE COLLECTOR U) (BREAKS TO WEST) z \ z PROPOSED STORAGE ` \ �� \ �� om UNIT BUILDING , `Oo 0 Q \ CHAIN LINK FENCE \ \ 00" W VEGETATED SWALE BREAKS TO EAST /�/\o \ i , \� %is 6.\' 00 (SEE SHEET 3) 10 i B 1 �\ ���\ Ld r> cfl \ O 2 \\ 2 0, 1 EXISTING (\ Q 00 . 6� 0,, \ i GRASS ISLAND RF �,� � \0'' � � � � (PERMEABLE) � -- 5/8" W z s 25'-0" 1 25'-0" 26'— EXISTING GRAVEL m portion Of Lot 12 \ 1 PARKING LOT 3/4" CF RIP RAP HEADWALL I 3 Jerry V. Sparrow, Sr,, / Lot o z 0 UD J. �IChae Sparrow, Jr., SEASONAL STREAM �\ ►� / \ \ \�\ ra J. Bingham, Jr, and Jonathan V. Sparrow, 25 TROUT BUFFER \ o / g p / '``' / Virginia J. Bingham, Trustees and W. Seth Sparrow � �' 5 8" RS Book of Records 1444, Page 664 Book of Records 665, Page 74 `2 ' / / Plat Book 9, Page 150 Plat Book 9, Page 50 IN 59°14'00" W� PIN 2921-71-3267-000 PIN 2921-61-9315-000 ' 30.44' / �1PER�lEABEE PLAN 3/4" CE / EXISTING D.O.T. DRAWN BY CHECKED BY INSTALLED CULVERT / KIM CHARLES CHARLES 2 DRAWINGA JULY 2018 REVISIONS NOTE IMPERMEABLE PLAN SITE PLAN SHEET NO. SITE SHALE BE SURFACE DRAINED AS SHOWN SCALE 1 " E, J, SCALE 1 " = 40' 3/4" CF2 SCALE FOR 24"x 36" SHEET u - LEGEND ITEM WETLAND EXISTING BUILDINGS 8c PARKING CHAIN LINK FENCE NEW DEVELOPMENT LIMITS � ROAD --------- STREAM TOTAL CONTOURS � 25' STREAM BUFFER LINE 3.476 EXISTING BUILT UPON AREA (IMPERMEABLE) B E BE NEW BUILT UPON AREA (IMPERMEABLE) MPERV OUS ACREAGE SCHEDULE ITEM ACREAGE EXISTING BUILDINGS 8c PARKING 0.097 NEW BUILDINGS 0.382 ASPHALT PAVEMENT 0.514 TOTAL 0.993 TA TOTAL SITE ACREAGE 3.476 ACREAGE CALCULATION NORMAL HIGH WATER LINE BROWN BRANCH TO NHWE = 0.031 SEASONAL STREAM TO NHWE 0.015 TOTAL ACRES NHWE 0.046 TOTAL_ IMPERVIOUS DEVELOPMENT DEFINE BN =BUILT NEW = 0.896 DEFINE BE =BUILT EXISTING = 0.097 DEFINE TA =TOTAL ACRES (3.476) LESS NHWE ACRES (0.046) = 3.43 B N - TA - B E BE 0.896 - 0.097 0.799 = 3.43 - 0.097 = 3.33 = 0.23999 = 23.99% cn C) J m IV o � 9" MIN = � � z O Du N C OJ O ITl m O Tl m D O m � � z C/) n F-1 r� z 0 z F -- F-7 cn cry o O r,-1 I m 0 0 00 N IV CT) O O u -u O O 7-1 -7-1 � n D C C _7 rrn z z rC O cam-, O C O z FT -1 D m nC D c/7 771 D z Fg o D FT -1 n F— c� I --I N I I-- ' I F N 71 N 0 l J — �_ o O o FF] z D 4- z o � o � m z FT -1 � n � D O z z � o � C) z CD -77 7-, r7 z cn G7) n 2 � m U, o O C z � o z r� I 0 VARIES 6" MIN. D Cn � n n O C -Ti O O z z a r� z F-1 J IV c/) O m Csl � O z ci D SCJ C� 3'-0" D I -Tl D cn n m m m O N X W Cli cn m F-1 FT-1� MICHAEL ALBERTO,PE PLLC����m ��CIVILENGINEERING o z NEW STORAOE BUILDINGS EOR: Q � F-- m Dmf �m� .�-r� CTI =� Z C �� D��OD nzz o. N� co o 3 s s CD ��N o �g�� o LICENSE No. P-1 753 STRUCTURAL ENGINEERING C,IkDROGERS M ��_"" �� 580 20th AVENUE COURT NW z � n � o c�.a O O O D ➢ S = p z g�= o W z o •�. �. �. m �� � 176 I.J. BINGHAM PL BOONE, NC 28607 ����F g� -CD Q g Q HICKORY, NC 28601 SITE PLANNING o� o ���oz oD � r�--j z� � PHONE: 919-621-7667 F7 CONSTRUCTION CONSTRUCTION CONSULTANT o cmIchae1.aIberto@gmaIl.com