Loading...
HomeMy WebLinkAbout20180007 Ver 2_Oct Inspection_20181004Wetland Inspection Report Project Num: 20180007 Version: 2 Project Name: NCDOT - I-85/SR 1221 Interchange (I-3804) County: Rowan Location: NCDOT - I-85/SR 1221 Interchange (I-3804) Latitude: +35° 31' 56" SW Plan Location Site Owner Name NC DOT Division 9 Inspection Date: 10/3/2018 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: � Permit (401 WQC) Inspection Summary: Project is currently in compliance. Title: ❑ Not Compliant Status: Issued Project Type: New Road/Highway Region: Winston-Salem Longitude: -80° 34' 26" Phone: Phone: 336-776-9703 page: 1 Site Number: 20180007 Inspection Date: 10/3/2018 Owner: Tippett, Lyndo Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? �❑❑❑ Are the culverts and/or filled areas installed properly? �❑❑❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? �❑❑❑ Comment: DOT staff, DEO and myself reviewed Site 1 A to determine sediment impacts related to recent floodinq. Floodinq caused water to backup into EC devices which in turn discharqed to the wetland Site 1A. All sediment will be removed followinq construction and the wetland returned to oriqinal elevations. Other sites were reviewed but were still under construction and impacts not finalized. page: 2