Loading...
HomeMy WebLinkAboutWQ0040324_Application (FTSE)_20180815Strickland, Bev From: 1 stfloorscanner@ncdenr.gov Sent: Friday, October 05, 2018 11:36 AM To: Dunn, Barbara M Subject: USE Permit - WQ0040324 Attachments: USE Permit - WQ0040324.pdf See attached document Attachment File Type: pdf, Multi -Page Multifunction Printer Location: machine location not set Device Name: Xerox 5955 2nd Floor Multifunction Printer IP Address: 10.251.193.234 State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T.0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: WI 0l]42)dM (to be competed by ❑WR) All items must be completed or the anplication will be returned 1. APPLICANT INFORMATION: 1. Applicant's name: City_ of Rocky Mount (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ❑ State/County ® Municipal 3. Signature authority's name: William B. Kerr. PE per 15A '14CAU U2T _01.06 b Title: Director of Engineerine 4. Applicant's mailing address: PO Box 1180 City: Rocky Mount State: NC Zip: 27802- 5. Applicant's contact information: Phone number:2(_52) 972-1120 Email Address: brad.kerrQrockymountnc.go_v II. PROJECT INFORMATION: ❑ Privately -Owned Public Utility ❑ Other NC Dept Of Fnviron,11en1,11 ptt�llity A01i 1 " 2018 Raleigh Regionai office 1. Project name: Stonewall Villas- Phase 1 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Nash 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.962185 Longitude: -77.8I0042 5. Parcel ID (if applicable): 316039 (or Parcel 1D to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: J. Michael Stocks License Number: 19843 Firm: Stocks_ Engineering, P.A. Mailing address: PO Box 1108 City: Nashville State: NC Zip: 27856 - Phone number:j2) 459-8196 Email Address: mstocks(a-)stocksengineerine com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Tar River Regional Wastewater Treatment Plant Permit Number: NC030317 Owner Name: Ci1y of Rocky Mount. V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): FORM: FTA 04-16 Page 1 of 5 V1. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes [-]No ®N.'A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FO}tM: UEV} been attached? ❑ Yes [:]No ®N'A 3. If the Applicant is a Home[Proaerty.Owners' Association, has an Operational Agreement fl, HOA) been attached? ❑ Yes ❑No [ON. -:A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical f dental ! veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial % Industrial ( 1 SA NCAC 0?'I' ,0103(203) 4 Is there a Pretreatment Program in effect? ❑ Yes [:]No 6. Has a flow reduction been approved under 15ANCAC_02T _01 14f 1l? ® Yes ❑ No D If yes, provide a cony of flow reduction annroval letter 7. Summarize wastewater generated by project: Establishment Type (see 021.0114ff}1 Daily Design Flow' b No. of Units Flow Residential Lots 360 gal/day 14 5,040 GPD gall GPD gall GPD gall GPD gal/ GPD gal/ GPD Total 5,040 GPD a See S N &C 02T .0I 14[h), WL (e)(1) and fel(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G. -S. 42A4). b Per 15A NCAC 02T.01 14(c), design flow rates for establishments not identified [in table 15A 1tiCAC 02T_01 14] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 5,040 GPD (per 15A.NCAC 02T,0 1 14) D Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this Iine ❑ FIow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 Vll. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T.0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 670 SDR -26 PVC ➢ Section 11 &III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section Ill contains information related to minimum slopes for gravity sewer(s) Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) - 02T.0305 & MDC (Puma Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - _ 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): _ gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(11. ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(13)., ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - I5A NCAC 02T .0305(h)(1)(C): D It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B.0200 & 15A NCAC 02T .0305(f)): I. Does the project comply with all separations found in 15A NCAC 02T _0305Ct & f¢l ➢ 15A NCAC 02T.030541) contains minimum seuarations that shall be nrovided far sewer systems- ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches IS inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS -1 waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS -I or WS -V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches Any building foundation 10 feet 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches 15A NCAC 02T_0305(g) contains alternatives where separations in 02T.0305[fw cannot be achieved. D **Stream classifications can be identified using the Division's 14C Surface Water Classifications webpaec If noncompliance with 02T.0305(f) or f, see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No See the Division's draft separation requirements for situations where separation cannot be meet D No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B.0200? ® Yes ❑ No D This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project comply with an individual 404 Permit or any 401 Certifications? ® Yes ❑ No D Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c){6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6}, directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high-priority?" Per 15A NCAC 02T.0402, "high-priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. []Yes ® No D If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least onceevery six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NC AC 02T, the Minimum Design C ritcria liar the Permitting of Pump Stations and Farce Mains tlatest version, and the Gravity 5cwer Minimum Desien Criteria (latest vcrsian) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. ARRroval of the request is required prior to submittal of the Fast Track Application and supporting documents 2. Professional Engineer's Certification: I, 11 CkACA&A S4crAc _ _ attest that this application for (Professional Engineer's name from Application Item Ill. 1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (Iatest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE - - In accordance with General Statutes 143-215.6A and 143-215.66, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. ........................_ .-._._....._..._ _...... .... . ��tit�et�trtii North Carolina Professional Engineer's seal, signature, and date: ♦♦�`,H CgRO''►.,� �.`�� .•'FESS/p'.; Ly� L a SEAL '!9843 s Applicant's Certification per 15A NCAC 02T .0106(b): f 1, _ VV ! �! t Q_e-A J� rr _ attest that this application for (Signature Authority's name & title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE In accordance with General Statutes 143-215.6A and 143-2I5.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: / • g, �t FORM: FTA 04-16 Page 5 of 5 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: City of Rocky Mount Project Name for which flow is being requested: Stonewall Villas - Phase I More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. 0 a. WWTP Facility Name: Tar River Regional WWFP (A) (B) b. WWTP Facility Permit #: NC 0030317 (D)=(B+C) E � All flows are in MCDi U-) c. WWTP facility's permitted flow 21.00 Lo d. Estimated obligated flow not yet tributary to the WWTP 0.531 �- e. WWTP facility's actual avg. flow 10.83 Q f. Total flow for this specific request 0.00504 A g. Total actual and obligated flows to the facility 11.366 Flow** h. Percent of permitted flow used 54.124% Flow Plus Il. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** 97 Lift St. 30.0 12.0 6.5 0.2 6.7 5.3 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Tar River Regional Downstream Permit Number: NC 0030317 Page 1 of FTSE 04-16 Ill. Certification Statement: I William B. Kerr certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and 11 plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Signingial Sig lure Date Page a of 6 FTSE 04-16 � `§ � � �% ` � �s @ � ■ » is @® ƒ 2 m � � � 7 u. .22 « � � � E I � � � 7 E o & En � g A .Xf | � k k � `§ � � �% ` � @ � ■ » is @® E � « � � � � a � } E o & � � k k S f rL £ � � / 5 'aA |@ 4 'MICHAEL SCDfT.OR r BELL DR tAHfC kq a C MALlru RD si 4 i � C � { , r� I WFATHERSTbNFD STONY ELSEA OR MANSFIELD DR f G ` � l 'I3t��oiaa�— p •� ` y �� .) DDBURN DT s :1, Ba x3381 NDLS� N / o TYSDH AYE (� JOAFS•RD TIMBERLME" O FNGLFWOOD 3AY 3TYDHDAYSH�'M AND ' RNFS4f 5 wQWBLVa Y _ L4 1N8W03td �o TDRx sr x�� — 1 ZY Al - OR- � � � tcl. S 5 ^ 1 ?I NlP ntcFRysT �,. � rj � jSr Sr as N MYfST SRL ST Y Y51 p H R'FtL ST �+� i• u �ai ' =',�� r i' ? .... �' �� � RCS ST r I 1 %'t Sewer Project Narrative For Stonewall Villas Stonewall Villas is a subdivision in Rocky Mount, NC that will consist of 71 residential lots. Phase One of sewer design will serve 14 lots. Stonewall Villas subdivision, is located off Falling River Walk, just south of US 64 in Rocky Mount. It will consist of 100% domestic flow. The sewer system will be constructed of approximately 670 LF of 8 -inch SDR -26 PVC sewer pipe. Each residential lot served by this sewer service will require 360ga1?day. Phase One includes 14 lots which makes the total projected flow for this facility 5,040 GPD. The wastewater treatment plant facility that will be handling this flow is the Tar River WWTF (Permit # NC 0030317). The permitted flow for the WWTF is 21.0 MGD (NPDES). LE717ER OF TRANSMIYFAL Stocks Engineering, PA PO Box 1108 J. Michael Stocks, PE Nashville, NC 27856 J. Kevin Varnell 252.903.6891 252.459.8196 252.382.0012 To: Ted Cashion NCDEQ-DWQ 3800 Barrett Drive, Suite 101 Raleigh, NC 27609 Phone: 919-791-4252 Overnight No Yes Job No. 2018-004 - 0 Job Name: Stonewall Villas .... y Ctd A E N d Date: 7/23118 c W CM fy Sent By: Ethan Averette o We are sendingA you the following U 0 EC Plans ❑ Prints/Plans ❑ Construction Plat ❑ Site Plan Drawings ❑ Computer Disk ❑ Contracts x Permit Applications ❑ Site Work Calculations ❑ These are transmitted as checked below: x For Approval Cl As Discussed ❑ For Your File ❑ As Requested O For Your Use ❑ For Review and Comment ❑ For Your Signature, then return to Copies Date Description 2 8-13-18 Fast Track Sewer Application 2 8-13-18 Flow Tracking/Acceptance for Sewer Extension Applications 2 8-13-18 USGS Map with location of site shown 2 1 8-13-18 1 Street Map of Surrounding Area 2 1 8-13-18 1 Sewer Narrative 1 1 8-13-18 1 Permit Fee Check Copies To: