HomeMy WebLinkAboutWQ0034195_FP AttB_20130725NCDENR
North Carolina Department of Environment and
Division of Water Quality
Pat McCrory Thomas A. Reeder
Governor Acting Director
July 25, 2013
MR. MARSHALL PURYEAR - TECHNICAL SERVICES DIRECTOR
SYNAGRO CENTRAL, LLC
284 BOGER ROAD
MOCKSVILLE, NORTH CAROLINA 27028
Dear Mr. Puryear:
Natural Resources
John E, Skvarla, III
Secretary
Subject: Attachment B Certification
Permit No. WQ0034195
Synagro Central, LLC Residuals
Land Application Program
Pittsylvania County, VA
In accordance with a permit modification request received from the City of Danville on May 30,
2013, and subsequent additional information received July 10, 2013, we are forwarding herewith a
modified Attachment B, certified July 25, 2013, to Synagro Central, LLC for the subject residuals land
application program.
This certification is being issued to modify Attachment B by removing the land application sites
NC -CS -10, NC -CS -12, NC -CS -14, and NC -CS -15 from Synagro Central, LLC residuals Iand application
program per the land owner request to transfer these fields to the City of Danville residuals program
(WQ0036561).
Please replace the existing Attachment B of Permit No. WQW34195 that was previously certified
on September 9, 2009, with this modified Attachment B. Note that it is the Permittee's responsibility to
ensure that a complete permit is created by inserting this modified Attachment B into Permit No,
WQ0034195, issued on September 9, 2009.
� � o
This modified Attachment B shall be effective from the date of certification; shall void
Attachment B of Permit No. WQ0034195 that was previously certified on September 9, 2009; and shall
be subject to the conditions and limitations as specified therein and well as those specified in the above -
referenced permit.
tf any parts, requirements, and/or limitations contained in this certification or modified
Attachment B are unacceptable, you have the right to request an adjudicatory hearing upon written
request within 30 days following receipt of the certification. This request shall be in the form of a written
petition, conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of
Administrative Hearings at 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such
demands are made, this permit shall be final and binding.
AQUIFER PROTECTION SECTION
1636 Mail Service Center, Raleigh, North Carolina 27699-1636
Location: 512 N. Salisbury St., Raleigh, North Carolina 27604
Phone: 919-807-64641 FAX: 919-807-6496
Intemet: htto:!/oorol.nodenr.Grafweblw Ig cps
An Equal Opportunityf Affirrwivektlon Employer
One
NorthCaroli.na
Natffiraliff
Mr. Marshall Puryear
July 25, 2013
Page 2
If you need any additional information concerning this matter, please contact Chonticha
McDaniel by telephone at (919) 807-6337 or via e-mail at chonticha.mcdaniel@ncdenr.gov.
Sincerely,
Thoma' s A. Reeder
cc: Caswell County Health Department
Winston-Salem Regional Office — Aquifer Protection Section
APS Permit File WQ0034195
Notebook File WQ0034195
ATTACHMENT B - Approved Land Application Sites
Synagro Central, LLC
Certification Date: July 25, 2013
Permit Number: WQ0034195 Version: 1.4
Field/ Site
Owner
Lessee
County
Latitude
Longitude
Net Acreage
Dominant
Soil Series
Footnote
NC -PS -1-1
Sidney Thompson
Person
36030'22"
79°07'54"
99.1
Fairview (Fa133)
a
NC -PS -1-2
Sidney Thompson
Person
3630'16"
7907`27"
57.6
Toast (ToB)
NC -PS -1-3
Sidney Thompson
Person
36030'36"
79008'06"
20.3
Fairview (FaB3)
NC -PS -1-4
Sidney Thompson
Person
36°30'47"
79008'01"
41.2
Fairview (FaB3)
NC_PS-1-5
Sidney Thompson
Person
36030'57"
79°OT27"
24.2
Fairview (FaB3)
NC -PS -1-6
Sidney Thompson
Person
36°31'31"
79°44`28"
86.8
Toast (ToB)
NC -PS -1-7
Sidney Thompson
o
Person
36°31'26"
79°07'30"
30.2
Fairview (FaB3)
NC -PS -1-8
Sidney Thompson
Person
36031'54"
79008'52"
15.9
Clifford (CMB)
b
NC -PS -1-9
Sidney Thompson
Person
36032'06"
79007'37'
24.6
Clifford (CMB)
NC -PS -1-10
Sidney Thompson
Person
36°31'53"
79014'36"
74.1
Clifford (CMB)
c
NC -PS -1-11
Sidney Thompson
Person
36031'57"
79°06'53"
30.2
Clifford (CMB)
d
NC -PS -1-12
Sidney Thompson
Person
36032'19"
79007'14"
31.3
Clifford (CMB)
Total
1
535.5
aA redefined compliance boundary has been approved for field NC -PS -1-1 due to the location of an on-site well. The re -defined compliance boundary is located in the northeast portion of field NC -
PS -1-1. The 100 -ft setback between wells and the land application area(s) must still be met.
'A redefined compliance boundary has been approved for field NC -PS -1-8 due to the location of an on-site well. The re -defined compliance boundary is located on the northeast side of field NC -PS -1-
8. The 100 -ft setback between wells and the land application area(s) must still be met.
`A redefined compliance boundary has been approved for field NC -PS -I-10 due to the location of an on-site well. The re -defined compliance boundary is located on the northest side of field NC -PS -1-
10. The 100 -ft setback between wells and the land application area(s) must still be met.
dA redefined compliance boundary has been approved for field NC -PS -I -I I due to the location of an on-site well. The re -defined compliance boundary is located in field NC -P5-1-11, slightly south of
the intersection of Barker Road and Virginia Line Road. The 100 -ft setback between wells and the land application area(s) must still be met.
Page 1 of 1