Loading...
HomeMy WebLinkAboutWQ0034603_Correction_20100924A g4,7 &L*Ak ,= HCDENk North Carolina Department of Environment and Natural R. -sources -Beverly Eaves Perdue Governor Mr. Lee Willmon — HSE Manager Novartis Vaccines & Diagnostics Inc. 475 Green Oaks Parkway Holly Springs, North Carolina 27540 Dear Mr, Willmon: Division of Water Quality Coleen H. Sullins Directo!- September 24, 2010 Dee Freeman Secretary Subject: Correction WQ0034603 Novartis Vaccines & Diagnostics Facility Conjunctive Reclaimed Water System Wake County In accordance with your email request on September 19, 2010, we are forwarding herewith a correction to Permit No., WQ0034603, issued April 15, 2010 to Novartis Vaccines & Diagnostics Inc. Condition 111.2. on Page 4 has been corrected to state that "At the time of permit issuance, a certified ORC is not required for conjunctive reclaimed water users". Please replace Page 4 in the existing permit with this corrected Page 4. If you need additional information concerning this matter, please contact me at (919) 715-6187 or lori.montgomery@nedenngov. Sincerely, Lon A. Montgomery, P Environmental Engineer cc: Raleigh Regional Office, Aquifer Protection Section Permit File WQ0034603 Notebook File WQ0034603 AQUIFEP, PRO'ECTIOv' SECTION 1636 !Jail Service Gente% Raleigh. Norte Carolina 27699-1636 Lccatiar.: 2725 CaFild BWevard. Raieigh, North Carotina 27604 Phone: 919-733.32211 FAX 1: 917-7:5-058,1: FAX 2: 919-715-6045'k Customer Service: 1-E77.623-5745 Internet: wwrv.ncwatemuafitv.oro Ac Ec.,al C"PPr- .ir .,. I fifTLL ;,, xn JrnloyE-- 0110 NoitiCarol na. ,AWIM7 4 9. Reclaimed water distribution lines shall meet the separation distances to sewer lines in accordance -with Rule .0305 of Subchapter 02T. 10. The compliance and review boundaries are established at the reclaimed water utilization area boundaries. Any exceedance of standards at the compliance or review boundary shall require action in accordance with 15A NCAC 02L .0106. 11. The Permittee shall apply for a permit modification to establish a new compliance boundary prior to any sale or transfer of property affecting a compliance boundary. 12. In accordance with 15A NCAC 02L .0107(4), no wells, excluding Division approved monitoring wells, shall be constructed within the compliance boundary except as provided for in 15A NCAC 02L .0107(g). 13. The facilities permitted herein shall be constructed according to the following setbacks: a. The setbacks for reclaimed water utilization sites permitted after September 1, 2006 shall be as follows (all distances in feet): i. Surface waters not classified SA: ii. Surface waters classified SA: iii. Any well with exception to monitoring wells 25 100 100 b. The setbacks for storage and treatment units permitted after September 1, 2006 shall be as follows (all distances in feet): i. Any habitable residence or place of public assembly under separate ownership: 100 ii. Any private or public water supply source: 100 iii. Surface waters: 50 iv. Any well with exception of monitoring wells: 100 v. Any property line: 50 111. OPERATION AND MAINTENANCE REQUIREMENTS The facilities shall be properly maintained and operated at all times. The facilities shall be effectively maintained and operated as a non -discharge system to prevent the discharge of any wastewater resulting from the operation of this facility. The Permittee shall maintain an Operation and Maintenance Plan pursuant to 15A NCAC 02T .0913, which at a minimum shall include operational functions, maintenance schedules, safety measures and a spill response plan. 2. Upon the Water Pollution Control System Operators Certification Commission's (WPCSOCC) classification of the subject non -discharge facilities, in accordance with 15A NCAC 080 .0200 the Permittee shall designate and employ a certified operator in responsible charge (ORC) and one or more certified operator(s) as backup ORC(s). The ORC or their back-up shall visit the facilities in accordance with 15A NCAC 08G .0200, and shall comply with all other conditions specified in the previously cited rules. At the time of this permit issuance, a certified ORC is not required for conjunctive reclaimed water users. 3. A suitable year round vegetative cover shall be maintained on the irrigation areas at all times, such that crop health is optimized, allows for even distribution of reclaimed water and allows .inspection of the reclaimed water irrigation system. 4. Adequate measures shall be taken to prevent reclaimed water ponding in or runoff from the reclaimed water irrigation areas listed in Attachment B. WQ0034603 Version 1.0 Shell Version 100209 Page 4 of 7