Loading...
HomeMy WebLinkAbout20051844 Ver 1_Complete File_20050928r O 511:? -.C Michael F. Easley, Q6e-mod' J. William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality October 19, 2005 DWQ# 05-1844 Iredell County Mr. Bob Huffman VP Construction St. Lawrence Homes 7200 Falls of Neuse Road, Suite 300 Raleigh, NC 27615 Subject: Wellesley S/D, Mooresville APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Huffmann: You have our approval, in accordance with the attached conditions and those listed below, to fill 0.14 acre of wetland and impact 148 linear feet (If) of Back Creek (WS II Waters) in order to construct the Wellesley subdivision (Phase 1) in Iredell County, as described in your application received by the Division of Water Quality (DWQ) on September 28, 2005. After reviewing your application, we have determined that this project is covered by Water Quality General Certification Number 3402, which can be viewed on our web site at http://h2o.enr.state.nc.us/ncwetlands. The General Certification allows you to use Nationwide Permit Number 39 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. The above noted Certification will expire when the associated 404 permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter; and is thereby responsible for complying with all conditions. In addition to the requirements of the certification, you must also comply with the following conditions: DWQ shall be notified if the total stream impacts associated with this site exceed 149 linear feet. This includes the proposed road stub (potential stream crossing) located at the southwest corner of the subdivision. 2 The base flow stream channel shall be maintained (reconstructed) immediately above and below the proposed stream crossings. This may be accomplished through the construction of flood plain benches or similar measures. These measures must be approved, in writing, by this office prior to construction. No Carolina atura!!y North Carolina Division of Water Quality 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone (704) 663-1699 Customer Service Internet: h2o.enr.state.nc.us FAX (704) 663-6040 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper 3. Deed notifications or similar mechanisms shall be placed on all lots with remaining jurisdictional wetlands and waters or areas within 50 feet of all streams and ponds on the property. These mechanisms shall be put in place within 30 days of the date of this letter or the issuance of the 404 Permit (whichever is later). A sample deed notification format can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetiands. 4. Stormwater discharge structures at this site shall be constructed in a manner such that the potential receiving streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion of the stream banks. 5. All wetlands, streams, surface waters, and riparian buffers located on the project site where impacts are not allowed shall be clearly marked (example- orange fabric fencing) prior to any land disturbing activities. 6. No waste, spoils, solids, or fill of any kind shall be placed in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notification application. All construction activities associated with this project shall meet, and/or exceed, those requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual and shall be conducted so that no violations of state water quality standards, statutes, or rules occur. 7. Sediment and erosion control devices shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within two months of the date the Division of Land Resources has released the project. 8. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of Completion" form to the 401/Wetlands Unit of the NC Division of Water Quality. Please send photographs of the upstream and downstream sides of each culvert site to document correct installation, along with the Certificate of Completion form. 9. Continuing Compliance. The applicant (MAG Land Development) shall conduct all activities in a manner so as not to contravene any state water quality standard (including any requirements for compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of state and federal law. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC 2H.0507(d). Before codifying the certification, DWQ shall notify the applicant and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503, and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to the applicant in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-1699 or Ms. Cyndi Karoly in the Central Office in Raleigh 919-733-9721. Sincerely, for Alan W. Klimek, P.E. Attachments cc: Army Corps of Engineers, Asheville Ian McMillan, Wetlands Unit MRO, Land Quality Central Files Len Rindner F W A TF p?p ,9QG Michael F. Easley, Governor William G. Ross Jr., Secretary r North Carolina Department of Environment and Natural Resources p Y Alan W. Klimek, P.E. Director Division of Water Quality October 19, 2005 DWQ# 05-1844 Iredell County Mr. Bob Huffman } VP Construction St. Lawrence Homes OCT 7200 Falls of Neuse Road, Suite 300 Raleigh, NC 27615 p 1^?F.rlf Subject: Wellesley S/D, Mooresville APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Huffmann: You have our approval, in accordance with the attached conditions and those listed below, to fill 0.14 acre of wetland and impact 148 linear feet (If) of Back Creek (WS II Waters) in order to construct the Wellesley subdivision (Phase 1) in Iredell County, as described in your application received by the Division of Water Quality (DWQ) on September 28, 2005. After reviewing your application, we have determined that this project is covered by Water Quality General Certification Number 3402, which can be viewed on our web site at http://h2o.enr.state.nc.us/ncwetiands. The General Certification allows you to use Nationwide Permit Number 39 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. The above noted Certification will expire when the associated 404 permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter; and is thereby responsible for complying with all conditions. In addition to the requirements of the certification, you must also comply with the following conditions: 1. DWQ shall be notified if the total stream impacts associated with this site exceed 149 linear feet. This includes the proposed road stub (potential stream crossing) located at the southwest corner of the subdivision. 2 The base flow stream channel shall be maintained (reconstructed) immediately above and below the proposed stream crossings. This may be accomplished through the construction of flood plain benches or similar measures. These measures must be approved, in writing, by this officebprior to construction. N hCarolina Naturally North Carolina Division of Water Quality 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone (704) 663-1699 Customer Service Internet: h2o.enr.state. nc.us FAX (704) 663-6040 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-1699 or Ms. Cyndi Karoly in the Central Office in Raleigh 919-733-9721. Sincerely, for Alan W. Klimek, P.E. Attachments cc: Army Corps of Engineers, Asheville Ian McMillan, Wetlands Unit MRO, Land Quality Central Files Len Rindner Triage Check List Date: 10105105 Project Name: Wellesley Phase I c/o St. Lawrence Homes DWQ#: 05-1844 County: Iredell To: Alan Johnson, Mooresville Regional Office r C9 \ {f 1r ?,% 60-day Processing Time: 9/28/05 -11/26/05 From: Cyndi Karoly Telephone : (919) 733-9721 The file attached is being forwarded to you for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: As per our discussion regarding revision of the triage and delegation processes, please review the attached file. Note that you are the first reviewer, so this file will need to be reviewed for administrative as well as technical details. If you elect to place this project on hold, please ask the applicant to provide your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim procedure as we slowly transition to electronic applications. Please apprise me of any complications you encounter, whether related to workload, processing times, or lack of a "second reviewer" as the triage process in Central had previously provided. Also, if you think of ways to improve this process, especially so that we can plan for the electronic applications, let me know. Thanks! Wellesley Phase - 1 Iredell County. North Carolina 2 0 0 5 1 8 4 4 Joint Application Form and Supporting Documentation for NATIONWIDE PERMITS THAT REQUIRE NOTIFICATION TO CORPS OF ENGINEERS & NCDENR Prepared For Bob Huffrnan VP of Construction St. Lawrence Homes 7200 Falls of Neuse Road Suite 300 Raleigh, NC 27615 Prepared By: Leonard S. Rindner, PWS Environmental Planning Consultant 3714 Spokeshave Lane Matthews, NC 28105 (704) 846-0461 *Subject to verification by the USACE September 27, 2005 F@20V1 SFP 2 3 1005 DENR • WATER QUA[ ITY WETLANDS AND STORMWATER BRANCH Page 1 of 9 Office Use Only: Form Version May 2002 USACE Action ID No. DWQ No. (If any uarticular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: X Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit Isolated Wetland Permit DWQ X 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: 39 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Mana? $e,ment Area of Environmental Concern (see the top of page 2 for further details), check here: II. Applicant Information 1. Owner/Applicant Information Telephone Number: E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Leonard S. Rindner PWS Company Affiliation: Environmental Planning Consultant Mailing Address: 3714 Spokeshave Lane Matthews NC 28105 Telephone Number: 704 904 2277 E-mail Address: lrindnerncarolina.mcom Fax Number: Bob Huffman VP of Construction St. Lawrence Homes 7200 Falls of Neuse Road Suite 300 Raleigh, NC 27615 Fax Number: 704 847 0185 Page 2 of 9 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Wellesley 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 4. Location County: Iredell County Nearest Town: Mooresville Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): Oak Ridge Farm Highway (NC 150) 5. Site coordinates, if available (UTM or Lat/Long): 35.60400N, 80.7817°W (WGS84/NAD83) USGS Mooresville (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): + 35 Acres 7. Nearest body of water (stream/river/sound/ocean/lake): UT of Back Creek 8. River Basin: Yadkin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/map,-11/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Undeveloped timbered woodland and agricultural areas. 10. Describe the overall project in detail, including the type of equipment to be used: Proposed residential development 11. Explain the purpose of the proposed work: Page 3 of 9 Site preparation to develop residential areas. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. P_reliminM wetland and stream evaluation and delineation was conducted in conjunction with project planning Modifications were made to the initial concepts to minimize impacts to jurisdictional streams and wetlands based on recommendations. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. A future road crossing will be required to access Phase 2 which is in early preliminary and schematic clearing. Additional wetland impacts are not expected. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Proposed minor impacts to wetlands are limited to site preparation. 2. Individually list wetland impacts below: Wetland Impact Area of Located within Distance to Site Number Type of Impact* Impact 100-year Floodplain** Nearest Stream Type of Wetland*** (indicate on ma) (acres) es/no) (linear feet) #1 fill 0.14 no <300' PSS1A Page 4 of 9 * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at littp://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: +/- 0.14 acres. There is also an existing pond to remain and streams to remain Total area of wetland impact proposed: +/-0.14 acre 3. Individually list all intermittent and perennial stream impacts below: Future Phase Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts ana assoc?ateo rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usts.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.inanquest.coni, etc.). Cumulative impacts (linear distance in feet) to all streams on site: FUTURE (expected to be less than 150 linear feet) 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: N/A Page 5 of 9 Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name Wat) (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: tui, excavation, areagmg, flooding, drainage, bulkheads, etc. 5. Pond Creation if construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands [stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: V. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Permanent impacts to wetlands are limited to minor impacts to prepare development parcels. 100' buffers are required adjacent to the perennial stream. Extended stormwater wetlands will be constructed to treat stormwater. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors Page 6 of 9 including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Permanent impacts to wetlands are limited to minor impacts to prepare development parcels. 100' buffers are required adjacent to the perennial stream Extended stormwater wetlands will be constructed to treat stormwater. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http•//h2o enr.state.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: NA Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): VI. Environmental Documentation (required by DWQ) NA Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Page 7 of 9 Yes ? No X If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? VII. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) NA It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Miti ation 1 3 2 1.5 Total * Zone I extends out 30 feet perpendicular from near bank of channel; zone t extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. Page 8 of 9 VIII. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. See attached - The stormwater management for the project will be conducted in accordance with local WS II Stormwater Management requirements. IX. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Municipal System X. Violations (required by DWQ) NA Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No X Is this an after-the fact permit application? Yes ? No X XI. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Signature Date Page 9 of 9 TopoZone - The Web's Topographic Map Page I of I topozone :owl 199A.70C3 AbPs a Y cloe Inc ' - r ? F? i C I-, I n i' qL MS.? , '? e r r .1 -J , _ t i' I •r' " -6, -Pk s•14 lip ? aK 1 l J ?Y? ?p ? ' : '?' ? ?•,? ?? ?'. ) 7 ?.?_,, ?F Ill I i? ??. X b'C' r s If ?' 1- ??' / ?- w X .. 6 ' I L` If l l:_- • P'. r .ny= T II n .'' Q, ,T'S af•`?:'n.i - -'' ' - G - - III :' fog ' f fl { a I ,,ter l ? ! I I ; I' _ J I ' 1 I` ? 17 ' ?, I I M14 ?` .' - I l7. .'AI r F _..y ??I ? ?'` 7i •`f? II .y, ro_ Z'. I ?• 1'? . 'n'1 I, 1 r, 4, _ l - fl 4? 5 - I + y? ?? 41'r Ua* 1 ; `. '?;?_, .tW:FP in.? ? a: f?, J ? 1;- •,,`?, 9? I. r7 I 7T 4eNp? - [ ?. d:' r r tern r fl V'?r ?'w l 4 ?I r I 11 l x a I.P f ( r I 1 i 7, 'i rq'' I;` ??{j,Y?t;I .t ?ry \ 'l r ?•' `;1 1. sI ? ?I `i -,i I 1 1 1,01 t I - - 11. 97 • 1 :.- ..++: '? n+?rywM ?" ? - 1. O • N?irr7'w rwq a ?` I ?` +? I '?i ? I? r ?' T t ?, F ?.• -Jw I'?I* 0 0.6 1.2 1.8 2.4 3 km G 0 0.4 0.8 1.2 1.6 2 mi Map center is 35.60400N, 80.78171W (WGS84/NAD83) Mooresville quadrangle M=-7.249 Projection is UTM Zone 17 NAD83 Datum G=0.127 http://www.topozone.com/print.asp?z=17&n=3940055.00009436&e=519773.999999999&... 9/27/2005 TopoZone - The Web's Topographic Map Page 1 of 1 ?JAopazone''' ` , .. c ?? I ' t ?? , ; III f . Copy11?11egg.4pooM?poa4ane ? ? I ? r - J /. ?, -' • 'I i ? ??) I ,k, f!r'??~i' 1 ; I ', 4 L"' _ .7" J j r -- 151. • . ?-•-' i t'! ?' JrJrr Rog .._' ?,? - ? ' fry ,? ? , •.:, ? ?• 1 ` ? I >J,' `? • ? ? 1.??, "? I } , F :li ? ? ??J ?'? ?, - J ?1 ? ? ti 5 r _ _ III ! I SpJ l?'1 ?t• ?-? - '•? ????j t' II • ? , r ?. - - 5 f ! ,'ri. J ! d i ?'ti1', j7 ?J , ? r I tf ? / f I '. 1 -- j r' I I ?.If '' r f ? i ?... -= N 5 I - • ?'•y 14 Ir'I I • ,r 4? ? ? f` '} y? J ',iy5, 5. r ?f 5 \ J f7 I I ?1 r? f? f r I 4' r 1 -/ l '1. I r I 1 I I' I f' .. I ?_ 4 ?I,I 12397 ??.. w _..,?,... ?L...-? ;hrJ, J + I lJ ... \i, I?-,? ?h I •, ?' . 15 f'_ .'I?• . ?rf • wit i .y?'!, ,t -•'Ir . r. I N - /'r . 7' - 1 r?,\'li __ ?' :"t- ' ? ? /? 4?' 1 f ? ?? t ?`, I'1 5 ?. 5?5 y I I 'rf', ?1 ?'rf???r •'J '. P??? 1? - I A ? 'i! I .• 1 ??/ ?., J?It I` I ; '~ \ \ I I 1? I ,+ff / /?6,_?/?r,J , - •a I _. ? '? r ,\ I '. ? ? ? Ilr '. rJ! ? ?,?' r ?r r f 1 5,5 1/ • r• ,• jl !? II Y yl ?rl' III a,¦. •1• • y ?` ? ? /J, .?I (` ??', `.'_- ?,• '1, I{y,?f ''?rll r?,? ?? ?'I?'I II 7j 777¦? J "?•f { 'Jf? •\ ,\_4 _ ?' // ? ? I J _ f - ter' Q j'r ?1 ?I • _ ? 5 'r _ I • fs .ti '' ? •' I I _ I t• 'r ! r0?jl4vrR5Yi Ilr y kLti 5 t ._....- ? ?,?I,Z$=?Q ° w.. • E a:. I _ \ , ? •' ="., 1 ?I ? 1, r I 1 ? 1 i I 92, ? In 4r . II i? ? , 1 - l-J",' ? y •----?-?,??? '? , , ' ? . I ? .. , I'I. ;r,? • ? r-- , 't' I y. n?'?"?.: .155 - 1 '_ }'.• / t l I • ' 5 y ? k?' I 1 ? ? I _ I : a• • ' '• • 1\ Y !, Jr 5 f *_, Tf I 5_? s r l 7/ _ t , "?5,^ '. ' ,? ?I A? • • ?I?" ?I may, • ?_ '.,,,'t I ti.l ?, I. ?? a , lil, _J?' f't (, ? •,?`ti ?,, `.' 1 %"' S I? ''1?r) .. ? 'S5?5??1 t -_-,,5 ?11 1 - !; ,! J ! r ?+rJM1?l1: j Vx r1YF * 51 j j ' J)4 II''J I'S ?'\Lr•'l-?. 5 yli 1 T. I tJ 'r I FIt• .7 .. r ?r i .. , t tl I r II /Iti14 _ ?r l5 p, :,,?? tl f . t\ 615 • r?r1?' ] }w I L' I t 71 I '?` ?. r IjRit, 11 4 5 .I ' 9 'S wJJ f • `? •'' 1 - - - .. , 1-, , , I a j , 1 I? -,j'..y 15 •5 Jt '' till J 11 j _= r?f/;/(,l 1 j I r JF , ti ti r II ,9 Irrf ' J - .J :- ''._? \ra• ! S¢'p ? Ir? Ir1?`t? I•v `t--. ??I t? I??i I'u-? 11 I?!','Ill ri"'_..-. ?''r _? 11JI _i` _l ,?ti 1? ?? I r ,??,?G?._ ti :?}4 ?t ? 1 I II ? I+r;•' ? ( i! MHC 0 0.3 0.6 0.9 1.2 1.5 Km G 0 0.1 0.2 0.3 0.4 0.5 mi Map center is 35.60400N, 80.7817°W (WGS84/NAD83) Mooresville quadrangle M=-7.249 Projection is UTM Zone 17 NAD83 Datum G=0.127 http://www.topozone.comlprint.asp?z=17&n=3940055.00009436&e=519773.999999999&... 9/27/2005 71 n. �' tv i �, - � ri lai . � �:; �E ay .� -'.4 �• 3, 8 4xe�R.. � F � 3 `,,. - � ' • E YY a F el . i r, If a �` ^ 3 � lfp ,y _.1_ �.i _ • r - i xq J� E' I lw- . A Pr ' . � ,�;' 'aY 'Y� � j•�.� E^ .fir'_+ n Ile Ap • x _31!l r fid' ( ' wa., z 4 ^. 'w 'r• :�i� �! �` '°°SPP„ �� �'�:3' . i � j s a •.. � g x.°�� /��°y �,.. w MaR` A t£':4SS W?ET-.T--,.FSLEY TOWN OF MOOKESPMLE IREDELL COUNTY, NORTH CAROLIlVA T "tzr_-_ Ayr, SCALE: 1"=400' OVERALL. SITE PLAN FOR WETLANDS SUBMITTAL 1d111W8nS SON` I13M a0A Od01/M 311S IIVH3AO .rr Grll J rn !:I Ft 0 .I.I? z O Z O U t het t ?et - - - - - - - ? • ° V Yy t`. s ate. ° R .000 E!E ? - r? ? ? ,? •'' I y,:. ,;? i?? ? ma W? 4 WWW W ?e ?f fee V r m 11 i• rte. 1 w Q U U Q H O z T z a J CL w w Z cri w O w Q a Q w Q X O a a a Q WETLAND IMPACT AREA 2 SECTION 2 Wetland Pond I Calculations I SITE P.,V, "g& S-,mg r i 1 1 1 1 ?? / ''SORE .•. % `fir r r` ? `+??rsi % / I ,. ? f A f ! ! f s f I s A I? / h?'J 1 ? 1 y - 1 ,f I r 1 I rr LEGEND ' PROMSED CDMrouRS i LOW MARSH RP90EEP) EX/SrMG CONTOURS i HM MARSH 174'DEEPI PROPWO STORM DRAINAGE MIM /gp lJ DEEP) rOP DF STREAY BARK RIP RAP MAN I n?rERSECrA7R GUTrER FLOW AMM WAS-Off CURB a GUTTER (V SECTION Ar THE CENTER OF rKE RADWS RENRNI WETLAND POND 1 WETLAND POND l SCALE" 1"=60' FIGURE 3 oe-rLAA)D 5AQ SZ1.ZS=eD.39A-C (L `? sad,/ 22, s x i /. 0 co 1?16 ? C Ya1 ?. o..•• 1 a..;,..a..t 1 S AC-) M•K ) (-9 O. <0 5 8 /!i/t = Z8442. -F+3 29y ZSS F+3 Pond 1 -Wellesley ELEV. SA (ac) SA/DA ratio 820 0.29 0.92 820.25 0.30 0.95 820.5 0.31 0.98 820.75 0.32 1.01 821 0.33 1.04 821.25 0.34 1.08 821.5 0.35 1.11 821.75 0.36 1.14 822 0.37 1.17 DA= 31.6 AC ELEV. SA (ft) VOLUME (ft) 821.25 14810 0 821.50 15215 3753 821.75 15621 7608 822.00 16026 11564 822.25 16432 15621 822.50 16837 19780 822.75 17243 24040 823.00 17648 28401 823.05 17729 29285 823.25 18054 32864 823.50 18459 37428 823.75 18865 42093 824.00 19270 46860 A' BEST MANAGEMENT PRACTICE - WEST D.A. ALL AMERICAN RELOCATION - BOBBITT Proposed BMP: Pond 1 Area draining to BMP: 1,376,500 Square Feet Percentage Impervious: 22.5% Per table 1. 1, Page 5 of the NCDENR BMP Manual: Average permanent pool surface area required (at 3 foot depth, as a percentage of D.A.): 22.5% Impervious => 1.06% .-- or -- 14591 Square Feet Volume of temporary storage required = first one inch of rainfall on Drainage Area: Rv = 0.05 + 0.009(22.5%) = 0.2525 inch/inch Volume = 1 inch rainfall x Rv x 1/12 feet/inch x Drainage Area Volume of temporary storage required = 28964 Cubic Feet Volume of storage provided at EL. 823.05 = 29285 Cubic Feet Maximum head at extended detention storage = 1.80 Feet PEAK OUTFLOW RATE FOR DRAWDOWN TIME OF 48 HOURS: Qpeak = S/(0.5 x 3600 x 48) WHICH EQUALS: STORAGE x 0.0000116 = 0.335 REQUIRED ORIFICE AREA: A=Qpeak/(0.6 x (64.4 x h)^0.5 REQUIRED ORIFICE AREA = 0.051893 FEET DIAMETER OF A CIRCULAR ORIFICE = 2 x (REQUIRED ORIFICE AREA/3.14)^0.5 DIAMETER OF A CIRCULAR ORIFICE = 0.257 FEET= 3.085 INCHES USE 3.0 INCH ORIFICE Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 2 Year, Type 2 Rainfall: 3.12 inches at Pond 1 Time of Concentration: 15 min. Drainage Area: 31.600 acres. Weighted 'C' Factor: 0.400 Time (min) Rainfall Incr. Total (inches) (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.07 0.07 0.28 3.51 30 0.13 0.20 0.51 6.39 45 0.86 1.06 3.45 43.57 60 0.32 1.38 1.29 16.36 75 0.10 1.48 0.39 4.95 90 0.08 1.56 0.32 4.09 105 0.06 1.62 0.25 3.10 120 0.06 1.68 0.22 2.78 135 0.05 1.73 0.20 2.53 150 0.05 1.77 0.18 2.33 At time = 375 minutes, the flow is 1.14 CFS. Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 10 Year, Type 2 Rainfall: 4.80 inches at Pond 1 Time of Concentration: 15 min. Drainage Area: 31.600 acres. Weighted 'C' Factor: 0.400 Time (min) Incr. (inches) Rainfall Total (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.11 0.11 0.43 5.41 30 0.19 0.30 0.78 9.84 45 1.33 1.63 5.30 67.03 60 0.50 2.13 1.99 25.17 75 0.15 2.28 0.60 7.61 90 0.12 2.40 0.50 6.29 105 0.09 2.49 0.38 4.77 120 0.08 2.58 0.34 4.28 135 0.08 2.66 0.31 3.90 150 0.07 2.73 0.28 3.58 At time = 375 minutes, the flow is 1.76 CFS. Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 50 Year, Type 2 Rainfall: 6.48 inches at Pond 1 Time of Concentration: 15 min. Drainage Area: 31.600 acres. Weighted 'C' Factor: 0.400 Time (min) Rainfall Incr. (inches) Total (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.14 0.14 0.58 7.30 30 0.26 0.41 1.05 13.28 45 1.79 2.20 7.16 90.49 60 0.67 2.87 2.69 33.98 75 0.20 3.07 0.81 10.27 90 0.17 3.24 0.67 8.49 105 0.13 3.37 0.51 6.44 120 0.11 3.48 0.46 5.78 135 0.10 3.59 0.42 5.26 150 0.10 3.68 0.38 4.84 At time = 375 minutes, the flow is 2.38 CFS. Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 100 Year, Type 2 Rainfall: 6.96 inches at Pond 1 Time of Concentration: 15 min. Drainage Area: 31.600 acres. Weighted 'C' Factor: 0.400 Time (min) Rainfall Incr. (inches) Total (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.16 0.16 0.62 7.84 30 0.28 0.44 1.13 14.26 45 1.92 2.36 7.69 97.19 60 0.72 3.08 2.89 36.50 75 0.22 3.30 0.87 11.03 90 0.18 3.48 0.72 9.12 105 0.14 3.62 0.55 6.91 120 0.12 3.74 0.49 6.21 135 0.11 3.85 0.45 5.65 150 0.10 3.95 0.41 5.20 At time = 375 minutes, the flow is 2.55 CFS. Basin Storage/Elevation Input pU N I:> Elevation Area Storage (ft) (acres) (acre-ft) 821.25 0.34 0.000 822 0.37 0.266 823 0.41 0.656 824 0.44 1.081 Outlet Structure Configuration Outlet Structure Configuration for Pond 1 Stage 1: Circular Orifice Invert Elevation = 821.25 feet Diameter = .25 feet Discharge Coefficient =.6 Stage 2: Emergency Spillway Crest Elevation = 823.05 feet Crest Length = 30 feet Discharge Coefficient = 3 Basin Rating Curve Outlet Rating Table for Pond 1 Basin Water Elevation Basin Outflow (cfs) Riser Box Water Elevation Tailwater Elevation (ft) Outfall Culvert Control 821.25 0.00 N/A N/A N/A 821.35 0.01 N/A N/A N/A 821.45 0.06 N/A N/A N/A 821.55 0.10 N/A N/A N/A 821.65 0.12 N/A N/A N/A 821.75 0.14 N/A N/A N/A 821.85 0.16 N/A N/A N/A 821.95 0.18 N/A N/A N/A 822.05 0.19 N/A N/A N/A 822.15 0.21 N/A N/A N/A 822.25 0.22 N/A N/A N/A 822.35 0.23 N/A N/A N/A 822.45 0.25 N/A N/A N/A 822.55 0.26 N/A N/A N/A 822.65 0.27 N/A N/A N/A 822.75 0.28 N/A N/A N/A 822.85 0.29 N/A N/A N/A 822.95 0.30 N/A N/A N/A 823.05 0.31 N/A N/A N/A 823.15 3.14 N/A N/A N/A 823.25 8.34 N/A N/A N/A 823.35 15.08 N/A N/A N/A 823.45 23.06 N/A N/A N/A 823.55 32.11 N/A N/A N/A 823.65 42.12 N/A N/A N/A 823.75 53.00 N/A N/A N/A 823.85 64.69 N/A N/A N/A 823.95 77.14 N/A N/A N/A 824.05 90.29 N/A N/A N/A 824.15 104.13 N/A N/A N/A 824.25 118.60 N/A N/A N/A Modified Puls Routing Po ND -L - 2, y'FE4k, Inflow Hydrograph: G:\PROJECT2\STLAWR-I\CHERRY-1\H&H\PI-2.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-I\H&H\P1.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-l\H&H\P1.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 821.25 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 821.25 0.00 0.00 0.06 0.88 0.88 0.002 821.26 0.00 0.00 0.13 1.76 1.76 0.009 821.28 0.00 0.00 0.19 2.64 2.64 0.020 821.31 0.01 0.01 0.25 3.51 3.51 0.036 821.35 0.02 0.02 0.31 4.23 4.23 0.056 821.41 0.04 0.04 0.38 4.95 4.95 0.080 821.47 0.07 0.07 0.44 5.67 5.67 0.107 821.55 0.10 0.10 0.50 6.39 6.39 0.137 821.64 0.12 0.12 0.56 15.69 15.69 0.193 821.80 0.15 0.15 0.63 24.98 24.98 0.298 822.08 0.20 0.20 0.69 34.28 34.28 0.449 822.47 0.25 0.25 0.75 43.57 43.57 0.649 822.98 0.30 0.30 0.81 36.77 36.77 0.813 823.37 16.61 16.61 0.88 29.97 29.97 0.870 823.50 27.94 27.94 •?'? 0.94 23.16 23.16 0.866 823.49 26.97 26.97 1.00 16.36 16.36 0.841 823.44 21.95 21.95 1.06 13.51 13.51 0.817 823.38 17.37 17.37 1.13 10.65 10.65 0.798 823.33 14.04 14.04 1.19 7.80 7.80 0.781 823.29 11.24 11.24 1.25 4.95 4.95 0.763 823.25 8.41 8.41 1.31 4.73 4.73 0.749 823.22 6.68 6.68 1.38 4.52 4.52 0.741 823.20 5.69 5.69 1.44 4.30 4.30 0.736 823.19 5.08 5.08 1.50 4.09 4.09 0.732 823.18 4.65 4.65 1.56 3.84 3.84 0.729 823.17 4.32 4.32 1.63 3.59 3.59 0.727 823.17 4.03 4.03 1.69 3.35 3.35 0.725 823.16 3.76 3.76 1.75 3.10 3.10 0.723 823.16 3.50 3.50 1.81 3.02 3.02 0.721 823.15 3.29 3.29 1.88 2.94 2.94 0.720 823.15 3.14 3.14 1.94 2.86 2.86 0.719 823.15 3.07 3.07 2.00 2.78 2.78 0.718 823.14 3.00 3.00 2.06 2.72 2.72 0.717 823.14 2.93 2.93 2.13 2.66 2.66 0.715 823.14 2.86 2.86 2.19 2.60 2.60 0.714 823.14 2.79 2.79 2.25 2.53 2.53 0.713 823.14 2.72 2.72 Modified Puls Routing po/V ?> 2 - /o YCAl? Inflow Hydrograph: G:\PROJECT2\STLAWR-I\CHERRY-1\H&H\Pl-IO.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-I\CHERRY-1\H&H\P1.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-l\CHERRY-I\H&H\P1.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 821.25 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 821.25 0.00 0.00 0.06 1.35 1.35 0.003 821.26 0.00 0.00 0.13 2.70 2.70 0.014 821.29 0.01 0.01 0.19 4.06 4.06 0.031 821.34 0.01 0.01 0.25 5.41 5.41 0.056 821.41 0.04 0.04 0.31 6.51 6.51 0.086 821.49 0.07 0.07 0.38 7.62 7.62 0.122 821.59 0.11 0.11 0.44 8.73 8.73 0.164 821.71 0.14 0.14 0.50 9.84 9.84 0.211 821.84 0.16 0.16 0.56 24.13 24.13 0.298 822.08 0.20 0.20 0.63 38.43 38.43 0.458 822.49 0.25 0.25 0.69 52.73 52.73 0.690 823.08 1.16 1.16 0.75 67.03 67.03 0.904 823.58 35.57 35.57 0.81 56.56 56.56 0.987 823.78 56.24 56.24 0.88 46.10 46.10 0.972 823.74 52.20 52.20, 0.94 35.64 35.64 0.936 823.66 43.18 43.18' 1.00 25.17 25.17 0.895 823.56 33.46 33.46 1.06 20.78 20.78 0.861 823.48 25.94 25.94 1.13 16.39 16.39 0.836 823.42 20.91 20.91 1.19 12.00 12.00 0.812 823.37 16.52 16.52 1.25 7.61 7.61 0.788 823.31 12.46 12.46 1.31 7.28 7.28 0.770 823.27 9.55 9.55 1.38 6.95 6.95 0.761 823.25 8.17 8.17 1.44 6.62 6.62 0.755 823.23 7.50 7.50 1.50 6.29 6.29 0.751 823.22 7.00 7.00 1.56 5.91 5.91 0.748 823.22 6.57 6.57 1.63 5.53 5.53 0.744 823.21 6.16 6.16 1.69 5.15 5.15 0.741 823.20 5.77 5.77 1.75 4.77 4.77 0.738 823.19 5.38 5.38 1.81 4.65 4.65 0.735 823.19 5.06 5.06 1.88 4.52 4.52 0.734 823.18 4.83 4.83 1.94 4.40 4.40 0.732 823.18 4.65 4.65 2.00 4.28 4.28 0.731 823.18 4.50 4.50 2.06 4.18 4.18 0.730 823.17 4.37 4.37 2.13 4.09 4.09 0.729 823.17 4.26 4.26 2.19 3.99 3.99 0.728 823.17 4.15 4.15 2.25 3.90 3.90 0.727 823.17 4.05 4.05 Modified Puls Routing polo J> I- - Inflow Hydrograph: G:\PROJECT2\STLAWR-I\CHERRY-I\H&H\P1-50.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-I\H&H\P1.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-1\H&H\P1.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 821.25 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 821.25 0.00 0.00 0.06 1.82 1.82 0.005 821.26 0.00 0.00 0.13 3.65 3.65 0.019 821.30 0.01 0.01 0.19 5.47 5.47 0.042 821.37 0.02 0.02 0.25 7.30 7.30 0.075 821.46 0.06 0.06 0.31 8.79 8.79 0.116 821.58 0.11 0.11 0.38 10.29 10.29 0.165 821.71 0.14 0.14 0.44 11.78 11.78 0.221 821.87 0.17 0.17 0.50 13.28 13.28 0.285 822.05 0.19 0.19 0.56 32.58 32.58 0.402 822.35 0.23 0.23 0.63 51.88 51.88 0.619 822.91 0.29 0.29 0.69 71.19 71.19 0.866 823.49 27.09 27.09 0.75 90.49 90.49 1.034 823.89 69.60 69.60 0.81 76.36 76.36 1.070 823.97 83.37 83.37 0.88 62.24 62.24 1.033 823.89 69.39 69.39 0.94 48.11 48.11 0.991 823.79 57.41 57.41 1.00 33.98 33.98 0.940 823.67 44.20 44.20 1.06 28.05 28.05 0.898 823.57 34.13 34.13 1.13 22.13 22.13 0.869 823.50 27.59 27.59 1.19 16.20 16.20 0.840 823.43 21.73 21.73 1.25 10.27 10.27 0.811 823.36 16.18 16.18 1.31 9.83 9.83 0.788 823.31 12.50 12.50 1.38 9.38 9.38 0.778 823.29 10.82 10.82 1.44 8.94 8.94 0.772 823.27 9.85 9.85 1.50 8.49 8.49 0.768 823.26 9.19 9.19 1.56 7.98 7.98 0.764 823.25 8.64 8.64 1.63 7.46 7.46 0.761 823.25 8.15 8.15 1.69 6.95 6.95 0.757 823.24 7.69 7.69 1.75 6.44 6.44 0.753 823.23 7.21 7.21 1.81 6.27 6.27 0.750 823.22 6.80 6.80 1.88 6.11 6.11 0.747 823.21 6.51 6.51 1.94 5.94 5.94 0.745 823.21 6.28 6.28 2.00 5.78 5.78 0.744 823.21 6.08 6.08 2.06 5.65 5.65 0.742 823.20 5.90 5.90 2.13 5.52 5.52 0.741 823.20 5.75 5.75 2.19 5.39 5.39 0.740 823.20 5.61 5.61 2.25 5.26 5.26 0.739 823.19 5.47 5.47 Modified Puls Routing Vo.w 2 10 s'Er-? Inflow Hydrograph: G:\PROJECT2\STLAWR-1\CHERRY-I\H&H\P1-100.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-1\H&H\P1.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-I\CHERRY-1\H&H\P1.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 821.25 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 821.25 0.00 0.00 0.06 1.96 1.96 0.005 821.26 0.00 0.00 0.13 3.92 3.92 0.020 821.31 0.01 0.01 0.19 5.88 5.88 0.045 821.38 0.03 0.03 0.25 7.84 7.84 0.081 821.48 0.07 0.07 0.31 9.45 9.45 0.125 821.60 0.11 0.11 0.38 11.05 11.05 0.177 821.75 0.14 0.14 0.44 12.66 12.66 0.237 821.92 0.17 0.17 0.50 14.26 14.26 0.306 822.10 0.20 0.20 0.56 34.99 34.99 0.432 822.43 0.24 0.24 0.63 55.73 55.73 0.665 823.02 0.30 0.30 0.69 76.46 76.46 0.910 823.60 36.93 36.93 0.75 97.19 97.19 1.061 823.95 78.17 78.17 0.81 82.02 82.02 1.081 824.07 93.42 93.424-- 0.88 66.85 66.85 1.040 823.90 71.35 71.35 0.94 51.67 51.67 1.004 823.82 61.07 61.07 1.00 36.50 36.50 0.952 823.70 47.21 47.21 1.06 30.13 30.13 0.908 823.59 36.45 36.45 1.13 23.77 23.77 0.877 823.52 29.44 29.44 1.19 17.40 17.40 0.848 823.45 23.15 23.15 1.25 11.03 11.03 0.817 823.38 17.31 17.31 1.31 10.56 10.56 0.793 823.32 13.28 13.28 1.38 10.08 10.08 0.783 823.30 11.56 11.56 1.44 9.60 9.60 0.776 823.28 10.56 10.56 1.50 9.12 9.12 0.772 823.27 9.86 9.86 1.56 8.57 8.57 0.768 823.26 9.27 9.27 1.63 8.02 8.02 0.765 823.26 8.70 8.70 1.69 7.47 7.47 0.761 823.25 8.18 8.18 1.75 6.91 6.91 0.757 823.24 7.70 7.70 1.81 6.74 6.74 0.754 823.23 7.28 7.28 1.88 6.56 6.56 0.751 823.22 6.98 6.98 1.94 6.38 6.38 0.749 823.22 6.73 6.73 2.00 6.21 6.21 0.747 823.22 6.52 6.52 2.06 6.07 6.07 0.746 823.21 6.34 6.34 2.13 5.93 5.93 0.745 823.21 6.18 6.18 2.19 5.79 5.79 0.743 823.21 6.02 6.02 2.25 5.65 5.65 0.742 823.20 5.88 5.88 ANTIFLOTATION BLOCK CALCULATION WELLESLEY - ST. LAWRENCE HOMES ANTIFLOTATION BLOCK (POND 1) CROSS-SECTION AREA OF RISER INTERIOR= 12.56 SF RISER HEIGHT= 5.75 FT VOL. OF INTERIOR OF RISER= 72.22 CF WT. OF H2O DISPLACED BY RISER INTERIOR= 4507 # WT. OF CONC. NEEDED (1.15 FS)= 5183 # THICKNESS OF CONC. BASE= 2.00 FT SIDE LENGTH OF CONC. BASE= 6.00 FT AREA OF CONC. BASE 36.00 SF WT. OF CONC. BASE= 6307 # FACTOR OF SAFETY= 1.40 ANTIFLOTATION BLOCK (POND 2) CROSS-SECTION AREA OF RISER INTERIOR= 12.56 SF RISER HEIGHT= 4.25 FT VOL. OF INTERIOR OF RISER= 53.38 CF WT. OF H2O DISPLACED BY RISER INTERIOR= 3331 # WT. OF CONC. NEEDED (1.15 FS)= 3831 # THICKNESS OF CONC. BASE= 1.50 FT SIDE LENGTH OF CONC. BASE= 6.00 FT AREA OF CONC. BASE 36.00 SF WT. OF CONC. BASE= 4730 # FACTOR OF SAFETY= 1.42 SECTION 3 Wetland Pond 2 Calculations I SITE ,..g-,g .s- <G? ? ? WETLAND POND 2 - LEGEND PROPOSED LOWTORPS EriSTMG CONMIRS PROPOSED SrOMV ORAMiAGE TOP OF STREAM &WR / WrERSECTIOW OITTER FLOW ARROW IWASHOIT CURB i OPTTER (V SECTIOII AT THE CENTER OF THE ROM RETURN! i i i i 1 - 1 1 1 1 ? ? ? % ? ? ? ? i ? FOREBM ?` % 4L ?` % ? r I I. s 10, Ile :. • a r e _.. I LOW MARSH F"WEPI MACH MARSH RT WDEEP) UICRD POOL t!' DEEPI r RIP RAP BEAU SCALE" V=60' FIGURE WETLAND POND 2 4 S? 7 r7Z 5A = = a . /I Ate. = zl"? ? (26 Irv = ca . c? s -,f-- o . ©og C ?? cl C? 0 (0-2-3 2 Zf,4.%. 175 7 --f- 3 Pond 2 - Wellesley ELEV. SA (ft) VOLUME (ft") 825.00 6700 0 825.25 6982 1710 825.50 7263 3491 825.75 7545 5342 826.00 7826 7263 826.25 8108 9255 826.35 8220 10071 826.50 8389 11317 826.75 8671 13449 827.00 8952 15652 827.25 9234 17925 827.50 9515 20269 827.75 9797 22683 828.00 10078 25167 BEST MANAGEMENT PRACTICE - WEST D.A. ALL AMERICAN RELOCATION - BOBBITT Proposed BMP: Area draining to BMP: Percentage Impervious: Pond 2 509,652 Square Feet 20.0% Per table 1. 1, Page 5 of the NCDENR BMP Manual: Average permanent pool surface area required (at 3 foot depth, as a percentage of D.A.): 20.0% Impervious => 0.97% .- or -- 4944 Square Feet Volume of temporary storage required = first one inch of rainfall on Drainage Area: Rv = 0.05 + 0.009(22.5%) = 0.23 inch/inch Volume = 1 inch rainfall x Rv x 1/12 feet/inch x Drainage Area Volume of temporary storage required = 9768 Cubic Feet Volume of storage provided at EL. 826.35 = 10071 Cubic Feet Maximum head at extended detention storage = 1.35 Feet PEAK OUTFLOW RATE FOR DRAWDOWN TIME OF 48 HOURS: Qpeak = S/(0.5 x 3600 x 48) WHICH EQUALS: STORAGE x 0.0000116 = 0.113 REQUIRED ORIFICE AREA: A=Qpeak/(0.6 x (64.4 x h)^0.5 REQUIRED ORIFICE AREA = 0.020209 FEET DIAMETER OF A CIRCULAR ORIFICE = 2 x (REQUIRED ORIFICE AREA/3.14)^0.5 DIAMETER OF A CIRCULAR ORIFICE = 0.160 FEET= 1.925 INCHES USE 1.9 INCH ORIFICE Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 2 Year, Type 2 Rainfall: 3.12 inches at Pond 2 Time of Concentration: 15 min. Drainage Area: 11.700 acres. Weighted 'C' Factor: 0.400 Time (min) Rainfall Incr. (inches) Total (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.07 0.07 0.28 1.30 30 0.13 0.20 0.51 2.37 45 0.86 1.06 3.45 16.13 60 0.32 1.38 1.29 6.06 75 0.10 1.48 0.39 1.83 90 0.08 1.56 0.32 1.51 105 0.06 1.62 0.25 1.15 120 0.06 1.68 0.22 1.03 135 0.05 1.73 0.20 0.94 150 0.05 1.77 0.18 0.86 At time = 375 minutes, the flow is 0.42 CFS. Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 10 Year, Type 2 Rainfall: 4.80 inches at Pond 2 Time of Concentration: 15 min. Drainage Area: 11.700 acres. Weighted 'C' Factor: 0.400 Time (min) Rainfall Incr. (inches) Total (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.11 0.11 0.43 2.00 30 0.19 0.30 0.78 3.64 45 1.33 1.63 5.30 24.82 60 0.50 2.13 1.99 9.32 75 0.15 2.28 0.60 2.82 90 0.12 2.40 0.50 2.33 105 0.09 2.49 0.38 1.77 120 0.08 2.58 0.34 1.59 135 0.08 2.66 0.31 1.44 150 0.07 2.73 0.28 1.33 At time = 375 minutes, the flow is 0.65 CFS. Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 50 Year, Type 2 Rainfall: 6.48 inches at Pond 2 Time of Concentration: 15 min. Drainage Area: 11.700 acres. Weighted 'C' Factor: 0.400 Time (min) Rainfall Incr. Total (inches) (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.14 0.14 0.58 2.70 30 0.26 0.41 1.05 4.92 45 1.79 2.20 7.16 33.50 60 0.67 2.87 2.69 12.58 75 0.20 3.07 0.81 3.80 90 0.17 3.24 0.67 3.14 105 0.13 3.37 0.51 2.38 120 0.11 3.48 0.46 2.14 135 0.10 3.59 0.42 1.95 150 0.10 3.68 0.38 1.79 At time = 375 minutes, the flow is 0.88 CFS. Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 100 Year, Type 2 Rainfall: 6.96 inches at Pond 2 Time of Concentration: 15 min. Drainage Area: 11.700 acres. Weighted 'C' Factor: 0.400 Time (min) Rainfall Incr. (inches) Total (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.16 0.16 0.62 2.90 30 0.28 0.44 1.13 5.28 45 1.92 2.36 7.69 35.99 60 0.72 3.08 2.89 13.51 75 0.22 3.30 0.87 4.08 90 0.18 3.48 0.72 3.38 105 0.14 3.62 0.55 2.56 120 0.12 3.74 0.49 2.30 135 0.11 3.85 0.45 2.09 150 0.10 3.95 0.41 1.92 At time = 375 minutes, the flow is 0.95 CFS. Basin Storage/Elevation Inpu po V D t Z Elevation Area Storage (ft) (acres) (acre-ft) 825 0.154 0.000 826 0.180 0.167 827 0.206 0.360 828 0.231 0.579 Outlet Structure Configuration Outlet Structure Configuration for Pond 2 Stage 1: Circular Orifice Invert Elevation = 825 feet Diameter = .158 feet Discharge Coefficient =.6 Stage 2: Emergency Spillway Crest Elevation = 826.35 feet Crest Length = 10 feet Discharge Coefficient = 3 Basin Rating Curve Outlet Rating Table for Pond 2 Basin Basin Riser Box Tailwater Outfall Water Outflow Water Elevation Culvert Elevation (cfs) Elevation (ft) Control 825.00 0.00 N/A N/A N/A 825.10 0.01 N/A N/A N/A 825.20 0.03 N/A N/A N/A 825.30 0.04 N/A N/A N/A 825.40 0.05 N/A N/A N/A 825.50 0.06 N/A N/A N/A 825.60 0.07 N/A N/A N/A 825.70 0.07 N/A N/A N/A 825.80 0.08 N/A N/A N/A 825.90 0.09 N/A N/A N/A 826.00 0.09 N/A N/A N/A 826.10 0.10 N/A N/A N/A 826.20 0.10 N/A N/A N/A 826.30 0.10 N/A N/A N/A 826.40 0.44 N/A N/A N/A 826.50 1.85 N/A N/A N/A 826.60 3.86 N/A N/A N/A 826.70 6.32 N/A N/A N/A 826.80 9.17 N/A N/A N/A 826.90 12.35 N/A N/A N/A 827.00 15.83 N/A N/A N/A 827.10 19.60 N/A N/A N/A 827.20 23.63 N/A N/A N/A 827.30 27.89 N/A N/A N/A 827.40 32.39 N/A N/A N/A 827.50 37.11 N/A N/A N/A 827.60 42.04 N/A N/A N/A 827.70 47.18 N/A N/A N/A 827.80 52.50 N/A N/A N/A 827.90 58.01 N/A N/A N/A 828.00 63.70 N/A N/A N/A Modified Puls Routing POND 2. - 2 YE'A-r2 Inflow Hydrograph: G:\PROJECT2\STLAWR-1\CHERRY-1\H&H\P2-2.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-I\CHERRY-l\H&H\P2.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-I\CHERRY-I\H&H\P2.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 825.00 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 825.00 0.00 0.00 0.06 0.33 0.33 0.001 825.01 0.00 0.00 0.13 0.65 0.65 0.003 825.02 0.00 0.00 0.19 0.98 0.98 0.008 825.05 0.00 0.00 0.25 1.30 1.30 0.013 825.08 0.01 0.01 0.31 1.57 1.57 0.021 825.12 0.02 0.02 0.38 1.83 1.83 0.029 825.18 0.03 0.03 0.44 2.10 2.10 0.039 825.24 0.04 0.04 0.50 2.37 2.37 0.051 825.30 0.04 0.04 0.56 5.81 5.81 0.072 825.43 0.06 0.06 0.63 9.25 9.25 0.110 825.66 0.07 0.07 0.69 12.69 12.69 0.166 826.00 0.09 0.09 0.75 16.13 16.13 0.240 826.38 0.36 0.36 0.81 13.61 13.61 0.300 826.69 6.04 6.04 0.88 11.09 11.09 0.324 826.81 9.52 9.5 0.94 8.58 8.58 0.325 826.82 9.71 9. 1.00 6.06 6.06 0.316 826.77 8.35 8.35 1.06 5.00 5.00 0.305 826.72 6.79 6.79 1.13 3.94 3.94 0.296 826.67 5.60 5.60 1.19 2.89 2.89 0.288 826.63 4.51 4.51 1.25 1.83 1.83 0.279 826.58 3.51 3.51 1.31 1.75 1.75 0.272 826.55 2.78 2.78 1.38 1.67 1.67 0.268 826.52 2.33 2.33 1.44 1.59 1.59 0.265 826.51 2.03 2.03 1.50 1.51 1.51 0.263 826.50 1.83 1.83 1.56 1.42 1.42 0.262 826.49 1.72 1.72 1.63 1.33 1.33 0.260 826.48 1.61 1.61 1.69 1.24 1.24 0.259 826.48 1.51 1.51 1.75 1.15 1.15 0.257 826.47 1.41 1.41 1.81 1.12 1.12 0.256 826.46 1.32 1.32 1.88 1.09 1.09 0.255 826.46 1.25 1.25 1.94 1.06 1.06 0.255 826.45 1.20 1.20 2.00 1.03 1.03 0.254 826.45 1.15 1.15 2.06 1.01 1.01 0.253 826.45 1.11 1.11 2.13 0.98 0.98 0.253 826.44 1.07 1.07 2.19 0.96 0.96 0.252 826.44 1.04 1.04 2.25 0.94 0.94 0.252 826.44 1.01 1.01 Modified Puls Routing Inflow Hydrograph: G:\PROJECT2\STLAWR-1\CHERRY-1\H&H\P2-10.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-I\H&H\P2.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-1\H&H\P2.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 825.00 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 825.00 0.00 0.00 0.06 0.50 0.50 0.001 825.01 0.00 0.00 0.13 1.00 1.00 0.005 825.03 0.00 0.00 0.19 1.50 1.50 0.012 825.07 0.01 0.01 0.25 2.00 2.00 0.021 825.12 0.02 0.02 0.31 2.41 2.41 0.032 825.19 0.03 0.03 0.38 2.82 2.82 0.045 825.27 0.04 0.04 0.44 3.23 3.23 0.061 825.36 0.05 0.05 0.50 3.64 3.64 0.078 825.47 0.06 0.06 0.56 8.94 8.94 0.110 825.66 0.07 0.07 0.63 14.23 14.23 0.170 826.01 0.09 0.09 0.69 19.52 19.52 0.254 826.45 1.13 1.13 0.75 24.82 24.82 0.336 826.87 11.50 11.50 0.81 20.94 20.94 0.376 827.07 18.59 18.59 0.88 17.07 17.07 0.378 827.08 - --I T85 18.85 0.94 13.19 13.19 0.364 827.02 16.56 16.56 1.00 9.32 9.32 0.345 826.92 13.21 13.21 1.06 7.69 7.69 0.329 826.84 10.35 10.35 1.13 6.07 6.07 0.316 826.77 8.35 8.35 1.19 4.44 4.44 0.304 826.71 6.64 6.64 1.25 2.82 2.82 0.293 826.65 5.12 5.12 1.31 2.70 2.70 0.283 826.60 3.95 3.95 1.38 2.57 2.57 0.278 826.58 3.38 3.38 1.44 2.45 2.45 0.275 826.56 3.01 3.01 1.50 2.33 2.33 0.272 826.54 2.75 2.75 1.56 2.19 2.19 0.270 826.53 2.54 2.54 1.63 2.05 2.05 0.268 826.53 2.36 2.36 1.69 1.91 1.91 0.267 826.52 2.20 2.20 1.75 1.77 1.77 0.265 826.51 2.04 2.04 1.81 1.72 1.72 0.264 826.50 1.92 1.92 1.88 1.68 1.68 0.263 826.50 1.83 1.83 1.94 1.63 1.63 0.262 826.49 1.77 1.77 2.00 1.59 1.59 0.262 826.49 1.72 1.72 2.06 1.55 1.55 0.261 826.49 1.67 1.67 2.13 1.51 1.51 0.260 826.48 1.63 1.63 2.19 1.48 1.48 0.260 826.48 1.59 1.59 2.25 1.44 1.44 0.259 826.48 1.55 1.55 Modified Puls Routing POND 2. - 50 ;-' A2 Inflow Hydrograph: G:\PROJECT2\STLAWR-1\CHERRY-I\H&H\P2-50.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-I\H&H\P2.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-1\H&H\P2.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 825.00 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 825.00 0.00 0.00 0.06 0.68 0.68 0.002 825.01 0.00 0.00 0.13 1.35 1.35 0.007 825.04 0.00 0.00 0.19 2.03 2.03 0.016 825.09 0.01 0.01 0.25 2.70 2.70 0.028 825.17 0.03 0.03 0.31 3.26 3.26 0.043 825.26 0.04 0.04 0.38 3.81 3.81 0.061 825.37 0.05 0.05 0.44 4.36 4.36 0.082 825.49 0.06 0.06 0.50 4.92 4.92 0.105 825.63 0.07 0.07 0.56 12.06 12.06 0.149 825.89 0.09 0.09 0.63 19.21 19.21 0.229 826.32 0.18 0.18 0.69 26.36 26.36 0.322 826.80 9.30 9.30 0.75 33.50 33.50 0.396 827.16 22.13 22.13 0.81 28.27 28.27 0.426 -827. 30 27.94 27.94 0.88 23.04 23.04 0.418 _ 827.27 26.41 26.41 0.94 17.81 17.81 0.397 827.17 22.45 22.45 1.00 12.58 12.58 0.372 827.05 17.86 17.86 1.06 10.39 10.39 0.349 826.94 13.88 13.88 1.13 8.19 8.19 0.333 826.86 11.04 11.04 1.19 6.00 6.00 0.318 826.78 8.72 8.72 1.25 3.80 3.80 0.304 826.71 6.61 6.61 1.31 3.64 3.64 0.293 826.65 5.15 5.15 1.38 3.47 3.47 0.287 826.62 4.36 4.36 1.44 3.31 3.31 0.283 826.60 3.88 3.88 1.50 3.14 3.14 0.280 826.59 3.60 3.60 1.56 2.95 2.95 0.278 826.58 3.37 3.37 1.63 2.76 2.76 0.276 826.56 3.15 3.15 1.69 2.57 2.57 0.274 826.55 2.95 2.95 1.75 2.38 2.38 0.272 826.54 2.75 2.75 1.81 2.32 2.32 0.271 826.54 2.58 2.58 1.88 2.26 2.26 0.269 826.53 2.46 2.46 1.94 2.20 2.20 0.268 826.53 2.36 2.36 2.00 2.14 2.14 0.268 826.52 2.28 2.28 2.06 2.09 2.09 0.267 826.52 2.21 2.21 2.13 2.04 2.04 0.266 826.52 2.15 2.15 2.19 2.00 2.00 0.266 826.51 2.09 2.09 2.25 1.95 1.95 0.265 826.51 2.04 2.04 Modified Puls Routing POND - - / o v ???? Inflow Hydrograph: G:\PROJECT2\STLAWR-I\CHERRY-1\H&H\P2-100.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-I\CHERRY-1\H&H\P2.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-I\CHERRY-I\H&H\P2.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 825.00 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 825.00 0.00 0.00 0.06 0.73 0.73 0.002 825.01 0.00 0.00 0.13 1.45 1.45 0.007 825.04 0.00 0.00 0.19 2.18 2.18 0.017 825.10 0.01 0.01 0.25 2.90 2.90 0.030 825.18 0.03 0.03 0.31 3.50 3.50 0.046 825.28 0.04 0.04 0.38 4.09 4.09 0.066 825.39 0.05 0.05 0.44 4.69 4.69 0.088 825.53 0.06 0.06 0.50 5.28 5.28 0.113 825.68 0.07 0.07 0.56 12.96 12.96 0.160 825.96 0.09 0.09 0.63 20.63 20.63 0.245 826.41 0.51 0.51 0.69 28.31 28.31 0.339 826.89 12.08 12.08 0.75 35.99 35.99 0.410 827.23 24.81 24.81 0.81 30.37 30.37 0.438 827.36 30.50 30.50 0.88 24.75 24.75 0.428 827.31 28.46 28.46 0.94 19.13 19.13 0.406 827.21 24.07 24.07 1.00 13.51 13.51 0.379 827.09 19.09 19.09 1.06 11.16 11.16 0.355 826.97 14.91 14.91 1.13 8.80 8.80 0.337 826.88 11.81 11.81 1.19 6.44 6.44 0.322 826.80 9.31 9.31 1.25 4.08 4.08 0.307 826.73 7.07 7.07 1.31 3.91 3.91 0.295 826.67 5.47 5.47 1.38 3.73 3.73 0.289 826.63 4.65 4.65 1.44 3.55 3.55 0.285 826.61 4.15 4.15 1.50 3.38 3.38 0.282 826.60 3.82 3.82 1.56 3.17 3.17 0.280 826.59 3.59 3.59 1.63 2.97 2.97 0.278 826.58 3.37 3.37 1.69 2.76 2.76 0.276 826.57 3.16 3.16 1.75 2.56 2.56 0.274 826.55 2.95 2.95 1.81 2.49 2.49 0.272 826.55 2.77 2.77 1.88 2.43 2.43 0.271 826.54 2.64 2.64 1.94 2.36 2.36 0.270 826.53 2.54 2.54 2.00 2.30 2.30 0.269 826.53 2.45 2.45 2.06 2.25 2.25 0.269 826.53 2.37 2.37 2.13 2.20 2.20 0.268 826.52 2.31 2.31 2.19 2.14 2.14 0.267 826.52 2.25 2.25 2.25 2.09 2.09 0.267 826.52 2.19 2.19 ANTIFLOTATION BLOCK CALCULATION WELLESLEY - ST. LAWRENCE HOMES ANTIFLOTATION BLOCK (POND 1) CROSS-SECTION AREA OF RISER INTERIOR= 12.56 SF RISER HEIGHT= 5.75 FT VOL. OF INTERIOR OF RISER= 72.22 CF WT. OF H2O DISPLACED BY RISER INTERIOR= 4507 # WT. OF CONC. NEEDED (1.15 FS)= 5183 # THICKNESS OF CONC. BASE= 2.00 FT SIDE LENGTH OF CONC. BASE= 6.00 FT AREA OF CONC. BASE 36.00 SF WT. OF CONC. BASE= 6307 # FACTOR OF SAFETY= 1.40 ANTIFLOTATION BLOCK (POND 2) CROSS-SECTION AREA OF RISER INTERIOR= 12.56 SF RISER HEIGHT= 4.25 FT VOL. OF INTERIOR OF RISER= 53.38 CF WT. OF H2O DISPLACED BY RISER INTERIOR= 3331 # WT. OF CONC. NEEDED (1.15 FS)= 3831 # THICKNESS OF CONC. BASE= 1.50 FT SIDE LENGTH OF CONC. BASE= 6.00 FT AREA OF CONC. BASE 36.00 SF WT. OF CONC. BASE= 4730 # FACTOR OF SAFETY= 1.42 Wellesley Phase - 1 r' 0 0 5 1 8 4 4 Iredell County. North Carolina Joint Application Form and Supporting Documentation for NATIONWIDE PERMITS THAT REQUIRE NOTIFICATION TO CORPS OF ENGINEERS & NCDENR Prepared For Bob Huffinan VP of Construction St. Lawrence Homes n @ E 7200 Falls of Neuse Road 3 7 SEP 2 Suite 300 , 005 Raleigh, NC 27615 WETLANDO?NR - WATER QUALITY S AND STORM W ATER BRANCH Prepared By: Leonard S. Rindner, PWS Environmental Planning Consultant 3714 Spokeshave Lane Matthews, NC 28105 (704) 846-0461 *Subject to verification by the USACE September 27, 2005 Page 1 of 9 Office Use Only: Form Version May 2002 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: X Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit Isolated Wetland Permit DWQ X 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: 39 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: n II. Applicant Information 1. Owner/Applicant Information Telephone Number: Bob Huffman VP of Construction St. Lawrence Homes 7200 Falls of Neuse Road Suite 300 Raleigh, NC 27615 Fax Number: E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Leonard S. Rindner, PWS Company Affiliation: Environmental Planning Consultant Mailing Address: 3714 Spokeshave Lane Matthews NC 28105 Telephone Number: 704 904 2277 Fax Number: 704 847 0185 E-mail Address: lrindnerncarolina.mcom Page 2 of 9 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Wellesley 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 4. Location County: Iredell Country Nearest Town: Mooresville Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): Oak Ridge Farm Highway (NC 150)5. Site coordinates, if available (UTM or Lat/Long): 35.60400N, 80.7817°W (WGS84/NAD83) USGS Mooresville (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): + 35 Acres 7. Nearest body of water (stream/river/sound/ocean/lake): UT of Back Creek 8. River Basin: Yadkin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Undeveloped timbered woodland and agricultural areas. 10. Describe the overall project in detail, including the type of equipment to be used: Proposed residential development 11. Explain the purpose of the proposed work: Page 3 of 9 Site preparation to develop residential areas. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Preliminary wetland and stream evaluation and delineation was conducted in coniunction with project planning Modifications were made to the initial concepts to minimize impacts to jurisdictional streams and wetlands based on recommendations. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. A future road crossing will be required to access Phase 2 which is in early preliminary and schematic cleari n. Additional wetland impacts are not expected. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Proposed minor impacts to wetlands are limited to site preparation. 2. Individually list wetland impacts below: Wetland Impact Site Number Type of Impact* Area of Impact Located within 100-year Floodplain** Distance to Nearest Stream Type of Wetland*** (indicate on ma) (acres) es/no) (linear feet) # 1 fill 0.14 no <300' PSS IA Page 4 of 9 * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts clue to both structure and nooamg. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: +/- 0.14 acres. There is also an existing pond to remain and streams to remain Total area of wetland impact proposed: +/-0.14 acre 3. Individually list all intermittent and perennial stream impacts below: Future Phase Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet) Stream Name* * Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.uSf_*s.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.map,quest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: FUTURE (expected to be less than 150 linear feet) 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: N/A Page 5 of 9 Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation if construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands [stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: V. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Permanent impacts to wetlands are limited to minor impacts to prepare development parcels. 100' buffers are required adjacent to the perennial stream. Extended stormwater wetlands will be constructed to treat stormwater. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors Page 6 of 9 including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.html. I. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Permanent impacts to wetlands are limited to minor impacts to prepare development parcels. 100' buffers are required adjacent to the perennial stream Extended stormwater wetlands will be constructed to treat stormwater. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/w!P/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: NA Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): VI. Environmental Documentation (required by DWQ) NA Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Page 7 of 9 Yes ? No X If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? VII. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) NA It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from near bank of channel; /,one :z extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. Page 8 of 9 VIII. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. See attached - The stormwater management for the project will be conducted in accordance with local WS II Stormwater Management requirements. IX. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Municipal System X. Violations (required by DWQ) NA Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No X Is this an after-the fact permit application? Yes ? No X XI. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Signature Date Page 9 of 9 TopoZone - The Web's Topographic Map Page 1 of 1 :np?sidlNpao=Mips arCade kie y I \ F• l R 1 P fl l I I r ': / - i e .' 1111 i ?ti ?r 01, F .iR. ? 5 ? I !' .lyy f- F al ?$! t,YMI 4 I' r,•i '-znr w? I I ` t 5 ?I I -?IJwi 5 w I I'I ,+I R ? ??? , ,; til 1.1 ?! ,1 ?•`7v -? ?I,, ,? I Jr f" Y _„_? F I I IV 7 r DIY I '. ?' l - I ?.. I i -IY 'S IY41 I -{ ? ? •???at ??1 + .S. V; ,?? I .+ I .'? 4 . I ,?, Q+; ?f,.l ?,:? 5? I I'. ?`Fi.. ?' S I I 0-th ?E 1 '1 J 14 ?_, ? ,M ?. I .yt ' i ? I - 1 I?x- •? t II?t$r4..:b. '? It 1114' ??? 1 '7'I.'_ "k I r4J4? If _ + _ ?II III I' 'I F7, 11.5 /1 0 0.6 1.2 0 0.4 0.8 1.8 2.4 3 km 1.2 1.6 2 mi Map center is 35.60400N, 80.7817°W (WGS84/NAD83) Mooresville quadrangle Projection is UTM Zone 17 NAD83 Datum http://www.topozone.com/print.asp?z=17&n=3940055.00009436&e=519773.999999999& dlr I`.r 11 ?s? r< ' r 1r atia ,. G M=-7.249 G=0.127 9/27/2005 TopoZone - The Web's Topographic Map Page 1 of 1 ',topozone 341 r 1 ?III I 't,r '' <' Cupyn h118t?4MI LAMPS e r aAe kc a {y i . r% { _ f,- r / 1 /1.L - . JI ?i1. + ? `.. S ' R r+" 11 I ?'Jlr •-.`\I [J/, 11 I /? -.ter - f/?'1 ?V . ??I rr+ 'i.Vr +r"?a _ ry--• r"1 ?I +Y-?'..? ,'? ,. r 4, ?---?1"?-?'Q - ?µ ilk , + . ? ,• ? -?? j ? (1, ?,?y4J, f , , I ? I ?.::. ?Sfi-! ? ?i;' g II +' 1+4 I ?.1li%1 III, I 2?49? , .? 1 A", r T397' ?? ?? 1 r { r f ; `'\ ; r l• I ?ti a ?'+ . I I - 1 I??\\ 41i ., • I ./ '? ?I, fj f I ,'?I ??? t... w `_ k ?.fi \?r• F, ?! ' ,? i - ? I', 1?.1? I .1 NN" -/?? +y {j' ? ?I?? I ?c?? ) . ?? ' ?• , ?,? `"!1 r t.+ 1 r?^--? 5'', ,? ?yl l /1? I, ' J r ,/" I r+ tf_ " y 5 -rl . f I 1 f1 ( II- r I'r ' a + J s J a 1 lil . \.Ir l li i' I 92 a : IF i\ .r\. ?1+ I , ? 1 - V - .- I -. ??' ?? • 1 ? '', i l Jrr+ ? +a3' '? ? ?^?t?w' r"-., rjj ' i \? ?` I. k . ly i 7r r fir7. 5 r ? ?? I??r i ?' i I I / IGI \ :?"-! ?5Y5 ` ' i + • ?? 55?+ + !?? t I?. 1 1 f r i r - 'f" i 000 f a \.• l j! tilt w»' ? • • i / . , t ' -' - V1 ?\ I ? i 1 III 'J ', 1 ?II ?'\ i? ' '?/ '\•-?' ?? ?-."`+? - ,ff` rr' I If L.l r!.f'--) ?i I?+,I'' ?Ik5?7?..+. \I X11 ? r ?? I I _ ?•! III _; r? ?fl I I r 6 +? . i 1 t I „t,` '', ? ' ?•t." '. ', 51 ?, -S,I?L--?\ - I ? ; ,' flfl ; ? f ., j i ??,, I _ 1 r I - Ill ti'.. I?t ?`tti``* L ? 'tip' ti ° 1? f. a u r 4FA MSC 0 0.3 0.6 0.9 1.2 1.5 km G 0 0.1 0.2 0.3 0.4 0.5 mi Map center is 35.60400N, 80.7817°W (WGS84/NAD83) Mooresville quadrangle M=-7.249 Projection is UTM Zone 17 NAD83 Datum G=0.127 http://www.topozone.com/print.asp?z=17&n=3940055.00009436&e=519773.999999999&... 9/27/2005 9 �y yf 1W� • h � �� yi `.l q `� ply ' " .. - •� a '!w �d qR* `. ",�`� � �t ". ; - + r � 1 n"i 4 i _ - :. v _- �r:� _�,.A_ s> >t a A'^' kvw +E •,y;. ���"•y„ .:y':•, H.d 1.-3+• �•'�� 1 k 'g�'if A� . � .. �'� � � � i - ,y r� s by r�••• � { A^ r !! 771 JT IS Vf is aq a ;i A •i, r � a,, ; �"�w� t k� •1 M •6 R A J'6 "�...,'* I p fir, �•.�. e A oww Ilk- 1 •��:`. ,. "_.._ AAA �: _ • _. ;�: .' �. . �J' W?E T I SLEY TOWN OF MOOKESVILLE nBEDELL COUNTY, NORM CAKOUNA SCALE: 1"=400' OVERALL. SITE PLAN FOR WETLANDS SUBMITTAL ivi- ens SONVU3M HOJ OdOLM 311S IIVU3A0 ?e 8t?t 1 IA \ ?l ? • • eh c II ...? ? \ • t! ---------- ? 1 ac ? Q U 1 1 t l/ K ? ? I o 1 ti c 1, a1 1 , ?y0e ? k,? 1I ??t I 1 1? del .` r t / do, ? - "t - 1 I , ? l oy{y{' t a tE ? t ; 7 e • LZI W 0 ., 1 d LL. t ANN 0 " ?` _ _ • Ft J x V OD r m 3 %MOO 1 r Q r" 1 f ' r W ?. Q U U Q O Z L 1 Q J CL w V) I w Z ui U. O w Q a Q w Q X O a a Q SECTION 2 Wetland Pond I Calculations I SITE s .,ing s 0 i A `V 1 / w 1 00, ^?. I 1 10 Kt? ? • / \ f -- - ?? WETLAND POND I % laid 7 ? A I t t t LEGEND PROPOSED CONTOURS LOW MARSH t0'-TCEEPJ ? EltarAw CONTOURS i HOY MARSH MODEM PROPOSEO STM ~ASE MC/O PM t? DEEP! TOP OF STRAY BANK RP RAP BERM AKERSECTgN GUTTER ftDl ANON WASNOOT CM & GUTTER (V SECTARY AT THE CENTER Of TR RAM RETURN WETLAND POND 1 SCALE" V=60'' FIGURE 3 1>6 Ac V I C V0144,*%c C - Ve-.l 1 0 -'Z S 1. C "' f+ v1 I? / \ VD hollo" 0 Va(cj^c-- e? 823.05 = 2,12,SS F-3 Pond 1 -Wellesley ELEV. SA (ac) SA/DA ratio 820 0.29 0.92 820.25 0.30 0.95 820.5 0.31 0.98 820.75 0.32 1.01 821 0.33 1.04 821.25 0.34 1.08 821.5 0.35 1.11 821.75 0.36 1.14 822 0.37 1.17 DA= 31.6 AC 0- ELEV. SA (ft) VOLUME (ft) 821.25 14810 0 821.50 15215 3753 821.75 15621 7608 822.00 16026 11564 822.25 16432 15621 822.50 16837 19780 822.75 17243 24040 823.00 17648 28401 823.05 17729 29285 - 823.25 18054 32864 823.50 18459 37428 823.75 18865 42093 824.00 19270 46860 ddr- BEST MANAGEMENT PRACTICE - WEST D.A. ALL AMERICAN RELOCATION - BOBBITT Proposed BMP: Pond 1 Area draining to BMP: 1,376,500 Square Feet Percentage Impervious: 22.5% Per table 1. 1, Page 5 of the NCDENR BMP Manual: Average permanent pool surface area required (at 3 foot depth, as a percentage of D.A.): 22.5% Impervious => 1.06% .-- or -- 14591 Square Feet Volume of temporary storage required = first one inch of rainfall on Drainage Area: Rv = 0.05 + 0.009(22.5%) = 0.2525 inch/inch Volume = 1 inch rainfall x Rv x 1/12 feet/inch x Drainage Area Volume of temporary storage required = 28964 Cubic Feet Volume of storage provided at EL. 823.05 = 29285 Cubic Feet Maximum head at extended detention storage = 1.80 Feet PEAK OUTFLOW RATE FOR DRAWDOWN TIME OF 48 HOURS: Qpeak = S/(0.5 x 3600 x 48) WHICH EQUALS: STORAGE x 0.0000116 = 0.335 REQUIRED ORIFICE AREA: A=Qpeak/(0.6 x (64.4 x h)^0.5 REQUIRED ORIFICE AREA = 0.051893 FEET DIAMETER OF A CIRCULAR ORIFICE = 2 x (REQUIRED ORIFICE AREA/3.14)^0.5 DIAMETER OF A CIRCULAR ORIFICE = 0.257 FEET = 3.085 INCHES USE 3.0 INCH ORIFICE Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 2 Year, Type 2 Rainfall: 3.12 inches at Pond 1 Time of Concentration: 15 min. Drainage Area: 31.600 acres. Weighted 'C' Factor: 0.400 Time (min) Rainfall Incr. (inches) Total (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.07 0.07 0.28 3.51 30 0.13 0.20 0.51 6.39 45 0.86 1.06 3.45 43.57 60 0.32 1.38 1.29 16.36 75 0.10 1.48 0.39 4.95 90 0.08 1.56 0.32 4.09 105 0.06 1.62 0.25 3.10 120 0.06 1.68 0.22 2.78 135 0.05 1.73 0.20 2.53 150 0.05 1.77 0.18 2.33 At time = 375 minutes, the flow is 1.14 CFS. Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 10 Year, Type 2 Rainfall: 4.80 inches at Pond 1 Time of Concentration: 15 min. Drainage Area: 31.600 acres. Weighted 'C' Factor: 0.400 Time (min) Incr. (inches) Rainfall Total (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.11 0.11 0.43 5.41 30 0.19 0.30 0.78 9.84 45 1.33 1.63 5.30 67.03 60 0.50 2.13 1.99 25.17 75 0.15 2.28 0.60 7.61 90 0.12 2.40 0.50 6.29 105 0.09 2.49 0.38 4.77 120 0.08 2.58 0.34 4.28 135 0.08 2.66 0.31 3.90 150 0.07 2.73 0.28 3.58 At time = 375 minutes, the flow is 1.76 CFS. Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 50 Year, Type 2 Rainfall: 6.48 inches at Pond 1 Time of Concentration: 15 min. Drainage Area: 31.600 acres. Weighted 'C' Factor: 0.400 Time (min) Rainfall Incr. Total (inches) (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.14 0.14 0.58 7.30 30 0.26 0.41 1.05 13.28 45 1.79 2.20 7.16 90.49 60 0.67 2.87 2.69 33.98 75 0.20 3.07 0.81 10.27 90 0.17 3.24 0.67 8.49 105 0.13 3.37 0.51 6.44 120 0.11 3.48 0.46 5.78 135 0.10 3.59 0.42 5.26 150 0.10 3.68 0.38 4.84 At time = 375 minutes, the flow is 2.38 CFS. Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 100 Year, Type 2 Rainfall: 6.96 inches at Pond 1 Time of Concentration: 15 min. Drainage Area: 31.600 acres. Weighted 'C' Factor: 0.400 Time (min) Rainfall Incr. Total (inches) (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.16 0.16 0.62 7.84 30 0.28 0.44 1.13 14.26 45 1.92 2.36 7.69 97.19 60 0.72 3.08 2.89 36.50 75 0.22 3.30 0.87 11.03 90 0.18 3.48 0.72 9.12 105 0.14 3.62 0.55 6.91 120 0.12 3.74 0.49 6.21 135 0.11 3.85 0.45 5.65 150 0.10 3.95 0.41 5.20 At time = 375 minutes, the flow is 2.55 CFS Basin Storage/Elevation Input PO N L> Elevation Area Storage (ft) (acres) (acre-ft) 821.25 0.34 0.000 822 0.37 0.266 823 0.41 0.656 824 0.44 1.081 Outlet Structure Configuration Outlet Structure Configuration for Pond 1 Stage 1: Circular Orifice Invert Elevation = 821.25 feet Diameter = .25 feet Discharge Coefficient = .6 Stage 2: Emergency Spillway Crest Elevation = 823.05 feet Crest Length = 30 feet Discharge Coefficient = 3 Basin Rating Curve Outlet Rating Table for Pond 1 Basin Water Elevation Basin Outflow (cfs) Riser Box Water Elevation Tailwater Elevation (ft) Outfall Culvert Control 821.25 0.00 N/A N/A N/A 821.35 0.01 N/A N/A N/A 821.45 0.06 N/A N/A N/A 821.55 0.10 N/A N/A N/A 821.65 0.12 N/A N/A N/A 821.75 0.14 N/A N/A N/A 821.85 0.16 N/A N/A N/A 821.95 0.18 N/A N/A N/A 822.05 0.19 N/A N/A N/A 822.15 0.21 N/A N/A N/A 822.25 0.22 N/A N/A N/A 822.35 0.23 N/A N/A N/A 822.45 0.25 N/A N/A N/A 822.55 0.26 N/A N/A N/A 822.65 0.27 N/A N/A N/A 822.75 0.28 N/A N/A N/A 822.85 0.29 N/A N/A N/A 822.95 0.30 N/A N/A N/A 823.05 0.31 N/A N/A N/A 823.15 3.14 N/A N/A N/A 823.25 8.34 N/A N/A N/A 823.35 15.08 N/A N/A N/A 823.45 23.06 N/A N/A N/A 823.55 32.11 N/A N/A N/A 823.65 42.12 N/A N/A N/A 823.75 53.00 N/A N/A N/A 823.85 64.69 N/A N/A N/A 823.95 77.14 N/A N/A N/A 824.05 90.29 N/A N/A N/A 824.15 104.13 N/A N/A N/A 824.25 118.60 N/A N/A N/A Modified Puls Routing T'o/k)D -L - 2, rE.4k, Inflow Hydrograph: G:\PROJECT2\STLAWR-I\CHERRY-l\H&H\Pl-2.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-1\H&H\P1.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-l\CHERRY-I\H&H\P1.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 821.25 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 821.25 0.00 0.00 0.06 0.88 0.88 0.002 821.26 0.00 0.00 0.13 1.76 1.76 0.009 821.28 0.00 0.00 0.19 2.64 2.64 0.020 821.31 0.01 0.01 0.25 3.51 3.51 0.036 821.35 0.02 0.02 0.31 4.23 4.23 0.056 821.41 0.04 0.04 0.38 4.95 4.95 0.080 821.47 0.07 0.07 0.44 5.67 5.67 0.107 821.55 0.10 0.10 0.50 6.39 6.39 0.137 821.64 0.12 0.12 0.56 15.69 15.69 0.193 821.80 0.15 0.15 0.63 24.98 24.98 0.298 822.08 0.20 0.20 0.69 34.28 34.28 0.449 822.47 0.25 0.25 0.75 43.57 43.57 0.649 822.98 0.30 0.30 0.81 36.77 36.77 0.813 823.37 16.61 16.61 0.88 29.97 29.97 0.870 823.50 27.94 27.94 •?'"-'? 0.94 23.16 23.16 0.866 823.49 26.97 26.97 1.00 16.36 16.36 0.841 823.44 21.95 21.95 1.06 13.51 13.51 0.817 823.38 17.37 17.37 1.13 10.65 10.65 0.798 823.33 14.04 14.04 1.19 7.80 7.80 0.781 823.29 11.24 11.24 1.25 4.95 4.95 0.763 823.25 8.41 8.41 1.31 4.73 4.73 0.749 823.22 6.68 6.68 1.38 4.52 4.52 0.741 823.20 5.69 5.69 1.44 4.30 4.30 0.736 823.19 5.08 5.08 1.50 4.09 4.09 0.732 823.18 4.65 4.65 1.56 3.84 3.84 0.729 823.17 4.32 4.32 1.63 3.59 3.59 0.727 823.17 4.03 4.03 1.69 3.35 3.35 0.725 823.16 3.76 3.76 1.75 3.10 3.10 0.723 823.16 3.50 3.50 1.81 3.02 3.02 0.721 823.15 3.29 3.29 1.88 2.94 2.94 0.720 823.15 3.14 3.14 1.94 2.86 2.86 0.719 823.15 3.07 3.07 2.00 2.78 2.78 0.718 823.14 3.00 3.00 2.06 2.72 2.72 0.717 823.14 2.93 2.93 2.13 2.66 2.66 0.715 823.14 2.86 2.86 2.19 2.60 2.60 0.714 823.14 2.79 2.79 2.25 2.53 2.53 0.713 823.14 2.72 2.72 Modified Puls Routing ?0 1"1j,'> 2 - /o YC'4 k Inflow Hydrograph: G:\PROJECT2\STLAWR-1\CHERRY-I\H&H\PI-]O.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-1\H&H\P1.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-I\H&H\P1.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 821.25 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 821.25 0.00 0.00 0.06 1.35 1.35 0.003 821.26 0.00 0.00 0.13 2.70 2.70 0.014 821.29 0.01 0.01 0.19 4.06 4.06 0.031 821.34 0.01 0.01 0.25 5.41 5.41 0.056 821.41 0.04 0.04 0.31 6.51 6.51 0.086 821.49 0.07 0.07 0.38 7.62 7.62 0.122 821.59 0.11 0.11 0.44 8.73 8.73 0.164 821.71 0.14 0.14 0.50 9.84 9.84 0.211 821.84 0.16 0.16 0.56 24.13 24.13 0.298 822.08 0.20 0.20 0.63 38.43 38.43 0.458 822.49 0.25 0.25 0.69 52.73 52.73 0.690 823.08 1.16 1.16 0.75 67.03 67.03 0.904 823.58 35.57 35.57 0.81 56.56 56.56 0.987 823.78 56.24 56.24•x'-"' 0.88 46.10 46.10 0.972 823.74 52.20 52.20; 0.94 35.64 35.64 0.936 823.66 43.18 43.18' 1.00 25.17 25.17 0.895 823.56 33.46 33.46 1.06 20.78 20.78 0.861 823.48 25.94 25.94 1.13 16.39 16.39 0.836 823.42 20.91 20.91 1.19 12.00 12.00 0.812 823.37 16.52 16.52 1.25 7.61 7.61 0.788 823.31 12.46 12.46 1.31 7.28 7.28 0.770 823.27 9.55 9.55 1.38 6.95 6.95 0.761 823.25 8.17 8.17 1.44 6.62 6.62 0.755 823.23 7.50 7.50 1.50 6.29 6.29 0.751 823.22 7.00 7.00 1.56 5.91 5.91 0.748 823.22 6.57 6.57 1.63 5.53 5.53 0.744 823.21 6.16 6.16 1.69 5.15 5.15 0.741 823.20 5.77 5.77 1.75 4.77 4.77 0.738 823.19 5.38 5.38 1.81 4.65 4.65 0.735 823.19 5.06 5.06 1.88 4.52 4.52 0.734 823.18 4.83 4.83 1.94 4.40 4.40 0.732 823.18 4.65 4.65 2.00 4.28 4.28 0.731 823.18 4.50 4.50 2.06 4.18 4.18 0.730 823.17 4.37 4.37 2.13 4.09 4.09 0.729 823.17 4.26 4.26 2.19 3.99 3.99 0.728 823.17 4.15 4.15 2.25 3.90 3.90 0.727 823.17 4.05 4.05 Modified Puls Routing -Po/.j1> 2 - Inflow Hydrograph: G:\PROJECT2\STLAWR-I\CHERRY-1\H&H\P1-50.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-I\CHERRY-I\H&H\P1.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-I\CHERRY-I\H&H\P1.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 821.25 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 821.25 0.00 0.00 0.06 1.82 1.82 0.005 821.26 0.00 0.00 0.13 3.65 3.65 0.019 821.30 0.01 0.01 0.19 5.47 5.47 0.042 821.37 0.02 0.02 0.25 7.30 7.30 0.075 821.46 0.06 0.06 0.31 8.79 8.79 0.116 821.58 0.11 0.11 0.38 10.29 10.29 0.165 821.71 0.14 0.14 0.44 11.78 11.78 0.221 821.87 0.17 0.17 0.50 13.28 13.28 0.285 822.05 0.19 0.19 0.56 32.58 32.58 0.402 822.35 0.23 0.23 0.63 51.88 51.88 0.619 822.91 0.29 0.29 0.69 71.19 71.19 0.866 823.49 27.09 27.09 0.75 90.49 90.49 1.034 823.89 69.60 69.60 0.81 76.36 76.36 1.070 823.97 83.37 83.37 0.88 62.24 62.24 1.033 823.89 69.39 69.39 0.94 48.11 48.11 0.991 823.79 57.41 57.41 1.00 33.98 33.98 0.940 823.67 44.20 44.20 1.06 28.05 28.05 0.898 823.57 34.13 34.13 1.13 22.13 22.13 0.869 823.50 27.59 27.59 1.19 16.20 16.20 0.840 823.43 21.73 21.73 1.25 10.27 10.27 0.811 823.36 16.18 16.18 1.31 9.83 9.83 0.788 823.31 12.50 12.50 1.38 9.38 9.38 0.778 823.29 10.82 10.82 1.44 8.94 8.94 0.772 823.27 9.85 9.85 1.50 8.49 8.49 0.768 823.26 9.19 9.19 1.56 7.98 7.98 0.764 823.25 8.64 8.64 1.63 7.46 7.46 0.761 823.25 8.15 8.15 1.69 6.95 6.95 0.757 823.24 7.69 7.69 1.75 6.44 6.44 0.753 823.23 7.21 7.21 1.81 6.27 6.27 0.750 823.22 6.80 6.80 1.88 6.11 6.11 0.747 823.21 6.51 6.51 1.94 5.94 5.94 0.745 823.21 6.28 6.28 2.00 5.78 5.78 0.744 823.21 6.08 6.08 2.06 5.65 5.65 0.742 823.20 5.90 5.90 2.13 5.52 5.52 0.741 823.20 5.75 5.75 2.19 5.39 5.39 0.740 823.20 5.61 5.61 2.25 5.26 5.26 0.739 823.19 5.47 5.47 Modified Puls Routing v,n /U )j 2 /oo Inflow Hydrograph: G:\PROJECT2\STLAWR-I\CHERRY-I\H&H\P1-100.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-I\H&H\Pl.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-l\H&H\Pl.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 821.25 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 821.25 0.00 0.00 0.06 1.96 1.96 0.005 821.26 0.00 0.00 0.13 3.92 3.92 0.020 821.31 0.01 0.01 0.19 5.88 5.88 0.045 821.38 0.03 0.03 0.25 7.84 7.84 0.081 821.48 0.07 0.07 0.31 9.45 9.45 0.125 821.60 0.11 0.11 0.38 11.05 11.05 0.177 821.75 0.14 0.14 0.44 12.66 12.66 0.237 821.92 0.17 0.17 0.50 14.26 14.26 0.306 822.10 0.20 0.20 0.56 34.99 34.99 0.432 822.43 0.24 0.24 0.63 55.73 55.73 0.665 823.02 0.30 0.30 0.69 76.46 76.46 0.910 823.60 36.93 36.93 0.75 97.19 97.19 1.061 823.95 78.17 78.17 0.81 82.02 82.02 1.081 824.07 93.42 93.42 0.88 66.85 66.85 1.040 823.90 71.35 71.35 0.94 51.67 51.67 1.004 823.82 61.07 61.07 1.00 36.50 36.50 0.952 823.70 47.21 47.21 1.06 30.13 30.13 0.908 823.59 36.45 36.45 1.13 23.77 23.77 0.877 823.52 29.44 29.44 1.19 17.40 17.40 0.848 823.45 23.15 23.15 1.25 11.03 11.03 0.817 823.38 17.31 17.31 1.31 10.56 10.56 0.793 823.32 13.28 13.28 1.38 10.08 10.08 0.783 823.30 11.56 11.56 1.44 9.60 9.60 0.776 823.28 10.56 10.56 1.50 9.12 9.12 0.772 823.27 9.86 9.86 1.56 8.57 8.57 0.768 823.26 9.27 9.27 1.63 8.02 8.02 0.765 823.26 8.70 8.70 1.69 7.47 7.47 0.761 823.25 8.18 8.18 1.75 6.91 6.91 0.757 823.24 7.70 7.70 1.81 6.74 6.74 0.754 823.23 7.28 7.28 1.88 6.56 6.56 0.751 823.22 6.98 6.98 1.94 6.38 6.38 0.749 823.22 6.73 6.73 2.00 6.21 6.21 0.747 823.22 6.52 6.52 2.06 6.07 6.07 0.746 823.21 6.34 6.34 2.13 5.93 5.93 0.745 823.21 6.18 6.18 2.19 5.79 5.79 0.743 823.21 6.02 6.02 2.25 5.65 5.65 0.742 823.20 5.88 5.88 ANTIFLOTATION BLOCK CALCULATION WELLESLEY - ST. LAWRENCE HOMES ANTIFLOTATION BLOCK (POND 1) CROSS-SECTION AREA OF RISER INTERIOR= 12.56 SF RISER HEIGHT= 5.75 FT VOL. OF INTERIOR OF RISER= 72.22 CF WT. OF H2O DISPLACED BY RISER INTERIOR= 4507 # WT. OF CONC. NEEDED (1.15 FS)= 5183 # THICKNESS OF CONC. BASE= 2.00 FT SIDE LENGTH OF CONC. BASE= 6.00 FT AREA OF CONC. BASE 36.00 SF WT. OF CONC. BASE= 6307 # FACTOR OF SAFETY= 1.40 ANTIFLOTATION BLOCK (POND 2) CROSS-SECTION AREA OF RISER INTERIOR= 12.56 SF RISER HEIGHT= 4.25 FT VOL. OF INTERIOR OF RISER= 53.38 CF WT. OF H2O DISPLACED BY RISER INTERIOR= 3331 # WT. OF CONC. NEEDED (1.15 FS)= 3831 # THICKNESS OF CONC. BASE= 1.50 FT SIDE LENGTH OF CONC. BASE= 6.00 FT AREA OF CONC. BASE 36.00 SF WT. OF CONC. BASE= 4730 # FACTOR OF SAFETY= 1.42 SECTION 3 Wetland Pond 2 Calculations I SITE two, ,,n^m WETLAND POND 2 - LEGEND PROIGSEO CoNrOU S ENSTWG OOYrOURS PROPWO STORY DRAINAGE rOP OF SrREAV BANK / WrERSECFAV OR7ER FLOW ARROW WASMOUT CURB 1 OUrrER (1O'SECF*V Ar rME CENTER OF rME RAOVS RETURN? I I I I I / I IF 1 1 1 b: 1 i 1 - 1 1 % ` FOREBAY `? ??` % 0 s I 1 LON MARSH (" VEEP) MNi? MARSH lV4rDEEP) wow POa croup) RIP RAP BERM WETLAND POND 2 Z-mW SCALE" 1"=60' FIGURE 4 l,.?F'!LA?D AND Z = $/ l f? DA-z- 2, on; s ,4 >C ?1. 100 5A- 0- Y 46 J;ze A-c-- ? _. main-- a CD 5 o. o s -f- o. 00 (Zoe 44 1/01?.?.?._ (1 "x(0.23 •'..,,)<l?..?(??• /?•?-? Pond 2 - Wellesley ELEV. SA (ft) VOLUME (ft j) 825.00 6700 0 825.25 6982 1710 825.50 7263 3491 825.75 7545 5342 826.00 7826 7263 826.25 8108 9255 826.35 8220 10071 826.50 8389 11317 826.75 8671 13449 827.00 8952 15652 827.25 9234 17925 827.50 9515 20269 827.75 9797 22683 828.00 10078 25167 BEST MANAGEMENT PRACTICE - WEST D.A. ALL AMERICAN RELOCATION - BOBBITT Proposed BMP: Area draining to BMP: Percentage Impervious: Pond 2 509,652 Square Feet 20.0% Per table 1. 1, Page 5 of the NCDENR BMP Manual: Average permanent pool surface area required (at 3 foot depth, as a percentage of D.A.): 20.0% Impervious => 0.97% .-- or -- 4944 Square Feet Volume of temporary storage required = first one inch of rainfall on Drainage Area: Rv = 0.05 + 0.009(22.5%) = 0.23 inch/inch Volume = 1 inch rainfall x Rv x 1/12 feet/inch x Drainage Area Volume of temporary storage required = 9768 Cubic Feet Volume of storage provided at EL. 826.35 = 10071 Cubic Feet Maximum head at extended detention storage = 1.35 Feet PEAK OUTFLOW RATE FOR DRAWDOWN TIME OF 48 HOURS: Qpeak = S/(0.5 x 3600 x 48) WHICH EQUALS: STORAGE x 0.0000116 = 0.113 REQUIRED ORIFICE AREA: A=Qpeak/(0.6 x (64.4 x h)^0.5 REQUIRED ORIFICE AREA = 0.020209 FEET DIAMETER OF A CIRCULAR ORIFICE = 2 x (REQUIRED ORIFICE AREA/3.14)^0.5 DIAMETER OF A CIRCULAR ORIFICE = 0.160 FEET= 1.925 INCHES USE 1.9 INCH ORIFICE Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 2 Year, Type 2 Rainfall: 3.12 inches at Pond 2 Time of Concentration: 15 min. Drainage Area: 11.700 acres. Weighted 'C' Factor: 0.400 Time (min) Rainfall Incr. (inches) Total (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.07 0.07 0.28 1.30 30 0.13 0.20 0.51 2.37 45 0.86 1.06 3.45 16.13 60 0.32 1.38 1.29 6.06 75 0.10 1.48 0.39 1.83 90 0.08 1.56 0.32 1.51 105 0.06 1.62 0.25 1.15 120 0.06 1.68 0.22 1.03 135 0.05 1.73 0.20 0.94 150 0.05 1.77 0.18 0.86 At time = 375 minutes, the flow is 0.42 CFS. Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 10 Year, Type 2 Rainfall: 4.80 inches at Pond 2 Time of Concentration: 15 min. Drainage Area: 11.700 acres. Weighted 'C' Factor: 0.400 Time (min) Rainfall Incr. (inches) Total (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.11 0.11 0.43 2.00 30 0.19 0.30 0.78 3.64 45 1.33 1.63 5.30 24.82 60 0.50 2.13 1.99 9.32 75 0.15 2.28 0.60 2.82 90 0.12 2.40 0.50 2.33 105 0.09 2.49 0.38 1.77 120 0.08 2.58 0.34 1.59 135 0.08 2.66 0.31 1.44 150 0.07 2.73 0.28 1.33 At time = 375 minutes, the flow is 0.65 CFS. Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 50 Year, Type 2 Rainfall: 6.48 inches at Pond 2 Time of Concentration: 15 min. Drainage Area: 11.700 acres. Weighted'C' Factor: 0.400 Time (min) Rainfall Incr. Total (inches) (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.14 0.14 0.58 2.70 30 0.26 0.41 1.05 4.92 45 1.79 2.20 7.16 33.50 60 0.67 2.87 2.69 12.58 75 0.20 3.07 0.81 3.80 90 0.17 3.24 0.67 3.14 105 0.13 3.37 0.51 2.38 120 0.11 3.48 0.46 2.14 135 0.10 3.59 0.42 1.95 150 0.10 3.68 0.38 1.79 At time = 375 minutes, the flow is 0.88 CFS. Rational Formula Hydrograph SCS 24 - Hour Storm Distribution 100 Year, Type 2 Rainfall: 6.96 inches at Pond 2 Time of Concentration: 15 min. Drainage Area: 11.700 acres. Weighted 'C' Factor: 0.400 Time (min) Rainfall Incr. (inches) Total (inches) Rainfall Intensity (in/hr) Flow (cfs) 0 0.00 0.00 0.00 0.00 15 0.16 0.16 0.62 2.90 30 0.28 0.44 1.13 5.28 45 1.92 2.36 7.69 35.99 60 0.72 3.08 2.89 13.51 75 0.22 3.30 0.87 4.08 90 0.18 3.48 0.72 3.38 105 0.14 3.62 0.55 2.56 120 0.12 3.74 0.49 2.30 135 0.11 3.85 0.45 2.09 150 0.10 3.95 0.41 1.92 At time = 375 minutes, the flow is 0.95 CFS. Basin Storage/Elevation Input ?p f)'D Z Elevation Area Storage (ft) (acres) (acre-ft) 825 0.154 0.000 826 0.180 0.167 827 0.206 0.360 828 0.231 0.579 Outlet Structure Configuration Outlet Structure Configuration for Pond 2 Stage 1: Circular Orifice Invert Elevation = 825 feet Diameter = .158 feet Discharge Coefficient =.6 Stage 2: Emergency Spillway Crest Elevation = 826.35 feet Crest Length = 10 feet Discharge Coefficient = 3 Basin Rating Curve Outlet Rating Table for Pond 2 Basin Basin Riser Box Tailwater Outfall Water Outflow Water Elevation Culvert Elevation (cfs) Elevation (ft) Control 825.00 0.00 N/A N/A N/A 825.10 0.01 N/A N/A N/A 825.20 0.03 N/A N/A N/A 825.30 0.04 N/A N/A N/A 825.40 0.05 N/A N/A N/A 825.50 0.06 N/A N/A N/A 825.60 0.07 N/A N/A N/A 825.70 0.07 N/A N/A N/A 825.80 0.08 N/A N/A N/A 825.90 0.09 N/A N/A N/A 826.00 0.09 N/A N/A N/A 826.10 0.10 N/A N/A N/A 826.20 0.10 N/A N/A N/A 826.30 0.10 N/A N/A N/A 826.40 0.44 N/A N/A N/A 826.50 1.85 N/A N/A N/A 826.60 3.86 N/A N/A N/A 826.70 6.32 N/A N/A N/A 826.80 9.17 N/A N/A N/A 826.90 12.35 N/A N/A N/A 827.00 15.83 N/A N/A N/A 827.10 19.60 N/A N/A N/A 827.20 23.63 N/A N/A N/A 827.30 27.89 N/A N/A N/A 827.40 32.39 N/A N/A N/A 827.50 37.11 N/A N/A N/A 827.60 42.04 N/A N/A N/A 827.70 47.18 N/A N/A N/A 827.80 52.50 N/A N/A N/A 827.90 58.01 N/A N/A N/A 828.00 63.70 N/A N/A N/A Modified Puts Routing PO A)D Z - 2 YiF* ---- Inflow Hydrograph: G:\PROJECT2\STLAWR-I\CHERRY-1\H&H\P2-2.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-I\H&H\P2.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-I\H&H\P2.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 825.00 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 825.00 0.00 0.00 0.06 0.33 0.33 0.001 825.01 0.00 0.00 0.13 0.65 0.65 0.003 825.02 0.00 0.00 0.19 0.98 0.98 0.008 825.05 0.00 0.00 0.25 1.30 1.30 0.013 825.08 0.01 0.01 0.31 1.57 1.57 0.021 825.12 0.02 0.02 0.38 1.83 1.83 0.029 825.18 0.03 0.03 0.44 2.10 2.10 0.039 825.24 0.04 0.04 0.50 2.37 2.37 0.051 825.30 0.04 0.04 0.56 5.81 5.81 0.072 825.43 0.06 0.06 0.63 9.25 9.25 0.110 825.66 0.07 0.07 0.69 12.69 12.69 0.166 826.00 0.09 0.09 0.75 16.13 16.13 0.240 826.38 0.36 0.36 0.81 13.61 13.61 0.300 826.69 6.04 6.04 0.88 11.09 11.09 0.324 826.81 9.52 9.5 0.94 8.58 8.58 0.325 ± _ 2 __ __ 9.71 9.7 1.00 6.06 6.06 0.316 _ 826.77 8.35 8.35 1.06 5.00 5.00 0.305 826.72 6.79 6.79 1.13 3.94 3.94 0.296 826.67 5.60 5.60 1.19 2.89 2.89 0.288 826.63 4.51 4.51 1.25 1.83 1.83 0.279 826.58 3.51 3.51 1.31 1.75 1.75 0.272 826.55 2.78 2.78 1.38 1.67 1.67 0.268 826.52 2.33 2.33 1.44 1.59 1.59 0.265 826.51 2.03 2.03 1.50 1.51 1.51 0.263 826.50 1.83 1.83 1.56 1.42 1.42 0.262 826.49 1.72 1.72 1.63 1.33 1.33 0.260 826.48 1.61 1.61 1.69 1.24 1.24 0.259 826.48 1.51 1.51 1.75 1.15 1.15 0.257 826.47 1.41 1.41 1.81 1.12 1.12 0.256 826.46 1.32 1.32 1.88 1.09 1.09 0.255 826.46 1.25 1.25 1.94 1.06 1.06 0.255 826.45 1.20 1.20 2.00 1.03 1.03 0.254 826.45 1.15 1.15 2.06 1.01 1.01 0.253 826.45 1.11 1.11 2.13 0.98 0.98 0.253 826.44 1.07 1.07 2.19 0.96 0.96 0.252 826.44 1.04 1.04 2.25 0.94 0.94 0.252 826.44 1.01 1.01 Modified Puls Routing Inflow Hydrograph: G:\PROJECT2\STLAWR-1\CHERRY-1\H&H\P2-IO.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-I\CHERRY-1\H&H\P2.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-I\H&H\P2.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 825.00 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 825.00 0.00 0.00 0.06 0.50 0.50 0.001 825.01 0.00 0.00 0.13 1.00 1.00 0.005 825.03 0.00 0.00 0.19 1.50 1.50 0.012 825.07 0.01 0.01 0.25 2.00 2.00 0.021 825.12 0.02 0.02 0.31 2.41 2.41 0.032 825.19 0.03 0.03 0.38 2.82 2.82 0.045 825.27 0.04 0.04 0.44 3.23 3.23 0.061 825.36 0.05 0.05 0.50 3.64 3.64 0.078 825.47 0.06 0.06 0.56 8.94 8.94 0.110 825.66 0.07 0.07 0.63 14.23 14.23 0.170 826.01 0.09 0.09 0.69 19.52 19.52 0.254 826.45 1.13 1.13 0.75 24.82 24.82 0.336 826.87 11.50 11.50 0.81 20.94 20.94 0.376 827.07 18.59 18.59 0.88 17.07 17.07 0.378 827.08 IT .85 18.85 0.94 13.19 13.19 0.364 827.02 16.56 16.56 1.00 9.32 9.32 0.345 826.92 13.21 13.21 1.06 7.69 7.69 0.329 826.84 10.35 10.35 1.13 6.07 6.07 0.316 826.77 8.35 8.35 1.19 4.44 4.44 0.304 826.71 6.64 6.64 1.25 2.82 2.82 0.293 826.65 5.12 5.12 1.31 2.70 2.70 0.283 826.60 3.95 3.95 1.38 2.57 2.57 0.278 826.58 3.38 3.38 1.44 2.45 2.45 0.275 826.56 3.01 3.01 1.50 2.33 2.33 0.272 826.54 2.75 2.75 1.56 2.19 2.19 0.270 826.53 2.54 2.54 1.63 2.05 2.05 0.268 826.53 2.36 2.36 1.69 1.91 1.91 0.267 826.52 2.20 2.20 1.75 1.77 1.77 0.265 826.51 2.04 2.04 1.81 1.72 1.72 0.264 826.50 1.92 1.92 1.88 1.68 1.68 0.263 826.50 1.83 1.83 1.94 1.63 1.63 0.262 826.49 1.77 1.77 2.00 1.59 1.59 0.262 826.49 1.72 1.72 2.06 1.55 1.55 0.261 826.49 1.67 1.67 2.13 1.51 1.51 0.260 826.48 1.63 1.63 2.19 1.48 1.48 0.260 826.48 1.59 1.59 2.25 1.44 1.44 0.259 826.48 1.55 1.55 Modified Puls Routing pv ND 2. - 50 A Z Inflow Hydrograph: G:\PROJECT2\STLAWR-1\CHERRY-I\H&H\P2-50.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-1\H&H\P2.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-I\CHERRY-1\H&H\P2.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 825.00 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 825.00 0.00 0.00 0.06 0.68 0.68 0.002 825.01 0.00 0.00 0.13 1.35 1.35 0.007 825.04 0.00 0.00 0.19 2.03 2.03 0.016 825.09 0.01 0.01 0.25 2.70 2.70 0.028 825.17 0.03 0.03 0.31 3.26 3.26 0.043 825.26 0.04 0.04 0.38 3.81 3.81 0.061 825.37 0.05 0.05 0.44 4.36 4.36 0.082 825.49 0.06 0.06 0.50 4.92 4.92 0.105 825.63 0.07 0.07 0.56 12.06 12.06 0.149 825.89 0.09 0.09 0.63 19.21 19.21 0.229 826.32 0.18 0.18 0.69 26.36 26.36 0.322 826.80 9.30 9.30 0.75 33.50 33.50 0.396 827.16 22.13 22.13 0.81 28.27 28.27 0.426 1827. 30 72 94 27.94 0.88 23.04 23.04 0.418 _ 827.27 26.41 26.41 0.94 17.81 17.81 0.397 827.17 22.45 22.45 1.00 12.58 12.58 0.372 827.05 17.86 17.86 1.06 10.39 10.39 0.349 826.94 13.88 13.88 1.13 8.19 8.19 0.333 826.86 11.04 11.04 1.19 6.00 6.00 0.318 826.78 8.72 8.72 1.25 3.80 3.80 0.304 826.71 6.61 6.61 1.31 3.64 3.64 0.293 826.65 5.15 5.15 1.38 3.47 3.47 0.287 826.62 4.36 4.36 1.44 3.31 3.31 0.283 826.60 3.88 3.88 1.50 3.14 3.14 0.280 826.59 3.60 3.60 1.56 2.95 2.95 0.278 826.58 3.37 3.37 1.63 2.76 2.76 0.276 826.56 3.15 3.15 1.69 2.57 2.57 0.274 826.55 2.95 2.95 1.75 2.38 2.38 0.272 826.54 2.75 2.75 1.81 2.32 2.32 0.271 826.54 2.58 2.58 1.88 2.26 2.26 0.269 826.53 2.46 2.46 1.94 2.20 2.20 0.268 826.53 2.36 2.36 2.00 2.14 2.14 0.268 826.52 2.28 2.28 2.06 2.09 2.09 0.267 826.52 2.21 2.21 2.13 2.04 2.04 0.266 826.52 2.15 2.15 2.19 2.00 2.00 0.266 826.51 2.09 2.09 2.25 1.95 1.95 0.265 826.51 2.04 2.04 Modified Puts Routing POIV ra 2- - / O 0 Y ??2 Inflow Hydrograph: G:\PROJECT2\STLAWR-l\CHERRY-1\H&H\P2-100.HYD Storage/Elevation Curve: G:\PROJECT2\STLAWR-l\CHERRY-I\H&H\P2.ES Discharge/Elevation Curve: G:\PROJECT2\STLAWR-1\CHERRY-I\H&H\P2.EO Basin Bypass Capacity = 0.0 cfs Starting Pool Elevation = 825.00 feet Time Interval =.0625 hours Event Hydrograph Basin Storage Elevation Basin Outflow Time Inflow Inflow Used Above MSL Outflow Total (hours) (cfs) (cfs) (acre-ft) (feet) (cfs) (cfs) 0.00 0.00 0.00 0.000 825.00 0.00 0.00 0.06 0.73 0.73 0.002 825.01 0.00 0.00 0.13 1.45 1.45 0.007 825.04 0.00 0.00 0.19 2.18 2.18 0.017 825.10 0.01 0.01 0.25 2.90 2.90 0.030 825.18 0.03 0.03 0.31 3.50 3.50 0.046 825.28 0.04 0.04 0.38 4.09 4.09 0.066 825.39 0.05 0.05 0.44 4.69 4.69 0.088 825.53 0.06 0.06 0.50 5.28 5.28 0.113 825.68 0.07 0.07 0.56 12.96 12.96 0.160 825.96 0.09 0.09 0.63 20.63 20.63 0.245 826.41 0.51 0.51 0.69 28.31 28.31 0.339 826.89 12.08 12.08 0.75 35.99 35.99 0.410 827.23 24.81 24.81 0.81 30.37 30.37 0.438 1827.36 30.50 30.501 0.88 24.75 24.75 0.428 827.31 28.46 28.46 0.94 19.13 19.13 0.406 827.21 24.07 24.07 1.00 13.51 13.51 0.379 827.09 19.09 19.09 1.06 11.16 11.16 0.355 826.97 14.91 14.91 1.13 8.80 8.80 0.337 826.88 11.81 11.81 1.19 6.44 6.44 0.322 826.80 9.31 9.31 1.25 4.08 4.08 0.307 826.73 7.07 7.07 1.31 3.91 3.91 0.295 826.67 5.47 5.47 1.38 3.73 3.73 0.289 826.63 4.65 4.65 1.44 3.55 3.55 0.285 826.61 4.15 4.15 1.50 3.38 3.38 0.282 826.60 3.82 3.82 1.56 3.17 3.17 0.280 826.59 3.59 3.59 1.63 2.97 2.97 0.278 826.58 3.37 3.37 1.69 2.76 2.76 0.276 826.57 3.16 3.16 1.75 2.56 2.56 0.274 826.55 2.95 2.95 1.81 2.49 2.49 0.272 826.55 2.77 2.77 1.88 2.43 2.43 0.271 826.54 2.64 2.64 1.94 2.36 2.36 0.270 826.53 2.54 2.54 2.00 2.30 2.30 0.269 826.53 2.45 2.45 2.06 2.25 2.25 0.269 826.53 2.37 2.37 2.13 2.20 2.20 0.268 826.52 2.31 2.31 2.19 2.14 2.14 0.267 826.52 2.25 2.25 2.25 2.09 2.09 0.267 826.52 2.19 2.19 ANTIFLOTATION BLOCK CALCULATION WELLESLEY - ST. LAWRENCE HOMES ANTIFLOTATION BLOCK (POND 1) CROSS-SECTION AREA OF RISER INTERIOR= 12.56 SF RISER HEIGHT= 5.75 FT VOL. OF INTERIOR OF RISER= 72.22 CF WT. OF H2O DISPLACED BY RISER INTERIOR= 4507 # WT. OF CONC. NEEDED (1.15 FS)= 5183 # THICKNESS OF CONC. BASE= 2.00 FT SIDE LENGTH OF CONC. BASE= 6.00 FT AREA OF CONC. BASE 36.00 SF WT. OF CONC. BASE= 6307 # FACTOR OF SAFETY= 1.40 ANTIFLOTATION BLOCK (POND 2) CROSS-SECTION AREA OF RISER INTERIOR= 12.56 SF RISER HEIGHT= 4.25 FT VOL. OF INTERIOR OF RISER= 53.38 CF WT. OF H2O DISPLACED BY RISER INTERIOR= 3331 # WT. OF CONC. NEEDED (1.15 FS)= 3831 # THICKNESS OF CONC. BASE= 1.50 FT SIDE LENGTH OF CONC. BASE= 6.00 FT AREA OF CONC. BASE 36.00 SF WT. OF CONC. BASE= 4730 # FACTOR OF SAFETY= 1.42 Y } C ' a U = L >% l0) w aN O€ CM U U ci a co m NO'O E-S r ?j cad 'S'j Q ui o? m o 3?Y QEE 0o UQma ` w<o m d 0 E d O ¢ U m? .Z ? m g itaa cc M r-? d ;> 00 3 N o fLJ O rI Ln Ln E' Ir O 0 CO 0 0 .m a a U-1 0 O C`- Z N 1yn. v I` WAY x? of w a U) 0 z D x r »r N v c co ? T cc W co c .c a a) N a a? c a) Cl) T 0 c ? N a L ? C V O I ?wc°n r nom- N on b U z a) C13 Q 0 U n u 7, .2 N C-) I'll ct N ce