Loading...
HomeMy WebLinkAbout20040665 Ver 1-_COMPLETE FILE_20040422Carolina Wetland services August 19, 2004 WETLANDS/ 401 GROUP Mr. Ed Schwartzman AUG 2 0 2004 NCDENR - Division of Water Quality Wetlands Unit WATER QUALITY SECTION 2321 Crabtree Blvd. Raleigh, NC 27604-2260 Subject: Additional Information regarding Storm Water Treatment 24-Acre University Crossing Site Charlotte, North Carolina Carolina Wetland Services Project No. 2003-0424 DWQ # 04-0665 Dear Mr. Schwartzman: On behalf of our client REALTICORP, Carolina Wetland Services, Inc. (CWS) is submitting this letter in response to your request for additional information in a letter dated May 6, 2004, regarding the 24-Acre University Crossing Site (DWQ#04-0665) located in Charlotte, North Carolina. We are submitting seven copies of this letter and the conceptual Storm Water Management Plan for the site. Gray Engineering is developing the Storm Water Management Plan according to the NCDENR Manual for this project that will incorporate a wet pond and avoid impacting on-site jurisdictional wetland areas. Based on the results of our analysis, using an on-site floodplain wetland for storm water treatment is not feasible. Please see the attached conceptual SWMP plan view and a cross section of the proposed Wet Pond for your review. Please don't hesitate to call me if you have questions concerning this project. Thank you for your attention to this matter. Sincerely, Greg ry . Antemann, PWS Principal Biologist E Attachments: Conceptual Storm Water Management Plan and Wet Pond Cross Section cc: Mr. Brian Rollar, REALTICORP Mr. Chris Price, Gray Engineering E 5000 Nations Crossing Road, Suite 230 • Charlotte, NC 28217 • (704) 527-1177 Phone • (704) 527-1133 Fax i \1 www.carolinawetlandservices.com F A?f, JCB NAME JOB NUMBER r GE NO. UNIV S ITY &os.???vG 2yvo7? JOB CESCAIPTiON // BY DATE T6F'lt-IV770A/ C??t/Cr?'?" ?L+ 07/ INC./ 1 C-2 Pi I cgnni Fcad! Groiznvii,,-, ??, '07 ? (iv i 1) 7-30027 i .W ,?,:? _;n., ,Y 1 +?? _, ;; ?' ?- ?--- ?', ? ? ? 1 ? \ ? ? `1'` ,l , `?? ?T' >' ??? ??? ? u i ? LJ J? ? U? '' ? 1? ?'? 1 ? \ ,, , ;, ^?? ?`??? ? L. ?;???? ? ??? J ? , ?\\ \\ q ,1 1 '` ??? ? :1? '? \?\A???V 'd ?? ??1 It V\ ??;? li ?? ,,;???? ,,, .... ._ ._ ___ _ ?. _ ,V ? ?A 1 ?, ? ? x i \ ?\\ ?, ? , 1 ?_ /1 ?1 7 \\\\\\ ? / ? ? i 1 l~ ? ?, ? / o- .?-?` ,r ,,,.? !' `,? ?, l :- '? '`_, ,.¢ •; ?- ,,a -.;.?? _. ;? Carolina Wetland services August 19, 2004 WETLANDS/ 401 GROUP Mr. Ed Schwartzman NCDENR - Division of Water Quality A UG 2 0 2004 Wetlands Unit 2321 Crabtree Blvd. WATER QUALITY SECTION Raleigh, NC 27604-2260 Subject: Additional Information regarding Storm Water Treatment 24-Acre University Crossing Site Charlotte, North Carolina Carolina Wetland Services Project No. 2003-0424 DWQ # 04-0665 Dear Mr. Schwartzman: On behalf of our client REALTICORP, Carolina Wetland Services, Inc. (CWS) is submitting this letter in response to your request for additional information in a letter dated May 6, 2004, regarding the 24-Acre University Crossing Site (DWQ#04-0665) located in Charlotte, North Carolina. We are submitting seven copies of this letter and the conceptual Storm Water Management Plan for the site. Gray Engineering is developing the Storm Water Management Plan according to the NCDENR Manual for this project that will incorporate a wet pond and avoid impacting on-site jurisdictional wetland areas. Based on the results of our analysis, using an on-site floodplain wetland for storm water treatment is not feasible. Please see the attached conceptual SWMP plan view and a cross section of the proposed Wet Pond for your review. Please don't hesitate to call me if you have questions concerning this project. Thank you for your attention to this matter. Sincerely, Greg ry . Antemann, PWS Principal Biologist Attachments: Conceptual Storm Water Management Plan and Wet Pond Cross Section cc: Mr. Brian Rollar, REALTICORP > Mr. Chris Price, Gray Engineering 5000 Nations Crossing Road, Suite 230 • Charlotte, NC 28217 • (704) 527-1177 Phone • (704) 527-1133 Fax I! \? www.carolinawctIandserviccs.com n +, 1?1 + Al un 'un l t 1 \\\/ T ?fwi \ '\\\\ .} YA t »-?-may c XG NAME JOB NUMBER PAGE NO. JOB CESCRIPTICN // BY GATE T6F-, t?v77oN t?.v?cPT' G?,,,? 07/? U;;_a`I ..?Ic- INE.tinlt',la .. Imo. / 132 Pi,crim Fcad / Grp anvil Carolina wetland services August 19, 2004 Mr. Ed Schwartzman WETLANDS / 401 GROUP NCDENR - Division of Water Quality A UG 2 0 2004 Wetlands Unit 2321 Crabtree Blvd. WATER QUALITY SECTION Raleigh, NC 27604-2260 Subject: Additional Information regarding Storm Water Treatment 24-Acre University Crossing Site Charlotte, North Carolina Carolina Wetland Services Project No. 2003-0424 DWQ # 04-0665 Dear Mr. Schwartzman: On behalf of our client REALTICORP, Carolina Wetland Services, Inc. (CWS) is submitting this letter in response to your request for additional information in a letter dated May 6, 2004, regarding the 24-Acre University Crossing Site (DWQ804-0665) located in Charlotte, North Carolina. We are submitting seven copies of this letter and the conceptual Storm Water Management Plan for the site. Gray Engineering is developing the Storm Water Management Plan according to the NCDENR Manual for this project that will incorporate a wet pond and avoid impacting on-site jurisdictional wetland areas. Based on the results of our analysis, using an on-site floodplain wetland for storm water treatment is not feasible. Please see the attached conceptual SWMP plan view and a cross section of the proposed Wet Pond for your review. Please don't hesitate to call me if you have questions concerning this project. Thank you for your attention to this matter. Sincerely, Greg ry . Antemann, PWS Principal Biologist Attachments: Conceptual Storm Water Management Plan and Wet Pond Cross Section cc: Mr. Brian Rollar, REALTICORP Mr. Chris Price, Gray Engineering l 5000 Nations Crossing Road, Suite 230 • Charlotte, NC 28217 • (704) 527-1177 Phone • (704) 527-1133 Fax www.carolinawetlandserviccs.com i 'x 'a 3 d s+ \X \, ; \! 11 , h JCU NAME JCB NUMBER PAGE NO. JCB BESCRIPTICN BY BATE T677- -,UVON 6?vccP7- /,",p °'? a G%.'?'? " IGIA3r?.:31,1G r.C?14.5 ;?.:.•., , . ?,, ?. ! 1.:?. .cr;;,i Fcad/ Gr anvil ,,, -? , 0 , (36») 2977-302' Carolina Wetland Services August 19, 2004 Mr. Ed Schwartzman NCDENR - Division of Water Quality Wetlands Unit 2321 Crabtree Blvd. Raleigh, NC 27604-2260 Subject: Additional Information regarding Storm Water Treatment 24-Acre University Crossing Site Charlotte, North Carolina Carolina Wetland Services Project No. 2003-0424 DWQ # 04-0665 Dear Mr. Schwartzman: On behalf of our client REALTICORP, Carolina Wetland Services, Inc. (CWS) is submitting this letter in response to your request for additional information in a letter dated May 6, 2004, regarding the 24-Acre University Crossing Site (DWQfl04-0665) located in Charlotte, North Carolina. We are submitting seven copies of this letter and the conceptual Storm Water Management Plan for the site. Gray Engineering is developing the Storm Water Management Plan according to the NCDENR Manual for this project that will incorporate a wet pond and avoid impacting on-site jurisdictional wetland areas. Based on the results of our analysis, using an on-site floodplain wetland for storm water treatment is not feasible. Please see the attached conceptual SWMP plan view and a cross section of the proposed Wet Pond for your review. Please don't hesitate to call me if you have questions concerning this project. Thank you for your attention to this matter. Sincerely, Greg ry . Antemann, PWS Principal Biologist Attachments: Conceptual Storm Water Management Plan and Wet Pond Cross Section cc: Mr. Brian Rollar, REALTICORP tQ Mr. Chris Price, Gray Engineering ll 5000 Nations Crossing Road, Suite 230 • Charlotte, NC 28217 • (704) 527-1177 Phone • (704) 527-1133 Fax ?! ?l www.carolinawetlandservices.com r? 'U) `b '., ..r -_ ? ,111, •\ `? 0 t? u n t 1 ? , \t \ ; PPP l . 1A 5 t X0 NAME JOB NUMBER PAGE NO. 611v1V&ys 1r(t oS.Sive Z`?va7a J00 DESCRIPTION BY 0A, E ;P6Fjr6-;V 770 t/ C ?.vLcP7- Z-111P lloyellv? i rt1(.71 t It J t., i r Ir ? P17S, ,.1:? 'M. . 1 ^,'f eftc venvi l? 1 .,?, '16'.) '21071-3027, r,;?:.'??3?,r? .3 i.? ;a 'i.T>?., / ..? ..ri;.i Rcad/ Gr -SC ;.:.?7,' (? _ Carolina Wetland Services August 19, 2004 WETLANDS 1401 GROUP Mr. Ed Schwartzman NCDENR-Division of Water Quality AUG 2 0 2004 Wetlands Unit 2321 Crabtree Blvd. Rale WATER QUALITY SECTION Raleigh, NC 27604-2260 Subject: Additional Information regarding Storm Water Treatment 24-Acre University Crossing Site Charlotte, North Carolina Carolina Wetland Services Project No. 2003-0424 DWQ # 04-0665 Dear Mr. Schwartzman: On behalf of our client REALTICORP, Carolina Wetland Services, Inc. (CWS) is submitting this letter in response to your request for additional information in a letter dated May 6, 2004, regarding the 24-Acre University Crossing Site (DWQ#04-0665) located in Charlotte, North Carolina. We are submitting seven copies of this letter and the conceptual Storm Water Management Plan for the site. Gray Engineering is developing the Storm Water Management Plan according to the NCDENR Manual for this project that will incorporate a wet pond and avoid impacting on-site jurisdictional wetland areas. Based on the results of our analysis, using an on-site floodplain wetland for storm water treatment is not feasible. Please see the attached conceptual SWMP plan view and a cross section of the proposed Wet Pond for your review. Please don't hesitate to call me if you have questions concerning this project. Thank you for your attention to this matter. Sincerely, (' Greg6ry C. Antemann, PWS Principal Biologist I Attachments: Conceptual Storm Water Management Plan and Wet Pond Cross Section cc: Mr. Brian Rollar, REALTICORP Mr. Chris Price, Gray Engineering i 5000 Nations Crossing Road, Suite 230 • Charlotte, NC 28217 9 (704) 527-1177 Phone • (704) 527-1133 Fax I.\1 www.carolinawctlandscrvices.com T JCO NAAAE JOB NUMBER PAGE NO. U1v1l/6,,?-vs rTY ?.Voo73 JCB CESCRIPTICN oo C??VGcP7^ ey DATE TAT 7ON e Up 07e o ` I -3021 r•/ r:a t It l+ r"I !q i -\\?..., !..gi,p....,/ ...?. 11=2 C;t Fcad/ Gr3• 1? Z ' '8 ?.) 2i "; .,.? G?:.1, "IU13?E;.3? i.? I \i,a....,.?.., i ,wi L,,, ??. 2....?. ?7 , (c,?>.? ? i Carolina Wetland Services August 19, 2004 WETLANDS/ 401 GROUP Mr. Ed Schwartzman AUG 2 0 2004 NCDENR - Division of Water Quality Wetlands Unit WATER QUALITY SECTION 2321 Crabtree Blvd. Raleigh, NC 27604-2260 Subject: Additional Information regarding Storm Water Treatment 24-Acre University Crossing Site Charlotte, North Carolina Carolina Wetland Services Project No. 2003-0424 DWQ # 04-0665 Dear Mr. Schwartzman: On behalf of our client REALTICORP, Carolina Wetland Services, Inc. (CWS) is submitting this letter in response to your request for additional information in a letter dated May 6, 2004, regarding the 24-Acre University Crossing Site (DWQ#04-0665) located in Charlotte, North Carolina. We are submitting seven copies of this letter and the conceptual Storm Water Management Plan for the site. Gray Engineering is developing the Storm Water Management Plan according to the NCDENR Manual for this project that will incorporate a wet pond and avoid impacting on-site jurisdictional wetland areas. Based on the results of our analysis, using an on-site floodplain wetland for storm water treatment is not feasible. Please see the attached conceptual SWMP plan view and a cross section of the proposed Wet Pond for your review. Please don't hesitate to call me if you have questions concerning this project. Thank you for your attention to this matter. Sincerely, Greg 6ry C. Antemann, PWS Principal Biologist Attachments: Conceptual Storm Water Management Plan and Wet Pond Cross Section cc: Mr. Brian Rollar, REALTICORP Mr. Chris Price, Gray Engineering 5000 Nations Crossing Road, Suite 230 • Charlotte, NC 28217 • (704) 527-1177 Phone • (704) 527-1133 Fax \1 www.carolinawetlandscrvices.com I.A w ( 1V0 N. mo, t t _ Y? + JC6 NAME JCB NUM©EA PAGE N0. 611VI?en ir?? o?.?i?ve Zyoo7c? JCO OESCAIPTiCP4 / 9Y OATE i Czt^.'a , IGIA? ..,. 1.! a (;C ?;.a ; .. , ? ?,, !; :.. 3^ ?il,, , ??:, i^ j-? ? ???:+) ??n ? ., E' E-q " G ?'r"?. i ; ,17,S N ! 1 crirm Rcad / Gr-oenvil a 027 Carolina Wetland Services August 19, 2004 WETLANDS/ 401 GROUP Mr. Ed Schwartzman NCDENR - Division of Water Quality AUG 2 0 2004 Wetlands Unit 2321 Crabtree Blvd. wAIER QUALITY SECTION Raleigh, NC 27604-2260 Subject: Additional Information regarding Storm Water Treatment 24-Acre University Crossing Site Charlotte, North Carolina Carolina Wetland Services Project No. 2003-0424 DWQ # 04-0665 Dear Mr. Schwartzman: On behalf of our client REALTICORP, Carolina Wetland Services, Inc. (CWS) is submitting this letter in response to your request for additional information in a letter dated May 6, 2004, regarding the 24-Acre University Crossing Site (DWQ#04-0665) located in Charlotte, North Carolina. We are submitting seven copies of this letter and the conceptual Storm Water Management Plan for the site. Gray Engineering is developing the Storm Water Management Plan according to the NCDENR Manual for this project that will incorporate a wet pond and avoid impacting on-site jurisdictional wetland areas. Based on the results of our analysis, using an on-site floodplain wetland for storm water treatment is not feasible. Please see the attached conceptual SWMP plan view and a cross section of the proposed Wet Pond for your review. Please don't hesitate to call me if you have questions concerning this project. Thank you for your attention to this matter. Sincerely, "c'; C. Antemann, PWS Principal Biologist Attachments: Conceptual Storm Water Management Plan and Wet Pond Cross Section cc: Mr. Brian Rollar, REALTICORP Mr. Chris Price, Gray Engineering 5000 Nations Crossing Road, Suite 230 Charlotte, NC 28217 (704) 527-1177 Phone (704) 527-1133 Fax I' \1 www.carolinawetlandservices.com TVA 1 S - F t JGO NAME JC0 NUMBER PAGE NO. JCB CESCRIPMN BY OAic T?7?770Al /1"P o?V//o GRAY rep(GINrZ 2 I r•i?i `a,..... I??;. , 1?n ?{I J GmSnvil;a, _?. ..n r„ 7 (264) :??7 ",! a t crri Rc. .^0 , r i \ I I I I r~, ~ ~ ~ \ \ \ \ ~ ~ I I III 11 \ ~'I I 1 ~ III 11 ~ / / / / / ~ ~ I I I 1 1 ~ 1 ~ ~ ~ 1 I ~ ~ V ~ ~ A ~ ~ ~ ~ ~ ~ , / / / / , , ! I I ~ ~ 1 ~ ! / / / / / ~ / / / I 1 ~ II 1 ~ ~ ~ V ~ \ ~ / / I I ~ / / / ~ / i ~ ~ 1 \ V ~ II III I A ~ I I i ~ I III I / ~ ~ ~ \ ~ ~ ~ I II II II A1V1`_~ I 111 ~ I ~II I \ 1 / / / I I 1 I I I I I I 1 1 / ~ A 1 \ 1 ~ ~ ~ ~ ~ ~ ~ / / ! ! ! l 1 I ~ ! / / / i ! l l / 1 I I ! ! 1 1 1 1 ~ ~ ~ ~ ~ _ i ~ / / ! l I l ~ / / i / , ~ ~ / 1 1 V A ~ ~ I 1 II Illlllll \V1111 I J II II ' V I IIII `III - ~ ~ ~ v ~ ~ II II I 0 I I I ~ 1 V A ~ 1 I I III 1 ~I I 1 1 I I I I / I I I ~ 1 ~ ~ / ! ~ ~ ~ I ~ - / ~ ~ / ~ ~ v v ~ ~ v III, IIII v ~ II tl1 1 II ;Ih v / / 1 ! I ~ ~ ~ ~ ~ 1 / ! r , / l l , ! 1 1 / , , ~ ~ / ~ \ ~ , l / ~ / / ~ 1 1 V~ i I~ ~ 1 ~I ~ ~ A V I I! ~ I ~ I ! l ! ! 1 / I l l l I 1 ! l 1 , 1 111 I I ~ I ~ ~ I ~ ~ ~ ~ ~ ~ / ~ / / l ~ . ~ 1 ~ / i / \ ~ - _ ~ / / 1 l / / 1 I l l l I I 1 _ - i , - - _ I ~ ~ ~ / / / / / / I I ~ ~ ~ I CJ \ \ A A \ ~ \ \ II i I 1 \ ~ i' I i ~ ~ I I„ \ \ ~ ~ I I 'i / / / / / ~ / i ~ ~ / ~ 1 / / / / / / / ! ! / 1 I I ~ l ~ ~ ~ / / V ~ ~ ~ V~ ~ ~ \ V / / , I i ~ ~ 1 V I 1 ~ / / / l I 1 / ~ ~ ~ ~ ~v v ~ i ~ / / / l I I ~ ~ I ~ ~ ~I 1 I ~ 1 \ \ ( I / / / / / l 1 I I I 1 'V ~ ~ ~ I ~ \ I 1 II I I ~ ~ ~ v I I I/ I I I 1 ~ I , , ~ / / / I ~ 1 ~ ~ ~ , - ~ ~ ~ / / / I I i - ~ ~ A I I I I I 1 II I I I I I ~ ~ 1 ~ ~ 1 / ~i i ~ i A I 11 i I ~ IIl I I / / / / / / / / ~ 1 ~ I I ~ V V~~~ V~~A~~~~ / i - ~ / / 1 .I, , , II 1 I I :I / / / ~ ~ I I 11111/ / / ~ Ir~~l I II ~ , hl ql II ~ I I Ir I I ~ ~ I ~ ~ A ~ l ~ I ~ ~ i ~ \ 1 ~l l1 / / l `A ~~~'I` ~ ~ I I 1 1 1 ` ~t' ~ I 1111 ~ 11 I I i ~ V 1 I V 11 lI III I ~ I I I I i I I l Ill l l ~ ~ i 1 ~ 1 1 I I I 1 1 ~ I «I 1 / I I i ~ ,I / I I I 111 11 I l I III I i V + I ~ ~ ~ ~~i ~ i ~ ~i~ ~i~ l ~ i/ / / / i~ 11 1 it ~ ~ i ~ ~ ~ 1 ~ ~ ~ ~ I 11 1 1 I ~ ,1 r I IIII -I- 1 l 1 1 i ~ 1 1 I ( ~ 11111 I v I l + 1 >l ~ I 1 1 I I 1 1 + 1 v - I I l 11 11 1 , I 1 V I I I I 1 I 11 I I I ~ ~ /,,r I , I, , , , 3 v I ~ III - + + V ~ I I 111111,11 Il I (11111 I 1 I ~ I I I I( I I I ~ I / ~ I I / III I ~ l ~ ~ / ~ / 1 ~ ~ / ~ 1 + 1 I ~ / , - i ~ ~ ~ ~ ~ I "J ~ ~ ~ 1 l 111 I III l III ~ 1 I I I I I I I 1 I ~ I ~ 1 IIII 1 1 , ~ ~ ~ ~ ~ i ~ I ~ ? ~ 1 ~ i ~ _ ~ ~ I ~ _ _ ~ l I I ~ i ~ ~ ~ I ~ ~ ~ ~ ~ ~ I 1 ~ I 11 I 1 1 ~ 1 I i' I J 1 I I I 111 1111 v`,~ ~ ~ vvvI i'1 I! III I r 1 I I \ ~ ~ ~ I ~ ~ ~ ~ ~ ~ .f ~ i ~ ~ / ~ ~ ~I I ~ / ~ ~ I I ~ ~ / I I' 1 1 ~ ~ A ~ ~ ~ I A l I I I l 1111111 I „j~ 1 l I 1! VIII I III ;I I l ~ 1 I I I !I 11 1 I~ \ I 111 II111 t VIII II 'IIII I \ ~ ~ ~ I I I \ ~ 0 / i I I ~ , / ~ ~ ~'1 II 1~ ~ I ~ ~ ~ ~ i 1 - 1 I ~ \ I I 11 11111 III 1, 'I 1. AA ll ~ I I I III Il I I I I V I III ~ III I \ I I 1 I ~ ~ A ~ I I I I I I I I / ~ ~ I 1 A I Illnlll v / I ~ II X 1 1 III I~ 1 1 III. 111 1 I ~ I I 111 II I III I I I I\ 1 ' l III I i I 111 ~ I I I / / I / / ! I ~ I ~ ' 1 1 1 / / / 1 ~ ~ ! I ' i 1 I ~ I ~ 1 / I I ~ ~ ~ i ~ ~ 1 ~ ~ _ ~ I I III I I I I 11 ~ I h I I I I II •1 1 A ~ I I 11f111111 l I II I I I 1111 I ~ I I I i Ill 111 I / / , ~ l / / I I I ; I 1 1 + I ~ ~ - / ~ ~i ~ / / I ~ I / I ~ ~ ~ I ~ A rr__ / ! / / / I I I ~ ~ `CJ ~ 1 / III I1 I ' / / I II II~\ I I Ill I I l II~ I / I ~ I ~ / l l 1 1 1 I ~ I : II I I ~ ~ / I II I ~ I I I I ~ I F+ 1 I I / / I + ~ I _ 1 / I ~ 1 ~ I ~ I I III 11 I 1 1 I I I I l I 1 I I I l 1 1 III I ~ ~ 111 111 I I i ~ 1 I II I 1 i/ I l / I~ I I I III II I l 1 ~ V I l l I. I l i l 1 II I 1 ~ ~ V ~ I I I l 1 1 I / / / / I ~ ~ 1 I ~ _ ~ ~ 1 / / / ~ ~ / I ~ ~ ~ / ~ / v ~ \ 1~ I r 1 1 I I I tl, 11 1 ~ ~ ~ ~ ~ I I l IIII I I l l 1 l 1 1 1 I 11 l l l ~ IIII I I V 1 ~ 11 I I I~ I~ I 1 1 i 1 1 I 0 ~~11~ I 1 I 1 I / / / I I 1 ~A / ~ ~ I I I / / / / / /.I ~ / 1 I_ ~ ~ / i , ~ / / I ( / 1 I / / / / / / / 1 / ~ i I ~ ~ ~ ~ / V I ~ / / ~ ~ v ~ ~ I I I II l i I I I I i I I I III ~ 1 1 ~ i I I I 1 l V l I! V~ 1 I I I I ".J tl! a I I I i ~ A ~11j 11 i~ l 11 I I I I A I I v/ l 1 l l 1 I I III III I i I / / / ~ ! I I V 1 ~ ~ / - I I I l / ~ / / / , ! ~ ~ ~ ~ / , l I ~ ~ ~ ~ ~ ~ I I I V I I A V I~ ~ I III I II ~ I / ! 1 I / / l / / l I ! I ! ~ I I ~ - ~ 1 / ~ i ~ j1111 ~ ~ ~ l \ I I 1 I I \ 1 ~ ~ ~ vI 111 111 l I 1 111 1111 ~ - - ~ ~ ~ l1l 1 ~ 1 1 \ \ \ ~ I l ` ~ , ~ ~ ~ ~ I II 1 111111 ~ III I / ~ llld i I 1 1 1 / / / I I I ! 11 ~ I / ~ I //11 I I ~ ~ v I 1 v 1 1, ~I IIII ~ t 1 11111'• 111 I / ~ ~ ~ i~ / ~ / ~ I I 1 ~ \ ~ ,~v1 I / 11 I III ~ ~ ~ ~ 11 11 I I / / I ` n I ~ ~ ~ ~ / 1 ! ! ~ ! ~ / 1(I I I I I I II / / / ~ ~ ! 1 ~ ~ / ~ / ~ / i 1 1 1 I I 11 II ~ I 11111 I / ~ V ~ / l / ~ I 1 I I \ ~ 111 I 1 / III (IIII ~ ~ 1111 i 11 I 1 ! / , / / / ~n 11 r l I I 1 ~ I I 2~ / r~ / i / A ~ I I V I i V ~ l 1 / I I I I ~ III I/ l IIl 1 ~ II ~ III I ~ _ ~ / ~ / 1 1 1 I 1 A i I 1 I 1j / I 111v~ A A I 11111 i Ill 1 I l l/ / l I !I I ! I ! 1 ~c ~ ! l l , ill + , 1 + 1 ti~ 1 I ~ ~ ~ ~ ~ ~ i / ~ ~ / I I l I 1 1 1 I I I / \il I ~ 111 ~II 11 . i ~ / / / I ~ ( 1 1~1 I1 \ / 1 I 1 I ~ ~.J' 111: 1 V~~~ i-- ~ / ~ / I I I 1 1 ~ I IIII Ill 1 ~ / i i / / i / ~l1 ~I I I l~ ~ ~ ~ ~ ~ l I , l% A,))~_Y~ r'~. 1 ~ ~ ~ ~ ~ V ~ V ~ / 1 A 1 i i ~ I I I~ 1 1 / \ / / ~ / / I I / / 1 I ` ~ 1111 I I j1 11 ~ / l / / ~il I Il I ! / I I_ \ ~ ~ 1~ i i i / / I I 1, ~ / I I I ~ 1 I I II 1 i l l it 1 I\ ~ ! 1111 I I P 1 I ! I ~ I I I "J I I 11 i i ~ ~ IIII / I / ~ \ l / / I \ 1~. ~ / I l/ ~,1 1 1 1111.1 1 I I ~ , , / / ~ ~ IIII I i / / 1 / ~ ~ - - / / / I I I I / ~ ~ i / ~ 1~ ~ ~ \ / ~ - I ~ 1 I \ / f ~ ~ ~ - - / ! ! I / ~ l l i I ~ 111 11111 1 / ~ ~ l / / / l 1 / 1 ~ 1 III 1 e 11 1 i/~ i~ / / i / A\ ~ ~i i / I l/ll I ~ ~ i I / 1 ~ I - l r I I / I 1 1~~~ ~ / / / / ~ ~ / / / ~ 11 / ~ I 11111 111 1 11 \ ~ ~ ~ _ i _ ~ l / _ 1 I ~ II 11 I ~ 1 , V ~ 1 1 / ~ / / ~ / / / l / _ ~ , ~ ~ V~\ I l l 11 I ~ 11 I I1 / / ~ / / ~ I ll'~ I ! / ~ ~ v ~ 1 ~ 1 I / / / / / / l I \ ,i l ~II I I 1111 A \ ~ I / / / ~l ~ 1 I % ~ / ~ I !II ~ / / 1 ~ ~ I _ ~ , 1 / / 1 l v ~ ~ I ~ _ / / / / / / / / I I I~ A / I X111 ll 1 1~ 11 ~ c~ ~ v ~ ~ ~I / ~ ~ / / / / / i l ~ I / 1 1 II I I 1 I J I ~ ~ ~ I! ~ 1 I ~ / ~ ~ II / I "J l ~ / III V ~ ~ ' ~ ~ II / / ~ I ~ ~ ~ ".1 I I / I I I I I \ \ ~ ~ I I ~ / ~ / ~ / / / < f_~ V / I I ~ IIII ' III I III 1 1 ~ ~ ~ ~ / ~ / I I ~ / _ t ~ ~ ~ I ~ \ \ ~ ~ ~ I 1 i / / SCI VIII A \ ~ ~ . ~ l / 1 / ~ ~ ~ I I II 111/ i~ 1 1 i / 111 ~ I ~ ~1 'V ~ 1 _ q~ ~ / 1 / I ~ / I i I ~ 'CJ ! ~ - - ~ ~ i l I l ~ l ! II III ~ ~ A / I ~ 1 I ~ / l l 1 ~ ~ ~ I 111111111 ~ i "J I (11 ~ 11 I 1 ~ 1 I I i I I I II,,~~ I I~ 1 ~ - - - - - + / ~ l ll 1 ~ ~ 1 ~ ~ ~ ~ + I ~ I / / / 1, CJ I ~ ~ J ~ / O C,1' I V 1 ~ ~ ` ~ / / l I ! 1 / l I ~ I ~ U11 IIII1 \ ~ I II l I ~ I ~ ~ ~ I 1 1 I l I I I i ~ ill 1 l l / / / / i I V / ~ _ ~ ~ ~ ~ A / \ / / ~ ~ / I / , ~ ~ ~ ~ ~ / / V A V ~ I I ~ ~ ~ / 1 I l l i ~ I ~ I I ~ ~ ~ ~ ' - I ~ I 1 1 / 1 I I II I I I \ ~ ~ IIII ; l I / i / ~ - ~ - ~ / / / I II ~ _ ,i i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , I ~ / 1 I I 1 1 ~ I 1 1 (IIII / I Il I l ' 1 11 I i ~ A l v~ / l I 1 ~ 1 ~ 1 I~ ll I 1 ~ / r 1 / ~0 ! ~ ¦ ~ - ~ I ~ ~ ~ ~ II_~ i ~ l 1 I I 0~• 1 I1 l v _ I ~l~l 111 I ~ ~ ~ I ~ I I I I I I I , ~ /I / / I ~ , ~ I - / 1 ~ 1 ~ I I 2~ ~ /1 I ~ ~ ~ / I 1 ~ 1 I~ 111111 ~ ~ / V III ~ 11 I ~ Il I /I ~ ~ ~ _ 1 I I , I 1 ~ ~ - ~ 1 ~ III : I 1 ~ ~ I I (1, 11 / ~ r, I / 'V ~ / 1 ti ~ , , ~o ` ~ 1 - J I I / ~ I v / 1 ~ ~111~ 111 1 ~ ~ ~ / ~ / 11 11 111 1 I I J ~ 1 \ ti ~ / / ~ ~ 1 ~ / / ~ ~ I + ~ ~ - _ 1 \ 1 / ~ \ ~ ~ ~ ~ _ _ _ _ - I - - _ _ _ / 111 ~ / ~ - - - 1I "I 11 ~ ~ ! ~ ~ 11 11 ~ ~ ~ / ~ 1 ~ ~ ~ ~ ~ ~ ~ I I 1 ~ _ - - ~ _ _ _ _ ~ 1 1 I 42 ~ ~ ~ ~ I ~ y _ 11 t ~ ~ ~ ~ - ~ \ - ~ - - , J ~ ~ ~ 1111 1 \ ~ ~ ~ A ~ ! (p + ~~II ~ 1 1 ~ ! r _ 1 / ail I~p ~ _ I I ~ f 1 l I I ~ ~ - 1 1 111 i \ ~ _ 1 # ~ I I ~ ~ I ~ ~ ~ ! ~ 1 ~ ~ ~ / 1 1 ~ 1 ~ A / I / / _ I I ! I 1 \ ~ _ ~ ~~~~~11~ ~ V ~ + I I ~ _ _ 1 J V 1 - ~ I I I 1 1 ~~n~l ~ ~ ~ ~ V ~ I V ~ I I II i - ~ I I \ ~ > ~ ~ ~ lam/ I 1 - ~ ~ I I/ 1 11~ X11 1 ~ ! ~ ~ 'r ~ / / ~ / 6 ~ I ~ _ i ¦ l I i I i - i ~ 1 I 11 111 1 ~ / ~ ~ \ - - - _ ~ t \ I I I I l~' - / I I ¦ ~ . I \ _ _ - I _ / ~ / ~ ~ ~ I ~I ~ + / I ~ ~///~l/j/11 / l /l ~ ll~I i,~ / ~ / / ~ i ~ ~ /I / I ! 1 ~I~ / ~ i \ I \ - I I /r i I , l I i~ i l/ l I ~ l l l - ~ A ~ ~ 1 f I I _ - \ 9' I ~ I ~ / ~ V 1 1 I ~ i l ~ / //1 v 2 ~1 ~1 I Ill 11 / I, l i ~i ~i / I ~ / ( 'U / / 1 I ~ ~ _ . I / , 1 , 1 ~ ~ ' I I ~ I 1 11 / /1I r ~ ~ \ ~ I1 i i 1 I I I l 1111 / /j ~ I ~ \ i i ~ 1 - - - - ~ l ~ / I _ - / ~ ! r1 r ~ I ~ / / ~ ~ I ~ ~ / / ~ I ~i ~i it ~ ~ f ~ - ~ ~ i ~ I i ~ / l i ' I I / ~ / , , 1 1 1 1 1 i l 1\ , r 1 I ~ ~ I I il`// ~ ~ 1 / 1 I I I 1 ~ / \1 l l t l/ ~ ~ I ~ i I ~ ~ ~ I I 1 v ~ ~ I /i l / / I A 1 ~ / ~ ~ / 'f- ~ / / ~ V ~ ~ / ~ i / I ~ ! / ~ / / !//ii/ I ~ ~ ~ l i~-- ~ ~ I ~ ~ v ~ / I / I 1v1 vvvv 1 ~ ~ I / %i ~V II I V ~ i i~ l ~ I 1 ~ I / ~ ~ 1 I /i 1 I 1 I A~ I I / ~ / / ~ A 1 I I l ii 1 I i ~ ///iii ~ ~ ~ ~ - ! 1 ~l~~il ~ ll~ l I ~ ~ ~ i i ~ / / I 1 ~ + / I I ~ /l/ 11 I I i ~ ~ ~ I I ~ ` _ lr - ' ' ~ V l / l / r 111 II ! l! A ~ l I ~ i / I ~ ~ i ~ l 1111 I ~ i 1 ~ ~ / / III 1 1 ~ / / / I I I 1 ~ ` ' - - ~ ~ I - ~ ~ ~ ~I V/ 1 - I i~ ~ I/% ~ I1 I ~ II 1 ~ ~ ~ i/ _ ~A~ / X 1 1 t ~I ~ ~ I l l ~ A CJ ~ 1 I I I I III 1 \ ~ ~'C~~ I 1 i Ill ' ll ~`VVA I V ~ II I / / i A 11 1 I~ ~ / I I ! 1 , / / I III v 1 ~ ~ ~ I / - i ~ / 1 I A / ~1 I ~ - - it-' i / / i A\\ 1 VIA V~V ~ / 1 ~ / ~A \ I 1 \~~A~ A a I I I I ~ ~ / 1 1 I ~ i J / \ I I _ ,j1 1 ~ `v 1 / / I ~ . 1 v l lil /il 1 / ~ / _ _ 1 / / / / vv1 ~ V I' V ~ ~ - ~ A I I 1. ~ ~ ~ ~ 1 ~ i ~ 1 \V~~ J' I ~ I ~ ~ ~ / ~ ~ / ~ + V I l / _ i I \11 1 \~AA~ 1 V ~ V I I i ! ~ ~ ~ / ) ~ ~i ~ ~ - - I \~A V I A ~ ~ I ~ ~ ~ ~ / / / A ~ - ~ 1 11 A~~ ~ l ~ A ~ ~ \ / , ~ ~ II ~ vvvvv1 11 1 I IIII 1 1 ~ V~ ~Q' ~ ~A 1 ~ 1 I I 1 ~ ~ ~ /r ~ / ~ ~ ~ ~ ~ / - - ' ~ ~ 1 ~ 11;,~ - / ~ / / ~ / / ~ ~ / 111v _ ~ ~ ~ I - - - ~ ~ , / I 1 ~ / /i l /il 1 11 1 ~ _ I I I I I 1 ~ ~ - ~ ~ I I I .I ! ~ ` i ' ~ I IIm ~ ~ ~ / /i l I ~ ~ ~ - ~ 1- _ ~ ~ I / r/l . l I ~ I - 1 \ ~ ~ I I - ti i I I„! A A ~ I I,l 1 ~ ~ _ _ - ~ _ ~ l ~ ii I III~;~ ~ I 1/ lj/ ~///I 1 1 ~ / i l I I11!1'> - l 111 lU/ 1 1 !1/111 ~ ~ A ! I ~ 1 ~ ~ 1 1 ~ ~ ~ ~ ~ ~ /I ~ _ _ , - I I ~ ~ I 1~ V V AA ~ I I I V ~ ~ ~ AI 11 l v~~ ~ / I I I I ~j I 1 i ~ ~l /li ! / I I - 1 I III A~ ~ ~ ~ ~ ~ ~ _ l ~ ~ ~ 1 / 1 II. I I ~ A ~ ~ V ~ ~ \ ~ ~ ~ ~ ~ V ~ I I I ~ 1 ~ ( ~ ~ ~ ~ I ~ ~ I I I - ' ~ i ~ ~ ~ 1 - 1 ~ /l ll/ ~ ///l l 11 I - 1 ;I / / / / ~ / l I ~ I1~V ~~AA~~~ ~ ~ I I I I I1 ~ ~ ~ / ~ 1 _ VA ~ I I 1 ~ 1 , i ~ / ~ i i, / /1j III I 11 I A ~ A A~ ~ ~ ~ ~ I I ~ ~ ~ ~ ~ ~ - I l 1 IIII / ~ / I \ ~ ~ / 111 ~ ~ ~ / ~ 'V 1 I / I A ~ / r~ 1 / I I I I III A ~ v ~ ~ ~ ~ I I I 1 ~ , ! ~ _ _ ~ , v i ~ ~ ` ~ ~ ~ ~ _ l ~ it ~ ~ ~ ~ { / / I - - 11~ I V _ _ I 'I I r ~ ~ / I 1 ~ /l/ I I IIII 111111 l I I l ~ I I l ~ I ~1 I ~ I / - ~ + ~;i ~~'~i~~ .l I 11 ~ I A I - ~ i I / II ~ ~ 11: ll /I ~ ~ 1 I II~,~ ~ ~ 0 / 1 I (I i _ ~ ~ 1 ~ , / I l I l d , II 1 11 II ~ ~ CJ ~ ~ 1 ~ I I 1 ~ it ~ 1 I ~ 1 i ~ A 1 A 1 1 ~ ro I ~ ~ ~ ~ ~ I / ~ % i / / / I 1 11 _ A / A I V _ ~1 1 \ ~ ~ ~ ~ ~ / I ~ 1 ~ A I,~ / 1 ~ \ ~ / i I A 1U' ~ ~ l~ 1 i ~ o l I I I I 1 ~~I ~ A~ ~ ~ 111 I ~ A .~V A I I , ~ - , I I / / ~ ~ ~ A I ~ V ~ - I ~ I I ~ ~ _ I I I 1/ ! ) AI ~ ~ II ~ ~ \ ~;,Y~ ~I I I I 1 / / ~ ~ ~ ly / I I ~ ~ ~ ~ ~ ~ / / 1 ~ / ~l ~ ~ 1 ~ ~ ~ ~ ~ ~ I ~ / / / _ ~ r i I ~ ~ , ~ - ! I 1 I I I 1 1 I, I~ ~ II i 1' ` I I I I 1 / ~ ~ 1.11 ~ (11/, I/I I 1 ~ ~ ~I ~ 1 l I I i I I ~ 11 ! / / /l ~ I ~//1 A l A ~ lI II ~~I 1 l ~l l1 1 I V 1 / lII ~ 1 ~ ~ i I i / ~ 1 1 I //1 ~ I ~ ~ ~ ~ I I I ~ p~ I I 1 1 ~ ~ ~ ' - - _ ~ ~ ~ I ~ / \ / I 1 l/ 1 I 1 i / l ~ l ~ I / / / / I ~ ~ l / / - ~ I ~ 1 \ ~ ~ ~ ~ 1 III i I I 1 I I ~ ~ ~ ~ V 1 / , I J , - . _ _ it I _ ~ ~ I I ~ I I I I 1 ~ / - _ I _ / 1 ~ ~ I i 1 I A ~ ~ ~ ~ I 1 1 ! ~ - ~ - (I i - V l/ l l/l ~ 6 i ' ~ / / / / / I ~ ~ ~ X11 ~ / l ~ l/ 1 II 11 I / I I I ~ ~ ~ / I i I ~ A~ ~ ~ t I ~ ~ - I I I ~ ~ ~ i I ~ I I4 V ~ I I I - ~ - - ~ w A ll I III ~ ~ t l1 ~ I I / / / / / _ 1 ~ ! I I I I I I ~ / I ~ I I 1 1 ~ ~ I ~ 1 ~ ~ ~ I ~ ~ ~ ~ - i ~ ~ ~ 11 f I i 11 I / / ~ l/l \I I I A 1_ 7~~1 I 1v vv v / ~ ~ I 111 I 1 1 \ ~ 1 ~v vv V I`__f` ~ \1 ~ ~ ~ 1 A 1 A l v V A vv ~ ~ ~ \ I v A 1 ~ ~ ~ ~ III l I J. i - ~----a2e ~ I / i ; I I f 11 l ~ /j/ r / ( \v v / v ~ I ~ v 1 v ~ v 1 1 1 ~ _ ~ ~ ~ ~ ~ _ (0 ? I ~ / - I 1 / / ~ / ; rv II ~ I I / / ~ / ~ I I l I / ~ lj/ /lll ~ r v ~ v, 1 ~ ~ I ~ ~ v~ - - i I 1 / ~ ( I I ~ / ~ / / ~ ~ / / ~.J I / / f _ _ _ ..r 2~ ~ ~ ~ I A / / ~ ~ ~ ~ ~ I ~ / / / / + \ 1 _ _ ~ I A v~ I ~ ~ ~ ~ vv ~ ~ ~ A vA II ~ ~ / 1 1 ~ ~ 1 ~ v~ I ~ ~ `~`~A ~ v~' v _ ~ ~ I I ~ I V I I / ~ ~ l / / ~ 11 / - m--~ V ~ ~i / ~ I I 1 \ ~ r / ~ / I1 \ \ , ` I ~ ~ I Imo,- ~ ~ ~ ~ ~ _ ~ - 11 ' l ' ~ ~ r I \ V ~ ~ r /l Ill A ~ J ~ f l 1 1 ~ / 1 1 r~ _ r~ ~ / I ~l~ 11 ~ \ ~ I \ / r ti' ~ ~ ~ ~ ~ ~ ` 1 ~ ~ ~ lIf ~ f/11 ~ I - _ _ ~ - ? e' r ~ - a / 1 , / , - ~ ~ ~ l p I l 1 / " _ / I 0 Il / Ill - - ~ f r / / A V / II I ' L_ i~/ II \ ~ _ ~ /I / ~ l / _ _ _ , ~ ~ A ~ v / r / II I - ~ r / 11 / I//I 1 ~ ~ ~A ~ / / ~ ~ A ~ / I _ ~ ~ i - r ~ r / ~ V A \ ~ / ~ A ~ ~ / / 1 / - ~ I ~ ~ _ _ _ / r / i ~ ~ ~ ~ ~ ~ 1 / ~ ~ / / I fl / A i / / / / \ \ / / ~ ~ ~ 1 ~ ~ A ~ i /i _ f I ~ i r ~ ~ r ~ ~ ~ ~ ~ ~ . I ago / / ~ / / r / / ~ ~ A \ \ \ ~ ~ / I/ f-~ / / / V / I rl / / f / i / - - \ \ \ V ~ ~ i'ii~ ~ I l / ~ f/ ~ f/// ~ \ ~ ~A \ ~ ~ V f r / ~ / II / / ~ / / / ~ ~ ~ ~ ~ \ \ I / / / / / ~ \ \ \ \ ~ \ ~ ~ \ \ ~ \ ~ ~ ~ V / 1 I I / ~ r I / I I I / / / / / (j' \ \ \ \ 1 ~I I I I / / ~ ~ ~v ~ \ V A ~ v 1 1 \ \ ~ \ \ \ \ \ ~ / 1 i !J l / fll ~ 1 / I V A VA,A \ V A\ ~ ~ / I << 1 r / f ' l l I I I / ~ ~ ~ ~ \ \ v ~ 1 J 1 I I I 11 ~ / I I 1 v ~ V v ~ I I f / ~ v i ~ \ v V I I I / I 1 A A A v A ~ i I f r r r I Il ~ ~ I I v v v r I' ~ I / l l ~ 1 f \ \ ~~l l ~ ~ ~ / ~ I 11 ~ I 1 11 I I ~ v ~ \ ~ I / 1 ~ i I ~ I I \ v ~ 1 A \ \ y v I l I ~ V I ~ ~ v ~ / v ! I f I I ~ ~ 1 1 ~ A ~ \ ~ \ I I ~ ~ ~ I I / ~ I ~ I f ~ ~ I ~ 1 1 1 ~ / ~ / ~ I 5 / / fl 1 if , - i ~ ~ I I I l l ~ ~ A 1 III 1 1 I I I~ \ v ~v ~ ~ V A\ V v ~ ~ ~ I I I 1 1 1 1 I / v v / v v ~ v i 1 \ I ( ' ~ ~ ~ - ~ / / I ~ III f1f / ~ ~ < ~ i I / ~ \ ~ 1 1 1 1 1 I I ~ / v A / I I \ \ V A v ~ 1 1 1\\ v I. 1 1 1 1 1 V 1 I I ~ \ / v v A\ 1 V A A v v 1 ~ \ ~ ~ ~ I 1 ~ ~ ~ / ~ / Iff ~ /f ~ f~ lr~/ ~ \ ~ 1 ~ l ~ ~ ~ v I I I I V ~ I~ 1 A ~ ~ I , 1 I 1 1 1 1 \ V / ~ ~ v ~ I 1 v ~ V r 1 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ _ _ - z / ~ % ~ ~ III ~ / l if lr ~ A ~ ~ ~c • / \ ~ I ~ ~ ~ ~ ~ I 11 / ~ ~ ~ _I A ~ I ~ ~ ~ ~ ~ f X92 III , / : II / ~i ~ ~ v / ~ i 1 1 v~ v V ~ / ~ v ! l ~ I I I ~ I ~ ~ ~ \ ~ ~ V ~ ~ I - I l / / ~ ~ ~ \ ~ I V ~ ~ V V I II r~ / / l ~ \ ~ i I l ~ v ~ v v~~ v ~ I ~r _ I I I ~ r~ ~ :1 / I 1 1 1 1 ~ \ ~ / / \ \ \ ~ / / / i l i I / ~ I I I I 1 1 v V A \ V / _ ~ v v I 1 1 ~ ~ ~ ~ ~ ~ r °~°~-na - I / i ~ \ ~ I ~ ~ J I I r% / ~ I I I I ~ ~ ~ ~ v ~ ~ /r ~ `V ~ I / I ~ r ~r I I :J / / ~y V ~ ~ ~ ~ ~ ~ ~ ~ I ~ ' - - - ~ I I I ~ rj / / / ~ I I TJ ~ ~ / 1 1 1 1 \ \ V A~ A \ \ \ / ~ V v ~ V / / / / / / ~ / I \ \ / \ \ / / / i i / i i ~ / I l 1 1 \ \ \ \ \ \ \ / / / ~ / ~ ~ ~ ~ ~ ~AV / - I I / ~ / - r, ~ ll• \ \ / 1 \ V v V A v v v~ / / ~ / ~ / / 1 1 ! V I \ \ \ \ \ \ \ / / ~ \ l / / / / / / i i ~ ~ / / / V ~ V A V ~ ~ / / / / / \ ~ V` V A V / / / / / , / / ~ ~ ~ i ~ ~ i ~ / i i v ' - V ~ ~ ' I I i ~ / r r / r ~ ~ ~ ~ ~ ~ / ~ I I I ~ ` / l / ~ I V~' / / / ~v y II ~ a ~ i// f ~ ~ r r r ' a ~ s . .v. V v ~ ~ . ' ~ ~ / ~ ~ / ~ ~ r / r ~ ~ I , r ~ rr I ~ rr ~ r r v ~ / / / ~ A A~ \ ~ / 1 1 V ~ \ / / / ~ vvv v~~ I ~ A ~ iI l lI ' /i ~lllr Cb r r l lr f v v ~ ~ ~ i ? ~ I I l ~ ~ / r ~ ~ / / r l ~ l ~ ~ I I I I/ / v v V A V ~v \V A \ ~ I l I I f v ~ ~ \ 1 1 / / / / / / / / / / V A V A \ \ \ / / / V A \ A 1 1 / / / l l l i I f ~ I I ~ 1 1 ii r / ~ r f I ~ ? f \ V - l l ~ ~ / i ~ \ V A / / / i ~ \ 1 1 / / / \ / ~ V A ~ \ V A \ \ ~ / / / / / v \ V A 1 l ~ / / l l l l l ~ ~ ~ ~ ~ ~ i ~ ' - ~ f , I ~ ~ v v v v f v v ~ ? ~ l 1 f III rr i iir r / / r e f I I f f / i~` \v ~ ,I III /i i l/ + / / / t I V A ~ ~ V A~ V A ~ l l / / \ 1 \ ~ ~ / l / l i ~i , i v ~ ill 1 / / ~ / / / / I ~ ~ ~ I I ~i ~ / / / 1 / r / / ~ \ i I l / / r ~ r / / / I I I V A V A A _ I / 1 1 1 / l l l/ ~ i i ~ / / V A \ V ~ / / / / 1 1 1 1 A / ~ / / / / / / / / / ~ ~ ~ / / ~ _ _ - i / I V A A ~ I I l ~ ~ i J ~ ~ / i- / / r I I ~ / ~ ~ v III I I % \ i ~ / I / r 1 I I ~ i~ ~ ~ _ ~ ~ / / I I V A A ~ ~ / / 1 1 ~ / / / ~ / / / v ~ / l v 1 1 / / / r VA \ \\v~~ I ii// I 1 11 1 ~ / ~ / / i---' - ~ ~ ~ / I1 1 ~ lII ~ I / ~ ~ / / I ~ ~ I I I I ~ I I ~i i A~ ~ f f ~ ~ / V 1 ~ / / / / ' V V v \ v v i t I l V l I / / / / ~ / ~ / / / ~ / / f l S I I ~ \ ~ / v , - - ~ ~ / ~ ~ i ~ / ~ I i ~~ll ~ II ~ I II % ~ / / v v v v v v ~ ~ / / / A 1 \ 1 1 V 1 / ~ / / / / / / / / / ~ - ~v ~ ~ A A V\ / / lI llll l/ l/ ~ ~ \ y~ ~ / V A A / / i , ~ ~ i i / ~ I 1 III I f /i ~ / ~ \ ~ ~ i . ~ ~ ~ / I 1 1 it ~ ~ I ll ~ I 1 ~ / ~ V A A l A V A V \ 1 ~ 1 / l/ l/ 1 1 ~ ~ i ~ i- / ~ i / / ~~,I Ill I If //i/ / ~ A ~ / V ~ A A / / / A \ i l l / / ~ ~ i ~ / I ~ ~ / ~ ~ I li ~ ~i / / /ice ~ ~ A ~ ~ ~ i / / ~ V A v v ~ ~ ~ ~ / ~ \ V A ~ ~ / / / / / / i ~ / ~ / ~ / / ~ I I _ - - ~ ~ iii _ I / i 1 ~ i I / i ~ % / _ _ / / _ _ A A v A ~ A i l / ~ i V ~ ~ _ ~ i ~ ~ A V A V / ~ l l / i / ~ - - - - - - / i ~ ~il ~ ~ ~ ~ / / / i ~ ~ ~ / - - _ / G / i ~ I / ~ ~ / ~ / ~ / - i ~ i ~ - i ~ i i ~ i\~. Ill ii' \ ~ \ / / ~ i / / r'/ / - v v ~ A / ~ i l / ~ ~ i v i A \ V A / ~ / l 1 / ~ / / v ` ~ - ' i ~i ~ ~ ~ - - A A \ \ \ V / ~ / / / l l J l / l / ~ ~ ~ ~ ~ ~ ~ / / ~ / ~ ~ ' ~ \U~ l ~ ii / AV A / ' / / / ~ / r/ / / / ' / V1V~ I i'i'i / / ~i\\\ ~ / / / / / i r / / / / / ~ i~ ~ I ~ ~ \VA\ \V I~ ~ ~ n ~\V A\\ r f l l ~ ~ / / / / i ~ - / ~ A ~\\A ~ ~ A\~ / / f I i / / l / ~i ' i / i' - \ V V ~ ~ ~ A / - l / / i / i~ i ~ ~ ~ A 1\V % ~ ~ 1 \\l~ r / l l i~ l l / / ~ \ \ v v ~ ~ i / ~ \ A V l / / / 1 / ~ / ~ / i ~ A V A ~ Q~~i ~ \ f I ~ i / / l l ~ - ~ / i l A 1~ ~ l ~ ~ ~ 1 / / / / f ~ / i ~ A AA ~ ~ /i ~ / l f 1 l / I V A V A 1 \ I I l 1 / ~ ~ / / i i \ ~ ~ ~ i i ' ~ \ l / I l ~ / / ~ i i ~ / ~_i ~ 1 1 I r 1 1 \ l I l ! i / / i i i ~ ~ i - I ~ \ ~ / / ~ VV ~ / / I ~ / / I / ~ i ~ 11I + /i/i ~ ~ \ \ 1 l r I I I / l I I 1. f 1 l / i / . ~ i ~ ' 1 ~ ( r / f i ~ ~ "J 1~ /i 'i ~ I~ 11 ~ V I I / / I f I . _ ~ ' / / ~ / ~ ~ ~ / I I `Ir I I l/ l , / , / r - , / ; ~J - ~ j ~ „i, I, I ~ ,f i , v / i ! l l l 1 1 / ~ I l l l - / / - ~ ~ ~ - I I I 1 ~ I I s ~ \ ' + I I 1 / r ~ / / I 11 11 / / I ~ / 1 / / / of I ~ ~ ~ ~ V 1 I ~ I ~ ~ ~ / I I ~ \ ~ \ 1 ~ ~ ~ e4.. . i/iii l I ~ I I I ~ ~ \ \ ~ ~ \ ~ \ ~ ~ \ \ \ \ Q~ \ ~ \ ~ _ / III III I I / / 1 I I i ~ 1 / ' ~-T~.,/ f \ .l.''""` 1 / / ~ / 1 IIII I 1 , / l / f 1 1 I l I ~ ~ I I / / / I I \ \ \ \ \ \ ~ / 1 III I I I I / l/ I I I I I l ,.T l I / / l ~I / ~ ~ I I I l I r ~ ~ \ v A A A ~ \ \ v ~ 9j0~ ~ ~ ~ / ~ > ~ ,i , /I 1 IIII III I / / / I I I 1 I /I / / I I / / t \ / / 1 1 1 1 1 1 1 / / I I / v \ 1 / I / I I / ~i ~ I I l i / \ t V A V A ~ A \ ~ ~ ~ ~ ~ ~ A ~ I r r / I1 1 1 1 1 1 1 1 / / / l l l 11/ 1 1 1 / I 1 , I 1 1 1 ~ l / I f I 1 1 1 1 I I 1 1 11 1 v / / I I 1 I I 'A ~ 1 I l l I ~ _ / 1 1 v, 1 1\ 1 1 I / / ~ / a/ /r~ I I ~ \ ~ I / ~ /r / rr I I ~ ' ~ \ \ \ r ~ ~ r / { V A ~ \ V ~ . V ~ ~ ~ 1 1 I I 1 I I v~~~ ~ / / 1 1 1 \ 1\ 1 I I / i r II l l vv v~ I ~'r i I~ i~tii ;nr ~~I~ 5 r- ~ •ti 7 ~FJ~ LI ++I r -~Fal ~I~ - ,L ~ _ Y' • _ ~ ~ '1~ - ~ ~ - I ' i~ a ~ ~ - _ I i i~ `i I i I 11 _ _ \ \ ! ~ I ~ h ~ 1, / / 11 1 1 1 1 1 I I r / l l/ l/ / l r / v v v v~ I I III II v vv v v +I III I~ / ~ I III I v ~ II II v v v 1 ~11 ~ ~ / v v v v v ~ I I r ill! II vvvv1'-~ I III ~ ~ ~ I III .I / / 1 1 r 1 v \ VA v 1 / 1 ~ ~ \ ~~v~~ \ / / / l I I I I I I 1 / / l / / / / r ~ ~I I 1 ~ ~ I II v II v I ! II / v v v v ~ v I I I I I II vvv v i t ~ 0 I III ~ I ~ ~ ~ v v v v ~ , j1 1111 v I 1 II II an I 11 :III v / / lI I I 1 1 1 1 1 1 r 111 ~ \ \ V A r ~ ~ ~ \ ~~vv ~A~ / / / l1 11 1 r / / / / / / r \ 1 _ / / I I I1 I I > > I l ~ ~ 1 1 v rr ~ rrr 1 l1 r l/ / ? ////r ~ I I II II vv1 ~ 11 / ~ ~ I ~ v v v v ~ I IIII IIII ~ 1~ III 1 ~1~1 / I I I 1 1 1 I ~ 1 1 1 \ , ~ ~ A v~ v~ - ~ / / 1 1 1 _ / / I / J 1 1 1 1 1 ~ A r /I~' ~ v~ / / i I ~ / / / / 1 I 1 1 1 \ ~ \ \ \ _ / / / l / / l ! I 1 1 I 1 v 1 1 1 1 r ~ f l ~ ~ ~ ~ ~ ~v r / / l 1 / - ~ I l / / / / / / ~ v v v I I G. I ~ I l / / / / l 1 ( 1 1 1 1 I V v 1 V A 1 ~ ~ ~ ~ ~ ~ \ v~~ ~ ~ r / / / / l I l / / / l / / / / / 1 / II V 1 v ~ ~ v - I ~ / / ~ ~ V 1 v v` ~ v v I i1 III I I 11 v ~ ~ v ~0 ~ v ~ ` v v u Iv + I 1 :I / / I - 1 / l l 1/ 1 J l 1 l I A 1 1 1 A 1 / ~ 1 v~ v v~ ~v~ l / I l l 1 I nj \ \ \ \ I I I I ` " I l 1 1 1/ 1 1 1 A ~ ~v\ ~ ~v~ ~ v l I / / I / / ~ ~v ~ / ~ I 1 \ ~ v \ I I I I ~ I I l l I r I; ~ l / l 1 1 1 1 1 1 i/~ ~ I r ~ 11 ~ V A~~ v~~~\V l l 1 rr _----_-\I 1 11\ v v I I I I -f. ` ~ v v I I I I I I / / / I I r i ~ ~ ~ ~ ~~A A \ ) / / / / 1 1 / I I ~ / r Y / 7 / ~ \ VA V I I ~ v / / / f r ~ ~ v A ~ V _ ~ / V 1 / / / / / / 1 I I I v I r r 0' ~ ~ ~ v~ ~ v v ~ I ~ ~ v I I 1 1 ~ X11 I Ii ~ qi I I I ~ I I I I ~ ~ I v I 1 1 ~ 1 I III ,1 I I / / / / / I I 11 1 r 1 ~ ~ l ~ ~ ~ v~~~ ~v ~ ~ \ r - ~ I ~ / / / I 5 I ~ v v A v v~ _ - I ~ / 1 I I ~ r ~ ~ v~ ~v~ ~ - ~ v / / / / / l I 1 ~ ~ , v ~ v ~ ~ v 1 r! ~ , ~ _ ~ II ~ Gj, I ~ ql I I / ~ ~ 1111 / / / ~ r I I IIII ~ ~ ~ ~ I III ~I, I. / / I I I 11 A11 1 1 v ~v~~w r ~__1 / / / / / / I ~ \ V 1 - _ 1 / l ~ ~ ~A~~ ~ V ~ - / i I / / ~ v I ~ ~ 111!! ~ l ~ /I I I I I D~• <'J I II :i~l~ 1 ~ / I! / ( ~ a I I I I III 11 I I V I I ~ 111111`' / 1 "J i a ~~i I I I ".J I II / / I I A - ~ - - - ~ v A ~v~ ~ ~ - ~ r ~ 1 / / / / / / I 1 1 1 ~ ~ - r l ~ ~ I I I ~ I I 1 1 I ~ / / / / / 1 ~ I I ~ _ ! I 1/111! 1 I ! ~ / / .I ( ~ IIII I I ~ ~ I I 1 11 !1 1 / I ~O -I- ~ I t I I I I / r r r , ~v / / 1 ~ ~ ~ \v ~ A v ~r / \ / i r l / r I I / ~ 'f' I I / ! 11111 V I 1 ((~~I I III II I I I \ ! I I I I! , ~ v I I I I / r r r r r r / / / r I 1 ~ ~ ~ l ~ ~ / rr r ~rrr, l r r / 'U~ I 1 + - - I ! II 1 ~ ~ ; II I 1 ~ ~ V I I I 11 1 I I I I~ 111 I I I I. l I I I l1 I I I ~1 I / III 1 1 1 r r r r r ~ , / / ~ l CJ I ~ ~ O I ~ ~ \ + v v I ~ ! !1 I I I I I I III I ~ ~ `IIII ~ 1 I ( I I I I I y1 I I I I I I I I I II I 1 _ 1 1 ~ r / I ~ ~ ~ v _ 1 1 1v I ~ I I ~ I ~ I I I IIII I~ v v I 11 I! III III I I 1 11111 1 v~ _,1 vvII I I1 Ii1~1 v I :II r r r'// r r r / I ~ I ~ ~ 1 v ~ r ~ l - I II 1 \ r r r ~ I / ~ ~y, 1 I I - ~ I v~ I ~ 1 ! I I I I 1111111111 ,I~~ vI I I I Ili! j~' IIII I III IIII I v ~ I I 1 111 1111 ~ l V\ III II III II 1 ~1 II I III;11 I I I ~ \ I I 1 II 11 111 ~ 1, ~1 \ 1 ~ I I 1 l '1 III I I III ~ 1 v vv ~ r ~ ~ vI 1 I 1 / ~ ~ ~ 1 I v ~ / r I I I ~ I I ~ ~ I ~ 1 ~ / r r - I II I I~ ~ / ~ - - - I ~ 1 I I 111 II V / I 1 1 I I I Ill 1~ ~ I I I I II I ~ III I / I I ~ I ~ / / / I / ~ ~ ~ V 1 I I 1 I I / r / / I I I I 11 ~ ~ I I ~ I I 111 11 I I V 1 1 I\ 1 1 I I I I I I I ~ ~ I I II II I / / I II II 111 I I ~I i~ III I I I III III I ~ I I 111 11 I I I I 1 I ( I~ I l l/ l 1 ~ 1 1 / /lill II 1 1/ I 1 ~ ."s i--~ 1 \ ~ 1 1 I A 1 1/ 1111111111 I / III 11 III/\ I r I IIII I I ~ ~ III E III I I / \ ~ I1 I v l ~ 1 1 I! 1 I I ~ I I III I I I I / / / / ~ , l r / 1 I 1 ~ I / 1 ~ ~ I ~ 1 / / 1 1 1 / I I I r I ~ 1 I v / 1 / / 1 ~ ~ 3', I / / 1 ~ I 1 v I I I ~ ~ I v ~ ~ 1 / ~ I 1 1 1/ / ! I I I I 1 ~l 1 1 I I I 1 I ~ I ~ II I ~ I I 1 1 / I I I 1 V / ~ I I I I V I I II I 1 i~ I I I I 1 ~ ~t 1 1 1 I / I 1 ~ 1 / I 1I / ~ / / I ~ / 1 1 / / CJ ~ ~ \ ~ ~ / I I / / / I V I~ ~ I ~ F I ~ r v ~ ~ 1 1 I I I 1 1 ~ \ ! l 1 1 l~ i 1 11 1 ~ V 1 I II v A 1 I I I ! 1 f I ! I ~ ~ 1 1 ~ 111 ~ I I 1 i l ~ I I II / / I 1 1 1 ~ i I I I Q ~ ~ I II I I III ~ / t I I i I! / I A 1, I I I I o 1 1 i I / / I \ I ~ ti - ~ f / \ / 1 I v I I ~ / / ~ ~ ~ ~ I I I I~~ l i ! I I I I I 11 / V III I ~ I IIII II 1 ~ ~ v ~ I I ~i 1 I ~ A 1 v ~ v ! I III 1 I ~ 11 1 1 1 I I / / / / / I I vv v~ / I ~ I ~ 1 ~ ~ ~ A 111 11 ill I I I ! 1 11 I I~ V I`~ v1 l 1 111 1 I I IIII III / ~ ~ 1 ~ 1 v ~ ~ I \ ~ A !II I I I V I I I I 1 v ~ v I! 1 1 IIII 1 ~ 11111 III I 1 I I / / / / / / /.I I I / 1 I l_ v 1 ~ / v _ / ~ r. t / r, v ~ 1 ~ / I I 1 / / I / / l / / / l/1 I 1 I v ~ ~ ~ / I ~ / ~ ~ III 1 ~ ~ ~ . v I' II I I I - \ ~ //I/! / I v v v I ~ I I v ~ ~ I' I III ~ I , Illil = III 1 / v I r / I I 1 tp 1 1 1 ~ I ti I I v ~ 1 / / l 11 I1 ~ ~ ~ ~ I ~ , ,/I ! I ~ ~ v I I 1 ~ ! ~ II I ~ v ~ III II I / , / / ~ t ~ ~ ~1~ ~ ! III I I I Ih 1 1 1 / l / l/ 1 / ~ , I : r, r 1 I / 1 1 1 1 / I I ~ I 1 / / ~ I ~ ~ v _ / I 1 ~ I I / ~ ~ / / / , I I I I I v /III 1! n! 1j1111 I v 1 I (IIII '11 1 . I n / /1 ~ / I 1 vI l4 / / / 1 1 l 1 1/ l, 1~ 11 1 1 l - I I v °v~z:~ ~ ~ / I v ~~1 I ~1 I / A ~ / ! l / 1 1 I I I / III I/ ~ I 111111 V I (IIII , 111 I I I l 1 1 / / ~ ~Il 1 1 1 / I I I I I / i ~ / I / / / ~ Q ~ V ~ ~ / ~ A ~_i, / / 1 I I I ~ 1 I 11111 / li I V vvv A ~ I ICI 111 II ~ - / / / I 1 1 11 v I I~ ~ 1 1 1 I ! 1 / / / / / / / ' 11 I 1 1 I I I I I ~ A- ' ~ v 1 \ 1 V ~ ~ / / / ~ 1 J / 11 1 ~ ~ _ ~ ~ / I l / / ~ 11 I l 1 ~ 1 \ i _ ~ ~ ~ ~ / / / I / I I I 1 / I ~ ~ ' III I I ~ ~ ~ / / / I 1 I 1 / I I I IIIII~11 1 v / / I 1 I I vv I II ~ II I / / 1 ~ 1 'f' ~ ~ ~ ~ - / / / / I / A I ~ / ~ I ~ ~ A A I 1 / / / / / ~ / ~ . , ~ 1 ~ ~ ~ \ / V~ / / / ! I I 1 A t ~ III 11 ~ .1 V / / 1 I A I CAI I V'~. I Ill IIII l I l / / / ~ I I 1 t l~ I ~ A l 1 2 1 ~ , , ~V ~ ^ ~ L ~ L-~ ~ I I ' I F~ III ~ 1 P f~ ~ ~ / 1i II I 1 i v v ~ I I I 11 I I ~ ~ I I ~ IIII I 1 ! ~ , ' / 1 1 / I 1 I III l~ ~ ~ ~ 1 1 / I / I ~ ~ / 1 - l I j1 1111 I % / / / % ~ III! / 1 / / I i ~ - V~ V V ~ 1 r~ ~ / / / , / ! ! 1 / I ~1 ~ 1 11111 111 III r ~ 'C1 ~ ~ ~ I v~v e r r ~ / l / / ~ I II I ~ r ~ l V~V A~ / I i i / ~ I 1 ~ I "J v~ ! ~ , / I ~ I I ~ q vI / 1 1 , ~ ~ ~ , / / , , / / / / II , _ vv ! 1111;111 11 v ~ ! / ~ / / ! - , ~v I I I I I / ~ ~i~~ / / l l II11 1 i~ / r~ r ~ r (O I v~ v~\ I l 1 vv v / r ~ / l ~ ~ r ~ - / / / - ~11 I 1 1 v, v ! , / I 1 / ~ ~ I I1~ / ~ r I l/11 I / r l ~ t A~ / ~ r - r I / l / r / / I 11 / I / ~ ~ I I v~~~ 1 ~v` 11 ! ! ~ ' / ' / / / / ~ I v / 11111;111 111 v ~ ~ v v ~ 0 _ / , / / / / / I I I~ I I / II ~ II~ I II I 1\ ~ ~ I I l / / ! l l l ~I i I / 1111 r ~ 1111 / / A ~ / / ~ I I ~ ~ ~ I 11 1 I V ~ I I / / / / ! / / / ~ A / ( I Ill i '~iir~~ / 11 r I ~ / / / I ~ i / I I/ /i ~ / ~ 1 / ~ / ~ A v~~ / / / ! II / I ~ V A ~ ~v ~ ~ ~ I i / / / ! / 1 III Ill I - _ ~ i l ii ~ r ~ Ill / I ~ ~ ! ~ 1 ~ ~ ~ ~ / III - / 2 ~ v~ 2 II 1 - i ~ ~ I \ ~ _ ~ ~ / / / / / ! ! ~ ~ i ! I 1 III I~_,- v ~ "J I I11~ I I I ~ ~ l l III II I I A V ` I I 1 I / I l l ~ I l I II 1 V ~ n~~ I 11 ~ III Q I I I ~1 ,,{{~~1d ~ ~ III / ~ ''V l ~ ~ ~ ~1 / ~ I / I ~ / / I~ II v ~ / ~ r ~ / /ill I / I v 1 ~ ~ 1 ~ ~ I 1 I ~ A II III i ('U ~l I 1 I / /l 11 ( / - A s i ~ + l ~ ~ ~ , v ~ ~ ' I 1 1 1 / / ! V ~ ~ A IIII 1111 ( ~ IIII , I I \ ~ l 1 I 1 / / ! 1 I III / I III I 1 r + / ~ I / / / J V / i ~ ~ ~ \ ~ ~ ~ ~ _ ~ , I I ~ / / / I I I I I I I ~ IIII t v v~ I ~ / 1 I l I 1 1! ~V I/ ~ I ~I~I i 111 ~ /r I ~ ~ /li + I (p ~ / / / ~ ~ / I 11 v - r r - 1 i ~ v ~ ~ ~ Il~v / / ! ! 1 I I 1/ 1 1 1 v I 111 ~ III I I ~ ~ I 111111 \ ~ / ~ \ II II 1 / / / r ~ 1 r o' I vv 1 / ~>"5 - 1 ~ ¦ v / ! 1 ~ 1 I/ I 1 ~ ~ I V 111' 1 1 -----i ~ ~~i r v v v ~ I v /l1 ~ / 1 ~ r I l l ~ A ~ ~A ~ ~j' ~ / I 1 / V ~ rr ~ 1 1 ~ ~ I I I / v / v 111 /1 v L J ~ I ~ 1 ~ ~ II 111 1 ~ ~ ~ / v 1 / 11 I ll l I l lI / I ~ / v~ 1 / / ~ / ~ ._-I 1 ti 1 j v ~ _ - _ I 1 ~ ! ~III~ 111 i 1~ v ~ ~ ~ ~ I / - - 11 I I ~ ~ 1 1 /l/ l l I r ~ l ~ ~ 1 l ~ ~ r vv + J r ~ ~ ~o ~ I ~ r ti 11 1 ~ ~ 1 ~ ~ III 111 ~ ~ ~ ~ ~ ~ I I 1 I ~1 ~ /lil//l r~i~ ~ 1' / vv11 ~ ~ t v v ~/l l// r r / ~ 1 ~ i v \ \ ~ - ~ ~ ~1~ G I I A 1 I I l1 I r ~p rl I / III I 1 ~ ~ ~ \ ~ ` _ \ ~ ~ 1 ~ 1 \ ~ I I - - - - - - - - - - - - - v - J~~~ I I 1 e ~ ~ - - - - I II ~ _ //l r 1 ~ - / / 1 ~ i/ 1 l 1 ~ i \ I~ - v I I \ V 11~/j I ~•~~/l/ 11 ~ 1 ~ l / v ~ 1' - ~ ~ ~ ~ A\ 1 ~ ~ ~ ~ v / I i~~ A \ I I r ~ I l / ~ I / / \ \ v 1 1 v I 1 \ ~ 1 I 1 l 1 I ~ 1~ l _ ~ ~ ~ ~ ~ VA 11 II _ / / ~ 1 / ~Q / ~ I \ \ I \ ' - SIGNAL \ I ( I I , ; , _ i _ , _ ` ~ 11 11 I - - Ir~~ / V v ~ \ ~ 1 I I _ ~ ~ __,~1 1 / 1 l r~ J1 1AIIIIIIII ! I 1l / l~ r l / 1 ~ 'r rrl 11 I II A VA\ rte- ~ / ~ / ~ / I 1 \ ~ ~ 1 1 1 I I _ ~ ~ / \ ~ j 1 ~ / III I / l / ~ / r/ /l l 1 I ~ / I r ~ ~ l 1, l rr r , / //I III / / / / ,I / ~ r-~-- / / ;:r: 1 \ ~ I 1 i l ~v / l ~ II / - ~ ~1 I I I ~ ~i / ~ / v ~1 A V ~ ~ I I ~ ~ ~ 1 I I I I ~v / 1l 1 r ~ _ ~ ~ ~ i / / / / / jl ll//j I / / Y1l 1A1 / ~ 1 1 1 l ( / ? i I I ~ ~ I I III III / ~ 1 I I I t ~ 1 / I / i~ it r~%,%ll r t/ ~'~/1 IIl _ I / ' / ~ i /i~rirr l 1 r J~ ~ ~ ~ l ~ ~ 1 / r ~ I / ~ ~ I it / ~ l r/ ~ rr!rirrri ~ 1 ~ ~ /~V ~ / r I ~ - ! l / I / r ' / r/i ri rr ~ i ~ I r r ~ / / I r r i / r ~ 1 r I~ l / I I 1 I ~ v 1 1 I I I / ~ ~ I 1 I ~ I A\\ I i 1 i I I 1 i / ~ / 1 A A \\1 ~.I / / ~l \ i 1 V l l rr ri ri r~ l / ~ ~ l I l r I r~ v r ~ 1 / l r rr r ~ ( I ~ I / / r r "j - r 1 1 l/ ~ ( l 1 ~ / \ \ 1 \ \ 1 ~ / ~ I I \ ~ \ \ I I _ \ / I / I \ 1 I ..F I / 11 ! 111 I I I //r ~ ~ / / l T' ~ / / 1. r I l \ 1 ~ 11 1' ~ r/ ~ / ~ / / / A \ 1 - ~ ~ / i C I I I v A I 1~~ I / ~ / / I I V ~ 1 I V v V~ ~ ~ ~ i/ v / l ~11 / r l// II 1 1 / l l j~ I \ v / 1 ~Q ~ ~ l l / ~ - - ~ ~ l I / / v ~ ~a l lr l ~ I 1 ~ ~ ~ _ _ 1~ ~ - ~ ~ ~ ~ - - , I l l /l Il l ~ l/l III I / r/ / I 2 , ? r r l I/l//ii I v ~ ~ 1 ' I I 1 ~ . / r ~ / ~ ~ r ~ ~ ~ 1 I ~ I I 1 ~ ~ I ! 1 I ~ ~ 1 r l /l1 //l 1 v / I , ~ ~ / ' /~i ~ II I r ~ r ~ r~ ~ ~ - r - _ I I 1 Il ~ I\ I ~ I I I 1~ / v I ~1,,--. / ~ / i A\ \ l / 111 I I ~ 1 1 1 l ~ V /I 1 1111 III ~ ~ ' / I ~ ~ i / ~ ~ / ~ ' I III I ~ 1 ~ / / ~ ~ r ~ ~ / II v II Illll I ~ l ~ \ r~ v ~ / ~ - ~ J / , vvv. I I 1 1 / l li ! lil _ _ , vv / I \ \ II ll 1~ \ I ~ ~ ~ I I ~ ~ ~ 1 / / J ~ / r r \V A\ V~ \ ~ / I 1 ~ / 1 / / I I v \\VA\ ' / 1 ~ ~ r ~ r 1~ ~ I I ~ ~ A i i- \ 1 ~AV AV AA \ ~ l I 1 ~ / ~ ~ ~ ~ 1 / ~ I: A ~ AAAQVA ~ A ~ I I ~ ~ ~ ~ ~ ~ ~ / ~ - - ~ J' ! / / 1 I / - i t / ! / 11 ~ / 1 vvvv ~r ~ ~ ~ / / I 1 l ~ / ~ I ~ _ _ _ - - - - - i / ~ / III V\I A\\ ~ ~ I~.I I / ~ / / I ~ ~ ` i / ~ V ' - ~ r r 1 AvA Q~v ~ 1 ~V I I ~ / ~ ~ ~ ~ V A/ ~ r t i _ _ ~ ~ / / i ~ i / / / 1 ~ ) 111r ~ ~ i / / / I I ZJ ~ //j l ~ !ll 1 \ 11 \ \\1 11 vvv~Q v ~ I A ~"t I I I I d 1 ~ / l~ \ ~ ~ / \ _ 1 1 1 A~~ v \ ~ ~r ~ I ~ ~ ~ / ~ ~ r A ~ _ - - \ .11 A vA ~A v 1 ~ V~ ~ ~ 1 I I ~ ~ / ~ / ~ ~ ~ ~ r ~ / ~ i' / / ~ I / _ k ~ i 1111 / 1_ _ ~ / / / / ~ 1 11 i / / . 1 \ V V ~ ~ 1 1 I ~ I ~ ~ V~ 1111 I A VA v VA ~ I 1 t ~ ~ ~ r III I 1 A\~ v I ~ V ~ _ I I I ~i. 1 ~ A ~ ~ V A r / / / ti ~I I ~i ~ - ~ V I1 II \ v~ l v I 1 ~ ~ - - - I ~ ll 111 1 1 A ~ A \ v l"' I I I 1 I ~ \ \ _ '11 I V 1 A ~ ~ ~ I \ ~ V ~v ~ ~ I A 1 ~ ~ - - - / ~ _ ~ l / i ~ I lily . _ ~l ~;//l l i~~ ~ ~ ~ ti _ ~ - _ ~ /l l l l 1 II / I - ~ .I ~ l ~ ~ \ 1 ~ / l/ l ~ 111 / ( I 111 \ ~ A ~ V A ~ ~ \ V 1 ~ ~ I I I \ \ \ 1 ~ ~ ~ ~ ~ ~ ~ ~ 1 I ~ ~ ' 1 1111 ~ A \ ~ A~ ~ ~ \ ~ I I 1 - ~ ~ ~ n / l1 ~ r 1 1! ~ ~ III / / ! \ ~ ~ l~/ ll~ l / 11 I 111 1 \ \ I I \ I ~ - ~ ~ / 1 I 1 1 A V v v vv vv ~ ~ ~ l ~ I r - ~ A ~ ~ ~ it ~ ~ 1 1 I 1/ I l l ! 1r I 111 - - . \ / ! / i . ' ~ I 1 1 ~ ~ ~ / 1 A 1 ? I ! 11 I 11 I I 1 A/ V A 1 A A V A A A \ ~ A I 1 1 1 1 1 1 l I i~ I i s ~ 111, I \ \ \ \ \ ~ \ I I I / - ~ ~ ~ ~ / ~ irr _ ~ ! ~ l1 _ _ I !1 1 ~ ~ / 1 A 1 ll l 1l III I 11 \ V Av vvv ` ~ ~ . ~ 1' I I I I 1 I 1 ~ ' r,,_~ ~~''rr-' / / I I A 1 \ \ V AA ~ \ ~ ~ ~ I I \ 1 1 I ~ ~ ~ ~ ~ /i ~ I ~ ! 11 ! A ~ I I IIA,'v~v~ ~ / ~ I 1 1 IIII / i ~ ~ ~ 1 ~ ~ / / ~ / I 111 I I I I \ V A\ 1 ' I 11 1 1 1 / ~ ~ / i/.~ ~ iii r j ~ / ~ ~ ~ I I ~ / v v ~ ~ Di 1 /i l ; l1/ I I I / / II : I I I I 1 v ~ VA ~ V( i - v~ ~ 1 sal 1 A V ~ / / ~ i i /li i i 1 ~ I II 1 A \ OVA ~ V 1 i ~ V 1 1 I 1 ~ - ~ / i~-- \ ~ ~ / A ~ ~ ~ I I ~ ~ ~ ~ ~ ~ / / / / / / / r ~ I I I I II 1 V A \ \ VA ~ V~ ~ 1 1 1 A V A A 1 ( / - - - ~ ~ ~ - _ ~~A ~ / / ~ I I II v v vv v v ~ / V A I I II I 11 1`~1A V A~~ vAA ~~11 A \ \ 1 V 1 1 r r ~ o l - 1 ~ ~ ~ ~ ~ l/ / I / 1 ' ~ \ / 1 1 ~ ~ ~ l 1 1 I l/l CJ 1l~ll 1 1 / 1 ~v I A A vvv ~ / \ _ ~ ~ 111 i 1 A A V A VA 1 1 I / r r' - ~ I \ / 11 i 1 ~ ~ I / i / / / I ~ I I i l l l l I III / / ~ ~ A 1 ~~~V ~ ~ ~ I 1 ? A V t 1 I / i - ~ ~ ~ \ ! I ~ \ I I 'J~ / / / / / I / !1 , , ~ ~ l/ l/l,~ lj/ II II I 1/ l l I 1 I 1 \ ~ ~ II ly \ \ P 1 I \ 1 / / / ~ ~ I ~~//l ~ ~ I l i l l (1~1 / l/ II/I III V A I I I ~ 1, 1 I I I I A 1 1 1 / / l 1 - ~~"llll l / / / / ~ I I "J l / ljl I 1 \ / 1 l lI 1 \ \ I I, I I~ S I 1 \ 1 1 / 1 1 - _ I II II ~ I 1 ! 1 / r \ \ II 1~ 1 I \ 1 ~ ~ / 1 ll ~ l ~ ~ ~ \ IIII II ~ ~ I ~ I I I V~ / ~ / 'Il II v ~ 1 / v. 1 .vv v v~ .III ~ vim/ j~l i ~ ,v \ v. v\ V ~ / I ~ I v ~ ~ ~ - _ / ~ ~ I / ~ ~ ~ ~ Ill~~ ITV I II I ~ I ~~/l~~•~//~~ 1 1 ~ II ! I I ! 1 \ \ 1 \ ~ I l I I \ ` `mot 1 - ~ / / ~ v v II I! ~ / I I 1 I I ~ / I i A II I I \I I I / ~ I I 1 v , l 11 A I v ~ v ~ ~ , ~ ~ \ III I I 1 ~ / - I ~ / ~ / v ~ II I I 1 \ I I I A \ ~ I I / ~ 1 v \ v ~ "J I 1 1 - ~ ~ 1 ~ ~ A V A - ~ ~ ~ ~ ~ v.~ - _ _ , - ~-sz % ~ 0 II / I / i I III /j ~ l/l / M ~ ~ V A ~ II/ I I I / 1 ~ ~ ' I I I ( / / / / 1 \ ~ 1 - ~ ~ ~ ~ \ \ ' ~ / I \ I 1 V 1 1 ~ v~ \ ~ - V 'f' 1 II i I I ~ 1 / / ! I I / / / / - ~ ~ eti 1 / / I ~ ~ 1 / ~ ~ /1 _ _ 1 24 I I / I / , ~ I I I~ / / / / - ~ ' N. II I I V I \ .J / / 11 1 ` v`~i v I 1 v v ~ r \ v v I ~~v ~ ~ ` v ~ ~~1 v III 1 1 \ l 1 ~ _ \ I \ I ~ ~ I ~ ~ \ _ V1 ( ~ V ` ~ \ ~ I I ~ ~ ~ A` ~ ~ ~ ~ ~ - .7; II ~.I ~ I I ~ ~ / I \ III / ~ / / A - ~ ~ Ill ~ I(II ~ I / A ~ / `I till / / ~ / / II 0 /1 , ~1~ I / ~ v A ~ / I I ~ - ~ / I l/l 11 l \ v v v / I \ v / / I / / 1 ~ ~ A~ ~ ~ ~ ~ ~ ~ ~ ~ v 1 / V A A V II ~ ~ - lj/l 1111 1 ~ / v 1 I I ~ ~ ~ - ~ \ \ ~ \ • \ \ \ ~ I / ~ V ~ \ VA \ V ~ V A / / ~ i / / \ - / / i _f~ ~ ~ \ \ \ \ \ ~ / 1 1 / \ \ 1 n / / / ~J v~ A v v v v v v ~ \ 1 1 1 / ~ I I / 1111 I (I~ / / / / f~ \ v v v v A\ v v ( A I ~ I / / / / / / / / / / / / - i - \ \ \ \ \ \ ~ \ \ \ \VA \ V A \ V A - - ~ / ".J ~ I / / l I' Ill l I v I I I I I l / / V A \ V v v I l I ~ / I 1/ l~ 11 I \ \ I f / (r ~ / / ~ / ~ / ~ - n ~ \ \ ~ ~ v \ \ \ V A \ V A \ \ V A \ \ \ ~ \ / 1 1/ ~ ~ / 1 ~ / 1 v A V A~ v ~ v~ I I ~ I / I 11 I ~ \ I I 1 / / / / ~ (j~, ~ \ \ \ \ \ \ \ II I r / / / / / / ~ ~ ~ ~ V v 1 1 1 I A \ v A \ v \ V V ~ / i / / / ! ~ l l I A \ \ vA v A \ \ \ ~ v / I 1 1 it ~ ~ 1 / Ill ? II I I II I l l / / ~ ~ V ~ \ V A\ \ \ l l l r / I I I \ \ \ \\1 ~ ~ ~ \ \ 1 ! - II / ~ 11l Ill \ ~ / \ 1 I \ 1 ~ / ~ / I / / ~ ~ 1 ~ I ~I I ~ ) 1/ I I \ / / II Ill ` Illl / / \ I I I I I ~ !I I I ! / ~ v v \ ~v ~ I l r I I I I ! / ~ ~ r_~ 1 \ \ \ \ \ I / ~ I I / ~ \ / \ ~ / _ v i I~:: / / I/ ~ ~ Illl / v ~ A I I ~ \ \ ~ \ \ \ 1 1 \ I I ~ 1 A V I I V v ~ v / V~ v " 1 ~ \ \ I I l \ l ~ ~ / ' ~ III / I / / ~ \ ~ ` I I 1 I~ / v I I \ A \ v v~ I 1 1\\ v 1 1 l 1 \ 1 I I I / \ ~ / \ \ " ~r \ \ I I v v ~ ~ ~ ~v z. ~ i I 111 / ~i ~v ~ \ 1 V I I V A ~ 1\ ~ / I / 1 / / II 1 \ I I \ ` \ \ \ \ I I I~I,1 \ 1 l 1 V ~ 1 L.' - I 1 ~ ! I I 1 I I v v V ~ vvv ~z III 1/ / / ~ ` v \ v I I I ~ v vv ~ l I II ~ n~/ \ ~ ~ ~ \ \ / I 1 1 1 1 1 1 v v /v v ~ v v ~ / I I I 1 1 1 \ \ ~ / ~ / \ ~ \ / / / / . . I \ \ ~ ~ \ \ ~r / / / ~ \ `CJ I v v I / ~o I~ I I ~ ~ J/ / ~ ` v ~ ~ 1 / I 1 ~ ~ / I A V ~ V ~ ~ ~ ~ / / ~ - ~Y ~ I I I ~ / I \ \ \ \ / - ~ \ \ - I l 1 ~ / / / ~ ~ / / I P~ v v ~ ~~~~~~vvv / - ~ ~ I~ I! ~ % / / / / / / v ~ \ ~~~Vvvv ~I / - ~y I II / / / 1 ~ I 1 \ \ \ \ / \ \ \ \ / / / / / ~ i ~ ~ ~ / / / I 1 \ \ \ \ \ \ \ / / / / \ \ \ \ \ l / / / / ~ ~ i ~ ~ i / l a v - vv v I„ I ~ % 1 / ,e~ ~ v v v vv " i I ~ ~ / ~ ~ ~ l V ~ \ \ / A V / ~ / a i \ \ \ \ \ \ \ \ / / / / / \ \ \ \ \ ~ / / / / / / ~ ~ ~ ~ ~ ~ / / / ' \ \ \ \ \ \ ~ I / / / \ \ \ \ / / / / / / ~ / i ~ / / / I k~ ~ ~ ~'1 ~ ~ ~ I 1 ~ ~ ~ I I I q I I I I ~ l1 / Il ~ / / / ~ / I l \ \ \ \ \ / / / / \ \ / / ~i i i / / / I \ \ \ \ \ \ / ! I \ \ \ \ \ \ \ / / / / / / ~ ~ ~ / \ ` \ \ \ \ \ \ ~ / l I \ \ / / / l ~ i / / i v v \ \ \ \ ! l I I v v v \ 1 1 / / / / / / / / / ~ ~ ~ ~ / / ~ , ' / t~`~=~ 1 ~ I III % ~/l ~ ~ / / / / / / I I I 1 l / 1 \ V ~ III:,.. 11 I I / / / + ~ ~ / / / 1 \ \ \ \ \ / / / / \ \ \ \ 1 1 / / / / ~ / / / / 1 ~ I I l r/ I I ' I VA AV ~ III I I ~ ~ / / - I I ~ I v ~ I 11 ~ / /'r ~ ~ / / / / I I \ \ \ \ \ \ \ \ \ / / / / \ \ \ \ 1 1 \ J/ / / r! / 1 / / ~ / V A V A \ v l / / \ V 1 / / ! I l l / / / ~ ~ ~ ~ ~ / - - - 1 / / , 4.:, ' / ~ \ \ n~~ it I I I) ~'/~i A ~ / 1 / ~ / / / II i / ~ / i / ~ \ ~ ~ (~~1 III i I I ~ \ ~ / / / / / / \ \ \ \ ~ / ( / 1 1 1 / / \ V A V A A ~ - ~ / - V A ~ / I / / / / ~ ~ - ~ / V A \ \ V ~ ~ i / / / / / v 1 1 1 A ~ ~ / / ! / / / / i II i i / _ / i i 1 \ \ \ \ I / I \ 1 / / I l / ~ / / _ I I / / ~ / / !I 1, 1I ~ III I \ ~ / V v v / I \ V 1 ~ I I l l l ~ / ' / v v v v v v v~ ~ / ! r rv V 1 1 / / l I l / l l / / / / / ' / /I I / \111 ~ I III ~ \ ~ , ~ / ~ / ~ I III I / - ~ ~ ~ ~ / I 1 I I 11 I 1 \ \ \ ~ / / f \ 1 / / / / / / / / / / v vvV A \ V v~ A l / l l V A \ V A V ~ l / I l ! l/ / / / l ~ / / ~ ~ ~ /ll 1 1,. ~ I I ~ ~ ~ ~ ~ / I fl I I I ~ / / I I I ~ ~ 1 - / ~ ~ / l II III II ~/~/i/ l ~ ~ _ ~ / ~ / ~ ~ / ~ I II / III ~ ~ - ~ V A V A V ~ ~ - ~ ~ / / / \ V A A \ V ~ / / r / / / / / / ~ / / / ~ I I / 111 \ ~ - / / ~ ~ ice' i \ 1'1 / \ / / ~ ~uU~' - i i / / \ \ / / / / ~ i~ ~ i i~ - A II 1 i ~i i ,i / VA~1V1 I / / i i ~ ~ / //i v\ \v vvv v ~ - ~ ~ / / V A \ V A \ / / / / / / / / / / / ~ / / / i 1 . i V i _ - i / i i ~ / _ i i ,i / ~ - i _ ' ~ ~ ~ ~ - v~ v v v v ~ / ~ / V A \ V A / / / / ~ / / / / / / ~ ~ v / \ ~ / i / / iii ~ i nn~ ,i / ~ ii f ~ ~ / / ~/i ~l / ~ - - / - ~ ~ ~ / ~ K~ III ~ \ / ~ / / - - ~ \ V A A v v ~ ~ ~ ~ ~ A A \ V A / / / / / / / / / / i / ~ ~ / / / \ \ i \ \ \ / / / l I / / ~ ~ ~ / ~ / ~ VA \ iii / ~ ' ' / / \ \ \ \ i/// / \ \ / / / / / l I ! / / / / / \ V A v ~ A A V A V/ / 1 / / / ~ ~ ~ ~ ~ / ~ ~i / / - i / / ~ J ~ I / i / / / , - v V / 1 I l / / ~ ~ / ! / ~ i ~ ~ / / \ \ \ \ \ \ \ J/ / l l l ! ! ! ! / / / / ~ i / j/~ / \ V A ~ / / qA \ V A A \ \ ! l r ! r / / / v vv' ' ~ ~ v , l I I I l l/ I ~ li/ /1\\\ l! r rl 111 i'/ \ \ \ / ~ ~ ' ~ / / / \ \ \ \ \ \ \ \ ~ l l ! r r I / l / l ~ ~ i ~ / / / / / / / ' , ' r v , ~ ~ - ~ ~J / ,-y~, ~ vvv v r 1 I I / / I I I I I I ' ~ , I / I i I / I r / ~~,II~ ~ , v v v / 1 ~ / ~ v V / / A V A V ! J l ! ! ! / ~ / / v \ ~ / ~ ~ ~ ~ / ~1 V A \ V A \ \ ! ! / r r / r / l l / / i ~ i / / / / ~ , I ~ I / / ~~"`ti I ~ v I v I I I v ~ V 1 1 1 1~ l I / l l I ~ ~ / ~ \ - vvv ~ 1 1 1 1 1 I I / / r / ! r ! ! / ! / / / / ~ ~ ~ / a ~ / ' ;/~'I~ III 1 \ \ \ \ / / I I I 1 \ ~ ~ / / \ \ I I / r I I r ! / / / / ~ ~ / / / I \ I I I ' ~ / ~ iii ~ I I III ~ VA \ V / 1 I / \ ~ V A 1 1 1 1 I I I 1/ l / 1 1 ! l / l l / / / / / ~ i~ / / / / ~ / / \ \ \ \ 1 1 I I I / / ! r ! r / / / / / / / / / ~ / / / ' / ~ ~ ~ 1 1 V A \ \ I I I v \ i~ ~ V iii I ~ V A V A A ~ / V A 1 I r ] I / r 1 I l l / l / / / ~ / / v ~ V A I / l I l 1 1 l 1 1 / / / / ~ ~ii,° I I I I I l- A\ \ \ \ I V I I v A A i ~ \ ii ii I ~ V A \ \ ~ / iii' I I I I ~ / i A\ V A \ \ \ \ \ \ V A ~ ~ .i p, I v \ ~ \ \ A III I l l I / 1 / / l l/ l l l/ / / I / / / / / / / / ~ / / ' / I / v v v v v v / I I I II I / v \v ~ v v v A v v v ~ / / IIII IIII r I / l ! l r ! I / l / / I / / / / / i i, ~ i/~ I I I I A\ V A~V AA V A\ V A V A A V ~ ~ A~ ' ~ - ~ ~ / / I I IIII l l ~ / / l I I I l ! / / l / 1 V I l / / / / IIII I I I v-'~ ' I I I I ! I l ~ I I r / / / / / 1 III I I ` 1 1 1 r I I I I I l l I l l l / / / / ~ /i /~i / I I I I I / / \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ ~ ~ \ \ ~ ii / ~ I I I A\ 1 \ A A A\\ ~ V v ~ / /1 I IIII III 1 - / / I I !I I / I 1 / / /~1 1/ II I I \ 1 V A\~A A VA V A A V A ~ / / / I I / \ \ \ \ \ ~ ~ l /~/Ol I/~ I I ~ \ 1 A A \ VAAA \ \ V ~ / / I I I I I I I / r l l l I I! v I l / I l I / / / / 11 I \ V AA \ \ V ~ ~ v / / I/ I I I I I} V ~ / I I I I 11! A 1 1 1 1 / I / i / I III ~ i / / ! l l 1 1 1 1 1 I I / l I I a V\ \ \ \ \ \ " \ V A \ ~ I ' / / I I A \ \ VA \ V ~ V \ I I Il I I I I I vv ~ / / I I 1 I I 1 I v / / I I I v~ 1 1 1 1 1 V I I / ;~ii / l I 1 1 1 /i / / ~ ~ ! I III I ~ ~ ~ / / / / 1 I 1 \ \ V 1 I I / p _ ,t. I . - _ 1 i I - r u _ 1~ J:. i I ~ 7~i ' I •I' i _ / ~ ~ _ 1 1 1 1 V~ ~ I I ~ ~I ~ II v VA Al \ I~ ! ~ I ~I~ l i l l / / ! ~ I 1 1 1 1 1 1 1 ~I ~ ~ V ~ v A ~ ~ ~ v ~ ~ ~ ~ / / / I / ~ I I I ~ I ~ ~ / / / / / / I I 1 ~ v ~ v ~ / / / / / l / ~ ~ \ \ 1 ~ ~ I III l \ i I / Ql I :1 i ~ 1 \ ~ ~ I I i ~I II 1 111~_~ I II ~ I III I / ~ I I I I l l I I I I 1 v \ 1 \ 1 ~ ~ ~ ~ ~ v vv~~ ~ / / / l! l ~ l l ~ I ~ l / / / / i I I I 1 v 1 1 ~ i ~ ~ ~ ~ i~ / ~ ~ 1 i / 1 1 1 ~ II I I V I ~ V I ~ II ~ ~ 1 ~ ~ A I 1 I II~~ II 1\ 1 ~ I~ II ~ V 1 III ; I ~ l ! I I 1 I ~ / I 1 1 1 1 1 ~ ~ ~ ~ A ~v~A~ ~A ~ - / / ~ I ~ ~ l l / / / / / ! ! / / ! ~ i ~ ~ / ~ 11 ~ A 1 1 1 1 1 A A i ~ ~ VA~~ V~ i / / / / l ~ I I ~ ~ ! / / ! / l ~ / / / / ~ 1 l I j I v 1 ~ 1 ` ~ ~ ~ A v / / ~ - ~ / / / / ~ ~ ~ ~i 1 1 1 A ~ ~ 1 I I~~ III I I ~1 1 ~ I~ I i i 0 ~ I~ 111 _ / / I A 1 \ V - ~ l l I l I 1 1 1 ~ - ~ / ~ ~ ~ ~ ~ ~ / / / ~ l ~ l / / ! ~ i ~ l J ~ l l~/ ~ l l ~ ~ 1 A V V ~ ~ ~v~ / l I / ~ ~ / ~ ~ 1 1 V A ~ ~ 1 II I Il X11 ~ l III / ~ dl I II~~ II \ ~ ~ ~ II ~ i 1 ~ ~ A A V ~ A I i ~ I~ ~ I / 1 A \ \ I ~ \ v ~ vv ~ / / / / t / / / ~ l ~ ~ ~ / l l ! l I I ~ ~ ~ ~ ~ 1 1 I V 1 1 1 1 \ 1 ~ \ _ 1 ~ ~ ~ ~ ~ ~ ~v l / / / / ! ~ ~ 1 ~ ~ / / ~ l l I l 1 I ~v v~ i / l / 1 I ~ / l / l ~ I - ' - ~ v v~ ~ v l ~ ~ \ \ I I i I I' i 1 I I \ CJ \ \ \ \ \ 1 ' i I \ I' 14 l l/ / / I I I I ~ 1 ~ v\ ~ ~ ~v~v v~ A / / i~ A\~ / - / / / / / / l I l ~ ~ ~ ~ I I ~ ~ \A~ ~ ~ ~AA~ ~A VA / ! / ~ ~ I I 1 \ ~ A v ~ i ~ / / / / i ~ l i / ~ / / / / ~ / / ~ 1 ~ ~ I ~ ~ ~ ~ i l ~ A ~ ~ v v \ / ! I r' ~ ~ V~ v I 1 1 ~ 1 ~ I ~ ~ ~ i i ~ / / / / I 1 1 ~ ~ / ~ ~ ~ ~ A ~ V ~ ~ / / I I I \ l ~ ~ V A ~ 11 1 1 1 ~ / f I ~ n ~ ~ ~ ~ \V~ V l _ J / / / I 1 V~ ~ V ~ 1 + ` ~ ~ 1 ~ ~ ! : i I 1 1 ~ ~ ~ ~ I ~ I / ! 1 I 1 1 ~ i ~ ~ I ~ ~ ~ ~ v \ ~ / l ~ / / / / / ( I ~ 1 1 ~CJ , " / i ~ \ I I \ 1 i i, A ~ I I I'i~ ~ ~ 1 I'i i ~ ~ 1 1 r! ~ ' iii ~ i ~ Ali i i ~ ~ i I A ~ ~ 1 v~ ~v ~ I / ~O' ~ ! ~ ~ ~1 , l ~ ! ~ ~ ~ 11 1 ~ r ~ I i D~' ~ I I 1 i I 1 u! -a 1 ! Iii 1 ~Il i l / ! ! ~ ~ ii ~ it ! ! a I ~ i I .I ! t t ~ ~ ~l I II ~ I I I 1 /1 / ~ I I ~ I i I ! I ll ll l ~ I i - 1111 ~i ~ ~ I N I 1 ! 0 i~ l I I I I I I i ~ i i / V I 1 ~ 1 ~ r ! ! r! ! ! i ~O ! I ~ ~ I ~ i 1 i ~ ~ >II~ I i! Iiil11 1 ~ i / / 1 i ~ ~ ! I ~ ' 1 ~ I A ~ ~ ~ I „ ! I I ~,,,r ~ ~ , ! I , , r ! ~ ll 1 ~ -i- v 1 I 1 I ~ ~ \ / 1 \ ~ / ~ i ~ I ~ ~ A ~ ~ i I ! I I I 1 v r !I ! i I I ~ ~I i ~ II i I I 1 !I ! I I l III ~ ~ I I ~ I I ~ / / i ~ ~ I i ~ ~ ~ J 1 ~ ~ I ~ ~ ~ rw \ I I 1 ! ! I I ~ 11111 ~~I I ~I~I! 1 - ~ I I l I III ll I ~ _ ~ A I ! ~l~ ~ ~ \ / ~ I ~ I I III I \ ~ - ~ 1\ q ~ ~ I. ~~~I ~ ~ III I 1 l I ~ ! ! ll!!1 II (~fj~ \I \1 ll~~! 1 ~I i~ "II 1 I III I I \ I I ~ V I I ~ I I h III ~ V\ I III I I ! IIII \ I III ~ II I I I / - ~ ¦ r( r- / ( ~ / I \ ( ~ ~ ~ I l I !!!I III ~ I~ 1 1 ~ ~ l II I! I ~ II ~I ~ ICI I \ ~ ~ i ! !I! II v ~ i I it ~ 1 ail I 1 ~ l' i i , I / / 1 'V / ! ~ III ~ \ 1 i I / / ~ 1 1 ~ ~ ~ I ~ ~ / ~ I 1 `i I / I I ~ C.1 ~ I i 1 ~ 1 ~ ! !I! I I l I 1 '~I `~h _ I ~ I I I!I II , ~ ~ I it 1 1 i lv, I I it i i I I~ l e i, 1 i _ ~ i A ~ I ! I ~IlIlIIlI i ~ ,'I I'll 111 I i~ III I I l ICI ` ~ ~ 1 I I `i ~ / I I I 11 I ~ ~ 1 / ! ` ~ 1 ~ ICI !I ~l I ~ ~ ~ III ! 11~~1 I ~ i III ~ 1 ! 1i ~ i~1~ I I l / / 1 1 ~ I I r~ ~ ~ 1 1 / / / I V1 ~ ~ 1 ~ ~ I / / 'I I I ~ I \ ~ ~ ~ l it ~ , / !I I , l 1~: I l I ! + 1 ili !I ! i i I I 1 I~r l~ N I q I ~ ~ (pv I~ I II ! I ,.i„• I r I ~ I I I ~ ICI I I I f 1 I I ! / / / ~ A~ v I I ~ ' ~ I I / / / I I l ~ ~ i i l ~ V I III II I I l ~ 1 !l / 1 I I! I II 1 ~ / I ~ IIII I f I l I i I ~ V I'I I ~ ~ ~ I C I I~Illl l! l ! I !I I i i ~ ~ ~ I 0 ICI ~l~ I I I / / / I 1\ ~ ~ / I ~ I I j J 1 / ~ / I / ! / I 1 ~ / ~ I I I / I/ 1 ! II I I I 7~ ! ~ I I i ~ i ~ ~ ~ I i / / ~ I I I ~ I I I lil i ! I 1 1 I i I ~('U 0 ~''~Il ~ I~ I I I / / ~ ! I I CJ ~ / 1 1 I I / / / I I V 1 ~ ~ ~ \ II I ~~II I 1 1 ~ l v 1 !i ~v / II 1 I ~.J ~ ~ a I I I ~ ~ ~ ~l I I 1 I I 11 v! I! I I ~ 1 ~ ~I I I I I~ ~ I I / / l/ ! l 1 l 1~ 1 1 ~ _ ~ i ~ , , / , / ! / i ~ I 1 1 ~I I ~ I ~ ~ ! , ~ ~ _ ~ l~l I ~ ! ~ l \ I ~ 1 I 1 A ~ ! ~ IIII I I 1 ~11~ II i ~ ~ 1 1 ~ / I 1 ~ 1 1~` I ~ i I I l l 1 1 ~ I III ~ ~ ~ _ \ ~ I ! \ \ \ I I I 1 ~ ~ ~ II ~ I I ~ I I I i / / / ! I I ~ ~ ! 1 I , ~ ~ I ~ ~ ~ ~ I / / / ~ 11,+1 / - ~ ~ 1 / 1 i ~ ~ ~ ~ l 1 X 1 1 1 \ 1~ 11~~ ~ I! I III ~ 1 I 1 111 ~ III _ / 1 ~ 1 ~ I ~ I I I I / / / l ~ l I I 1 1 ~ AI ~ ~ / I l ~ ~ ~ / / / ~ I l i l I I I I I / I / / V ~ ~ ~ / i ~ ~ ~ ~ ~ 1 1 I I 1 1 \ ~ ~~1 I I I ~ 1 ~~II~ III ~ ~ ~ - ~ ~ ji ~i ~ ~ ~ ~ 1 1 1 1 I l ~I~~ / Illll ~ ~ I ~I~I~~ I I ,~il,, ~ ~ II o I 2• v~ ~ ~ ~ ~ ~ ~ i ! I ~ 1 1~~ I 11~ I ~ / 111 I~Ifi~ 1 ~ I 111 ICI ~ i ~ A i~ ~ ~ l l ~ I I 1 1 1 1 ~ III I~ I l X11 1 I ~ I II I ~I 1 1 ~ ~ I 1 I I I I~ V I I~ 1 / - ~ ~ i / l ~ I I ! 1 ~ 1 III ~ I A~~~ \ I IIII ° Illl ~I V~ ~ ~ ~ ~ ~ / I 1 I IIII / l/ I l 1~~~ I I 1 ~ ~~l ~ II 1 V~ ~ ~ / / I 1 I ~ I ~1~' ~ l ~ I 1 , - - ~ ! ~ i ~ I I 1 I IIII ~ v ~ I I I ~I i li ! V ~ ~ ~ i~ ~ ~ l/ ! ,i ,i 1 I I ~ 1 I I l I~ I~~ I 1 ~ ~ ICI I I I ~ ~ ~ i / / / / ~el I Il ~ l ! \ / ~ 11 I ~ ~A I I~ l I ~ ~ ~ 1 I l~l 11 i~ 1 i viii : i 11 ~ / / ~ I ! ~ \ ~ / ! ~ v - ~ ~ i ~ , I I!I ~ i 1 ~ + I i li ill ~ ! ! 1 ~ Ali i! 1 v ~J lil~i r 1 i ~ I 1 ~ ~ ~ ! r I ! ~ ~ i ~ I~ I ~ ~ ~ l ~llii ~ ih II ~ ~ ~ / ! ~ 1111 I ~ I ~ 1 / ~ / / I VA~\ \V r ~ ~ ~ ~ ~ ~ / ~ / 11 ~ ' ~ ~ ~1 ICI / ~ - / / I 1 I 1 ~ / , ~ ~ 1\ \ ~ \ ~ / / I i i ~ "J \ \ ! I / 1 1 I ~ ~ ! ! / l I l 1 i ~ 1 1 ~ l~~ i 1 1~~~ ~ 1 i / / i ~ ~ / ~ / l ~ v III I~ 1 II / / - ~ r I I ~ l ~ ~ i- ~ l / I ~ l I 1 III ~ 11 11 ~ A ~ ~ 1 ~A ~ ! ! ~ ~ / ~ ~ ~ ~ I ~ ~ ~ ~~AAVA Il~~ 111 Il \ ~ ~ ~ A \ ~ I ! / ~ / / ~ l ~ ~ ~ 1 1111111 1 ! ~ I I I I 11 I1 I ~ ~ - / / ~ ~ I / / I I J. I~ ~ 1 ! ~ ~ ~ ~ / III V ~ i ~ ~ l 1 ~ ` ~ ~ ~ ~ I / ~ ~ ~ ~ ~ ~ I 11111111 1 I ~ 11 I 1~ 1 ~ ~ 1 C~ ~ ~ ~ ~ / ~ / / ~ ~ ! 1 ~ / ~~Il I I 1 ~ 1 ` ~ ~ ~ ~ I I ~ i l / ~J ~ ~ ~ I 11111111 i ~ l I ~I 2 II ~ ~ ~ ~ ~ I ~ III II ~ ~ I 1 1 ~ ~ / ~ i ~ ~ I ~ i A 1 ~ l ~ ~ l ~ ~ ~ A l I ~ ~ III I ~ ~ 1 ~ 1 ~ ~ _ ~ 1 i / / ~ ~ I ~I ~ ~ I III11 I 1 ~ i ! III / / ~ / ~ / ~ ~ I ~ ~ ~ ~ 1 ~ ~ 1~ 1 1 ~ ~ I ! ! 1 ~ ~ l l ! ~ ~ l ! 1 II III IA-__ ~ l ~ 1 - - - ~ ~ / / _ I V / J ~ I ~ CJ 1 ~ / / / / i \ ~ / 0 I ~ ~ ~ ~ ~ ~ ~ ~ ~ I t ! I ~ ! ~ ~ l ~ ` ~ 11111111 \ ~ ~ ( ~ ~ ~ I I ~ l ~ ~ I I I ~ ~ (O ~ ~ ~ I ~ ~ ! ! ~ ~ ~ ! V 1 ' ~ A I 1 V ~ i ~ ~I~~ I l ~ d / ~ 1 ~ ~ i/ / _ / ~ ~ i ~ ~ ~ ~ ~ ~ ~ ! ~ ~ 11111111 i ~ I ( I I I~ ~ I ! I ( I ~ ; A - I / ~ / / I ~ "J ~ II I . I ~ ~ I ~ ! ! ! ~ ! 1 I ~ ! ~Ill~l ~ / ~ Il ~ 111 ~ 1 / ~ ~ ~ 1 i~ ~ ~ A ~ I I ~ ~ ~ ~ ! ! I ~ v / ~ I ICI I ~ ICI I I I; ~ ~ ~ ~ l l ! I ~ 1 1~ ~ I ~ - ~ ICI i I~~ 1 11 ~~~1 1 / ! ~ ~ ~ \ \ ~ 1 1 ~ ~i ~ \ Ili: II ~ ~ ~ ~ ~ / 1 ~ 1 I Iliillll V ~ ~I I ~ I ! ~ 1 I ~ ~ / ! ~ / \ II ~ ~ i ~ ~ ~ - ~ 1 -1 I ! 1 ' ~ ~v t , (,,~(p' (i ~ l I l ! ~ I ~ / / ~ ~ I ll!/ l I ~ ~ J ~ ~ 'V / ~ ~ l II ~ I ~ ~ ~ i _,ill! I ~ 1 _ J I l i ~ ~ ! 11 v Ij1~ IIII 1 I Jr b 1 ti ~ A ~ ! ~ / ~ vv 1 i ~ ~ ~ ~ ~ ~ - ~ ~ ~1I1~ 1 I \ r,_~~ ~ ~ ~ _ _ ~ 1~V~_ 11 ~ ~ 1 i 111 v ~ ~ ~ 1 ~ ~ ~ ~ / ~ ~ i Q vv11 I iii - ~ ~ ~ ~ _ i 1 ~ i ~ ~ ~ \ _ / I / ~ ~ 1 ~ 1 \ I 1 V ~ ~ ~ I 1 ~ Qj11 1 I I _ ~ I I ~ - _ _ "1 1 11 ~ ~ ~ ~ ~i / l l~ I (i, i ~ ~ 'f' / \\II ~ \ ~ I 1 ~ ~ / / ~ / ~ /l! I ~ l ~ - - - - ~ I / , III / / / A i I 1 \ 1 ~ - ~ f~ ~ i ~ I ~ 1 111 111 ~ ~ / I ~ ~ _ I I 1 / 1 ~ _ ~ ~ ~ ~ A \ \ ~ ~ ~ ~ ~ ~ ~ \ ~ / I / / ~ ! I / i 1 - ~ i ~ ~ AA V l i ' J ~ I / ~ ~ I A ~ ' ~ ~ / I ~ ~ I I / 1 1 ~ ~ I ~\II I I I O / \ / ~ 1) IA I I III III I I / ~ ~i ! ~ I l l ~ i i / I I I i l ~ ~ ~ i / !/I III II / / A11 i ! / / ~ / ~ ~ ~ \ ~ 1 1 1 ~ ~ - - - - I ~ ¦ ~ l ~ ~ I - _ ~ I I v / ~ v I 1 1 A 1 / 1 - ~GNAI A ~ ~ ! ,I I! r_(~ I III ~ ~ ~ ~ ~ ~ ~ ~ / ~ III / ~ ~ ! / ~ I 1 i / ~ ~ ~ _ ~ ~ / / ~ ~ - ~ i / ~ / / I / ~ 1 / ~ - - ~ ~ - / ~ ~ / / ~ ' ~ ~~i i!! / / `"1 1 11 ~ l ~ i ~ \ ~ 1 1 \ i i~ ~ ~ I ~ \ / ~ + Ill ~ 2 , I, I II _ 9 II ( / ~ ~ A V 1 1 ( i I I ~ ~ I i ~ ~ l i ~/ii i~i~ l ~ ~ _ ~ ~Q / / I 1 ~ - ~ ~ / i ~ l f ~ I I I I ~ i l ~ l ~ ~ 1 ~ 2 I I I I ~ I ~ ~ I I ~ ~ ~ \ 1 ~ ~ I I ~ ~ ~ I ~ I ~ I ~ III ° ~ ~ i / i~~ ~ ~i ~ l ~ ~ I , / ~ ~ - v I i i / I iii ii ~ ~ ~ / ! / I i l ! i i ~ i _ l I ! ~ \ v ~ ~ 1 i ll, i ~ ~ I ~ ~ ~ I ~i ii it ~ ~ ( .1 ~ ~ i ~ 1 i ~ / / / / I I I ~ ~ i r ii 1 I ~ i, ~ I i I / ~~i ir~ ~ ~ ~ ~ ~ , ; ~ ' ICJ ~ ~ / ~ _ ' l I I I ~ V ~ \ \ I I II, ~ ~ I 111 / ~ I I i~ \ ~ ~ 1 / / ~ I I ~ ~ ~ A ~ ~ ~ / I I I \1\ ~ ~ V ~ I ~ ~ ~ ~ ~ A V I l l I I \ ~ i I l~ 1 ~ I / / 1 / ~ ~ 1 ~ / ~ ~ I / / I A 1 ~ ~ ~ ~ / / ~ \ ~ I / ~ ~ / ~ ~ / / A V ~ ~ ~ ~ ~ 1 ¦ / 1 I ".J I A ~ 1 A I ~ I 1A A\\\ 1 ~.J i% 11 / / -1 ~ 1 ~ ~ ~ I ~ 1 \ A ~ ~ l /i-- \ i ~ I / ~ V ~ / ~ ~ I ~ ~ \ \ V I I - I ~ ~ A A A 1\\ 1 1 ~ i/ j ' 1 I I ~ ~ V ~ ~ ~ ~ ~ ~ I I / ~ ~ t I ~ I l /i 1 I / ' ~ ~ I I I I ? ~ ~ r / ~!~!i I v ~ ! 1 + ~ ~ ! I V I I ! 1 1. ~ ~ ~ ~ ~ ~ ~ I ! ~ Il I ~ I ~ ~ ~ ~ ~r~~ V A I / ~ / 1// r / 1 1 ~ 1 ~ ~ - I II 'I ? , i I II 1 IIIIII ~ ~ ~ / I I ~ 1 ~ , ~ 1 l ~ / ~ ~ ~ V~~ ' ~ ~ N 11 I ~ I I I I ~ ~ 1 ~ ~ ~ ~ i~ ~ ! ~ I ~ Il I I I ! ~ I ~ I I A~ ~ ~ l l ~ I / I i / v 1 ll ~ I I / / "_J ~ v: % ~ ~ ~ ~ 11 v 111 VA ~ I ~ ~ I ~ - 1 i _ ~ - ~ ~ i I I I ~ ~ 1 V _ ~ \ 'I I / I ~ ill ~jl i`~11 1 V1\ V~ ~ / / ~ ~ / ~ i i I I ! ~ I I ~ ~ I ~ l V~ ICI ~ ~ ' ~ ~ l i A\1~ 1 1 VAV AV AA ( I / ~ / ~ ~ \ \\~AV 1 V I I ~ 1 1 I / i i l I ~ ~ \ _ 1 I ' ! ~ ~ ill i i / ~ ! i ! I I / ~ ~ / ` 111 I~ - _ / 1 11 vv~ rA~ ~ I i ~ ~ / ~ ~ / _ / 1 111 1 ~Vv~v I V 'V V I 1 / ~ / 1 ~ v / ~ ~ ~ ~ ~ / I 1 I II _ i ! ~ i ~ / 1~ 1 11 A~V t I ~ ~ ~ ~ ~ ~ 1 .Il v VA Q ~ I \ ~ ~ ~ 1 I 1 ~ ~ ~ / ~ \ _ ~ / ~ / . I \ v vv v J V ~ 1 I I ~ ~ ~ ~ ~ ~ / \ 11 V~ 1 ~ ~ i / ! ~ ~ I ! ! ~ ~ I - - - ~ ~ ~ ~ ~ ~ j~ l~ ~ 1 \\\1~ ~ ~ ~ i ~ l ! / ~ ~ I _ - - - i ~ ~ ~ V 1 I 1111 1 1 \ VA~~ \ VA~ ~ V 1 1 I I ~ ~ ~ ~ / ~ \ i ~ V ~ ~ ~ - - 1I 1 1 A\~~ v I `V V \ V 11 1 I ~ ~ ~ ~ ~ 1 ~ I I III \ y. y A~ ~ 1 I I I ~ ~ ~ - 1 1 I ~ i ~ / l~ l 1 11 - 1 ~ A ~ I - ~ ~ V ~ ~ I I ~ - - ~ V ~ \ lll~ A l A ~ ~ ~ I I I 1 I ~ ~ \ I ~ 11 \ V ~ A ~ V ~ A v ~ ~ _ I I 1 '~I - - , ~ i ~ ~ I I I \ ~ ~i I _ I i I ~ 111 ill I ~ ~ / ~ ~ ! ! \ 'f' ill ~ !I ~l ~ ~ - i i ~ l / % / 1 1 1 1 /ill ~ \ ~ A~ ~ ~ A V A I I 1 ~ \ 1 ~ ~ ~ ~ ~ ~ i ~ , - 1 i 1 11 1 A A v vA ~ ~v I I A _ A 11 ! ~ ~ i 1 ~ \ \ ~ I ~ i - / ~ ~ 1 ! \ \ ~ I I lll~, ~ _ _ i, i ~ i 1 I I v v v v ~ v l I I 1 ¦ 1 / I _ / I III V1 VAvv AA v I I 1 1 ~ _ ~ ~ 1 ~ n / I II. I I I A A \ v \ 1 I I I I I 1 i ~ ~ ~ / I I l A V ~ li _ IIII~~ i - - - , _ A ~ l~~ ~ l~~l l 1~ II ~ `k ~ !I ~ \ ~ ~ _ I, , ~ ~ ~ ~ ! !I i / III I ~ 1A1 ~ AV A A\ \A \ ~ I I I I j I 1 ~ i ~ ~ ~ ~ ~ ~ ~ ~ ! I i- ,y, J I / \ ! I \ l I /I II I 1111 vvAAv vv v ~ ~ I I I I 1 I ~ ~ ! ~ ! I III I I V A \ ~ \ Av ~ \ I 1 I 1 I 1 I ~ I ~ - _ _ _ ~ _ _ ~ / ~ / _ 1 / hill 11 I 1\\ \VA\AA - ~ 1 1 11 \ \ 1 I 1 ! ~ ~ - ~ ~ ~-i~~^~~ ~~~~i~ ~ l ~ ~ ~ ~ ~i~ dl ~ ~ l I I I 1 111 1 v \ v w ~ v 1 ~ ~ \ 1 1 1 ~ t, 1 1 I / ~ ~ ~ ~ - ~ ~ ~ _~i~~~ ~ 1 l - I ~ ~ / ~ l I '1, ~ ll I I II I 11 11 ~ v ~ Av 'V v ~ 1 1 ~ V 1 1 1 ~ r ~ ~ ~ ~ I I 1 ~ V \ 1 1 I 1 V A ~ ( ~ - ~ ~ ~ l I \ ~ ~ 1 ~ / / ~ / I ~ I ~ ~ ~ \ ~ ~ ~ ~ ~jl l~/ ! ! I ~o / I I I I 1 ~ 1 1~1A ~ AAA v_ t 1 A 1 1 l ~ _ ~ I 1 ~ \ v - ~ `11 ~ V 1 1 / ~ ~ ~ I 11 1 ~v l ~ A\ ~ y ~ V 111 I t 1 A 11 1 A 11 i I ~i ~ I I / / ~ A ~ ~ ~ - - ~ 1 i ~i i ~ v ~ ~I ~ v ~ A ` ~ v ~ I iii lip I ~ l~1 1 I / I I 11 I 1 ~ ~ 1 1 1 1 1 I I 1 ! 1/ 1 \ ~ 1 1 ~ 1 1 1 1 i i i i ~ _ / I ~ A I I ~ I ~ 1 I i ~ ~j ~ ill I I ~ /ry~ ! 1~ I II 1 ~ 1 1 A l / / i / ~ ~ i I I. II 1 ` JI 1/I 11 v V ~1 I 1 1 1 I 1 A 11 / i !l ~ I V ~ 1 l I ~ I 1 \ I / ~ l l l ~ I \ ~ ! I / _ ~ / ~ / / ~ ! l ~ il! I I A ~1 ~ ~ / ~ 11 I ~ I ~ I I I 1\ v V 1 1 I 1 I l 1 I I ~ ~ I ~ / I ~1 1 I l VA I / t / ~ ~ II ,11 ~ , ~I 1 I~,Rvv,v, v±~,~ 1 I',1 II ~o, I',1 , ` ~ ~ ~ _ , ~ I ~ i v ~ 6!.! illy ~ ~ I ~ / ~ ~ ~ ~ I i l ~ -I~G1~ ,i ~ ~ I _ 11 I / ~ I 1 \ VA ~ ~ 'n ICI ~ v~~ 1 v\ v AV' \ ~ / I / I ~ ~ ' _ ~v " / - i ' r V l 1 J ~ i 1 ~ ~ I I I / / / / ~ / / - _ \ ~ i / I I I I/ vv v I 1 I I V ~ ~ V v~ - / - ri rr 1 , r-~ ~ ~ /1 II / I ri~~ II 1I I I ~ / / ~ / / / ~ r r , ~ A 111 1 I ' 1 ~ 1 1 1 I ~ I I V A v v //l I I \ ~ I v ~ v~ 1 l l v v v~ v~~ - / 1 11 A I, 1 v v / I 1 I v v ~ v v ~ - ~ ~ ~ ~ 11 II r I I I I ~ / ///i / VA I V A///~/ ~ / 1 A V 1 V 1 1 v v v A V ~ ~ ~ ~ _ / v~ ~v- ~ ~ 1 ~ ~ ~ I I1 I I ~ 1 ~ I I 1 1 1 i t I I I /i l / I i 1 II I I ' I 1 - r ~ ~ ~ I I i 1 I / l VA\ \ i~~l I I 1 V v v ~ \ 1 ~ V 1 1 A ~ ~ `v ~ v - / 11 / I I I / ~ / I I1 "J - ~ ~ A A I I I 1 I I / / / / / ' I ' I I 1 / / ~ " ~ I 1 / / l ~ /i / _ A / I 1 I I / r - l r ~ ~ V ~ II I I / ~ r Q 1 - ~ / / r ~ ' ~ r l \ V I 1 I I ~ ~ ( ~ ~ I I I I / ~ / / 1111 1 f \ 1 1 \ - 1 I \ \ \ I I - ~ ~ \ - _ / r II I ~ / / / -.J~ Q I / //F / ~ ~ A III I { / l " I I - ~ / ~ ~ \ 111 ll I 1 I ~ - 1 i I I / 11 11 .J~ /jl: l ' r A I I A I I 11 / 1 ~ \ h ~ / / i ~ A I 1 ~ 1 / / ~ 1 I I ~ / A \\V A A V~ I \ ~ / / / ' ~ y ~ - - ' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ VA v~~ \ ~ /II 1 11 111 ~ / / ~ r 1 1 II \ r 11 / l/l \ . - _ ~ ~ ~ 11 1 \ 1 ~ 1 ~ l / ~ - ~ i I I ljl ~ /l ~ 1 ~ ill`---- i ~ / l ~ ~ ~ ~ ~ ~ ~ / r ` ~ I 1 \ / i 1 II / / I I ~ i i / r 1 0 / 11 ~ l ~ \ ~ \ / i'~ ~ l I I i~ / r l/1 ~l 11 l ~ 1~ A ~ ~ r 111 / II ~ I ~ / lil ° 1/I ~ ~ I~~ r ~ ~ ~ ~ rill 1 l~ I _ aa I' 1 - ~ V• / ^ / ~ ~ - ~ ~ ~A A V ~ ~ V ~ / 1 / 11 / / 1 ~ ~ i~ / f V A ~ ~ ~ \ A ~ 1~ / ~ ~ ~ ~ II 11 / ~ ~---r \ \ - \ ~ V ~ ~ ~ ~ ~ ~ r ~ 1 / r I / I l I II ~ ~ / / / 1 ~ i ~ r ~ \ \ \ i I I 1 ~ ~ / / - i ~ / \ \ ~ v ~ ~ ~ + ~ ` r I , I ~ ' I I II ~ / iii V ~ ~ ~ ~ ~ ~ A~~ ~ ~ i 111 l I ~ r~ r~ /i/ ~ ~ii~ + 1 / ' 'ice / / / / ~ - \ \ \ \ \ \ \ \ ~ \ ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ I I / 1 I I 1 I l ~ r ~ r ' ~ ; /j// 1 ~ ? r ~I ~ ~ Il 1 / - \ \ I l / /I ~ / ~ / ' ~ i ~ ~ \ \ \ \ \ \ \ \ \ \ \ I I I " / ' / ~ ~ \ \ \ \ \ \ ~ \ \ \ \ I I I ( / / ~ 2 \ ~ \ \ \ \ \ \ ~ II l~ / / ~ ~ ~ ~ A v\ V v v v I A v v ~ ~ ~ ~ ` v`~ ~ ? ~ ~ v ~1 IIII / I I I I / ~ + 1 I : lll/ I ~~1 ~ 1 ~ ~ ~ v 11 ~ - 1 Il ~ ~ ~ ~ 1 / ~ ~ I I ~ 11 ~ v v~v 1~ ~ ~ ~ , I I ~ 1 , I I II I I I 1 / / / \ ~ ~ \ \ \ \ \ \ \ 1 1 1 \ I I I I ~ I , ~ v ~ \ v v ~ I 1 1 I'~ ~ v ~ ~ r II ~ / 1 ~ , ~ Il I 1 1 v~ v ~ ~ I I X 1 1 I / , 11 N I ~ 1 ~ ~~1 I \ ~ 11 ~ r , ~ 1/ I I I ~ / I I ~ ~ \ V A v ~ I I / I I I I I / vv v i v v v v I I I ~ I I 1 1 I / 1 1 / 1 ~ 1 1 ~ ` 1 1 1 1 t r 1 _ 1 ~ ~ 1~ 11 r I 1 J r ~ 1, ~ ~ r ~ 1 I 11 , ' ~ 1 r ~ 1111 111/ ~ I I I I ~ \ \ I 1 \ \ \ \ \ \ I I ~ I I I \ I ~ ~ ~ ~ / \ ~ I I I I i< < I 1 i~ r ~~i ~r - ~ 'V~ 1 1 r 1 1 I ! 1 r ~ ~ 1 ~ ~ ~ ~<<~ ~ I I 11~ r r ~ III 111 111 , ~ ~ 1 1 1 1 1 1 I I I~ \ v v ~ ~ ~ A A\ V A v v v l l( 1 \ 1 1 I / \ \ \ / \ \ \ \ I 1 \ 1 1 1 1 1 I I ~ / v A J / ~ I \ V A v v 1 1 1\\ V I l 1 - - ~ ~ - ~ ~ 1 / / ~ 1 ~ 1 I 1 ~ 1 ~ ~ ~ I 1 ~ r / r II I l / / ~ ~ ~ ~ 1 1 1 1 1 1 1 I I ~ \ / v v \ \ V A v v v I I ~ 1 1 V 1 ~ _ V ~ v v v l l 11 1 V `I I 1 1 1 1 1 1 1 v v V / ~ ~ v ~ t I v \ I \ I 1 I ~ ~ ~ 1~ ~ 1 ~ ~ ~ ~ r r ~ 1 II /l 11 l/ / ~ ~ ~ r I ~ ~ ~ I ~ , r III / I/l1 ~ ~ ~ ~ ~ 1 i I 11 1 1 1 1 vv v ~ ~ v v / / v v 1 ! I I I I I I I 1 1 v ~ ~ I I I I I I I v 1~ ~ 1 , r~ I I l~ I r/ ~i ~ ~ ~ I ~ ~ I / / \ I ~ ~ ~ \ ~ V - i r - I l / ~ 11 / l/ ~ ~ r 1 1 \ ~ \ ~ i \ ~ \ I I I I I I I 1 1 1 \ \ \ ~ / / / \ \ \ ~ / / / ' / ~l I / I 1 I I I I ~ ~ ~ ~ ~ ~ ~ 1 v ~ I I I I ~ ~ ~ \ ~ n 1 1 \ \ \ \ \ / _ ~ / ~ / / / ~ I I I 1 1 1 1 \ v v A~v \ \ \ / ~ v v v v / / / / ~ ~ / I I A I ~ ~ ~ ~ ~ ~ ~ r I i i ~ ~ I 1 ~ ~ ~ ~ I i ~ _ ~ I i ~ `r ~ ~ ~ ~ ~ I I ~ i I 1 \ ~ ~ ~ ~ ~ ~ I ~ ~ ~ _ ' I II iii i// ~ I ~ ~ / \ \ / / / / i i / 1 ~ 1 A. v V v A V ~ v v v l ~ ~ ~ ~ ~ ' \ i 1 \ \ \ / ~ \ / / ~ i l I 1 V ~ ~ ~ ~V ~ / ~ _ i I I I / r 1 / / \ \ \ \ \ \ \ \ \ \ / / / \ \ \ \ \ / / / / i i i l 1 \ V / / / / ~ i / / / - ~ \\V r ~ - ~ _ ~ ~ r ~ III ~ ~ / ~ / / / / / 1 ~ ~ . VA V~ ~ \v~~ ~ ~ ~ ~ II III -1• i i / / ~ / ~ + ! \\V A\\V~VA V VA\ ~ / 1 o A / I ~ - A~ / I / / / / / v \ \ \ / / V / / ~ i ~ / / ~ VA Vv / ~ II I I ~ \ ~ A I 1 ~ - ~ V I I , / J~ / / ~ - \ ~ I I ~ / / / / 1 V~ II /l 1l ~ / / ~ \ \ / / I I \ \ \ 1 / / / l / ' i / ~ ~ A \ ~ ~ 1 1 a 1 I / + ~ ~ / / / i \ r I I I I l \ / r ~ ~ ~ ~A~ 11 ~ I ~ III M ~ / / / / l / l vv v v vv v v I I v v v 1 1 / / / ' \ \ \ \ \ \ / / / / \ 1 1 / / / / 1 I ~ \ 11 \ 1111 ~ I 11 III r~ / / / I Il \ \ \ \ \ ~ / l / / \ \ \ 1 / / / l / l / / / ~ ~ i / / / _ - - \ \ \ \ \ \ \J l l / l / \ \ \ 1 1 \ ' / / / l l ! / / ~ ~ / i i ~ 11 1\\ ~ ~I~ II IIII r/// ll ~ ~ / / , /11 1 l 1 1 A 1 _ ~ i, V A ~ ~ / / / V A / / / ~ ~ / \ ~ \ v / / 1 1 / / / ~ / \ / _ A / / ~ ~ ~ ~ / l ~ / / ~ I \ _ I I /i ~ \ i l r r I r ~I 1 \ III , r'r (~,~'i- ~ ~ r I I V A \ A \ ~ ~ / / / v 1 1 1 A i / ~ l l l l l / / i i , ~ / / - - - V A A \ \ V . ~ ~ ~ ~ ~ / / / / 1 1 1 / / / / / / / ~ - ~ / / / . v v~ v v ~ / / V 1 / / / / ~ ~ / r , I / 1 I 1 ~ i ~i ~ ~ ~ r - , r / / I ~ ~ / / i 1 I I III I I I ~ ~ ~ 1-r ~ r , ~ 1 VA v vvvv v / ~ ~ I ~ I V 1 1 11 1 ' ~ / / / / / ' - V v \v A ~ / / ) /A V 1 / / l l l / / ~ ~ / / ' / i / ~ II 1 ~ ri I - 1 III I~ I ~ ' ~ ~ ~ ~ ~ r ~ I ~ rr ~ ~ ~ 111 1 II ~ I I %i r r~ =_r r 111 v \ V ~ / 1 / / / ~ / v ~ v \ - / 1 1 1 / / / ~ / v v ` v \ v v ~ ~ ~ ~ / l l l l A V A 1 ~ / / ~ I l / / / / l / / / ~ / r ~ i / ~ I I 111 ~ III I I 11 I r~% ~ ~ r ~ _ _ ~ I ~ ~ 1 I \ 1 ~ III I 1 'r' ~ ~ \ ~ ~ ~ li I ~v V A ~ / / V A V \ ~ / / I l l / l / l ~ ~ / i / V A ~ A ~ ~ i / / / / V A A / / / / / / ' ~ ' ' - - ~ V A A v v ~ - - ~ ~ / / ~ \ \ V \ \ ~ / ~ / / / / / ~ ~ / / / / ' ' ~ ~ l I I 1 II ~ ~ I II ' r I 1 . ~r r ~ ~ 1 Ill I 1 i r/ ~ ~ - r i / / 1 II I II r~ r'~' ~/I I _ _ V~ V A A v v v v ~ ~ ~ , - ~ ~ / / / \ V A \ V ~ / / / / / / / / / / / ~ / / / \ ~ ~ i / V V A A / / / / / / _ ~ ~ ~ ~ ~ r I I ~ 111 I II / ~ / / ~ ~ ~ ~A1 I I 1 I ~ , ~?,~rr~ _ 111 ' ~ A V A V v ' ~ / V A A v / / / / / / / ~ / ~ / V A ~ ~ - - ~ ~ i A V A \ ~ ~ / / / / \ V v ~ ~ ~ / / / V A A / / / / / / / / / ~ ' / / / / / ~ _ \ ~ 11 I / r \ 1 \ ~ ~ ~ ~ ~ _ _ - ~i ~ , ~ ii~,~ - ~ A\11 ~ II - / i~ 'i AA V / r ' ~ ~ / ~ r ~ ~ ~ ~ \ ~l II i~i ~ ri ~ \V ~ AA ~ l ~ ~ ' ~ 'r v v ~ ~ ~ ~ ~ ~ A / ~ / / / ~ v ~ ~ . " / V A \ \ V / / / i / l l / l / / ~ / / l / A V A / / / i i ~ i / i ~ - - - - - i i ~ ~ ~ ~ A ~ ~ A \ i 'i ~ VA \ . / ~ ~ i ~ ' ' - ~ ~ - - - - - - - ' i i ~ V ~ i A ~ / / ~ / / ~ ~ ~ ~ A A \ V \ \ / / / / / / ~ i~ i r \ / / i i i ~ - - v v v ~ ~ \ \ \ V A / l I l l ~ ~ ~ ~ / ' r A P\ I ~ ~ ~ ~A ~ r r r - - _ i i, i ' r ' r V III ~i ~'i, \ ~ r ~r~, ~ r ~ l ~ ~ r '~r \ \ ~ / ~ ~ A \ V A A V \ ~ / l l I / / ~ i i i ~ ~ ' r , i ~ ~ ~ - 1 ~ - - - / \ ~ \ ~ ~ ~ ~ A\ ~ / / ! r ~ / l / l / ~ ~ r \ \ \ \ ~ ' ' ' ' ~ / \ \ \ V l l ~ l ~ l l / i ~ ~ i i i ~ i / ' , / \ V \ ~ ~ ~ / 1 \ V A A \ \ l / / / / / / ~ / / ~ / i i i / ' ' ~ \ ~ J~ \I / ~ / / r ~ r r ~ ~ i AVA ~ ~ ~ i ~ ~ \ 1 / / / l 1 / l r / l / / ~ r \ v i ~ V A V A A ~ / l ~ ' ' / i ~ v \V ' ~ ~ \ \ V A V ~ ~ / ~ ~ ~ l ~ l l / / ~ / i i / ~ r r 1 ~ / i i ~ / l 1 I l l~ ~ l r ' r ~ ~ ~ ~ III r , ~ ~ ~ ~ V`, 1 / / I I I / / l 4 .y ~ \ \ v _ - 1 1 1 I 1 1 / / / ~ / ~ / / / / i , r / ~ l 1 ~ ~ ~ 1 1 I / / / v ~ v ~ / 1 1 1 1 I / / I / ~ / / / ~ / P ati - I 11 (~1 I I / / 1 o s ~ ~ I '.J / l I I G 1 ~ - ~ ' i ~ / \ 1 1 I I I I / / / ~ / / / / i ' ~ i' / ' / i ~ ~ Y i / _ V A 1 1 1 I l/ / / 1 / ~ ~ l l ~ l l / / / / / ~ / / / ~ / , r ii~ ~I I1 ~ ~ \ A / I ~ 1 - , - ~ ~ I I 1 Ill 1~ ~ ~ ~ \ , / I ~ I ~ / ~ V 1 1 1 I l / / I / / / / / ~ ~ / / / ~ v ~ / /VA A V A I I I l l I 1 / l / / / / ~ ~ / / / v ~ , ~ / / V A A ! 1 / / / / / / / / / ~ ~ / ~ / / i ~ / 1 + ~ ~ ~ ~ I 1 I 1 1 - 1 I 1 ~ ~ 1, ~ v ~ ~ ' ' A I ~ I 1 / 1 I / l l / / l l l ~ ~ ~ , ' ' ~ / / / ~ - I I I I I I I / / / l ~ l l/ l / l l/ / ~ / / / ' 0' ~ I ~ I ~ ~ \ f I I 1 \ ~ ~ ' ' ~ ~ - iii % I I I 1 1 ~ ~ ~ V 1 I I ~ ~ \ / I I l ~ I ~ l l l l/ / I / ~ / ~ II / / / / / ' ~ / i 'ii~ii I ~ ~ A 1 1 I ~ r , ~ ~ ~~'ii i Oi I I I I 1 I \ " i AV A ~ \ \ ~ A 1 \ 1 ~ ~ ~ V \ ` - , /I I I IIII I I / / / lI 1 ~ ll / / 1 I / / / / ~ / / I I ~ / I / / / 1 I / / ~ / I IIII IIII I ~ - ~ / I I I I I I I I v I I / l / / / / /I I I I III I ~ l l I I I I I l / l l / l l r r 11 IIII ~ \ \V ~ ~ ~ ~ ~ ~ ~ ~ ~ ` ~ r ~ r I ~ ~ ~ 1 r ri / II ~ \ ~ ~ / I I l l I lI 1 I ~I ~ / / I I I I I I I 1 1 / ~ l l l I ~ v I / I / I 'rir l l V VI I A \ ~ ~ ~ ~ ~ ~ ~ 1 ~ is , ~ ~ II I I I ~ A ~ 1 ~ ~ ~ ~ ~ ~ ~ i rr i v ' / I I I I I I V / l/ / I I 11/ A 1 1 1 I / I I / I 111 I / / I I 1 I I ~ ~ i I ~i III ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ s'~ I I 1 1 1 I I I v / / / ~ 1 1 I I v~ 1 1 1 1 V I i I I I I) v / / 1 1 1 A-, 1 1 1 1\ V I I I i ~ir~iii l % III I ~ ~ ~ ~ ~ ~ ri / / I /ii'~~i / / / III I ~ ~ ~ ~ \VA ~ ~ ~ ~ ~ ~ IIII ~ 1 1 1\ 1 1 I / / 1 1 /i- / I I ~ AV ~ \ ~r T ~ ~k ~1 Carolina Wetland services Isolated Wetlands Permit Prepared For: Mr. Tom Bruce Mr. Brian Rollar REALTICORP 14120 Ballantyne Corporate Place, Suite 160 Charlotte, North Carolina 28277 (704) 542-7773 24-Acre University Crossing Site Charlotte, North Carolina Carolina Wetland Services Project No. 2003-0424 April 21, 2004 Prepared By: Mr. Gregory C. Antemann, P.W.S. Mr. Kip J. Kerecman Carolina Wetland Services, Inc. 5000 Nations Crossing Road, Suite 230 Charlotte, North Carolina 28217 (704) 527-1177 I )A? WETLANDS 1401 GROUP APR 2 2 2004 WATER QUALITY SECTION 5000 Nations Crossing Road, Suite 230 • Charlotte, NC 28217 • (704) 527-1177 Office • (704) 527-1133 Fax www.carolinawetlandscrviccs.com kia L n u n r. L n 24-Acre University Crossing Site April 21, 2004 Isolated Wetlands Permit Application Project No. 2003-0424 Table of Contents Executive Summary ......................................................................................................................... 1 Existing Conditions ......................................................................................................................... 2 Current Land Use ......................................................................................................................... 2 Jurisdictional Delineation ............................................................................................................3 Pre-Application Meetings ................................................................................................................4 Agency Correspondence ..................................................................................................................4 Purpose and Need for the Project .................................................................................................... 5 Avoidance and Minimization .......................................................................................................... 5 Proposed Impacts to On-Site Features ............................................................................................. 5 Compensatory Mitigation ................................................................................................................6 Storm Water Management Plan ....................................................................................................... 6 List of Attachments Attachment A - Figure 1. USGS Site Location Map Attachment A - Figure 2. NRCS Soil Survey Attachment A - Figure 3. Wetland Boundary Survey Attachment B - Agent Certification of Authorization Form Attachment C - Pre-Construction Notification Application Attachment D - Routine On-Site Data Forms Attachment E - Stream Classification Forms Attachment F - Representative Photographs Attachment G - Agency Correspondence Attachment H - U.S. Army Corps of Engineers Notification of Jurisdictional Determination Attachment I - Figure 4. Proposed Impacts r. 24-Acre University Crossing Site April 21, 2004 Isolated Wetlands Permit Application Project No. 2003-0424 Executive Summary The 24-Acre University Crossing Site is located in Charlotte, North Carolina, in the southwest corner of the Mallard Creek Church Road - North Tryon Street (US 29) intersection (Attachment A - Figures 1 and 2). REALTICORP has contracted Carolina Wetland Services, Inc. (CWS) to provide permitting services for this project (Attachment B). The results of the on-site field investigation conducted by CWS indicate that there is one jurisdictional wetland area (Wetland AA) and one non jurisdictional wetland area (Wetland BB) located within the project limits. On-Site jurisdictional areas were field-verified by Ms. Amanda Jones of the U. S. Army Corps of Engineers (USACE) on November 17, 2003. On behalf of REALTICORP, CWS is submitting an Isolated Wetlands Permit application with attachments in accordance with North Carolina Administrative Code T15A: 02H.1300 (Attachment C). n u s L, 24-Acre University Crossing Site April 21, 2004 Isolated Wetlands Permit Application Project No. 2003-0424 Existing Conditions The 24-Acre University Crossing Site is located in Charlotte, North Carolina, in the southwest corner of the Mallard Creek Church Road - North Tryon Street (US 29) intersection (Attachment A - Figures 1 and 2). This project proposes to develop approximately 24 acres of land into a commercial development. REALTICORP has contracted Carolina Wetland Services, Inc. (CWS) to provide permitting services for this project (Attachment B). The following sections describe the existing conditions of the project area. Current Land Use The current land use for the site is undeveloped woods. The current land usages for the surrounding areas are commercial and residential and consist of apartment complexes and shopping centers. Dominant canopy vegetation within the project area includes sweetgum (Liquidambar adi i l bl ll i Pi d h kb lti t i l t li l Li i d d t ) C ron p fera), y p ne ( nus ac erry ( e s s yrac ? ua), u p pop ar ( r o en o o ae a , laevigata), and red maple (ricer nebmin). Dominant understory vegetation consists of Chinese privet (Lignrstnun sinense), poison ivy (Toxicodendron radicans), Japanese honeysuckle (Lonicera japonica), and kudzu (Pueraria ntontana). According to the Soil Survey of Mecklenburg Countyt (Attachment A - Figure 2), on-site soils predominantly consist of Enon sandy loam (EnB and EnD). This soil type exhibits slow permeability and medium water capacity. u n C! 1 U.S. Department of Agriculture, 1980. Soil Survey of Mecklenburg County, North Carolina. 1 2 L? r fl 0 u n n u r. C 24-Acre University Crossing Site April 21, 2004 Isolated Wetlands Permit Application Project No. 2003-0424 Jurisdictional Delineation From September 24 to September 26, 2003, CWS's Gregg Antemann, Isaac Hinson and Kip Kerecman delineated on-site jurisdictional waters of the U.S.z within the project area. Jurisdictional areas were delineated on site using the U.S. Army Corps of Engineers (USACE) - Routine On-Site Determination Method. This method is defined in the 1987 Corps of Engineers Wetlands Delineation Manual 3 Routine On-Site Data Forms representative of Wetland AA, the non jurisdictional isolated wetland area, and adjacent upland areas have been included as Attachment D. On-Site channels were classified according to recent North Carolina Division of Water Quality (NCDWQ)' and USACE guidance. These classifications included sampling with a D-shaped dip net, taking photographs, and defining breakpoints (a point at which a channel changes classification) within each on-site stream channel. No jurisdictional stream channels were located on-site. A NCDWQ Stream Classification Form and USACE Stream Quality Assessment Worksheet representative of on-site non jurisdictional channels have been included as Attachment E. Results The results of the on-site field investigation conducted by CWS indicate that there is one jurisdictional wetland area (Wetland AA) and one non jurisdictional isolated wetland area (Wetland BB) located within the project limits (Attachment A - Figure 3). On-Site waters are located within the Mallard Creek watershed. Mallard Creek is part of the Yadkin/Pee Dee River basin (HU# 03040105)5 and is rated "Class C Waters" by the NCDWQ. Wetland AA is approximately 0.35 acre in size (on-site) and is located within the floodplain of Mallard Creek in the southeastern portion of the site (Attachment A - Figure 3). This wetland exhibits hydrophytic vegetation consisting of false nettle (Boehnieria cylindrica), willow oak (Quercus phellos), sycamore (Platanus occidentalis), tag alder (Abuts sernilata), poison ivy (Toxicodendron radicans), Chinese privet (Ligntstnan sinense), and sweetgum (Liquidambar styraciflua). Inundation and saturation within the upper twelve inches of the soil profile and low- chroma soils (10YR 4/2) with mottles (5YR 4/6) were also observed within this wetland. A data 2 "Jurisdictional waters of the U.S." includes essentially all surface waters such as: all navigable waters and their tributaries, all interstate waters and their tributaries, all wetlands adjacent to these waters, and all impoundments of these waters. s Environmental Laboratory. 1987. "Corps of Engineers Wetlands Delineation Manual," Tcclmical Report Y-87-1, US Army Engineer Waterways Experiment Station, Vicksburg, Mississippi. ° North Carolina Division of Water Quality, 1999 Stream Classification Method. Version 2.0. s "HU#" is the Hydrologic Unit Code U.S. Geological Survey, 1974. Hydrologic Unit Map, State of North Carolina. L 24-Acre University Crossing Site April 21, 2004 Isolated Wetlands Permit Application Project No. 2003-0424 point representative of this wetland has been included as Attachment D - DP 1. Photographs of Wetland AA have been included as Attachment F - Photographs A and B. An approximately 0.21-acre non jurisdictional isolated wetland area (Wetland BB) is located in the north-central portion of the site (Attachment A - Figure 3). Mecklenburg County and USGS mapping indicate that this wetland lies in the basin of an old farm pond. This wetland was determined to be non jurisdictional based on its lack of a surface connection to any jurisdictional waters of the U.S. Dominant vegetation includes cottonwood (Popullts deltoides), sycamore (Platanus occidentalis), black willow (Salix nigra), and silky willow (Salix sericea). Inundation and saturation within the upper twelve inches of the soil profile and low-chroma soils (2.5Y 4/2) with mottles (10YR 4/6) were also observed within this wetland. A data point representative of this non jurisdictional isolated wetland area has been included as Attachment D - DP2. A photograph of this non jurisdictional isolated wetland has been included as Attachment F - Photograph C. To the cast of the non jurisdictional isolated wetland area there are several non jurisdictional channels (Attachment A - Figure 3). These channels were evaluated to be non jurisdictional based on their lack of a continuous bed and bank and channel substrate. These channels also lack biological indicators and hydric soils (Attachment E - SCP1). Channel A scored 5.5 out of a possible 71 points on the NCDWQ Stream Classification Form and 27 out of a possible 100 points on the USACE Stream Quality Assessment Worksheet. A photograph of a representative channel has been included as Attachment F - Photograph D. Pre-Application Meetings On October 23, 2003, CWS representatives met on-site with Ms. Amanda Jones of the USACE to field-verify the results of the jurisdictional delineation of the on-site features. All present parties agreed that the 0.21-acre wetland area lacks a surface water connection and therefore is isolated and non jurisdictional. Ms. Jones sent CWS a Notification of Jurisdictional Determination on November 17, 2003 (Attachment H). Agency Correspondence Cultural Resources A letter was forwarded to the State Historic Preservation Office (SHPO) on April 2, 2004, to determine the presence of any areas of architectural, historic, or archaeological significance that would be affected by the project. To date, no response has been received from SHPO. 4 24-Acre University Crossing Site April 21, 2004 Isolated Wetlands Permit Application Project No. 2003-0424 Protected Species A letter was forwarded to the North Carolina Natural Heritage Program (NCNHP) on April 2, 2004, to determine the presence of any federally-listed species or critical habitat located within the project area. In a letter dated April 13, 2004 the NCNHP responded stating "The Natural Heritage Program has no record of rare species, significant natural communities, or priority natural areas at the site nor within'/ - mile of the project area" (Attachment G). Purpose and Need for the Project The 24-Acre University Crossing Site project proposes to develop approximately 24 acres of woods into a mixed-use commercial development. The purpose of this project is to provide 'i retail business space to an area experiencing significant population growth. This development will bring retail shopping within walking distance of adjacent apartments, the university, and residential subdivisions. Avoidance and Minimization On-Site jurisdictional waters of the U.S. will no 1by this de clopment. This project proposes to completely avoid impacting Wetlacre). Impa is to non-jurisdictional AA3 L Wetland BB are necessary to accommodate the ce into t site (Attachment I - Figure 4). This s ite is ideally 1 etail d elopment and provides good visibility from both main roadways. Prime lots d Creek Church Road must be built and sold to cover the development costs of the project. In addition, the North Carolina Department of Transportation (NCDOT) has restricted the location of the central entrance and it t th l ti d b d th di t t th i t ti f M ll d C k Ch h e ex o oca on propose ase on e s ance o e n ersec on o a ar ree urc Road and North Tryon Street (US 29). Proposed Impacts to On-Site Features Unavoidable impacts to on-site features will total approximately 0.21 acre of non jurisdictional isolated wetlands (Attachment I - Figure 4). This project proposes to fill approximately 0.21 acre f th i l t d tl d t d t t ti f th d l t O b h lf f e a e o accommo e cons o so we an a ruc on o e eve opmen . n e a o REALTICORP, CWS is submitting an Isolated Wetlands Permit application with attachments in accordance with North Carolina Administrative Code T15A: 02H.1300 (Attachment C). u 1 S 24-Acre University Crossing Site April 21, 2004 Isolated Wetlands Permit Application Project No. 2003-0424 Compensatory Mitigation Given the limited nature of the proposed impacts, no formal mitigation is being proposed. The additional hydrology generated by storm water will likely increase the function and value of the on-site floodplain wetland area. In addition, the increase is hydrology will likely decrease the density of weedy species such as poison ivy and Chinese privet growing within this wetland area. L Storm Water Management Plan Because this project is proposing greater than 30% impervious coverage a Storm Water Management Plan is being developed. This plan is proposing to utilize Wetland AA to treat stormwater runoff. Wetland AA is located in a FEMA-regulated floodplain. Mecklenburg County has agreed to allow direct storm water discharge into this forested floodplain to avoid flooding concerns. This proposed plan will utilize the pollutant removal functions of Wetland AA and enhance its hydrology. Due to Wetland AA's size, adjacent flat topography, and 1 forested nature of the floodplain this wetland should provide the same, or better, pollutant removal functions as a constructed wetland area. Prior to entering Wetland AA, storm water velocities will be dissipated through the use of a forebay. This forebay will capture sediments and slow storm water prior to entering Wetland AA. Details regarding the design of this ® pretreatment device are being developed. nw N 1 C L L 1 24-A rc1'niccrsit (Ios?int,Site April 21. 21)414 kohlc•ci W(Ahilds Permit Application ho uct No. '0111A)124 Atfachmeni A -- Figures, 1-3 i I 1 A; `, j r. ? _ ?? 1 t''s ?i ? i li ??,..? J/.? -?__•s-'\ t ? + ?J.11?:! ?. f Gf•?k r •, I - ? ?.,g d•? ? ` f r ?? ;I?!'? ? I? r'J? 1? .??( s 1 i?' : s 4, ? `..:I ? J6Q •?,? ?, ,\ - 111 ;,.: < r \ - ? c t r 1 ?? ? 1 1 A?\\ Mallard Creek Church Road _ f ??f``??l / it ! e io;l SITE "?` = \ ` ., \ ' / , a :fit , I ,S / •;? r u?r,!,= .`,: ?? V `1, + v ,..z.. ??}.. .;?ice `Y, t• \,! North T _ ?. .4 ryon Street \ ar - - M 1 ? V i 1 I r _} f Y ?? 01I I l - \ s l\ \ \ i s t 1 e r •?'. _ ' rte. ? \ {{? ! tom` / ? t ! 1 ?r??'' ? darot r fl 1 ` o? // 1 l t . e 7' . it f, if z -L ,?t•?,???., I v?`} 4 r I i??l r.`` ?! 4` yr,. ? ?`..?\s! ??;t1v' 4>r56_ FitiWti iufrarltf i r` N ir ` Ratk f r , lei. of North' ?? ?.? ? ` c "- - .. -s• t. _ _1,?,.-• ' :7.?.A.F,! ?at.Chy','jgEt?b`,,,7 ..? `\"a + r'?\ !?`' '. j 1 Approximate Scale 1" = 2000' Reference: USGS 7.5 Minute Topogr hic Map Series, Derita and Harrisburg, NC, quadrangles, dated 19%. 1 i 1 Carolina Wetland Services Figure 1. USGS Site Location Map 1 ( ! 5000 Nations Crossing Road, Suite 230 24 - Acre University Crossing Site II Charlotte, North Carolina Charlotte, North Carolina 28217 CWS Project No. 2003-0424 PREPARED BY DATE CHECKED BY DATE KIT 9f y' d3 L c .? (? • • 0 3 1 j 1 I v V kE ????L j ' \ MoEf 11 (? "rl \ °s / ?_-. - 1 ' c r? ! ! 1 1 ? / o• v •N6 kE //% / w = ? 3'• ^ / ?/ J ? 4 ? ( s ? ? I 2 , // y ? (( - v ? YVi{f ? 1 , ? ? ? MeB Doti ? ii ?. ?O 3•r L__• r? -;t 6 En B M W? afia < w :Et 1 v WkD t c \ 1 cep:' 1 • 1•L GTj GeB2 ??•. ? ,. - EnD CeR2 r ? ? , 1 4Sl P`E u r9 Gi+ ? _,,?? f, t oll nD W,'?F MeB P?. •_; RD - j MeD ! Wk H• r -? e ` Fr)F3 -+?WkE WkE? , PaE En M0 \ W), 7- WkE SITE f Pt i + -r. WkT) / ?J I IrY 4- , Wkt) • ? ? ?, . W kE t E?if3 3, .r " t `1 W kB - WkE 'kD ? V MO Wk€f \ ? WkD WkE 1 - l 1 WkC' ? = wkE - - ?b Ne? ?, WkD - yyi?.D MD A J, ,. t C 0 r ?' WkE kD Vd,.A ?`\,•? /t t . a 1rH E?4 J 30? ?- -,E IrD ??, ' '? i Wk[ Qi 3 ? Q? J JYkR ? WkD I'?'kD?c 4- X, _nD f l n: !kA Nees WkD whf. i ' ) t wkE :?• En8 3 <,1 - yp f? ?" t pw EnD s rv W s`y ?? t'1 L 50 EnD e Wk / ? e \ WkD ? ? • 7) nH /// y 1 r r ? I WkD l?D `, ~ t . MeB q ?i' c 7Wr' JR, Weu /` Y 1r C ;:, f _?C © [ Ur Ur Ce82 Fri a I ? \J wkEf ?? \WkD En8 np ,? 'K90 W -? FnR? Cu6,, EnF1 / J II MeB , sk ?fI f? wkD ,e \ V „t ' A PProximate Scal 1" = 2000' Reference: NRCS Soil Survey ofho, klenburg County, North Carolina, Sheet Nos. 4 and 5, dated 1980. I ' Carolina Wetland Services Figure 2. NRCS Soil Survey 5000 Nation I I Crossing Road, Suite 230 24 - Acre University Crossing Site . Charlotte, No rth Carolina 28217 Charlotte, North Carolina j CWS Pro ect No. 2003-0424 ? PREPARED BY DATE s? 9NQ CH ECKED BY ?,? DATE lU - U 1 t 1 ? f ? i S 29' TN°? Street N°rth -o I i I L i L N I 1 I 2 I ? cu Cc0 G 4 O cc0 U ? m V) O c :0 J.0 N X 7 2 7 ac CL 0 QZ M a i c ca a co N m m N N Jig U y Y UU aZO F 6y P CU ? ?" 8 N Q K 9 W? LO M r ?i Z ? C cc c N L- U m' o c z > ai a> 'c o a? cu cyi v s Q U N L.L Mo N o m Y m a Lu 0 0 o I m j z a II N 0 r 8 0 0: CL o N n Oct ova 3 oz v o ?z o? a D W O O d' U C*n U C7 J Q W W Z Z w a = Z W q U Z a a a a w J z W Z A J W 3 rn o ~ q 3 z z u a L'i `" Z o a o ? N ., O A A J I- Q Q ~ W 0 >- ? U O a' a' d' a F J q > LL W ? ? a W . ¢ a z ° z° a q cn CL Z W = ?CL ®-?::? 24-Acre University ('I ossing Site Allril 21, 2004 Is"isilcd Wetlands PermitApplicntion Project No. 2093-0424 Attachment 13 -- Agent CertNication (tf' Atithorizatian Form AGENT CERTWICATION OF AUTHORIZATION 1, Brian Xellar, representing The REALTICORP, hereby certify that I have authorized Gresozy C. Antemann of Carolina -?Tetland Services, Inc: to act on my behalf and take all actions necessary to the processing, issuance, and acccptance of this Isolated Wetland Permit and any and all standard and special conditions attached, We hereby certify that the above information submitted in this application is true and accurate to the best of our knowledge. Applicazxt's signature b Date Agent's signature Date Completion of this forma will allow the agent to sign all future application correspondence. 24-Acre University Crosshig Site Alnil 21, 2004 Isohttetl 11,0111ntis Permit AppllcuUon_, - - Project No. 2003-0424 Attachment C- Pre-Construction Notification Application Office Use Only: Form Version April 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Section 10 Permit ? 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: Isolated Wetlands Permit 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: REALTICORP, Contact: Mr. Tom Bruce/Mr. Brian Rollar Mailing Address: 14120 Ballantyne Corporate Place, Suite 160 Charlotte, North Carolina 28277 Telephone Number: (704) 542-7773 Fax Number:_ (704) 542-5854 E-mail Address: brollargrealticorp.com 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Gregory C. Antemann, PWS Company Affiliation: Carolina Wetland Services, Inc. Mailing Address: 5000 Nations Crossing Road, Suite 230 Charlotte, North Carolina 28217 Telephone Number: 704-527-1177 Fax Number: 704-527-1133 1 E-mail Address: ereggocarolinawetlandservices.com Page 1 of 7 III. Project Information 1. Name of project: 24-Acre University Crossing Site 2. T.I.P. Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): 04744104, 04744102 4. Location County: Mecklenburg Nearest Town: Charlotte Subdivision name (include phase/lot number):_ University Crossing Directions to site (include road numbers, landmarks, etc.): From Charlotte, take Interstate 85 (I-85) north to exit 46 (Mallard Creek Church Road). Go east from the exit for approximately 1 mile. The site is located in the southwest quadrant of the intersection of Mallard Creek Church Road and North Tryon Street (US HWY 29). 5. Site coordinates, if available (UTM or Lat/Long): N 35° 19'l 7" W 80°44' 13" (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: The current land use for the site is forested with open areas. A portion of the site appears to be an abandoned home site. 7. Property size (acres): 24 acres 8. Nearest body of water (stream/river/sound/ocean/lake): Mallard Creek 9. River Basin: Yadkin/Pee Dee River (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 10. Describe the purpose of the proposed work: The University Crossing project proposes to develop approximately 24 acres of land into a mixed-use commercial development The purpose of this project is to provide retail business to an area experiencing significant population growth. 11. List the type of equipment to be used to construct the project: Heavy equipment typically used for site grading and paving work will be used. 12. Describe the land use in the vicinity of this project:_ The current land usages for the surrounding areas are residential and commercial and consist of several apartment complexes, shopping centers and office parks. Page 2 of 7 IV. Prior Project History There is no known prior project history. V. Future Project Plans A VI. Proposed Impacts to Waters of the United States/Waters of the State 1. Wetland Impacts Wetland Impact Area of Impact Located within 100-yea Distance to Site Number Type of Impact* (acres) Floodplain ** Nearest Stream Type of Wetland*** (indicate on map) (es/no) (linear feet) Wetland BB Site grading 0.21 ac. No 1,200 If Non-jurisdictional Isolated Wetland * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http:/%www.fenm.7,ov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwatcr/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: 0.35 acre jurisdictional wetlands and 0.21 acres non-jurisdictional wetlands Total area of wetland impact proposed: 0.21 acre of non-juri sdictional wetlands 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Length of Average Width Perennial or Site Number Type of Impact* Impact Stream Name** of Stream Intermittent'? (indicate on ma) (linear feet) Before Impact (please secif ) N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.uov. Several intemet sites also allow direct download and printing of USGS maps (e.g., wWW.top07one.coin, www.mapquest_com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: N/A Page 3 of 7 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. N/A L 1 Open Water Impact Area of Name Wat Type of Waterbody Site Number Type of Impact* Impact ) (if applicable) (lake, pond, estuary, sound, (indicate on ma) (acres) bay, ocean, etc.) N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, ' flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankinent, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: N/A VII. Impact Justification (Avoidance and Minimization) On-Site jurisdictional waters of the U.S. will not be impacted by this development. This project proposes to completely avoid impacting Wetland AA (0.35 acre). Impacts to non-iurisdictional Wetland BB are necessary ' to accommodate the central entrance into the site (Attachment I - Figure 4). This site is ideally located for a retail development and provides good visibility from both main roadways. Prime lots fronting Mallard Creek Church Road must be built and sold to cover the development costs of the project. In addition, the Nort h Carolina Department of Transportation (NCDOT) has restricted the location of the central entrance and exit to ' the location proposed based on the distance to the intersection of Mallard Creek Church Road and North Tryon Street (US 29). 1 Page 4 of 7 1 VIII. Mitigation Given the limited nature of the proposed impacts, no formal mitigation is being proposed. The Storm Water Plan is proposing to utilize Wetland AA to treat storm water runoff. This will likely enhance the hydrology of this floodplain wetland area. t 1. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at lutp://li2o.enr.state.nc.us/wm/iindex.htni. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: N/A Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ? No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? L r C Page 5 of 7 I X. 0 U 0 L U F L' r L L' r r Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify: )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. N/A Zone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. N/A Page 6 of 7 r XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Because this nroiect is nronosing greater than 30% imnervious coverage a Storm Water Management Plan is bein developed. This plan is proposing to utilize Wetland AA to treat stormwater. Wetland AA is located in a FEMA- regulated floodplain. Mecklenburg County has agreed to allow direct storm water discharge into this forested floodplain'to avoid flooding concerns. This proposed plan will utilize the pollutant removal functions and enhance Wetland AA's hydrology. Due to Wetland AA's size, flat topography, and forested nature of the floodplain this wetland should provide the same, or better, pollutant removal functions as a constructed wetland area. Prior to entering Wetland AA, storm water velocities will be dissipated through the use of a forebay. This forebay will capture sediments and slow storm water prior to entering Wetland AA. Details regarding the design of this pretreatment device are being developed. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. All new construction will be connected to the public sanitarv sewer and water svstem. XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired 1 construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Construction is scheduled to bet?inupon receipt of appropriate permits. C. 4-Z( . I Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 7 of 7 24-Acre Uriivcrsilt 0o""illg Site April 2t. 2011.1 IsulalM 11cll.atl(1s Pcrmil Applica(lutt___ Ilio.1cct Ntt.2003-0IN Attachment 1) -- Roy bic On-Site Data Forms v Z O Q 2 Z L `j O E W K u! 'N O O p < z Q p- o? u u = O ? U ? r K N ? > N I1 - 4 O 1 -g E - N 9 N p w » U v e 1 N y ? ? = 3` s a d s a s E O ? ? .= 5 3 LL Bz ?. 3z_a z s W o o R 72 I I I? I I ? w m ? .? 3 r _ E ?? ° ? o w U J p o d ? x x N a? 0 '? Z I I I I I? p c ? E z' ? u a R " E t N - d a O ' ^ 6 3 3 3 = ? LL LL 2 -E m O - Y - c?i of v ?ri m n E 2 C a f c U 3 I zz O03- Q '- Z w f a` „ Y m L 4 d ? L S. j n 9 N u ` x 3 x m m c ^ ° E m v `m m c? U ? a w C a v p m? a g N? a C N 's ? N? ,rj 0? LL O E 4 >4 >4 >4 >4 >4 `g X414 4 04 a y h ? O H t ? a 5 ? s a m a 3 ? ? o m m v -' _ m 3 m ? Q N a 0 a vi y I I I ? z - Q ? z o 0 0 O C C C 3 ya Q E 3 0 -_n E N K 3 C N w U 7 E q O y O C C v Z O ? c Q ? z 2 ? co K ? u 'C O c ? LL. ? N Q z a C Q ? H O uj S W W ZO f- U a-O rn v ? .22 N N N l m J J ?? 2 x 2 H q y? a U .? m y E N N =? N o"i S 3 N a c 'gy LL m _ m o z ? ea _ U 2 6 O U U _ 9 ? U E n E o U m ? o 3 w Ou ° - u 2 'v v N Z m I I I I Iry ? c ? ? C o E N N e v LL 2 J ? 5 N n < v? N ? 2 1 E K z c H LL U Z m 1 a H L Q g z w z a N .u m L 4 0. ? L m w Z .X ? n Q t w 5 N m 3 ? ° E c o .?. w O g w ? o? ? r= c m q a `? c o y o ' ? CO 5 N? O N O a O ?? ?.a. O E>I>I>1>I4.l a` w m Q 4 E 3 m t-t ? q d 0 3m= - y $ 3 9 ^n g N Q O o ? ` ? c N N I l l y z :?. 3 ? ° a a a 0 0 om s z O E c C > 2 a j 3 N O N N CL G O N O S 0 y O o` K C V. N n m C M K i N j r a? F 7P S N ? ? Y D ? 5 ? m LL m p Z N C ?( O - m [ O ? N N '?i IL` U S O 7 ? 0 a ? IIIIII w E o U 12 U i E m c U ? ? v_ o 5. O o U J ` - o W U ` 2' 3 m a N Q N d S S K (7 9 E N O U m C 119 Zoo Z ^ O a '9 z c K ? ? W c 00 LL p N a U ^ H Q Q J w' O ? W QI LL, U? U) w oo J 7m L".^.J S n c.. ?? rr ...? • c Q dh G U - y "? ? "'Q ? O ? > x a E e ' ? u +? m no ?- .y N C y N N .. E c a U U .. C .. 3 ` ._ O? C aN U m Z O o .m m C_ h- N ?? U N N 0_ F W as > O L ? W d Q C Q y_ ? ? W Q U < ? LL F 3 2 N m 3 W a v a a W f t ?a 3 U ? } ZOC T } a c z Y a d L o a L L ? r y ? ? s v Q o E L S 3 2 C _ m C ? g ?? rv U J ? H c .S c O a` a9 c N m a j E m o - 1 -3 N y v mF _?I?IIIIs?III ? F a a 3 C c 3 m - a :, a m x O m Oa t? J L ? 6 ? aS to Q v ? O `o ? 3 9 o D 5` t 0 t y ? a N Q O a H .. ? I t s .2 0 0 0 D C K Z h d 6 S O O p ? O - K C c > 1 ya a Q N 0 6'. LL O N 0 LL p O 2?Acm Unix "Hy t'rvncsNg Site Awl 2" 2N4 isolated Wellnnds Permit Application. Prs+j=- t Nit. 21103-0424 Attachment E; - Stream Chissitication Forms NCDWO Stream Classification Form SCP1 - Non-jurisdictional Channel A Project Name: 24-acre University Crossing Site River Basin: Yadkin/Pee Dec County: Mecklenburg Evaluator(s): KJK GCA DWQ Project Number: Nearest Named Stream: Mallard Creek Signature(s):1CS?k Date: 9/26/03 USGS QUAD: Harrisburg Longitude: W 80a 44' 13" Latitude: N 35a 19' 17" Location/Dircctions: From Charlotte take North Tryon (US 29) towards Concord. The site is located in the southwest quadrant of the Mallard Creek Church Road - North Tryon Street (US 29) intemoction. 'PLEASE NOTE: If evaluator and landowner agree that the feature is a man-made ditch, then use of this form is not necessary. Also, if in the best professional judgement of the evaluator, the feature is a man-made ditch and not a modified natural stream--this rating system should not be used- Primary Field Indicators: (Circle One Number Per Line) L Geomorphology Absent Weak Moderate Strona 1) Is Thcre A Riffle-Pool Sequence? Q 1 2 3 2) Is The USDA Texture In Streambed Different From Surrounding Terrain? 0 2 3 3 Are Natural Levees Present? I 1 2 3 4) is The Channel Sinuous? 1 1 2 3 r i I 5) Is There An Active (Or Relic) 11. Hydrology Absent Weak Moderate Strong 1) Is There A Groundwater Flow/Discharee Present? Q 1 2 3 PRIMARY HYDROLOGY INDIC 1 TOR POINTS: 0 1 Are Fibrous Roots Present in Streambed? 3 2 1 I 2) Are Rooted Plants Present In Streambed? 3 2 1 I 3 Is Per h ton Present? I 1 2 3 4) Are Bivalves Present? I 1 2 3 PRIMARY BIOLOGYINDICATOR POINTS: 0 Secondary field indicators: (Circle One Number Per Line) 1. Geomorpholoey Absent Weak Moderate Strong 1 is There A Head Cut Present in Channel? I 0.5 1 1.5 2) is There A Grade Control Point in Channel? H 0.5 1 1.5 3) Does Topography Indicate A Natural Drainage Way? 0 1 1.5 SECONDARY GEOMORPHOLOGY I.1DIC t TOR POINTS: 0.5 i1. Hydrology Absent Weak Moderate Strong 1) Is This Year'i s (Or Last's) Leatlittcr Present in Streambed? 15 1 0 0 2 Is Sediment On Plants Or Debris Present? I 0.5 I 1.5 3) Arc Wrack Lines Present? 1 0.5 1 1 5 4) Is Water In Channel And >48 firs. Since 1 0.5 1 1.5 Last Known Rain? ('NOTE: IiDitch Indicated lit 09 Above Skin This Step And k5 Below,') ' 5) Is There Water In Channel During Dry I© 0.5 1 1.5 Conditions Or In Growing Season)? 6) Are Hydric Soils Present in Sides Of Channel (Or In Hcadcut)o Yes=1 5 Ao=? SECOIVDARYiIYDROLOGYiNDIC,4TOR POINTS: 0.5 ilioloty 111• Absent ? Weak Moderate Strong i Are Fish Present? I 0.5 1 1.5 2 Are Amphibians Present? I 0.5 1 1.5 3 Are A uaticTuriles Present? 1 0.5 1 1.5 4 Are Crayfish Present? 1 0.5 1 1.5 5 Are Nfacrobenthos Present? 0.5 1 1.5 6) Are Imn Oxidizing, Bacteria,'Fungus Present? I 0.5 1 1.5 7 is Filamentous AI sae Present? 0.5 1 1.5 8) Are Wetland Plants In Streambed? SAV Mostly OBL Dfostly FACW Mostly FAC Mostly FACU Mostly UPI, (' NOTE: if Total Absence Of All Plants lit Streambed 2 1 0.75 0 0 As Noled Above Skip This Step UNLESS S4V Present'). SECONDARY BIOLOGY INDIC 1 TOR POINTS: 0.5 TOT. IL POINTS (Primary +,Secondan')= 5.5 (If Greater Than Or Equal To 19 Points The Stream Is Al Least Intermittent) ('NOTE: If Bed & Bank Caused By Ditchine,4nd IVITHOUTSinaosity Then Score=0') 10) Is A 2od Order Or Greater Channel (As Indicated On Topo Map AndlOr in Field) Present? Yes=-3 No=1 PRIMARY GEOAfORPHOLOGYINDiCATOR POINTS: 4 OFFICE USE ONLY DWQ# 1 ,{- STREAM QUALITY ASSESSMENT WORKSHEET SCPI: Channel A - Non-jurisdictional _,- 1. Applicant's Name: REALTICORP 2. Evaluator's Name: Gregg Antemann and Kip Kerecman 3. Date of Evaluation: 09/26/03 4. Time of Evaluation: 4:00 pm 5. Name of Stream: N/A 6. River Basin: Yadkin/Pee Dee 1 7. Approximate Drainage Area: 1 acre S. Stream Order: First 9. Length of Reach Evaluated: approximately 60 linear feet 10. County: Mecklenburg 11. Location of reach under evaluation (include nearby roads and landmarks): The site is located in the southwest quadrant of the intersection of North Trvon Street (US 29) and Mallard Creek Church Road. 12. Site Coordinates (if known): N 35° 19'17" W 80°44' 13" 13. Proposed Channel Work (if any): 14. Recent Weather Conditions: No rain within 48 hours 1 15. Site conditions at time of visit: Sunny, 80°F 16. Identify any special waterway classifications known: -Section 10 -Tidal Waters -Essential Fisheries Habitat -Trout Waters -Outstanding Resource Waters Nutrient Sensitive Waters -Water Supply Watershed (I-IV) 17. Is there a pond or lake located upstream of the evaluation point? YES SIf yes, estimate the water surface area: N/A 18. Does channel appear on USGS quad map? YES e) 19. Does channel appear on USDA Soil Survey? YE N 20. Estimated Watershed Land Use: 25% Residential % Commercial % Industrial 0 % Agricultural 75% Forested % Cleared / Logged % Other ( ; 1 21. Bankfull Width: 2-3 feet 22. Bank Height (from bed to top of bank): 1-3 feet 23. Channel slope down center of stream: -Flat (0 to 2%) X Gentle (2 to 4%) -Moderate (4 to 101/16) -Steep (>10%) 24. Channel Sinuosity: X Straight -Occasional Bends Frequent Meander -Very Sinuous -Braided Channel Total Score (from reverse): 19 Comments: Channel appears to have been man made. Evaluator's Si-nature ?/Gt?° Date ?o/a/D3 This channel evaluation form is intended to hused only as a guide to assist landowners and environmental professionals in gathering t fie data required by the United States Army Corps of Engineers in order to make a preliminary assessment of stream quality. The total score resulting from the completion of this form is subject to USACE approval and does not imply a particular mitigation ratio or requirement. Form subject to change - version 05103. To Comment, please call 111-376-3441 x 26. 1 CJ L USACE AID#_ 24-Acre I nhersitp Cru?sinl; Siic April 21 2(1(',t kohlicil N\ ctilintls Y(I mil Atlpilcplintt I'r+l?ct! Nr, 2U(1i-11?2d lk achment F -- Ile, presellt<ltiVe I"I'Mo ttli•a)h5 24-Acre Unive ity Crossing Site Photograph A. View of Wetland A4 Photograph B. View of Wetland AA it i April 21, No. 2003. j 24-Acre Univeosity Crossing Site April 21, Photograph C. View of non jurisdictional isolated wetland II WI r Photograph D. View of non jurisdictional Channel A u I 24-Ac rc I niVt.I it N. a I11"Nink, Site April 21, 004 kolAt'd W than, l'rrosit lpplicnlion 1'rol-vt No. 20131..01124 Attachment (: -- Algellcy ('01,11'esp lidencc r u DE North Carolina Department of Environment and Natural Resources Michael F. Easley, Governor U 1-1 P- U P.- U Mr. Kip Kerecman Carolina Wetland Services 5000 Nations Crossing Road, Suite 230 Charlotte, NC 28217 April 13, 2004 William G. Ross Jr., Secretary Subject: 24-Acre University Crossing Site - Commercial Development; Charlotte, Mecklenburg County CWS Project No. 2003-0424 Dear Mr. Kerecman: The Natural Heritage Program has no record of rare species, significant natural communities, or priority natural areas at the site nor within 3/4-mile of the project area. Although our maps do not show records of such natural heritage elements in the project area, it does not necessarily mean that they are not present. It may simply mean that the area has not been surveyed. The use of Natural Heritage Program data should not be substituted for actual field surveys, particularly if the project area contains suitable habitat for rare species, significant natural communities, or priority natural areas. You may wish to check the Natural Heritage Program database website at <www.ncsparks.net/nhp/search.html> for a listing of rare plants and animals and significant natural communities in the county and on the topographic quad map. Please do not hesitate to contact me at 919-715-8697 if you have questions or need further information. Sincerely, Z- Z Harry E. LeGrand, Jr., Zoologist Natural Heritage Program HEL/hel s n 1601 Mail Service.Center, Raleigh, North Carolina 27699-1601 Phone: 919-733-4984 - FAX: 919-715-3060 • Internet: wMv.enr.state.nc.us An Equal Opportunity ! Affirmative Aeon Employer- 50 % Recyded • 10 9% Post Consumer Paper NorthCarolina ,I1'atura!!y 24-;sere lliik?:rsit? (.Iussint; Site ._ Isolated N%01 I)IIs PvIIII iI ApplicaIilIII April 21, 2004 I'rn+c cf Nr). 2001-0424 Attacbmcnt 11 -- U.S. Army Corps o1' U',mvinvers Notificatioll of Jurisdictional DetC'l'lllinatioll L' F C i 0 1.1 U.S. ARMY CORPS OF ENGINEERS Wilmington District Action ID: 200430108 County: Mecklenbur __?, \,= P NOTIFICATION OF JURISDICTIONAL DETERMINATION U, Property Authorized Owner Realtico Attn: Brian Rollar Address 14120 Ballantyne Corporate Place Suite 160 Charlotte, NC 28277 Telephone Number 704-542-7773 Agent Carolina Wetland Services, Inc. Attn: Gregory Antemann Address 5000 Nations Crossing Road, Suite 230 Charlotte, NC 28217 Telephone Number 704-527-1177 Size and Location of Property (waterbody, Hi2liwav name/number, town, etc.): The property is Basis for Determination: The site contains wetlands with indicators of ordinary high water marks There are waters of the U.S., to include wetlands, on the above described property which we strongly. suggest should be delineated and surveyed. The surveyed wetland lines must be verified by our staff before the Corps will make a final jurisdictional determination on your property. Because of the size of your property and our present workload, our identification and delineation of your wetlands cannot be accomplished in a timely manner. You may wish to obtain a consultant to obtain a more timely (US Hwy 29), in Charlotte, Mecklenburg County, North Carolina. The site is approximately 24 acres in size. located Indicate in the Which of th western the Follow quadrant ing of the iApplv:ntersection Mallard Creek Church Road and North Tryon Street , located adjacent to Mallard Creek, in the Catawba River Basin. There are also wetlands (labeled "wetland BB") and ephemeral drainage features on the property that are considered non.-jurisdictional. delineation of the wetlands. Once the consultant has flagged a wetland line on the property, Corps staff will review it, and, if it is accurate, we strongly recommend that you have the line surveyed for final approval by the Corps. The Corps will not make a final jurisdictional determination on your property without an approved survey. X The waters of the U.S., to include wetlands, on your lot have been delineated, and the limits of the Corps jurisdiction have been explained to you. Unless there is a change in the law or our published regulations, this determination may be-relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the 1 date of this notification. Placement of dredged or fill material in wetlands on this property without a Department of the 1 Army Permit is in most cases a violation of Section 301 of the Clean Water Act (33 USC 1311). A permit is not required for work on the property restricted entirely to existing high ground. If you have any questions regarding the Corps of Engineers regulatory program, please contact Amanda D. Jones at tele one number 828 271-7980 ext. 7 Project Manager Signature Date November 17, 2003 ExpiraiiQn Date November 17, 2008 SURVEY PLAT OR FIELD SKETCH OF THE DESCRIBED PROPERTY AND THE WETLAND DELINEATION FORM `LUST BE ATTACHED TO THE YELLOW (FILE) COPY OF THIS FORM. t-Acre l -IiNcl ;it ( Io""ing Site lpril 21. 2004 l nlstir 1 1? ilai??l? l'i•rmtt \nplic ttimi i', njrcl it 1. <lNl 4)_t'_ 3 Aitachmoit I ---. Proposed laa p acts (Fi,,urc 4) N .? ,D O -p O C N Q E CO c? Q ? j M (n > r O 0- 0 CL i : Aga . p. ;\ f ({?;, ; 7 ? 4 l co 0 Fla I - a f o N i 1 H Z o v t '? Hr w '• 7 N L5Y ? NEI a h n ? ? o U -? cn U C m 0 , CLC_ E 'Fn O En L- D C U - o UU co -C O 0 0 L Z a_ j U C +-+ d- O LQ) D :Q U ti ?. N w m o m Y 8 ? Q O K O _ U b g m D N ?+{ a N VU "S N a (n N V) 00 y,?N y y b ?,Vq ?ro U 0v)in 3.? z:; N o ° .? z d c 0 u ?U ?erv/c n s o Ir $7 ru }0? b 0 It m Z W l7 W J W U o 0 N N ? C Q ¢ ZQ J W ¢ ¢ J W 3 ~ W 3 Z O r. ~ J z 0 U A H U H ? 2 Z mm 05/26/2004 17:11 7045271133 CAROLINA WETLAND SVC PAGE' 01/02 r ? • t• J, CAROLINA WETLAND SERVICES INC. ? 11 5000 NATIONS CROSSING ROAD, SUI'T'E 230 a1 CHARLO'l T$, NC 28217 r,L704-527-1177-OFFICE 704-527-1133-FAX FACSIMILE TRANSMITTAL SHEET TO: FROM L- Ed Schwar rn n GzeggAntemann COMPANY: EdL\[i.: NCDWQ - gre clrolinaa edandservices.con.T FA : N'UmBi i T07AL NO. OF PAGLS [N(,I.U'DING COVLPL: (919) 733-6893 2 PHONE NU.NIDL:L- DATr•_ (919) 733-1786 May 26, 2004 RL: YOUR ILCk t -NC5 T4UMBER. DWQ#04-0665 El URGLNT Q rOP. RZVILw ? PLEASE W mIENT ? PLEAS: K1 FLY ? PLEA L KECi CLE N OT E 51 M-U4EN 1•S: Ed I'leasc see the attached letter requesting more time to prepare the xcquested information. If you leave any questions give me a call at 704-527-1177. Thalals, Gregg V EgI "DS 1401 GROUP \sdIgER dPAulY SECTfO;d S:4Sl11-"! f 141 1"rv t1'OTTCE: 1 rn raGi„ sp ye attmde oo y ror 1e< use of ho .,,,vtJ K l or ccnry r? w [ tbdrasrL ud my caw:atn amta(y;lhon' ct is pm il14cd. ?oafd-teal, and (z mp from dixloaure vAft applirahle law, If 1Lc ruder of this me- jc lY not the immded reelpiear, or the emplayee or q,;*t rtapcaaiblo fur de::?erint the mmmge to nc% ialmded reapient, you mo hccaby arched that any dirsaaicadon, dlatrlpupon, or copyirg of iu4 communication iu i:riclly mohibit.L if you hnvt rcaa?w this comaltulicatiua in error, pleat w;fy es i rmedutdy by tNephoae and ream the orl3 wl tern a[a to mat 1110 LjVYc oddres pis the U.S. Portal Stavice Thank yov. IF TRANSMISSfON IS NOT R2CEIVED IN GOOD ORAER. PLEASE CALL GREGG ANTEMANN ;3 704.377.16:2 MAY-26-200,4 WED 16:03 TEL:9197336893 NAME:DWQ-WETLAt-1DS P 1 or 05/26/2004 17:11 7045271133 CAROLINA WETLAIJD SVC Carolina Wedand Services May 26, 2004 Mr. Ed Schwartzman NCDENR - Division of Water Quality Wetlands Unit 2321 Crabtree Blvd. Raleigh, NC 27604-2260 Subject: Request for an Extension to Provide Additional Information 24-Acre University Crossing Site Charlotte, North Carolina Carolina Wetland Services Project No. Z1003-0424 DWQ # 04-0665 . Dear Mr. Schwartzman PAGE 02/02 On behalf of our client REALTICORP, Carolina Wetland Services, Inc. (CWS) is submitting this letter in response to your request for additional information in a letter dated May 6, 2004, regarding the 24-Acre University Crossing Site (DWQ;#04-0665) located in Charlotte, North Carolina. Gray Engineering is developing the Storm Water Management Plan for this project and needs additional time to come up with the design details requested. We are requesting a two week extension to provide the information you requested. Thank you for your attention to this matter. Sincerely, temann, PWS Principal Biologist Attachments. ec: Mr. Brian Rollar, R1-ALTICORP Mr. Lynn Solcsbee, Gray Engineering 1 ?I 5000 Nations Crossing Road, Suite 230 • Charlotte, NC 28217 • (704) 527-1177 Phonc . (704) 527-1133 Fax www.carolinawetlandsmices.com MAY-26-2004 WED 16:04 TEL:9197336993 NAME:DWQ-WETLAtJDS P: 2 Carolina Wetland Services May 26, 2004 Mr. Ed Schwartzman NCDENR - Division of Water Quality Wetlands Unit 2321 Crabtree Blvd. Raleigh, NC 27604-2260 I,ArVE '• r TL,nni01?^ (1?l i Subject: Request for an Extension to Provide Additional Information 24-Acre University Crossing Site Charlotte, North Carolina Carolina Wetland Services Project No. 2003-0424 DWQ # 04-0665 Dear Mr. Schwartzman: On behalf of our client REALTICORP, Carolina Wetland Services, Inc. (CWS) is submitting this letter in response to your request for additional information in a letter dated May 6, 2004, regarding the 24-Acre University Crossing Site (DWQ#04-0665) located in Charlotte, North Carolina. Gray Engineering is developing the Storm Water Management Plan for this project and needs additional time to come up with the design details requested. We are requesting a two week extension to provide the information you requested. Thank you for your attention to this matter. Sincerely, egor C. Antemann, PWS Principal Biologist Attachments: cc: Mr. Brian Rollar, REALTICORP Mr. Lynn Solesbee, Gray Engineering l' t it 5000 Nations Crossing Road, Suite 230 Charlotte, NC 28217 (704) 527-1177 Phone (704) 527-1133 Fax 11? www.carol inawctlandserviccs.corn C N T Cl? O 01 0 N a CL > - E.6 2 7 o0)a?oE U'y « > N O ) CYO .L O N t U) O 0 (D U U y N C a ? ? Q cJ LO. U ? C U -0 c a .- ? co o V) co U O C •p P N U U IC N C N ' y .- O CL air EL " c C _J O U a 0 N U a N U t U Z O n U 2 N aNi E O a O X ¢ (U ?a ? 2 ? CL a 2 U N N N U CC 5 <n 8Y? ? M O l0 h J u h ? 4 ?^ .a ti o 0 u o U f`7 ? 00 y N ? ?zc 0 ; o O d a > cG=U0 to } li Z N O V N m m R1 0•" m rq 0 Q N U N C3 I u rl C ra a m ILL _ U rn o, O I u rz- I- 1 c N n u I ` I LL h af- D ?Icc N ? E U C r?lo I¢ N ILL I;. i •?i rr? .u w Z zQ 4?-? NC?u Cd C ? ?. A C C < ? o °. `o ? o a G.C=; ?•? C 0 ?e C z m m (n ? > - 7 CL (D m (n 1 T o U) (D N (D r Cl) o m -< 0 0 r- n? m ;" d CL (D cn iv a :. 1 N i s -u -n,) @No-,. Cr C/) n XO Z O Qo N O?O? \ NA T F9pG ? r O 'C Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality January 30, 2006 DWQ Project # 04-0665 Mecklenburg County REALTICORP C/O Mr. Tom Bruce 14120 Ballantyne Corporate Place Charlotte, NC.28277 Subject Property: University Crossing Site APPROVAL OF STORMWATER MANAGEMENT PLAN Dear Mr. Bruce: On August 25, 2005, the Division of Water Quality (DWQ) received the revised storm water management plan prepared by your engineer, Mr. Chris Price, of Gray Engineering Consulting Inc. This Plan has been reviewed and satisfies the storm water management conditions of the Isolated Wetlands Pen-nit issued on August 27, 2004. The structural storm water practices as approved by DWQ as well as drainage patterns must be maintained in perpetuity. No changes to the structural storm water practices shall be made without written authorization from the Division of Water Quality. Storm water easements shall be recorded for a distance of at least 10 feet on each side of all storm water conveyances on all lots containing these structures including future access for maintenance. The storm water easements shall allow for the ability to maintain the structures, perform corrective actions as described above and shall provide protection of the structures from potential alternations by future property owners. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Samuel A. Aghimien at 919-733-3574. Sincerely, Cyndi B. Karoly DWQ, 401 Oversight/Express Permitting Unit CBK/Saa cc: DWQ Raleigh Regional Office USACE Asheville Regulatory Field Office DWQ Mooresville Regional Office File Copy Central Files Chris L. Price, P.E., Gray Engineering Consulting, 132 Pilgrim Road, Greenville, SC. 29607 Filename: 04-0665 University Crossing BMP Approval, 1-30-06 One C N arolina 401 Oversight/Express Review Permitting Unit .ptth?t`rr`!? 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919.733-6893 / Internet: http://h2o.cnr. state.no,us/ncwetlands An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper ,0 Project Name: University Cross Project No. DWQ 04-0665 Pond No. SUBMITTED DESIGN. 1 REQUIRED DESIGN: 8/31/2005 elevations 5.6 average depth status Bottom of Basin (ft) 588 Permanent Pool (ft) 593 5 ft. depth ok Temporary Pool (ft) 595.5 2.5 ft. depth ok areas Permanent Pool SA (sq ft) 25300 22626 sq. ft. ok Drainage Area (ac) 20.61 -6639; based on avg depth ok Impervious Area (ac) 17.52 85.0% - volumes Permanent Pool (cu ft) 141096 Temporary Pool (cu ft) 63700 60979 cu. ft. ok Forebay (cu ft) 30000 21.3 % ok other parameters SA/DA 2.66 2.52 - Orifice Diameter (in) 3 0.26 cfs drawdown - Design Rainfall (in) 1 2.8 day drawdown ok Linear Interpolation of Correct SAIDA*** 5 ft. Permanent Pool Depth % Impervious SA/DA fron (Avg. Depth) Next Lowest 80 2.38 -0.969992095 1.08 Project Impervious 85.0 2.52 0.74 1.26 Next Highest 90 2.66 -0.509607905 1.43 3 ft 4 .r ' 1:8!25/2005 09:55 8642975187 GRAY ENGIHEERIlfG PAGE 01/02 FAX TRANSMITTAL GRAY ENGINEERING CONSULTANTS, INC. 132 PILGRIM ROAD, GREENVILLE, SC 29607 PHONE: 864-297-3027 FAX: 864-297-5187 TO: SAM ? C Wil ?7L/ COMPANY- ?LtJ FAX NO.: 'J J 9- 733 -&&13 FROM: Cam, Ste( G.E.C. PROJECT NO.: `?©CS?? 1? 0? 2S0 f J Co t)ojiye'1Z5('1`1 (R.osS /U(-, TOTAL. DATE: PAGES: (INCLUDING COVER PAGE) COMMENTS: .??1 -? r9Y ? ?1?2?1-? 1 ? 2c Vr ,??c? ?2.1cS f???-? T l I ?` IF YOU RECEIVE THIS FAX IN ERROR. FLEA5E NOTIFY U3 AT 004.297-3027 AND DISCARD ALL INFORMATION RECEIVED IN ERROR. PLEASE REMEMBER THAT ALL FAXES ARE CONFIDENTIAL AND SHOULD NOT BE C1VEN TO ANYONE OTHER THAN SPECIFIED ON THIS TRANSMITTAL. NEWrAXFM.NK4 c11:5ro1 AUG-25-2035 THU 03:21 TEL:9197336693 NANE:DWO-WETLANDS P. 11 1 ` 08/25/2005 09:55 8642975187 GRAY ENGINEERING PAGE 02/02 Project No. DWQ &I/, ogrs- (to be provided by DWO) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWQ Stcrmwater Manogement Plan Review: 1. PROJECT INFORMATION (please complete the following information): Project Name; 2!9 S it! Contact Person: _2.Did/r/ L)AV7S Phone Number: a 9 0 D For projects with multipL basins, specify which basin this worksheet applies to: _N1, Basin Bottom Elevation 0 a ft. (average elevation of the floor of the basin) Permanent Pool Elevation 593.06 ft. (elevation of the orifice invert out) Temporary Pool Elevation 5-0 ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area ZS; &0 sq. ft. (water surface area at permanent pool elevation) Drainage Area zt,. to 1 ac. (on-site and off-site drainage to the basin) Impervious Area 17.57- ac. (on-site and off site drainage to the basin) Permanent Pool Volume 141.01( cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume G 3 .moo o cu, a. (volume detaired on top of the permanent pool) Forebay Volume 3 0 1"Q 2t7 cu, ft. SAIDA used Z. U 0" (surface Brea to drainaga area ratio) Diameter of Orifice 3 in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stcrmwater Best Management Practices Manual, Initial in the space provided b indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not baen met, attach an explanation of why. At a minimum, a complete sormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all Bfi and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project Applicants Initials C++° The temporary pool controls runoff from the 1 inch storm event. ZPLN d The basin length to width rate is greater than 3:1, The basin side slopes are no steeper than 3:1. ce A submerg.d and vegetated perimeter shelf at less than 6:1 is provided. (if 0 Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. G° The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). CIO The temporary pool draws down in 2 to 5 days. ?Cle The forebay volume is approximately equal to 20°,'0 of the total basin volume. (A4 S:dimant storage is provided in the permanent pool. Ce Access is provided for maintenance. edo A notarized site specific operation and maintenance (4&M) plan is provided. +?•TG ZU-A vegetation managemenUrnowing schedule is provided in the 0&M plan. Semi-annual inspections are specified in the 0&M plan. G+?! A debrs check is specified in the 00 plan to be performed after every storm ovent. c41 A specific sediment dean-out benchmark is listed (elevation or depth) in G&NI plan. G° A responsible party is designated in the C&M plan. Oki AUG-25-2885 THU 88:21 TEL:9197336893 NANE:DWQ-WETLANDS P. 2 o?OF W A TF9QG Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources August 27, 2004 REALTICORP C/o Mr. Tom Bruce 14120 Ballantyne Corporate Place Suite 160 Charlotte, NC 28277 Subject Property: 24-Acre University Crossing Site APPROVAL of Isolated Wetlands Permit Dear Mr. Bruce: Alan W. Klimek, P.E. Director Division of Water Quality DWQ Project # 04-0665 Mecklenburg County You have our approval, in accordance with the attached conditions, to place permanent fill in 0.21 acre of isolated wetlands in order to construct the 24-acre University Crossing Site at Mallard Creek Church , as described in your application for the Road and North Tryon Street intersection in Mecklenburg County purpose of constructing a mixed use commercial development at the subject property, as described within your application dated and received by the Division of Water Quality on April 22, 2004 and as modified per the letter from your consultant dated August 19, 2004 (received August 20, 2004). After reviewing your application, we have determined that this fill is covered by the State General Permit for Impacts to Isolated Wetlands and Isolated Waters (IWGP100000). In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. Also, this Permit will expire upon the expiration date of IWGP100000 (September 30, 2008) or unless otherwise rescinded by the Director of the Division of Water Quality. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Permit and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached Permit and any additional conditions listed below. 6?_ '? 0 f? S CO J t V? 0, t 7/ 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699.1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733.1786 /FAX 919.733.6893 /Internet: http://h2o.enr.state.nc.us/ncwetiands None Carolina Naturally An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper REALTICORP: Page 2 of 3 August 27, 2004: The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Plan Location or Reference nits Isolated Wetlands 0.21 (acres) Figure 4 - Proposed Impacts 24-Acre University Crossing Site 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Desigki Manual. b. The design, installation, operation, and maintenance.of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion REALTICORP: Page 3 of 3 August 27, 2004: Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Written Stormwater Management Plan (Final Plan Needed) A final, written stormwater management plan (including a signed and notarized Operation and Maintenance Agreement) shall be approved in writing by this Office before the impacts specified in this Certification occur. The stormwater management plan must include worksheets, plans and specifications for stormwater management facilities that are appropriate for surface waters classified as Class C and designed to remove 85% TSS according to the most recent version of the NC DENR Stormwater Best Management Practices Manual. These facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. Also, before any permanent building is occupied at the subject site, the facilities (as approved by this Office) shall be constructed and operational, and the stormwater management plan (as approved by this Office) shall be implemented. The structural stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. Violations of any condition herein set forth may result in revocation of this Permit and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Permit, shall expire upon expiration of IWGP100000 (September 30, 2008) or unless otherwise rescinded by the Director of the Division of Water Quality.. If you do not accept any of the conditions of this Permit (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This Permit and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under the Isolated Wetlands Rules as described within 15 NCAC 2H, Section 0.1300. If you have any questions, please telephone John Dorney in the Central Office in Raleigh at 919-733-9721 or Alan Johnson in the DWQ Mooresville Regional Office at 704-663-1699. AWK/jrd Enclosures: IWGP100000 Certificate of Completion cc: Gregory Antemann; Carolina Wetland Services; 5000 Nations Crossing Road, Suite 230, Sincerely, REALTICORP: Page 4 of 3 August 27, 2004: Charlotte, NC 28217 USACE Asheville Regulatory Field Office DWQ Mooresville Regional Office File Copy Central Files Filename: 040665UniversityCrossing(Meeklenburg)ISO GRAY ENGINEERING CONSULTANTS, INC. July 15, 2005 Mr. Sam Aghimien t p "??IJ IJ NCDENR DWQ 2 321 Crabtree Blvd JUL R 2005 Suite 250 Raleigh, NC 27604 DENR -WATER QUAUTY 919-733-3574 WETLANDS RID STOPJAyATER BRANCH Mr. Aghimien: Re: University Crossing Stormwater Design DWQ Project #04-0665 GEC Job #250116 Enclosed is a copy of the stormwater calculations and design for this project. I think there is some confusion on what is being constructed and I am hoping that this information will clarify the issues. Below are responses to your comments dated May 23, 2005. 1. The pond is designed per the BMP Manual with the exception of vertical walls in the detention pond. This was coordinated with Edward Schwartzman in the DWQ office. 2. See drainage calculations. 3. See drainage calculations. 4. See drainage calculations and plan. Please contact me with any questions. Si ray,rjhqi4-eerVg Consultants, Inc. s L. Price, P.E. 250116.11tr-sadenr.doc 132 Pilgrim Road - Greenville, S.C. 29607 Phone (864) 297-3027 - Fax (864) 297-5187 ?OF W ATF9o Michael F. Easley, Governor ?O DW 61 William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality May 23, 2005 CERTIFIED MAIL: RETURN RECEIPT REQUESTED Realticorp Inc Mr. Tom Bruce 14120 Ballantyne Corporate Place, Suite # 160 Charlotte, NC, 28277 Subject Property: 24- acres University Crossing Site REQUEST FOR MORE INFORMATION Dear Mr. Bruce: DWQ Project # 04-0665 Mecklenburg County On March 22, 2005, the Division of Water Quality (DWQ) received the revised storm water management plan prepared by your engineer Mr. Chris Price, P.E., of Gray Engineering Consultants Inc, to comply with the conditions of the Isolated Wetlands Permit issued on August 27, 2004. The following additional information is needed before the plans can be approved. 1. 401 Wet Detention Basin Worksheet, and the ponds should meet 85 % TSS as per latest BMP. 2. The drainage area map shows 63.08 ac site, PCN shows 24.035 or 26 ac, and your worksheet shows 20.61 ac, account for all of the site flow rates and the differences in the area given. 3. The Forebay, the Orifice, and the Drawdown did not meet requirements. 4. Wet Detention pond design with level spreaders for more benefits and a map showing buffers area. Please respond within three weeks of the date of this letter by sending three (3) copies of this information in writing. This letter only addresses the Storm water Management Plan review and does not authorize any impacts to wetlands, waters or protected buffers. Please call Mr. Sam Aghimien at 919-733-3574 if you have any questions. Sincerely, Cyndi Karoly, Supervisor 401 Oversight/Express Review Permits Unit CBK/SAA cc: Alan Johnson, DWQ Mooresville Regional Office USACE Asheville Regulatory Field Office File Copy Central Files Chris Price, P.E., Gray Engineering Consultants Inc, 132 Pilgrim Rd, Greenville, SC. 29607 Filename: 04-0665 University Crossing info 5-19-05-1 401 Oversight/Express Review Permits Unit 1650 Mail Service Center, Raleigh, North Carolina 27699.1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919.733-1786/ FAX 919.733-6893/ Internet: htto://h2o.enr.state.nc.us/ncwetiands NocthCarolina Alnturallj An Equal Opportunity/Affirmative Action Employer- 50% Recycled/100o Post Consumer Paper o?o? wAr?RQ? C QWar/ ? Y Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources May 23, 2005 CERTIFIED MAIL: RETURN RECEIPT REQUESTED Realticorp Inc Mr. Tom Bruce 14120 Ballantyne Corporate Place, Suite # 160 Charlotte, NC, 28277 Subject Property: 24- acres University Crossing Situ REQUEST FOR MORE INFORMATION Dear Mr. Bruce: Alan W. Klimek, P.E. Director Division of Water Quality DWQ Project # 04-0665 Mecklenburg County On March 22, 2005, the Division of Water Quality (DWQ) received the revised storm water management plan prepared by your engineer Mr. Chris Price, P.E., of Gray Engineering Consultants Inc, to comply with the conditions of the Isolated Wetlands Permit issued on August 27, 2004. The following additional information is needed before the plans can be approved. 1. 401 Wet Detention Basin Worksheet, and the ponds should meet 85 % TSS as per latest BMP. 2. The drainage area map shows 63.08 ac site, PCN shows 24.035 or 26 ac, and your worksheet shows 20.61 ac, account for all of the site flow rates and the differences in the area given. 3. The Forebay, the Orifice, and the Drawdown did not meet requirements. 4. Wet Detention pond design with level spreaders for more benefits and a map showing buffers area. Please respond within three weeks of the date of this letter by sending three (3) copies of this information in writing. This letter only addresses the Storm water Management Plan review and does not authorize any impacts to wetlands, waters or protected buffers. Please call Mr. Sam Aghimien at 919-733-3574 if you have any questions. Sincerely C di Karoly, Supervisor 401 Oversight/Express Review Permits Unit CBKISAA cc: Alan Johnson, DWQ Mooresville Regional Office USACE Asheville Regulatory Field Office File Copy Central Files Chris Price, P.E., Gray Engineering Consultants Inc, 132 Pilgrim Rd, Greenville, SC. 29607 Filename: 04-0665 University Crossing info 5-19-05-1 401 Oversight/Express Review Permits Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-68931 Internet: http://h2o.enr.state.nc.us/ncwetiands None Carolina ?ttirn!!U An Equal Opportunity/Affirmative Action Employer- 50% Recycled110% Post Consumer Paper ?,O+F WAT?9o Ivlichacl F. Easley, Governor ! ?i William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources 0 . Alan W. Klimek, P.E. Director Division of Water Quality May 23, 2005 CERTIFIED MAIL: RETURN RECEIPT REQUESTED Realticorp Inc Mr. Tom Bruce 14120 Ballantyne Corporate Place, Suite # 160 Charlotte, NC, 28277 Subject Property: 24- acres University Crossing Site REQUEST FOR MORE INFORMATION Dear Mr. Bruce: DWQ Project # 04-0665 Mecklenburg County On March 22, 2005, the Division of Water Quality (DWQ) received the revised Storm water management plan prepared by your engineer Mr. Chris Price, P.E., of Gray Engineering Consultants Inc, to comply with the conditions of the Isolated Wetlands Permit issued on August 27, 2004. The following additional information is needed before the plans can be approved. 1. 401 `'Vet Detention Basin Worksheet, and the ponds should meet 85 % TSS as per latest BMP. 2. The drainage area map shows 63.08 ac site, PCN shows 24.035 or 26 ac, and your worksheet shows 20.61 ac, account for all of the site flow rates and the differences in the area given. 3. The Forebay, the Orifice, and the Drawdown did not meet requirements. 4. Wet Detention pond design with level spreaders for more benefits and a map showing buffers area. Please respond within three weeks of the date of this letter by sending three (3) copies of this information in writing. This letter only addresses the Storm water Management Plan review and does not authorize any impacts to wetlands, waters or protected buffers. Please call Mr. Sam Aghimien at 919-733-3574 if you have any questions. Sincerely, /a? C?n?roly, Supervisor 401 Oversight/Express Review Permits Unit CBKISAA cc: Alan Johnson, DWQ Mooresville Regional Office USACE Asheville Regulatory Field Office File Copy Central Files Chris Price, P.E., Gray Engineering Consultants Inc, 132 Pilgrim Rd, Greenville, SC. 29607 Filename: 04-0665 University Crossing info 5-19-05-1 401 Oversight/Express Review Permits Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-68931 Internet: http://h2o.enr.state.nC.us/ncwetlands Nol-tliCarolina Jlalrrrally An Equal Opportunity/Affirmative Action Employer- 50% Recycledl10% Post Consumer Paper JOB NAME JOB NUMBER PAGE NO. d/viyCitc,im 1 iv 24W-7e- JOB DESCRIPTION BY DATE D/ ?,o crl" V i 105 ??}SI IBS G? ?'? GRAY ENGINEERING CCNSU11JANTS, INC. / 132 Pi!Orim Rcad / Greenville, SG 2S607 / (°64) 297-3027 WET [WETLAND] DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT [Wetland maintenance wording is bracketed. Please modify the document as appropriate.] The wet [wetland] detention basin system is defined as the wet [wetland] detention basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet [wetland] detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet [wetland] detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet [wetland] detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4.5 _ feet in the main pond, the sediment shall be removed. [For stormwater wetlands: If the elevation of the marsh areas exceed the permanent pool elevation, the sediment should be removed to design levels. This shall be performed by removing the upper 6 inches of soil and stockpiling it. Then the marsh area shall be excavated six inches below design elevations. Afterwards the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks.] When the permanent pool depth reads 3, o feet in the forebay [and micro-pool], the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation oo Sediment Removal El. Bottom Elevation 5$9.0x1 ------ ------- 75% Sediment Removal Elevation 59?.50 75% 8 FOREBAY MAIN POND Page I of 2 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. [For wetlands: Wetland planting densities in the marsh areas should be maintained by replanting bare areas as needed. Wetland plants should bd encouraged to grow in the marsh areas.] 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet [wetland] detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be, maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. cw Print name: annul k . Q-A Title Address: Phone: lbq _ Signature: Date: Z1 t?, Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, a Notary Public for the State of ly/°'''i? County of i' do hereby certify that personally appeared before me'this 17' day of r?-ojGGai -?? 7 and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, c' W O T v SEAL My commission expires Page 2 of 2 ? 5F xNATF9Q Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources > _? , =1 Alan Klimek, P.E., Director CJ '? Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality May 6, 2004 DWQ # 04-0665 Mecklenburg County CERTIFIED MAIL - RETURN RECEIPT REQUESTED Realticorp Attn: Tom Bruce/Brian Rollar 14120 Ballantyne Corporate Place, Suite 160 Charlotte, NC 28277 Subject Property: 24-acres University Crossing Site Dear Mr. Bruce and Mr. Rollar: On April 22, 2004 the Division of Water Quality (DWQ) was notified by receipt of your application regarding your plan to fill wetlands or waters for the purpose of a commercial development in Mecklenburg County. Approval from DWQ is required to disturb these areas. Please provide 7 copies of the following information and refer to the DWQ # listed above in your reply. Please show these on maps of suitable scale (for instance 1" = 100 feet) so we can begin to determine your projects' compliance with 15A NCAC 2H .0500. 1. Please provide detail for the stormwater management practices. 2. Please indicate all stormwater outfalls on the site plan. 3. Stormwater Management: Applicant is proposing to use wetland "AA" to treat stormwater. Flows into this wetland will need to be non-erosive and protect the wetland uses. A pretreatment device (likely a dry basin with level spreaders) will be needed if the wetland is large enough to handle the flow. Applicant must provide calculations to meet these design criteria. Wetland monitoring will also likely be needed with t backup plan if wetland uses are lost. Please contact John Dorney at 733-9146 for details. Please telephone John Dorney at 919-733-9646 if you have any questions or would require copies of our rules or procedural materials. This project will remain on hold as incomplete in accordance with 15A NCAC 2H .0505(c). The processing time for this application will begin when this information is received. If we do not hear from you by writing or by fax at (919) 733-6893 within three (3) weeks we will assume you no longer want to pursue the project and will consider it withdrawn. Sincerely, JRD/bs 0/1 * rater y 1 lity Ce is ion Program cc: Mooresville DWQ Regional Office Asheville Corps of Engineers Central Files File Copy Gregory Antemann, CWS, 5000 Nations Crossing Road, Suite 230, Charlotte, NC 28217 Ed Schwartzman, DWQ N. C. Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) (919) 733-1786 (phone), 919-733-6893 (fax), (httVIlh2o.enr.state.nc.us/ncwctlands) Customer Service #: 1-877-623-6748 V? NCDH-.?R ITITITME In (07 L?< GRAY ENGINEERING CONSULTANTS, INC. CHRIS L. PRICE, P.E. (EXT. 28) TO: Gregg Antemann Carolina Wetland Services 5000 Nations Crossing Road, Suite 230 Charlotte, NC 28217 704-527-1177 DATE: 3/8/2005 10:52 AM G.E.C. JOB#: 240078 RE: University Crossing Development U.S. 29 and West Mallard Creek Road Charlotte, NC WE ARE TRANSMITTING SHOP DRAWINGS PLANS SOIL RESULTS LETTER SUBMITTALS SPECIFICATIONS COST ESTIMATE SEE DETAIL X PRINTS ATTACHED X CALCULATIONS DISK(S) MAILED VIA UNITED STATES MAIL OVERNIGHT-NEXT AFTERNOON BY BAND x OVERNIGHT- NEXT MORNING 2- DAY DELIVERY COURIER SERVICE AS CHECKED BELOW: FOR APPROVAL PRELIMINARY REVIEW & COMMENT APPROVED AS SUBT. X FOR YOUR USE FOR CONSTRUCTION BID DOCUMENTS APPROVED AS NOTED FOR FIELD USE AS REQUESTED PERMIT REVISE & RESUBMIT QTY. I REVISION NO. I DESCRIPTION I Gregg Set of Full Size Civil Plans, Storm Calculations, Wet Detention Worksheet, Level Spreader Worksheet REMARKS: Gregg, Enclosed are the items requested for you to forward to the NCDENR Water Quality Division. Please contact me if you have any questions. Thank you. DISTRIBUTION: DISTRIBUTION: 1 FILE:240078-1tr-gacivs.doc SIGNED: 132 Pilgrim Road • Greenville, S.C. 29607 Phone (864) 297-3027 • Fax (864) 297-5187 'C""ITOHna' V7cthand stnikcs Aueust 19, 200.1 WETLANDS 1401 GROUP Mr. Ed Sclnrtrtzman NCDENR - Division of Water Quality AUG 2 0 2004 11 ctlands Unit 2321 Crabtree Blvd. Ralcish, NC 27604-2260 WATER QUALITY SECTION Subject: Additional Information regarding Storm Water Treatment 24-Acre University Crossing Site Charlotte, North Carolina Carolina Welland Services Project No. 2003-0424 DWQ tJ 04-0665 Dear Mr. Schwartzman: On behalf of our client REALTICORP, Carolina Wetland Services, Inc. (CWS) is submitting this letter in response to your request for additional information in a letter dated May 6, 2004, regarding the 24-Acre University Crossing Site (DWQW-1-0665) located in Charlotte, North Carolina. We are submitting seven copies of this letter and the conceptual Storm Water Management Plan for the site. Gray Engineering is developing the Storm Water Managenient Plan according to the NCDENR Manual for this project that will incorporate a wet pond and avoid impacting on-site jurisdictional wetland areas. Based on the results of our analysis, using an on-site floodplain wetland for stone seater treatment is not feasible. Please see the attached conceptual SWMP plan view and a cross section of the proposed Wet Pond for your review. Please don't hesitate to call me if you have questions concerning this project. Thank you for your attention to this matter. Sincerely, Greg6ry C. Antcmann, PWS Principal Biologist t Attachments: Conceptual Stonn Water Management Plan mid Wet Pond Cross Section s cc: Mr. Brian Rollar, REALTICORP Mr. Chris Price, Gray Engineering tt i(1 5000 Nations Crossing Road, Suite 230 Charlotte, INC 28217 (703) 527-1 177 Phone (704) 527-1133 Fax kv%vxv.carol ina«ctlandscrsiccs.com A.lr 1 Y. • f-I o e ?T Auumst 19, 2004 WETLANDS 1401 GROUP Mr. Ed Sch).vartzrrra n NCDENR - Division of Water Quality AUG 2 0 2004 Wetlands Unit 2321 Crabtree Bhd. Ralei-h, NC 27604-2260 WATER QUALITY SECTION Subject: Additional information regarding Storm Water,rreatment 24-Acre University Crossing Site Charlotte, North Carolina Carolina Wetland Services Project No. 2003-0424 DWQ 4 04-0665 Dear Intr. Schwartzman: On behalf ofour client REALTICORP, Carolina Wetland Services, Inc. (CWS) is submitting this letter in response to your request for additional information in a letter dated May 6, 2004, regarding the 24-Acre Universitv Crossing Site (DWQri04-0665) located in Charlotte, North Carolina. We are submitting seven copies of this letter and the conceptual Storm Water Management Plan for the site. Gray Engineering is developing the Storm Water Management Plan according to the NCDENR Manual for this project that will incorporate a wct pond and avoid impacting on-site jurisdictional wetland areas. Based on the results of our analysis, using an on-site iloodplain wetland for storm water treatment is not feasible. Please see the attached conceptual SWMI' plan view and a cross section of the proposed Wet Pond for your review. Please don't hesitate to call me if you have questions concerning this project. Thank you for your attention to this matter. Sincerely, AGrcg6ry C. Antcmann, PWS Principal Biologist 1 Attachments: Conceptual Stonn Water Management Plan and Wet Pond Cross Section t' cc: Mr. Brian Rollar, REALTICORP t Mr. Chris Price, Gray Engineering 1 t l 5000 Nations Crossing Road. Suite 230 • Charlotte, NC 28217 • (703) 527-1 177 Phone • (704) 537-1133 Fax ?` I?\1 .%w.earolma%Nctlandsenices.com ?l J00 NAME JOB NUMBER PAGE NO. GlNlveres X7.1 ?r?os.;?lvc 2yno78 JOB DESCRIPTION / BY DATE 77 ON L??VGcPT? ?L' f? 107 o .............. ...-.-.-..u.? i.-,"., n Y4 ..I--. If,1 , I .4 n-n no-.i... M....?4 1 (_rnn nvillr? Q(` ^C-4r)-7 I IP;'d) M7.?.(l,.;, i (Carolina Wetland services March 18, 2005 Mr. Ed Schwartzman NCDENR - Division of Water Quality Wetlands Unit 2321 Crabtree Blvd. Raleigh, NC 27604-2260 Subject: Storm Water Management Plan 24-Acre University Crossing Site Charlotte, North Carolina Carolina Wetland Services Project No. 2003-0424 DWQ # 04-0665 Dear Mr. Schwartzman: On behalf of our client REALTICORP, Carolina Wetland Services, Inc. (CWS) is submitting this letter and the enclosed Final Storm Water Management Plans for the 24-Acre University Crossing Site (DWQ904-0665) located in Charlotte, North Carolina for your review. Please don't hesitate to call me if you have questions concerning this project. Thank you for your attention to this matter. Sincerely, C Gregory C. Antemann, PWS Principal Biologist Attachments: Storm Water Management Plan A` ? j ?1 i f 219@20YRN MAH 2 2 2005 DENR - WATER QUALITY titi1?1 AtJOS AND STOR PATER BRANCH 550 E. Westinghouse Blvd. • Charlotte, NC 28273 • (704) 527-1177 Phone • (704) 527-1133 Fax www.cws-inc.net DWQ Project No DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name : U IV V112-1;jn C?dSy/ivG, Contact Person: a124 4N /?6L(,4lL Phone Number: Level Spreader ID: . Level Spreader Length / 80 ft. Drainage Area 20. to 1 ac. Impervious Area /7.52 ac. Maximum Filter Strip/Buffer Slope O L4 % grass Max. Discharge from a 10 Year Storm 26.0 cfs Max. Discharge to Level Spreader #z&. O cfs Filter Strip/Buffer Vegetation (4RAS$ Pre-treatment or Bypass Method P II. REQUIRED ITEMS CHECKLIST (perpendicular to flow) (on-site and off-site drainage to the level spreader) (on-site and off-site drainage to the level spreader) (6% for forested, leaf littler cover, 8% for thick ground cover)' (thick ground cover or grass, canopied forest with leaf litter groundcover) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials !6e e Nare(1? Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. LJL - Pre-Form Scour Holes are on flat slopes only life No structures are located in protected buffers" If bypass method specified in the Draft Level Spreader Design Option Document: ?v??4- Bypass method is specified (if applicable) and plan details and calculations are provided N14 Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. No structures are located in protected buffers. KJ.4 Plan details for the bypass and outlets are provided. GP The operation and maintenance agreement includes annual erosion and vegetation repair. The operation and maintenance agreement signed and notarized by the responsible party is provided. Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document. This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. JOB NAME JOB NUMBER PAGE NO. UIV t V,-Vs f ssi fu Z?00-7 8 JOB DESCRIPTION O BY , n DATE -Vy'q/ ven- ?R ?L'YL- D2lLSl??? t GVr 7 GRAY ENGINEERING CONSULTANTS, INC. 1132 Pil.,dm Rcad / Greenville, SC 29607 / (864) 297.2027 r dica d he wo6,1- Idsu??%f dra?njjo,,j bps%? 6?4?1e- d `y ra?? ?e5 y? S rn 0 Wetlands Unit Phone Numbers Updated April 12, 2004 Beth Barnes ............................... 715-8394 Chet Buell ................................. 715-4631 John Dorney .............................. 733-9646 Alicia DuClos ............................ 733-9584 Larry Eaton ................................ 715-3471 Debbie Edwards ........................ 733-9502 John Hennessy ........................... 733-5694 Mike Horan ............................... 715-3404 Cyndi Karoly ............................. 733-9721 Steve Kroger ............................. 733-3574 Rob Ridings ............................... 733-9817 Rick Savage ............................... 715-3479 Ed Schwartzman ........................ 715-3477 Danny Smith .............................. 733-9716 Beverly Strickland ..................... 733-3176 Cynthia Van Der Wiele ............. 715-3473 Bob Zarzecki ............................. 733-9726 DOT ........................................... 733-9604 DOT ........................................... 715-3425 DOT Line .................................. 733-5715 EPA Tracking Grant .................. 715-4617 Open - Amanda ......................... 715-3475 Open - Dave .............................. 715-3481 Main Number .......................... 733-1786 Express Main Number............ 733-0203 Conference Room ................... 715-4616 Conference Room 2 ................. 715-4614 Fax Number ............................. 733-6893 a 7-1 O - r- U o LL O U:) c z'l - C1 .. z -- w L:: _ It__IA l LZOS-/-6Z (V99) //.0963 OS '811)nuO9J!Z)/ peon WP61Id M PONI'S1NVI7InSNO3 !DNIa33NIJN3 "HE) ?11. 71, -- - - -; • --- - ---?-- ` . ' + ' ?__ ' _ ._ 1.-- --1-- + --•-?-- 1 ' I Sim. 7-_ -- ?- -?- ?I I I I t + , 4z/,ig 1 <Y-7-;? -1cWiv/ )y?qnvZ 31Y0 A8 NOI1dIa0S30 60P / 'ON 30Yd H3UVtnN HOP 3NJYN e0P ?v s ?U ?n -- 1A vv ?I oa D q III. k O O QJ1 0 Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and.roads. Also provide a detailed site plan showing property \ndan d development plans,in relation to surrounding properties. Both the vicinity map must include a s le and north arrow. The specific foo ? rints of all bu ildings, urfaces, or other ities must be included. If possible, th maps and plans should ppropriate USGS To ographic Quad Map and NRCS Soil urvey with the property utlined. Plan drawin s, or other maps maybe included at he applicant's discretion, e property is giearl defined. For administrative and istribution purposes, the es informati¢n to e submitted on sheets no larger t an 11 by 17-inc ormat; however, DW may ac ept pa erwork of any size. DWQ pre ers full-size oonstruction drawings rather an a 4uentia sheet version of the full-size pl ns. If ful ize plans are reduced to a small cale uch that he final version is illegible, the ap licant w'1 be informed that the project has been pJa ed on hold until decipherable maps are prov ded 1. Name of project:?Ofislow County Water Treatment P1antkEaraHes - 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identifi ation Number ((fax PIN) 4. Location `?.. County: Onslo Subdivision nage (include phase/lot nu Directions to sitq (include road numbers A Nearest Town: Jacksonvill andmarks, etc.): Take 1-4U east to exit 364 near Warsaw and Jacksonville. The westernmost well is proposed to be( located adjacent to ; proposed well sites and raw water/ ghway 24, Sly 1428 south of SR 4? Hig 5. Site coordinat I , if available (U_ ?M or (Note - If project is linear, sucYt as a r( coordinates for each crossimz of a disti 6. Property sizel(acres): 7. Nearest body of water iti 1432. /Long See Al or utili ? line, attach a waterbod .) over a rox'matel on locean/lake): Bell S" 8. River Basin: White Oak 1 (Note - this must b one of North Carolina's seventeen desi River Basin map i available at http://h2o.enr.state.nc.us/adm Sheet that separately lists the and major river basins. The 9. Describe the cyXsting conditions on the site arid?general land use in the"vicinity of the project at the time of this application: 1. HSW10 - Riggs Site: The northwestern portion of the Riggs Site has been disturbed, and a production well is located in the disturbed area. The Page 6 of 15 n file:///Untitled U Chris, ??// Please forward these comments regarding the University Crossing Project to Len Solesby. According to my review of the project and John Dorney's comments, you first need to show that the wetland AA can effectively assimilate the stormwater generated from the site. Please provide calculations for this, taking into account the area of the wetland, the drainage area, and percent impervious. An example that may lend itself well to your model would be the design/sizing criteria of a constructed stormwater wetland, as demonstrated in our Stormwater BMP Manual. However, I would recommend that when calculating necessary surface area,use a ponding depth of 9" in the wetland as opposed to 2' as shown in our manual. Another resource for sizing constructed wetlands from NCSU is at http://www.neuse.ncsu.edu/SWwetlands.pdf. If you can show that the wetland can assimilate the stormwater from the site, then we can begin to review the dry detention basin design. I was mistaken when I suggested that the dry detention basin could remove 85% TSS, rather it is estimated to only remove 50%. If the wetland size is inadequate to handle the stormwater flows, we may want to consider another design besides a dry detention basin, such as a wet detention basin or a combination of BMP's in series that can provide 85% TSS before reaching the wetland. In regards to the dry detention basin design that you submitted, I will have to ask John Dorney's opinion and unfortunately this may take a little while. My main concern is the fact that by using retaining walls as opposed to grassed slopes, you will lose treatment ability and retention time. Furthermore I have concerns over the long term maintenance required with the retaining walls should they eventually begin to weaken and fall apart. I would additionally recommend that you make sure to indicate the stormwater outlets on site in your final plan. It's also a good idea to work with the consultants to develop a wetland monitoring plan for wetland AA with annual monitoring that will measure hydrology and vegetation in order to assess potential impacts to the wetland. Please don't hesitate to contact me with any further questions. I will be in the field tommorow and next Tuesday but will be in the office on Wednesday and Thursday of next week. Ed Schwartzman "Chris L. Price, P.E." wrote: Ed,Attached is the "rough" concept plan for the detention. Please contact us with any questions. Regards, Chris L. Price, P.E. Gray Engineering Consultants, Inc. 132 Pilgrim Road Greenville, SC 29607 Ph: (864) 297-3027 Fax: (864) 297-5187 cprice@graVendineerinq.com 1 of 1 5/27/04 6:18 PM DWQ# d 010 Date D * Who Reviewed: ?)_ '7Y 10? Plan Detail Incomplete ? Please provide a location map for the project. ? Please show all stream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan. ? Please show all wetland impacts including fill slopes on the site plan. ? Please indicate all buffer impacts on the site plan. ? Please indicate proposed lot layout as overlays on the site plan. ? Please indicate the location of the protected buffers as overlays on the site plan. ? Please locate all isolated or non-isolated wetlands, streams and other waters pf the State as overlays on the site plan. ? Please provide cross section details showing the provisions for aquatic life passage. ? Please locate any planned sewer lines on the site plan. ? Please provide the location of any proposed stormwater management practices as required by GC Please provide detail for the stormwater management practices as required by GC ? Please specify the percent of project imperviousness area based on the estimated built-out conditions. Please indicate all stormwater outfalls on the site plan. ? Please indicate the diffuse flow provision measures on the site plan. ? Please indicate whether or not the proposed impacts already been conducted. Avoidance and/or Minimization Not Provided ? The labeled as on the plans does not appear to be necessary. Please eliminate the or provide additional information as to why it is necessary for this project. ? This Office believes that the labeled on the plans as can be moved or reconfigured to avoid the impacts to the . Please revise the plans to avoid the impacts. ? . This Office believes that the labeled on the plans as can be moved or reconfigured to minimize the impacts to the . Please revise the plans to minimize the impacts. ? The stormwater discharges at the location on the plans labeled will not provide diffuse flow through the buffer because . Please revise the plans and provide calculations to show that diffuse flow will be achieved through the entire buffer. If it is not possible to achieve diffuse flow through the entire buffer then it may be necessary to provide stormwater management practices that remove nutrients before the stormwater can be discharged through the buffer. Other ? The application fee was insufficient because over 150 feet of stream and/or over I acre of wetland impacts were requested. Please provide $ . This additional fee must be received before your application can be reviewed. ? Please complete Section(s) on the application. ? Please provide a signed copy of the application. ? Please provide' copies of the application, f Mitigation copies of the site plans and other supporting information. ? of compensatory mitigation is required for this project. Please provide a compensatory mitigation plan. The plan must conform to the requirements in 15 A NCAC 2H.0500 and must be appropriate to the type of impacts proposed. ? Please indicate which 404 Permit the USACE would use to authorize this project. V v?? • N „Vn pSi JP U`?C- p?aD ? Flows 14 Cl;ks9? a Ay aay;? ?;VI? YIID- iCPf? YW?/ C4_ ?IWS , ?e$I? ? ??\? ^wIa/c?vA. unVti ? w;1l?aVso ?'?F??,??u`W!o?t' uses ? b? ?n STORMWATER MANAGEMENT AND EROSION CONTROL REPORT L1-- I For the Proposed UNIVERSITY CROSSING - PHASE I N. Tryon Street (U.S. Hwy 29) and W. Mallard Creek Ch. Road (SR 2472) Charlotte, North Carolina Prepared for REALTICORP, INC. 14120 Ballantyne Corporate Place Charlotte, NC 28277 ACA,? Prepared by Chris L. Price, P.E. ado SEAL • 029755 ? f R4'Gft1 GRAY ENGINEERING CONSULTANTS, INC. 132 Pilgrim Road Greenville, SC 29607 4:i? G.E.C. Job No. 240078 January 10, 2005 M P?? ?L ,? 7 n05 h ? 6R?ot DEN S WpSt0;t1fi V;E0 r F_t TABLE OF CONTENTS Project Description 1 Soils 1 ® Town of 6Vake Forest Stormivater 11anagement Requirements. 1 Site Location 11ap 2 Site Topographic flap. 3 Site Aerial Alap 4 Site Hydrology S Pre-Development Conditions. 5 Post-Development Conditions 6 Permanent 6Vater Quality Requirements 7 Storm Drain and Rip-Rap Outlet Stabilization Design 7 Sedlmentology 7 Erosion and Sedimentation Control Devices . 8 Tables: Table I. Pre-Development Area Peak Flow Summary 5 Table II. Post-Development Area No. I Peak Flow Summary. 6 Table III. Post-Development Area No. 2 Pond Outfall Summary 6 Table IV. Post-Development Area No. 2 Peak Flow Summary. 6 Appendices: APPENDIX I Pre-Development Conditions Map Pre-Dev. Conditions SEDCAD Calculations Precipitation Figures APPENDIX II Post-Development Conditions Map Post-Dev. Conditions SEDCAD Calculation s Pond Volume Calculations APPENDIX III Storm Drainage Map Storm Drain Design Riprap Outlet Protection Design Buoyancy Calculations F.-I'a, APPENDIX IV Water Quality Design Temporary Sediment Basin Calculations Level Spreader Design Additional Calculations 1 V. STORi'VIWATER MANAGEMENT AND SEDIivIENTOLOGY REPORT UNIVERSITY CROSSING - PHASE I CHARLOTTE, NORTH CAROLINA Project Description RealtiCorp, Inc. is proposing the construction of the first phase of an office/retail park located in the City of Charlotte, North Carolina. The site is located on a 24.035-acre tract of land at the western quadrant of North Tryon Street (U.S. Highway No. 29) and West Mallard Creek Church Road (SR 2472). Refer to the Site Location Map. The project will include the construction of a city street, commercial drives, private roads, a stormwater detention facility, perimeter landscaping, mass grading, and buffer areas. This stormwater management report considers the pre-development and the post-development conditions for the entire watershed to the project site. The stormwater detention facility has been sized for the post-development conditions including the full build-out of all development including all outparcels. The total disturbed area for this project will be approximately 26-acres. Soils According to the Soil Map provided by the City of Charlotte, the predominant soils in the project area are identified as Enon and Wilkes soils (see soils map attached). The Enon and Wilkes soils belong to the hydrologic soil group C. To be conservative, hydrologic soil group B was used to model the site hydrology. City of Charlotte Stornnvater iblanabenzent Requirements The proposed development must follow the requirements set forth by the City of Charlotte. The following are a few of the stormwater management requirements for the City: • Stormwater Quality is required. • Analyze the 2, 10, and 100-year storm events • Desired that Post-Development release peak rates not to exceed Pre-Dev. release peak rates for 2 and 10-year storms • Emergency Spillway designed for 50-year storm event Please refer to Charlotte-Mecklandburg Stormwater Design Manual and the Charlotte-Mecklandburg Land Development Standards Manual for specific design requirements. Also, the design of the ponds must also meet the minimum standards for design criteria set forth by the North Carolina Department of the Environment and Natural Resources, Division of Water Quality, 401 Wetlands Unit. 0 Page 1 of 9 240013-StormSedReport-RcvZOO-;O I I O.doc, I q' o I/ SITE p J jo'J / Y ?Qr j? r a\ GrO, / i 1`?! tix vC`cJ ? r°? ,f 0 0.28mI `FL SITE VICINITY MAP UNIVERSITY CROSSING - PHASE I City of Charlotte, North Carolina Not to Scale Page 2 of 9 230078-StomiSedReport-Rev20050110.doc 0 CMUSGUSCharlotte, North Carolina, United States 01 Jul 1996 -As > 3-` ~i irk ?? ll '? r ?I j/'ln ` \` ^ 1 ??, • _, i r. ±??-r f _ ^'r j? r j. ,? i 32 650 ci( .?-?_ ?; i %•' ?%J '? _ -tic..-.- ? f ?( ' • M ???\ V v l l'+ -w,1-'--`5 -- -??.?; , '? '`r'r ,.'yam ?*`..?; /? -r•.' r `= -? ` ` "•?o (fir j f .? ?:? ? ? ? ? • `, 1 -; t ll ? 1_- ? -?:-? ' ( ;? , 1`y? ?= 'i 'r' .,'' 1 1T1 i I Sl l J ?J !" err j t J y F l- 1 ','r _.?/?' lY' f r ?.Z L= m 1 100, 200, 300, Will yds 100 200 300 USGS QUAD MAP UNIVERSITY CROSSING - PHASE I City of Charlotte, North Carolina k-,_1 Page 3 of 9 240078-StormSedReport-Rev200501 I O.doc r4' t ? t A r Ill - t ^' '7r tt ? } J - _ t j`T ?, 9 4 1 ?. ?. 1 - y b x ?('1 I •.- ` or'i i V MlecklanburgCounty GIS r " i 'c SITE AERIAL MAP UNIVERSITY CROSSING - PHASE I City of Charlotte, North Carolina Page 4 of 9 240073-StonnSedRcport-Rcv200501IO.doc Site Hydrology The proposed development's site stormwater management plan has been designed such that the post-development peak runoff rates are less than the pre-development peak runoff rates for the 2 and 10-year storm events. The emergency spillways have been designed to handle the post-development 50 and 100-year storm events. Rainfall data specific to Charlotte-Meeklandburg were used. The SEDCAD 4 method of analysis was utilized to produce the pre- and post-development peak runoff rates. All data and computations reported in the following narrative and presented in the Appendices reflect the SEDCAD 4 method of analysis. Refer to Appendix I for pre-development calculations and Appendix II for post-development and pond design calculations. Pre-Development Conditions The existing ground cover is assumed to consist of wooded areas. Even though some of the watershed is developed, it is assumed that adequate detention was provided to mimic their pre-developed conditions. Under pre-development conditions, the site drains in two directions; a slight ridge running northwest-southeast divides the east corner of the site from the rest of watershed. The majority of the site (Area 42) drains toward the southwest, to Mallard Creek. This creek is off-site yet features a 100-year floodplain that crosses the southern corner of the property. The creek also features a low flat wetland area that also encroaches onto the southern corner of the property. Eventually, Mallard Creek outlets to the south under North Tryon Street (US Hwy 29) flowing toward the Rocky River. Where Mallard Creek intersects North Tryon Street is our Point of Study (POS) 92. The east corner of the site (Area #1) drains to a 30" RCP culvert under North Tryon Street (US Hwy 29). This culvert eventually flows to Mallard Creek on the other side of North Tryon Street. The entrance to this culvert is our Point of Study (POS) #1. There is little off-site area draining to the site and none of the off-site area drains into the detention facility. The total watershed area studied under pre- development conditions is approximately 68-acres. Supporting hydrologic data and pre- development calculations can be found in the Appendix I. Table I. Pre-Development Peak Flow Summary J PRE-DEVELOPMENT PEAK FLOW SUMMARY STORM PRECIPITATION PRE-DEV AREA NO.1 PRE-DEV AREA N0.2 EVENT (CFS) OUTFLOW (CFS) OUTFLOW (CFS) YEAR 2 3.12 5.38 26.47 10 4.80 11.87 86.68 50 6.48 18.88 159.10 100 6.96 20.92 181.14 Page of 9 2 30073-Storm&dReport-Re00050110.doc 0 a s s A e s s s s s A e e e e e s Post-Development Conditions Under post-development conditions, there is one (1) permanent on-site detention facility designed to detain the increased runoff from the proposed outparcels and most of the main site. The 360' of the northern most drive to North Tryon Street drains undetained to the 30" RCP culvert (POS #1) under North Tryon Street. Supporting hydrologic data and post-development calculations can be found in the Appendix II. Tahle 111 Pnct-nevelnnment Area No_ 1 Peak Flow Summarv POST-DEVELOPMENT AREA No.1 PEAK FLOW SUMMARY (POS #1) STORM EVENT (YEAR) PRE-DEV OUTFLOW (CFS) POST-DEV OUTFLOW (CFS) 2 5.38 4.36 10 11.87 6.74 50 18.88 9.11 100 20.92 9.79 Tahle 11 Post-nevelopment Area No_ 2 Detention Outflow Summarv STORM EVENT (YEAR) PEAK FLOW TO POND (CFS) PEAK OUTFLOW FROM POND (CFS) MAX. WATER SURFACE ELEVATION 2 45.16 4.73 597.03 10 72.63 25.96 599.14 50 99.76 72.49 600.25 100 107.47 85.30 600.56 TOP OF DIKE = 601.50 E.S. CKESC = 60U.UU I UP Ur 1<1JEK =.)ys._)U FUUL tL _ .)ys.UU Tnhle IV Pnct_nevelnrnnent area Nn 2 Peak Flow Suntmarv POST-DEVELOPMENT AREA NO.2 PEAK FLOW SUMMARY (POS #2) STORM EVENT (YEAR) PRE-DEV OUTFLOW (CFS) POST-DEV OUTFLOW (CFS) 2 26.47 24.99 10 86.68 84.52 50 159.10 192.79 100 181.14 221.88 Page 6 of 9 240073-StormSedReport-Rev2OO5Ol10.doc a Pertnartent Water Quality Requirements Based on the requirements by NCDENR and the City of Charlotte, both permanent water quality and post-development detention will be provided for this project. The wet retention basin (Water Quality Pond) for stormwater will be provided for the on- site permanent pond. Permanent water quality is achieved by using the permanent detention pond. Based on the drainage area and impervious areas to the pond, the required North Carolina Coastal Surface Area to Drainage Area (SA/DA) is provided with a permanent pool. Approximately 20% of the volume of the permanent pool will consist of a forebay. In addition to the permanent pool, the first one-inch of runoff from the site will be detained and released over 2 to 5 days from a temporary pool. For post-development detention purposes, the 2 and 10-year storm events will be attenuated to below the pre-development conditions for the respective storm event. One pond in the southern corner of the site near the existing wetlands will be used to achieve the detention and the water quality requirements. Also, the pond will successfully achieve the 85% total suspended solids (TSS) removal requirements as set forth by the NCDENR for the piedmont area. The pond shall be used as a temporary sediment pond during construction. The pond will also successfully handle the 100-year storm without overtopping the retaining wall. The pond will have a single outfall. This outfall has been designed such that it will handle the temporary pool volume and will be released upstream of the existing wetlands to a riprap apron and level spreader to slow flow velocity. This outfall has been designed such that it will also handle the remaining larger storm events and will release flow to the level spreader. Store: Drain and Rip-Rap Outlet Stabilization Design Refer to the site grading and storm drain plan for pond locations, grading, and layout configuration of the stormwater collection and conveyance system. The stormwater conveyance system was designed using the Rational method. The 10-year storm assuming a rainfall intensity of 7.0 inches per hour was used for design. The Rip-Rap Outlet Stabilization was sized based on the 10-year design flow determined at each pipe outfall. Refer to Appendix III for additional information. Sedimentolob y In order to control sediment runoff during construction, the proposed on-site stormwater detention pond will be used as temporary sediment pond. As shown in the calculations below, the storage volume of silt per disturbed acre is greater than 1,800 cubic feet (67 C.Y.) per acre, implying that a minimum trapping efficiency of 80% for the 10-year storm event will be maintained. Page 7 of 9 240078-StonnSedReport-Rev200_;01 I O. doc In addition to the main detention pond, four (4) temporary sediment basins, all sized to be greater than 1,800 cubic feet per disturbed acre, will be installed during the initial phase of construction. Refer to Appendix IV for temporary sediment trap calculations. Best management practices such as silt fencing, inlet protection, temporary check dams stone check dams, riprap outlet protection, and stone mud-mats will be used to deter sediment-laden runoff from leaving the site. Calculations (Refer to Appendix 11 for pond volume calculations) Disturbed Acreage (on-site) = 20.61 acres Basin No. 1 Volume (Permanent Pool Volume) = 141,096 ft3 Storage / Disturbed Acre = 6.845 ft (253 C.Y./AC) Erosion and Sedimentation Control Devices Construction Exits One (1) construction exit will be installed as per the plans and details. The location will be at the proposed entrance off West Mallard Creek Church Road to the new City road. It will be necessary to monitor and replace or repair these entrances as needed. 2. Silt Fencing Double rows of silt fencing will be installed along all the fill slopes. This barrier will provide added sedimentation protection. Silt fencing is also required around all topsoil stockpiles. Location of silt fencing is shown on all the erosion control plans. Sediment Basins Four (4) temporary sediment basins will be constructed at the low points on the project site as shown on the plans and details. These basins are being used to provide sediment control for those low points which will exist during the beginning phases of construction. The sediment basins have been designed using the N.C.D.E.N.R. BMP Manual and the Charlotte-Mecklandburg Land Development Standards. The basins have been sized for 1,800 CF/AC of drainage area, the perforated riser and barrel have been sized for the Q10 using Rational, and the emergency spillways have been sized for the Q50 using C=3.0, H=0.5 in. or less. 4. Temporary Berms and Diversion Ditches Temporary berms and diversion ditches will be used to intercept sediment laden runoff from all the disturbed areas and direct runoff into the sediment basins. Page8of9 240073-S to nn& dRepo rt-Rev=0050110. doc 5. Temporary Slope Drains with Berms Several temporary slope drains and berms utilizing stone check dams will be installed along the top slope of the wet detention pond in order to reduce sediment and flow velocity running down the fill slope into the pond. 6. Storm Drain Inlet Protection As added projection, anywhere there is a storm structure inlet proposed, inlet protection will be installed to filter any sediment from entering the storm drains. 7. Riprap Outlet Protection Anywhere there is a storm outfall, properly riprap aprons shall be installed to reduce flow velocity, minimize sediment-laden runoff, and reduce erosion. Pond Outlet Protection The outlet from the detention pond will flow to an energy dissipater structure surrounded by a rip-rap apron. From this structure water will flow through a level spreader to the existing wetlands in the southern corner of the property. This system will be installed to reduce flow velocity, minimize sediment-laden runoff, and reduce erosion. J III Project Stag es for Erosion Control This project will consist of generally three (3) stages of construction: Stage One shall consist of contractor mobilization and limited clearing only to install all initial temporary erosion control devices as shown on the Clearing Limits and Temporary Erosion Control Plan (CV-1). These measures include the construction exit off West Mallard Creek Church Road, silt fencing, wet detention pond, temporary sediment basins, temporary berms, temporary diversion ditches, and temporary slope drains. Stage Two shall consist of final pond construction, primary fill slopes on the south side of the site, retaining walls, and initial storm drainage construction as shown of the Grading, Drainage, and Erosion Control Plan (CV-2). Construction of the drives to West Mallard Creek Church Road and North Tryon Street shall take place. Additional erosion sediment control devices used during this phase include silt dams around catch basins, additional temporary slope drains (as needed), and vegetative matting to stabilize fill slopes. Stage Three shall consist of installation of concrete curb and gutter for the site, paving, installations of all utilities, highway improvements, and final stabilization and grassing. Refer to the Appendices for all calculations and refer to the detailed Erosion Control Plans and Details for all specific details, notes, and the construction sequences. Page 9 of 9 240073-5 tormSedReport-Rev20050110. doc APPENDIX I PRE-DE VEL OPMENT CONDITIONS SEDCAD CALCULATIONS PRECIPITATION FIGURES FOR 2, 10, 50 AND 100-YEAR STORMS J J D H 7 7 u r? E i -: k¦ - aapoos -1 r :- - ,s= I Ioo, _ ?" +?` ? ?1\11,,11,, 11 - ??.e?S'" ?'?? \ 2 ? I \ • III '1' 1'''' '1 ? / ? j \ \?" ???? _ , 1 ?,',i??O'. ?. ? , i i l 1'',111'11 1 ? _ ,' ''? ' /1 I I \\\\_.\•Co :. /,'j, ??\•i •?• ?, ,';\'``1`'11 ?,'?/ '', O I \ \ \? I '? / \•?\ ' \11`11`1 \- /' '?; CN LL LLJ nz \1 C5 U-1 M` _______- \X A 0'. Ilk = W - I i 11,,,,,111, 04 V, N M W \ \'? \ \ \'; \111, ' \ \1 ` a? LL J cn `/ \ 1 \ \1 \1 \'11,1 ,i,- %` \, 1` \ 1 \1, ?1 1 \\ `s \ _ It \ 1111,'1, '` , X1,11 \ \' 1,• - - I'' ,-?- \'1 11 X11 1\Ir-- I ,Y F- ?. Q _ c U) CL CN '? { W l 1 , N - - c1r) CL , \ 11.1;1; '1111 `?'1;; ? ;.;;?, ;. r: a \1 `' _ _ ` \. %11,11111'\`,1111111\11111`111\1',11, 1///// N UJI c_' - Q o 9 LL -i U) SEDCAD 4 for. Windows r`-'H. h/ IOQA D-1. I Crh.unh ?D?IIVE9?SH? t??OSSgMG GEC 24®078 Existing Conditions Basin 1 Paul J. Harrison Gray Engineering Consultants, Inc. 132 Pilgrim Road Greenville, SC 29607 Phone: (864) 297-3027 Email: cprice@grayengineering.com Filename: 240078-existBasinl sc4 1 Printed 01-10-2005 SEDCAD 4 for Windows r-,-ht 1acA D-i. 1 Gh-h General Information Storm Information: Storm Type: NR T e II Design Storm: 2 yr - 24 hr Rainfall Depth: 3.120 inches 2 Filename: 240078-existBasin1.sc4 Printed 01-10-2005 I SEDCAD 4 for Windows (`- inhf 1aca o-i. i Gh,u-h 3 Structure Networking: Type Stru # (ffllow Stru # Musk. K Musk. X Description Null #1 =_> End 0.000 0.000 1 Basin #1 to P.O.S. #1 #1 Null Filename: 240078-existBasinl.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,,il ht I OCR 0-1. I crh-.h Structure Summary: Immediate Total Total Peak Contributing Contributing Discharge Runoff Area Area Volume (ac) (ac) (cfs) (ac-ft) #1 5.320 5.320 5.38 0.39 4 H Filename: 240078-existBasinl.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,-Ht 10011 0-1 1 Crhw?h 5 0 Structure Detail: Structure ,;?'l (gull ) Basin #1 to P.O.S. #1 Filename: 240078-existBasintsc4 Pnnted 01-10-2005 SEDCAD 4 for Windows r-,-ht 1 OCR P-i. 1 Crho.esh Subwatershed Hydrology Detail: Peak Runoff S S SWS Area Time of Conc Musk K Curve MuskX UHS Discharge Volume A Stru # (ac) (hrs) (hrs) Number (cfs) (ac-ft) # 1 1 5.320 0.085 0.000 0.000 72.000 F 5.38 0.390 5.320 5.38 0.390 Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert. Dist. Horiz. Dist. Velocity (fps) (ft) (ft) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.00 5.890 0.016 #1 1 Time of Concentration: 0.085 6 Filename: 240078-existBasinl.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r--hl I COR D-1. I Ghwah 0 0 0 M El 0 0 0 0 0 General Information Storm Information: Storm Type: NRCS Ty e II Design Storm: 10 yr - 24 hr Rainfall Depth: 4.800 inches 1 Filename: 240078-existBasinl.sc4 Printed 01-10-2005 0 SEDCAD 4 for Windows (`nnurinh/ 100A D-i. 1 Cnh-h 1 Subwatershed Hydrology Detail: Peak Runoff S S SWS Area Time of Conc Musk K Curve Discharge Volume Stru# MuskX UHS A (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 5.320 0.085 0.000 0.000 72.000 F 11.87 0.907 5.320 11.8 0.907 10-4a- Subwatershed Time of Concentration Details: Stru # # SWS Land Flow Condition Slope (%) (ft) ( Vert. Dist. Hon(ft) Dist. Velocity (fps) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.00 5.890 0.016 #1 1 Time of Concentration: 0.085 Filename: 240078-exist8asin1.sc4 Pnnted 01-10-2005 SEDCAD 4 for Windows r'--fnhf 1 OQA 0-1c I ,,huiah General Information Storm Information: Storm Type: NRCS T e II Design Storm: 5 yr - 24 hr Rainfall Depth: 6.480 inches 1 Filename: 24C078-existBasinl.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r,.. -h+ I ona D-I i c,h-.k Subwatershed Hydrology Detail: Peak Runoff SWS SWS Area Time of Conc Musk K Curve Musk X UHS Discharge Volume Stru # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 5.320 0.085 0.000 0.000 72.000 F 18.88 1.503 T 5.320 18.88 1.503 5p. `R2-- Subwatershed Time of Concentration Details: Stru # SWS Land Flow Condition Slope (%) Vert. Dist. Horif Dist. Velocity (fps) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.00 5.890 0.016 #1 1 Time of Concentration: 0.085 1 Filename: 240078-existBasinl.sc4 Printed 01-10-2005 SEDCAD 4 for Windows (`--ht 100A D-1. I Ghuinh 1 General Information Storm Information: Storm Type: NRCS Type II Design Storm: 00 yr 24 hr Rainfall Depth: 6.960 inches Filename: 240078-existBasinl.sc4 Printed 01-10-2005 SEDCAD 4 for Windows f -,HH Hf 100A P-1. 1 Crhuiah 1 Subwatershed Hydrology Detail: Peak Runoff SWS SWS Area Time of Conc Musk K Curve Musk X UHS Discharge Volume Stru # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 5.320 0.085 0.000 0.000 72.000 F 20.92 1.682 5.320 20.92 1.632 Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert. Dist. Horiz. Dist. Velocity (fps) (ft) (ft) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.00 5.890 0.016 #1 1 Time of Concentration: 0.085 Filename: 240078-existBasinl.sc4 Printed 01-10-2005 SEDCAD 4 for Windows ("--ht IGGA Q-1. I Ghwoh 1 U 1"VE RSH CROSSHIMG GEC #240078 Existing Conditions Basin 2 Paul J. Harrison Gray Engineering Consultants, Inc. 132 Pilgrim Road Greenville, SC 29607 Phone: (864) 297-3027 Email: cprice@grayengineering.com Filename: 240078-exist6asin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows (`-1-h1 100%1 D.-In I Crh-h General Information Storm Information: Storm Type: NR T e II Design Storm: 2 yr - 24 hr Rainfall Depth: 3.120 inches 2 Filename: 240078-existBasin2.sc4 Printed 01-10-2005 e e e e v e s e e e e e e e SEDCAD 4 for Windows (`nn-Ht SODA P-1. I Gh?uah 3 Structure Networking: Type Stru # (flow Stru # Musk. K Musk. X Description Null j #1 =_> End ( 0.000 0.000 Basin #2 to P.O.S. #2 #1 Null Filename: 240078-existBasin2.sc4 Pnnted 01-10-2005 SEDCAD 4 for Windows r- inhf IGOA D.-I. I Ghwoh 4 Structure Summary: Immediate Total Peak Total Contributing Contributing Discharge Runoff Area Area Volume (ac) (ac) (cfs) (ac-ft) #1 63.080 63.080 26.47 1.99 Filename: 240078-existBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,-ht 100H 0-1. 1 Ghwoh 5 Structure Detail: Structure - .1 (Alull Basin #2.to P.O.S. #2 Filename: 240078-existBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,-ht 100A P-i I Crhu.?h Subwatershed Hydrology Detail: Peak Runoff S S SWS Area Time of Conc Musk K Curve MuskX UHS Discharge Volume A Stru # (ac) (hrs) (hrs) Number (cfs) (ac-ft) # 1 1 63.080 0.092 0.000 0.000 60.000 F 26.47 1.985 E 63.080 26.47 1.985 5ubwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 6 Filename: 240078-existBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r' inhf 100A o-1. i c,H-h General Information Storm Information: Storm Type: NRCS Type II Design Storm: 10 yr - 24 hr Rainfall Depth: 4.800 inches 1 Filename: 240078-existBasinIsc4 Printed 01-10-2005 a a 0 e e 0 a 93 0 e A D D 0 D SEDCAD 4 for Windows ('--hf 1 OOA D-1. 1 Gh...?h Subwatershed Hydrology Detail: Peak Runoff S S SWS Area Time of Conc Musk K Curve k X UHS M Discharge Volume A Stru # us (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 63.080 0.092 0.000 0.000 60.000 F I 86.68 6.234 63.080 86.68 6.234 ID'K Subwatershed Time of Concentration Details: Stru # SWS Land Flow Condition Slope (%) Vert. Dist. Horiz. Dist. Velocity (fps) Time (hrs) 91 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 Filename: 240078-exiztBasin2.sc4 1 Printed 01-10-2005 SEDCAD 4 for Windows 1 General Information Vill Storm Information: Storm Type: NRCS Tye II Design Storm: 50 yr - 24 hr Rainfall Depth: 6.480 inches fl 0 0 Q Filename: 240078-existBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,-ht 1aaa o-i. i c,ti..nti 1 Subwatershed HvdroloAv Detail: Peak Runoff SWS SWS Area Time of Conc Musk K Curve Musk X UHS Discharge Volume Stru # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 63.080 0.092 0.000 0.000 60.000 F 159.10 11.787 T 63.080 159.10 11.787 5ubwatershed Time of Concentration Details: Stru # SWS Land Flow Condition Slope (%) Vert. Dist. Horiz. Dist. Velocity (fps) Time (hrs) #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 Filename: 240078-existBasin2.sc4 Printed 01-10-2005 s SEDCAD 4 for Windows r-rinht I GOR 0-1. 1 Ghwah Filename: 240078-existBasin2.sc4 General Information Storm Information: Storm Type: NRCS T e II Design Storm: 1 0 yr - 24 hr Rainfall Depth: 6.960 inches 1 Pnnted 01-10-2005 SEDCAD 4 for Windows r-,,inht toga o-1. i c,.H-h 1 Subwatershed Hydrology Detail: Peak Runoff S S SWS Area Time of Conc Musk K Curve Discharge Volume Stru # # MuskX UHS (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 63.080 0.092 0.000 0.000 60.000 F 181.14 13.538 63.080 181.14 13.538 Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 Filename: 240073-existBasin2.sc4 Printed 01-10-2005 APPENDIX II I 11 n 1 POST-DE VELOPIIAIENT CONDITIONS SEDCAD CALCULATIONS POND VOL UME CALCULATIONS BUOYANCY CALCULATIONS 7 ,WIV 'y?'i! - • O i - _ _ ` '?• ?? ? .. 1 \ ?, 1111' , 1 1, ,.?`\` ,' C4 "111". LLI w LL CL EL CL CL Co O ) W L3 ba 0 CL `- -" 2711: LL J (/) t- .\j' _ _ \ I1 O J (n a 11 i / •? - - \? O N II \\ 0 M I I CL a+ ----- --- = ,? 2 > ,f a_ Cf) co m J O II II / T Z W EL 00 co w % ' N I LL J U) CL - c,4 N M W ?) // IrJ? €j?4 I I ' 1' I ''1111'+1 Cf) ILL _j C*4 U) LLI 14 LL) 12? U. LL oil CL w W a a r ?• n \ ?'. +'{,' i/ wax ?'' ° ') r- 1114 ?4 LL _j 1 4 NNW ;3 si ? r 11 \` \ \\I r. -- r r ,i /; ., jY; Tai e F'- II II d -?' !T?? _ s - I, x? ?•' ??`'', ?`:` ` \`? `_ ?? -' _ LL _j U) 07 - ?1_ /la / (?, \ q,ii a CV o U y?.-• dMN Cf) C14 LL _j , _13 `\`??\",?? ?-'-,; '.\1', \ I 1 .?\ 1, ?i?.r_=--%?=?<?_ . vi" mililm _01 s e e i SEDCAD 4 for Windows r--ht I QQA Q-1. I Gh-h NIVERSI CROSSING GEC #240078 Proposed Conditions Basin 1 Paul J. Harrison Gray Engineering Consultants, Inc. 132 Pilgrim Road Greenville, SC 29607 Phone: (864) 297-3027 Email: cprice@grayengineering.com 1 Filename: 240078-prcpBasin1.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,-ht 100A o-i. I Crhw?h E H] 0 u n u L ?I P 2 General Information Storm Information: Storm Type: NRC.S Type II Design Storm: 2 yr - 24 hr Rainfall Depth: 3.120 inches Filename: 240078-propBasinl.sc4 Printed 01-10-2005 SEDCAD 4 for Windows (`n w-W IGOA P-1. I Crh?.?oh Structure Networking. 3 Type Stru # ('fllotow, Stru # Musk. K Musk. X Description Null I #1 =_> #3 0.000 0.0001 Basin #1A to P.O.S. #1 Null #2 =_> #3 0.000 0.000 Basin #1B to P.O.S. #1 Null #3 =_> End 0.000 0.000 P.O.S. #1 e e 1 #2 Null #1 Null #3 Null Filename: 240078-propBasinl.sc4 Printed 01-10-2005 e SEDCAD 4 for Windows r-,H..ro 100A 0-1. 1 c,ti,.,.h 4 Structure Summary: P?, s a E u n u 0 0 Immediate Total Peak Total Contributing Contributing Discharge Runoff Area Area Volume (ac) (ac) (cfs) (ac-ft) #2 0.340 0.340 0.81 0.08 #1 1.500 1.500 3.55 0.36 #3 0.000 1.840 4.36 0.44 Filename: 240078-propBasinl.sc4 Printed 01-10-2005 F, :i. SEDCAD 4 for Windows 5 Structure Detail: e t e 1 L LI C'. D j n u C E 0 11 n Structure w 2 (1!lull) Basin #1B to P.O.S. #1 Structure =1 (Null Basin #IA to P.O.S. #1 Structure #3 (Null P.O.S. #1 Filename: 240078-prcpBasinl.sc4 Printed 01-10-2005 F I SEDCAD 4 for Windows (`--h/ 1 OQA D-1. I Crh.uoh 6 Subwatershed Hydrology Detail: 3 1 I-11 ri. U n 0- -_I L-j Stru # S#S SWS Area (ac) Time of Conc (hrs) Musk K (hrs) Curve MuskX UHS Number Peak Discharge (cfs) Runoff Volume (ac-ft) #2 1 0.340 0.026 0.000 0.000 98.000 F 0.81 0.082 0.340 0.81 0.082 #1 1 1.500 0.085 0.000 0.000 98.000 F 3.55 0.361 S 1.500 3.55 0.361 #3 1.840 4.36 0.443 Z-a-tl?? 5ubwatershed Time. of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.05 5.890 0.016 #1 1 Time of Concentration: 0.085 #2 1 7. Paved area and small upland gullies 3.24 11.01 340.00 3.620 0.026 9. Small streams flowing bankfull 5.00 3.00 60.00 20.120 0.000 #2 1 Time of Concentration: 0.026 Filename: 240078-prcp8asin1.sc4 Printed 01-10-2C05 '7 SEDCAD 4 for Windows r'-w nh} 1 QQQ D-1 I -,hwah 1 General Information Storm Information: Storm Type: NRC Type II Design Storm: 10 yr 24 hr Rainfall Depth: 4.800 inches Filename: 240078-prcpBasin 1.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,-ht 1 ooa o,,.,oi, I Crh-.h e H 1 Subwatershed Hydrology Detail: Stru # SAS SWS Area (ac) Time of Conc (hrs) Musk K (hrs) Curve Musk X UHS Number Peak Discharge (cfs) Runoff Volume (ac-ft) #2 1 0.340 0.026 0.000 0.000 98.000 F 1.25 0.129 T 0.340 1.25 0.129 #1 1 1.500 0.085 0.000 0.000 98.000 F 5.49 0.570 1.500 5.49 0.570 #3 1.840 C6.74 0.700 Subwatershed Time of Concentration Details: t e t 1 1-1 e Stru # SWS Land Flow Condition Slope (%) Vert. Dist. (ft) Dist. Velocity (fps) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.05 5.890 0.016 #1 1 Time of Concentration: 0.085 #2 1 7. Paved area and small upland gullies 3.24 11.01 340.00 3.620 0.026 9. Small streams flowing bankfull 5.00 3.00 60.00 20.120 0.000 #2 1 Time of Concentration: 0.026 Filename: 240078-prop Basin 1.sc4 Printed 01-10-2005 u SEDCAD 4 for Windows (`--h} 100A P-1. 1 Crhwah C 1 General Information 17 Storm Information: Storm Type: NRCS Type II Design Storm: 50 yr - 24 hr Rainfall Depth: 6.480 inches [7 n ;l L- U e w Filename: 240078-propBasin tsc4 Printed 01-10-2005 I SEDCAD 4 for Windows r-,Hr hr 100A 10-1. I Z,i,-.h I P., u_--- 1 Subwatershed Hydrology Detail: Stru # SAS SWS Area (ac) Time of Conc (hrs) Musk K (hrs) Curve MuskX UHS Number Peak Discharge (cfs) Runoff Vclume (ac-ft) #2 1 0.340 0.026 0.000 0.000 98.000 F 1.68 0.177 0.340 1.68 0.177 #1 1 1.500 0.085 0.000 0.000 98.000 F 7.43 0.780 1.500 7.43 0.780 #3 1.840 9.11 0.957 Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert . Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.05 5.890 0.016 #1 1 Time of Concentration: 0.085 #2 1 7. Paved area and small upland gullies 3.24 11.01 340.00 3.620 0.026 9. Small streams flowing bankfull 5.00 3.00 60.00 20.120 0.000 #2 1 Time of Concentration: 0.026 H r_?- U U- I I Filename: 240078-prepBasin1.sc4 Printed 01-10-2005 t SEDCAD 4 for Windows (`--l'/ 10051 P-I. 1 CrF?uoh P1 pt4 t 9 n-, H- p General Information Storm Information: Storm Type: NRCS Type II Design Storm: 100 yr - 24 hr Rainfall Depth: 6.960 inches Filename: 240078-prop Basin 1.sc4 Printed 01-10-2005 1 I SEDCAD 4 for Windows r--ht I OCR 0-1. 1 IZ,H-h Subwatershed Hydrology Detail: Stru # SAS SWS Area (ac) Time of Conc (hrs) Musk K (hrs) Curve MuskX UHS Number Peak Discharge (cfs) Runoff Volume (ac-ft) #2 1 0.340 0.026 0.000 0.000 98.000 F 1.81 0.190 0.340 1.81 0.190 #1 1 1.500 0.085 0.000 0.000 98.000 F 7.98 0.840 1.500 7.98 0.840 #3 '' 1.840 9.79 1.031 Subwatershed Time of Concentration Details: Stru # SAS Land Flow Condition Slope (%) (ft) Vert. Dist. Hori (?f) Dist. Velocity (fps) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.05 5.890 0.016 #1 1 Time of Concentration: 0.085 #2 1 7. Paved area and small upland gullies 3.24 11.01 340.00 3.620 0.026 9. Small streams flowing bankfull 5.00 3.00 60.00 20.120 0.000 #2 1 Time of Concentration: 0.026 1 Filename: 240078-prcpBasin1.sc4 Printed 01-10-2005 e r e t e e e e d e i t e e SEDCAD 4 for Windows C. ...i?hf 1aaa o-1, i c,h-.h 1 UNIVERSITY CROSSING GEC #240078 Proposed Conditions Basin 2 Paul J. Harrison Gray Engineering Consultants, Inc. 132 Pilgrim Road Greenville, SC 29607 Phone: (864) 297-3027 Email: cprice@grayengineering.com Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,Hnhf 1OCR 0-1. 1 Crhwnh 0 U U U P ??z General Information Storm Information: Storm Type: NRCS Type II Design Storm: 2 yr - 24 hr Rainfall Depth: 3.120 inches 2 I Filename: 240078-propSasin2.sc4 Printed 01-10-2005 E e t i t A 1 I e r SEDCAD 4 for Windows r'---ht 100A P-1. I Crh-h 3 Structure Networking: Type Stru # (Into Stru # Musk. K Musk. X Description Null #1 =_> End I 0.000 0.000 Basin 2A to P.O.S. #2 Pond #2 =_> #1 0.010 0.443 I Basin 2B to P.O.S. #2 #2 Pond #1 Null Structure Routing Details: Stru # Land Flow Condition Slope Vert. Dist. Horiz. Dist. (%) (ft) (ft) Velocity (fps) Time (hrs) #2 9. Small streams flowing bankfull 2.19 10.99 502.00 13.31 0.010 #2 Muskingum K: 0.010 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows (`nn.irin hf BOOR D-1. I Crh-h 4 Structure Summary: Immediate Total Peak Total Contributing Contributing Discharge Runoff Area Area Volume (ac) (ac) (cfs) (ac-ft) In 45.16 4.07 #2 20.610 20.610 Out 4.73 3.57 #1 46.070 66.680 24.99 5.65 Filename: 240078-prcpBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r'nnvrinhf loon 0-1. 1 Crh-h Structure Detail: Str uctUre-= 2 (Pond ) Basin 2B. to P. O.S. #2 Pond Inputs: Initial Pool Elev: 593.00 Initial Pool: 0.99 ac-ft Fixed Siphon Crest Elev Inlet Elev Outlet Elev Diameter (in) Length (ft) Manning's n 593.01 593.00 592.50 3.00 10.00 0.0130 Emeraencv Soillwa Spillway Elev Crest Length Left Right Bottom (ft) Sideslope Sideslope Width (ft) 600.00 16.00 3.00:1 3.00:1 30.00 Perforated Riser Riser Riser Height Barrel Barrel Length Barrel Slope Number of Diameter (in) (ft) Diameter (in) (ft) (ova) Manning's n Spillway Elev Holes per Elev 60.00 5.511 30.00 16.00 5.00 0.0130 598.50 3 Pond Results: Peak Elevation: 597.03 2-? ?- Dewater Time: 2.36 days Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Elevation Area (ac) Capacity (ac-ft) Discharge Dewater Time (CFs) (hrs) 591.00 0.412 0.000 0.000 591.25 0.432 0.105 0.000 591.50 0.452 0.216 0.000 591.75 0.472 0.331 0.000 592.00 0.493 0.452 0.000 592.25 0.514 0.578 0.000 5 Filename: 240078-propBasin1sc4 Printed 01-10-2005 e e e e s e i e t e SEDCAD 4 for Windows r--ht 10QA 0-1. 1 ',,h-.h 6 Elevation Area (ac) Capacity (ac-ft) Discharge (Cfs) Dewater Time (hrs) 592.50 0.536 0.709 0.000 592.75 0.558 0.846 0.000 593.00 0.581 0.988 0.000 593.01 0.581 0.994 0.219 0.32* Spillway #1 593.25 0.582 1.134 0.268 6.30* 593.50 0.582 1.279 0.311 5.66* 593.75 0.583 1.425 0.350 5.04* 594.00 0.584 1.571 0.385 4.59* 594.25 0.585 1.717 0.416 4.45 594.50 0.585 1.863 0.446 4.10 594.75 0.586 2.010 0.474 3.85 595.00 0.587 2.156 0.500 3.65 595.25 0.588 2.303 0.525 3.45 595.50 0.588 2.450 0.549 3.35 Low hole SPW #3 595.75 0.589 2.597 1.990 5.30 596.00 0.590 2.745 2.600 1.45 596.25 0.591 2.892 3.072 1.15 596.50 0.591 3.040 3.473 1.00 596.75 0.592 3.188 3.828 1.00 597.00 0.593 3.336 4.150 1.30 597.03 0.593 3.357 4.732 0.60 Peak Stage 597.25 0.593 3.485 8.387 597.50 0.594 3.633 10.296 597.75 0.594 3.782 11.809 598.00 0.595 3.930 13.113 598.25 0.596 4.079 14.279 598.50 0.596 4.228 15.346 Spillway #3 598.75 0.597 4.377 16.336 599.00 0.598 4.527 18.033 599.25 0.598 4.676 32.461 599.50 0.598 4.826 49.543 599.75 0.598 4.975 67.429 600.00 0.598 5.125 68.536 Spillway #2 600.25 0.598 5.274 72.491 600.50 0.598 5.424 76.430 600.75 0.598 5.573 111.384 600.99 0.598 5.717 135.713 F 601.00 0.598 5.723 148.723 *Designates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit. Detailed Discharge Table Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows (`nrn-he loon Oomnlo 1 Crh\u.h i 1 J L i r L f] u 7 Elevation Fixed Siphon cfs) ( Emergency Spillway (cfs) Perf. Riser (cfs) Combined Total Discharge (cfs) 591.00 0.000 0.000 0.000 0.000 591.25 0.000 0.000 0.000 0.000 591.50 0.000 0.000 0.000 0.000 591.75 0.000 0.000 0.000 0.000 592.00 0.000 0.000 0.000 0.000 592.25 0.000 0.000 0.000 0.000 592.50 0.000 0.000 0.000 0.000 592.75 0.000 0.000 0.000 0.000 593.00 0.000 0.000 0.000 0.000 593.01 0.219 0.000 0.000 0.219 593.25 0.268 0.000 0.000 0.268 593.50 0.311 0.000 0.000 0.311 593.75 0.350 0.000 0.000 0.350 594.00 0.385 0.000 0.000 0.385 594.25 0.416 0.000 0.000 0.416 594.50 0.446 0.000 0.000 0.446 594.75 0.474 0.000 0.000 0.474 595.00 0.500 0.000 0.000 0.500 595.25 0.525 0.000 0.000 0.525 595.50 0.549 0.000 6.00>0.000 0.549 595.75 0.572 0.000 1.418 1.990 596.00 0.594 0.000 2.006 2.600 596.25 0.616 0.000 2.456 3.072 596.50 0.637 0.000 2.836 3.473 596.75 0.657 0.000 3.171 3.828 597.00 0.676 0.000 10.00>3.474 4.150 597.25 0.695 0.000 7.691 8.387 597.50 0.714 0.000 9.582 10.296 597.75 0.732 0.000 11.077 11.809 598.00 0.750 0.000 12.363 13.113 598.25 0.767 0.000 13.512 14.279 598.50 0.784 0.000 14.562 15.346 598.75 0.801 0.000 15.535 16.336 599.00 0.817 0.000 17.216 18.033 599.25 0.833 0.000 31.628 32.461 599.50 0.848 0.000 48.695 49.543 599.75 0.864 0.000 66.565 67.429 600.00 0.879 0.000 67.657 68.536 600.25 0.894 2.866 68.731 72.491 600.50 0.909 5.732 69.789 76.430 600.75 0.923 39.629 70.831 111.384 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 e a e i e t e t SEDCAD 4 for Windows r'--ht DOA P-1. I Ghw.h 8 Combined Fixed Siphon Emergency Total Elevation cfs Spillway cfs) Perf. Riser (cfs) ( ) ( Discharge (cfs) 600.99 0.937 62.959 71.817 135.713 601.CG 0.937 75.928 71.858 148.723 Structure #1 (iLlull Basin 2A to P.O.S. #2 Filename: 240078-propBasinIsc4 Printed 01-10-2005 SEDCAD 4 for Windows r,- inhr 1 QQR D-1. I C,h-h 9 Subwatershed Hydrology Detail: Peak Runoff S S SWS Area Time of Conc Musk K Curve Discharge Volume Stru # Musk X UHS A (ac) (hrs) (hrs) Number (cfs) (ac-ft) #2 1 20.610 0.047 0.000 0.000 93.000 F 45.16 4.069 7 20.610 45.16 4.069 #1 1 46.070 0.092 0.000 0.000 61.000 F 21.42 1.581 66.680 24.99 5.649 Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%Q) Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 #2 1 3. Short grass pasture 24.00 6.00 25.00 3.910 0.001 7. Paved area and small upland gullies 3.12 10.01 320.84 3.550 0.025 9. Small streams flowing bankfull 3.51 45.03 1,282.90 16.860 0.021 #2 1 Time of Concentration: 0.047 Filename: 240078-prcpBasin2.sc4 Printed 01-10-2005 e e e e e e e t s e e t s i SEDCAD 4 for Windows r,-rinhf 1 CQA P-1. I Crh-.h 1 General Information Storm Information: Storm Type: NRCS Type II Design Storm: 10 yr 24 hr Rainfall Depth: 4.800 inches Filename: 240078-propBasin2.sc4 Pnnted 01-10-2005 SEDCAD 4 for Windows r....,,,i?nt loos o,,.,oi? i c,h-h Structure Detail: Structure = 2 (Pond } Basin 2B to P.O.S. #2 Pond Inputs: Initial Pool Elev: 593.00 Initial Pool: 0.99 ac-ft Fixed Siphon Crest Elev Inlet Elev Outlet Elev Diameter (in) Length (ft) Manning's n 593.01 593.00 592.50 3.00 10.00 0.0130 Emeraencv Soillwa Spillway Elev Crest Length Left Right Bottom (ft) Sideslope Sideslope Width (ft) 600.00 16.00 3.00:1 3.00:1 30.00 Perforated Riser Riser Riser Height Barrel Barrel Length Barrel Slope Number of ' Diameter (in) (ft) Diameter (in) (ft) (%) s n Spillway Elev Holes per Manning Elev 60.00 5.511 30.00 16.00 5.00 0.0130 598.50 3 Pond Results: Peak Elevation: 599.14 10 IL- Dewater Time: 2.40 days Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Elevation Area (ac) Capacity (ac-ft) Discharge Dewater Time (cfs) (hrs) 591.00 0.412 0.000 0.000 591.25 0.432 0.105 0.000 591.50 0.452 0.216 0.000 591.75 0.472 0.331 0.000 592.00 0.493 0.452 0.000 592.25 0.514 0.578 0.000 592.50 0.536 0.709 0.000 1 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 e e s a s a t t t t SEDCAD 4 for Windows (`-,-hl 1OOR D-I. 1 Crhuioh Elevation Area (ac) Capacity (ac-ft) Discharge (cfs) Dewater Time (hrs) 592.75 0.558 0.846 0.000 593.00 0.581 0.988 0.000 593.01 0.581 0.994 0.219 0.32* Spillway #1 593.25 0.582 1.134 0.268 6.30* 593.50 0.582 1.279 0.311 5.66* 593.75 0.583 1.425 0.350 5.04* 594.00 0.584 1.571 0.385 4.59* 594.25 0.585 1.717 0.416 4.40 594.50 0.585 1.863 0.446 4.10 594.75 0.586 2.010 0.474 3.90 595.00 0.587 2.156 0.500 3.65 595.25 0.588 2.303 0.525 3.45 595.50 0.588 2.450 0.549 3.30 Low hole SPW #3 595.75 0.589 2.597 1.990 3.60 596.00 0.590 2.745 2.600 1.65 596.25 0.591 2.892 3.072 1.30 596.50 0.591 3.040 3.473 1.15 596.75 0.592 3.188 3.828 1.20 597.00 0.593 3.336 4.150 1.30 597.25 0.593 3.485 8.387 0.75 597.50 0.594 3.633 10.296 0.30 597.75 0.594 3.782 11.809 0.30 598.00 0.595 3.930 13.113 0.25 598.25 0.596 4.079 14.279 0.20 598.50 0.596 4.228 15.346 0.25 Spillway #3 598.75 0.597 4.377 16.336 0.20 599.00 0.598 4.527 18.033 0.40 599.14 0.598 4.609 25.957 0.10 Peak Stage 599.25 0.598 4.676 32.461 599.50 0.598 4.826 49.543 599.75 0.598 4.975 67.429 600.00 0.598 5.125 68.536 Spillway #2 600.25 0.598 5.274 72.491 600.50 0.598 5.424 76.430 600.75 0.598 5.573 111.384 600.99 0.598 5.717 135.713 601.00 0.598 5.723 148.723 *Designates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit. Detailed Discharge Tab Filename: 240078-propBasin2.so4 2 Printed 01-10-2005 SEDCAD 4 for Windows ( -,,inhf I QQQ 0-1n 1 -,h-.h u I- [;z r C f c P- L u nL h u G 3 Elevation Fixed Siphon cfs ( ) Emergency Spillway cfs ( ) Perf. Riser (cfs) Combined Total Discharge (cfs) 591.00 0.000 0.000 0.000 0.000 591.25 0.000 0.000 0.000 0.000 591.50 0.000 0.000 0.000 0.000 591.75 0.000 0.000 0.000 0.000 592.00 0.000 0.000 0.000 0.000 592.25 0.000 0.000 0.000 0.000 592.50 0.000 0.000 0.000 0.000 592.75 0.000 0.000 0.000 0.000 593.00 0.000 0.000 0.000 0.000 593.01 0.219 0.000 0.000 0.219 593.25 0.268 0.000 0.000 0.268 593.50 0.311 0.000 0.000 0.311 593.75 0.350 0.000 0.000 0.350 594.00 0.385 0.000 0.000 0.385 594.25 0.416 0.000 0.000 0.416 594.50 0.446 0.000 0.000 0.446 594.75 0.474 0.000 0.000 0.474 595.00 0.500 0.000 0.000 0.500 595.25 0.525 0.000 0.000 0.525 595.50 0.549 0.000 6.00>0.000 0.549 595.75 0.572 0.000 1.418 1.990 596.00 0.594 0.000 2.006 2.600 596.25 0.616 0.000 2.456 3.072 596.50 0.637 0.000 2.836 3.473 596.75 0.657 0.000 3.171 3.828 597.00 0.676 0.000 10.00>3.474 4.150 597.25 0.695 0.000 7.691 8.387 597.50 0.714 0.000 9.582 10.296 597.75 0.732 0.000 11.077 11.809 598.00 0.750 0.000 12.363 13.113 598.25 0.767 0.000 13.512 14.279 598.50 0.784 0.000 14.562 15.346 598.75 0.801 0.000 15.535 16.336 599.00 0.817 0.000 17.216 18.033 599.25 0.833 0.000 31.628 32.461 599.50 0.848 0.000 48.695 49.543 599.75 0.864 0.000 66.565 67.429 600.00 0.879 0.000 67.657 68.536 600.25 0.894 2.866 68.731 72.491 600.50 0.909 5.732 69.789 76.430 600.75 0.923 39.629 70.831 111.384 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 e t e e e e e e e e t t e e e e e SEDCAD 4 for Windows r-,-ht IGOR D-1. I 4 Combined Fixed Siphon Emergency Total Elevation cfs Spillway cfs Perf. Riser (cfs) ( ) ( ) Discharge (cfs) 600.99 0.937 62.959 71.817 135.713 601.00 0.937 75.923 71.858 148.723 Filename: 240078-propl3asin2.sc4 Printed 01-10-2005 a e e e t e t e e SEDCAD 4 for Windows r-,,inhf 100A D-i. i Crhwoh 1 Subwatershed Hydrology Detail: Peak Runoff SWS Stru # SWS Area Time of Conc Musk K Curve Musk X UHS Discharge Volume # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #2 1 20.610 0.047 0.000 0.000 93.000 F 72.63 6.873 S 20.610 72.63 6.873 # 1 1 46.070 0.092 0.000 0.000 61.000 F 66.55 4.801 66.680 8 11.674 !o `'t[L- Subwatershed Time of Concentration Details: Stru # SWS Land Flow Condition Slope (%) Vert. Dist. Horiz. Dist. Velocity (fps) Time (hrs) #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 #2 1 3. Short grass pasture 24.00 6.00 25.00 3.910 0.001 7. Paved area and small upland gullies 3.12 10.01 320.84 3.550 0.025 9. Small streams flowing bankfull 3.51 45.03 1,282.90 16.860 0.021 #2 1 Time of Concentration: 0.047 Filename: 240078-prcpBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows f nnvrinhf 1?Oq D?mul? 1 Crh.u?h 1 General Information Storm Information; Storm Type: NRCS T e II Design Storm: 50 yr 24 r Rainfall Depth: 6.480 inches Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r'--ht 100A D-1. I Crh.uah 1 Structure Detail: Structure #2 (Pond Basin 2B to P.O.S. #2 Pond Inputs: Initial Pool Elev: 593.00 Initial Pool: 0.99 ac-ft Fixed Siphon Crest Elev Inlet Elev Outlet Elev Diameter (in) Length (ft) Manning's n 593.01 593.00 592.50 3.00 10.00 0.0130 Emeraencv Soillwa Spillway Elev Crest Length Left Right Bottom (ft) Sideslope Sideslope Width (ft) 600.00 16.00 3.00:1 3.00:1 30.00 Perforated Riser Riser Riser Height Barrel Barrel Length Barrel Slope Number of Diameter (in) (ft) Diameter (in) (ft) (oho) Manning's n Spillway Elev Holes per Elev 60.00 5.511 30.00 16.00 5.001 0.0130 598.50 3 Pond Results: Peak Elevation: 600.25 50-4 V-- Dewater Time: 243 days Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Elevation Area (ac) Capacity (ac-ft) Discharge Dewater Time (cfs) (hrs) 591.00 0.412 0.000 0.000 591.25 0.432 0.105 0.000 591.50 0.452 0.216 0.000 591.75 0.472 0.331 0.000 592.00 0.493 0.452 0.000 592.25 0.514 0.578 0.000 592.50 0.536 0.709 0.000 Filename: 240078-propBasin1sc4 Printed 01-10-2005 0 i t e i 1 1 1 1 1 1 SEDCAD 4 for Windows ('---ht 10011 0-1. 1 Crh-h 2 Elevation Area (ac) Capacity (ac-ft) Discharge (cfs) Dewater Time (hrs) 592.75 0.558 0.846 0.000 593.00 0.581 0.988 0.000 593.01 0.581 0.994 0.219 0.32* Spillway #1 593.25 0.582 1.134 0.268 6.30* 593.50 0.582 1.279 0.311 5.66* 593.75 0.583 1.425 0.350 5.04* 594.00 0.584 1.571 0.385 4.59* 594.25 0.585 1.717 0.416 4.40 594.50 0.585 1.863 0.446 4.15 594.75 0.586 2.010 0.474 3.85 595.00 0.587 2.156 0.500 3.65 595.25 0.588 2.303 0.525 3.45 595.50 0.588 2.450 0.549 3.30 Low hole SPW 93 595.75 0.589 1597 1.990 1.60 596.00 0.590 2.745 2.600 2.55 596.25 0.591 2.892 3.072 1.45 596.50 0.591 3.040 3.473 1.35 596.75 0.592 3.188 3.828 1.30 597.00 0.593 3.336 4.150 1.80 597.25 0.593 3.485 8.387 1.05 597.50 0.594 3.633 10.296 0.40 597.75 0.594 3.782 11.809 0.30 598.00 0.595 3.930 13.113 0.25 598.25 0.596 4.079 14.279 0.25 598.50 0.596 4.228 15.346 0.25 Spillway #3 598.75 0.597 4.377 16.336 0.25 599.00 0.598 4.527 18.033 0.25 599.25 0.598 4.676 32.461 0.35 599.50 0.598 4.826 49.543 0.05 599.75 0.598 4.975 67.429 0.05 600.00 0.598 5.125 68.536 0.05 Spillway #2 600.25 0.598 5.274 72.491 600.25 0.598 5.274 72.494 0.05 Peak Stage 600.50 0.598 5.424 76.430 600.75 0.598 5.573 111.384 600.99 0.598 5.717 135.713 601.00 0.598 5.723 148.723 *Designates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit. Detailed Discharge Table Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows f --h1100A 0-1. 1 Crh-h 3 Elevation Fixed Siphon cfs ( ) Emergency Spillway (cfs ) Ferf. Riser (cfs) Combined Total Discharge (cfs) 591.00 0.000 0.000 0.000 0.000 591.25 0.000 0.000 0.000 0.000 591.50 0.000 0.000 0.000 0.000 591.75 0.000 0.000 0.000 0.000 592.00 0.000 0.000 0.000 0.000 592.25 0.000 0.000 0.000 0.000 592.50 0.000 0.000 0.000 0.000 592.75 0.000 0.000 0.000 0.000 593.00 0.000 0.000 0.000 0.000 593.01 0.219 0.000 0.000 0.219 593.25 0.268 0.000 0.000 0.268 593.50 0.311 0.000 0.000 0.311 593.75 0.350 0.000 0.000 0.350 594.00 0.385 0.000 0.000 0.385 594.25 0.416 0.000 0.000 0.416 594.50 0.446 0.000 0.000 0.446 594.75 0.474 0.000 0.000 0.474 595.00 0.500 0.000 0.000 0.500 595.25 0.525 0.000 0.000 0.525 595.50 0.549 0.000 6.00>0.000 0.549 595.75 0.572 0.000 1.418 1.990 596.00 0.594 0.000 2.006 2.600 596.25 0.616 0.000 2.456 3.072 596.50 0.637 0.000 2.836 3.473 596.75 0.657 0.000 3.171 3.828 597.00 0.676 0.000 10.00>3.474 4.150 597.25 0.695 0.000 7.691 8.387 597.50 0.714 0.000 9.582 10.296 597.75 0.732 0.000 11.077 11.809 598.00 0.750 0.000 12.363 13.113 598.25 0.767 0.000 13.512 14.279 598.50 0.784 0.000 14.562 15.346 598.75 0.801 0.000 15.535 16.336 599.00 0.817 0.000 17.216 18.033 599.25 0.833 0.000 31.628 32.461 599.50 0.848 0.000 48.695 49.543 599.75 0.864 0.000 66.565 67.429 600.00 0.879 0.000 67.657 68.536 600.25 0.894 2.866 68.731 72.491 600.50 0.909 5.732 69.789 76.430 600.75 0.923 39.629 70.831 111.384 Filename: 240078-prcpBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-...sn ht 100A 0-1. 1 Q,H,..K 4 Combined Fixed Siphon Emergency Total Elevation Perf. Riser (cfs) (cfs) Spillway (cfs) Discharge (cfs) 600.99 0.937 62.959 71.817 135.713 601.00 0.937 75.928 71.358 148.723 Filename: 240078-prop6asin2.sc4 Printed 01-10-2005 t e i i i t e e e t e e e SEDCAD 4 for Windows (`.nnvrinhf 1 QOA D-i. I C,h.uoh Subwatershed Hydrology Detail: Stru # SAS SWS Area (ac) Time of Conc (hrs) Musk K (hrs) Curve MuskX UHS Number Peak Discharge (cfs) Runoff Volume (ac-ft) #2 1 20.610 0.047 0.000 0.000 93.000 F 99.76 9.716 S' 20.610 99.76 9.716 #1 1 46.070 0.092 0.000 0.000 61.000 F 120.30 8.958 66.680 192.79 18.673 Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 #2 1 3. Short grass pasture 24.00 6.00 25.00 3.910 0.001 7. Paved area and small upland gullies 3.12 10.01 320.84 3.550 0.025 9. Small streams flowing bankfull 3.51 45.03 1,282.90 16.860 0.021 #2 1 Time of Concentration: 0.047 1 Filename: 240078-propEasin2.sc4 Printed 01-10-2005 I SEDCAD 4 for Windows r-wrinh} IQQR 13-1. 1 Crhw?h ie s e e s e t3 e e t s e s e General Information Storm Information: Storm Type: NRCS Type II _24 hr Design Storm: 100 yr - Rainfall Depth: 6.960 inches 1 Filename: 240073-prcpBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r`-,,inh} 1 OOA D-1. 1 1Z,H-K 1 Structure Detail; Structure 2 Pond Basin 2B to P.O.S. #2 Pond Inputs: Initial Pool Elev: 593.00 Initial Pool: 0.99 ac-ft Fixed Siphon Crest Elev Inlet Elev Outlet Elev Diameter (in) Length (ft) Manning's n 593.01 593.00 592.50 3.00 10.00 0.0130 Emeraencv SDillwa Spillway Elev Crest Length Left Right Bottom (ft) Sideslope Sideslope Width (ft) 600.00 16.00 3.00:1 3.00:1 30.00 Perforated Riser Riser Riser Height Barrel Barrel Length Barrel Slope Diameter (in) Diameter (in) Number of Manning's n Spillway Elev Holes per (ft) (%) (ft) Elev 60.00 5.511 30.00 16.00 5.001 0.0130 598.50 3 Pond Results: Peak Elevation: 600.56 Dewater Time: 2.44 days Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Elevation Area (ac) Capacity (ac-ft) Discharge Dewater Time (cfs) (hrs) 591.00 0.412 0.000 0.000 591.25 0.432 0.105 0.000 591.50 0.452 0.216 0.000 591.75 0.472 0.331 0.000 592.00 0.493 0.452 0.000 592.25 0.514 0.578 0.000 592.50 0.536 0.709 0.000 Filename: 240078-prop6asin2.sc4 Printed 01-10-2005 s 1 1 e a e i e e e e e e t e e e e SEDCAD 4 for Windows r`nnvnnhf loop D-1. I C-h-h Elevation Area (ac) Capacity (ac-ft) Discharge (cfs) Dewater Time (hrs) 592.75 0.558 0.846 0.000 593.00 0.581 0.988 0.000 593.01 0.581 0.994 0.219 0.32* Spillway #1 593.25 0.582 1.134 0.268 6.30* 593.50 0.582 1.279 0.311 5.66* 593.75 0.583 1.425 0.350 5.04* 594.00 0.584 1.571 0.385 4.59* 594.25 0.585 1.717 0.416 4.40 594.50 0.585 1.863 0.446 4.10 594.75 0.586 2.010 0.474 3.85 595.00 0.587 2.156 0.500 3.65 595.25 0.588 2.303 0.525 3.50 595.50 0.588 2.450 0.549 3.30 Low hole SPW #3 595.75 0.589 2.597 1.990 1.60 596.00 0.590 2.745 2.600 2.20 596.25 0.591 2.892 3.072 1.60 596.50 0.591 3.040 3.473 1.30 596.75 0.592 3.188 3.828 1.35 597.00 0.593 3.336 4.150 2.00 597.25 0.593 3.485 8.387 1.10 597.50 0.594 3.633 10.296 0.45 597.75 0.594 3.782 11.809 0.30 598.00 0.595 3.930 13.113 0.30 598.25 0.596 4.079 14.279 0.25 598.50 0.596 4.228 15.346 0.25 Spillway #3 598.75 0.597 4.377 16.336 0.25 599.00 0.598 4.527 18.033 0.30 599.25 0.598 4.676 32.461 0.30 599.50 0.598 4.826 49.543 0.10 599.75 0.598 4.975 67.429 600.00 0.598 5.125 68.536 0.05 Spillway #2 600.25 0.598 5.274 72.491 0.05 600.50 0.598 5.424 76.430 600.56 0.598 5.462 85.295 0.05 Peak Stage 600.75 0.598 5.573 111.384 600.99 0.598 5.717 135.713 601.00 0.598 5.723 148.723 *Designates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit. Detailed Discharge Table Filename: 240078-prcpBasin2.sc4 2 Printed 01-10-2005 SEDCAD 4 for Windows r'-,Hr hf I QQA D-1. 1 Crh-H 3 n n u G? 1-1 L Q Elevation Fixed Siphon cfs ( ) Emergency Spillway cfs ( ) Perf. Riser (cfs) Combined Total Discharge (cfs) 591.00 0.000 0.000 0.000 0.000 591.25 O.CGO 0.000 0.000 0.000 591.50 0.000 0.000 0.000 0.000 591.75 0.000 0.000 0.000 0.000 592.00 0.000 0.000 0.000 0.000 592.25 0.000 0.000 0.000 0.000 592.50 0.000 0.000 0.000 0.000 592.75 0.000 0.000 0.000 0.000 593.00 0.000 0.000 0.000 0.000 593.01 0.219 0.000 0.000 0.219 593.25 0.268 0.000 0.000 0.268 593.50 0.311 0.000 0.000 0.311 593.75 0.350 0.000 0.000 0.350 594.00 0.385 0.000 0.000 0.385 594.25 0.416 0.000 0.000 0.416 594.50 0.446 0.000 0.000 0.446 594.75 0.474 0.000 0.000 0.474 595.00 0.500 0.000 0.000 0.500 595.25 0.525 0.000 0.000 0.525 595.50 0.549 0.000 6.00>0.000 0.549 595.75 0.572 0.000 1.418 1.990 596.00 0.594 0.000 2.006 2.600 596.25 0.616 0.000 2.456 3.072 596.50 0.637 0.000 2.836 3.473 596.75 0.657 0.000 3.171 3.828 597.00 0.676 0.000 10.00>3.474 4.150 597.25 0.695 0.000 7.691 8.387 597.50 0.714 0.000 9.582 10.296 597.75 0.732 0.000 11.077 11.809 598.00 0.750 0.000 12.363 13.113 598.25 0.767 0.000 13.512 14.279 598.50 0.784 0.000 14.562 15.346 598.75 0.801 0.000 15.535 16.336 599.00 0.817 0.000 17.216 18.033 599.25 0.833 0.000 31.628 32.461 .599.50 0.848 0.000 48.695 49.543 599.75 0.864 0.000 66.565 67.429 600.00 0.879 0.000 67.657 68.536 600.25 0.894 2.866 68.731 72.491 600.50 0.909 5.732 69.789 76.430 600.75 0.923 39.629 70.831 111.384 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r,-,inhf 9QOA Oomul? I Crh.u.h Combined Fixed Siphon Emergency Total Elevation cfs) Spillway (cfs Ferf. Riser (cfs) ( ) Discharge (cfs) 600.99 0.937 62.959 71.817 135.713 601.00 0.937 75.98 71.853 148.723 4 Filename: 240078-prop6asin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows (`-,Hri hf I QQA D-I. I Gh.u?h 1 Subwatershed Hydrology Detail; Peak Runoff S S SWS Area Time of Conc Musk K Curve Discharge Volume Stru # MuskX UHS A (ac) (hrs) (hrs) Number (cfs) (ac-ft) #2 1 20.610 0.047 0.000 0.000 93.000 F 107.47 10.531 20.610 107.47 10.531 #1 1 46.070 0.092 0.000 0.000 61.000 F 136.59 10.263 N, 66.680 221.88 20.794 X00-1 F -- Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) ' Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 #2 1 3. Short grass pasture 24.00 6.00 25.00 3.910 0.001 7. Paved area and small upland gullies 3.12 10.01 320.84 3.550 0.025 9. Small streams flowing bankfull 3.51 45.03 1,282.90 16.860 0.021 #2 1 Time of Concentration: 0.047 Filename: 240078-prcpBasin2.sc4 Printed 01-10-2005 D--? ?-i ri n n n t fl POND VOLUME CALCULATIONS DETENTION POND ELEVATION (FT) SURFACE AREA DEPTH (FT.) VOLUME (Cl,) CUM. VOL. (C.F.) AREA (AC.) FOREBAY 589 2,518 0.058 1 2,831 2,831 590 3,143 0.072 1 3,488 6,319 591 3,833 0.088 1 14,565 20,883 592 5,209 0.120 1 15,323 36,206 593 6,865 0.158 MAIN BASIN PERMANENT POOL 587 8,632 0.198 1 9,168 9,168 588 9,704 0.223 1 17,760 26,928 589 10,835 0.249 1 18,382 45,310 590 12,025 0.276 1 19,030 64,340 591 13,275 0.305 1 19,655 83,995 592 15,755 0.362 1 20,895 104,890 593 18,431 0.423 TEMPORARY POOL VOLUME 593 25,296 0.581 1 25,366 25,366 594 25,436 0.584 1 25,503 50,869 595 25,569 0.587 0.5 12,816 63,685 595.5 25,569 0.587 2 -YR & 10-YR STORAGE 596 25,696 0.590 1 25,756 25,756 597 25,815 0.593 1 25,872 51,628 598 25,929 0.595 1 25,982 77,610 599 26,035 0.598 1 26,035 103,645 600 26,035 0.598 1 26,035 129,680 601 26,035 0.598 0.5 13,018 142,697 601.5 26,035 0.598 CLP 240078-SOCALCS-P8.XLS 1/10/2005 e t i e t s s e i r i e a e A JOB NAME JCB NUMBER PAGE NO. UN1 8f25ITt-f 6Zv5S -1% ASST 2q007'% JOB DESCRIPTION BY 1 DATE ll/%o/ Ll`fi` 1 11 0? T00 A r,L C:) too - (44 } G-?(0 o • 3 2 8. 3593 Fs AV ?qq? ? g2,Sa ? a l- . y?y 70 ?. "U T _ i 35 t '3, 13, 33S 59050 ,71 coo/ (2-0)?15o) c1L MD 35-13 --( GRAY ENGINEERING CONSULTANTS. INC. 1132 Pilcrim Road / Greenville. SC 29607 / (864) 297-3027 I ? -- • ? iR lr'IIr" oc s e r i. a s TINDALL CONCRETE PRODUCTS, INC. • P.O. BOX 1778 • SPARTANBURG. S.C. 29304 • TELEPHONE (803) 576-3230 J 1979 ? 6 - W c) ?I Zi Q) ?f Lo cal r- C) LL 26" MAX. " 8 5 24'-+1 8" -- rINS. DIA. (tyP G48 SECTIONS G60TT 48" INS. DIA. G60 - 64R G60 BASES 60 INS. DIA. . AS REQUIRED W cc: Z Z W J m Q cc Q 2° SLOPE GASKET ENLARGED VIEW OF JOINT 13/16' ENLARGED SECTION OF ` O-RING GASKET ONE OR MORE OPENINGS OR FLEXIBLE CONNECTORS AS REQUIRED IN BASES NOTES: ALL STANDARD SEWER MANHOLE SECTIONS MEET OR EXCEED THE REQUIREMENTS OF ASTM C478. TWO LIFTING HOLES ARE PROVIDED IN EACH SECTION FOR ON-SITE HANDLING. PROPER STRONGBACKS OR LIFTING HARNESSES ARE REQUIRED FOR SAFE HANDLING OF SECTIONS. TINDALL CONCRETE PRODUCTS IS NOT RESPONSIBLE FOR DAMAGE OR INJURY DURING HANDLING. ALL STEPS INSTALLED IN MANHOLE SECTIONS HAVE SERRATED TREAD & TALL END LUGS TO PREVENT FEET FROM SLIPPING. BUTYL RUBBER SEALANT IS RECOMMENDED FOR SEALING JOINTS. O-RING GASXSTS MAY BE USED. F series r TINDALL CONCRETE PRODUCTS, INC. • P.O. BOX 1778 • SPARTANBURG. S.C. 29304 • TELEPHONE (803) 576-3230 6' 1979 IL" ?1------ --- --- LAYING LGTH. FLAT SLAB TOP i G60 FST 2782 LBS. F-1 n 0 0 E. 0 D H 16" ,- ! - - - - - 1- - - --, LAYING LGTH. TRANSITION TOP G60 TT 2337 LBS. RISER 40 LAYING LGTH. -f ECCENTRIC CONE G60 - 40C 3449 LBS. LAYING LGTH. SECTION POUNDS 64" G60-64R 7188 48" G60-48R 5391 32" G60-32R 3593 16" G60-16R 1798 -7 LAYING LGTH. SECTION POUNDS 64 " G60-64B 8586 56" G60-56B 8173 48" G60-48B 7473 40" G60-40B 6772 32" G60-32B 6071 8" o MONOLITHIC BASE PIPE OPENINGS OR FLEXIBLE CONNECTORS ARE AVAILABLE ON SPECIAL ORDER. s APPENDIX III r i u Fl i? C L? STORM DRAIN DESIGN ENERGY DISSIPfI TOR DETAIL n I E E C 1. Developed Flow to Structures Recommended Pipe Size/Slope G' H-, F n P- 1] n J C1 U. L g tructure p Area Rainfall Flow se CwNlciarK ?,h ch rom T. CumulaWe Flow O Recammmded Pi Size n. m Pipe Capacity =u /, Oa /ch 7 VELOGTY Acual =)(C Slow Ca h MAX / 2A 2A to 26.14 18 1480 to 11B 006 0 95 7 00 0.40 11B 10B 0.40 18 0 50 74 0 68 87 YE: 4.91 1 CB 0.10 0 95 7 00 0.67 l CB 9B 1.06 18 0 50 7.4 0.83 96 Y-f' 5.43 91B 1.39 0 95 7.00 9.24 9.18 9B 9.24 18 1.00 105 1 22 11.6 rE. 6.56 9B 0 24 0 95 7.00 1.60 98 as 11.90 18 1.50 12.9 1 59 13.2 YE: 7.50 8B 013 0 95 7 00 0.86 88 7B 12.77 18 2.00 14.8 2 08 151 YEG - 8.57 7 28 1.37 0 95 7 00 9.11 7 2B 71B 9.11 18 1.00 10.5 1 56 13.1 YE, 7.43 7.18 0.21 0 95 700 1.40 7.18 7B 10.51 18 1 20 11.5 1.25 11.7 YE; 6.65 7B 0.10 095 7.00 7.67 78 6B 23.94 24 1.30 25.8 1.63 28.9 YE: 920 6.1 B 2.00 0 95 7 00 13.JO 618, 6B 13.30 24 0.50 16.0 1.63 299 YE` 9.20 6B 0 00 0 95 7 00 0.00 60 5B 37.24 24 3 00 392 3.03 393 Y=; 12.53 5.2B 1.06 0 95 7 00 7.05 5281 58 7.05 18 0 60 8.1 921 31 9 YE): 1 18.04 51B 0.70 0 95 7.00 4.66 51B 58 4.66 18 0 50 7.4 0.51 75 YE: 4.25 58 0.10 0 95 7.00 0.67 5B 4B 49.51 30 1.60 51.9 1.69 53.3 YE:. 10.87 4.2B 0.87 0.95 7.00 5.79 42B 4B 5.79 18 0.50 74 364 20.0 YE:: 11.34 418 0.72 095 7.00 4.79 41B 4B 4.79 18 0.50 7.4 051 75 YE; 425 48 0 20 0 95 7 00 1.33 48 3B 61.51 30 2.40 63.5 3 37 75.3 YE: 1534 3.3B 0 30 0 95 7 00 2.00 3.3B 32B 2.00 18 0.50 7.4 0.70 as YE:.: 4.98 3 2B 0 22 0 95 7 00 1.48 3.28 38 3.a6 18 0 50 7 4 0 51 75 VE:= 4.24 3113 8 46 0 95 7 00 56.26 3.18 38 56.26 J6 0 80 59.6 3.77 129.4 YE:. 18.31 30 0.00 0.95 7.00 0.00 3B 28 121.23 40 2.00 124.9 2.C9 127.6 YE: 14.62 2B 0 98 0 95 7 00 6.52 1 18 127.75 40 2.20 131.0 9 C7 265 9 'lE i. 30.48 1 B 0.00 0.95 7.00 0.00 3C 012 0.95 7 00 0.80 3C 2C 0 80 18 0.50 7.4 0.75 9.1 YE: 5.15 2C 0 26 0.95 7.00 1.73 2C 1 C 2.53 18 0.50 7.4 0.61 82 YF: 4.66 12C 0.30 0 95 7 00 2.00 1.2C 1 C 2.00 i8 0.50 7.4 10 00 33.2 18.80 1.1 C EXISTING 30 RCP (,1 0 50% 29.00 1.1 C 1 C 2900 30 0 50 290 9 78 128.2 vE:. 26.14 1 C 0.00 0.95 7 00 0.00 6D 3.50 0 95 7.00 23.28 6D 5D 23 28 24 1.20 24.8 2.42 352 YE: 11.21 51D 0.62 0 95 7 00 4.12 51D 50 4.12 18 0.50 7.4 0.58 8.0 YE: 4.53 50 0.14 0 95 7 CO 0.93 5D 40 28 33 24 1.70 29.5 1.92 31.3 YE: 9.98 41D 0.15 0.95 7 00 1.00 410 4D 1.00 18 0.50 7.4 0 56 78 YE: 4.43 40 0 21 0 95 7 00 1.40 4D 3D 30.72 30 0.60 31.8 1 82 55.3 YEC 1127 31D 0 37 0.95 7 00 2.46 3,11D 3D 2.46 18 0 50 7.4 0 83 9.6 YE: 5 43 30 0.30 0 95 7.00 2.00 3D 2D 35.18 30 0 80 36.7 1 05 421 YE: 8 57 2D 0.00 0 95 7 00 0.00 2D 10 35.18 JO 0 80 36.7 4 21 84.1 YE 17.15 1 D 0 00 0.95 7.00 0.00 3E 0.49 0 95 700 3 .26 3E 2E 3.25 18 0 50 7.4 0 80 9 4 32 5 2E 0.75 095 700 . 199 2E 1E 825 18 0.50 7.4 2.13 153 YEi 67 8 1.1E 0.08 0.95 7.00 0.53 1.1E 1E 0.53 18 0.50 7.4 0.94 10.2 YEE, 5.77 1E 0 00 0.95 7.00 0.00 2F 0 36 0 95 7 C0 2.39 2F IF 2.39 18 0.50 7.4 4 90 232 YE: 13.16 1F 000 0.95 7 00 0.00 C1o 2400795OCALCS- gXLS 111=005 n U. I F -7 0 LJ 0 Q U, u IJ S TORM DRAIN SCHEDULE STRUCTURE PIPE INVERT ELEVATION TOP INLET FROM TO LENGTH DIA. SLOPE INFL.END (FT) (IN) % EFFL.END 010 (CFS) V10-MAX (FPS) NO. TYPE COVER ELEV. WEIR ELEV. 3TM. ELEV. DEPTH (FT.) AREA 2A 1A 18 24 3.13 592.50 592.00 2700 14.80 2A 0 .1. 598.50 593.00 590.50 8.00 20.61 AC 1A E.D. 592.00 11B 10B 22 18 0.68 627.25 627.10 0.40 4.91 "H.G.' 631.25 627.25 4.00 0.06 AC 10B 9B 42 18 0.83 627.10 626 75 1.06 5.43 "H.G " - 631.25 627.10 4.15 0.10 AC 9.1 B 9B 37 18 1.22 627.20 626.75 9.24 6.56 "W.I " 632.83 632.00 627.20 4 80 1.39 AC 9B 8B 22 18 1.59 626.75 626.40 11.90 7.50 r "H.G " 631.25 626.75 4.50 0.24 AC 88 7B 296 18 2.08 626.40 620.25 12.77 8.57 "H.G.' 631.25 828.40 4.85 0.13A C 7.28 7.1B 32 i8 1.56 621.00 620.50 9.11 7.43 "W.I." 625.83 625.00 621.00 4.00 1.37 AC 7.13 7B 20 i8 1.25 620.50 620.25 10.51 6.65 7.1 "H.G.- - 625.75 620.50 525 021 AC 7B 6B 199 24 1.63 620.25 61700 2394 920 "H.G." - 625.75 620.25 5.50 0.10 AC 6.1 B 68 162 24 0.56 612.50 611.60 13.30 920 6.1B "W.I." 617.33 616.50 612.50 4.00 2.00 AC 6B 58 175 24 3 03 611.60 606.30 37.24 12.53 5B "M.H." 621.00 611.60 9.40 0.00 AC 528 5B 38 18 9.21 612.00 608.50 7.05 18.04 5.28 "W.I." 618.83 618.00 612.00 6.00 1.06 AC 5.18 5B 98 18 0.51 609.00 608.50 4.66 4.25 SAB "W.I.' 513.83 613.00 609.00 4.00 0.70 AC 5B 4B 189 30 1 69 606.30 60310 49.61 10.87 5B H.G." - 618 00 606.30 11.70 0.10 AC 4.28 4B 55 i8 364 612.00 610.00 5.79 11.34 4.2B "W.I." 618.83 618.00 612.00 8.00 0.67 AC 4.1B 48 137 i8 0.51 606.50 605.80 4.79 4.25 4.1B "W.I." 611.33 610.50 606.50 4.00 0.72 AC 46 3B 89 30 3.37 603.10 600.10 61.51 15.34 4B "H. G.' 615.50 603.10 12.40 0.20 AC 3.38 3.28 47 18 0.70 601.33 601.00 2.00 4.98 3.38 "H.G." 605.33 601.33 4.00 0.30 AC 3.28 3B 177 18 0.51 601.00 600.10 3.46 4.24 4 3.28 "H G.' - 605.33 601.00 4.33 0.22 AC 3.1 B 3B 316 36 3.77 612.00 600.10 56.26 18.31 3.1B "W.I." 621.83 621.00 612.00 9.83 8.46 AC 3B 2B 206 40 2.09 600.10 595.80 121.23 14.62 3B "M.H." 614.50 60010 14.40 0.00 AC 2B 1B 75 40 9.07 595.80 589.00 127.75 30.48 2B "W.I." 604.33 603.50 595.80 7.70 0.98 AC iB U.W.O. 589.00 3C 2C 20 18 0.75 610.90 610.75 0.80 5.15 3C "H.G." 614.90 610.90 4.00 0.12 AC 2C 1 C 57 18 0 61 610.75 610.40 2.53 4.66 2C "H.G.' 614.90 610.75 4.15 0.26 AC 1 2C 1 C 31 18 10.00 610.50 607 40 2.00 18 80 1.2C W1NG' 615.83 615.00 610.50 4 50 0.30 AC 1.1C 1C 106 30 9.78 612.00 601.63 29.00 26.14 1.1C "M.H.-NC 618.50 612.00 6.50 EXIST 1C "M.H -NC 617.00 29.00 588.00 6D 50 243 24 2.42 640.24 63425 23.28 11.21 6D "M.H.-NC' 648.00 640.24 7.75 3.50 AC 5.10 5D 43 18 0.58 634.60 634.35 4.12 4.53 SAD "H.G." 638.60 634.60 4.00 0.62 AC 5D 4D 263 24 1 92 634.35 629.30 28.33 9 98 5D "H.G." 638.60 63435 4.25 0.14 AC 41D 4D 36 18 0 56 629 50 629 30 1.00 4 43 4.1D "H G." 633 50 629 50 4.00 0.15 AC 40 3D 264 30 1 82 629.30 62450 30.72 11.27 4D "H.&" 633.50 62930 4.20 0.21 AT 31 D 3D 24 18 0.83 624.70 624.50 2.46 5.43 3.10 "H.G.' 628.90 624.70 4.20 0.37 AC 3D 2D 76 30 1.05 624.50 623.70 35.18 8.57 35 -H G.- 628.90 624.50 4.40 0.30 AC 2D 10 19 30 4.21 623.80 62300 35.18 17.15 2D "M.H.' 630.00 623.80 8.20 0.00 AC 1D E.D. 35.18 3E 2E 50 18 0 80 601.40 601 00 3.26 5 32 3E "WING" 606.73 605 .90 601.40 4.50 0.49 AC 2E 1 E 110 18 2.13 601.00 598 66 8.25 8.67 2E G.I.-NC" . 60450 601.00 3.50 0.75 AC 1.1 E 1 E 89 18 0.94 599.50 598.66 0.53 5.77 1.1E "H.G: NC" 602.75 599.50 3.25 0.08 AC 1E "M.H: NC' 603.60 598.66 4.94 2F 1F 51 18 4.90 595.50 593.00 2.39 13.18 2F "WING" 600.33 599.50 595.50 4.00 0.36 AC 1F H.W. 603.60 59866 4.94 CLP 240076-SOCALCSP9.X1.1 1/102005 • ? r 10101011 i r? ?'?---- ? .J? / ? ` , ? eA ??a ` Cwt+` .',l •, ? ? ? vv ?, ' v . r 1, l .? D _ t ? \ 3 ri 1 Y r?''-?- t• , ? \, ,\ ' ! Dom- .-?.? ?? , Ol v iV 9ra L? i :?. uj r4 o. pl, !? / ?'? ..999 ? ^ 1 ? ? `11,? ?• •? !I :J cal ?>. ,??\ co 44 i/ / i I i t e e e r e i a e e e e e a e e t n? ? N 2 _ ?v 'F?4 ,I O O ? N In N ? 0 J J W W CL r ° I I ? OO < w w CE X w ¢ ~ u N U U 7 WJ it ? > N N ? N L %/? a o J ?a ? U Y ? V z Q V r J- O a ~ I ?WOw ?0 a c N ? r U © ? Z > r - a u6 /.\ n YI Z Q a 0 N N W ? W W p U < W W J O O N 9 N W O ill l0 > W ? , W J w U Z O ? c W w t N ? < t i U V- W O Z 9 Q - -' w a a ? ~ I w a w O c N in a: 111 J o -- o o 111 I Z O O U - w wO ???II O Z W S W . w O J W ° a _ J • ? d W O :III o Q O O o H N 0 1111= w : w ° =1111 z ? O v ~ w ° 33d- Q ? u J U) OJ (n b d (n O a mw rW Q U - Z ? 1 I w vri > ? W w w? Z I 1:2 W 1 m ?-y I J WI m?O zi 0? Iz al ohm ? ? I 1 I 9w? c O ??? I J + J Z < U v<0 U U ww. N lY 'N ?a- APPENDIX IV PERMANENT WATER OUALITYPOOL DESIGN TE111PORARY WATER OUALITYPOOL DESIGN TEMPORARY SEDIMENT BASIN DESIGN, LEVEL SPREADER DESIGN ADDITIONAL CALCULATIONS f m L!", NA LJ I1: a ,1 0 JOB NAME JCB NUMBER PAGE NO. UIVI? LSI CIS I? - P?45E1- 2k07 JOB DESCRIPTICN !I1/E, SPL-r4DEIZ BY GAP DATE "/%s t , ' QLZ ---? -? - - - - - - - j- i L-- gO? _?lAr`? PIST/}KtCE ._L?I,CDL?1lS`U_ `Tb?D(?_Pslp( ?- _ _ 2 Cp s' F? ?P 6 orrT'yauzi F7-o1o From -_DT-r?v 1-tc9 t?1 }78 N ??? ro-` - T - - - ---, j ?f 1159, --- } _-ioLC__ g Fi,ouW_rt^_ - .ter' -i- -, - . , - ; ---- - . 1 -2Cc GFS = V / ?I i- r - cA,,J ln_f Tt?hruD Is DISK l2 'D ` ?3`_LzN 5R2 - j f i i j. , GRXI ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / (864) 297-3027 L t JOB NAME JOB NUMBER PAGE NO. nn qN 1 ?! I TL1 1.?9?f?G 2 Z 4OD78 JOB DESCRIPTION BY G DATE Dl `,' ! - WAr?L uL l 7 !,+ o D5- lj Ell E 0 ?N JOB NAME JOB NUMBER PAGE NO. t/olive"a; r7Li (2v?s,?c ?tf.?sE Z1407C JCS OESCRIPTICN BY ,?J OAM ?DIM?NT hStW IC,,.? GL-/- to ''OIOE or") r e e° e e A P e 4 0 IJ ns av cafe+ucc?fwff? ?nwfef n TAA,"Q iwir / two Cil-ri. 0^-ari / (SrocamAllo Q[-. 9CA07 / lRR11 9Q7_',r07 C! P, I H ?I E h-? 0 A e I : L U u rvr ? r J0S NAME / JOB NUMBER PAGE NO. t/)V!VSA''-177Lt ,2o?s„v? Sc Z4007? JCB DESCRIPTION BY DATE / ?,??DlrittrNt ?il?SlW ?iES1Cft? G?'? ???IOS /?C aV ?11n?o?I C.?Dlwln tIMM42111 TAAITQ IAIt` 1 112-7 Cilnrim ?nori / r.rcortvillo Ra^. 009117 / MAUI ')Q7-+tl5?7 a d.-Ill e' A' e F!"ill U C E0 JOB NAME JOB NUMBER PAGE NO. JCS DESCRIPTION BY DATE 2 SPILGW 5I2e? r-c av =a1r11UCt?l1.IP! Pf1hiC111 YA wriz mir 1 1,2,3 Milnrim ?^nA I (-riammi lla qr. 70r,07 / (AAA) ';q7..,; n97 F!", 7 e a e e e, e i a a E C c?,rH ca?.Nr JOB NAME ?j`Fi? JOB NUMBER PAGE NO. UJVIVCAz 17-q 620kijul 6 ,4,Se? Zgx)7e JOB CESCRIPTICN BY CATE ?'`%S GRAY E IGMEERING CCNSULTAMTS, INC. / 122 Pilgrim Road / Greenville, SC 29607 / (864) 297-::027 OVERLANp CHANNELIZEI r-40 r-4 1 cAo OLi 900 ?' 30 3 b00 0.016 700 0.02 (PVUT'j 600 OD?/ 25 2.5 SC0 0DA 1 i 400 s O-5 20 Z o 0.15 3.00 ODI 0 !0 = 0 20 - = E. (B ARE Mi,xE D 901E Z 0.40 0.30 j 0:50 i Q / W J y H J 2C0 i 0.02 020 1.00 ? 13 LS ? _ W 1.50 _ ? i 0.30 (PIOC}R GRASS) \ a. 2.00 ?. J 3.00 2 Uj .00 ISO / j v on 3 0ZA.V. GRASS) W 5.00 ?f u. 10.00 ¢ 0.80(DENSFG.tAS3 t- o 0.06 in 20.00 l0 L0 o c 1.00 v - /00 9 0.2 TO ox 0 ® 0.9 W W l` S0 +- T 0.7 40 • a as NOMOGRAPH..FOR TIME OF CONCENTRATION Fiz re 3-1 3-13 S 0.5 4 0.4 3 0.3 Sauna: Auat.in Ta:as Crainaas Manua! OVERLANQ CHANFIELIZEI r- 4 0 r--4 - K= 0A1 - 9C0 b00 0.016 -700 0.42(PYwTa - 600 0A3 f? RICO 0A4 0.03 400 ac. OD I C3 C (HARK MCxzo s0? _ _ c - ? O J 0.20 _ 200 - 0.02 Z Z z 0.30 (POCK GRASS) ? - 1 = 0D3 \0.4-0 (AV GRASS) 0 0.04 Q.? Li 0.8016 NS-F- GAA:1-31 -)00 0.06 -310 1.00 - 80 --70 4b - 60 - 50 - 4,0 - 30 - 20 0.10 0.15 z '0 0.30 0.40 - W 0:50 L = 1.00 1.50 \ O .00 ?i 4.00 W 5.00 E0.00 h ,zo NOMOGRAPH. FOR TIME OF CONCENTRATION Figure 3-1 3-13 30 3 23 Z.5 20 W 15 I.S. 1-- 2 0 a r 10 1.0 9 0.2 .\ L.. 'o t O.t . ti +- 0.7 6 0.6 5 0.5 4 0.4 3 0.3 5.]urLa: Aut in Tazaa Crainada Manual 1C?A Li 0 900 ow 0.016 i 700 0.02(pvwTa f? 0D3 500 ODD 0 400 is s OD I z f < as (8 A-K PAZ.KZ D 94 K. W e 15 _ O J O 020 _ 4J W W 1 x 0.34 (POOR GRASS) ? x i 0D3\ 0.4.0(AY, GRASS * 0 0.04 '-o , -,%o !2 W 0.9,0(DENSEGAASS 0 100 0.06 3t ?0 I.00? o 00 o \\\ 70 ap 6.0 50 40 30 OVERLAHp CHANNEIIZ,7I r-40 r- 4 . 30 3 2S i 2.5 20 2 h 0.10 0.15 = 0.20 0.30 v 0.40 " ? 0:50 W . An °? W lS LS = 1. W 1. Z o .00 .00 z y 5.00 10. a 20.00 10? I.0 v LL- 0 Q 0.9 W } 7 0.7 L6 0.4 ?-0.5 4 0.4 4 NOMOGRAPH FOR TIME OF CONCENTRATION [ 3 10.3 Figure 3-1 Scums: Auwlin Tazaa Crainara M+nua1 3-13 OVERLAS CHANNELIZEI r-40 ? 4 K'II-O 9CA ODI ^? 30 3 600 0.016 700 0.02(PY6(7U . Zs 2.5 6C0 OD3 500 0 400 ' 2 c. = v7 0.10 0 0DI z ?- 0.15 zo o 300 < a)0 = . 3 c (8 PACxED 50K -j' = v 0. 0 idLi O W r J uj ? 0:50 7 W s s J W 200 N 0.02 0.20 = • ? , ? I.00 1 50 }•- rz 0.30 (POOR GRASS) W . Z x ISO / <_ OD3 0 410 (AV GRASS) vi 3 00 s.00 W 2 i / U O G4 . . 0.50 W •00 p / o . U. ` 10.00 !2 C3 / iffCCC444 w ti- 0 06 0.80(DENSFGAA33 ? v7 20.00 ~ z_ 10 L0 . 1 00 W 3z o ?O m o . U ' 9 2 0 00 . U. p 0.s ? ?- 7 -0.7 40 6 0.6 30 5 0.5 2*? 4 0.4 NOMOGRAPH FOR TIME OF. CONCENTRATION 3 0.3 Figure 3-1 Saw= Austin Teza s Crainada Manusl 3-13 u r;-? C A 3.5 Desig 7 n Frequency Rainfall Intensity 3.5.2 nna€y? - 50 1.64 1.90 2.23 2.66 3.10 3.43 1 1.45. 1.68 1.98. 2.36 2.76. 3.05 3 2 0.88 1.03 1.21. 1.45 1.70 1.89 3 0.65 - 0.76 0.90 1.07 1.25 1.40 1 6 0.38 0.44 •0.53 0.62 0.73 0.82 0 12 0.22 0.25 0.31 0.36 0.42 0.47 0 24 0.13 0.15 0,18 0.20 0.24 0.27 0 Taken from equation for OF curv e for Charlot.e, N.C. as nyafo Table 3-3 Rainfall Intensities - Charl otte, North Carol ina Storm Duration Rainfall Intensirv(in./hr.) Ret urn Period (Years) hours minutes 2 3 5 10 25 50 0 5 5.03 5.60 6.30 7.03 8.21 9.00 6 4.78 5..33 6.02 6.75 7.89 8.65 7 4.55 5.09 5.76 6.49 7.59 8.32 8 4.34 4.88 5.53 6.26 7.31 8.03 9 4.16. 4.68 5.32 6.04 7.06 7.75 10 3.99 4.50 5.12 5.84 6.83 7.50 15 3.33 3.79 4.35 5.03 5.87 6.46 16 3.23 3.67 4.22 4.89 5.72 6.29 .17 3.13 3.57 4.10 4.77 5.57 6.13 18 3.04 3.47 3.99 4.65 5.43. 5.97 19 2.96 3.37 3.89 4.53 5.30 5.83 20 2.88 3.29 3.79 4.43 5.17 5.69 21 2.80 3.20 3.70 4.32 5.05 5.56 22 2.73 3.12 3.61. 4.23 4.94 5.44 23 2.66 3.05 3.53 4.14 4.83 5.32 24 2.60 2.98 3.45 4.05 4.73 '5.21 25 2.54 2.91 3.37' 3.96 4.63 5.10 26 2.48 2.85 3.30 3.88 4.54 5.00 27 . 2.43 2.79 3.23 3.81 4.45 4.90 28 2.38 2.73 3.17 . 3.73 4.36 4.81 29 2.33 2.68 .3..11 3.66 4.28 4.72 30 2.28 2.62 3.05 3.60 4.20 4.64 40 1.90 2.20 2.57 3.05 3.56 3.93 100 9.92 9.53 9.17 8.84 8.54 8.26 7.11 6.92 6.74 6.57 6.41 6.26 6.12 5.98 5.85 5.73 5.61 5.50 5.39 5.29 5.19 5.09. 4.32 3.76 .34 2.06 .52 .89 .51 .29 3.6 Rational Method Introduction When using the rational method some precautions should be considered. 3.6.1 • In determining the C value (land use) for the drainage area, hydrologic analysis should take into account future land use changes. Drainage facilities should be designed for future land use conditions as specified in the County and City Land Use Plans. • Since the rational method uses a composite C value for the entire drainage area, if the distribution of land uses within the drainage basin will affect the results of hydrologic analysis, then the basin should be divided into two or more sub-drainage basins for analysis. The charts, graphs, and tables included in this section are given to assist the engineer in applying the rational method. The engineer should use good engineering judgement in applying these design aids and should make appropriate adjustments when specific site. characteristics dictate that these adjustments are appropriate. Runoff The- rational formula estimates the peak rate of runoff at any location in a Equation watershed as a function of the drainage area, runoff coefficient, and mean rainfall 3.6.2 intensity for a duration equal to the time of concentration (the time required for water to flow from the most remote point of the basin to the location being analyzed). The rational formula is expressed as follows: Q = CIA (3..1) Where: Q = maximum rate of runoff (cfs) C = runoff. coefficient representing a ratio of runoff to rainfall I = average rainfall intensity for a duration equal to the time of concentration. (in/hr) A = drainage area contributing to the design location (acres) Infrequent The coefficients given in Table 3-5 are applicable for storms of 2-yr to 10-yr Storms frequencies Less fret. lgl7er rntes?ssty storms y?ri1l segiilre rnodif)cafion >jf 3.6.3 $ e car rcrem `becausa fifL-atscn a ar ea' fiasses have a proponionaily smaller .effete on runoff (Wright--McLaudhEn 5651. The adjustment of the rational . .. method for use with major storms can be made by multiplying the right side of the rational formula by a frequency factor C,. The rational formula now becomes: Q = CC,IA (3.2) n =1 G' L u 0 ?J 1 u U J Appendices 8.07 i The design of temporary sediment basins for construction sites should meet all minimum requirements contained in Practice Standards and Specifications: 6.61, Sediment Basin. The following outline provides guidance in designing sediment basins to meet those requirements. Size, Location, and Structures intended for more than 3 years of use should be designed as perma- Effieieney nent structures. Procedures outlined in this section do not apply to perma- nent structures. See the Dam Safety Law of 1967 and supplementary North Carolina Administrative code title 15A. Rev. 1:193 Basic requirements for design of a sediment basin are the following: • drainage area less than 100 acres; • design structure life less than 3 years; • minimum design storm, 10-yr peak runoff with minimum 1 ft freeboard; • In High Quality Water (HQW) Zones, minimum design storm, 25-yr peak runoff with minimum 1ft freeboard. The sediment basin shall settle the 40-micron particle with a minimum efficiency of at least 70 % during the 2-yr peak runoff event. See appendices beginning on pg. 8.07.13. • maximum height shall be less than 15 ft, measured from the top of the dam to the lowest point at the downstream toe; • hazard classification: sudden failure should notcause loss of life or serious property damage. Basin location-Locate the basin so that a maximum amount of runoff from disturbed areas can be brought into the structure. It should be accessible for periodic cleanout and should not interfere with construction activities. When possible delay clearing the sediment impoundment area until the dam is in place. Keep the remaining temporary pool area undisturbed. Basin volume-Minimum volume of the basin should be 1,800 ft3/acre for the disturbed area draining into the basin. Volume is measured below the principal spillway crest. Where possible the entire drainage basin is used for this compu- tation, rather than the disturbed area alone, to help ensure adequate trapping efficiency. Trapping efficiency- For additional information see Appendices pg. 8.07.13 - 8.07.42) Maximize the trapping efficiency of the basin by: • diverting runoff from undisturbed areas away from the basin; • limiting drainage area to increase the ratio of basin surface area to peak inflow rate. This ratio should be 0.01 acre/cfs or greater to achieve more than 75% efficiency on most soils. Subdivide area with additional traps and barriers to limit inflow rate and improve efficiency; • maximizing the length-to-width ratio of the basin. Length to width should be 2:1 or greater; • locating sediment inflow points as far as possible from the principal spillway inlet; • controlling flow at inlet points to maintain nonerosive velocities. 8.07,1_ 13 0 Basin cleanout-Plan to remove sediment when approximately one half of the basin volume has been filled. The minimum volume requirement (1,800 ft3/acre) must always be met. tq? Spillway System The spillway system, consisting of a principal spillway and an emergency Design spillway, should carry the peak runoff from a 10-yr storm with a minimum 1 ft freeboard above the design water surface in the emergency spillway. Base runoff computations on the most severe soil cover conditions expected during the effective life of the structure (Appendix 8.03). PRINCIPAL SPILLWAY The principal spillway consists of a vertical pipe riser fastened to a horizontal pipe barrel with watertight connectors. The horizontal conduit must extend beyond the toe of the dam and must be stabilized, usually by riprap. Minimum capacity-0.2 cfs/acre of drainage, computed for water surface at the emergency spillway elevation. Crest elevation of the riser may be set no lower than the elevation of the sediment detention pool as a minimum. Barrel conduit and riser-The minimum barrel conduit size allowable is 8 inches for corrugated pipe and 6 inches for smooth-walled pipe. Limit the maximum barrel diameter to 30 inches. The riser should have a cross-sectional area at least 1.5 times that of the barrel. Rod and lug type connector bands with gaskets are recommended for corrugated pipe to provide positive watertight connections. Basin dewatering can be accomplished by a single hole protected from trash or a series of holes covered with gravel. The pool may be drained by perforating the lower half of the riser with 1/4- to 1/2-inch holes approximately 3 inches apart on the outside pipe corrugations. Cover the perforated section with 2 ft of gravel (DOT #57 washed stone is ap- propriate for this application). Trash guard-Install a trash guard on top of the riser. A fabricated cone of steel rods, spaced 2 inches apart, fastened to the top of the riser is recommended. Protection against piping-Secure at least one watertight antiseep collar with a minimum projection of 1.5 ft around 8-inch or larger conduits. Locate the collar just downstream from the centerline of the dam. A properly designed drainage diaphragm installed around the barrel may be substituted for an antiseep collar. Protection against flotation-Anchor the riser with a mass with a buoyant weight greater than 1.1 times the weight of water displaced by the riser. Stabilize the outlet below the barrel against erosion (Appendix 8.06). 8.07.2 CI' 0 F1 fJJ Rey. LIM Appendices EMERGENCY SPILLWAY Construct the entire flow area of the emergency spillway in undisturbed soil. Cross section should be trapezoidal, with side slopes 3:1 or flatter. Select vegetated lining to meet flow requirements and site conditions (Figure 8.07a). Capacity-Design the emergency spillway for runoff from the 10-yr storm less any reduction due to flow in the principal spillway. Inlet protection-Ensure that the approach section has a slope toward the impoundment arear of not less than 2% and is flared at its entrance, gradually reducing to the design width of the control section. The control section should be level and straight and at least 20 ft long. Determine the width and depth for the required capacity and site conditions. Wide, shallow spillways are preferred because they reduce outlet velocities. The outlet section should be straight, aligned and sloped to assure supercritical flow with exit velocities not exceeding values acceptable for site conditions. Outlet velocity-Ensure that the velocity of flow from the basin is nonerosive for existing site conditions. It may be necessary to stabilize the downstream areas or the receiving channels. EMBANKMENT DESIGN There should be a cutoff trench in stable soil material under the dam at the centerline, extending up the abutments to the elevation of the emergency spillway. The trench should be at least 2 ft deep with 1:1 side slopes, and sufficiently wide to allow compaction by machine. Top width-Fill height 10 ft: minimum top width 8 ft Fill height 10-15 ft: minimum top width 10 ft Allowance for settlement-10% of fill height. Side slope-2.5:1 or flatter. Freeboard-minimum 1 ft between the settled top of the dam and the design water level in the emergency spillway. Embankment material should be a stable mineral soil, free of roots, woody vegetation, rocks or other objectionable materials, with adequate moisture for compaction. Place fill in 8-inch layers through the length of dam and compact by routing construction hauling equipment over it. Equipment must traverse the entire surface of each layer by at least one wheel width. EROSION CONTROL Construct the structure to minimize the area disturbed. Divert surface water away from disturbed areas. Complete the embankment before clearing the impoundment area. Stabilize the emergency spillway, embankment, and all other disturbed areas above the crest elevation of the principal spillway imme- diately after construction (Practices 6.10-6.15, Surface Stabilization). 8.07.3 El Level Portion Crest and Control Section I?,I 11 ! I ?.i , II •? LJ i i ,l it I ol''11 I I. l i \ , - - - - - -' Flow ' t Exit Section ,C Berm Approach channel Embankment Water surface Stage (Hp) Min Approach channel Note: Neither the location nor alignment of the control section has to coincide with the centerline of the dam. - I- Plan Control section i-nuHnl _ 20' - level or greater Profile along centerline X - length of exit channel Exit Section Cross section at control section Excavated earth spillway Figure 8.07a Design of excavated earthen spillway. 8.07.E 3 a f] L f] u u N Appendices Safety-Avoid steep side slopes. Fence basins properly and mark them with warning signs if trespassing is likely. Follow all State and local safety require- ments. Design Procedure Step 1. Determine peak flow, Qto, for the basin drainage area (Appendix 8.03). Step 2. Determine any site limitations for the sediment pool elevation, emer- gency spillway or top of the dam. Step 3. Determine basin volumes: • Compute minimum volume required (1800 ft3/acre disturbed). • Specify sediment cleanout level to be marked on riser (one-half the design volume referenced to the top of the riser) and sediment storage area to be cleared after the dam is built. Step 4. Determine area and shape of basin: • Check length/width ratio (should be greater than 2). • Compute the basin surface area at principal spillway elevation. • Check the ratio of basin surface area to peak inflow rate (should be greater than or equal to 0.01 acres/cfs, if possible). Employ diversions with additional traps and basins to reduce area drained. Step 5. Determine size of principal spillway. L 1 L GI I j BARREL Determine barrel capacity required for site conditions (minimum capacity for Op is 0.2 cfs/acre). Use Tables 8.07a or 8.07b to select a pipe for the design elevation, usually the head on the barrel. Alternatively, the size of the pipe barrel may be determined by the general pipe flow equation: OP = a 2gH 1 + Km + KpL where: Op = discharge from pipe, cfs, a = pipe area, ft2, g = acceleration of gravity, fVsec2, H = elevation head differential, ft, Km = coefficient/sum of minor losses, usually 1, Kp = pipe friction coefficient, L = pipe length, ft. 8.07.5 CI 0 a Table 8.07a a Pipe Flow Chart for Design of Corrugated Metal Outlet Conduit (Q in cubic ft/sec) n For Corrugated Metal Pipe Inlet Ke + Kb 1.0 and 70 feet of Corrugated Metal Pipe Conduit n . 0.025. Note correction factors for other pipe lengths. La. H 11 12" 15" 18" 21" 24" 30" 36" 42" 2 2.84 4.92 7.73 11.30 15.60 26.60 40.77 58.12 3 48 3 6.03 9.47 13.84 19.10 32.58 49.93 71.19 4 t4.02 6.96 10.94 15.98 22.06 37.62 57.66 82.20 5 4.49 7.78 12.23 17.87 24.66 42.06 64.46 91.90 6 4.92 8.52 13.40 19.57 27.01 46.07 70.60 100.65 7 5.32 9.21 14.47 21.14 29.19 49.77 76.28 108.75 8 5.68 9.84 15.47 22.60 31.19 53.19 81.53 116.23 9 6.03 10.44 16.41 23.97 33.09 56.43 86.49 123.30 10 6.36 11.00 17.30 25.26 34.88 59.48 91.16 129.96 11 6.67 11.54 18.14 26.50 36.59 62.39 95.63 136.33 12 6.96 12.05 18.95 27.68 38.21 65.16 99.87 142.37 13 7.25 12.55 19.72 28.81 39.77 67.83 103.96 148.21 14 7.52 13.02 20.47 29.90 41.27 70.39 107.88 153.80 15 7.78 13.48 21.19 30.95 42.72 72.85 111.66 159.18 16 8.04 13.92 21.88 31.96 44.12 75.24 115.32 164.40 17 8.29 14.35 22.55 32.94 45.48 77.55 118.87 169.46 18 8.53 14.77 23.21 33.90 46.80 79.81 122.33 174.39 19 8.76 15.17 23.84 34.83 48.08 81.99 125.67 179.15 20 8.99 15.56 24.46 35.73 49.33 84.12 128.93 183.80 21 9.21 15.95 25.07 36.62 50.55 86.21 132.13 188.36 22 9.43 16.32 25.65 37.47 51.73 88.22 135.21 192.76 23 9.64 16.69 26.23 38.32 52.90 90.21 138.27 197.12 24 9.85 17.05 26.80 39.14 54.04 92.15 141.24 201.35 25 10.05 17.40 27.35 39.95 55.15 94.05 144.15 205.50 L Correction Factors For Other Pipe Lengths 40 1.23 1.22 1.20 1.19 1.16 1.14 1.13 1.11 50 1.14 1.13 1.12 1.11 1.10 1.09 1.08 1.07 60 1.07 1.06 1.06 1.05 1.05 1.04 1.04 1.03 70 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 80 0.95 0.95 0.95 0.96 0.96 0.96 0.97 0.97 90 0.90 0.91 0.91 0.92 0.92 0.93 0.94 0.94 100 0.86 0.87 0.88 0.89 0.89 0.90 0.91 0.92 0 8.07.6 Q Appendices Table 8.07b Pipe Flow Chart for Design of Concrete Outlet Conduit (Q in cubic ft/sec) For R/C Drop Inlet, Ke + Kb = 0.65 with 70 feet of R/C conduit, n = .013. Note correction factors for other pipe lengths. la.1 H 1 12" 15" 18" 21" 24" 30" 36" 42" 2 4.54 8.01 11.74 16.60 22.44 36.74 54.65 76.02 3 5.56 9.81 14.39 20.33 27.49 45.00 66.94 93.11 4 6.42 11.33 16.61 23.48 31.74 51.96 77.30 107.52 5 7.18 12.66 18.57 26.25 35.49 58.09 86.42 .120.21 6 7.87 13.86 20.34 28.75 38.87 63.63 94.65 131.66 7 8.50 14.98 21.98 31.06 41.99 68.74 102.27 142.25 8 I 9.06 16.01 I 23.49 33.20 44.88 73.47 109.30 152.03 9 I 9.64 17.00 24.92 35.22 47.61 77.94 115.95 161.28 10 I 10.16 17.91 26.26 37.12 50.18 82.15 122.21 169.99 11 10.65 18.78 27.55 38.94 52.64 86.18 128.20 178.32 12 i t 11.13 19.62 I 28.77 40.67 54.97 89.99 133.88 186.22 13 11.58 20.42 29.95 42.33 57.23 93.68 139.37 193.86 14 12.01 21.18 31.07 43.93 59.37 97.19 144.59 201.12 15 12.44 21.93 32.17 45.47 61.46 100.62 149.69 208.21 16 12.85 22.65 33.22 46.96 63.48 103.92 154.60 215.04 17 13.24 23.35 34.24 48.40 65.43 107.12 159.35 221.65 18 i t 13.63 24.03 35.24 49.81 67.34 110.23 163.99 228.10 19 ! 14.00 24.68 36.21 51.17 69.18 113.25 168.48 234.34 20 ? i 14.36 25.32 37.14 52.50 70.97 116.18 172.84 240.41 21 14.72 25.95 32.()7 53.80 72.73 119.07 177.13 246.38 22 15.06 26.56 38.96 55.06 74.43 121.85 181.27 I 252.13 23 I 15.40 27.16 39.64 56.31 76.11 I 124.60 185.36 257.83 24 15.73 27.74 40.69 57.51 77.75 127.28 189.35 263.37 25 16.06 28.32 41.53 58.70 79.35 129.90 193.25 268.60 L i I Correction Factors For Other Pipe Lengths 40 i t 1.15 1.13 1.11 1.09 1.08 1.06 1.C6 1.05 50 j 1.09 1.08 1.07 1.06 1.05 1.04 1.04 1.03 60 i t 1.04 1.04 I 1.04 1.03 1.03 1.02 1.02 1.02 70 I 1.00 1.00 1.00 1.00 1.00 I 1.00 1.00 1.00 80 0.96 0.96 0.97 0.97 0.98 0.98 I 0.98 0.99 90 ` 0.93 0.94 0.94 I 0.95 I 0.95 0.96 0.97 0.97 100 0.90 I 0.91 0.92 I 0.93 I 0.93 0.95 0.95 0.96 8.07.7 El RISER Determine riser size from Figure 8.07b. Check the head and stage requirements. If the design stage is too high, choose a larger barrel or reevaluate steps 2-4. As a minimum, set the elevation of the riser at the same elevation as the top of the u sediment pool. Select the type of trash guard. Determine area of holes, Ao, to dewater the pool from the following equation: _ A 2h AO T Cd 20,428 where Ao = total area of the dewatering hole, ft2, As = surface area of the basin, ft2, h = maximum head of water above the hole, ft, T = detention time to dewater basin, hr, (8 hrs recommended min.), Cd = coefficient of contraction for the orifice (approximately 0.6). Step 6. Design antiseep collar. Ensure that andseep collars are no closer than 2 ft from a pipe joint. Collar must project at least 1.5 ft from the pipe. Indicate watertight connections. Step 7. Design antiflotation block. Determine the weight of water displaced by the empty riser, and design a block with buoyant weight 1.1 times the weight of water displaced. Step 8. Design outlet. Determine discharge velocity from the barrel. Design outlet protection to assure stable conditions. Riprap placement is usually necessary (.Appendix 8.06). Step 9. Design emergency spillway. • Determine the required capacity for the emergency spillway as Qe=010-Op. • From Table 8.07c or Table 8.07d, select the width and depth of the outlet, depending on soil conditions. In general, the wider bottom widths and lower slopes are preferred to minimize exit velocities at supercritical flow. • Set the elevation of the crest of the emergency spillway a minimum of 1 ft above the crest of the riser. Step 10 . Spillway approach section. Adjust the spillway alignment so that the control section and outlet section are straight. The entrance width should be 1.5 times the width of the control section with a smooth transition to the width of the control section. Approach channel should slope toward the reservoir no less than 2%. 8.07.3 Rev. 1:(93 0 1 Appendices 25C 20C 1SC 10C 9C 8C 7C 6C 50 U Q. 4C CZ 30 CL E 20 10 9 8 7 6 5 0.5 1.0 1.5 2.0 2.5 3.0 Head required at crest of riser in feet (h) Circular risers with litt ll er wa sp " bo 1 LH 3i2 3 Q = . Splitter-type _ Crest headwall 2 - h _ d i 7( Pipe Z riser - , T -77- p F Pipe conduit I 1 I - - - - -- For conduit slope > friction slope Z = 5D - , F d it l f i i or con ope < u s r ct on slope, Z = 2D Inlet Proportions Pipe Pipe Conduit Riser (D) - in (d) - in 8-12 18 15 21 18 24 21 30 24 30 30 36 36 48 42 54 48 60 Figure 8.07b Design chart fcr riser outlet. Pipe drop inlet spillway design: For a given Q and H, refer to Table 8.07a or 8.07b for conduit size. Then determine the riser diameter (d) from the Inlet Proportions Table on this figure. Next, refer to the above curves, using the conduit capacity and riser diameter, and find the head (h) required above the crest of the riser. The height of the riser should not be less than 5D - h, except as noted in the above sketch. Example - Given: CMP; Q = 20 cfs; H = 14 ft, h max. 1.0 ft; L = 70 ft. From Table 8.07a find conduit size (D) = 18 inches. From Inlet Propor- tions Table, riser size = 24 inches. Head (h) required for Q = 20 and d = 24 is 1.0 ft. Rev. 12M 3.07.9 13 Table 8.07c Design Table for Vegetated Spillways Excavated in Erosion Resistant Soils (side slopes-3 horizontal:1 vertical) 13 iacharge Slope Range Bottom Stage Discharge Slope Range Bottom St Q CFS Minimum Percent Maximum Percent Width Feet Feet Q CFS Minimum Percent Maximum Percent Width Feet age Feet 15 3.3 12.2 8 .83 2.8 5.2 24 1.24 3.5 18.2 12 .69 80 2.8 5.9 28 1.14 3.1 6.9 8 .97 2.9 7.0 32 1.06 20 3.2 13.0 12 .81 2.5 2.6 12 1.84 3.3 17.3 16 .70 2.5 3.1 16 1.81 2.9 7.1 8 1.09 2.8 3.8 20 1.45 25 3.2 9.9 ?2 .91 90 2.7 4.5 24 1.32 3.3 13.2 18 .79 2.8 5.3 28 1.22 3.3 17.2 20 .70 2.8 6.1 32 1.14 2.9 6.0 8 1.20 2.5 2.8 16 1.71 30 3.0 8.2 12 1.01 2.6 3.3 20 1764- 3.0 10.7 16 .88 2.6 4.0 24 1.41 3.3 13.8 20 .78 100 2.7 4.8 28 1.30 2.8 5.1 e 1.30 2.7 5.3 32 1.21 2.9 6.9 12 1.10 2.6 6.1 38 1.13 35 3.1 9.0 18 •94 2.5 2.8 20 1.71 3.1 11.3 20 .85 2.6 3.2 24 1.58 3.2 14.1 24 .77 120 2.7 3. 2 1. 2.7 4.5 6 1.40 2.7 4.2 32 1.34 2.9 8.0 12 1.18 2.7 4.8 36 1.26 40 2.9 7.8 16 1.03 2.5 2.7 24 1.71 3.1 9.7 20 .91 .45 3.2 28 1.58 3.1 11.9 24 .83 140 J .6 3.6 32 1.47 2.6 4.1 8 1.49 [ .6 4.0 36 1.36 2.8 5.3 12 1.25 2.7 4.5 40 •1.30 45 2.9 6.7 16 1.09 2.5 2.7 28 17-75- 3.0 8.4 20 .98 2.5 3.1 32 1.58 3.0 10.4 24 .69 160 2. 3.4 38 1.4 2.7 3.7 8 1.57 2. 3.8 40 1.4 2.8 4.7 12 1.33 2.7 4.3 44 1.33 50 2.8 6.0 16 1.16 2.4 2.7 32 1.72 2.9 7.3 20 1.03 2.4 3. 36 1. 3.1 9.0 24 .94 180 2.5 3.4 40 1.51 2. 3.1 8 1.73 2.6 44 1.43 2.7 3.9 12 1.47 2.5 2.7 36 1.70 60 2.7 4.8 16 1.28 2.5 2.9 40 1.80 2.9 5.9 20 1.15 200 2.5 3.3 44 1.52 2.9 7.3 24 1.05 2.6 3.6 48 1.45 3.0 8.6 28 .97 2.4 2.6 40 1.70 2.5 2.8 8 1.88 220 2.5 2.9 44 1.61 2.6 3.3 12 1.60 2'.5 3.2 48 1.53 70 2.6 4.1 18 1.40 2. 2. 44 2.7 5.0 20 1.26 240 2.5 2.9 48 1.82 2.8 6.1 24 1.15 25 3.2 52 4 2.9 7.0 28 1.05 8 2.4 2.8 48 1.70 2.5 2.9 .12 1.72 2 0 2.5 2.9 52 1.62 80 2.8 3.6 18 1.51 280 2.4 2.8 52 1.7 2.7 4.3 20 1.35 300 2.5 2.8 58 1.89 Example of Use - Given: Discharge, 0 = 87 c.f.s. Spillway slope, Exit section (from profile) = 40/6. Find: Bottom width and Stage in Spillway. Procedure: Enter table from left at 90 c.f.s. Note that Spillway slope (40%) falls within slope ranges corresponding to bottom widths of 24, 28, and 32 ft. Use bottom width, 32 ft., to minimize velocity. Stage in Spillway will be 1.14 ft. Note: Computations based on: Roughness coefficient, n = .040. Maximum velocity = 5.50 ft. per sec. 8.07.10 Rev. 1293 C u Appendices Table 8.07d Design Table for Vegetated Spillways Excavated in Very Erodible Solis (side slopes-3 horizontal:) vertical) Disoharge Slope Range Bottom Stage Q CFS Minimum Percent Maximum Percent Width Feet Feet 10 3.5 4.7 8 .68 5 3.4 4.4 12 .89 1 3.4 5.9 16 .60 3.3 3.3 12 .80 20 3.3 4'.1 16 .70 3.5 5.3 20 .62 3.3 3.3 16 .79 25 3.3 4.0 20 .70 3.5 4.9 24 .64 3.3 3.3 20 .78 0 3.3 4.0 24 .71 3 3.4 4.7 28 .65 3.4 5.5 32 .61 3.2 3.2 24 .77 35 3.3 3.9 28 .71 3.5 4.6 32 .66 3.5 5.2 36 .62 3.3 3.3 28 .78 0 3.4 3.8 32 .71 4 3.4 4.4 38 .67 3.4 5.0 40 .64 3.3 3.3 .32 .76 45 3.4 3.8 36 .71 3.4 4.3 40 .87 3.4 4.8 44 .64 3.3 3.3 36 .75 50 3.3 3.8 40 .71 3.3 4.3 44 .88 3.2 3.2 44 .75 60 3.2 3.7 48 .72 70 3.3 3.3 52 .75 80 3.1 3.1 56 .78 Example of Use Given: Discharge, 0 = 38 c.f.s. Spillway slope, Exit section (from profile) = 4%. Find: Bottom width and Stage in Spillway. Procedure: Enter table from left at 40 c.f.s. Note that Spillway slope (4.0%) falls within slope ranges correspcnding to bottom widths of 36 and 40 ft. Used wider bottom width, 40 ft., to minimize velocity. Stage in Spillway will be 0.64 ft. Note: Computations based on: Roughness coefficient, n = .040. Maximum velocity = 3.50 ft. per sec. p Rev. 12193 3.07.11 f:? i 0 0 Step 11. Spillway control section. • Locate the control section in the spillway near where it intersects the ex- tension of the centerline of the dam. • Keep a level area to extend at least 'Oft upstream from the outlet end of the control section, to ensure a straight alignment. • Side slopes should be 3:1. Step 12. Design spillway exit section. • Spillway exit should align with the control section and have the same bot- tom width and side slopes. • Slope should be sufficient to maintain supercritical flow, but make sure it does not create erosive velocities for site conditions. (Stay within slope ranges in appropriate design tables.) • Extend the exit channel to a point where the water may be released without damage. Step 13. Size the embankment. • Set the design elevation of the top of the dam a minimum of 1 ft above the water surface for the design flow in the emergency spillway. • Constructed height should be 10% greater than the design to allow for set- tlement. • Base top width on the design height. • Set side slopes 2.5:1 or flatter. J • Determine depth of cutoff trench from site borings. It should extend to a stable, tight soil layer (a minimum of 2 ft deep). • Select borrow site-the emergency spillway cut will provide a significant amount of fill. Step 14. Erosion control. • Locate and design diversions to protect embankment and spillway (Prac- tice Standards and Specifications: 6.20, Temporary Diversions). • Select surface protection measures to control erosion (Practice Standards and Specifications: 6.10, Temporary Seeding; 6.14, ;Mulching; and 6.15, Riprap). • Select vegetation for emergency spillway to provide protection for design flow velocity and site conditions. Step 15. Safety. • Construct a fence and install warning signs as needed. 1 3.07.12 7 - F- _ i ;/ ? - \ // ,, ?, I EL "I/ 1. '?", ? I., 1 , I I" f ,o. // 1 > 00, l:? .. - ---'s =._ ------ _ .: \ /, ,.??- ? . .11 ? : , 7 I :/ - r -? _ ' - ?. __ - == . - - _ , - -- . -`-- - - 11 -,.-a. -- 11 --- I t. ., "I'll, i , - - n _ v S - - ? - --4-1-'-- . ? i a- '-'? - ? I , ? I -- I I , :?', \ , I -- f -- f t , , (, r. N ., - 1, I ;,. ? ; " I I - I I 1? " I - , I i,i: i ,, ? , , " ?, " " , -.,. I C ? , t 1 ; , 0 10 ? I ", . I . I" ? " , -? .." \ , , I 'o I ? ? " , 1- ?,,,, . , - - " I I ... . .. I , " p, ;// \ ._ - _._ ; / _? , , _ ?- _ > -.r--- - -- i i - t „? _ F .. ;., - - , , . , bl , , ?. ., v . -, ? - - ?t , ? ? /_ `I . _- - V \\ ? , _-_`• - , - - - -? , ?? _ _ ., ' \ ,: - _ _ _ - - - _ _ - _ __ - t m ? _?_ ? ? ' < I - " -- , ? , ?, ? ? ?. I . 1. ? I , ; I . I / I ,?, ! !'I " ..? ,?,,,,, ,?,, ,,, " l ,? __..- 1, , .. \\ . o., t \ , .. ?, z - V : I , A- " ,,, - I .1 CL ? I ? .--., " I", ? 9 . , : ?` . .: . ! V O-? _ .. - , , ' 1 . ,,-,\ / / - , j . / / /, \ // /. J) ^% ,1 , C C - - - . - .. , , , / / W , /, , / ` j ` , ?? , ; I li , , " , ? . , ?: \ ' V / , , ?' - ' ' I , , i , / I 11 ?1, ,, ?' i? \, ? \, \ ?,, , , , , ?, , ? -- , " ? , " \ \ ,'?, '., - ? \- I , ,, , ? '/- ' /I ? - "-""\ L?,?'j" "' 11 I , ??,); ?\, 11 / \ " /,' , .7fi IJ I r ?? - \ 1, I I ,-? , , " -, , I . "\,\,\\ , ? A \ ?'.,-, ,? .1? . , " _ , , 1? - '? - - " - - , - - " ? / / ?'O ,? i // rr t ?- , n v ?, - , , - r v - ?U, \ , - -, ?, I , ? ?,? \" ; . ? , - - , I I - - .. - - . 1 \l? / 1 {' / ??,' / / ?, ,,,,\??,,,",?, ??,, 1 v ? \ ,_ r \? ! „ r \? .t ? , ;" ,? ? , ? ? ,\ 1) . ? - ? - , I ? , \,, -, O 1 ) :"? ? / , 11 , ? , ? I , , , , I , ? - I- . I I I , \ 'I, 1, - " ?; I I " 11 1; 11 I - , " , I ; I , , I , ? I /'?, I , , , ?, \ , 'I, I , ,,;,?, ) " ,,, ? ,,,,,, I " , I \ I I / L ' ""\ ... . .. \" . .. " . 11 . " , , __ - / ?- ,. / /? ; .?." -; \ ' ; - /,\ - . ' s? . o?,? ?' y - _ 1 ?/ ?, , -- v , -- - ,, , ; ?? -- , - I -- 1 STORMWATER MANAGEMENT AND EROSION CONTROL REPORT For the Proposed UNIVERSITY CROSSING - PHASE I N. Tryon Street (U.S. Hwy 29) and W. Mallard Creek Ch. Road (SR 2472) Charlotte, North Carolina Prepared for REALTICORP, INC. 14120 Ballantyne Corporate Place Charlotte, NC 28277 ;? CA Prepared by C) FES3ip •!y'% Chris L. Price, P.E. a?0' SEAL V. -V • 029755 >w • i ioo0-o` GRAY ENGINEERING CONSITLTANTS, INC. 132 Pilgrim Road Greenville, SC 29607 G.E.C. Job No. 240078 January 10, 2005 I 1 TABLE OF CONTENTS Project Description 1 Soils 1 Town of JVake Forest Stormtivater 11anagement Requirements. 1 Site Location Nlap 2 Site Topographic Nfap. 3 Site 4erial iVfap 4 Site Hydrology 5 Pre-Development Conditions. 5 Post-Development Conditions 6 Permanent IVater Quality Requirements 7 Storm Drain and Rip-Rap Outlet Stabilization Design 7 Sedimentology 7 Erosion and Sedimentation Control Devices . 8 Tables: Table I. Pre-Development Area Peak Flow Summary Table II. Post-Development Area No. I Peak Flow Summary. 6 Table III. Post-Development Area No. 2 Pond Outfall Summary 6 Table IV. Post-Development Area No. 2 Peak Flow Summary. 6 Appendices: APPENDIX I Pre-Development Conditions Map Pre-Dev. Conditions SEDCAD Calculations Precipitation Figures APPENDIX II Post-Development Conditions Map Post-Dev. Conditions SEDCAD Calculations Pond Volume Calculations APPENDIX III Storm Drainage Map Storm Drain Design Riprap Outlet Protection Design Buoyancy Calculations APPENDIX IV Water Quality Design Temporary Sediment Basin Calculations Level Spreader Design Additional Calculations I J?J? STORNIWATER MANAGEMENT AND SEDIMENTOLOGY REPORT UNIVERSITY CROSSING - PHASE I CHARLOTTE, NORTH CAROLINA Project Description RealtiCorp, Inc. is,proposing the construction of the first phase of an office/retail park located in the City of Charlotte, North Carolina. The site is located on a 24.035-acre tract of land at the western quadrant of North Tryon Street (U.S. Highway No. 29) and West Mallard Creek Church Road (SR 2472). Refer to the Site Location Map. The project will include the construction of a city street, commercial drives, private roads, a stormwater detention facility, perimeter landscaping, mass grading, and buffer areas. This stormwater management report considers the pre-development and the post-development conditions for the entire watershed to the project site. The stormwater detention facility has been sized for the post-development conditions including the full build-out of all development including all outparcels. The total disturbed area for this project will be approximately 26-acres. Soils According to the Soil. Map provided by the City of Charlotte, the predominant soils in the project area are identified as Enon and Wilkes soils (see soils map attached). The Enon and Wilkes soils belong to the hydrologic soil group C. To be conservative, hydrologic soil group B was used to model the site hydrology. City of Charlotte Stormwater illanab ement Requirements The proposed development must follow the requirements set forth by the City of Charlotte. The following are a few of the stormwater management requirements for the City: • Stormwater Quality is required. • Analyze the 2, 10, and 100-year storm events • Desired that Post-Development release peak rates not to exceed Pre-Dev. release peak rates for 2 and 10-year storms • Emergency Spillway designed for 50-year storm event Please refer to Charlotte-Mecklandburg Stormwater Design Manual and the Charlotte-Mecklandburg Land Development Standards Manual for specific design requirements. Also, the design of the ponds must also meet the minimum standards for design criteria set forth by the North Carolina Department of the Environment and Natural Resources, Division of Water Quality, 401 Wetlands Unit. Page l of 9 210078-StorinSedReport-Rvv20050110. doc G ? .s 0 0, -^-? <o b a m' tiry ?9 ! F.rF SITE " CrG lpos 4? Pd rf 1 C7 _ C,q, ` f a4ffn ?f Q .1 3 4 0 0.28m1 SITE VICINITY MAP UNIVERSITY CROSSING - PHASE I City of Charlotte, North Carolina Not to Scale Cr ? cg,j, Page 2 of 9 240073-StomiSedReport-Rev2OO5OIIO.doc m 0 - ? WGSSCharlotte, North Carolina, United States 01 Jul 1996 i?- IV ' ? M L //,\ ` i ` t' t '- ? tai •'? i ? • ? ?, !? `' • :e ? ? , ' JJ \ yj (550`1 32 =.? 65 7 ! ff? 4 t'? ,,t o j /\^r r t t•' j t 4l ?4''? (?`\ fir.! /_? ? .-r'a? `•.?? 111 F m 100, 200, 100, N yds 100 200 300 USGS QUAD MAP UNIVERSITY CROSSING - PHASE I City of Charlotte, North Carolina prwl Page 3 of 9 240073-Stom1SedReport-Rev20050110. doc u 4 n SITE AERIAL MAP UNIVERSITY CROSSING - PHASE I City of Charlotte, North Carolina A ri ilk . ?,_ .. ?l »' r f i• C ?' 1 t ,11 X ??r . a. a' 3? am, ti 44-1 Page 4 of 9 240073-StomiSedReport-Rev200501 10.doe a Site HydroloV The proposed development's site stormwater management plan has been designed such that the post-development peak runoff rates are less than the pre-development peak runoff rates for the 2 and 10-year storm events. The emergency spillways have been designed to handle the post-development 50 and 100-year storm events. Rainfall data specific to Charlotte-Mecklandburg were used. The SEDCAD 4 method of analysis was utilized to produce the pre- and post-development peak runoff rates. All data and computations reported in the following narrative and presented in the Appendices reflect the SEDCAD 4 method of analysis. Refer to Appendix I for pre-development calculations and Appendix II for post-development and pond design calculations. Pre-Development Conditions The existing ground cover is assumed to consist of wooded areas. Even though some of the watershed is developed, it is assumed that adequate detention was provided to mimic their pre-developed conditions. Under pre-development conditions, the site drains in two directions; a slight ridge running northwest-southeast divides the east corner of the site from the rest of watershed. The majority of the site (Area #2) drains toward the southwest, to Mallard Creek. This creek is off-site yet features a 100-year floodplain that crosses the southern corner of the property. The creek also features a low flat wetland area that also encroaches onto the southern corner of the property. Eventually, Mallard Creek outlets to the south under North Tryon Street (US Hwy 29) flowing toward the Rocky River. Where Mallard Creek intersects North Tryon Street is our Point of Study (POS) #2. The east corner of the site (Area 91) drains to a 30" RCP culvert under North Tryon Street (US Hwy 29). This culvert eventually flows to Mallard Creek on the other side of North Tryon Street. The entrance to this culvert is our Point of Study (POS) #1. There is little off-site area draining to the site and none of the off-site area drains into the detention facility. The total watershed area studied under pre- development conditions is approximately 68-acres. Supporting hydrologic data and pre- development calculations can be found in the Appendix I. Fl S ow ummary Table I. Pre-Development Peak U G L U n PRE-DEVELOPMENT PEAK FLOW SUMMARY STORM PRECIPITATION PRE-DEV AREA NO.1 PRE-DEV AREA N0.2 EVENT (CFS) OUTFLOW (CFS) OUTFLOW (CFS) YEAR 2 3.12 5.38 26.47 10 4.80 11.87 86.68 50 6.48 18.88 159.10 100 6.96 20.92 181.14 Page 5 of 9 230073-StormSedReport-Rev200501IO.doc e r a i e t t e s M Post-Development Conditions Under post-development conditions, there is one (1) permanent on-site detention facility designed to detain the increased runoff from the proposed outparcels and most of the main site. The 360' of the northern most drive to North Tryon Street drains undetained to the 30" RCP culvert (POS #1) under North Tryon Street. Supporting hydrologic data and post-development calculations can be found in the Appendix II. Lable HL. Post-Development Area No. L PealcPlow POST-DEVELOPMENT AREA No.1 PEAK FLOW SUMMARY (POS #1) STORM EVENT (YEAR) PRE-DEV OUTFLOW (CFS) POST-DEV OUTFLOW (CFS) 2 5.38 4.36 10 11.87 6.74 50 18.88 9.11 100 20.92 9.79 "Table 11. Post-Development Area No. l Detention Outflow S STORM EVENT (YEAR) PEAK FLOW TO POND (CFS) PEAK OUTFLOW FROM POND (CFS) MAX. WATER SURFACE ELEVATION 2 45.16 4.73 597.03 10 72.63 25.96 599.14 50 99.76 72.49 600.25 100 107.47 85.30 600.56 TOP OF DIKE = 601.50 E.S. CREST = 600.00 TOP OF RISER = 598.50 POOL EL = 593.00 "1 able IV. Post-Development Area No. Z Peak Plow POST-DEVELOPMENT AREA NO.2 PEAK FLOW SUMMARY (POS #2) STORM EVENT (YEAR) PRE-DEV OUTFLOW (CFS) POST-DEV OUTFLOW (CFS) 2 26.47 24.99 10 86.68 84.52 50 159.10 192.79 100 181.14 221.88 Page 6 of 9 240078-S tormSe dRe port-Re000501 10. doc u Permanent Water Quality Requirements Based on the requirements by NCDENR and the City of Charlotte, both permanent water quality and post-development detention will be provided for this project. The wet retention basin (Water Quality Pond) for stormwater will be provided for the on- site permanent pond. Permanent water quality is achieved by using the permanent detention pond. Based on the drainage area and impervious areas to the pond, the required North Carolina Coastal Surface Area to Drainage Area (SA/DA) is provided with a permanent pool. Approximately 20% of the volume of the permanent pool will consist of a forebay. In addition to the permanent pool, the first one-inch of runoff from the site will be detained and released over 2 to 5 days from a temporary pool. For post-development detention purposes, the 2 and 10-year storm events will be attenuated to below the pre-development conditions for the respective storm event. One pond in the southern corner of the site near the existing wetlands will be used to achieve the detention and the water quality requirements. Also, the pond will successfully achieve the 85% total suspended solids (TSS) removal requirements as set forth by the NCDENR for the piedmont area. The pond shall be used as a temporary sediment pond during construction. The pond will also successfully handle the 100-year storm without overtopping the retaining wall. The pond will have a single outfall. This outfall has been designed such that it will handle the temporary pool volume and will be released upstream of the existing wetlands to a riprap apron and level spreader to slow flow velocity. This outfall has been designed such that it will also handle the remaining larger storm events and will release flow to the level spreader. Storm Drain and Rip-Rap Outlet Stabilization Design Refer to the site grading and storm drain plan for pond locations, grading, and layout configuration of the stormwater collection and conveyance system. The stormwater conveyance system was designed using the Rational method. The 10-year storm assuming a rainfall intensity of 7.0 inches per hour was used for design. The Rip-Rap Outlet Stabilization was sized based on the 10-year design flow determined at each pipe outfall. Refer to Appendix III for additional information. SedimentoloV In order to control sediment runoff during construction, the proposed on-site stormwater detention pond will be used as temporary sediment pond. As shown in the calculations below, the storage volume of silt per disturbed acre is greater than 1,800 cubic feet (67 C.Y.) per acre, implying that a minimum trapping efficiency of 80% for the 10-year storm event will be maintained. Page 7 of 9 230073-StormSedReport-Rev20050 t t 0.doc, In addition to the main detention pond, four (4) temporary sediment basins, all sized to be greater than 1,800 cubic feet per disturbed acre, will be installed during the initial phase of construction. Refer to Appendix IV for temporary sediment trap calculations. Best management practices such as silt fencing, inlet protection, temporary check dams stone check dams, riprap outlet protection, and stone mud-mats will be used to deter sediment-laden runoff from leaving the site. Calculations (Refer to Appendix 11 for pond volume calculations) Disturbed Acreage (on-site) = 20.61 acres Basin No. 1 Volume (Permanent Pool Volume) = 141,096 ft3 Storage / Disturbed Acre = 6.845 ft'/AC (253 C.Y./AC) Erosion and Sedimentation Control Devices 1. Construction Exits One (1) construction exit will be installed as per the plans and details. The location will be at the proposed entrance off West Mallard Creek Church Road to the new City road. It will be necessary to monitor and replace or repair these entrances as needed. 2. Silt Fencing Double rows of silt fencing will be installed along all the fill slopes. This barrier will provide added sedimentation protection. Silt fencing is also required around all topsoil stockpiles. Location of silt fencing is shown on all the erosion control plans. 3. Sediment Basins Four (4) temporary sediment basins will be constructed at the low points on the project site as shown on the plans and details. These basins are being used to provide sediment control for those low points which will exist during the beginning phases of construction. The sediment basins have been designed using the N.C.D.E.N.R. BMP Manual and the Charlotte-Meeklandburg Land Development Standards. The basins have been sized for 1,800 CF/AC of drainage area, the perforated riser and barrel have been sized for the Q1o using Rational, and the emergency spillways have been sized for the Q;o using C=3.0, H=0.5 in. or less. 4. Temporary Berms and Diversion Ditches Temporary berms and diversion ditches will be used to intercept sediment laden runoff from all the disturbed areas and direct runoff into the sediment basins. Page 8 of 9 240073-StortnSedReport-Rev200?0110.doc 5. Temporary Slope Drains with Berms Several temporary slope drains and berms utilizing stone check dams will be installed along the top slope of the wet detention pond in order to reduce sediment and flow velocity running down the fill slope into the pond. 6. Storm Drain Inlet Protection As added projection, anywhere there is a storm structure inlet proposed, inlet protection will be installed to filter any sediment from entering the storm drains. 7. Riprap Outlet Protection Anywhere there is a storm outfall, properly riprap aprons shall be installed to reduce flow velocity, minimize sediment-laden runoff, and reduce erosion. 8. Pond Outlet Protection The outlet from the detention pond will flow to an energy dissipater structure surrounded by a rip-rap apron. From this structure water will flow through a level spreader to the existing wetlands in the southern corner of the property. This system will be installed to reduce flow velocity, minimize sediment-laden runoff, and reduce erosion. Project Stases for Erosion Control This project will consist of generally three (3) stages of construction: ¦ Stage One shall consist of contractor mobilization and limited clearing only to install all initial temporary erosion control devices as shown on the Clearing Limits and Temporary Erosion Control Plan (CV-1). These measures include the construction exit off West Mallard Creek Church Road, silt fencing, wet detention pond, temporary sediment basins, temporary berms, temporary diversion ditches, and temporary slope drains. ¦ Stage Two shall consist of final pond construction, primary fill slopes on the south side of the site, retaining walls, and initial storm drainage construction as shown of the Grading, Drainage, and Erosion Control Plan (CV-2). Construction of the drives to West Mallard Creek Church Road and North Tryon Street shall take place. Additional erosion sediment control devices used during this phase include silt dams around catch basins, additional temporary slope drains (as needed), and vegetative matting to stabilize fill slopes. ¦ Stage Three shall consist of installation of concrete curb and gutter for the site, paving, installations of all utilities, highway improvements, and final stabilization and grassing. Refer to the Appendices for all calculations and refer to the detailed Erosion Control Plans and Details for all specific details, notes, and the construction sequences. 0 Page 9 of 9 24007 8-S tormSedRepo rt-Rev20050110.doc 60 1, L11 -? LO Lij cr) C) X, -j U) li CY) CC) 00 c , c rJ- olo ti;j°' LL 0, U) ' II fff M M ?_ i \ \\ LL -i U) x?' 71 < CL C14 CY) 1?y,' `Tl v •?Et;' !?t ??f.1`r i Cam; , M N / ??`w?? _ ?ti X111..• ?'???+` ti 1 / J II II %j? _ _ I X1 o 43, ? I E?a?? TIA, LL -i U) _ ), - - -Oc Not SEDCAD 4 for Windows r-,,i,h! 1aaA o,molo I Crhw.h UNIVERSITY CROSSING GEC #240078 Existing Conditions Basin I Paul J. Harrison Gray Engineering Consultants, Inc. 132 Pilgrim Road Greenville, SC 29607 Phone: (864) 297-3027 Email: cprice@grayengineering.com 1 Filename: 240078-existBasinl.sc4 Printed 01-10-2005 SEDCAD 4 for Windows l?nnvnnhf loan P-1. I Ghui?h General Information Storm Information: Storm Type: NR T e II Design Storm: 2 yr - 24 hr Rainfall Depth: 3.120 inches 2 Filename: 240078-existBasinl.sc4 Printed 01-10-2005 SEDCAD 4 for Windows Structure Networking: Type I Stru # ('fllotov) Stru # Musk. K Musk. X Description Null I #i =_> End 0.000 0.000 Basin #1 to P.O.S. #1 #1 Null 3 Filename: 240078-existBasinl.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,rinhf 1GOA De-.1. 1 Crhuroh 4 Structure Summary: Immediate Total Peak Total Contributing Contributing Discharge Runoff Area Area (ac) (ac) (cfs) Volume (ac ft) #1 5.320 5.320 5.38 0.3g A A e t e Filename: 240078-existBasinl.sc4 i Printed 01-10-2005 SEDCAD 4 for Windows (`nrnirinh/ ?OOA Domolo I Crh-h Structure Detail: Structure #.I (Null ) Basin #1 to P.O.S. #1 5 Filename: 240078-existBasinl.sc4 Printed 01-10-2005 i SEDCAD 4 for Windows r^nvrinhl IQGA P-J 1 C-H-h Subwatershed Hydrology Detail: Peak Runoff SWS SWS Area Time of Conc Musk K Curve Musk X UHS Discharge Volume Stru # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 5.320 0.085 0.000 0.000 72.000 F 5.38 0.390 5.320 5.38 0.390 Subwatershed Time of Concentration Details: Stru # SAS Land Flow Condition Slope Vert. Dist. Horiz. Dist. (%) (ft) (ft) Velocity (fps) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.00 5.890 0.016 #1 1 Time of Concentration: 0.085 6 Filename: 240078-existBasinl.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r- ., inh1 +oan D?-.1. I crh.unh General Information Storm Information: Storm Type: NRCS Tye II Design Storm: 10 yr 24 hr Rainfall Depth: 4.800 inches Filename: 240078-existBasinl.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r„ -hf to°{7 1 "H,..h 1 Subwatershed Hydrology Detail: Peak Runoff SWS SWS Area Time of Conc Musk K Curve Musk X UHS Discharge Volume Stru # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 5.320 0.085 0.000 0.000 72.000 F 11.87 0.907 5.320 11.8 0.907 1 0 • `{n'' Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert. Dist. Horiz. Dist. Velocity (fps) (ft) (ft) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.00 5.890 0.016 #1 1 Time of Concentration: 0.085 Filename: 240078-existBasinl.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,Hn hf 1 GOA D-i. 1 Crhwah General Information Storm Information: Storm Type: NRCS Tyne II Design Storm: 5 yr - 24 hr Rainfall Depth: 6.480 inches 1 Filename: 240078-existBasin1.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,-h1 100A P?-.i. 1 Crh.u.h 1 Subwatershed Hydrology Detail; I Peak Runoff SwS SWS Area Time of Conc Musk K Curve Discharge Volume Stru # Musk X UHS (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 5.320 0.085 0.000 0.000 72.000 F 18.88 1.503 Y- 5.320 18.88 1.503 50 • `f? Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert. Dist. Horiz. Dist. Velocity (fps) (ft) (ft) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.00 5.890 0.016 #1 1 Time of Concentration: 0.085 Filename: 240078-existBasinl.sc4 Printed 01-10-2005 1 1 1 1 1 1 1 1 e a s t a a e SEDCAD 4 for Windows Filename: 240078-existBasin 1.sc4 General Information Storm Information: Storm Type: NRCS Type II Design Storm: 00 yr 24 hr Rainfall Depth: 6.960 inches 1 Printed 01-10-2005 SEDCAD 4 for Windows (`nrn.rinh} 1ODA P-1. I Crh-'h 1 Subwatershed Hvdrolo9v Detail: Peak Runoff SWS SWS Area Time of Conc Musk K Curve Musk X UHS Discharge Volume Stru # # (ac) (hrs) (hrs) Number (c{s) (ac-ft) #1 1 5.320 0.085 0.000 0.000 72.000 F 20.92 1.682 S' 5.320 t20.92 1.682 I ww- -jrr Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert . Dist. Horiz. Dist. Velocity (fps) (ft) (ft) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.00 5.890 0.016 #1 1 Time of Concentration: 0.085 Filename: 240078-existBasin 1.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,rinh/ IGOA D-1. I GMuah 1 ?NIVERSITY CROSSING GEC #24007 Existing Conditions Basin 2 Paul J. Harrison Gray Engineering Consultants, Inc. 132 Pilgrim Road Greenville, SC 29607 Phone: (864) 297-3027 Email: cprice@grayengineering.com Filename: 240078-existBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,Iinhf IGOA D-1. I Ghuw.h 2 General Information Storm Information: Storm Type: NR T e II Design Storm: 2 yr - 24 hr Rainfall Depth: 3.120 inches Filename: 240078-existBasinIsc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,rinh/ 1 OCR 0?-.1. 1 CZ,H-h 3 Structure Networking: Type fl o ) Stru # Musk. K Musk. X Description stru # ( 1 l to Null #1 =_> End 0.000 0.000 Basin #2 to P.O.S. #2 #1 Null Filename: 240078-existBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,"i'M DOA P-1. I Crhwoh 4 Structure Summary: Immediate Total Peak Total Contributing Contributing Discharge Runoff Area Area (ac) (ac) (cfs) Volume (ac-ft) #1 63.080 63.080 26.47 1.99 1 a 1 t 1 Filename: 240078-existBasin2.sc4 Printed 01-10-2005 1 SEDCAD 4 for Windows r--ht iaoR P,i. I z,h-h 5 Structure Detail: Structure -= 1Nuli? 11 Basin #2 to P.O.S. #2 Filename: 240078-existBasin2sc4 Printed 01-10-2005 SEDCAD 4 for Windows ('-,-Ht IQQA 0-1. 1 Crhunh Subwatershed Hydrology Detail: 6 Peak Runoff SWS SWS Area Time of Conc Musk K Musk X Curve UHS Discharge Volume Stn # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 63.080 0.092 0.000 0.000 60.000 F 26.47 1.985 S' 63.080 26.47 1.985 CO- lt+r Subwatershed Time of Concentration Details: SWS Land Flow Condition Stru # o Slope (/o) Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) s tY (P ) Time hrs) # #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 Filename: 240078-existBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,,inhf 1GOR D?mnl. I Crh-h General Information Storm Information: Storm Type: NRCS T e II Design Storm: 10 yr - 24 hr 0% or Rainfall Depth: 4.800 inches Filename: 240078-existBasin2.sc4 1 Pnnted 01-10-2005 SEDCAD 4 for Windows r-,6nh} 1 OCR D-1. I Gh.uoh 1 Subwatershed Hvdrologv Detail: Peak Runoff SWS SWS Area Time of Conc Musk K Musk X Curve UHS Discharge Volume Stru # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) # 1 1 63.080 0.092 0.000 0.000 60.000 F 86.68 6.234 T 63.080 86.68 6.234 fir.--1 Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 Filename: 240078-exisffiasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,-Ht loan D?mul? I Crh.u.h 1 General Information Storm Information; Storm Type: NRCS Tye II Design Storm: 50 yr - 24 hr Rainfall Depth: 6.480 inches Filename: 240078-existBasin2.sc4 Printed 01-10-2005 L U. SEDCAD 4 for Windows (`nm.rinh} 1000. Pamclo 1 Cnh\.I?h 1 Subwatershed Hvdrolo9v Detail: L] 1 A e e Peak Runoff SWS SWS Area Time of Conc Musk K Curve Musk X UHS Discharge Volume Stru # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 63.080 0.092 0.000 0.000 60.000 F - 159.10 - 11.787 T 63.080 159.10 11.787 Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 Filename: 240078-existBasin2.sc4 Printed 01-10-2005 1 1 1 N e i t SEDCAD 4 for Windows r,-, nhf iQQA D-1. I Gh-h Subwatershed Hvdroloqv Detail: Peak Runoff SWS SWS Area Time of Conc Musk K Curve Musk X UHS Discharge Volume Slru # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 63.080 0.092 0.000 0.000 60.000 F 159.10 11.787 Y- 63.080 159.10 11.787 by -714, Subwatershed Time of Concentration Details: Stru # SWS Land Flow Condition Slope (%) Vert. Dist. Horiz. Dist. Velocity (fps) Time (hrs) #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 1 Filename: 240078-existBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows (`-,-hf IQQR P-1. I Crhwnh 0 D i a s t 1 e a L 1 Filename: 240078-existBasin2.sc4 General Information Storm Information: Storm Type: NRCS Type II Design Storm: C176 yr - 24 hr Rainfall Depth: 6.960 inches Printed 01-10-2005 SEDCAD 4 for Windows r,-,,in Ht 10°R P-1. 1 CZ,H-h U 1 r e C e 1 t a Subwatershed Hydrology Detail: Peak Runoff S S SWS Area Time of Conc Musk K Curve Discharge Volume A Stru # MuskX UHS (ac) (hrs) (hrs) Number (cfs) (ac-ft) # 1 1 63.080 0.092 0.000 0.000 60.000 F 181.14 13.538 63.080 181.14 13.538 (GU-%Iw-- Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 1 t 0 Filename: 240078-existBasin2.sc4 Printed 01-10-2005 N? 111 i `_. \???? ? \? I•`•. ?' \ 1 '`\'\`\ /' A AMA, 01 v J iCCC ) -? W LL ?1 Q o ?- il, m a- < EL p =i -- I (L C) LIJ (0 LO d m '?? LL J U) F- ?Y I J I I I I ?- o -,q A-\' s'77--- "4- LLJ CI) M W \` \ LL J _ v eA / i ,I --- / ? '? -, ?`___- -- -I -?. `. ?,, 11 . 1!. ?, G?'?I t ? I - #01 - -4- V _ ?_ I .l 1 r. / f I a 7 y 0- cc,01 Cf) pp cV W IL LLJ u) ?7 Q 00 on- CI4 LL -i U) Q 1 a ! ?` CIS 't w f / N J i:y LL J U) LL T w 1 \`\\\ c'j Po co Jj' uj h ,n Cam, '?' a- I- Vvv A V A' EL IJ 2.? ?v V1` \ V1 A , _j CL LL -i U) Vu / II 0 0/ LL -1 (1) CL oo 0 IL \\ \_ LL J CI) I- \ ` \ \ \ \ \\ \ \aD t' LET {? \1 (C ?C, 'C ; 9 ' V \; ? \ --?' ?? v ? ?? ??- J/i ? /._ / )`? i•/. `? /,??' ? -tea ,yf?e? vA ?` ` v V . _'- - 'i,' ?'/ T4, 0 \I I WI, 10 SEDCAD 4 for Windows r-,rWO iQQA D-1. I Ghwrnh 1 UNIVERSITY CROSSING GEC #24007 Proposed Conditions Basin 1 Paul J. Harrison Gray Engineering Consultants, Inc. 132 Pilgrim Road Greenville, SC 29607 Phone: (864) 297-3027 Email: cprice@grayengineering.com Filename: 240078-prop Basin 1.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r'--ht 1 OCR P-1. I Crh-h 2 General Information Storm Information: Storm Type: NRCS Type II Design Storm: 2 yr - 24 hr Rainfall Depth: 3.120 inches Filename: 240078-propBasin 1.sc4 Printed 01-10-2005 SEDCAD 4 for Windows e Structure Summary Immediate Total Peak Total Contributing Contributing Runoff Area Area Discharge Volume (ac) (ac) (cfs) (ac-ft) #2 0.340 0.340 0.81 0.08 #1 1.500 1.500 3.55 0.36 #3 0.000 1.840 4.36 0.44 4 Filename: 240078-propBasin 1.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-.m?ht 1 GOR 01-1, 1 q,H-h 5 Structure Detail: Structure 4 2 (Null Basin #1B to P.O.S. #1 Structure #1 (Null) Basin #IA to P.O.S. #1 Structure -Y 3 (Null P.O.S. #1 Filename: 240078-propBasin 1 sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,rinhr SODA Dp-I. 1 Ghv,nh 6 Subwatershed Hydrology Detail: Stru # SWS # SWS Area (ac) Time of Conc (hrs) Musk K (hrs) Curve Musk X UHS Number Peak Discharge (cfs) Runoff Volume (ac-ft) #2 1 0.340 0.026 0.000 0.000 98.000 F 0.81 0.082 0.340 0.81 0.082 #1 1 1.500 0.085 0.000 0.000 98.000 F 3.55 0.361 Y- 1.500 3.55 0.361 #3 1.840 4.36 0.443 Subwatershed Time of Concentration Details: Stru # SWS Land Flow Condition Slope (%) Vert. Dist. Horiz. Dist. Velocity (fps) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.05 5.890 0.016 #1 1 Time of Concentration: 0.085 #2 1 7. Paved area and small upland gullies 3.24 11.01 340.00 3.620 0.026 9. Small streams flowing bankfull 5.00 3.00 60.00 20.120. 0.000 #2 1 Time of Concentration: 0.026 Filename: 240078-propBasin 1.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r,-,-hf 100A D?mcla 1 Crhwah General Information Storm Information: Storm Type: NRC Type II Design Storm: 10 yr - 24 hr Rainfall Depth: 4.800 inches 1 Filename. 240078-pro pBasin 1.sc4 Printed 01-10-2005 e e e e e e s s t e s e t s e t SEDCAD 4 for Windows P'--inh} 1 OOA p-i- I Crh..unh 1 Subwatershed Hydrology Detail: Stru # SAS SWS Area (ac) Time of Conc (hrs) Musk K (hrs) Curve MuskX UHS Number Peak Discharge (cfs) Runoff Volume (ac-ft) #2 1 0.340 0.026 0.000 0.000 98.000 F 1.25 0.129 Z 0.340 1.25 0.129 #1 1 1.500 0.085 0.000 0.000 98.000 F 5.49 0.570 1.500 5.49 0.570 #3 1.840 6.74 0.700 (e-1112-- Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert . Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.05 5.890 0.016 #1 1 Time of Concentration: 0.085 #2 1 7. Paved area and small upland gullies 3.24 11.01 340.00 3.620 0.026 9. Small streams flowing bankfull 5.00 3.00 60.00 20.120 0.000 #2 1 Time of Concentration: 0.026 Filename: 240078-p ropBasin 1.sc4 Printed 01-10-2005 ISEDCAD 4 for Windows 1`n rinhf 10091 D-1. 1 C'nh-h P-- 1 General Information H Storm Information: Storm Type: NRCS Type II Design Storm: 50 yr - 24 hr Rainfall Depth: 6.480 inches L C? UJ L 0 n P n N Filename: 240078-propBasin 1.sc4 Printed 01-10-2005 s e s e e e a e e e e a i SEDCAD 4 for Windows (`nn..rinhf 10OA P?mnl? I Crh??nh 1 Subwatershed Hydrology Detail: Stru # SAS SWS Area (ac) Time of Conc (hrs) Musk K (hrs) Curve MuskX UHS Number Peak Discharge (cfs) Runoff Volume (ac-ft) #2 1 0.340 0.026 0.000 0.000 98.000 F I 1.68 0.177 0.340 1.68 0.177 #1 1 1.500 0.085 0.000 0.000 98.000 F 7.43 0.780 1.500 7.43 0.780 #3 S' 1.840 9.11 0.957 50 -n Y -- Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert . Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.05 5.890 0.016 #1 1 Time of Concentration: 0.085 #2 1 7. Paved area and small upland gullies 3.24 11.01 340.00 3.620 0.026 9. Small streams flowing bankfull 5.00 3.00 60.00 20.120 0.000 #2 1 Time of Concentration: 0.026 Filename: 240078-propBasinl.sc4 Printed 01-10-2005 e e e e e e e i w t e i SEDCAD 4 for Windows ("--ht 100A D?TUI. I Crhwnh 1 General Information Storm Information: Storm Type: NRCS Type II Design Storm: 100 yr - 24 hr Rainfall Depth: 6.960 inches Filename: 240078-propBasin 1.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,-ht 1009k Oomul? 1 Crhw?h Subwatershed Hydrology Detail: Peak Runoff Stru # S S SWS Area Time of Conc Musk K Curve MuskX UHS Discharge Volume A (ac) (hrs) (hrs) Number (cfs) (ac-ft) #2 1 0.340 0.026 0.000 0.000 98.000 F 1.81 0.190 0.340 1.81 0.190 #1 1 1.500 0.085 0.000 0.000 98.000 F 7.98 0.840 1.500 7.98 0.840 #3 S 1.840 9.79 1.031 1 I co-`in.-- Subwatershed Time of Concentration Details: Stru # S#S Land Flow Condition Slope (%) Vert . Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 7. Paved area and small upland gullies 2.83 24.00 847.00 3.380 0.069 9. Small streams flowing bankfull 0.43 1.50 350.05 5.890 0.016 #1 1 Time of Concentration: 0.085 #2 1 7. Paved area and small upland gullies 3.24 11.01 340.00 3.620 0.026 9. Small streams flowing bankfull 5.00 3.00 60.00 20.120 0.000 #2 1 Time of Concentration: 0.026 e e e i a Filename: 240078-prop Basin 1.sc4 Printed 01-10-2005 t a e i 1 1 1 a a SEDCAD 4 for Windows r-,,inhf 1Goa Domuh 1 c,h-h 1 UNIVERSITY CROSSING GEC #24007 Proposed Conditions Basin 2 Paul J. Harrison Gray Engineering Consultants, Inc. 132 Pilgrim Road Greenville, SC 29607 Phone: (864) 297-3027 Email: cprice@grayengineering.com Filename: 240078-prcpBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows (`nnrtinhf 10?A D?mula I Ghuioh 2 General Information Storm Information: Storm Type: NRCS Type II Design Storm: 2 yr - 24 hr Rainfall Depth: 3.120 inches Filename: 240078-prop6asin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows (`nnvrinh/ 100A P?mul? I Crhw.h Structure Networking: Type Stru # (into) Stru # M(hrks?K Musk. X Description Null #1 =_> End 0.000 0.000 Basin 2A to P.O.S. #2 Pond #2 =_> #1 0.010 0.443 Basin 2B to P.O.S. #2 #2 Pond #1 Null Structure Routing Details: Stru # Land Flow Condition Slope (%) Vert. Dist. Horiz. Dist. Velocity (fps) Time (hrs) (ft) (ft) #2 9. Small streams flowing bankfull 2.19 10.99 502.00 13.31 0.010 #2 Muskingum K: 0.010 3 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows (`--ht 1QQR Q-1. I Crhui?h Structure Summary: Immediate Total Peak Total Contributing Contributing Runoff Area Area Discharge Volume (ac) (ac) (cfs) (ac-ft) In 45.16 4.07 #2 20.610 20.610 Out 4.73 3.57 #1 46.070 66.680 24.99 5.65 Filename: 240078-propBasin2.sc4 4 Printed 01-10-2005 SEDCAD 4 for Windows iooA o-i. i c,h-h 5 Structure Detail: Structure =2 (Pond) Basin 2B to P.O.S. #2 Pond Inputs: Initial Pool Elev: 593.00 Initial Pool: 0.99 ac-ft Fixed Siphon k2Ht Eley Inlet Elev Outlet Elev Diameter (in) Length (ft) Manning's n 593.01 593.00 592.50 3.00 10.00 0.0130 Emeraencv Soillwa Spillway Elev Crest Length Left Right Bottom (ft) Sideslope Sideslope Width (ft) 600.00 16.00 3.00:1 3.00:1 30.00 Perforated Riser Riser Riser Height Barrel Barrel Length Barrel Slope Number of Diameter (in) (ft) Diameter (in) (ft) (%) Manning's n Spillway Elev Holes per Elev 60.00 5.511 30.00 16.00 5.00 0.0130 598.50 3 Pond Results: Peak Elevation: 597.03 Dewater Time: 2.36 days Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Elevation Area (ac) Capacity (ac-ft) Discharge Dewater Time (cfs) (hrs) 591.00 0.412 0.000 0.000 591.25 0.432 0.105 0.000 591.50 0.452 0.216 0.000 591.75 0.472 0.331 0.000 592.00 0.493 0.452 0.000 592.25 0.514 0.578 0.000 Filename: 240078-prop6asin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows rnm.rinhl lQQA O?mnl? I Cnh-h Elevation Area (ac) Capacity (ac-ft) Discharge (cfs) Dewater Time (hrs) 592.50 0.536 0.709 0.000 592.75 0.558 0.846 0.000 593.00 0.581 0.988 0.000 593.01 0.581 0.994 0.219 0.32* Spillway #1 593.25 0.582 1.134 0.268 6.30* 593.50 0.582 1.279 0.311 5.66* 593.75 0.583 1.425 0.350 5.04* 594.00 0.584 1.571 0.385 4.59* 594.25 0.585 1.717 0.416 4.45 594.50 0.585 1.863 0.446 4.10 594.75 0.586 2.010 0.474 3.85 595.00 0.587 2.156 0.500 3.65 595.25 0.588 2.303 0.525 3.45 595.50 0.588 2.450 0.549 3.35 Low hole SPW #3 595.75 0.589 2.597 1.990 5.30 596.00 0.590 2.745 2.600 1.45 596.25 0.591 2.892 3.072 1.15 596.50 0.591 3.040 3.473 1.00 596.75 0.592 3.188 3.828 1.00 597.00 0.593 3.336 4.150 1.30 597.03 0.593 3.357 4.732 0.60 Peak Stage 597.25 0.593 3.485 8.387 597.50 0.594 3.633 10.296 597.75 0.594 3.782 11.809 598.00 0.595 3.930 13.113 598.25 0.596 4.079 14.279 598.50 0.596 4.228 15.346 Spillway #3 598.75 0.597 4.377 16.336 599.00 0.598 4.527 18.033 599.25 0.598 4.676 32.461 599.50 0.598 4.826 49.543 599.75 0.598 4.975 67.429 600.00 0.598 5.125 68.536 Spillway #2 600.25 0.598 5.274 72.491 600.50 0.598 5.424 76.430 600.75 0.598 5.573 111.384 600.99 0.598 5.717 135.713 601.00 0.598 5.723 148.723 6 Vesignates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit. Detailed Discharge Table Filename: 240078-prop8asin2.sc4 Printed 01-10-2005 e i s e e s e e a SEDCAD 4 for Windows r-,-ht 1 aaR Domnla 1 Crh?u?h 7 Elevation Fixed Siphon cfs ( ) Emergency Spillway cfs ( ) Perf. Riser (cfs) Combined Total Discharge (cfs) 591.00 0.000 0.000 0.000 0.000 591.25 0.000 0.000 0.000 0.000 591.50 0.000 0.000 0.000 0.000 591.75 0.000 0.000 0.000 0.000 592.00 0.000 0.000 0.000 0.000 592.25 0.000 0.000 0.000 0.000 592.50 0.000 0.000 0.000 0.000 592.75 0.000 0.000 0.000 0.000 593.00 0.000 0.000 0.000 0.000 593.01 0.219 0.000 0.000 0.219 593.25 0.268 0.000 0.000 0.268 593.50 0.311 0.000 0.000 0.311 593.75 0.350 0.000 0.000 0.350 594.00 0.385 0.000 0.000 0.385 594.25 0.416 0.000 0.000 0.416 594.50 0.446 0.000 0.000 0.446 594.75 0.474 0.000 0.000 0.474 595.00 0.500 0.000 0.000 0.500 595.25 0.525 0.000 0.000 0.525 595.50 0.549 0.000 6.00>0.000 0.549 595.75 0.572 0.000 1.418 1.990 596.00 0.594 0.000 2.006 2.600 596.25 0.616 0.000 2.456 3.072 596.50 0.637 0.000 2.836 3.473 596.75 0.657 0.000 3.171 3.828 597.00 0.676 0.000 10.00>3.474 4.150 597.25 0.695 0.000 7.691 8.387 597.50 0.714 0.000 9.582 10.296 597.75 0.732 0.000 11.077 11.809 598.00 0.750 0.000 12.363 13.113 598.25 0.767 0.000 13.512 14.279 598.50 0.784 0.000 14.562 15.346 598.75 0.801 0.000 15.535 16.336 599.00 0.817 0.000 17.216 18.033 599.25 0.833 0.000 31.628 32.461 599.50 0.848 0.000 48.695 49.543 599.75 0.864 0.000 66.565 67.429 600.00 0.879 0.000 67.657 68.536 600.25 0.894 2.866 68.731 72.491 600.50 0.909 5.732 69.789 76.430 600.75 0.923 39.629 70.831 111.384 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r,-,r-h} 1 OOA O?mcla I Crh1U.h Combined Fixed Siphon Emergency Total Elevation cfs Spillway (cfs Perf. Riser (cfs) ( ) ) Discharge (cfs) 600.99 0.937 62.959 71.817 135.713 601.00 0.937 75.928 71.858 148.723 Structure #1 (Null Basin 2A to P.O.S. #2 8 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,-hr iooa PI-i. 1 -h-.h 9 Subwatershed Hydrology Detail: Stru # S#S SWS Area (ac) Time of Conc (hrs) Musk K (hrs) Curve MuskX UHS Number Peak Discharge (cfs) Runoff Volume (ac-ft) #2 1 20.610 0.047 0.000 0.000 93.000 F 45.16 4.069 E 20.610 45.16 4.069 #1 1 46.070 0.092 0.000 0.000 61.000 F 21.42 1.581 66.680 24.99 5.649 e -161 Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 #2 1 3. Short grass pasture 24.00 6.00 25.00 3.910 0.001 7. Paved area and small upland gullies 3.12 10.01 320.84 3.550 0.025 9. Small streams flowing bankfull 3.51 45.03 1,282.90 16.860 0.021 #2 1 Time of Concentration: 0.047 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r,-,inhf 100A 0-1. 1 Ghui?h 1 General Information Storm Information: Storm Type: NRCS Type II Design Storm: 0 yr 24 hr Rainfall Depth: 4.800 inches Filename: 240078-prcpBasin2.sc4 Printed 01-10-2005 1 1 1 e A 1 1 1 1 1 1 e e t 1 1 1 1 1 SEDCAD 4 for Windows r-,Hnhf 1009 R-1, I Crhunh 1 Structure Detail: lztructure =? LPornd ) Basin 2B to P.O.S. #2 Pond Inputs: Initial Pool Elev: 593.00 Initial Pool: 0.99 ac-ft Fixed Siphon Crest Elev Inlet Elev Outlet Elev Diameter (in) Length (ft) Manning's n 593.01 593.00 592.50 3.00 10.00 0.0130 Emeraencv Soillwa Spillway Elev Crest Length Left Right Bottom (ft) Sideslope Sideslope Width (ft) 600.00 16.00 3.00:1 3.00:1 30.00 Perforated Riser Riser Riser Height Barrel Barrel Length Barrel Slope Diameter (in) Diameter (in) Number of Manning's n Spillway Elev Holes per (ft) Elev 60.00 5.51 30.00 16.00 5.001 0.0130 598.50 3 Pond Results: Peak Elevation: 599.14 Dewater Time: 2.40 days Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Elevation Area (ac) Capacity (ac-ft) Discharge Dewater Time (cfs) (hrs) 591.00 0.412 0.000 0.000 591.25 0.432 0.105 0.000 591.50 0.452 0.216 0.000 591.75 0.472 0.331 0.000 592.00 0.493 0.452 0.000 592.25 0.514 0.578 0.000 592.50 0.536 0.709 0.000 Filename: 240078-propSasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows (`-,Hi hf IGOR 0-1. 1 Crh?u?h 2 Elevation Area (ac) Capacity (ac-ft) Discharge (cfs) Dewater Time (hrs) 592.75 0.558 0.846 0.000 593.00 0.581 0.988 0.000 593.01 0.581 0.994 0.219 0.32* Spillway #1 593.25 0.582 1.134 0.268 6.30* 593.50 0.582 1.279 0.311 5.66* 593.75 0.583 1.425 0.350 5.04* 594.00 0.584 1.571 0.385 4.59* 594.25 0.585 1.717 0.416 4.40 594.50 0.585 1.863 0.446 4.10 594.75 0.586 2.010 0.474 3.90 595.00 0.587 2.156 0.500 3.65 595.25 0.588 2.303 0.525 3.45 595.50 0.588 2.450 0.549 3.30 Low hole SPW #3 595.75 0.589 2.597 1.990 3.60 596.00 0.590 2.745 2.600 1.65 596.25 0.591 2.892 3.072 1.30. 596.50 0.591 3.040 3.473 1.15 596.75 0.592 3.188 3.828 1.20 597.00 0.593 3.336 4.150 1.30 597.25 0.593 3.485 8.387 0.75 597.50 0.594 3.633 10.296 0.30 597.75 0.594 3.782 11.809 0.30 598.00 0.595 3.930 13.113 0.25 598.25 0.596 4.079 14.279 0.20 598.50 0.596 4.228 15.346 0.25 Spillway #3 598.75 0.597 4.377 16.336 0.20 599.00 0.598 4.527 18.033 0.40 599.14 0.598 4.609 25.957 0.10 Peak Stage 599.25 0.598 4.676 32.461 599.50 0.598 4.826 49.543 599.75 0.598 4.975 67.429 600.00 0.598 5.125 68.536 Spillway #2 600.25 0.598 5.274 72.491 600.50 0.598 5.424 76.430 600.75 0.598 5.573 111.384 600.99 0.598 5.717 135.713 601.00 0.598 5.723 148.723 *Designates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit. Detailed Discharge Table Filename: 240078-prop6asin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows (`nn..rinhf 1002 D?mnl? 1 Gh.u-h is u s n s Elevation Fixed Siphon cfs ( ) Emergency Spillway (cfs ) Ferf. Riser (cfs) Combined Total Discharge (cfs) 591.00 0.000 0.000 0.000 0.000 591.25 0.000 0.000 0.000 0.000 591.50 0.000 0.000 0.000 0.000 591.75 0.000 0.000 0.000 0.000 592.00 0.000 0.000 0.000 0.000 592.25 0.000 0.000 0.000 0.000 592.50 0.000 0.000 0.000 0.000 592.75 0.000 0.000 0.000 0.000 593.00 0.000 0.000 0.000 0.000 593.01 0.219 0.000 0.000 0.219 593.25 0.268 0.000 0.000 0.268 593.50 0.311 0.000 0.000 0.311 593.75 0.350 0.000 0.000 0.350 594.00 0.385 0.000 0.000 0.385 594.25 0.416 0.000 0.000 0.416 594.50 0.446 0.000 0.000 0.446 594.75 0.474 0.000 0.000 0.474 595.00 0.500 0.000 0.000 0.500 595.25 0.525 0.000 0.000 0.525 595.50 0.549 0.000 6.00>0.000 0.549 595.75 0.572 0.000 1.418 1.990 596.00 0.594 0.000 2.006 2.600 596.25 0.616 0.000 2.456 3.072 596.50 0.637 0.000 2.836 3.473 596.75 0.657 0.000 3.171 3.828 597.00 0.676 0.000 10.00>3.474 4.150 597.25 0.695 0.000 7.691 8.387 597.50 0.714 0.000 9.582 10.296 597.75 0.732 0.000 11.077 11.809 598.00 0.750 0.000 12.363 13.113 598.25 0.767 0.000 13.512 14.279 598.50 0.784 0.000 14.562 15.346 598.75 0.801 0.000 15.535 16.336 599.00 0.817 0.000 17.216 18.033 599.25 0.833 0.000 31.628 32.461 599.50 0.848 0.000 48.695 49.543 599.75 0.864 0.000 66.565 67.429 600.00 0.879 0.000 67.657 68.536 600.25 0.894 2.866 68.731 72.491 600.50 0.909 5.732 69.789 76.430 600.75 0.923 39.629 70.831 111.384 3 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r`-, inh/ 1009 Damnlo 1 Gh-h 4 Combined Fixed Siphon Emergency Total Elevation cfs Spillway (cfs Perf. Riser (cfs) ( ) ) Discharge (cfs) 600.99 0.937 62.959 71.817 135.713 601.00 0.937 75.928 71.858 148.723 Filename: 240078-prop6asin2.sc4 Printed 01-10-2005 e e s e e s e e e e s e B e e s B SEDCAD 4 for Windows Subwatershed Hydrology Detail: Stru# S#S SWS Area (ac) Time of Conc (hrs) Musk K (hrs) Curve MuskX UHS Number Peak Discharge (cfs) Runoff Volume (ac-ft) #2 1 20.610 0.047 0.000 0.000 93.000 F 72.63 6.873 20.610 72.63 6.873 #1 1 46.070 0.092 0.000 0.000 61.000 F 66.55 4.801 66.680 84.52 11.674 t0-Kim Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 #2 1 3. Short grass pasture 24.00 6.00 25.00 3.910 0.001 7. Paved area and small upland gullies 3.12 10.01 320.84 3.550 0.025 9. Small streams flowing bankfull 3.51 45.03 1,282.90 16.860 0.021 #2 1 Time of Concentration: 0.047 Filename: 240078-prcpBasin2.sc4 Printed 01-10-2005 i SEDCAD 4 for Windows (?nn.innhf 1GOA D?-.Io I Cnh-.h 1 General Information Storm Information: Storm Type: NRCS T e II Design Storm: 50 yr - 24 r Rainfall Depth: 6.480 inches Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r--Ht 1002 GPTCIa I Gh.uoh 1 Structure Detail: Structure ;?:-? (Pcnd Basin 2B to P.O.S. #2 Pond Inputs: Initial Pool Elev: 593.00 Initial Pool: 0.99 ac-ft Fixed Siphon Crest Elev Inlet Elev Outlet Elev Diameter (in) Length (ft) Manning's n 1 593.01 593.00 592.50 3.00 10.00 0.0130 Emeraencv Soillwa Spillway Elev Crest Length Left Right Bottom (ft) Sideslope Sideslope Width (ft) 600.00 16.00 3.00:1 3.00:1 30.00 Perforated Riser Riser Riser Height Diameter (in) Barrel Barrel Length Barrel Slope Number of Manning's n Spillway Elev Holes per Diameter (in) (ft) (ft) (%) I Elev 60.00 5.51 1 30.00 16.00 5.00 I 0.0130 598.50 3 Pond Results: Peak Elevation: 600.25 5o-4 V2 - Dewater Time: 2.43 days Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Elevation Area (ac) Capacity (ac-ft) Discharge Dewater Time (cfs) (hrs) 591.00 0.412 0.000 0.000 591.25 0.432 0.105 0.000 591.50 0.452 0.216 0.000 591.75 0.472 0.331 0.000 592.00 0.493 0.452 0.000 592.25 0.514 0.578 0.000 592.50 0.536 0.709 0.000 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r`-,Iii hl IGOR D?mul? I Crh-h Elevation Area (ac) Capacity (ac-ft) Discharge (cfs) Dewater Time (hrs) 592.75 0.558 0.846 0.000 593.00 0.581 0.988 0.000 593.01 0.581 0.994 0.219 0.32* Spillway 91 593.25 0.582 1.134 0.268 6.30* 593.50 0.582 1.279 0.311 5.66* 593.75 0.583 1.425 0.350 5.04* 594.00 0.584 1.571 0.385 4.59* 594.25 0.585 1.717 0.416 4.40 594.50 0.585 1.863 0.446 4.15 594.75 0.586 2.010 0.474 3.85 595.00 0.587 2.156 0.500 3.65 595.25 0.588 2.303 0.525 3.45 595.50 0.588 2.450 0.549 3.30 Low hole SPW #3 595.75 0.589 2.597 1.990 1.60 596.00 0.590 2.745 2.600 2.55 596.25 0.591 2.892 3.072 1.45 596.50 0.591 3.040 3.473 1.35 596.75 0.592 3.188 3.828 1.30 597.00 0.593 3.336 4.150 1.80 597.25 0.593 3.485 8.387 1.05 597.50 0.594 3.633 10.296 0.40 597.75 0.594 3.782 11.809 0.30 598.00 0.595 3.930 13.113 0.25 598.25 0.596 4.079 14.279 0.25 598.50 0.596 4.228 15.346 0.25 Spillway #3 598.75 0.597 4.377 16.336 0.25 599.00 0.598 4.527 18.033 0.25 599.25 0.598 4.676 32.461 0.35 599.50 0.598 4.826 49.543 0.05 599.75 0.598 4.975 67.429 0.05 600.00 0.598 5.125 68.536 0.05 Spillway #2 600.25 0.598 5.274 72.491 600.25 0.598 5.274 72.494 0.05 Peak Stage 600.50 0.598 5.424 76.430 600.75 0.598 5.573 111.384 600.99 0.598 5.717 135.713 601.00 0.598 5.723 148.723 *Designates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit. Detailed Discharge Table 2 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-sink/ loon o?mu1n i 3 Elevation Fixed Siphon cfs ( ) Emergency Spillway cfs ( ) Ferf. Riser (cfs) Combined Total Discharge (cfs) 591.00 0.000 0.000 0.000 0.000 591.25 0.000 0.000 0.000 0.000 591.50 0.000 0.000 0.000 0.000 591.75 0.000 0.000 0.000 0.000 592.00 0.000 0.000 0.000 0.000 592.25 0.000 0.000 0.000 0.000 592.50 0.000 0.000 0.000 0.000 592.75 0.000 0.000 0.000 0.000 593.00 0.000 0.000 0.000 0.000 593.01 0.219 0.000 0.000 0.219 593.25 0.268 0.000 0.000 0.268 593.50 0.311 0.000 0.000 0.311 593.75 0.350 0.000 0.000 0.350 594.00 0.385 0.000 0.000 0.385 594.25 0.416 0.000 0.000 0.416 594.50 0.446 0.000 0.000 0.446 594.75 0.474 0.000 0.000 0.474 595.00 0.500 0.000 0.000 0.500 595.25 0.525 0.000 0.000 0.525 595.50 0.549 0.000 6.00>0.000 0.549 595.75 0.572 0.000 1.418 1.990 596.00 0.594 0.000 2.006 2.600 596.25 0.616 0.000 2.456 3.072 596.50 0.637 0.000 2.836 3.473 596.75 0.657 0.000 3.171 3.828 597.00 0.676 0.000 10.00>3.474 4.150 597.25 0.695 0.000 7.691 8.387 597.50 0.714 0.000 9.582 10.296 597.75 0.732 0.000 11.077 11.809 598.00 0.750 0.000 12.363 13.113 598.25 0.767 0.000 13.512 14.279 598.50 0.784 0.000 14.562 15.346 598.75 0.801 0.000 15.535 16.336 599.00 0.817 0.000 17.216 18.033 599.25 0.833 0.000 31.628 32.461 599.50 0.848 0.000 48.695 49.543 599.75 0.864 0.000 66.565 67.429 600.00 0.879 0.000 67.657 68.536 600.25 0.894 2.866 68.731 72.491 600.50 0.909 5.732 69.789 76.430 600.75 0.923 39.629 70.831 111.384 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r-,,inht 7008 D?-.i. I Crhunh Combined Fixed Siphon Emergency Total Elevation Perf. Riser (cfs) (cfs) Spillway (cfs) Discharge (cfs) 600.99 0.937 62.959 71.817 135.713 601.00 0.937 75.928 71.858 148.723 4 Filename: 240078-prcpBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows Pn-rinhl 100A D-In I Cnh-h 1 Subwatershed Hydrology Detail: Stru # SWS # SWS Area (ac) Time of Conc (hrs) Musk K (hrs) Curve Musk X UHS Number Peak Discharge (cfs) Runoff Volume (ac-ft) #2 1 20.610 0.047 0.000 0.000 93.000 F 99.76 9.716 20.610 99.76 9.716 #1 1 46.070 0.092 0.000 0.000 61.000 F 120.30 8.958 66.680 192.79 18.673 Subwatershed Time of Concentration Details: Stru # SWS # Land Flow Condition Slope (%) Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 #2 1 3. Short grass pasture 24.00 6.00 25.00 3.910 0.001 7. Paved area and small upland gullies 3.12 10.01 320.84 3.550 0.025 9. Small streams flowing bankfull 3.51 45.03 1,282.90 16.860 0.021 #2 1 Time of Concentration: 0.047 Filename: 240078-prcpBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows r -,rinhf 1OQA P-1. 1 Crhwoh 1 General Information . Storm Information: Storm Type: NRCS T e II Design Storm: 100 yr - 24 hr Rainfall Depth: 6.960 inches Filename: 240078-prcpBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows 1 Structure Detail: Structure i=? (Pcnd} Basin 2B to P.O.S. #2 Pond Inputs: Initial Pool Elev: 593.00 Initial Pool: 0.99 ac-ft Fixed Siphon Crest Elev Inlet Elev Outlet Elev Diameter (in) Length (ft) Manning's n 593.01 593.00 592.50 3.00 10.00 0.0130 Emeraencv Soillwa Spillway Elev Crest Length Left Right Bottom (ft) Sideslope Sideslope Width (ft) 600.00 16.00 3.00:1 3.00:1 30.00 Perforated Riser Riser Riser Height Diameter (in) Number Barre l Barrel Length Barrel Slope of Manning's n Spillway Elev Holes per Diameter (in) (ft) (ft) (%) Elev 60.00 5.51 30.00 16.00 5.00 0.0130 598.50 3 Pond Results: Peak Elevation: 600.56 Dewater Time: 2.44 days Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Elevation Area (ac) Capacity (ac-ft) Discharge Dewater Time (cfs) (hrs) 591.00 0.412 0.000 0.000 591.25 0.432 0.105 0.000 591.50 0.452 0.216 0.000 591.75 0.472 0.331 0.000 592.00 0.493 0.452 0.000 592.25 0.514 0.578 0.000 592.50 0.536 0.709 0.000 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows (`--hl 1QQQ D?-.I. I Crhunh Elevation Area (ac) Capacity (ac-ft) Discharge (cfs) Dewater Time (hrs) 592.75 0.558 0.846 0.000 593.00 0.581 0.988 0.000 593.01 0.581 0.994 0.219 0.32* Spillway 11 593.25 0.582 1.134 0.268 6.30* 593.50 0.582 1.279 0.311 5.66* 593.75 0.583 1.425 0.350 5.04* 594.00 0.584 1.571 0.385 4.59* 594.25 0.585 1.717 0.416 4.40 594.50 0.585 1.863 0.446 4.10 594.75 0.586 2.010 0.474 3.85 595.00 0.587 2.156 0.500 3.65 595.25 0.588 2.303 0.525 3.50 595.50 0.588 2.450 0.549 3.30 Low hole SPW #3 595.75 0.589 2.597 1.990 1.60 596.00 0.590 2.745 2.600 2.20 596.25 0.591 2.892 3.072 1.60 596.50 0.591 3.040 3.473 1.30 596.75 0.592 3.188 3.828 1.35 597.00 0.593 3.336 4.150 2.00 597.25 0.593 3.485 8.387 1.10 597.50 0.594 3.633 10.296 0.45 597.75 0.594 3.782 11.809 0.30 598.00 0.595 3.930 13.113 0.30 598.25 0.596 4.079 14.279 0.25 598.50 0.596 4.228 15.346 0.25 Spillway #3 598.75 0.597 4.377 16.336 0.25 599.00 0.598 4.527 18.033 0.30 599.25 0.598 4.676 32.461 0.30 599.50 0.598 4.826 49.543 0.10 599.75 0.598 4.975 67.429 600.00 0.598 5.125 68.536 0.05 Spillway #2 600.25 0.598 5.274 72.491 0.05 600.50 0.598 5.424 76.430 600.56 0.598 5.462 85.295 0.05 Peak Stage 600.75 0.598 5.573 111.384 600.99 0.598 5.717 135.713 601.00 0.598 5.723 148.723 Vesignates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit. Detailed Discharge Table Filename: 240078-propBasin2.sc4 2 Printed 01-10-2005 s e i s s i s a a e SEDCAD 4 for Windows r,-,Hi hf 1 OCR Dpmoh 1 Crhu,ah 3 Elevation Fixed Siphon cfs) ( Emergency Spillway cfs ( ) Ferf. Riser (cfs) Combined Total Discharge (cfs) 591.00 0.000 0.000 0.000 0.000 591.25 0.000 0.000 0.000 0.000 591.50 0.000 0.000 0.000 0.000 591.75 0.000 0.000 0.000 0.000 592.00 0.000 0.000 0.000 0.000 592.25 0.000 0.000 0.000 0.000 592.50 0.000 0.000 0.000 0.000 592.75 0.000 0.000 0.000 0.000 593.00 0.000 0.000 0.000 0.000 593.01 0.219 0.000 0.000 0.219 593.25 0.268 0.000 0.000 0.268 593.50 0.311 0.000 0.000 0.311 593.75 0.350 0.000 0.000 0.350 594.00 0.385 0.000 0.000 0.385 594.25 0.416 0.000 0.000 0.416 594.50 0.446 0.000 0.000 0.446 594.75 0.474 0.000 0.000 0.474 595.00 0.500 0.000 0.000 0.500 595.25 0.525 0.000 0.000 0.525 595.50 0.549 0.000 6.00>0.000 0.549 595.75 0.572 0.000 1.418 1.990 596.00 0.594 0.000 2.006 2.600 596.25 0.616 0.000 2.456 3.072 596.50 0.637 0.000 2.836 3.473 596.75 0.657 0.000 3.171 3.828 597.00 0.676 0.000 10.00>3.474 4.150 597.25 0.695 0.000 7.691 8.387 597.50 0.714 0.000 9.582 10.296 597.75 0.732 0.000 11.077 11.809 598.00 0.750 0.000 12.363 13.113 598.25 0.767 0.000 13.512 14.279 598.50 0.784 0.000 14.562 15.346 598.75 0.801 0.000 15.535 16.336 599.00 0.817 0.000 17.216 18.033 599.25 0.833 0.000 31.628 32.461 599.50 0.848 0.000 48.695 49.543 599.75 0.864 0.000 66.565 67.429 600.00 0.879 0.000 67.657 68.536 600.25 0.894 2.866 68.731 72.491 600.50 0.909 5.732 69.789 76.430 600.75 0.923 39.629 70.831 111.384 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 SEDCAD 4 for Windows (`-,-H/ 100A D?molo 1 Crh?unh Combined Fixed Siphon Emergency Total Elevation cfs) Spillway cfs Perf. Riser (cfs) ( ( ) Discharge (cfs) 600.99 0.937 62.959 71.817 135.713 601.00 0.937 75.928 71.858 148.723 4 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 e a e s e e a e e e 0 0 t t t e s t SEDCAD 4 for Windows f`nnvrinhl 100A Domnlo 1 Ghw?h Subwatershed Hydrology Detail: Peak Runoff SWS SWS Area Time of Conc Musk K Curve Discharge Volume Stru # Musk X UHS # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #2 1 20.610 0.047 0.000 0.000 93.000 F 107.47 10.531 20.610 107.47 10.531 #1 1 46.070 0.092 0.000 0.000 61.000 F 136.59 10.263 S 66.680 221.88 20.794 c CM --j r&- Subwatershed Time of Concentration Details: Stru # # SWS Land Flow Condition Slope (%) (ft) Vert. Dist. (Horiz.ft) Dist. Velocity (fps) Time (hrs) #1 1 3. Short grass pasture 7.32 9.00 123.00 2.160 0.015 7. Paved area and small upland gullies 1.14 1.99 175.00 2.140 0.022 9. Small streams flowing bankfull 2.92 89.99 3,082.00 15.370 0.055 #1 1 Time of Concentration: 0.092 #2 1 3. Short grass pasture 24.00 6.00 25.00 3.910 0.001 7. Paved area and small upland gullies 3.12 10.01 320.84 3.550 0.025 9. Small streams flowing bankfull 3.51 45.03 1,282.90 16.860 0.021 #2 1 Time of Concentration: 0.047 1 Filename: 240078-propBasin2.sc4 Printed 01-10-2005 lJ a 1J e i I j 1-1 0 u n J E E POND VOLUME CALCULATIONS DETENTION POND ELEVATION (FT.) SURFACE AS FEA DEPTH (FT.) VOLUME (C.F.) CUM. VOL. (C.F.) AREA (AC.) FOREBAY 589 2,518 0.058 1 2,831 2,831 590 3,143 0.072 1 3,488 6,319 591 3,833 0.088 1 14,565 20,883 592 5,209 0.120 1 15,323 36,206 593 6,865 0.158 MAI N BASIN PERMANENT POOL 587 8,632 0.198 1 9,168 9,168 588 9,704 0.223 1 17,760 26,928 589 10,835 0.249 1 18,382 45,310 590 12,025 0.276 1 19,030 64,340 591 13,275 0.305 1 19,655 83,995 592 15,755 0.362 1 20,895 104,890 593 18,431 0.423 TEMPORARY POOL VOLUME 593 25,296 0.581 1 25,366 25,366 594 25,436 0.584 1 25,503 50,869 595 25,569 0.587 0.5 12,816 63,685 595.5 25,569 0.587 2 -YR & 10-Y R STORAGE 596 25,696 0.590 1 25,756 25,756 597 25,815 0.593 1 25,872 51,628 598 25,929 0.595 1 25,982 77,610 599 26,035 0.598 1 26,035 103,645 600 26,035 0.598 1 26,035 129,680 601 26,035 0.598 0.5 13,018 142,697 601.5 26,035 0.598 CLP _ 240078-SDCALCS-P8.XLS 1/10/2005 G E C rvrv vvr JOB NAME JOB NUMBER PAGE NO. u?v? ?t2s i7H Lzoss?N -1= Esc 2,400'1% 1 JOB DESCRIPTION BY DATE 57q Se) i o?JQ t- ?'? o - 3 2 P. 3593 # '?? ?g2,So ?,a i C Y j 510 -SO 5 t .So- slo- o 8' 7 rT/4'(sol)(62,4) ( 712-j r ? s'o 5,q SO - 594 ,So Z.o 0/l L GRAY ENGINEERING CONSULTANTS. INC. / 132 Pilarim Road / Greenville.'SC 29607 / (854) 291- IUZi T series TINDALL CONCRETE PRODUCTS, INC. • P.O. BOX 1778 • SPARTANBURG, S.C. 29304 • TELEPHONE (803) 576-3230 c 1979 24 8 ° ? - T INS. D/A. rlYp _ G48 SECTIONS 2' SLOPE AS REQUIRED GASKET G60TT c 48" INS. DIA. ENLARGED JOINT VIEW ,j rW _ 1 O - -_ .13116' G60 - 64R W z cc U ° Z ?? ENLARGED SECTION OF co O-RING GASKET Cal ASTM C361 U-j __ j G60 BASES u_ 1 1 26" MAX. 8" 60" INS. DIA. ONE OR MORE OPENINGS OR FLEXIBLE CONNECTORS AS REQUIRED IN BASES NOTES: ALL STANDARD SEWER MANHOLE SECTIONS MEET OR EXCEED THE REQUIREMENTS OF ASTM C478. TWO LIFTING HOLES ARE PROVIDED IN EACH SECTION FOR ON-SITE HANDLING. PROPER STRONGBACKS OR LIFTING HARNESSES ARE REQUIRED FOR SAFE HANDLING OF SECTIONS. TINDALL CONCRETE PRODUCTS IS NOT RESPONSIBLE FOR DAMAGE OR INJURY DURING HANDLING. ALL STEPS INSTALLED IN MANHOLE SECTIONS HAVE SERRATED TREAD & TALL END LUGS TO PREVENT FEET FROM SLIPPING. BUTYL RUBBER SEALANT IS RECOMMENDED FOR SEALING JOINTS. O-RING GASKETS MAY RF 11RFn LOOZIOIII SIX 6Q S]IVOOS-SLDOtZ ap 00'0 OOZ 960 00.0 jL 91 CL Z£z 06V VL OSO 8L 6£Z jl dZ 6E'Z 00L S60 9E-0 dz 00'0 OO L 96.0 00 0 3 l LL9 !?? ZOL V60 VZ DSO 8l ESO 3l 3l-L ES'0 OOL 960 BOO 311 L99 3A. ES1 ELZ VZ OSO 8l SZ8 3L 3Z 66'0 00L 960 SL0 3Z ZE S ?3A V 6 090 V L 09 0 8L 9ZE 3Z 3E 9Z'E OO L 560 6V0 3E 00'0 OO L S60 00.0 GL SLZL ;3A LV9 2t, 19£ 090 or 9L SE OL Oz 00,0 00L 960 000 Oz LS 8 3A L ZV SO L L 9E 090 OE 8L SE OZ OE OOZ 00 z 96.0 OE '0 OE EVS ,FA 96 E80 VL 090 Bl 9VZ OE OLE 917 00L S60 LED OLE LZ LL '=;A E SS ZB L 9 Ic 090 Or ZL-OE OE 0V 00'l OO L 960 LZ O OV EVV 2L 990 VL 09-0 8t 00L OV OL -V 007 00Z 96.0 SLO OL-V 866 ?3A £-LE Z6 1 9 6Z OL L 1Z CE BZ OV OS r6'0 00 L 960 VL 0 OS C9t, OB 890 V'L 090 I 8L ZL-V OS OL9 ZL'f 00L 960 Z90 OLS LZ L L ''3A z-SE ZV z B VZ OZ -L /Z 8Z-EZ OS O9 9ZTZ 00 L 96.0 09 E O9 00'0 00-L 56.0 OOD OL Vt-9Z '3A ZBZI 8C6 06Z OSO Or 0062 0L OL 1 00'62 %09-0 dN.."9011 $1X3 OL-t 08 81 ':'=A ZEE 00 OL VZ 090 8L 00-Z OL OZ I 00'Z OO L 960 OE O OZ l 99 V 4 Z 8 L90 V'L 090 8t ESZ Ol OZ EL'L OO L 960 9Z0 Oz SLB ;3A L6 SLO VL 090 8L 09.0 Oz OE 08'0 00L S60 z10 OE 00'0 00Z S6.O 000 Bt 9V OE "_A 699Z 106 0LEL OZZ 00, SLCLZL 81 BZ ZS"9 OOL 960 86.0 Sz Z9 VL ?3A 91ZL 60Z 611Zt 00z 01 EZ-LZL 8z Be 00'0 00z 960 00.0 BE LE BL ""A 11 UL LLE 969 080 9E 9Z 93 Be BLE 9Z'99 00L S60 918 OLE 11Z V ?3A S-L 1S 0 V'L 09.0 8t 90c Be 9ZE 91"t 00 L 960 zz 0 8Z E B6 -V '3 A. 8 B OL 0 V'L 09 0 81 OO Z 8ZE BE E 007 00 L 960 OE O BE E K SL ;-3 A, E SL LE E S £9 OVZ Or LS L9 BE BV EE'! OO L S6.0 Oz 0 BV SzV 3A 9L 190 VL 090 BG 6L 11 BV GL t, 6L"1 00L S60 ZL0 BL t, VE L L '=A 0 OZ V9 r, V'L 090 BC 6L 9 8V BZ V 6L'9 OO L S60 LB 0 9Z V L9 Dl '34 E ES 69 L 6 1S 09 L of t9 6V 8V BS 19'0 OO L 960 OL O BS Sz V r3A 9L LSD VZ 09 0 8t 990 8S BLS 99'1 00 L 960 OL 0 B L S V08L '?3A 6 LE LZ6 L'9 090 8L 901 99 13Z9 90'L 00Z 96.0 901 8z9 ES zt '3A E 6£ EO'E Z 6E 00 E 1Z VZ LE BS 89 00'0 00 L 96.0 000 99 OZ 6 ?3A 6 8Z C9 L 09L 090 OZ OEE L 89 G IL 9 OE'EL 00-L 960 OO Z B L 9 OZ 6 ;3A 6 8Z E9 1 B Sz OE- L 1Z V6 CZ 89 8L L9'0 OO L S60 NO SL 999 -'3A L LL Sz L S-LL OZ L 8t L9 DL 8L BL -L 01'l 00L S60 LZO BLZ EVZ ''3A L CL 99 L S-OL 00 L 8l LL 6 81 L 9Z -L W6 00Z 960 LE L 9Z L L99 !3A LSI 00z BVL 00z 8L LLZL 9L 08 88'0 00L 960 EL -0 89 OSL ;3A Z -EL 65l 6ZL OSL at 061L 99 86 09'L 00L 960 VZ0 86 959 'z3A 9L1 ZZ-L SOL 00-L 8L 11Z6 86 91,6 /Z'6 00L 560 6E-1 9L6 CV 9 '3A 96 E9 0 V L OS -0 8[ 90 L 2 0 86 SOL L9'0 OO L "0 O1 0 80 L L6V "3A L9 890 VZ 090 8l , O V BOL BLL 010 00L 96.0 900 9LL VL OR VL 8G VL9z V1 Vz VZ XVW s{a/ aD a e0 % ofS A100-73A Ld0 < a0 leraaV lomoy sla •0 lvo dro did % ofS wnww w u :ZIS 00!d pap0awwoa0a 0 Mold ?Aa" ,w , 0L wo/j sia M014 4N !ly01e21 walayyao0 'ac euy # u?4aMS e 0!Slaz!S a !d p0p0aww000d swn;3rulS 0; ,Hold pa 0lanap S00 L/L Six Ed-50l V 00S-9L009Z dl0 - 464 99869 - 09-C09 -M'H dL OV 9£ 0 001, OS 969 05669 CC 009 .9NIM. dZ 9L'CL 6C'Z 00 £65 09'969 06 4 at LS dL dZ - 46"4 99.965 - 09009 ,ON-'H"W. 3L OV 800 5Z"£ 09 665 SL 209 - .ON-'0'H. 3L'L LES C4'O 99869 OS"66S 460 8L 69 9L 31' L OV SL O 09'C OO L09 09409 - ..ON= 1"J. 3Z L9 8 9Z9 99965 00 L09 £L'Z at OIL 9L 3Z OV 64.0 09 4 04109 06909 CL-909 ..0NIM. 3£ Z£ 9 9Z'C OO L09 04 L09 09.0 at OS 3Z 3C - - 9I "SC - - '03 OL OV 000 OZ "9 08 CZ9 - 000£9 :H W. OZ 9L'LL 8V9C 00 £Z9 09 CZ9 LZ'4 OE 6L O1 OZ OV 0£"0 044 09 4Z9 06'BZ9 - :J "H.. or L98 SL 9C OL"CZ9 09 4Z9 90 L OE 9L OZ O£ OV L£"0 OZ 4 OLf4Z9 06 BZ9 - :0-H.. OLT £4-S 94'2 09 4Z9 OL 429 09 0 at 4Z 0£ OL"£ OV LZ 0 OZ'4 OC 6Z9 09B£9 - J'H. O? LZ' l l ZL OC OS 4Z9 0£6Z9 Z8" L OE 49Z O£ or OV 9L 0 00 4 09 M 09 CC9 - : 9 H. OL-? 64 4 00- L OC 6Z9 09 6Z9 990 at 9C O4 O L'4 OV 4L'0 9Z'4 S£ 4C9 09809 - :`J H. OS 866 CC'8Z 0£"6Z9 9C K9 Z6' L ?Z £9Z O4 O9 OV o 00 4 4£9 09'9C9 - ? H= L-S C5 4 ZC4 SC 409 094£9 290 at C4 05 C V9 OV R o 9CL 4Z-049 - 00849 4 _ .ONW.. 08 lZ'll BZCZ SC'4C9 42049 Z4Z ?Z £4Z OS 09 - 00895 006Z - 00'Ll9 .ON-H OL 1SIX3 099 00ZL9 - 09BL9 .ON - HW. 0 VX 4L 9Z 006Z C9 L09 00ZL9 8L6 OE 901 2L OL'L OVOCO 091, 09OL9 009L9 C99L9 099L OOZ 04L09 09OL9 OOOL at LC Ol OZL OV 9Z 0 SL "4 SL'OL9 06 4L9 - .'D = 994 r C9Z 0V OL9 SL"OL9 L9 0 at LS OI OZ OV ZCO 00 4 06 0`9 O6419 - H. Or gk"S 090 9['019 06'OL9 SL'O at OZ OZ O£ - - 00689 - - "OMn BL OV 86 0 OL'L 09569 OS C09 CC 409 : I'M. 9Z 84 OC 9L M 00689 08-969 L0 6 06 SL E31 8Z OV000 04'4L 0 L"009 - 094L9 :H W. H£ Z9 4L CZ"LZL 09969 OL"009 60'Z 06 90Z BZ 9C OV94 8 £9"6 00'2`9 00'LZ9 £8 LZ9 .'I'M.. 9L-£ I£ 9L 9Z 99 Ol"009 00'Zl9 LL C 9£ 9L£ 9C BL'C OV ZZ 0 CC 4 00 `09 CC 909 - 9 H. 9ZT 4Z 4 91, C O L 009 00 L09 L90 at LL L 8£ BZ"C OV OC 0 00 4 £C' L09 CC 509 - 0 H. 9ET 86 4 OO Z OO L09 CC L09 OL 0 at L4 BZ C 8£ £ OVOZ"0 04'ZL 0 L"C09 09 9L9 - H. HI 4C SL L9, 19 OL"009 OL'C09 LC £ or 69 BC 94 OVZLf0 00'4 09909 090`9 CC"LL9 .TM. BL-? SZ4 6L4 08909 09909 L90 at LCL 94 804 OVLB0 00'9 00'219 00919 £9BL9 .TM 9Z'? 4£'LL 6L'9 00 00 00'ZL9 49"C at 55 84 9Z"4 OV OL O OL IL OC 909 00 SL9 - .0 H. 9S LB OL L964 OL"C09 0£909 69'L E 69L 84 99 OV OL'0 001, 00 609 00 C L9 C8 CL9 TM. 91.9 SZ"> 99 4 09 809 00609 L9 0 at 96 89 a vg OV90'L 009 00'M 00'9L9 C8BL9 :I'M. 9Z-9 409L SO "L 09809 00 Z19 LZ6 L 9£ 89 BZ9 OV 00 0 04 6 09 L L9 00 LZ9 : H W. 99 CSZ L 4Z'LC OC909 09L l9 £0 £ Z r SL L 89 89 OVOOZ 004 OSZL9 099L9 CCLL9 .IM.. 0V9 OZ6 0£CL 09LL9 OSZL9 950 Z Z9L 89 8L9 OVOL0 05'S 9ZOZ9 SL 9Z9 - H. 9L OZ6 46 CZ 00LL9 SZ OZ9 C9L Z 66L 89 9L OV lZ 0 SZ 9 09 OZ9 W'M - .'O'H. 9LY 99 9 l9'0L SZ OZ9 O9 OZ9 9ZL L OZ 9L B LL OVLCL 004 OOlZ9 OOBZ9 £8529 lM. 9Z'L £4'L 116 09029 OOLZ9 9SL k Z£ 9LL BZ'L OV C L'O gall 04.929 SZ' IC9 - H. 88 LS 9 LL'Z L 9Z OZ9 04 929 80Z at 96Z at 89 OV 4Z"0 091, 9L 9Z9 SZ' LC9 - .'0 H. 96 OS L 06' L L 04 929 SL 9Z9 69' I at ZZ 89 96 OV6£'L 094 OZ LZ9 00'2£9 £9'ZC9 .'I'M. 91'6 999 4Z-6 SL 9Z9 OZ'LZ9 ZZ"L at LC 86 816 OV 000 SL "4 7=229 9Z'LC9 - .'0 H. BOL £4-S 90 1 9L M OL'LZ9 C8 0 BL Z4 86 90l OV900 004 SZLZ9 SZ'LC9 - J'H. 9LL L611 040 OL-LZ9 9Z"LZ9 990 BL ZZ 90L 9LL - - 00Z69 - - 0'3 VL OV L9 OZ 002 09065 OO C69 09 969 5.O VZ 08'>L 00"LZ 00Z69 09 Z69 C L'C ?Z 9L V L VZ V32IV ('Id) Hld30 A313 W18 'A313 a13M -A313 Li3A00 3d11 ON (Sdd) XtJW-D`A ISdO) 0i0 kc,3'ldd3 ON31dNl / 3dO1S lNU VIO Cld) HlON31 Ol WOild 19-NI d01 NO IIVA3131H3ANI 3did 3anlonals 3lnO3HOS NIVNO WUOl S C 0 W s ? V? m W _ ?-- ?? l l ? r \ ? ? u ???t f? / vii .,?,, ? t'J? }1..?e , -?•;?': Y ? `J ?? ??\?\ i ?\ - ?$? .i_- ?€ `? , ? ? _; •,.?-rte ...... _"..:..--- IC5 ? I R 1 C:o I `\ l j? ` 1 t, 9 t l \ `? I I e t A 1 1 1 1 1 e a r, ¢w ON Z 3 j ?v ? N ? o o? ?o N V Y O Q H''z O z Q LLJ O i o '1 Il ' a- N U/ . J U j W n _ a- O O Q? c- a. O O I I ? OO w (r ? u u N U U 0 0 N N Vl W U G O O 9 ? N I W a N W a ? U ? O O 9 n w ? ? I Q a ° - z J ° a ? Z O a z ¢ r ? o °n O O m ° a W J WNI W z J 0 W U V1 N O °.. 3 Of w 5 0 z z d J G aM a o I w J J III ? m ? O O Si co w U W z J O ° J 2 J <Z- 0z < Q ?<O UU a W W w. N 5 h i O I ? W J O Q Z O IJ w ? Z ? O ° ry ? z Q U ° F- W Q V7 a U a- F Cn cn (n w cn O m Q U oa z? NZ' nr, O - ?w W w I- Z ? O w O ? rl n d 4 U, it I j 1j" E C JOB NAME JOB NUMBER PAGE NO. UAJ I V Ee(, I C 1Z0 'e7 ' Pl * t?'-- Z?007 JOB DESCRIPTION (,-E?VEZ, SPA D?IZ sic?l? BY G?-P DATE %s GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / (864) 297-3027 u F s ri t 0 I I 1 u 1] E C w?•H JOB NAME JOB NUMBER PAGE NO. N IVew-)C7f TLI ?L S& 1 Z 4w7e JOB DESCRIPTION BY DATE ?451n? -1?1Aroe u?}? i D57-. Z- 0?, GRAY ENGINEERING CONSULTANTS, INC. 1132 Pilgrim Rcad / Greenville, SC 296071(864) 297-3027 e p"ll 0 L'I u e u ? G E 0 ?rH =wr Jos NAME JOB NUMBER PAGE NO. (,f NI VgiS; 17-11 6U-elsj Z ?v7f JOB DESCRIPTION BY DATE ?i jR?stw LESIC,,.? GGIG ??'?'los 4o - --- ---- _ __ _ ?- - - ( usE 1 B 1 B pm) /?oav C]?P!1p11G^D?61!`_ l?AAICf II TAAITC IKIt` 11,21) Dilnrim C7nor1 / Mrccnvillc Qr, vaRn7 / 1APAI 907..,;n97 u r? G v D 0 t 11 u F?', I , t 11 J G E C JOB NA/ME 610??lju JOB NUMBER PAGE NO. UIVIV9-2;1711 ZLb 07q JOB DESCRIPTION BY DATE s5vimv-? `F,+slw LES?c,r.? 6I p cp/%s ^C2 AV >=a1n/A1C?D1•If'`_ /?f1A1Ci 11 'rA KITC IAICI I I'll) Dilnrim Cnori / rSraar-willa CP : 9QAn7 / /RFC11 9Q7-.;(177 5 0 Cl 0 r -l j?j u t11 i E I 1 u L Al'-- NAME / JOB NUMBER PAGE NO. JOB (,lit/1VF-A;171.1 C?2o?S?04? - N 5iEr ..? Z qab-7? JCS DESCRIPTION BY ATE R+siw t--F?Ic,,. GL.IC' %S ^c av ?a?r+?ic ?Hlwtf! /??1?IC111 TA k"Q IAit` 1 110) Dilnrirn ?nori / (-rocnvillo C(: 7CR07 / 19Rd1 9Q7.'gM)7 t Cl 1 J E E 0 t 0 n L I Il 51 A-.?' JOS NAME JOB NUMBER PAGE NO. JOB DESCRIPTION BY DATE f GRAY ENGINEERING CONSULTANTS, INC./ 132 Pilgrim Road/ Greenville, 5(; 29bU/ i (ab4) 4V1-,)Ue-1 OVERLANp CN_NEL? 40 4 K= 900 30 3 S00 0.016 ` 700 0.o2(P.VUT3 25 5 2 600 . OD3 ; `. 500 OD4, 400 = 0.05 20 2 ,? t N 0.10 o 0.15 300 0DI = ?' 0.20 : c Ad BAIK MC ZD 50K-) 0.30 0.40 J d 0:50 ? W IS I.S M 0 C J .()o ~ W W 200 _ J _ . r 12 .30 (POOR GRASS) _ W CL. - t.SO _ u . = 0.03 040 (AV RASS) F- 0 J v? 3.00 4.00 2 1" . G :,. 5.00,- -- - ° 0.04 0 F. H % W 0.60MENSEGRASS - u cr- 10.00 0 a F?- 0 0 1 c 00 0 06 v? 20.0 Z . 90 . 1.00 U 0 J 04 o l 9 0.! i TO 0.10 ? 0 ® 0.9 j0 t ? ? .1 t•- T 0.T - 40 `\ 6 0.6 30 . S 0.5 2'0 4 0.4 NOMOG RAPN..FOR TIME OF CONCENTRATION 3 0.3 Figure 3-1 Saurrw Austin Taza a Drsinapa Manua! 3-13 r r r r• r i r _ J f- W W W U f- an r 0 T 0 J 4. r r 1 1 r r r 1 0LI 900 s00 0.016 700 0.02(PYIATJ 600 OD3 r' S00 04 r` 0 . 400 ac s 005 OD I z / \ c (HARE XZD 30 K. jc z ? J 200 J 0.02 0.20 ° _ w 0.30 (PQOR GRASS) _ 1 093 0.40 (AV. GRASS) ~ / o O.G4 0\ w 0.80 CDEHSEGAASS ICAO 0.06 \ 1.00 \ ° e0 \ .70 410 W 50 40 3a 20 OVER!_AN CHANNEU2E1 r- 40 r- 4 h 0.10 0.15 = 0:20 0.30 0.40 30 F--3 23 2.5 2 W 0:50 / .a. tir 13 I.S 1.00 W 1.50 4 2.06. .00 Z in '4 00 W 5.00 =o w - ?? \10.00 a = 00. \20 ?- 10 0 1 v i .. . z . U L a • 0.9 ?- 0.T b 0.6 5 0.5 4 ` 0.4 NOMOGRAPH..FOR TIME OF CONCENTRATION Figure 3-1 3-13 3 ?-- 0.3 Saun:.a: Austin 7azaa Grainaaa Manua! OVERMAN CHANNELIZEI r--40 r- 4 1C= ODi 9CA 000 0.016 700 0.02(PVUTa 600 OD3 500 OD4 li O.QS? 400 ' ODIC o.a W ? ^! J ? 0.20 _ W ? W 2 ? z Z = \ 0D3 0:3Q (PQOfi GRASS) ? 0.40 (AV. GRASS) 0.04 ' . 0.50 e O w 0:800DENSEGAAS3 0 100. 0.06 `• 3C !0 D LG01. ` 0 0.0 0 ?\ . 70 0.)0 50 40 30 _ 20 30 3 25 2.5 ZQ 2 N 0.10 ? O.IS 0 20 _ = : 0.30 , . 0.30 - = W 0.50 W 15 I.5 I ,50 2 .00 Vi .00 z N 5.00 0 u SQ. Q / ' 20.00 ~• l0 ` L0 , ` 9 0.f 0 6 0.8 t trl S, t F- T 0.7 a 0.6 5 0.5 NOMOGRAPH. FOR TIME OF CONCENTRATION Figure 3-1 3-13 4 0.4 3 0.3 Sauma: Aurtin Tazaa Drainage Manual r OVERLANQ CHANF(EIIZEI ?-- 40 .-4 K= 0111 900 30 3 b00 0.016 700 O.o2(PVUTa . ? - 23 2.5 600 OD3 ' 500 0D4 400 20 2 0.10 o \ 0.13 ODI z - ?, = 0 0 .20 300 ,? W as (9 M,C ZD $0x- ui ; v O as 0 ? 0:5 N J ;1 ° CL L r IS LS W 2Ca ~ 0.02 0.20 _ Z __ t 4 `; Ic - I.00 1.50 _ 0.30 (POOR GRASS) tiW ti 2.00 00 r x 150 = OD3 0.40 (AV. GRASS) F- J rn . 4.00 v 0 04 0.30 r i h / 0 W . 80(DENSF-CAxs3 0 ? , `, 10.00'•, a ~ . . 20. 00 -10 1.0 o O Q 0.06 39 ?0 M 1.00 v a .J 00 ° 9 - 0.f 1 . U 70 410 o a O.a a+0 W r t- 7 7 0 50 . O.L 30 - L ZO 4 0.4 NOMOGRAPH..FOR TIME OF CONCENTRATION 3 0.3 r Figure 3-1 Saute: Aurtin ?exam Drainage Manua! r 3-13 1 ? 3.5 Design Fre quency . Design Descriatian' ©esis*n Storm Frequencies 3.5.1 Stomt system P pe; 10 yr. pitch systar;M ?g yr. Wver t?; (subdivis;on -4rn=) Z5 yr, . . l?i?terts (tttarau>?rfare raat€s}?, 5E1 Y.E........ ......;:: Rainfall Intensity 3.5.2 Storm Duration hours 0 1 2 3 6 12 24 Table 3-3 Rainfall Intensities - Charlotte, North Carolina Rainfall Intensirv(in./hr. ) Return Period (Years) minutes 2 3 5 10 25 50 5 5.03 5.60 6.30 7.03 8.21 9.00 6 4.78 5..33 6.02 6.75 7.89 8.65 7 4.55 5.09 5.76 6.49 7.59 8.32 8 4.34 4.88 5.53 6.26 7.31 8.03 9 4.16. 4.68 5.32 6.04 7.06 7.75 10 3.99 4.50 5.12 5.84 6.83 7.50 15 3.33 3.79 4.35 5.03 5.87 6.46 16 3.23 3.67 4.22 4.89 5.72 6.29 .17 3.13 3.57 4.10 4.77 5.57 6.13 18 3.04 3.47 3.99 4.65 5.43. 5.97 19 2.96 3.37 3.89 4.53 5.30 5.83 20 2.88 3.29 3.79 4.43 5.17 5.69 21 2.80 3.20 3.70 4.32 5.05 5.56 22 2.73 3.12 3.61 4.23 4.94 5.44 23 2.66 3.05 3.53 4.14 4.83 5.32 24 2.60 2.98 3.45 4.05 4.73 5.21 25 2.54 2.91 3.37' 3.96 .4.63 5.10 26 2.48 2.85 3.30 3.88 4.54 5.00 27 .2.43 2.79 3.23 3.81. 4.45 4.90 28 2.38 2.73 3.17 3.73 4.36 4.81 29 2.33. 2.68 3.11 3.66 4.28 4.72 30 2.28 2.62 3.05 3.60 4.20 4.64 40 1.90 2.20 2.57 3.05 3.56 3.93 50 1.64 1.90 2.23 2.66 3.10 3.43 1.45 1.68 1.98. 2.36 2.76. 3.05 0.88 1.03 _ 1.21 1.45 1.70 1.89 0.65 -0.76 0.90 1.07 1.25 1.40 1 0.38 0.44 -0.53 0.62 0.73 0.82 0.22 0.26 0.31 0.36 0.42 0.47 0.13 0.15 0.18 0.20 0.24 0.27 Taken from equation for IDF curve for Chario«e, N.C. 100 9.92 9.53 9.17 8.84 8.54 8.26 7.11 6.92 6.74 6.57 6.41 3.26 6.12 5.98 5.85 5.73 5.61 5.50 5.39 5.29 5.19 5.09 4.32 3.76 3.34 2.06 .52 0.89 0.51 0.29 a_, n L?J 3.6 Rational Method Introduction When using the rational method some precautions should be considered. 3.6.1 • In determining the C value (land use) for the drainage area, hydrologic analysis should take into account future land use changes. Drainage facilities should be designed for future land use conditions as specified in the County and City Land Use Plans. • Since the rational method uses a composite C value for the entire drainage area, if the distribution of land uses within the drainage basin will affect the results of hydrologic analysis, then the basin should be divided into two or more sub-drainage basins for. analysis. • The charts, graphs, and tables included in this section are given to assist the engineer in applying the rational method. The engineer should use good engineering judgement in applying these design aids and should make appropriate adjustments when specific site characteristics dictate that these adjustments are appropriate. Runoff The -rational formula estimates the peak rate of runoff at any location in a Equation watershed as a function of the drainage area, runoff coefficient, and mean rainfall 3.6.2 intensity for a duration equal to the time of concentration (the time required for water to flow from the most remote point of the basin to the location being analyzed). The rational formula is expressed as follows: Q = CIA (3..1) Where: Q = maximum rate of runoff (cfs) C = runoff. coefficient representing a ratio of runoff to rainfall I = average rainfall intensity for a duration equal to the time of concentration. (in/hr) A = drainage area contributing to the design location (acres) Infrequent The coefficients given in Table 3-5 are applicable for storms of 2-yr to 10-yr Storms fre uencies LPSs fr q equrent.; I gher inten5lt3r SttZttAS inrt7f require xno iffcation Df .6.3 :. the cae resem bes:ause xtfiftraucxt antf otiseriass>rsftaVa a prnpartcona(Iy;smalfcr affect on Tuff 4Zc5Fr ht-1? ci au hP 9 3..... _......:...:.:..:9. ,.,...,........}.. The adjustment of the rational method for use with major storms can be made by multiplying the right side of the rational formula by a frequency factor C,. The rational formula now becomes: Q = CC,IA (3.2) 3-1 1 71 1? ? r Appendices 8.07 The design of temporary sediment basins for construction sites should meet all minimum requirements contained in Practice Standards and Specifications: 6.61, Sediment Basin. The following outline provides guidance in designing sediment basins to meet those requirements. Size, Location, and Structures intended for more than 3 years of use should be designed as perma- Effieieney nent structures. Procedures outlined in this section do not apply to perma- nent structures. See the Dam Safety Law of 1967 and supplementary North Carolina Administrative code title 15A. Basic requirements for design of a sediment basin are the following: e t Rev. 1-1193 • drainage area less than 100 acres; • design structure life less than 3 years; • minimum design storm, 10-yr peak runoff with minimum 1 ft freeboard; • In High Quality Water (HQW) Zones, minimum design storm, 25-yr peak runoff with minimum ift freeboard. The sediment basin shall settle the 40-micron particle with a minimum efficiency of at least 70 % during the 2-yr peak runoff event. See appendices beginning on pg. 8.07.13. • maximum height shall be less than 15 ft, measured from the top of the dam to the lowest point at the downstream toe; • hazard classification: sudden failure should not cause lass of life or serious property damage. Basin location-Locate the basin so that a maximum amount of runoff from disturbed areas can be brought into the structure. It should be accessible for periodic cleanout and should not interfere with construction activities. When possible delay clearing the sediment impoundment area until the dam is in place. Keep the remaining temporary pool area undisturbed. Basin volume-Minimum volume of the basin should be 1,800 ft3/acre for the disturbed area draining into the basin. Volume is measured below the principal spillway crest. Where possible the entire drainage basin is used for this compu- tation, rather than the disturbed area alone, to help ensure adequate trapping efficiency. Trapping efficiency- For additional information see Appendices pg. 8.07.13 - 8.07.42) Maximize the trapping efficiency of the basin by: • diverting runoff from undisturbed areas away from the basin; • limiting drainage area to increase the ratio of basin surface area to peak inflow rate. This ratio should be 0.01 acre/cfs or greater to achieve more than 759o efficiency on most soils. Subdivide area with additional traps and barriers to limit inflow rate and improve efficiency; • maximizing the length-to-width ratio of the basin. Length to width should be 2:1 or greater; • locating sediment inflow points as far as possible from the principal spillway inlet; • controlling flow at inlet points to maintain nonerosive velocities. 8.07,_ Basin cleanout-Plan to remove sediment when approximately one half of the basin volume has been filled. The minimum volume requirement (1,800 f0/acre) must always be met. Spillway System The spillway system, consisting of a principal spillway and an emergency Design spillway, should carry the peak runoff from a 10-yr storm with a minimum 1 ft freeboard above the design water surface in the emergency spillway. Base runoff computations on the most severe soil cover conditions expected during the effective life of the structure (Appendix 8.03). PRINCIPAL SPILLWAY The principal spillway consists of a vertical pipe riser fastened to a horizontal pipe barrel with watertight connectors. The horizontal conduit must extend beyond the toe of the dam and must be stabilized, usually by riprap. Minimum capacity-0.2 cfs/acre of drainage, computed for water surface at the emergency spillway elevation. Crest elevation of the riser may be set no lower than the elevation of the sediment detention pool as a minimum. Barrel conduit and riser-The minimum barrel conduit size allowable is 8 inches for corrugated pipe and 6 inches for smooth-walled pipe. Limit the maximum barrel diameter to 30 inches. The riser should have a cross-sectional area at least 1.5 times that of the barrel. Rod and lug type connector bands with gaskets are recommended for corrugated pipe to provide positive watertight connections. Basin dewatering can be accomplished by a single hole protected from trash or a series of holes covered with gravel. The pool may be drained by perforating the lower half of the riser with 1/4- to 1/2-inch holes approximately 3 inches apart on the outside pipe corrugations. Cover the perforated section with 2 ft of gravel (DOT #57 washed stone is ap- propriate for this application). Trash guard-Install a trash guard on top of the riser. A fabricated cone of steel rods, spaced 2 inches apart, fastened to the top of the riser is recommended. Protection against piping-Secure at least one watertight antiseep collar with a minimum projection of 1.5 ft around 8-inch or larger conduits. Locate the collar just downstream from the centerline of the dam. A properly designed drainage diaphragm installed around the barrel may be substituted for an antiseep collar. Protection against flotation-Anchor the riser with a mass with a buoyant weight greater than 1.1 times the weight of water displaced by the riser. Stabilize the outlet below the barrel against erosion (Appendix 8.06). 0 0 8.07.2 u L u 11 F 0 G n J U L 0 I L° Appendices 1 Rev, U193 EMERGENCY SPILLWAY Construct the entire flow area of the emergency spillway in undisturbed soil. Cross section should be trapezoidal, with side slopes 3:1 or flatter. Select vegetated lining to meet flow requirements and site conditions (Figure 8.07a). Capacity-Design the emergency spillway for runoff from the 10-yr storm less any reduction due to flow in the principal spillway. Inlet protection-Ensure that the approach section has a slope toward the impoundment arear of not less than 2% and is flared at its entrance, gradually reducing to the design width of the control section. The control section should be level and straight and at least 20 ft long. Determine the width and depth for the required capacity and site conditions. Wide, shallow spillways are preferred because they reduce outlet velocities. The outlet section should be straight, aligned and sloped to assure supercritical flow with exit velocities not exceeding values acceptable for site conditions. Outlet velocity-Ensure that the velocity of flow from the basin is nonerosive for existing site conditions. It may be necessary to stabilize the downstream areas or the receiving channels. EiVIBANICiNIENT DESIGN There should be a cutoff trench in stable soil material under the dam at the centerline, extending up the abutments to the elevation of the emergency spillway. The trench should be at least 2 ft deep with 1:1 side slopes, and sufficiently wide to allow compaction by machine. Top width-Fill height 10 ft: minimum top width 8 ft Fill height 10-15 ft: minimum top width 10 ft Allowance for settlement-10% of fill height. Side slope-2.5:1 or flatter. Freeboard-minimum 1 ft between the settled top of the dam and the design water level in the emergency spillway. Embankment material should be a stable mineral soil, free of roots, woody vegetation, rocks or other objectionable materials, with adequate moisture for compaction. Place fill in 8-inch layers through the length of dam and compact by routing construction hauling equipment over it. Equipment must traverse the entire surface of each layer by at least one wheel width. EROSION CONTROL Construct the structure to minimize the area disturbed. Divert surface water away from disturbed areas. Complete the embankment before clearing the impoundment area. Stabilize the emergency spillway, embankment, and all other disturbed areas above the crest elevation of the principal spillway imme- diately after construction (Practices 6.10-6.15, Surface Stabilization). 8.07.3 0 Level Portion Crest and Control Section - - - - - Flow -? 'Ot Berm Exit Section Approach channel Note: Neither the location nor alignment of the control section Embankment has to coincide with the centerline of the dam. I. Plan Water surface Stage (Hp) Nlin 2% Approach channel X - length of Control exit channel section 20,., level or greater Profile along centerline Exit Section 3 1f- Cross section at control section Excavated earth spillway Figure 8.07a Design of excavated earthen spillway. 8.07.4 - - Rev. 1 :x93 H n e E L<J t P r u s e I] n Appendices Safety-Avoid steep side slopes. Fence basins properly and mark them with warning signs if trespassing is likely. Follow all State and local safety require- ments. Design Procedure Step 1. Determine peak flow, Qto, for the basin drainage area (Appendix 8.03). Step 2. Determine any site limitations for the sediment pool elevation, emer- gency spillway or top of the dam. Step 3. Determine basin volumes: • Compute minimum volume required (1800 ft3/acre disturbed). • Specify sediment cleanout level to be marked on riser (one-half the design volume referenced to the top of the riser) and sediment storage area to be cleared after the dam is built. Step 4. Determine area and shape of basin: • Check length/width ratio (should be greater than 2). • Compute the basin surface area at principal spillway elevation. • Check the ratio of basin surface area to peak inflow rate (should be greater than or equal to 0.01 acres/cfs, if possible). Employ diversions with additional traps and basins to reduce area drained. Step 5. Determine size of principal spillway. BARREL Determine barrel capacity required for site conditions (minimum capacity for Cep is 0.2 cfs/acre). Use Tables 8.07a or 8.07b to select a pipe for the design elevation, usually the head on the barrel. Alternatively, the size of the pipe barrel may be determined by the general pipe flow equation: Qp = a 1 + Km + KpL where: Op = discharge from pipe, cfs, a = pipe area, ftZ, g = acceleration of gravity, ft/sec Z, H = elevation head differential, ft, Km = coefficient/sum of minor losses, usually 1, Kp = pipe friction coefficient, L = pipe length, ft. 8.07.5 Table 8.07a Pipe Flow Chart for Design of Corrugated Metal Outlet Conduit (Q in cubic ft/sec) For Corrugated Metal Pipe Inlet Ke + Kb = 1.0 and 70 feet of Corrugated Metal Pipe Conduit n = 0.025. Note correction factors for other pipe lengths. ia. H 12" 15" 18" 21" 24" 30" 36" 42" 2 2.84 4.92 7.73 11.30 15.60 26.60 40.77 58.12 3 3.48 6.03 9.47 13.84 19.10 32.58 49.93 71.19 4 4.02 6.96 10.94 15.98 22.06 37.62 57.66 82.20 5 I 4.49 7.78 12.23 17.87 24.66 42.06 64.46 91.90 6 4.92 6.52 13.40 19.57 27.01 46.07 70.60 100.65 7 5.32 9.21 14.47 21.14 29.19 49.77 76.28 108.75 8 5.68 9.84 15.47 22.60 31.19 53.19 81.53 116.23 9 6.03 10.44 16.41 23.97 33.09 56.43 86.49 123.30 10 6.36 11.00 17.30 25.26 34.68 59.48 91.16 129.96 11 6.67 11.54 18.14 26.50 36.59 62.39 95.63 136.33 12 6.96 12.05 18.95 27.68 36.21 65.16 99.87 142.37 13 7.25 12.55 19.72 28.81 39.77 67.83 103.96 148.21 14 7.52 13.02 20.47 29.90 41.27 70.39 107.88 153.80 15 7.78 13.48 21.19 30.95 42.72 72.85 111.66 159.18 16 8.04 13.92 21.88 31.96 44.12 75.24 115.32 164.40 17 8.29 14.35 22.55 32.94 45.48 77.55 118.87 169.46 18 8.53 14.77 23.21 33.90 46.80 79.81 122.33 174.39 19 8.76 15.17 23.84 34.83 48.08 81.99 125.67 179.15 20 8.99 1.56 24.46 35.73 49.33 84.12 128.93 183.80 21 9.21 15.95 25.07 36.62 50.55 86.21 132.13 188.36 22 9.43 16.32 25.65 37.47 51.73 88.22 135.21 192.76 23 9.64 16.69 26.23 38.32 52.90 90.21 138.27 197.12 24 9.85 17.05 26.80 39.14 54.04 92.15 141.24 201.35 25 10.05 17.40 27.35 39.95 55.15 94.05 144.15 205.50 L Correction Factors For Other Pipe Lengths 40 1.23 1.22 1.20 1.19 1.16 1.14 1.13 1.11 50 1.14 1.13 1.12 1.11 1.10 1.09 1.08 1.07 60 1.07 1.06 1.06 1.05 1.05 1.04 1.04 1.03 70 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 80 0.95 0.95 0.95 0.96 0.96 0.96 0.97 0.97 90 0.90 0.91 0.91 0.92 0.92 0.93 0.94 0.94 100 0.86 0.87 0.88 0.89 0.89 0.90 0.91 0.92 ?l 8.07.6 Appendices Table 8.07b Pipe Flow Chart for Design of Concrete Outlet Conduit (Q in cubic ft/sec) For R/C Drop Inlet, Ke + Kb = 0.65 With 70 feet of R/C conduit, n = .013. Note correction factors for other pipe lengths. la. H 12" 15" 18" 21" 24" 30" 36" 42" 2 4.54 8.01 11.74 16.60 22.44 36.74 54.65 76.02 3 I I 5.56 9.81 14.39 20.33 27.49 45.00 66.94 93.11 4 6.42 11.33 16.61 23.48 31.74 51.96 77.30 107.52 5 7.18 12.66 18.57 26.25 35.49 58.09 86.42 .120.21 6 7.87 13.86 20.34 28.75 38.87 63.63 94.65 131.66 7 8.50 14.98 21.98 31.06 41.99 68.74 102.27 142.25 8 9.08 16.01 I 23.49 33.20 44.88 73.47 109.30 152.03 9 i 9.64 17.00 24.92 35.22 47.61 77.94 115.95 161.28 10 I 10.16 17.91 26.26 37.12 50.18 82.15 122.21 169.99 11 10.65 18.78 27.55 38.94 52.64 86.18 128.20 178.32 12 11.13 19.62 I 28.77 40.67 54.97 89.99 133.88 186.22 13 11.58 20.42 29.95 42.33 57.23 93.68 139.37 193.86 14 12.01 21.18 31.07 43.93 59.37 97.19 144.59 201.12 15 12.44 21.93 32.17 45.47 61.46 100.62 149.69 208.21 16 12.95 22.65 33.22 46.96 63.48 103.92 154.60 215.04 17 13.24 j 23.35 34.24 48.40 65.43 107.12 159.35 221.65 18 I 13.63 i 24.03 35.24 49.81 67.34 110.23 163.99 228.10 19 14.00 24.68 36.21 51.17 69.18 I 113.25 168.48 234.34 20 ? i 14.36 25.32 37.14 52.50 70.97 116.18 172.84 240.41 21 i t 14.72 25.95 3e.n7 53.80 72.73 119.07 177.13 246.38 22 ? j 15.C6 26.56 38.96 55.06 74.43 121.85 181.27 252.13 23 15.40 j 27.16 I 39.84 56.31 76.11 I 124.60 185.36 257.83 24 15.73 27.74 40.69 57.51 77.75 127.28 189.35 263.37 25 16.06 28.32 41.53 58.70 79.35 129.90 193.25 268.60 L Correction Factors For Other Pipe Lengths 40 1.15 1.13 1.11 1.09 1.08 1.06 1.06 1.05 50 1.09 I 1.08 I 1.07 1.06 1.05 I 1.04 1.04 1.03 60 1.04 1.04 1.04 1.03 1.03 1.02 1.02 1.02 70 1.00 ) 1.00 1.00 1.00 1.00 f 1.00 1.00 1.00 80 0.96 0.96 0.97 0.97 0.98 0.98 0.98 0.99 90 0.93 0.94 0.94 I 0.95 I 0.95 0.96 0.97 0.97 100 I 0.90 I 0.91 i 0.92 0.93 I 0,93 0.95 0.95 0.96 3.07.7 D RISER Determine riser size from Figure 8.07b. Check the head and stage requirements. If the design stage is too high, choose a larger barrel or reevaluate steps 2-4. As a minimum, set the elevation of the riser at the same elevation as the top of the sediment pool. Select the type of trash guard. Determine area of holes, Ao, to dewater the pool from the following equation: A 2h A° = T Cd 20,428 where Ao = total area of the dewatering hole, ft As = surface area of the basin, ft2, h = maximum head of water above the hole, ft, T = detention time to dewater basin, hr, (8 hrs recommended min.), Cd = coefficient of contraction for the orifice (approximately 0.6). Step 6. Design antiseep collar. Ensure that antiseep collars are no closer than 2 ft from a pipe joint. Collar must project at least 1.5 ft from the pipe. Indicate watertight connections. Step 7. Design antiflotation block. Determine the weight of water displaced by the empty riser, and design a block with buoyant weight 1.1 times the weight of water displaced. Step 8. Design outlet. Determine discharge velocity from the barrel. Design outlet protection to assure stable conditions. Riprap placement is usually necessary (Appendix 8.06). Step 9. Design emergency spillway. • Determine the required capacity for the emergency spillway as Qe=Q10-Qp 8.07.8 • From Table 8.07c or Table 8.07d, select the width and depth of the outlet, depending on soil conditions. In general, the wider bottom widths and lowerslopes are preferred to minimize exit velocities at supercritical flow. • Set the elevation of the crest of the emergency spillway a minimum of 1 ft above the crest of the riser. Step 10 . Spillway approach section. Adjust the spillway alignment so that the control section and outlet section are straight. The entrance width should be 1.5 times the width of the control section with a smooth transition to the width of the control section. Approach channel should slope toward the reservoir no less than 2%. Rev. L193 I, 11 ?l N 0 u MI- P c I `4 Iul Appendices 250 200 150 100 90 80 70 60 50 U a 40 cs _o 30 U n 11 20 10 8 7 6 5 0.5 1.0 1.5 2.0 2.5 3.0 Head required at crest of riser in feet (h) Ci l i ith litt ll rcu ar r ser s w sp er wa o" b l i t H3/2 Q=3.1L I I i 3 - ° o S plitter-type _ T - - Crest headwall h ? 2 - _ - d Pipe z - riser 1 ? Pipe conduit I I I I For conduit slope > friction slope, Z = 5D For conduit slope < friction slope Z = 2D , Inlet Proportions Pipe Pipe Conduit Riser (D)-in (d)-in 8-12 18 15 21 18 24 21 30 24 30 30 36 36 48 42 54 48 60 Figure 8.07b Design chart for riser outlet. Pipe drop inlet spillway design: For a given Q and H, refer to Table 8.07a or 8.07b for conduit size. Then determine the riser diameter (d) from the Inlet Proportions Table on this figure. Next, refer to the above curves, using the conduit capacity and riser diameter, and find the head (h) required above the crest of the riser. The height of the riser should not be less than 5D - h, except as noted in the above sketch. Example - Given: CMP; Q = 20 cfs; H = 14 ft, h max. 1.0 ft; L = 70 ft. From Table 8.07a find conduit size (D) = 18 inches. From Inlet Propor- tions Table, riser size = 24 inches. Head (h) required for Q = 20 and d = 24 is 1.0 ft. Rev. 12,93 8.07.9 s Table 8.07c Design Table for Vegetated Spillways Excavated in Erosion Resistant Soils (side slopes-3 horizontal:) vertical) iacharge Slope Range Bottom Stage a CFs Minimum Percent Maximum Percent Width Feet Feet 15 3.3 12.2 8 .83 3.5 18.2 12 .89 3.1 8.9 8 .97 20 3.2 13.0 12 .81 3.3 17.3 18 .70 2.9 7.1 8 1.09 25 3.2 9.9 12 .91 3.3 13.2 18 ..79 3.3 17.2 20 .70 2.9 8.0 8 1.20 30 3.0 8.2 12 1.01 3.0 10.7 18 .88 3.3 13.8 20 .78 2.8 5.1 8 1.30 2.9 8.9 12 1.10 35 3.1 9.0 18 .94 3.1 11.3 20 .85 3.2 14.1 24 .77 2.7 4.5 8 1.40 2.9 6.0 12 1.18 40 2.9 7.8 18 1.03 3.1 9.7 20 .91 3.1 11.9 24 .83 2.8 4.1 B 1.49 2.8 5.3 12 1.25 45 2.9 8.7 18 1.09 3.0 8.4 20 .98 3.0 10.4 24 .89 2.7 3.7 9 1.57 2.8 4.7 12 1.33 50 2.8 6.0 18 1.18 2. 9 7.3 20 1.03 3.1 9.0 24 .94 2. 3.1 8 1.73 2.7 3.9 12 1.47 80 2.7 4.8 18 1.28 2.9 5.9 20 1.15 2.9 7.3 24 1.05 3.0 8.8 29 .97 2.5 2.8 B 1.88 2.8 3.3 12 1.80 70 2.8 4.1 18 1.40 2.7 5.0 20 1.28 2.8 8.1 24 1.15 2.9 7.0 28 1.05 2.5 2.9 12 1.72 80 2.8 3.8 18 1.51 2.7 4.3 20 1.35 ischarge Slope Range Bottom Stage a CFS Minimum Percent Maximum Percent Width Feet Feet 2.8 5.2 24 1.24 80 2.8 5.9 28 1.14 2.9 7.0 32 1.08 2.5 2.8 12 1.84 2.5 3.1 18 1.81 90 2.8 3.8 20 1.45 2.7 4.5 24 1.32 2.8 5.3 28 1.22 2.8 8.1 32 1.14 2.5 2.8 le 1.71 2.8 3.3 20 1.57- 100 2.8 4.0 24 1.41 2.7 4.8 28 1.30 2.7 5.3 32 1.21 2.8 8.1 38 1.13 2.5 2.8 20 1.71- 2.6 3.2 24 1.58 120 2.7 3. 2 --171- 2.7 4.2 32 1.34 2.7 4.8 38 1.28 2.5 2.7 24 1.71 2.5 3.2 28 1.58 140 2.8 3.8 32 1.47 2.8 4.0 38 1.38 2.7 4.5 40 1.30 2.5 2.7 28 1.75- 2.5 3.1 32 1.58 180 2. 3.4 38 1.4 2. 3.8 40 1.4 2.7 4.3 44 1.33 2.4 2.7 32 1.72 180 2.4 3. 38 1. 60 2.5 3.4 40 1.51 44 i 1.43 2.5 2.7 38 1.70 200 2.5 2.9 40 1. 60 2.5 3.3 44 1.52 2.8 3.8 48 1.45 2.4 2.8 40 1.70 220 2.5 2.9 44 1.81 27.5 3.2 48 1. 3 2. 2. 44 1. 240 2.5 2.9 48 1.82 2. 3.2 52 1.54 280 2.4 2.8 48 1.70 2.5 2.9 52 1-62 280 2.4 2.8 52 1.7 300 2.5 2.8 58 1.89 Example of Use Given: Discharge, 0 = 87 c.f.s. Spillway slope, Exit section (from profile) = 40/.. Find: Bottom width and Stage in Spillway. Procedure: Enter table from left at 90 c.f.s. Note that Spillway slope (40%) falls within slope ranges corresponding to bottom widths of 24, 28, and 32 ft. Use bottom width, 32 ft., to minimize velocty. Stage in Spillway will be 1.14 ft. Note: Computations based on: Roughness coefficient, n = .040. Maximum velocity = 5.50 ft. per sec. 3.07.10 Rcv. 1203 Appendices Table 8.07d Design Table for Vegetated Spillways Excavated in Very Erodible Soils (side slopes-3 horizontal:) vertical) Discharge Slope Range Bottom Stage Q CFS Minimum Percent Maximum Percent Width Feet Feet 10 3.5 4.7 8 .68 3.4 4.4 12 .69 15 3.4 5.9 16 .60 3.3 3.3 12 .80 20 3.3 4'.1 16 .70 3.5 5.3 20 .62 3.3 3.3 16 .79 25 3.3 4.0 20 .70 3.5 4.9 24 .64 3.3 3.3 20 .76 3.3 4.0 24 .71 30 3.4 4.7 28 .65 3.4 5.5 32 .61 3.2 3.2 24 .77 35 3.3 3.9 28 .71 3.5 4.6 32 .66 3.5 5.2 36 .62 3.3 3.3 28 .78 3.4 3.8 32 .71 40 3.4 4.4 36 .67 3.4 5.0 40 .64 3.3 3.3 22 .76 45 3.4 3.8 35 .71 3.4 4.3 40 .67 3.4 4.8 44 .64 3.3 3.3 36 .75 50 3.3 3.8 40 .71 3.3 4.3 44 .68 3.2 3.2 44 .75 80 3.2 3.7 48 .72 70 3.3 3.3 52 .75 80 3.1 3.1 56 .78 Example of Use Given: Discharge, Q = 38 c.f.s. Spillway slope, Exit section (from profile) = 41/o. Find: Bottom width and Stage in Spillway. Procedure: Enter table from left at 40 c.f.s. Note that Spillway slope (4.0%) falls within slope ranges corresponding to bottom widths of 36 and 40 ft. Used wider bottom width, 40 ft., to minimize velocity. Stage in Spillway will be 0.64 ft. Note: Computations based on: Roughness coefficient, n = .040. Maximum velocity = 3.50 ft. per sec. Rev. 1193 8.07.11 0 Step 11. Spillway control section. • Locate the control section in the spillway near where it intersects the ex- tension of the centerline of the dam. • Keep a level area to extend at least 20 ft upstream from the outlet end of the control section, to ensure a straight alignment. • Side slopes should be 3:1. Step 12. Design spillway exit section. • Spillway exit should align with the control section and have the same bot- tom width and side slopes. • Slope should be sufficient to maintain supercritical flow, but make sure it does not create erosive velocities for site conditions. (Stay within slope ranges in appropriate design tables.) • Extend the exit channel to a point where the water may be released without damage. Step 13. Size the embankment. • Set the design elevation of the top of the dam a minimum of 1 ft above the water surface for the design flow in the emergency spillway. • Constructed height should be 10% greater than the design to allow for set- tlement. • Base top width on the design height. • Set side slopes 2.5:1 or flatter. • Determine depth of cutoff trench from site borings. It should extend to a stable, tight soil layer (a minimum of 2 ft deep). • Select borrow site-the emergency spillway cut will provide a significant amount of fill. Step 14. Erosion control. • Locate and design diversions to protect embankment and spillway (Prac- tice Standards and Specifications: 6.20, Temporary Diversions). • Select surface protection measures to control erosion (Practice Standards and Specifications: 6.10, Temporary Seeding; 6.14, Mulching; and 6.15, Riprap). • Select vegetation for emergency spillway to provide protection for design flow velocity and site conditions. Step 15. Safety. • Construct a fence and install warning signs as needed. I i L±j 3.07.12 U NN N U .? C ? N a U ?j o QQ `o }Z U O E E N w ? C u v v T ? « yy f L=: ? C C U 'O } d X ri o N fJ L 2 z O a U 2 O (L E o ago 6d ? t? •h M F- m U d ? N Z U C N O m ? O Q. N Ev o E L • ? ` U U N r O r ? C/? :J C z ? -- N E M Z' U C3 O ril D U 'p O O a U [? O d c3 ~ O U ?yov 3? a I S'.. 47 t!1 O >,N rar ca N '? C U 0 0 ¢" O 0 0 N N N r`- 43 O U O d? 7 i r L U O Q O? CL E E Cr' ',`O a) U CS ? ' - i. ; .' L =a U) o U U I } ?I 7 O 9 N 0 N ' i? 0 m N -a m co Lr) r'• La Ln C3 0 C3 0 .D co O f? i A ? Z' rI N a E c U N I ? 0 0 N h 22 O i ll. r• i co E i CL i i?. p ?- ?, . ..,?.?+ . Rl LLJ y'wp N f Q 4 D WoNycc = IF . 1 ...U _Q¢ pYpW?' ?? . ........ Qp[a[Op - Z?j Ul Q W y 1-?.. S h p c, _ ?.-. Ir r-3 0 Q U cn O rl ? S O ?Q - O if E 1 y C? wx O O U z N A Q W U V) ??¢C7 o a U w ?" i \ I I I I r~, ~ ~ ~ \ \ \ \ ~ ~ I I III 11 \ ~'I I I ~ III 11 ~ / / / / / ~ ~ I I I 1 1 ~ 1 ~ ~ ~ 1 I ~ ~ V ~ ~ A ~ ~ ~ ~ ~ ~ , / / / / , , ! I I ~ ~ 1 ~ ! / / / / / ~ / / / I 1 ~ II 1 ~ ~ ~ V ~ \ ~ / / I I ~ / / / ~ / i ~ ~ 1 \ V ~ II III I A ~ I I i ~ I III I / ~ ~ ~ \ ~ ~ ~ I II II II A1V1`_~ I 111 ~ I ~II I \ 1 / / / I I 1 I I I I I I 1 1 / ~ A 1 \ 1 ~ ~ ~ ~ ~ ~ ~ / / ! ! ! l 1 I ~ ! / / / i ! l l / 1 I I ! ! 1 1 1 1 ~ ~ ~ ~ ~ _ i ~ / / ! l I l ~ / / i / , ~ ~ / 1 1 V A ~ ~ I 1 II Illlllll \V1111 I J II II ' V I IIII `III - ~ ~ ~ v ~ ~ II II I 0 I I I ~ 1 V A ~ 1 I I III 1 ~I I 1 1 I I I I / I I I ~ 1 ~ ~ / ! ~ ~ ~ I ~ - / ~ ~ / ~ ~ v v ~ ~ v III, IIII v ~ II tl1 1 II ;Ih v / / 1 ! I ~ ~ ~ ~ ~ 1 / ! r , / l l , ! 1 1 / , , ~ ~ / ~ \ ~ , l / ~ / / ~ 1 1 V~ i I~ ~ 1 ,1~1 ~ ~ A V I I! ~ I ~ I ! l ! ! 1 / I l l l I 1 ! l 1 , 1 111 I I ~ I ~ ~ I ~ ~ ~ ~ ~ ~ / ~ / / l ~ . ~ 1 ~ / i / \ ~ - _ ~ / / 1 l / / 1 I l l l I I 1 _ - i , - - _ I ~ ~ ~ / / / / / / I I ~ ~ ~ I CJ \ \ A A \ ~ \ \ II i I 1 \ ~ i' I i ~ ~ I I„ \ \ ~ ~ I I 'i / / / / / ~ / i ~ ~ / ~ 1 / / / / / / / ! ! / 1 I I ~ l ~ ~ ~ / / V ~ ~ ~ V~ ~ ~ \ V / / , I i ~ ~ 1 V I 1 ~ / / / l I 1 / ~ ~ ~ ~ ~v v ~ i ~ / / / l I I ~ ~ I ~ ~ ~I 1 I ~ 1 \ \ ( I / / / / / l 1 I I I 1 'V ~ ~ ~ I ~ \ I 1 II I 1 ~ ~ ~ v I I I/ I 1 1 1 ~ I , , ~ / / / I ~ 1 ~ ~ ~ , - ~ ~ ~ / / / I I i - ~ 1 I I /i ~ I I I I I I I I ~ ~ ~ 1 I I I I l/~i ~ ~ i A I 11 i I ~ IIl I I / / / / / / / / ~ 1 ~ I I ~ V V~~~ V~~A~~~~ / i - ~ / / 1 .I, , , II 1 I I :I / / / ~ ~ I IIIIII~/ / / ~ Ir~~l I II ~ , hl ql II ~ I I Ir I I ~O ~ I ~ ~ A ~ l ~ I ~ ~ i ~ \ 1 ~l lI / / l `A ~~~'I` ~ ~ I I 1 1 1 ` ~t' ~ I 1111 ~ 11 I I i ~ V 1 I V 11 lI III I ~ I I I I i I I l Ill l l ~ ~ i 1 ~ I 1 I I I 1 1 ~ I «I I / I I i ~ ,I / I I I 111 11 I l I III I i V + I ~ ~ ~ ~~i ~ i ~ ~i~ ~i~ l ~ i/ / / / i~ 11 1 it ~ ~ i ~ ~ ~ 1 ~ ~ ~ ~ I 11 1 1 I ~ ,1 r I IIII -I- 1 l 1 1 i ~ 1 1 I ( ~ 11111 I v I l + I >l ~ I 1 1 I I 1 1 + 1 v - 1 1 / 11 Ill , I ~ ~ 1 VIII I 1 I 11 I I I ~ ~ /,,r I , I, , , , 3 v I ~ III - + + V ~ I I III 111,11 Il I (11111 I 1 I ~ I I I I( I I I ~ I / ~ I I / III I ~ l ~ ~ / ~ / 1 ~ ~ / ~ 1 + 1 I ~ / , - i ~ ~ ~ ~ ~ I "J ~ ~ ~ 1 l 111 I III l III / 1 I I I I I I I 1 I ~ I ~ 1 IIII 1 1 , ~ ~ ~ ~ ~ i ~ I ~ ? ~ 1 ~ i ~ _ ~ ~ I ~ _ _ ~ l I I ~ i ~ ~ ~ I ~ ~ ~ ~ ~ ~ I 1 ~ I 11 I 1 1 ~ 1 I i' I J 1 I I I 111 1111 v`,~ ~ ~ vvvI i'1 I! III I r 1 I I \ ~ ~ ~ I ~ ~ ~ ~ ~ ~ .f ~ i ~ ~ / ~ ~ ~I I ~ / ~ ~ I I ~ ~ / I I' 1 1 ~ ~ A ~ ~ ~ I A l I I I l 1111111 I „j~ 1 l I 1! VIII I III ;I I l ~ 1 I I I !I 11 1 I~ \ I 111 II111 t VIII II 'IIII I \ ~ ~ ~ I I I \ ~ 0 / i I I ~ , / ~ ~ ~'1 II 1~ ~ I ~ ~ ~ ~ i 1 - 1 I ~ \ I I 11 11111 III 1, 'I 1. AA ll ~ I I I III Il I 1 1 I V I III ~ III I \ I I 1 I ~ ~ A ~ I I I I I I I I / ~ ~ I 1 A I II1n111 v / I ~ II X 1 1 III I~ 1 1 III. 111 1 I ~ I I 111 II I III I I I I\ 1 ' l III I i I 111 ~ I I I / / I / / ! I ~ I ~ ' 1 1 1 / / / 1 ~ ~ ! I ' i 1 I ~ I ~ 1 / I I ~ ~ ~ i ~ ~ 1 ~ ~ _ ~ I I III I I I I 11 ~ I h I I I I II •1 1 A ~ I I 11f111111 l I II I I I 1111 I ~ I I I i Ill 111 I / / , ~ l / / I I I ; I 1 1 + I ~ ~ - / ~ ~i ~ / / I ~ I / I ~ ~ ~ I ~ A rr__ / ! / / / I I I ~ ~ `CJ ~ 1 / III 11 I ' / / I II II~\ I I Ill I I l II~ I / I ~ I ~ / l l 1 1 1 I ~ I : II I I ~ ~ / I II I ~ I I I I ~ I F+ 1 I I / / I + ~ I _ 1 / I ~ 1 ~ I ~ I I III 11 I 1 1 I I I I l I 1 I I I l I I III I ~ ~ 111 111 I I i ~ 1 I II I 1 i/ I l / I~ I I I III II I l I ~ V I l l I. I l i l 1 II I 1 ~ ~ V ~ I I I l 1 1 I / / / / I ~ ~ 1 I ~ _ ~ ~ 1 / / / ~ ~ / I ~ ~ ~ / ~ / v ~ \ 1~ I r 1 1 I I I tl, 11 1 ~ ~ ~ ~ ~ I I l IIII I I l l 1 l 1 1 1 I 11 I l l ~ IIII I I V I ~ 11 I I I~ I~ I 1 1 i 1 1 I 0 ~~11~ I 1 I 1 I / / / I I 1 ~A / ~ ~ I I I / / / / / /.I ~ / 1 I_ ~ ~ / i , ~ / / I ( / 1 I / / / / / / / 1 / ~ i I ~ ~ ~ ~ / V I ~ / / ~ ~ v ~ ~ I I I II l i I I I I i I I I III ~ 1 1 ~ i I I I 1 l V l I! V~ I I I I I ".J tl! a I I I i ~ A ~11j 11 i~ l 11 I I 1 1 1 I I v/ l 1 l l 1 I I III III I i I / / / ~ ! I I V 1 ~ ~ / - I I I l / ~ / / / , ! ~ ~ ~ ~ / , l I ~ ~ ~ ~ ~ ~ I I I V I I A V I~ ~ I III I II ~ I / ! 1 I / / l / / l I ! I ! ~ I I ~ - ~ 1 / ~ i ~ j1111 ~ ~ ~ l \ I I 1 I I \ 1 ~ ~ ~ vI 111 111 l I 1 111 1111 ~ - - ~ ~ ~ lIl 1 ~ I 1 \ \ \ ~ I l ` ~ , ~ ~ ~ ~ I II 1 111111 ~ III I / ~ llld i I 1 1 1 / / / I I I ! 11 ~ I / ~ I //I~ I I ~ ~ v I 1 v 1 1, ~I IIII ~ t 1 11111'• 111 I / ~ ~ ~ i~ / ~ / ~ I I 1 ~ \ ~ ~v1 I / 11 I III ~ ~ ~ ~ 11 11 I I / / I ` n I ~ ~ ~ ~ / 1 ! ! ~ ! ~ / 1(I I I I I I II / / / ~ ~ ! 1 ~ ~ / ~ / ~ / i 1 1 1 I I 11 II ~ I 11111 I / ~ V ~ / l / ~ I 1 I I \ ~ 111 I I / III (IIII ~ ~ 1111 i 11 I 1 ! / , / / / ~n 11 r l I I 1 ~ I I 2~ / r~ / i / A ~ I I V I i V ~ l 1 / I I I I ~ III I/ l IIl 1 ~ II ~ III I ~ _ ~ / ~ / 1 1 1 I 1 A i I 1 I 1j / I 111v~ A A I 11111 i Ill 1 I l l/ / l I !I I ! I ! 1 ~c ~ ! l l , ill + , 1 + 1 ti~ 1 I ~ ~ ~ ~ ~ ~ i / ~ ~ / I I l I 1 1 1 I I I / \il I ~ 111 ~II II . i ~ / / / I ~ ( 1 1~1 I1 \ / I I 1 I ~ ~.J' 111: 1 V~~~ i-- ~ / ~ / I I I 1 I ~ I IIII Ill 1 ~ / i i / / i / ~l1 ~I I I l~ ~ ~ ~ ~ ~ l I , l% A,))~_Y~ r'~. 1 ~ ~ ~ ~ ~ V ~ V ~ / 1 A I i i ~ I I I~ 1 1 / \ / / ~ / / I I / / 1 I ` ~ 1111 I I j1 11 ~ / l / / ~il I Il I ! / I I_ \ ~ ~ 1~ i i i / / I I 1, ~ / I I I ~ 1 I I II I i l l it 1 I\ ~ ! 1111 I I P 1 I ! I ~ I I I "J I I 11 i i ~ ~ IIII / I / ~ \ l / / I \ 1~. ~ / I l/ ~,1 1 1 1111.1 1 I I ~ , , / / ~ ~ IIII I i / / 1 / ~ ~ - - / / / I I I I / ~ ~ i / ~ 1~ ~ ~ \ / ~ - I ~ 1 I \ / f ~ ~ ~ - - / ! ! I / ~ l l i I ~ 111 11111 1 / ~ ~ l / / / l I / 1 ~ 1 III 1 e 11 1 i/~ i~ / / i / A\ ~ ~i i / I l/ll I ~ ~ i I / 1 ~ I - l r I I / I 1 1~~~ ~ / / / / ~ ~ / / / ~ 11 / ~ I 11111 111 1 11 \ ~ ~ ~ _ i _ ~ l / _ 1 I ~ II 11 I ~ 1 , V ~ I / / ~ / / ~ / / / l / _ ~ , ~ ~ V~\ I l l 11 I ~ 11 I I1 / / ~ / / ~ I ll'~ I ! / ~ ~ v ~ 1 ~ 1 I / / / / / / l I \ ,i l ~II I I 1111 A \ ~ I / / / ~l ~ 1 I % ~ / ~ I !II ~ / / 1 ~ ~ I _ ~ , 1 / / 1 l v ~ ~ I ~ _ / / / / / / / / I I I~ A / I X111 ll 1 1~ 11 ~ c~ ~ v ~ ~ ~I / ~ ~ / / / / / i l ~ I / 1 1 II I I 1 I J I ~ ~ ~ I! ~ 1 I ~ / ~ ~ II / I "J l ~ / III V ~ ~ ' ~ ~ II / / ~ I ~ ~ ~ ".1 I I / I I I I I \ \ ~ ~ I I ~ / ~ / ~ / / / < f_~ V / I I ~ IIII ' III I III 1 1 ~ ~ ~ ~ / ~ / I I ~ / _ t ~ ~ ~ I ~ \ \ ~ ~ ~ I 1 i / / SCI VIII A \ ~ ~ . ~ l / I / ~ ~ ~ I I II 111/ i~ 1 1 i / 111 ~ I ~ ~1 'V ~ 1 _ q~ ~ / 1 / I ~ / I i I ~ 'CJ ! ~ - - ~ ~ i l I l ~ l ! II III ~ ~ A / I ~ 1 I ~ / l l 1 ~ ~ ~ I IIIIIIIII ~ i "J I (11 ~ 11 I 1 ~ 1 I I i I I I II,,~~ I I~ 1 ~ - - - - - + / ~ l ll 1 ~ ~ 1 ~ ~ ~ ~ + I ~ I / / / 1, CJ I ~ ~ J ~ / O C,1' I V 1 ~ ~ ` ~ / / l I ! 1 / l I ~ I ~ U11 IIII1 \ ~ I II l I ~ I ~ ~ ~ I 1 1 I l I I I i ~ ill 1 l l / / / / i I V / ~ _ ~ ~ ~ ~ A / \ / / ~ ~ / I / , ~ ~ ~ ~ ~ / / V A V ~ I I ~ ~ ~ / 1 I l l i ~ I ~ I I ~ ~ ~ ~ ' - I ~ I 1 1 / 1 I I II I I I \ ~ ~ II 1 l : l I / i / ~ - ~ - ~ / / / I II ~ _ ,i i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , I ~ / I I I I I ~ I l 1 (IIII / I Il I l ' 1 11 I i ~ A l v~ / l I 1 ~ I ~ 1 I~ ll I 1 ~ / r 1 / ~0 ! ~ ¦ ~ - ~ I ~ ~ ~ ~ II_~ i ~ l 1 I I 0~• 1 I I l v _ I ~l~l 111 I ~ ~ ~ I ~ I I I I I I I , ~ /I / / I ~ , ~ I - / 1 ~ 1 ~ I I 2~ ~ /1 I ~ ~ \ / I 1 ~ 1 I~ 111111 ~ ~ / V III ~ 11 I ~ Il I /I ~ ~ ~ _ 1 I I , I 1 ~ ~ - ~ 1 ~ III : I 1 ~ ~ I I (1, 11 / ~ r, I / 'V ~ / 1 ti ~ , , ~o ` ~ 1 - J I I / ~ I v / 1 ~ ~111~ 111 1 ~ ~ ~ / ~ / 11 Il 111 1 I I J ~ 1 \ ti ~ / / ~ ~ 1 ~ / / ~ ~ I + ~ ~ - _ 1 \ 1 / ~ \ ~ ~ ~ ~ _ _ _ _ - I - - _ _ _ / 111 ~ / ~ - - - II "I 11 ~ ~ ! ~ ~ 11 11 ~ ~ ~ / ~ 1 ~ ~ ~ ~ ~ I I I ~ _ ~ 11 I 42 ~ ~ ~ ~ I ~ y _ 11 t \ ~ ~11 ~ ~ - ~ ~ ~ 1111 1 \ ~ ~ ~ A ~ ! (p + ~~II ~ 1 1 ~ ! r _ 1 / ail I~p ~ _ I I ~ f 1 l I I ~ ~ - 1 1 111 i \ ~ _ 1 # ~ l I ~ ~ I ~ ~ ~ ! ~ 1 ~ ~ ~ / 1 1 ~ 1 ~ A / I / / _ I I ! I 1 \ ~ _ ~ ~~~~~11~ ~ V ~ + I I ~ _ 1 J V 1 - ~ I I I 1 1 ~~n~l ~ ~ ~ ~ V ~ I V ~ I I II i - ~ I I \ ~ > ~ ~ ~ lam/ I 1 - ~ ~ I I/ 1 11~ X11 1 ~ ! ~ ~ 'r ~ / / ~ / 6 ~ I ~ _ i ¦ l I i I i - i ~ I I 11 111 1 ~ / ~ ~ \ - - - _ ~ t \ I I I I l~' - / I I ~ ~ - - I A _ - / ~ / ~ ~ ~ I ~I ~ + / I ~ ~///~l/j/11 / l /l ~ ll~I i,~ / ~ / / ~ i ~ ~ /I / I ! 1 ~I~ / ~ i \ I \ - I I /r--- i I , l I \ ~V ~ I ~ I \ / III I ~ i~ i l/ l I ~ l l l - ~ A ~ ~ 1 f I I _ - \ 9' / ~ I ~ / ~ V 1 1 I ~ i l ~ / II v 2 ~1 ~1 I Ill 11 / I, l i ~i ~i / I ~ / ( 'U / / 1 I ~ ~ _ . I / , 1 , 1 ~ ~ ' I I ~ I 1 11 / III ~ ~ \ ~ I1 i i 1 I I I l 1111 / I ~ ~ \ i i ~ 1 l ~ / I _ - / ~ ! r1 r ~ I ~ / / ~ ~ I ~ ~ / / ~ I ~i ~i it ~ ~ f ~ - ~ ~ i ~ I i ~ / l i ' I I / ~ / , , 1 1 1 1 1 i l 1\ , r 1 I ~ ~ I I il`// ~ ~ 1 / 1 I I I 1 ~ / \1 l l t l/ ~ ~ I ~ i I ~ ~ ~ I I 1 1 ~ ~ I /i l / / I A 1 ~ / ~ ~ / 'f- ~ / / ~ V ~ ~ / ~ i / I ~ ! / ~ / / !//ii/ I ~ ~ ~ l i~-- ~ ~ I ~ ~ v ~ / I / I 1v1 1vvv 1 ~ ~ I / %i ~V II I V ~ i i~ l ~ I 1 ~ I / ~ ~ 1 I /i 1 I 1 I A~ I I / ~ / / ~ A 1 I I l ii 1 I i ~ ///iii ~ ~ ~ ~ - ! 1 ~l~~il ~ ll~ l I ~ ~ ~ i i ~ / / I A ' + / I 1 ~ /j/ 11 I l i ~ ~ ~ I I ~ ` _ lr - ' ' ~ V l / l / ~Il! r 111 111 II ! l! A ~ l I ~ i / I ~ ~ i ~ l 1111 I ~ i 1 ~ ~ / / III 1 1 ~ / / / I I I 1 ~ ` ' - - ~ ~ I - ~ ~ ~ ~I V/ 1 - I i~ ~ /l Ill ~ 111 I1 I ~ II 1 ~ ~ ~ i/ _ ~A~ / X 1 1 t ~I ~ ~ I l l ~ A CJ ~ 1 I I I I III 1 \ ~ ~'C~~ I 1 i Ill ' ll ~`VVA I V ~ II I / / i A 11 1 I~ ~ / I I ! 1 , / / I III v 1 ~ ~ ~ I / - i ~ / 1 I A / ~1 I ~ - - il- ~ i / / i A\\ 1 VIA V~V ~ / 1 ~ / ~A \ I 1 \~~A~ A a I I I I ~ ~ / 1 1 I ~ i J / \ I I _ ,j1 1 ~ `v 1 / / I ~ . I 1 / lil /il 1 / ~ / _ _ 1 / / / / vv1 ~ V I' V ~ ~ - ~ A I I 1. ~ ~ ~ ~ 1 ~ i ~ 1 \V~~ J' I ~ I ~ ~ ~ / ~ ~ / ~ + V I l / _ i I \11 1 \~AA~ 1 V ~ V I I i ! ~ ~ ~ / ) ~ ~i ~ ~ - - I \~A V I A ~ ~ I ~ ~ ~ ~ / / / A ~ - ~ 1 11 A~~ ~ l ~ A ~ ~ \ / , ~ ~ II ~ vvvvv1 11 1 I IIII 1 1 ~ V~ ~Q' ~ ~A 1 ~ 1 I I 1 ~ ~ ~ /r ~ / ~ ~ ~ ~ ~ / - - ' ~ ~ i ~ 11;,~ - / ~ / / ~ / / ~ ~ / 111v _ ~ ~ ~ I - - - ~ ~ , / I 1 ~ / /i l /il 1 11 1 ~ _ I I I I I 1 ~ ~ - ~ ~ I I I .I ! ~ ` i ' ~ I IIm ~ ~ ~ / /i l I ~ ~ ~ - ~ 1- _ ~ ~ I / r/l . l I ~ I - 1 \ ~ ~ I I - ti i I I„! A A ~ I I,l 1 ~ ~ _ _ - ~ _ ~ l ~ ii I III~;~ ~ I Il lj/ ~///I 1 1 ~ / i l I I11!I'> - l 111 lU/ 1 1 !1/111 ~ ~ A ! I ~ 1 ~ ~ 1 1 ~ ~ ~ ~ ~ ~ /I ~ _ _ , - I I ~ ~ I 1~ V V AA ~ I I I V ~ ~ ~ AI 11 l v~~ ~ / I I I I ~j I 1 i ~ ~l /li ! / I I - 1 I III A~ ~ ~ ~ ~ ~ ~ _ l ~ ~ ~ 1 / 1 II. I I ~ A ~ ~ V ~ ~ \ ~ ~ ~ ~ ~ V ~ I I I ~ 1 ~ ( ~ ~ ~ ~ I ~ ~ I I I - ' ~ i ~ ~ ~ 1 - 1 ~ /l ll/ ~ ///l l 11 I - I ;I / / / / ~ / l I ~ I1~V ~~AA~~~ ~ ~ I I I I I1 ~ ~ ~ / ~ 1 _ VA ~ I I 1 ~ 1 , i ~ / ~ i i, / /1j III I 11 I A ~ A A~ ~ ~ ~ ~ I I ~ ~ ~ ~ ~ ~ - I l 1 IIII / ~ / I \ ~ ~ / III ~ ~ ~ / ~ 'V 1 I / I A ~ / r~ I / I I I I III A ~ v ~ ~ ~ ~ I I I 1 ~ , ! ~ _ _ ~ , v i ~ ~ ` ~ ~ ~ ~ _ l ~ it ~ ~ ~ ~ { / / I - - 11~ I V _ _ I 'I I r ~ ~ / I 1 ~ /l/ I I IIII 111111 l I I l ~ I I l ~ I ~1 I ~ I / - ~ + ~;i ~~'~i~~ .l I 11 ~ I A I - ~ i I / II ~ ~ 11: ll /I ~ ~ I I II~,~ ~ ~ 0 / I I (I i _ ~ ~ 1 ~ , / I l I l d , II 1 11 II ~ ~ CJ ~ ~ 1 ~ I I 1 ~ it ~ 1 I ~ 1 i ~ A 1 A 1 I ~ ro I ~ ~ ~ ~ ~ I / ~ % i / / / I 1 11 _ A / A I V _ ~1 1 \ ~ ~ ~ ~ ~ / I ~ 1 ~ A I,~ / 1 ~ \ ~ / i I A 1U' ~ ~ l~ 1 i ~ o l I I I I 1 ~~I ~ A~ ~ ~ 111 I ~ A .~V A I I , ~ - , I I / / ~ ~ ~ A I ~ V ~ - I ~ I I ~ ~ _ I I I 1/ ! ) AI ~ ~ II ~ ~ \ ~;,Y~ ~I I I I 1 / / ~ ~ ~ ly / I I ~ ~ ~ ~ ~ ~ / / 1 ~ / ~l ~ ~ 1 ~ ~ ~ ~ ~ ~ I ~ / / / _ ~ r i I ~ ~ , ~ - ! I 1 I I I 1 1 I, I~ ~ II i 1' ` I I I I 1 / ~ ~ 1.11 ~ (11/, I/I I 1 ~ ~ ~I ~ 1 l I I i I I ~ 11 ! / / /l ~ I ~//1 A l A ~ lI II ~~I 1 l ~l l1 I I V 1 / 111 ~ 1 ~ ~ i I i / ~ 1 1 I //1 ~ I ~ ~ ~ ~ I I I ~ p~ I I 1 1 ~ ~ ~ ' - - _ ~ ~ ~ I ~ / \ / I 1 l/ I I 1 i / l ~ l ~ I / / / / I ~ ~ l / / - ~ I ~ 1 \ ~ ~ ~ ~ 1 III i I I 1 I I ~ ~ ~ ~ V 1 / , I J , - . _ _ it I _ ~ ~ I I ~ I I I I 1 ~ / - _ I _ / 1 ~ ~ I i 1 I A ~ ~ ~ ~ I 1 1 ! ~ - ~ - (I i - V l/ l l/l ~ 6 i ' ~ / / / / / I ~ ~ ~ III ~ / l ~ l/ 1 II 11 I / I I I ~ ~ ~ / I i I ~ A~ ~ ~ t I ~ ~ - I I I ~ ~ ~ i I ~ I I4 V ~ I I I - ~ - - ~ w A ll I III ~ ~ t /1 ~ I I / / / / / _ I ~ ! I I I I I I ~ / I ~ I I 1 1 ~ ~ I ~ 1 ~ ~ ~ I ~ ~ ~ ~ - i ~ ~ ~ 11 f I i 11 I / / ~ l/l \I I I A 1_ 7~~1 I 1v vv v / ~ ~ I 111 I 1 1 \ ~ 1 ~v vv V I`__f` ~ \1 ~ ~ ~ 1 A 1 A l v V A vv ~ ~ ~ \ I v A 1 ~ ~ ~ ~ III l I J. i - ~----a2e ~ I / i ; I I f 11 l ~ /j/ r / ( \v v / v ~ I ~ v 1 v ~ v 1 1 1 ~ _ ~ ~ ~ ~ ~ _ (0 ? I ~ / - I 1 / / ~ / ; rv II ~ I I / / ~ / ~ I I l I / ~ lj/ /lll ~ r v ~ v, 1 ~ ~ I ~ ~ v~ - - a ~ I 1 / ~ ( I I ~ / ~ / / ~ ~ / r ~.J I / / f ~ .y 2~ Y ~ ~ I A / / ~ ~ ~ ~ ~ 1 ~ / / / / + \ 1 _ _ ~ I A v~ I ~ ~ ~ ~ vv ~ ~ ~ A vA II ~ ~ / 1 1 ~ ~ 1 ~ v~ I ~ ~ `~`~A ~ v~' v _ ~ ~ I I ~ I V I I / ~ ~ l / / ~ 11 / - ~p-~ V ~I I / " I I 1 1 ~ r / ~ / I1 \ \ , ` I ~ ~ I Imo,- ~ ~ ~ ~ ~ _ - ~ l / 1 / ~I ~ ~ I I + \ \ I ,~i~ / / A ~ J ~ f ` l 1 1 ' / 1 1 r~ _ r~ ~ / I ~l~ 11 v \ ~ I \ / r ti' ~ ~ ~ ~ ~ ~ ` 1 ~ ~ ~ lIf ~ f/11 ~ I - _ _ ~ - ? e' r ~ - a / 1 , / , - ~ \ ~ l p I l 1 / " _ / I 0 Il / Ill - - ~ f r / / A V / II I ' L_ i~/ II \ ~ _ ~ /I / ~ l / _ _ _ , ~ ~ A ~ v / r / II I - ~ r / 11 / I//I 1 ~ ~ ~A ~ / / ~ ~ A ~ / I _ ~ ~ i - r ~ r / ~ V A \ ~ / ~ A ~ ~ / / 1 / - ~ I ~ ~ _ _ _ / r / i ~ ~ ~ ~ Vv v ~ ~ ~ ~ \ ~ v / %r ~ r// ~ Q ~ ~ V ~ 1 / ~ A / / I II / A V v v v ~ v v~ v 1~ ~ / 1 / I f ~ I ~ ~ ~ i/ 'I' TJ i / / / / \ \ / / V A V~~ \ 1 ~ ~ A ~ i /i _ f I ~ i r ~ ~ r v v v ~ V ~ . I ago / / ~ / / r / / ~ V A \ \ \ ~ ~ / I/ f-~ / / / V / I rl / / f / i / - - \ \ \ \ ~ ` VA \ ~ \ V f / f V A ~ i'ii~ ~ I l / ~ f/ ~ f/// ~ II / / ~ / / / ~ ~ ~ ~ ~ \ \ I / / / / / ~ \ \ \ \ ~ \ ~ ~ \ \ \ \ V V ~ V / 1 I I / ~ r I/ I I I / / / / / (j' \ \ \ \ 1 ~I I I I / / ~ ~ ~v ~ \ V A ~ v 1 1 \ \ \ \ \ \ \ \ \ / 1 i !J l / fll \ ~ 1 / I V A VA,A \ V A \ \ ~ / I << I r / / ' I l I I I / ~ ~ ~ ~ \ \ v ~ 1 J 1 I I I 11 ~ / I I 1 v ~ V v ~ I I f / ~ v i ~ \ v V I I I / I 1 A V A V A ~ i I f r r r l 11 ~ ~ I I\ v ~ v v r I' ~ I / f l ~ I I \ \ v~l l ~ v ~ / ~ I 11 ~ I 1 11 I I ~ v ~ \ ~ I / 1 ~ i I ~ I I \ v ~ 1 A \ \ y v I l I ~ V I ~ ~ v ~ / v ! I f I I ~ ~ l 1 A A ~ \ ~ \ l l ~ ~ ~ I I / ~ I ~ I f ~ ~ I ~ 1 1 1 ~ / ~ / ~ I 5 / / fl 1 if , - i ~ ~ I I I l l ~ ~ A 1 III 1 1 I I I~ \ v ~v ~ ~ V A\ V v ~ ~ ~ I I I 1 1 1 1 I / v v / v v ~ v i 1 \ I ( ' ~ ~ ~ - ~ / / I ~ III f1f / ~ ~ < ~ i I / \ \ \ 1 1 ~ ~ ~ ~ v ~ ~ I ~ fll r ~ v 1 1 1 1 1 I I ~ / v A / I I \ \ V A v ~ 1 1 1\\ v I. 1 1 1 1 1 V 1 I I ~ \ / v v A\ 1 V A A v v 1 ~ \ ~ ~ ~ I 1 ~ ~ ~ / ~ / Iff ~ /f ~ f~ lr~/ ~ \ ~ 1 ~ l ~ ~ ~ v I I I I V ~ I~ 1 A ~ ~ I , 1 I 1 1 1 1 \ V / ~ ~ v ~ I 1 v ~ V r 1 ~ ~ ~ ~ ~ ~ ~ ~ A ~ _ _ - z / ~ % ~ ~ III ~ / l if lr ~ A ~ ~ ~c • / \ ~ I ~ ~ ~ ~ ~ I 11 / ~ ~ ~ _I A ~ I ~ ~ ~ ~ ~ f X92 III , / : II / ~i ~ ~ v / ~ i 1 1 v~ v V ~ / ~ v ! l ~ I I I ~ I ~ ~ ~ \ ~ ~ V A ~ I - I l / / ~ ~ ~ \ i I V ~ ~ V V I II r~ / / l \ \ V i I l ~ v v v v~ v v ~ I ~r _ I I I ~ r~ ~ :1 / ~ I 1 1 1 1 ~ \ ~ / / \ \ \ ~ / / / i l i I / ~ I I I I 1 1 v V A \ V / _ ~ v v I 1 1 v ~ ~ ~ v ~ r °~°~-wa - I / / ~ \ 1 I v v ~ J I I r% / ~ I I I I ~ ~ ~ ~ v ~ ~ /r ~ `V ~ I / I I ~ r ~r I I :J / / ~y V ~ ~ ~ ~ ~ ~ ~ ~ I v ' - - - ~ I I I ~ rj / / / ~ I I TJ ~ ~ / 1 1 1 1 \ \ V A~ A \ \ \ / ~ V v ~ V / / / / / / ~ / I \ \ / \ \ / / / i i / i i ~ / I l 1 1 \ \ \ \ \ \ \ / / / ~ / ~ ~ ~ ~ ~ ~AV / - I I / ~ / I - r, ~ ll• \ \ / 1 \ V v V A v v v~ / / ~ / ~ / / 1 1 ! V I \ \ \ \ \ \ \ / / ~ \ l / / / / / / i i ~ ~ / / / V ~ V A V ~ ~ / / / / / \ ~ V` V A V / / / / / , / / ~ ~ ~ i ~ ~ i ~ / i i v ' - V ~ ~ ' I I i ~ / r r / r ~ ~ ~ ~ ~ ~ / ~ I I I ~ ` / l / ~ 1 Vv' / / / ~v y II ~ a ~ irr f ~ ~ , r r ' a ~ s . .v. V v ~ ~ . ' ~ ~ / ~ ~ / _ v v v v. , i ~ ~ I I / ~ ~ 1 ~ / v ~ r / r v ~ I ~ r ~ rr I ~ rr ~ r r v ~ / / / ~ A A~ \ ~ / 1 1 V ~ \ / / / ~ vvv v~~ I ~ A ~ iI l lI ' /i ~lllr Cb r r l lr f v v ~ ~ ~ i ? ~ I I l ~ ~ / r ~ ~ / / r l ~ l ~ ~ I I I I/ / v v V A V ~v \V A \ ~ I l I I f v ~ ~ \ 1 1 / / / / / / / / / / V A V A \ \ \ / / / V A \ A 1 1 / / / l l l i ~ l fi ~ l 1 ~ l l ~ `k , / r , ~ r f I I ? f \ V - l l ~ ~ / i ~ \ V A / / / i ~ \ 1 1 / / / \ / ~ V A ~ \ V A \ \ ~ / / / / / v \ V A 1 l ~ / / l l l l l ~ ~ ~ ~ ~ ~ i ~ ' - ' ~ f , I ~ ~ v v v v f v v ~ ? ~ l 1 f III rr i ilr r / / r e f I i I f f / i~` \v ~ ,I III /i i l/ + / / / I l V A ~ ~ V A~ V A ~ l l / / \ 1 \ ~ ~ / l / l i ~i , i v ~ ill 1 / / ~ / / / / I ~ ~ ~ I I ~i ~ / / / 1 / r / / ~ \ i I l / / r ~ r / / / I I I V A V A A _ I / 1 1 1 / l l l/ ~ i i ~ / / V A \ V ~ / / / / 1 1 1 1 A / ~ / / / / / / / / / ~ ~ ~ / / ~ _ _ - i / I V A A ~ I I l ~ ~ i J V ~ / i- / / r I I ~ / ~ ~ v III I I % \ i ~ / I / r 1 I I ~ i~ V ~ _ ~ ~ / / I I V A A ~ ~ / / 1 1 ~ / / / ~ / / / v ~ / l v 1 1 / / / r VA \ \\v~~ I ii// I 1 11 1 ~ / ~ / / i---' - ~ ~ ~ / I1 1 ~ lII ~ I / ~ ~ / / I ~ ~ I I I I ~ I I ~i i A~ ~ f f ~ ~ / V 1 ~ / / / / ' V V v \ v v i t I l V l I / / / / ~ / ~ / / / ~ / / f l S I I ~ \ ~ / v , - - ~ ~ / ~ ~ i ~ / ~ I i ~~ll ~ II ~ I II % ~ / / v v v v v v ~ ~ / / / A 1 \ 1 1 V 1 / ~ / / / / / / / / / ~ - ~v ~ ~ A A V\ / / lI llll l/ l/ ~ ~ \ y~ ~ / V A A / / i , ~ ~ i i / ~ I 1 III I f /i ~ / ~ \ ~ ~ i . ~ ~ ~ / I 1 1 it ~ ~ I ll ~ I 1 ~ / ~ V A A l A V A V \ 1 ~ 1 / l/ l/ 1 1 ~ ~ i ~ i- / ~ i / / ~~,I Ill I If //i/ / ~ A ~ / V ~ A A / / / A \ i l l / / ~ ~ i ~ / I ~ ~ / V ~ I li ~ ~i / / /ice ~ ~ A ~ ~ ~ i / / ~ V A v v ~ ~ ~ ~ / ~ \ V A ~ ~ / / / / / / i ~ / ~ / ~ / / ~ I I _ - - ~ ~ iii _ I / i 1 ~ i I / i ~ % / _ _ / / _ _ A A v A ~ A i l / ~ i V ~ ~ _ ~ i ~ ~ A V A V / ~ l l / i / ~ - - - - - - / i ~ ~il ~ ~ ~ ~ / / / i ~ ~ ~ / - - _ / G / i ~ I / ~ ~ / ~ / ~ / - i ~ i ~ - i ~ i i ~ i\~. Ill ii' \ ~ \ / / ~ i / / r'/ / - v v ~ A / ~ i l / ~ ~ i v i A \ V A / ~ / l 1 / ~ / / v ` ~ - ' i ~i ~ ~ ~ - - A A \ \ \ V / ~ / / / l l J l / l / ~ ~ ~ ~ ~ ~ ~ / / ~ / ~ ~ ' ~ \U~ l ~ ii / AV A / ' / / / ~ / r/ / / / ' / V1V~ I i'i'i / / ~i\\\ ~ / / / / / i r / / / / / ~ i~ ~ I ~ ~ \VA\ \V I~ ~ ~ n ~\V A\\ r f l l ~ ~ / / / / i ~ - / ~ A ~\\A ~ V A\~ / / f I i / / l / ~i ' i / i' - \ V V ~ ~ V A / - l / / i / i~ i ~ ~ ~ A 1\V % ~ ~ 1 \\l~ r / l l i~ l l / / ~ \ \ v v ~ ~ i / ~ \ A V l / / / 1 / ~ / ~ / i ~ AVA ~ Q~~i A \ f I ~ i / / l l ~ - ~ / i l A 1~ ~ l ~ ~ ~ 1 / / / / f ~ / i ~ A AA ~ ~ /i ~ / l f 1 l / I V A V A 1 \ I I l 1 / ~ ~ / / i i \ ~ ~ ~ i i ' ~ \ l / I l ~ / / ~ i i ~ / ~_i ~ 1 1 I r 1 1 \ l I l ! i / / i i i ~ ~ i - I ~ \ ~ / / ~ VV ~ / / I ~ / / I / ~ i ~ 11I + /i/i ~ ~ \ \ 1 l r I I I / l I I 1. f 1 l / i / . ~ i ~ ' 1 ~ ( r / f i ~ ~ "J 1~ /i 'i ~ I~ 11 ~ V I I / / I f I . _ ~ ' / / ~ / ~ ~ ~ / I I `Ir I I l/ l , / , / r - , / ; ~J - ~ j ~ „i, I, I ~ ,f i , v / i ! l l l 1 1 / ~ I l l l - / / - ~ - I I I 1 V I I s v \ ' + I I 1 / r ~ / / I 11 11 / / I ~ / 1 / / / of I ~ V A\ V 1 I ~ I \ ~ ~ / I l \ \ \ 1 ~ ~ \ e4.. . i/iii l I ~ I I I ~ ~ \ \ \ ~ \ \ \ \ \ \ \ \ \ QL ~ ~ \ \ _ / III III I I / / 1 I I i ~ 1 / ' ~-T~.,/ f \ .l.''""` 1 / / ~ / 1 IIII I 1 , / l / f 1 1 I l I ~ ~ I I / / / I I \ \ \ \ \ \ ~ / 1 III I I I I / l/ I I I I I l ,.T l I / / l ~I / ~ ~ I I I l I r A ~ \ v A A A \ \ \ v ~ 9j0~ ~ ~ ~ / ~ > ~ ,i , /I 1 IIII III I / / / I I I 1 I /I / / I I / / t \ / / 1 1 1 1 1 1 1 / / I I / v \ 1 / I / I I / ~i ~ I I l i / \ t V A V A V A\ ~ \ V~ ~ ~ A ~ I r r \ / I1 1 1 1 1 1 1 1 / / / l l l 11/ 1 1 1 / I 1 , I 1 1 1 ~ l / I f I 1 1 1 1 I I I w ~ / I I I / ~ \ ' \y \ ~ ~ 1 1 11 1 v / / I I 1 I I 'A ~ 1 I l l I ~ _ / 1 1 v, 1 1\ 1 1 I / / ~ / a/ /r~ I I \ \ ~ I / ~ /r / rr I I ~ ' ~ \ \ \ r ~ ~ r / { V A ~ \ V A . V ~ ~ ~ 1 1 I I 1 I I v~~~ ~ / / 1 1 1 \ 1\ 1 I I / i r II l l vv v v I ~'r i I~ i~tii ;nr ~~I~ 5 r- ~ •ti 7 ~FJ~ LI ++I r -~Fal ~I~ - ,L ~ _ Y' • _ ~ ~ '1~ - ~ ~ - I ' i~ a ~ ~ - _ I i i~ `i I i I 11 _ _ \ \ ! ~ I ~ h ~ 1, / / 11 1 1 1 1 1 I I r / l l/ l/ / l r / v v v v~ I I III II v vv v v +I III I~ / ~ I III I v ~ II II v v v 1 ~11 ~ ~ / v v v v v ~ I I r ill! II vvvv1'-~ I III ~ ~ ~ I III .I / / 1 1 r 1 v \ VA v 1 / 1 ~ ~ \ ~~v~~ \ / / / l I I I I I I 1 / / l / / / / r ~ ~I I 1 ~ ~ I II v II v I ! II / v v v v ~ v I I I I I II vvv v i t ~ 0 I III ~ I ~ ~ ~ v v v v ~ , j1 1111 v I 1 II II an I 11 :III v / / lI I I 1 1 1 1 1 1 r 111 ~ \ \ V A r ~ ~ ~ \ ~~vv ~A~ / / / l1 11 1 r / / / / / / r \ 1 _ / / I I I1 I I > > I l ~ ~ 1 1 v rr ~ rrr 1 l1 r l/ / ? ////r ~ I I II II vv1 ~ 11 / ~ ~ I ~ v v v v ~ I IIII IIII ~ 1~ III 1 ~1~1 / I I I 1 1 1 I ~ 1 1 1 \ , ~ ~ A v~ v~ - ~ / / 1 1 1 _ / / I / J 1 1 1 1 1 ~ A r /I~' ~ v~ / / i I ~ / / / / 1 I 1 1 1 \ ~ \ \ \ _ / / / l / / l ! I 1 1 I 1 v 1 1 1 1 r ~ f l ~ ~ ~ ~ ~ ~v r / / l 1 / - ~ I l / / / / / / ~ v v v I I G. I ~ I l / / / / l 1 ( 1 1 1 1 I V v 1 V A 1 ~ ~ ~ ~ ~ ~ \ v~~ ~ ~ r / / / / l I l / / / l / / / / / 1 / II V 1 v ~ ~ v - I ~ / / ~ ~ V 1 v v` ~ v v I i1 III I I 11 v ~ ~ v ~0 ~ v ~ ` v v u Iv + I 1 :I / / I - 1 / l l 1/ 1 J l 1 l I A 1 1 1 A 1 / ~ 1 v~ v v~ ~v~ l / I l l 1 I nj \ \ \ \ I I I I ` " I l 1 1 1/ 1 1 1 A ~ ~v\ ~ ~v~ ~ v l I / / I / / ~ ~v ~ / ~ I 1 \ ~ v \ I I I I ~ I I l l I r I; ~ l / l 1 1 1 1 1 1 i/~ ~ I r ~ 11 ~ V A~~ v~~~\V l l 1 rr _----_-\I 1 11\ v v I I I I -f. ` ~ v v I I I I I I / / / I I r i ~ ~ ~ ~ ~~A A \ ) / / / / 1 1 / I I ~ / r Y / 7 / ~ \ VA V I I ~ v / / / f r ~ ~ v A ~ V _ ~ / V 1 / / / / / / 1 I I I v I r r 0' ~ ~ ~ v~ ~ v v ~ I ~ ~ v I I 1 1 ~ X11 I Ii ~ qi I I I ~ I I I I ~ ~ I v I 1 1 ~ 1 I III ,1 I I / / / / / I I 11 1 r 1 ~ ~ l ~ ~ ~ v~~~ ~v ~ ~ \ r - ~ I ~ / / / I 5 I ~ v v A v v~ _ - I ~ / 1 I I ~ r ~ ~ v~ ~v~ ~ - ~ v / / / / / l I 1 ~ ~ , v ~ v ~ ~ v 1 r! ~ , ~ _ ~ II ~ Gj, I ~ ql I I / ~ ~ 1111 / / / ~ r I I IIII ~ ~ ~ ~ I III ~I, I. / / I I I 11 A11 1 1 v ~v~~w r ~__1 / / / / / / I ~ \ V 1 - _ 1 / l ~ ~ ~A~~ ~ V ~ - / i I / / ~ v I ~ ~ 111!! ~ l ~ /I I I I I D~• <'J I II :i~l~ 1 ~ / I! / ( ~ a I I I I III 11 I I V I I ~ 111111`' / 1 "J i a ~~i I I I ".J I II / / I I A - ~ - - - ~ v A ~v~ ~ ~ - ~ r ~ 1 / / / / / / I 1 1 1 ~ ~ - r l ~ ~ I I I ~ I I 1 1 I ~ / / / / / 1 ~ I I ~ _ ! I 1/111! 1 I ! ~ / / .I ( ~ IIII I I ~ ~ I I 1 11 !1 1 / I ~O -I- ~ I t I I I I / r r r , ~v / / 1 ~ ~ ~ \v ~ A v ~r / \ / i r l / r I I / ~ 'f' I I / ! 11111 V I 1 ((~~I I III II I I I \ ! I I I I! , ~ v I I I I / r r r r r r / / / r I 1 ~ ~ ~ l ~ ~ / rr r ~rrr, l r r / 'U~ I 1 + - - I ! II 1 ~ ~ ; II I 1 ~ ~ V I I I 11 1 I I I I~ 111 I I I I. l I I I l1 I I I ~1 I / III 1 1 1 r r r r r ~ , / / ~ l CJ I ~ ~ O I ~ ~ \ + v v I ~ ! !1 I I I I I I III I ~ ~ `IIII ~ 1 I ( I I I I I y1 I I I I I I I I I II I 1 _ 1 1 ~ r / I ~ ~ ~ v _ 1 1 1v I ~ I I ~ I ~ I I I IIII I~ v v I 11 I! III III I I 1 11111 1 v~ _,1 vvII I I1 Ii1~1 v I :II r r r'// r r r / I ~ I ~ ~ 1 v ~ r ~ l - I II 1 \ r r r ~ I / ~ ~y, 1 I I - ~ I v~ I ~ 1 ! I I I I 1111111111 ,I~~ vI I I I Ili! j~' IIII I III IIII I v ~ I I 1 111 1111 ~ l V\ III II III II 1 ~1 II I III;11 I I I ~ \ I I 1 II 11 111 ~ 1, ~1 \ 1 ~ I I 1 l '1 III I I III ~ 1 v vv ~ r ~ ~ vI 1 I 1 / ~ ~ ~ 1 I v ~ / r I I I ~ I I ~ ~ I ~ 1 ~ / r r - I II I I~ ~ / ~ - - - I ~ 1 I I 111 II V / I 1 1 I I I Ill 1~ ~ I I I I II I ~ III I / I I ~ I ~ / / / I / ~ ~ ~ V 1 I I 1 I I / r / / I I I I 11 ~ ~ I I ~ I I 111 11 I I V 1 1 I\ 1 1 I I I I I I I ~ ~ I I II II I / / I II II 111 I I ~I i~ III I I I III III I ~ I I 111 11 I I I I 1 I ( I~ I l l/ l 1 ~ 1 1 / /lill II 1 1/ I 1 ~ ."s i--~ 1 \ ~ 1 1 I A 1 1/ 1111111111 I / III 11 III/\ I r I IIII I I ~ ~ III E III I I / \ ~ I1 I v l ~ 1 1 I! 1 I I ~ I I III I I I I / / / / ~ , l r / 1 I 1 ~ I / 1 ~ ~ I ~ 1 / / 1 1 1 / I I I r I ~ 1 I v / 1 / / 1 ~ ~ 3', I / / 1 ~ I 1 v I I I ~ ~ I v ~ ~ 1 / ~ I 1 1 1/ / ! I I I I 1 ~l 1 1 I I I 1 I ~ I ~ II I ~ I I 1 1 / I I I 1 V / ~ I I I I V I I II I 1 i~ I I I I 1 ~ ~t 1 1 1 I / I 1 ~ 1 / I 1I / ~ / / I ~ / 1 1 / / CJ ~ ~ \ ~ ~ / I I / / / I V I~ ~ I ~ F I ~ r v ~ ~ 1 1 I I I 1 1 ~ \ ! l 1 1 l~ i 1 11 1 ~ V 1 I II v A 1 I I I ! 1 f I ! I ~ ~ 1 1 ~ 111 ~ I I 1 i l ~ I I II / / I 1 1 1 ~ i I I I Q ~ ~ I II I I III ~ / t I I i I! / I A 1, I I I I o 1 1 i I / / I \ I ~ ti - ~ f / \ / 1 I v I I ~ / / ~ ~ ~ ~ I I I I~~ l i ! I I I I I 11 / V III I ~ I IIII II 1 ~ ~ v ~ I I ~i 1 I ~ A 1 v ~ v ! I III 1 I ~ 11 1 1 1 I I / / / / / I I vv v~ / I ~ I ~ 1 ~ ~ ~ A 111 11 ill I I I ! 1 11 I I~ V I`~ v1 l 1 111 1 I I IIII III / ~ ~ 1 ~ 1 v ~ ~ I \ ~ A !II I I I V I I I I 1 v ~ v I! 1 1 IIII 1 ~ 11111 III I 1 I I / / / / / / /.I I I / 1 I l_ v 1 ~ / v _ / ~ r. t / r, v ~ 1 ~ / I I 1 / / I / / l / / / l/1 I 1 I v ~ ~ ~ / I ~ / ~ ~ III 1 ~ ~ ~ . v I' II I I I - \ ~ //I/! / I v v v I ~ I I v ~ ~ I' I III ~ I , Illil = III 1 / v I r / I I 1 tp 1 1 1 ~ I ti I I v ~ 1 / / l 11 I1 ~ ~ ~ ~ I ~ , ,/I ! I ~ ~ v I I 1 ~ ! ~ II I ~ v ~ III II I / , / / ~ t ~ ~ ~1~ ~ ! III I I I Ih 1 1 1 / l / l/ 1 / ~ , I : r, r 1 I / 1 1 1 1 / I I ~ I 1 / / ~ I ~ ~ v _ / I 1 ~ I I / ~ ~ / / / , I I I I I v /III 1! n! 1j1111 I v 1 I (IIII '11 1 . I n / /1 ~ / I 1 vI l4 / / / 1 1 l 1 1/ l, 1~ 11 1 1 l - I I v °v~z:~ ~ ~ / I v ~~1 I ~1 I / A ~ / ! l / 1 1 I I I / III I/ ~ I 111111 V I (IIII , 111 I I I l 1 1 / / ~ ~Il 1 1 1 / I I I I I / i ~ / I / / / ~ Q ~ V ~ ~ / ~ A ~_i, / / 1 I I I ~ 1 I 11111 / li I V vvv A ~ I ICI 111 II ~ - / / / I 1 1 11 v I I~ ~ 1 1 1 I ! 1 / / / / / / / ' 11 I 1 1 I I I I I ~ A- ' ~ v 1 \ 1 V ~ ~ / / / ~ 1 J / 11 1 ~ ~ _ ~ ~ / I l / / ~ 11 I l 1 ~ 1 \ i _ ~ ~ ~ ~ / / / I / I I I 1 / I ~ ~ ' III I I ~ ~ ~ / / / I 1 I 1 / I I I IIIII~11 1 v / / I 1 I I vv I II ~ II I / / 1 ~ 1 'f' ~ ~ ~ ~ - / / / / I / A I ~ / ~ I ~ ~ A A I 1 / / / / / ~ / ~ . , ~ 1 ~ ~ ~ \ / V~ / / / ! I I 1 A t ~ III 11 ~ .1 V / / 1 I A I CAI I V'~. I Ill IIII l I l / / / ~ I I 1 t l~ I ~ A l 1 2 1 ~ , , ~V ~ ^ ~ L ~ L-~ ~ I I ' I F~ III ~ 1 P f~ ~ ~ / 1i II I 1 i v v ~ I I I 11 I I ~ ~ I I ~ IIII I 1 ! ~ , ' / 1 1 / I 1 I III l~ ~ ~ ~ 1 1 / I / I ~ ~ / 1 - l I j1 1111 I % / / / % ~ III! / 1 / / I i ~ - V~ V V ~ 1 r~ ~ / / / , / ! ! 1 / I ~1 ~ 1 11111 111 III r ~ 'C1 ~ ~ ~ I v~v e r r ~ / l / / ~ I II I ~ r ~ l V~V A~ / I i i / ~ I 1 ~ I "J v~ ! ~ , / I ~ I I ~ q vI / 1 1 , ~ ~ ~ , / / , , / / / / II , _ vv ! 1111;111 11 v ~ ! / ~ / / ! - , ~v I I I I I / ~ ~i~~ / / l l II11 1 i~ / r~ r ~ r (O I v~ v~\ I l 1 vv v / r ~ / l ~ ~ r ~ - / / / - ~11 I 1 1 v, v ! , / I 1 / ~ ~ I I1~ / ~ r I l/11 I / r l ~ t A~ / ~ r - r I / l / r / / I 11 / I / ~ ~ I I v~~~ 1 ~v` 11 ! ! ~ ' / ' / / / / ~ I v / 11111;111 111 v ~ ~ v v ~ 0 _ / , / / / / / I I I~ I I / II ~ II~ I II I 1\ ~ ~ I I l / / ! l l l ~I i I / 1111 r ~ 1111 / / A ~ / / ~ I I ~ ~ ~ I 11 1 I V ~ I I / / / / ! / / / ~ A / ( I Ill i '~iir~~ / 11 r I ~ / / / I ~ i / I I/ /i ~ / ~ 1 / ~ / ~ A v~~ / / / ! II / I ~ V A ~ ~v ~ ~ ~ I i / / / ! / 1 III Ill I - _ ~ i l ii ~ r ~ Ill / I ~ ~ ! ~ 1 ~ ~ ~ ~ / III - / 2 ~ v~ 2 II 1 - i ~ ~ I \ ~ _ ~ ~ / / / / / ! ! ~ ~ i ! I 1 III I~_,- v ~ "J I I11~ I I I ~ ~ l l III II I I A V ` I I 1 I / I l l ~ I l I II 1 V ~ n~~ I 11 ~ III Q I I I ~1 ,,{{~~1d ~ ~ III / ~ ''V l ~ ~ ~ ~1 / ~ I / I ~ / / I~ II v ~ / ~ r ~ / /ill I / I v 1 ~ ~ 1 ~ ~ I 1 I ~ A II III i ('U ~l I 1 I / /l 11 ( / - A s i ~ + l ~ ~ ~ , v ~ ~ ' I 1 1 1 / / ! V ~ ~ A IIII 1111 ( ~ IIII , I I \ ~ l 1 I 1 / / ! 1 I III / I III I 1 r + / ~ I / / / J V / i ~ ~ ~ \ ~ ~ ~ ~ _ ~ , I I ~ / / / I I I I I I I ~ IIII t v v~ I ~ / 1 I l I 1 1! ~V I/ ~ I ~I~I i 111 ~ /r I ~ ~ /li + I (p ~ / / / ~ ~ / I 11 v - r r - 1 i ~ v ~ ~ ~ Il~v / / ! ! 1 I I 1/ 1 1 1 v I 111 ~ III I I ~ ~ I 111111 \ ~ / ~ \ II II 1 / / / r ~ 1 r o' I vv 1 / ~>"5 - 1 ~ ¦ v / ! 1 ~ 1 I/ I 1 ~ ~ I V 111' 1 1 -----i ~ ~~i r v v v ~ I v /l1 ~ / 1 ~ r I l l ~ A ~ ~A ~ ~j' ~ / I 1 / V ~ rr ~ 1 1 ~ ~ I I I / v / v 111 /1 v L J ~ I ~ 1 ~ ~ II 111 1 ~ ~ ~ / v 1 / 11 I ll l I l lI / I ~ / v~ 1 / / ~ / ~ ._-I 1 ti 1 j v ~ _ - _ I 1 ~ ! ~III~ 111 i 1~ v ~ ~ ~ ~ I / - - 11 I I ~ ~ 1 1 /l/ l l I r ~ l ~ ~ 1 l ~ ~ r vv + J r ~ ~ ~o ~ I ~ r ti 11 1 ~ ~ 1 ~ ~ III 111 ~ ~ ~ ~ ~ ~ I I 1 I ~1 ~ /lil//l r~i~ ~ 1' / vv11 ~ ~ t v v ~/l l// r r / ~ 1 ~ i v \ \ ~ - ~ ~ ~1~ G I I A 1 I I l1 I r ~p rl I / III I 1 ~ ~ ~ \ ~ ` _ \ ~ ~ 1 ~ 1 \ ~ I I - - - - - - - - - - - - - v - J~~~ I I 1 e ~ ~ - - - - I II ~ _ //l r 1 ~ - / / 1 ~ i/ 1 l 1 ~ i \ I~ - v I I \ V 11~/j I ~•~~/l/ 11 ~ 1 ~ l / v ~ 1' - ~ ~ ~ ~ A\ 1 ~ ~ ~ ~ v / I i~~ A \ I I r ~ I l / ~ I / / \ \ v 1 1 v I 1 \ ~ 1 I 1 l 1 I ~ 1~ l _ ~ ~ ~ ~ ~ VA 11 II _ / / ~ 1 / ~Q / ~ I \ \ I \ ' - SIGNAL \ I ( I I , ; , _ i _ , _ ` ~ 11 11 I - - Ir~~ / V v ~ \ ~ 1 I I _ ~ ~ __,~1 1 / 1 l r~ J1 1AIIIIIIII ! I 1l / l~ r l / 1 ~ 'r rrl 11 I II A VA\ rte- ~ / ~ / ~ / I 1 \ ~ ~ 1 1 1 I I _ ~ ~ / \ ~ j 1 ~ / III I / l / ~ / r/ /l l 1 I ~ / I r ~ ~ l 1, l rr r , / //I III / / / / ,I / ~ r-~-- / / ;:r: 1 \ ~ I 1 i l ~v / l ~ II / - ~ ~1 I I I ~ ~i / ~ / v ~1 A V ~ ~ I I ~ ~ ~ 1 I I I I ~v / 1l 1 r ~ _ ~ ~ ~ i / / / / / jl ll//j I / / Y1l 1A1 / ~ 1 1 1 l ( / ? i I I ~ ~ I I III III / ~ 1 I I I t ~ 1 / I / i~ it r~%,%ll r t/ ~'~/1 IIl _ I / ' / ~ i /i~rirr l 1 r J~ ~ ~ ~ l ~ ~ 1 / r ~ I / ~ ~ I it / ~ l r/ ~ rr!rirrri ~ 1 ~ ~ /~V ~ / r I ~ - ! l / I / r ' / r/i ri rr ~ i ~ I r r ~ / / I r r i / r ~ 1 r I~ l / I I 1 I ~ v 1 1 I I I / ~ ~ I 1 I ~ I A\\ I i 1 i I I 1 i / ~ / 1 A A \\1 ~.I / / ~l \ i 1 V l l rr ri ri r~ l / ~ ~ l I l r I r~ v r ~ 1 / l r rr r ~ ( I ~ I / / r r "j - r 1 1 l/ ~ ( l 1 ~ / \ \ 1 \ \ 1 ~ / ~ I I \ ~ \ \ I I _ \ / I / I \ 1 I ..F I / 11 ! 111 I I I //r ~ ~ / / l T' ~ / / 1. r I l \ 1 ~ 11 1' ~ r/ ~ / ~ / / / A \ 1 - ~ ~ / i C I I I v A I 1~~ I / ~ / / I I V ~ 1 I V v V~ ~ ~ ~ i/ v / l ~11 / r l// II 1 1 / l l j~ I \ v / 1 ~Q ~ ~ l l / ~ - - ~ ~ l I / / v ~ ~a l lr l ~ I 1 ~ ~ ~ _ _ 1~ ~ - ~ ~ ~ ~ - - , I l l /l Il l ~ l/l III I / r/ / I 2 , ? r r l I/l//ii I v ~ ~ 1 ' I I 1 ~ . / r ~ / ~ ~ r ~ ~ ~ 1 I ~ I I 1 ~ ~ I ! 1 I ~ ~ 1 r l /l1 //l 1 v / I , ~ ~ / ' /~i ~ II I r ~ r ~ r~ ~ ~ - r - _ I I 1 Il ~ I\ I ~ I I I 1~ / v I ~1,,--. / ~ / i A\ \ l / 111 I I ~ 1 1 1 l ~ V /I 1 1111 III ~ ~ ' / I ~ ~ i / ~ ~ / ~ ' I III I ~ 1 ~ / / ~ ~ r ~ ~ / II v II Illll I ~ l ~ \ r~ v ~ / ~ - ~ J / , vvv. I I 1 1 / l li ! lil _ _ , vv / I \ \ II ll 1~ \ I ~ ~ ~ I I ~ ~ ~ 1 / / J ~ / r r \V A\ V~ \ ~ / I 1 ~ / 1 / / I I v \\VA\ ' / 1 ~ ~ r ~ r 1~ ~ I I ~ ~ A i i- \ 1 ~AV AV AA \ ~ l I 1 ~ / ~ ~ ~ ~ 1 / ~ I: A ~ AAAQVA ~ A ~ I I ~ ~ ~ ~ ~ ~ ~ / ~ - - ~ J' ! / / 1 I / - i t / ! / 11 ~ / 1 vvvv ~r ~ ~ ~ / / I 1 l ~ / ~ I ~ _ _ _ - - - - - i / ~ / III V\I A\\ ~ ~ I~.I I / ~ / / I ~ ~ ` i / ~ V ' - ~ r r 1 AvA Q~v ~ 1 ~V I I ~ / ~ ~ ~ ~ V A/ ~ r t i _ _ ~ ~ / / i ~ i / / / 1 ~ ) 111r ~ ~ i / / / I I ZJ ~ //j l ~ !ll 1 \ 11 \ \\1 11 vvv~Q v ~ I A ~"t I I I I d 1 ~ / l~ \ ~ ~ / \ _ 1 1 1 A~~ v \ ~ ~r ~ I ~ ~ ~ / ~ ~ r A ~ _ - - \ .11 A vA ~A v 1 ~ V~ ~ ~ 1 I I ~ ~ / ~ / ~ ~ ~ ~ r ~ / ~ i' / / ~ I / _ k ~ i 1111 / 1_ _ ~ / / / / ~ 1 11 i / / . 1 \ V V ~ ~ 1 1 I ~ I ~ ~ V~ 1111 I A VA v VA ~ I 1 t ~ ~ ~ r III I 1 A\~ v I ~ V ~ _ I I I ~i. 1 ~ A ~ ~ V A r / / / ti ~I I ~i ~ - ~ V I1 II \ v~ l v I 1 ~ ~ - - - I ~ ll 111 1 1 A ~ A \ v l"' I I I 1 I ~ \ \ _ '11 I V 1 A ~ ~ ~ I \ ~ V ~v ~ ~ I A 1 ~ ~ - - - / ~ _ ~ l / i ~ I lily . _ ~l ~;//l l i~~ ~ ~ ~ ti _ ~ - _ ~ /l l l l 1 II / I - ~ .I ~ l ~ ~ \ 1 ~ / l/ l ~ 111 / ( I 111 \ ~ A ~ V A ~ ~ \ V 1 ~ ~ I I I \ \ \ 1 ~ ~ ~ ~ ~ ~ ~ ~ 1 I ~ ~ ' 1 1111 ~ A \ ~ A~ ~ ~ \ ~ I I 1 - ~ ~ ~ n / l1 ~ r 1 1! ~ ~ III / / ! \ ~ ~ l~/ ll~ l / 11 I 111 1 \ \ I I \ I ~ - ~ ~ / 1 I 1 1 A V v v vv vv ~ ~ ~ l ~ I r - ~ A ~ ~ ~ it ~ ~ 1 1 I 1/ I l l ! 1r I 111 - - . \ / ! / i . ' ~ I 1 1 ~ ~ ~ / 1 A 1 ? I ! 11 I 11 I I 1 A/ V A 1 A A V A A A \ ~ A I 1 1 1 1 1 1 l I i~ I i s ~ 111, I \ \ \ \ \ ~ \ I I I / - ~ ~ ~ ~ / ~ irr _ ~ ! ~ l1 _ _ I !1 1 ~ ~ / 1 A 1 ll l 1l III I 11 \ V Av vvv ` ~ ~ . ~ 1' I I I I 1 I 1 ~ ' r,,_~ ~~''rr-' / / I I A 1 \ \ V AA ~ \ ~ ~ ~ I I \ 1 1 I ~ ~ ~ ~ ~ /i ~ I ~ ! 11 ! A ~ I I IIA,'v~v~ ~ / ~ I 1 1 IIII / i ~ ~ ~ 1 ~ ~ / / ~ / I 111 I I I I \ V A\ 1 ' I 11 1 1 1 / ~ ~ / i/.~ ~ iii r j ~ / ~ ~ ~ I I ~ / v v ~ ~ Di 1 /i l ; l1/ I I I / / II : I I I I 1 v ~ VA ~ V( i - v~ ~ 1 sal 1 A V ~ / / ~ i i /li i i 1 ~ I II 1 A \ OVA ~ V 1 i ~ V 1 1 I 1 ~ - ~ / i~-- \ ~ ~ / A ~ ~ ~ I I ~ ~ ~ ~ ~ ~ / / / / / / / r ~ I I I I II 1 V A \ \ VA ~ V~ ~ 1 1 1 A V A A 1 ( / - - - ~ ~ ~ - _ ~~A ~ / / ~ I I II v v vv v v ~ / V A I I II I 11 1`~1A V A~~ vAA ~~11 A \ \ 1 V 1 1 r r ~ o l - 1 ~ ~ ~ ~ ~ l/ / I / 1 ' ~ \ / 1 1 ~ ~ ~ l 1 1 I l/l CJ 1l~ll 1 1 / 1 ~v I A A vvv ~ / \ _ ~ ~ 111 i 1 A A V A VA 1 1 I / r r' - ~ I \ / 11 i 1 ~ ~ I / i / / / I ~ I I i l l l l I III / / ~ ~ A 1 ~~~V ~ ~ ~ I 1 ? A V t 1 I / i - ~ ~ ~ \ ! I ~ \ I I 'J~ / / / / / I / !1 , , ~ ~ l/ l/l,~ lj/ II II I 1/ l l I 1 I 1 \ ~ ~ II ly \ \ P 1 I \ 1 / / / ~ ~ I ~~//l ~ ~ I l i l l (1~1 / l/ II/I III V A I I I ~ 1, 1 I I I I A 1 1 1 / / l 1 - ~~"llll l / / / / ~ I I "J l / ljl I 1 \ / 1 l lI 1 \ \ I I, I I~ S I 1 \ 1 1 / 1 1 - _ I II II ~ I 1 ! 1 / r \ \ II 1~ 1 I \ 1 ~ ~ / 1 ll ~ l ~ ~ ~ \ IIII II ~ ~ I ~ I I I V~ / ~ / 'Il II v ~ 1 / v. 1 .vv v v~ .III ~ vim/ j~l i ~ ,v \ v. v\ V ~ / I ~ I v ~ ~ ~ - _ / ~ ~ I / ~ ~ ~ ~ Ill~~ ITV I II I ~ I ~~/l~~•~//~~ 1 1 ~ II ! I I ! 1 \ \ 1 \ ~ I l I I \ ` `mot 1 - ~ / / ~ v v II I! ~ / I I 1 I I ~ / I i A II I I \I I I / ~ I I 1 v , l 11 A I v ~ v ~ ~ , ~ ~ \ III I I 1 ~ / - I ~ / ~ / v ~ II I I 1 \ I I I A \ ~ I I / ~ 1 v \ v ~ "J I 1 1 - ~ ~ 1 ~ ~ A V A - ~ ~ ~ ~ ~ v.~ - _ _ , - ~-sz % ~ 0 II / I / i I III /j ~ l/l / M ~ ~ V A ~ II/ I I I / 1 ~ ~ ' I I I ( / / / / 1 \ ~ 1 - ~ ~ ~ ~ \ \ ' ~ / I \ I 1 V 1 1 ~ v~ \ ~ - V 'f' 1 II i I I ~ 1 / / ! I I / / / / - ~ ~ eti 1 / / I ~ ~ 1 / ~ ~ /1 _ _ 1 24 I I / I / , ~ I I I~ / / / / - ~ ' N. II I I V I \ .J / / 11 1 ` v`~i v I 1 v v ~ r \ v v I ~~v ~ ~ ` v ~ ~~1 v III 1 1 \ l 1 ~ _ \ I \ I ~ ~ I ~ ~ \ _ V1 ( ~ V ` ~ \ ~ I I ~ ~ ~ A` ~ ~ ~ ~ ~ - .7; II ~.I ~ I I ~ ~ / I \ III / ~ / / A - ~ ~ Ill ~ I(II ~ I / A ~ / `I till / / ~ / / II 0 /1 , ~1~ I / ~ v A ~ / I I ~ - ~ / I l/l 11 l \ v v v / I \ v / / I / / 1 ~ ~ A~ ~ ~ ~ ~ ~ ~ ~ ~ v 1 / V A A V II ~ ~ - lj/l 1111 1 ~ / v 1 I I ~ ~ ~ - ~ \ \ ~ \ • \ \ \ ~ I / ~ V ~ \ VA \ V ~ V A / / ~ i / / \ - / / i _f~ ~ ~ \ \ \ \ \ ~ / 1 1 / \ \ 1 n / / / ~J v~ A v v v v v v ~ \ 1 1 1 / ~ I I / 1111 I (I~ / / / / f~ \ v v v v A\ v v ( A I ~ I / / / / / / / / / / / / - i - \ \ \ \ \ \ ~ \ \ \ \VA \ V A \ V A - - ~ / ".J ~ I / / l I' Ill l I v I I I I I l / / V A \ V v v I l I ~ / I 1/ l~ 11 I \ \ I f / (r ~ / / ~ / ~ / ~ - n ~ \ \ ~ ~ v \ \ \ V A \ V A \ \ V A \ \ \ ~ \ / 1 1/ ~ ~ / 1 ~ / 1 v A V A~ v ~ v~ I I ~ I / I 11 I ~ \ I I 1 / / / / ~ (j~, ~ \ \ \ \ \ \ \ II I r / / / / / / ~ ~ ~ ~ V v 1 1 1 I A \ v A \ v \ V V ~ / i / / / ! ~ l l I A \ \ vA v A \ \ \ ~ v / I 1 1 it ~ ~ 1 / Ill ? II I I II I l l / / ~ ~ V ~ \ V A\ \ \ l l l r / I I I \ \ \ \\1 ~ ~ ~ \ \ 1 ! - II / ~ 11l Ill \ ~ / \ 1 I \ 1 ~ / ~ / I / / ~ ~ 1 ~ I ~I I ~ ) 1/ I I \ / / II Ill ` Illl / / \ I I I I I ~ !I I I ! / ~ v v \ ~v ~ I l r I I I I ! / ~ ~ r_~ 1 \ \ \ \ \ I / ~ I I / ~ \ / \ ~ / _ v i I~:: / / I/ ~ ~ Illl / v ~ A I I ~ \ \ ~ \ \ \ 1 1 \ I I ~ 1 A V I I V v ~ v / V~ v " 1 ~ \ \ I I l \ l ~ ~ / ' ~ III / I / / ~ \ ~ ` I I 1 I~ / v I I \ A \ v v~ I 1 1\\ v 1 1 l 1 \ 1 I I I / \ ~ / \ \ " ~r \ \ I I v v ~ ~ ~ ~v z. ~ i I 111 / ~i ~v ~ \ 1 V I I V A ~ 1\ ~ / I / 1 / / II 1 \ I I \ ` \ \ \ \ I I I~I,1 \ 1 l 1 V ~ 1 L.' - I 1 ~ ! I I 1 I I v v V ~ vvv ~z III 1/ / / ~ ` v \ v I I I ~ v vv ~ l I II ~ n~/ \ ~ ~ ~ \ \ / I 1 1 1 1 1 1 v v /v v ~ v v ~ / I I I 1 1 1 \ \ ~ / ~ / \ ~ \ / / / / . . I \ \ ~ ~ \ \ ~r / / / ~ \ `CJ I v v I / ~o I~ I I ~ ~ J/ / ~ ` v ~ ~ 1 / I 1 ~ ~ / I A V ~ V ~ ~ ~ ~ / / ~ - ~Y ~ I I I ~ / I \ \ \ \ / - ~ \ \ - I l 1 ~ / / / ~ ~ / / I P~ v v ~ ~~~~~~vvv / - ~ ~ I~ I! ~ % / / / / / / v ~ \ ~~~Vvvv ~I / - ~y I II / / / 1 ~ I 1 \ \ \ \ / \ \ \ \ / / / / / ~ i ~ ~ ~ / / / I 1 \ \ \ \ \ \ \ / / / / \ \ \ \ \ l / / / / ~ ~ i ~ ~ i / l a v - vv v I„ I ~ % 1 / ,e~ ~ v v v vv " i I ~ ~ / ~ ~ ~ l V ~ \ \ / A V / ~ / a i \ \ \ \ \ \ \ \ / / / / / \ \ \ \ \ ~ / / / / / / ~ ~ ~ ~ ~ ~ / / / ' \ \ \ \ \ \ ~ I / / / \ \ \ \ / / / / / / ~ / i ~ / / / I k~ ~ ~ ~'1 ~ ~ ~ I 1 ~ ~ ~ I I I q I I I I ~ l1 / Il ~ / / / ~ / I l \ \ \ \ \ / / / / \ \ / / ~i i i / / / I \ \ \ \ \ \ / ! I \ \ \ \ \ \ \ / / / / / / ~ ~ ~ / \ ` \ \ \ \ \ \ ~ / l I \ \ / / / l ~ i / / i v v \ \ \ \ ! l I I v v v \ 1 1 / / / / / / / / / ~ ~ ~ ~ / / ~ , ' / t~`~=~ 1 ~ I III % ~/l ~ ~ / / / / / / I I I 1 l / 1 \ V ~ III:,.. 11 I I / / / + ~ ~ / / / 1 \ \ \ \ \ / / / / \ \ \ \ 1 1 / / / / ~ / / / / 1 ~ I I l r/ I I ' I VA AV ~ III I I ~ ~ / / - I I ~ I v ~ I 11 ~ / /'r ~ ~ / / / / I I \ \ \ \ \ \ \ \ \ / / / / \ \ \ \ 1 1 \ J/ / / r! / 1 / / ~ / V A V A \ v l / / \ V 1 / / ! I l l / / / ~ ~ ~ ~ ~ / - - - 1 / / , 4.:, ' / ~ \ \ n~~ it I I I) ~'/~i A ~ / 1 / ~ / / / II i / ~ / i / ~ \ ~ ~ (~~1 III i I I ~ \ ~ / / / / / / \ \ \ \ ~ / ( / 1 1 1 / / \ V A V A A ~ - ~ / - V A ~ / I / / / / ~ ~ - ~ / V A \ \ V ~ ~ i / / / / / v 1 1 1 A ~ ~ / / ! / / / / i II i i / _ / i i 1 \ \ \ \ I / I \ 1 / / I l / ~ / / _ I I / / ~ / / !I 1, 1I ~ III I \ ~ / V v v / I \ V 1 ~ I I l l l ~ / ' / v v v v v v v~ ~ / ! r rv V 1 1 / / l I l / l l / / / / / ' / /I I / \111 ~ I III ~ \ ~ , ~ / ~ / ~ I III I / - ~ ~ ~ ~ / I 1 I I 11 I 1 \ \ \ ~ / / f \ 1 / / / / / / / / / / v vvV A \ V v~ A l / l l V A \ V A V ~ l / I l ! l/ / / / l ~ / / ~ ~ ~ /ll 1 1,. ~ I I ~ ~ ~ ~ ~ / I fl I I I ~ / / I I I ~ ~ 1 - / ~ ~ / l II III II ~/~/i/ l ~ ~ _ ~ / ~ / ~ ~ / ~ I II / III ~ ~ - ~ V A V A V ~ ~ - ~ ~ / / / \ V A A \ V ~ / / r / / / / / / ~ / / / ~ I I / 111 \ ~ - / / ~ ~ ice' i \ 1'1 / \ / / ~ ~uU~' - i i / / \ \ / / / / ~ i~ ~ i i~ - A II 1 i ~i i ,i / VA~1V1 I / / i i ~ ~ / //i v\ \v vvv v ~ - ~ ~ / / V A \ V A \ / / / / / / / / / / / ~ / / / i 1 . i V i _ - i / i i ~ / _ i i ,i / ~ - i _ ' ~ ~ ~ ~ - v~ v v v v ~ / ~ / V A \ V A / / / / ~ / / / / / / ~ ~ v / \ ~ / i / / iii ~ i nn~ ,i / ~ ii f ~ ~ / / ~/i ~l / ~ - - / - ~ ~ ~ / ~ K~ III ~ \ / ~ / / - - ~ \ V A A v v ~ ~ ~ ~ ~ A A \ V A / / / / / / / / / / i / ~ ~ / / / \ \ i \ \ \ / / / l I / / ~ ~ ~ / ~ / ~ VA \ iii / ~ ' ' / / \ \ \ \ i/// / \ \ / / / / / l I ! / / / / / \ V A v ~ A A V A V/ / 1 / / / ~ ~ ~ ~ ~ / ~ ~i / / - i / / ~ J ~ I / i / / / , - v V / 1 I l / / ~ ~ / ! / ~ i ~ ~ / / \ \ \ \ \ \ \ J/ / l l l ! ! ! ! / / / / ~ i / j/~ / \ V A ~ / / qA \ V A A \ \ ! l r ! r / / / v vv' ' ~ ~ v , l I I I l l/ I ~ li/ /1\\\ l! r rl 111 i'/ \ \ \ / ~ ~ ' ~ / / / \ \ \ \ \ \ \ \ ~ l l ! r r I / l / l ~ ~ i ~ / / / / / / / ' , ' r v , ~ ~ - ~ ~J / ,-y~, ~ vvv v r 1 I I / / I I I I I I ' ~ , I / I i I / I r / ~~,II~ ~ , v v v / 1 ~ / ~ v V / / A V A V ! J l ! ! ! / ~ / / v \ ~ / ~ ~ ~ ~ / ~1 V A \ V A \ \ ! ! / r r / r / l l / / i ~ i / / / / ~ , I ~ I / / ~~"`ti I ~ v I v I I I v ~ V 1 1 1 1~ l I / l l I ~ ~ / ~ \ - vvv ~ 1 1 1 1 1 I I / / r / ! r ! ! / ! / / / / ~ ~ ~ / a ~ / ' ;/~'I~ III 1 \ \ \ \ / / I I I 1 \ ~ ~ / / \ \ I I / r I I r ! / / / / ~ ~ / / / I \ I I I ' ~ / ~ iii ~ I I III ~ VA \ V / 1 I / \ ~ V A 1 1 1 1 I I I 1/ l / 1 1 ! l / l l / / / / / ~ i~ / / / / ~ / / \ \ \ \ 1 1 I I I / / ! r ! r / / / / / / / / / ~ / / / ' / ~ ~ ~ 1 1 V A \ \ I I I v \ i~ ~ V iii I ~ V A V A A ~ / V A 1 I r ] I / r 1 I l l / l / / / ~ / / v ~ V A I / l I l 1 1 l 1 1 / / / / ~ ~ii,° I I I I I l- A\ \ \ \ I V I I v A A i ~ \ ii ii I ~ V A \ \ ~ / iii' I I I I ~ / i A\ V A \ \ \ \ \ \ V A ~ ~ .i p, I v \ ~ \ \ A III I l l I / 1 / / l l/ l l l/ / / I / / / / / / / / ~ / / ' / I / v v v v v v / I I I II I / v \v ~ v v v A v v v ~ / / IIII IIII r I / l ! l r ! I / l / / I / / / / / i i, ~ i/~ I I I I A\ V A~V AA V A\ V A V A A V ~ ~ A~ ' ~ - ~ ~ / / I I IIII l l ~ / / l I I I l ! / / l / 1 V I l / / / / IIII I I I v-'~ ' I I I I ! I l ~ I I r / / / / / 1 III I I ` 1 1 1 r I I I I I l l I l l l / / / / ~ /i /~i / I I I I I / / \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ ~ ~ \ \ ~ ii / ~ I I I A\ 1 \ A A A\\ ~ V v ~ / /1 I IIII III 1 - / / I I !I I / I 1 / / /~1 1/ II I I \ 1 V A\~A A VA V A A V A ~ / / / I I / \ \ \ \ \ ~ ~ l /~/Ol I/~ I I ~ \ 1 A A \ VAAA \ \ V ~ / / I I I I I I I / r l l l I I! v I l / I l I / / / / 11 I \ V AA \ \ V ~ ~ v / / I/ I I I I I} V ~ / I I I I 11! A 1 1 1 1 / I / i / I III ~ i / / ! l l 1 1 1 1 1 I I / l I I a V\ \ \ \ \ \ " \ V A \ ~ I ' / / I I A \ \ VA \ V ~ V \ I I Il I I I I I vv ~ / / I I 1 I I 1 I v / / I I I v~ 1 1 1 1 1 V I I / ;~ii / l I 1 1 1 /i / / ~ ~ ! I III I ~ ~ ~ / / / / 1 I 1 \ \ V 1 I I / p _ ,t. I . - _ 1 i I - r u _ 1~ J:. i I ~ 7~i ' I •I' i _ 1 ~ ~ _ 1 1 1 1 V~ ~ I 1 ~ I~ ~ N ~ VA Al \ I~ ! ~ I ~I~ l i l l / / ! ~ I 1 1 1 1 1 1 1 ~I ~ ~ V ~ v A ~ ~ ~ v ~ ~ ~ ~ / / / I / ~ I I I ~ I ~ ~ / / / / / / I I 1 ~ v ~ v ~ / / / / / l / ~ ~ \ \ 1 ~ ~ I III l \ i I / Ql I :J i ~ 1 \ ~ ~ I I i ~I II 1 111~_~ I II ~ I III I / ~ I I I I l l I I I I 1 v \ 1 \ 1 ~ ~ ~ ~ ~ v vv~~ ~ / / / l! l ~ l l ~ I ~ l / / / / i I I I 1 v 1 1 ~ i ~ ~ ~ ~ i~ / ~ ~ 1 i / 1 1 1 ~ II I I V I ~ V I ~ II ~ ~ 1 ~ ~ A I 1 I II~~ II 1\ 1 ~ I~ II ~ V 1 III ; I ~ l ! I I 1 I ~ / I 1 1 1 1 1 ~ ~ ~ ~ A ~v~A~ ~A ~ - / / ~ I ~ ~ l l / / / / / ! ! / / ! ~ i ~ ~ / ~ 11 ~ A 1 1 1 1 1 A A i ~ ~ VA~~ V~ i / / / / l ~ I I ~ ~ ! / / ! / l ~ / / / / ~ 1 l I j I v 1 ~ 1 ` ~ ~ ~ A v / / ~ - ~ / / / / ~ ~ ~ ~i 1 1 1 A ~ ~ 1 I I~~ III I I ~1 1 ~ I~ I i i 0 ~ I~ 111 _ / / I A 1 \ V - ~ l l I l I 1 1 1 ~ - ~ / ~ ~ ~ ~ ~ ~ / / / ~ l ~ l / / ! ~ i ~ l J ~ l l~/ ~ l l ~ ~ 1 A V V ~ ~ ~v~ / l I / ~ ~ / ~ ~ 1 1 V A ~ ~ 1 II I Il X11 ~ l III / ~ dl I II~~ II \ ~ ~ ~ II ~ i 1 ~ ~ A A V ~ A I i ~ I~ ~ I / 1 A \ \ I ~ \ v ~ vv ~ / / / / t / / / ~ l ~ ~ ~ / l l ! l I I ~ ~ ~ ~ ~ 1 1 I V 1 1 1 1 \ 1 ~ \ _ 1 ~ ~ ~ ~ ~ ~ ~v l / / / / ! ~ ~ 1 ~ ~ / / ~ l l I l 1 I ~v v~ i / l / 1 I ~ / l / l ~ I - ' - ~ v v~ ~ v l ~ ~ \ \ I I i I I' i 1 I I \ CJ \ \ \ \ \ 1 ' i I \ I' 14 l l/ / / I I I I ~ 1 ~ v\ ~ ~ ~v~v v~ A / / i~ A\~ / - / / / / / / l I l ~ ~ ~ ~ I I ~ ~ \A~ ~ ~ ~AA~ ~A VA / ! / ~ ~ I I 1 \ ~ A v ~ i ~ / / / / i ~ l i / ~ / / / / ~ / / ~ 1 ~ ~ I ~ ~ ~ ~ i l ~ A ~ ~ v v \ / ! I r' ~ ~ V~ v I 1 1 ~ 1 ~ I ~ ~ ~ i i ~ / / / / I 1 1 ~ ~ / ~ ~ ~ ~ A ~ V ~ ~ / / I I I \ l ~ ~ V A ~ 11 1 1 1 ~ / f I ~ n ~ ~ ~ ~ \V~ V l _ J / / / I 1 V~ ~ V ~ 1 + ` ~ ~ 1 ~ ~ ! : i I 1 1 ~ ~ ~ ~ I ~ I / ! 1 I 1 1 ~ i ~ ~ I ~ ~ ~ ~ v \ ~ / l ~ / / / / / ( I ~ 1 1 ~CJ , " / i ~ \ I I \ 1 i i, A ~ I I I'i~ ~ ~ 1 I'i i ~ ~ 1 1 r! ~ ' iii ~ i ~ Ali i i ~ ~ i I A ~ ~ 1 v~ ~v ~ I / ~0' ~ ! ~ ~ ~1 , l ~ ! ~ ~ i 11 1 ~ r ~ I i D~' ~ I I 1 i I 1 u! -a 1 ! Iii 1 ~Il / ! ! ~ ~ ii ~ it ! ! a I ~ i I .I ! t t ~ ~ ~l I II ~ I I I 1 /1 / ~ I I ~ I i I ! I ll ll l ~ I i - 1111 ~i ~ ~ I N I 1 ! 0 i~ l I I I I I I i ~ i i / V I 1 ~ 1 ~ r ! ! r! ! ! i ~O ! I ~ ~ I ~ i 1 i ~ ~ >II~ I i! Iiil11 1 ~ i / / 1 i ~ ~ ! I ~ ' 1 ~ I A ~ ~ ~ I „ ! I I ~,,,r ~ ~ , ! I , , r ! ~ ll 1 ~ -i- v 1 I 1 I ~ ~ \ / 1 \ ~ / ~ i ~ I ~ ~ A ~ ~ i I ! I I I 1 v r !I ! i I I ~ ~I i ~ II i I I 1 !I ! I I l III ~ ~ I I ~ I I ~ / / i ~ ~ I i ~ ~ ~ J 1 ~ ~ I ~ ~ ~ rw \ I I 1 ! ! I I ~ 11111 ~~I I ~I~I! 1 - ~ I I l I III ll I ~ _ ~ A I ! ~l~ ~ ~ \ / ~ I ~ I I III I \ ~ - ~ 1\ q ~ ~ I. ~~~I ~ ~ III I 1 l I ~ ! ! ll!!1 II (~fj~ \I \1 ll~~! 1 ~I i~ "II 1 I III I I \ I I ~ V I I ~ I I h III ~ V\ I III I I ! IIII \ I III ~ II I I I / - ~ ¦ r( r- / ( ~ / I \ ( ~ ~ ~ I l I !!!I III ~ I~ 1 1 ~ ~ l II I! I ~ II ~I ~ ICI I \ ~ ~ i ! !I! II v ~ i I it ~ 1 ail I 1 ~ l' i i , I / / 1 'V / ! ~ III ~ \ 1 i I / / ~ 1 1 ~ ~ ~ I ~ ~ / ~ I 1 `i I / I I ~ C.1 ~ I i 1 ~ 1 ~ ! !I! I I l I 1 '~I `~h _ I ~ I I I!I II , ~ ~ I it 1 1 i lv, I I it i i I I~ l e i, 1 i _ ~ i A ~ I ! I ~IlIlIIlI i ~ ,'I I'll 111 I i~ III I I l ICI ` ~ ~ 1 I I `i ~ / I I I 11 I ~ ~ 1 / ! ` ~ 1 ~ ICI !I ~l I ~ ~ ~ III ! 11~~1 I ~ i III ~ 1 ! 1i ~ i~1~ I I l / / 1 1 ~ I I r~ ~ ~ 1 1 / / / I V1 ~ ~ 1 ~ ~ I / / 'I I I ~ I \ ~ ~ ~ l it ~ , / !I I , l 1~: I l I ! + 1 ili !I ! i i I I 1 I~r l~ N I q ~ ~ (pv I~ I II ! I ,.i„• I r I ~ I I I ~ ICI I I I f 1 I I ! / / / ~ A~ v I I ~ ' ~ I I / / / I I l ~ ~ i i l ~ V I III II I I l ~ 1 !l / 1 I I! I II 1 ~ / I ~ IIII I f I l I i I ~ V I'I I ~ ~ ~ I C I I~Illl l! l ! I !I I i i ~ ~ ~ I 0 ICI ~l~ I I I / / / I 1\ ~ ~ / I ~ I I j J 1 / ~ / I / ! / I 1 ~ / ~ I I I / I/ 1 ! II I I I 7~ ! ~ I I i ~ i ~ ~ ~ I i / / ~ I I I ~ I I I lil i ! I 1 1 I i I ~('U 0 ~''~Il ~ I~ I I I / / ~ ! I I CJ ~ / 1 1 I I / / / I I V 1 ~ ~ ~ \ II I ~~II I 1 1 ~ l v 1 !i ~v / II 1 I ~.J ~ ~ a I I I ~ ~ ~ ~l I I 1 I I 11 v! I! I I ~ 1 ~ ~I I I I I~ ~ I I / / l/ ! l 1 l 1~ 1 1 ~ _ ~ i ~ , , / , / ! / i ~ I 1 1 ~I I ~ I ~ ~ ! , ~ ~ _ ~ l~l I ~ ! ~ l \ I ~ 1 I 1 A ~ ! ~ IIII I I 1 ~11~ II i ~ ~ 1 1 ~ / I 1 ~ 1 1~` I ~ i I I l l 1 1 ~ I III ~ ~ ~ _ \ ~ I ! \ \ \ I I I 1 ~ ~ ~ II ~ I I ~ I I I i / / / ! I I ~ ~ ! 1 I , ~ ~ I ~ ~ ~ ~ I / / / ~ 11,+1 / - ~ ~ 1 / 1 i ~ ~ ~ ~ l 1 X 1 1 1 \ 1~ 11~~ ~ I! I III ~ 1 I 1 111 ~ III _ / 1 ~ 1 ~ I ~ I I I I / / / l ~ l I I 1 1 ~ AI ~ ~ / I l ~ ~ ~ / / / ~ I l i l I I I I I / I / / V ~ ~ ~ / i ~ ~ ~ ~ ~ 1 1 I I 1 1 \ ~ ~~1 I I I ~ 1 ~~II~ III ~ ~ ~ - ~ ~ ji ~i ~ ~ ~ ~ 1 1 1 1 I l ~I~~ / Illll ~ ~ I ~I~I~~ I I ,~il,, ~ ~ II o I 2• v~ ~ ~ ~ ~ ~ ~ i ! I ~ 1 1~~ I 11~ I ~ / 111 I~Ifi~ 1 ~ I 111 ICI ~ i ~ A i~ ~ ~ l l ~ I I 1 1 1 1 ~ III I~ I l X11 1 I ~ I II I ~I 1 1 ~ ~ I 1 I I I I~ V I I~ 1 / - ~ ~ i / l ~ I I ! 1 ~ 1 III ~ I A~~~ \ I IIII ° Illl ~I V~ ~ ~ ~ ~ ~ / I 1 I IIII / l/ I l 1~~~ I I 1 ~ ~~l ~ II 1 V~ ~ ~ / / I 1 I ~ I ~1~' ~ l ~ I 1 , - - ~ ! ~ i ~ I I 1 I IIII ~ v ~ I I I ~I i li ! V ~ ~ ~ i~ ~ ~ l/ ! ,i ,i 1 I I ~ 1 I I l I~ I~~ I 1 ~ ~ ICI I I I ~ ~ ~ i / / / / ~el I Il ~ l ! \ / ~ 11 I ~ ~A I I~ l I ~ ~ ~ 1 I l~l 11 i~ 1 i viii : i 11 ~ / / ~ I ! ~ \ ~ / ! ~ v - ~ ~ i ~ , I I!I ~ i 1 ~ + I i li ill ~ ! ! 1 ~ Ali i! 1 v ~J lil~i r 1 i ~ I 1 ~ ~ ~ ! r I ! ~ ~ i ~ I~ I ~ ~ ~ l ~llii ~ ih II ~ ~ ~ / ! ~ 1111 I ~ I ~ 1 / ~ / / I VA~\ \V r ~ ~ ~ ~ ~ ~ / ~ / 11 ~ ' ~ ~ ~1 ICI / ~ - / / I 1 I 1 ~ / , ~ ~ 1\ \ ~ \ ~ / / I i i ~ "J \ \ ! I / 1 1 I ~ ~ ! ! / l I l 1 i ~ 1 1 ~ l~~ i 1 1~~~ ~ 1 i / / i ~ ~ / ~ / l ~ v III I~ 1 II / / - ~ r I I ~ l ~ ~ i- ~ l / I ~ l I 1 III ~ 11 11 ~ A ~ ~ 1 ~A ~ ! ! ~ ~ / ~ ~ ~ ~ I ~ ~ ~ ~~AAVA Il~~ 111 Il \ ~ ~ ~ A \ ~ I ! / ~ / / ~ l ~ ~ ~ 1 1111111 1 ! ~ I I I I 11 I1 I ~ ~ - / / ~ ~ I / / I I J. I~ ~ 1 ! ~ ~ ~ ~ / III V ~ i ~ ~ l 1 ~ ` ~ ~ ~ ~ I / ~ ~ ~ ~ ~ ~ I 11111111 1 I ~ 11 I 1~ 1 ~ ~ 1 C~ ~ ~ ~ ~ / ~ / / ~ ~ ! 1 ~ / ~~Il I I 1 ~ 1 ` ~ ~ ~ ~ I I ~ i l / ~J ~ ~ ~ I 11111111 i ~ l I ~I 2 II ~ ~ ~ ~ ~ I ~ III II ~ ~ I 1 1 ~ ~ / ~ i ~ ~ I ~ i A 1 ~ l ~ ~ l ~ ~ ~ A l I ~ ~ III I ~ ~ 1 ~ 1 ~ ~ _ ~ 1 i / / ~ ~ I ~I ~ ~ I III11 I 1 ~ i ! III / / ~ / ~ / ~ ~ I ~ ~ ~ ~ 1 ~ ~ 1~ 1 1 ~ ~ I ! ! 1 ~ ~ l l ! ~ ~ l ! 1 II III IA-__ ~ l ~ 1 - - - ~ ~ / / _ I V / J ~ I ~ CJ 1 ~ / / / / i \ ~ / 0 I ~ ~ ~ ~ ~ ~ ~ ~ ~ I t ! I ~ ! ~ ~ l ~ ` ~ 11111111 \ ~ ~ ( ~ ~ ~ I I ~ l ~ ~ I I I ~ ~ (O ~ ~ ~ I ~ ~ ! ! ~ ~ ~ ! V 1 ' ~ A I 1 V ~ i ~ ~I~~ I l ~ d / ~ 1 ~ ~ i/ / _ / ~ ~ i ~ ~ ~ ~ ~ ~ ~ ! ~ ~ 11111111 i ~ I ( I I I~ ~ I ! I ( I ~ ; A - I / ~ / / I ~ "J ~ II I . I ~ ~ I ~ ! ! ! ~ ! 1 I ~ ! ~Ill~l ~ / ~ Il ~ 111 ~ 1 / ~ ~ ~ 1 i~ ~ ~ A ~ I I ~ ~ ~ ~ ! ! I ~ v / ~ I ICI I ~ ICI I I I; ~ ~ ~ ~ l l ! I ~ 1 1~ ~ I ~ - ~ ICI i I~~ 1 11 ~~~1 1 / ! ~ ~ ~ \ \ ~ 1 1 ~ ~i ~ \ Ili: II ~ ~ ~ ~ ~ / 1 ~ 1 I Iliillll V ~ ~I I ~ I ! ~ 1 I ~ ~ / ! ~ / \ II ~ ~ i ~ ~ ~ - ~ 1 -1 I ! 1 ' ~ ~v t , (,,~(p' (i ~ l I l ! ~ I ~ / / ~ ~ I ll!/ l I ~ ~ J ~ ~ 'V / ~ ~ l II ~ I ~ ~ ~ i _,ill! I ~ 1 _ J I l i ~ ~ ! 11 v Ij1~ IIII 1 I Jr b 1 ti ~ A ~ ! ~ / ~ vv 1 i ~ ~ ~ ~ ~ ~ - ~ ~ ~1I1~ 1 I \ r,_~~ ~ ~ ~ _ _ ~ 1~V~_ 11 ~ ~ 1 i 111 v ~ ~ ~ 1 ~ ~ ~ ~ / ~ ~ i Q vv11 I iii - ~ ~ ~ ~ _ i 1 ~ i ~ ~ ~ \ _ / I / ~ ~ 1 ~ 1 \ I 1 V ~ ~ ~ I 1 ~ Qj11 1 I I _ ~ I I ~ - _ _ "1 1 11 ~ ~ ~ ~ ~i / l l~ I (i, i ~ ~ 'f' / \\II ~ \ ~ I 1 ~ ~ / / ~ / ~ /l! I ~ l ~ - - - - ~ I / , III / / / A i I 1 \ 1 ~ - ~ f~ ~ i ~ I ~ 1 111 111 ~ ~ / I ~ ~ _ I I 1 / 1 ~ _ ~ ~ ~ ~ A \ \ ~ ~ ~ ~ ~ ~ ~ \ ~ / I / / ~ ! I / i 1 - ~ i ~ ~ AA V l i ' J ~ I / ~ ~ I A ~ ' ~ ~ / I ~ ~ I I / 1 1 ~ ~ I ~\II I I I O / \ / ~ 1) IA I I III III I I / ~ ~i ! ~ I l l ~ i i / I I I i l ~ ~ ~ i / !/I III II / / A11 i ! / / ~ / ~ ~ ~ \ ~ 1 1 1 ~ ~ - - - - I ~ ¦ ~ l ~ ~ I - _ ~ I I v / ~ v I 1 1 A 1 / 1 - ~GNAI A ~ ~ ! ,I I! r_(~ I III ~ ~ ~ ~ ~ ~ ~ ~ / ~ III / ~ ~ ! / ~ I 1 i / ~ ~ ~ _ ~ ~ / / ~ ~ - ~ i / ~ / / I / ~ 1 / ~ - - ~ ~ - / ~ ~ / / ~ ' ~ ~~i i!! / / `"1 1 11 ~ l ~ i ~ \ ~ 1 1 \ i i~ ~ ~ I ~ \ / ~ + Ill ~ 2 , I, I II _ 9 II ( / ~ ~ A V 1 1 ( i I I ~ ~ I i ~ ~ l i ~/ii i~i~ l ~ ~ _ ~ ~Q / / I 1 ~ - ~ ~ / i ~ l f ~ I I I I ~ i l ~ l ~ ~ 1 ~ 2 I I I I ~ I ~ ~ I I ~ ~ ~ \ 1 ~ ~ I I ~ ~ ~ I ~ I ~ I ~ III ° ~ ~ i / i~~ ~ ~i ~ l ~ ~ I , / ~ ~ - v I i i / I iii ii ~ ~ ~ / ! / I i l ! i i ~ i _ l I ! ~ \ v ~ ~ 1 i ll, i ~ ~ I ~ ~ ~ I ~i ii it ~ ~ ( .1 ~ ~ i ~ 1 i ~ / / / / I I I ~ ~ i r ii 1 I ~ i, ~ I i I / ~~i ir~ ~ ~ ~ ~ ~ , ; ~ ' ICJ ~ ~ / ~ _ ' l I I I ~ V ~ \ \ I I II, ~ ~ I 111 / ~ I I i~ \ ~ ~ 1 / / ~ I I ~ ~ ~ A ~ ~ ~ / I I I \1\ ~ ~ V ~ I ~ ~ ~ ~ ~ A V I l l I I \ ~ i I l~ 1 ~ I / / 1 / ~ ~ 1 ~ / ~ ~ I / / I A 1 ~ ~ ~ ~ / / ~ \ ~ I / ~ ~ / ~ ~ / / A V ~ ~ ~ ~ ~ 1 ¦ / 1 I ".J I A ~ 1 A I ~ I 1A A\\\ 1 ~.J i% 11 / / -1 ~ 1 ~ ~ ~ I ~ 1 \ A ~ ~ l /i-- \ i ~ I / ~ V ~ / ~ ~ I ~ ~ \ \ V I I - I ~ ~ A A A 1\\ 1 1 ~ i/ j ' 1 I I ~ ~ V ~ ~ ~ ~ ~ ~ I I / ~ ~ t I ~ I l /i 1 I / ' ~ ~ I I I I ? ~ ~ r / ~!~!i I v ~ ! 1 + ~ ~ ! I V I I ! 1 1. ~ ~ ~ ~ ~ ~ ~ I ! ~ Il I ~ I ~ ~ ~ ~ ~r~~ V A I / ~ / 1// r / 1 1 ~ 1 ~ ~ - I II 'I ? , i I II 1 IIIIII ~ ~ ~ / I I ~ 1 ~ , ~ 1 l ~ / ~ ~ ~ V~~ ' ~ ~ N 11 I ~ I I I I ~ ~ 1 ~ ~ ~ ~ i~ ~ ! ~ I ~ Il I I I ! ~ I ~ I I A~ ~ ~ l l ~ I / I i / v 1 ll ~ I I / / "_J ~ v: % ~ ~ ~ ~ 11 v 111 VA ~ I ~ ~ I ~ - 1 i _ ~ - ~ ~ i I I I ~ ~ 1 V _ ~ \ 'I I / I ~ ill ~jl i`~11 1 V1\ V~ ~ / / ~ ~ / ~ i i I I ! ~ I I ~ ~ I ~ l V~ ICI ~ ~ ' ~ ~ l i A\1~ 1 1 VAV AV AA ( I / ~ / ~ ~ \ \\~AV 1 V I I ~ 1 1 I / i i l I ~ ~ \ _ 1 I ' ! ~ ~ ill i i / ~ ! i ! I I / ~ ~ / ` 111 I~ - _ / 1 11 vv~ rA~ ~ I i ~ ~ / ~ ~ / _ / 1 111 1 ~Vv~v I V 'V V I 1 / ~ / 1 ~ v / ~ ~ ~ ~ ~ / I 1 I II _ i ! ~ i ~ / 1~ 1 11 A~V t I ~ ~ ~ ~ ~ ~ 1 .Il v VA Q ~ I \ ~ ~ ~ 1 I 1 ~ ~ ~ / ~ \ _ ~ / ~ / . I \ v vv v J V ~ 1 I I ~ ~ ~ ~ ~ ~ / \ 11 V~ 1 ~ ~ i / ! ~ ~ I ! ! ~ ~ I - - - ~ ~ ~ ~ ~ ~ j~ l~ ~ 1 \\\1~ ~ ~ ~ i ~ l ! / ~ ~ I _ - - - i ~ ~ ~ V 1 I 1111 1 1 \ VA~~ \ VA~ ~ V 1 1 I I ~ ~ ~ ~ / ~ \ i ~ V ~ ~ ~ - - 1I 1 1 A\~~ v I `V V \ V 11 1 I ~ ~ ~ ~ ~ 1 ~ I I III \ y. y A~ ~ 1 I I I ~ ~ ~ - 1 1 I ~ i ~ / l~ l 1 11 - 1 ~ A ~ I - ~ ~ V ~ ~ I I ~ - - ~ V ~ \ lll~ A l A ~ ~ ~ I I I 1 I ~ ~ \ I ~ 11 \ V ~ A ~ V ~ A v ~ ~ _ I I 1 '~I - - , ~ 1 /ill ~ \ ~ A~ ~ ~ A V A I I 1 ~ \ 1 ~ ~ ~ ~ ~ ~ i ~ , - 1 i 1 11 1 A A v vA ~ ~v I I A _ A 11 ! I I v v v v ~ v l I I 1 ¦ 1 / I _ / I III V1 VAvv AA v I I 1 1 ~ _ ~ ~ 1 ~ n / I II. I I I A A \ v \ 1 I I I I I 1 i ~ ~ ~ / I I / ~ 1 l A \ V I ' ~ - ~ / I l A V ~ li _ IIII~~ i - - - , _ A ~ l~~ ~ l~~l l 1~ II ~ `k ~ !I ~ \ ~ ~ _ I, , ~ ~ ~ ~ ! !I i / III I ~ 1A1 ~ AV A A\ \A \ ~ I I I I j I 1 ~ i ~ ~ ~ ~ ~ ~ ~ ~ ! I i- ,y, J I / \ ! I \ l I /I II I 1111 vvAAv vv v ~ ~ I I I I 1 I ~ ~ ! ~ ! I III I I V A \ ~ \ Av ~ \ I 1 I 1 I 1 I ~ I ~ - _ _ _ ~ _ _ ~ / ~ / _ 1 / hill 11 I 1\\ \VA\AA - ~ 1 1 11 \ \ 1 I 1 ! ~ ~ - ~ ~ ~-i~~^~~ ~~~~i~ ~ l ~ ~ ~ ~ ~i~ dl ~ ~ l I I I 1 111 1 v \ v w ~ v 1 ~ ~ \ 1 1 1 ~ t, 1 1 I / ~ ~ ~ ~ - ~ ~ ~ _~i~~~ ~ 1 l - I ~ ~ / ~ l I '1, ~ ll I I II I 11 11 ~ v ~ Av 'V v ~ 1 1 ~ V 1 1 1 ~ r ~ ~ ~ ~ I I 1 ~ V \ 1 1 I 1 V A ~ ( ~ - ~ ~ ~ l I \ ~ ~ 1 ~ / / ~ / I ~ I ~ ~ ~ \ ~ ~ ~ ~ ~jl l~/ ! ! I ~o / I I I I 1 ~ 1 1~1A ~ AAA v_ t 1 A 1 1 l ~ _ ~ I 1 ~ \ v - ~ `11 ~ V 1 1 / ~ ~ ~ I 11 1 ~v l ~ A\ ~ y ~ V 111 I t 1 A 11 1 A 11 i I ~i ~ I I / / ~ A ~ ~ ~ - - ~ 1 i ~i i ~ v ~ ~I ~ v ~ A ` ~ v ~ I iii lip I ~ l~1 1 I / I I 11 I 1 ~ ~ 1 1 1 1 1 I I 1 ! 1/ 1 \ ~ 1 1 ~ 1 1 1 1 i i i i ~ _ / I ~ A I I ~ I ~ 1 I i ~ ~j ~ ill I I ~ /ry~ ! 1~ I II 1 ~ 1 1 A l / / i / ~ ~ i I I. II 1 ` JI 1/I 11 v V ~1 I 1 1 1 I 1 A 11 / i !l ~ I V ~ 1 l I ~ I 1 \ I / ~ l l l ~ ~ I ! ~ 1 II / I A ~1 ~ / ~ ~ / 11 I ~ I ~ I I I 1\ v V 1 1 I 1 I l 1 I I ~ ~ I ~ / I ~1 1 I l VA I / t / ~ ~ II ,11 ~ , ~I 1 I~,Rvv,v, v±~,~ 1 I',1 II ~o, I',1 , ` ~ ~ ~ _ , ~ I ~ i v ~ 6!.! illy ~ ~ I ~ / ~ ~ ~ ~ I i l ~ -I~G1~ ,i ~ ~ I _ 11 I / ~ I 1 \ VA ~ ~ 'n ICI ~ v~~ 1 v\ v AV' \ ~ / I / I ~ ~ ' _ ~v " / - i ' r V l 1 J ~ i 1 ~ ~ I I I / / / / ~ / / - _ \ ~ i / I I I I/ vv v I 1 I I V ~ ~ V v~ - / - ri rr 1 , r-~ ~ ~ /1 II / I ri~~ II 1I I I ~ / / ~ / / / ~ r r , ~ A 111 1 I ' 1 ~ 1 1 1 I ~ I I V A v v //l I I \ ~ I v ~ v~ 1 l l v v v~ v~~ - / 1 11 A I, 1 v v / I 1 I v v ~ v v ~ - ~ ~ ~ ~ 11 II r I I I I ~ / ///i / VA I V A///~/ ~ / 1 A V 1 V 1 1 v v v A V ~ ~ ~ ~ _ / v~ ~v- ~ ~ 1 ~ ~ ~ I I1 I I ~ 1 ~ I I 1 1 1 i t I I I /i l / I i 1 II I I ' I 1 - r ~ ~ ~ I I i 1 I / l VA\ \ i~~l I I 1 V v v ~ \ 1 ~ V 1 1 A ~ ~ `v ~ v - / 11 / I I I / ~ / I I1 "J - ~ ~ A A I I I 1 1 I / / / / / ' I ' I I 1 / / ~ " ~ I 1 / / l ~ /i / _ A / I 1 I I / r - l r ~ ~ V ~ II I I / ~ r Q 1 - ~ / / r ~ ' ~ r l \ V I 1 I I ~ ~ ( ~ ~ I I I I / ~ / / 1111 1 f \ 1 1 \ - 1 I \ \ \ I I - ~ ~ \ - _ / r II I ~ / / / -.J~ Q I / //F / ~ ~ A III I { / l " I I - ~ / ~ ~ \ 111 ll I 1 I ~ - 1 i I I / 11 11 .J~ /jl: l ' r A I I A I I 11 / 1 ~ \ h ~ / / i ~ A I 1 ~ 1 / / ~ 1 I I ~ / A \\V A A V~ I \ ~ / / / ' ~ y ~ - - ' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ VA v~~ \ ~ /II 1 11 111 ~ / / ~ r 1 1 II \ r 11 / l/l \ . - _ ~ ~ ~ 11 1 \ 1 ~ 1 ~ l / ~ - ~ i I I ljl ~ /l ~ 1 ~ ill`---- i ~ / l ~ ~ ~ ~ ~ ~ ~ / r ` ~ I 1 \ / i 1 II / / I I ~ i i / r 1 0 / 11 ~ l ~ \ ~ \ / i'~ ~ l I I i~ / r l/1 ~l 11 l ~ 1~ A ~ ~ r 111 / II ~ I ~ / lil ° 1/I ~ ~ I~~ r ~ ~ ~ ~ rill 1 l~ I _ / ^ / ~ ~ - ~ ~ \ \ / I i ~ i ~ /l/ / / v ~ v v ~ 1~ / ~ II 11 / ~ ~ / \ \ - \ ~ V ~ ~ ~ ~ ~ ~ r ~ 1 / r I / I l I 11 ~ ~ / / / 1 ~ i ~ r ~ \ \ \ i I I 1 ~ ~ / / - i ~ / \ \ ~ v ~ ~ ~ + ~ ` r I , I ~ ' I I II ~ / iii V ~ ~ ~ ~ ~ ~ A~~ ~ ~ i 111 l I ~ r~ r~ /i/ ~ ~ii~ + 1 / ' 'ice / / / / ~ - \ \ \ \ \ \ \ \ ~ \ ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ I I / 1 I I 1 I l ~ r ~ r ' ~ ; /j// 1 ~ ? r ~I ~ ~ Il 1 / - \ \ I l / /I ~ / ~ / ' ~ i ~ ~ \ \ \ \ \ \ \ \ \ \ \ I I I " / ' / ~ ~ \ \ \ \ \ \ ~ \ \ \ \ I I I ( / / ~ 2 \ ~ \ \ \ \ \ \ ~ II l~ / / ~ ~ ~ ~ A v\ V v v v I A v v ~ ~ ~ ~ ` v`~ ~ ? ~ ~ v ~1 IIII / I I I I / ~ + 1 I : lll/ I ~~1 ~ 1 ~ ~ ~ v 11 ~ - 1 Il ~ ~ ~ ~ 1 / ~ ~ I I ~ 11 ~ v v~v 1~ ~ ~ ~ , I I ~ 1 , I I II I I I 1 / / / \ ~ ~ \ \ \ \ \ \ \ 1 1 1 \ I I I I ~ I , ~ v ~ \ v v ~ I 1 1 I'~ ~ v ~ ~ r II ~ / 1 ~ , ~ Il I 1 1 v~ v ~ ~ I I X 1 1 I / , 11 N I ~ 1 ~ ~~1 I \ ~ 11 ~ r , ~ 1/ I I I ~ / I I ~ ~ \ V A v ~ I I / I I I I I / vv v i v v v v I I I ~ I I 1 1 I / 1 1 / 1 ~ 1 1 ~ ` 1 1 1 1 t r 1 _ 1 ~ ~ 1~ 11 r I 1 J r ~ 1, ~ ~ r ~ 1 I 11 , ' ~ 1 r ~ 1111 111/ ~ I I I I ~ \ \ I 1 \ \ \ \ \ \ I I ~ I I I \ I ~ ~ ~ ~ / \ ~ I I I I i< < I 1 i~ r ~~i ~r - ~ 'V~ 1 1 r 1 1 I ! 1 r ~ ~ 1 ~ ~ ~ ~<<~ ~ I I 11~ r r ~ III 111 111 , ~ ~ 1 1 1 1 1 1 I I I~ \ v v ~ ~ ~ A A\ V A v v v l l( 1 \ 1 1 I / \ \ \ / \ \ \ \ I 1 \ 1 1 1 1 1 I I ~ / v A J / ~ I \ V A v v 1 1 1\\ V I l 1 - - ~ ~ - ~ ~ 1 / / ~ 1 ~ 1 I 1 ~ 1 ~ ~ ~ I 1 ~ r / r II I l / / ~ ~ ~ ~ 1 1 1 1 1 1 1 I I ~ \ / v v \ \ V A v v v I I ~ 1 1 V 1 ~ _ V ~ v v v l l 11 1 V `I I 1 1 1 1 1 1 1 v v V / ~ ~ v ~ t I v \ I \ I 1 I ~ ~ ~ 1~ ~ 1 ~ ~ ~ ~ r r ~ 1 II /l 11 l/ / ~ ~ ~ r I ~ ~ ~ I ~ , r III / I/l1 ~ ~ ~ ~ ~ 1 i I 11 1 1 1 1 vv v ~ ~ v v / / v v 1 ! I I I I I I I 1 1 v ~ ~ I I I I I I I v 1~ ~ 1 , r~ I I l~ I r/ ~i ~ ~ ~ I ~ ~ I / / \ I ~ ~ ~ \ ~ V - i r - I l / ~ 11 / l/ ~ ~ r 1 1 \ ~ \ ~ i \ ~ \ I I I I I I I 1 1 1 \ \ \ ~ / / / \ \ \ ~ / / / ' / ~l I / I 1 I I I I ~ ~ ~ ~ ~ ~ ~ 1 v ~ I I I I ~ ~ ~ \ ~ n 1 1 \ \ \ \ \ / _ ~ / ~ / / / ~ I I I 1 1 1 1 \ v v A~v \ \ \ / ~ v v v v / / / / ~ ~ / I I A I ~ ~ ~ ~ ~ ~ ~ r I i i ~ ~ I 1 ~ ~ ~ ~ I i ~ _ ~ I i ~ `r ~ ~ ~ ~ ~ I I ~ i I 1 \ ~ ~ ~ ~ ~ ~ I ~ ~ ~ _ ' I II iii i// ~ I ~ ~ / \ \ / / / / i i / 1 ~ 1 A. v V v A V ~ v v v l ~ ~ ~ ~ ~ ' \ i 1 \ \ \ / ~ \ / / ~ i l I 1 V ~ ~ ~ ~V ~ / ~ _ i I I I / r 1 / / \ \ \ \ \ \ \ \ \ \ / / / \ \ \ \ \ / / / / i i i l 1 \ V / / / / ~ i / / / - ~ \\V r ~ - ~ _ ~ ~ r ~ III ~ ~ / ~ / / / / / 1 ~ ~ . VA V~ ~ \v~~ ~ ~ ~ ~ II III -1• i i / / ~ / ~ + ! \\V A\\V~VA V VA\ ~ / 1 o A / I ~ - A~ / I / / / / / v \ \ \ / / V / / ~ i ~ / / ~ VA Vv / ~ II i I ~ \ ~ A I 1 ~ - ~ V I I , / J~ / / ~ - \ ~ I I ~ / / / / 1 V~ II /l 1l ~ / / ~ \ \ / / I I \ \ \ 1 / / / l / ' i / ~ ~ A \ ~ ~ 1 1 a 1 I / + ~ ~ / / / i \ r I I I I l \ / r ~ ~ ~ ~A~ 11 ~ I ~ III M ~ / / / / l / l vv v v vv v v I I v v v 1 1 / / / ' \ \ \ \ \ \ / / / / \ 1 1 / / / / 1 I ~ \ 11 \ 1111 ~ I 11 III r~ / / / I Il \ \ \ \ \ ~ / l / / \ \ \ 1 / / / l / l / / / ~ ~ i / / / _ - - \ \ \ \ \ \ \J l l / l / \ \ \ 1 1 \ ' / / / l l ! / / ~ ~ / i i ~ 11 1\\ ~ ~I~ II IIII r/// ll ~ ~ / / , /11 1 l 1 1 A 1 _ ~ i, V A ~ ~ / / / V A / / / ~ ~ / \ ~ \ v / / 1 1 / / / ~ / \ / _ A / / ~ ~ ~ ~ / l ~ / / ~ I \ _ I I /i ~ \ i l r r I r ~I 1 \ III , r'r (~,~'i- ~ ~ r I I V A \ A \ ~ ~ / / / v 1 1 1 A i / ~ l l l l l / / i i , ~ / / - - - V A A \ \ V . ~ ~ ~ ~ ~ / / / / 1 1 1 / / / / / / / ~ - ~ / / / . v v~ v v ~ / / V 1 / / / / ~ ~ / r , I / 1 I 1 ~ i ~i ~ ~ ~ r - , r / / I ~ ~ / / i 1 I I III I I I ~ ~ ~ 1-r ~ r , ~ 1 VA v vvvv v / ~ ~ I ~ I V 1 1 11 1 ' ~ / / / / / ' - V v \v A ~ / / ) /A V 1 / / l l l / / ~ ~ / / ' / i / ~ II 1 ~ ri I - 1 III I~ I ~ ' ~ ~ ~ ~ ~ r ~ I ~ rr ~ ~ ~ 111 1 II ~ I I %i r r~ =_r r 111 v \ V ~ / 1 / / / ~ / v ~ v \ - / 1 1 1 / / / ~ / v v ` v \ v v ~ ~ ~ ~ / l l l l A V A 1 ~ / / ~ I l / / / / l / / / ~ / r ~ i / ~ I I 111 ~ III I I 11 I r~% ~ ~ r ~ _ _ ~ I ~ ~ 1 I 11 ~ III I I rr ~ (1 \ ~ ~ - / / l ~v V A ~ / / V A V \ ~ / / I l l / l / l ~ ~ / i / V A ~ A ~ ~ i / / / / V A A / / / / / / ' ~ ' ' - - ~ V A A v v ~ - - ~ ~ / / ~ \ \ V \ \ ~ / ~ / / / / / ~ ~ / / / / ' ' ~ ~ lII 1 II ~ ~ I II r r L1 I 1 ~ ~r r ~ ~ 1 Ill I 1 i r/ ~ ~ - r i / / 1 II I II r~ r'~' ~/I I _ _ V~ V A A v v v v ~ ~ ~ , - ~ ~ / / / \ V A \ V ~ / / / / / / / / / / / ~ / / / \ ~ ~ i / V V A A / / / / / / _ ~ ~ ~ ~ ~ r I I ~ 111 I II / ~ / / ~ ~ ~ ~A1 I I 1 I ~ , ~?,~rr~ _ 111 ' ~ A V A V v ' ~ / V A A v / / / / / / / ~ / ~ / V A ~ ~ - - ~ ~ i A V A \ ~ ~ / / / / \ V v ~ ~ ~ / / / V A A / / / / / / / / / ~ ' / / / / / ~ _ \ ~ 11 I / r \ 1 \ ~ ~ ~ ~ ~ _ _ - ~i ~ , ~ ii~,~ - ~ A\11 ~ II - / i~ 'i AA V / r ' ~ ~ / ~ r ~ ~ ~ ~ \ ~l II i~i ~ ri ~ \V ~ AA ~ l ~ ~ ' ~ 'r v v ~ ~ ~ ~ ~ ~ A / ~ / / / ~ v ~ ~ . " / V A \ \ V / / / i / l l / l / / ~ / / l / A V A / / / i i ~ i / i ~ - - - - - i i ~ ~ ~ ~ A ~ ~ A \ i 'i ~ VA \ . / ~ ~ i ~ ' ' - ~ ~ - - - - - - - ' i i ~ V ~ i A ~ / / ~ / / ~ ~ ~ ~ A A \ V \ \ / / / / / / ~ i~ i r \ / / i i i ~ - - v v v ~ ~ \ \ \ V A / l I l l ~ ~ ~ ~ / ' r A P\ I ~ ~ ~ ~A ~ r r r - - _ i i, i ' r ' r V III ~i ~'i, \ ~ r ~r~, ~ r ~ l ~ ~ r '~r \ \ ~ / ~ ~ A \ V A A V \ ~ / l l I / / ~ i i i ~ ~ ' r , i ~ ~ ~ - 1 ~ - - - / \ ~ \ ~ ~ ~ ~ A\ ~ / / ! r ~ / l / l / ~ ~ r \ \ \ \ ~ ' ' ' ' ~ / \ \ \ V l l ~ l ~ l l / i ~ ~ i i i ~ i / ' , / \ V \ ~ ~ ~ / 1 \ V A A \ \ l / / / / / / ~ / / ~ / i i i / ' ' ~ \ ~ J~ \I / ~ / / r ~ r r ~ ~ i AVA ~ ~ ~ i ~ ~ \ 1 / / / l 1 / l r / l / / ~ r \ v i ~ V A V A A ~ / l ~ ' ' / i ~ v \V ' ~ ~ \ \ V A V ~ ~ / ~ ~ ~ l ~ l l / / ~ / i i / ~ r r 1 ~ / i i ~ / l 1 I l l~ ~ l r ' r ~ ~ ~ ~ III r , ~ ~ ~ ~ V`, 1 / / I I I / / l 4 .y ~ \ \ v _ - 1 1 1 I 1 1 / / / ~ / ~ / / / / i , r / ~ l 1 ~ ~ ~ 1 1 I / / / v ~ v ~ / 1 1 1 1 I / / I / ~ / / / ~ / P ati - I 11 (~1 I I / / 1 o s ~ ~ I '.J / l I I G 1 ~ - ~ ' i ~ / \ 1 1 I I I I / / / ~ / / / / i ' ~ i' / ' / i ~ ~ Y i / _ V A 1 1 1 I l/ / / 1 / ~ ~ l l ~ l l / / / / / ~ / / / ~ / , r ii~ ~I I1 ~ ~ \ A / I ~ 1 - , - ~ ~ I I 1 Ill 1~ ~ ~ ~ \ , / I ~ I ~ / ~ V 1 1 1 I l / / I / / / / / ~ ~ / / / ~ v ~ / /VA A V A I I I l l I 1 / l / / / / ~ ~ / / / v ~ , ~ / / V A A ! 1 / / / / / / / / / ~ ~ / ~ / / i ~ / 1 + ~ ~ ~ ~ I 1 I 1 1 - 1 I 1 ~ ~ 1, ~ v ~ ~ ' ' A I ~ I 1 / 1 I / l l / / l l l ~ ~ ~ , ' ' ~ / / / ~ - I I I I I I I / / / l ~ l l/ l / l l/ / ~ / / / ' 0' ~ I ~ I ~ ~ \ f I I 1 \ ~ ~ ' ' ~ ~ - iii % I I I 1 1 ~ ~ ~ V 1 I I ~ ~ \ / I I l ~ I ~ l l l l/ / I / ~ / ~ II / / / / / ' ~ / i 'ii~ii I ~ ~ A 1 1 I ~ r , ~ ~ ~~'ii i Oi I I I I 1 I \ " i AV A ~ \ \ ~ A 1 \ 1 ~ ~ ~ V \ ` - , /I I I IIII I I / / / lI 1 ~ ll / / 1 I / / / / ~ / / I I ~ / I / / / 1 I / / ~ / I IIII IIII I ~ - ~ / I I I I I I I I v I I / l / / / / /I I I I III I ~ l l I I I I I l / l l / l l r r 11 IIII ~ \ \V ~ ~ ~ ~ ~ ~ ~ ~ ~ ` ~ r ~ r I ~ ~ ~ 1 r ri / II ~ \ ~ ~ / I I l l I lI 1 I ~I ~ / / I I I I I I I 1 1 / ~ l l l I ~ v I / I / I 'rir l l V VI I A \ ~ ~ ~ ~ ~ ~ ~ 1 ~ is , ~ ~ II I I I ~ A ~ 1 ~ ~ ~ ~ ~ ~ ~ i rr i v ' / I I I I I I V / l/ / I I 11/ A 1 1 1 I / I I / I 111 I / / I I 1 I I ~ ~ i I ~i III ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ s'~ I I 1 1 1 I I I v / / / ~ 1 1 I I v~ 1 1 1 1 V I i I I I I) v / / 1 1 1 A-, 1 1 1 1\ V I I I i ~ir~iii l % III I ~ ~ ~ ~ ~ ~ ri / / I /ii~'i~ / / III I ~ ~ ~ \ VA ~ ~ ~ ~ ~ IIII ~ 1 1 1\ 1 1 I / / 1 1 ~ : ~ /1 I I I ~ \ \ \ V A ~ ~ ~ ~ ~ A ~ ~ ~ ~r T I tii ~1 - - r - ' 1 / / / 11 I I I I 1 V 1 A 1 11 v v A VA v A vv ~ v v vv`v t~ / / / / I 1 1 1 1 1 11 , / I / / / / / ~ / 1 I 1 1 I r 1 v ~ 1 v v V~ vvv \ V / / I / / / , 1 / l I I 1 i I I I I I I v A 1 1 1 v , v~ v \V V~ / / 1 1 / 1 1 1 1 / / 1 \ ~ ~ III IIII AVA1 A I I III ~ l V A I I I 1 I I / Q~ I ( l J I I / I \ 1 1 1 1 V v , v v A Vv v / / l 1 ~ / / 6 ~ ~ 1 III II 1 I I III I ~ ~ / t v v v ~ ~ II it I I vv1 11 ~ II } ~ V I ~ II v v v ~ ~ v I 11j111 IIII 1v111 I /III 1:~~ ~ I IIII `II 1 111111 II v v}, I I l l' I I c I 111 III - / / ( I v ~ ~ , / / , / / / 1 / v v ( / / 1 / ( 1 v v v v v / v ~ v v v v / I/ I 1 I 1 1 1 - I'\ v v v / / / / \ \ , I IIII ~ I I / ~ Vl I 11 1 V \ 1 A ~ \ I I I 1 I I I I ~ I I I ( / 1 1 1 l l l ( / 1 1 ( 1 1 1 1 V A 1 \ / v 1 v v v v vvv / / / l ~ r( / I l \ _ ~ / / / / / / / 1 I 1 _ - / I \ / / / 1 I / / 1 I / / / / / 1 1 - - ~ v~ Q~~ v / V ~ A V 1 II I~ II 1 1~1 \ V 1 \ ~ \ ~ I I I / / / / / / / / I I 1 \ - - ~ / ~ A \ v V VAA \ VA A / / / ~ A \ ~ / / / / I 1 / 1 / l ( i ~ / / \ vv v ~ vvv vv vv / / ( v I 1 1 :J V 1 ~ \ \ II II Ali I I 1 v v I I 1 ~ ~ 1 -.J / / / / I / / \ \ / \ / / / / l / l 1 / I v l ~ l/ V ~ v v VAAV A A \ / / 1r' , v~ V 1 1 1 l 1 1 1 I 11 A ! / ~ / ~ / v v~ vvv v~ 1 ll 1 1 1 1 / / / I I 0 ~ v vv v ~v vv I , - _ ~ A A I ~ / 1 I 11 ~ v v vvvv ~ / / 1 ~ ~ , ~ v v vv v v v ~ v / / / / / 1 I I V11 ~ v v~ \ V 1 , v / / / I I I , 1 r v vvv \ v vv - - ~ - .J I v \ V 1 A I I I/ II I ~ 1 A 1 I ' I III I I r / / v ( \ v vv ~ - - I v 1 / / / / / / / I I I I AA v_ / v~ v vvvv ~ `vvvv ~ v I I 1 l/ , 1 1 \ 1 1! lr r i ~ ~ ' III I ' I III I I II I I I 1 D( 1 I I( / / ~ ~ ' I I . I I / / / / 1 1 v 1A vvv - vv`~ ~ vvvv~`~ ~ ~--1 1 / / / / ~ ( \I ~ 1 / v v ,vw - , / , - / l / / l V 'U v v v v v v v / ~ J r_ l I I I I / (Q~ 1 I 1 1 IIII!/ /l `~1`(~ I I IIII ~ r CJ I ' III I 1 I l l J / ~'~~I~ l I I I ~ I 111 I I 1 I 1 11 l ~ I I I I 1 ~ I I. ~ 111 1 i ~ II J ~I i ~ I J I l ~ ~ ~ / I I I III . I.. I I l I/ / / ~ ~ I I ".J ~ I / / ~ , l / / / / l ( ~ v V A \ \ ~ / ! 1 /l 11 J / I / _ IIII ~ 1 ~ I I I I 11 1 1 I ~ / I I I I I / I I i ( ~ ~ ~ V A V V~ / / / / / ~ / / / / ~ / ~ I / / / ~ - I C.1 v _ 1 v ~ v ~ ~ 1 ~ ! 11 11 I I / I ~ I I I I l l l IJI11 \ l~ III` I I l III 1 1 / / I / I ~ i v ~v ~v _ V I J I !III I I l I ~ I ~ I/ 1 1 1 i I 1 l I I / I I 1 V ~ I I I I I I I~ ~ 11 1 I1 I I / / ~ ~ / / I ~ ~ ~ v v ~ I I 11 1 i III I I I 11 II 1 I I ~ I / ~I I / III I 1 \ I 1 11 I I I ~ 1 I I J I / / - _ / I ~ ~ ~ v _ 1 / 1~ ` I I I I I I I ~ I I IIII I I I ~ 1 1 1 I II ~ 111,,1 ~~I I I ' ; I l~ 1 v i / ~ 1 v I - ~ v- - l I \ \ ~ , , / ~ ~ I ~ ~ ~ v v v ~ ~ / A ` / ~ / ~I ~ I ~ ~ I / ~ I V v ~ I I I 111 IIII A \ III I / 111 ~1 I / 1 ! I I I lIl 11 l ,I ~ ? 1 A \ \ II i/ III I l l I 1 1 1 ~ \ ~ I i 1 ~ ~ / I I 1 / ~ A _ I ~ 1 ~ / / I I I v I / ~ A v 1 1 I ~ ( ~ / I I~ V I ~ I I I 1 II ~ \I I 1 } IIII I 1 ~I III } ~ 1 111 ,1 I \ 1 I \ ~ I 1 Illll111 - 1 VA I~ II IIII III IIII } I 111 .III \ ` ~ A ~ 1 l I I I 1 / / / 1 11 1 / 11 / v v / ~ 1 v ~ I / / ' (1 (0 ( / j1,~11 I ( 1vl 1 v I l I I Ilf II ~ 1~ %1 VII ~ I I ill 1 IIII I II ~ III I \ I I II II V / I 1 1 ~ I II 1~ ~ I I 111 ~ I 1 / ~ 1 I ' I I / / 1 \ ~ / ' / I I 1 'CJ I / ~ C1 A - / 1 I l I I III I I 1 1 \ I I I\ 1 ~ I III I I I I I I I I II II I / / I I 1 I I I I I I 1 I ~ I I A ~ I I I Iflf Ij11 / / III IIII 11~ I rl , III I I I II :IIII 1 1 I I ~ 1 / I I I I / v I I I ~ 1 ~ 'fix ' \ / , , / 1 ~ ~ , , ~ 1 ~ I v ~ I / III 11111 I / l/ III 11 III/\ l i I III I I III III I I / 1. 1 1/ I ~ ~ I / ~ I I l 1 / / / I \ v I ~ ~ v ~ ~ I II II ~ l ~ l i 1 1 1 I I I~ I / I ~ II 1 ! + I III II l 1 1 I 11 I I~l I I h I III I I 1 ( I I / / / / / / I I V vv v-~ I 1 ~ 1 v I / I I / / / I V A~ / I ~ + ~ ~ 1 / ~ V ~ V I I II I 1 Ali/I 1 / II I I I I I 1 ~ I I 1 1 I / i 1 I ~ I I I I I ~ ~ V I I II I I ~ I } I I / 1 I I I i l I II I 1 ~ / i ~ III I I I II / I 1 ! I I I ~ V ~I I I 1 I / / / / / / I / \ v / I 1 v I 1 / / / I ( / / / l , I I I A ~ 't 1 / / ~ / i v ~ ~ I I I I 1 1 I I , ~ ~ I I I I I 1 i ~ I I I I 1 I 11 1 (l l II I I I :.1~ V I i 11 ~ ~ I I I I I~ / i / / I I I 1 I I ~ ~ ~I11 ~ I I I I ( / 1 / / / / / / / ( / / / / ~ V ~ ~ \ V I ~ / / 1 I / 1 / / ~ I ( I \ 1 ~ ~ / I _ / / / / ~ ~I ~ ~ 1~ v ~ / 1 `V I V 1 ~ ~ ~ \ (~i t ! 1 l 1 1 IJ / \ l I I I ~ I I III I ~ I I i t I 1 1 I v I i ~ y 0 I ~ ~ ~ \ ~I I I 1 I I 11 I c A/ I II I 1 IIII I I i~ A lil 11 ~ l l l 1 1 I l l V I 111 \~I'~ A / 11 IIII I I + 1 III III , ~ _ ] 1 I V } ~ v I ' I I III i II ~ ~ , \ ~ //I / 1 \ \ \ I l ~ ~ ~ / II 1 I l I ~ 1 I I I I / /J / ~ 1 1 I \ 1 \ ~ J I ~ IIII II i ~ / I ~ I 1\ 1 ~ ~1~~ I ~I II l I 1 I I I r / l 1 1 I r v ~ z~ ~ ~ , ( 1 ( l , / ~1( 111 ( I I 11 ~ / I / / ~ / , ~ ~ / / ~ 1 1 I I 1 1 \ } I// II I ~ ~ VIII III I ~ J/ / / ~ / 1 1 1 1 I 1 II/~ I/ VIII \ I 1 jll II I r 1/ 1/ l / l 1 r 1 ' I I I U I 1 v~ / , I / / ~ ~ / I r~ ~ / 1 \ / / / / 1 111 I / / II I \ 1 111 I I ~ ~ / / i 1 I \ I ! VIII 1 I 11 I ~ ~ /n i / / / I I I 1 1 / III I/ I I Ili \ I IIII II I I l (1 1 v , v ( / l l / / / ( 1 1 ( ( ~ ~ v ~ 1 v ~ / ~ , - / / 1 I 1 I 1 I I 1 II ~ \ III ! I I l l I l I ~ I ~ ~ ~ l l l / / ~ / v i A`,' / ~ I \ ~ ~ ~ ~ ~ i / / / / I I I 1 1 1 I I / I 1j1 v~~~ I IIII ~ IIII II / / / / I I IIII I! A~~~ 1 I ~ I III II 1 _ ~ / / 1 1 I II ~ I~ ~ I / / / / , / / / / / / ~~I 1 1 I ~1 l~ - ~ 1 ~ ~ ~v \ l A~~- i- / l l 1 I 1 I I / I ~ I I III 1 ~ / III ~ I I I i / ! 1 1 11 V " I I I / / / ~ _ 1 v v ~ / / / ~ ~ ~l~ ~ v~~ / / I ~ 1 I I I II 1 A I 1 ~ ~ ~ ~ ~ IIII ~ I 1 ~ ~ I I I i .I I / }v I~ 1 ~ I I I IIII I Ii~ 1 \ ~ l / I ;ilk" ~ ~ III I I• i III III A , / / / ~ / ~ ~ 1111 1 / ~ l I ~ ~ ` v l ~ v / / , _ , / / / `i I ~ ~ / / ~ r~ I( I ~ I vvv ~ l 1 l I ~11 I I 1 ~ "J III P / / I Y I I 1 / ~ II / ~ ~ ` / ~ - - ~ l l I I l l / ~ II I - ~ ~ ~ I IIII ;III 1 r~~ ~ / / / / /II I ~ III 11 1 ~ / / I / I / I ~ I I ~ ~ ~ I I ~ I I 1 / / / / / , ~ I 1 \ 1 / / / l / 1 r/ll i -v / / / ~ / ~ ~ I A~ ~ 1v`~, I 1 I ~ l / ~ l I I I / I i ~ _ ~ I 1 III 1 I I 1 ~ ~ I / ! / / / / / / / I ~ . I III 1 1 / / / / / ~ / ~ ( I f~ ( \ ~ I \ I~~A~ ! / / / / / / / / / II / ~ I I I IIII ~ II 111 \ ~ ~ ~ ~ ' ~ ! / / ~ X11A I I I 1 1 / / / ~ ~ / / / I " ~ ~ / I I / ~ ~ ~ r I ~ v vv ~ I I I I ~ / / l / l I I l ~ 1 11 1 J III I I 111 ~ _ / / / 1 1111 ~ I I I 11 I I ~ ` / / / / I I / V / I I ~ ~ 1 \ ~ ~ ~ ~ ~ I 0 I / / / / I II III I I I 1 1 / I( I / v ~ / ~ III / I ~ ! I 1 i- ~ / I I V ~ ~ 1 ~ ~ ~ Q / / / / ~ / I J I I II I / I ~I I l o I 1 1 1 ~ ~ ~ ~ I I / / / / I / I III III ~ I I I• I ~ I 2 II v I ~ / ~ i ~ ~ III I / ( 1 ! ~ ~ ~ \ \ ~ / / / / ~ 1 \ / ! II I ~ IIII I 1 I \ \ ~ ~ I i r_ I ~ i I II 1 ~ ~ i / ! / \ CJ IIII IIII 1 / ~ ~ III / / 1 - - I / 2~ v ~ ~ s / ~ / /d11 \ I ~ ~ /v1 ~ ~~y yy ,r 1 ~ ~ / ~ ! / / / ~ J I III/ - ~ 1~ 1 \ ~l~ ! I/ I ! I / l l l I ~ I ! I IIIIIIII~,__- ~ ~ I I - ~ ~ l 111 l( / _ I V / I / I v ( v / / / /lull ~ \ ~ i A l A 1 \ I ` ' / ~ / / I ~ J v / / / / - / V ,r„ ~ I I ~ ~ ~ ~ I I ~ 1 / . ~ III 111 \ I I I I ~ ~ I 1 1 I it III ~ ~J III I ~ ~ J / 1 / l I r v I 1 1 / i ~ ~ ) /I , ~ ~ ' ~ ~ ~ ~ ~ I I I ! I l IIIIIIIII A ~ I I III I ~ ~ ~ ~ V~ ~ ~ ~ ~ l I / / I V I ' ~ A I V ~ ~ ~I I I I Q I I ~ l I II / l// / / I ~ ~ I 'f' ~ ' ~ ~ ~ 1 ~ ~ v r~ / / ~ / / 1 'V ~ ~ l / ~ / / ~ ~ 4 • , / 1,~ 1 v _ / C,r ~ ~ 1 1 1 ~ IIIIIIII ~ ( I I ~ ~A I / I / / / 1 I ~ "J~ JIII; I v ~ I ~ I I 1 I I l I V I I I ~ / I I I 111 I , , 1 / t / ( ( ~0 / \ ~ \ \ / / \ , / I i•<,,,: ~ ~ ; ; ~ A 11 ~ v / / I I I :J v l + 1 III I ~ I I / ~ ~ ~ ~ ; ~ _ ~ / I 1 I I I Oj ' 1 I ~ I III I I 1 } v (11(1 / lll~ l ~ ~ v ~ ` 1 v ~ l v 1 ~i I ~ vv r X I ~ ~ ~ V / / I 1 ~ I/ ~ I I Illlllli ~ I ~I IIII I X 1 ~ ~ I I ~ 1 / I ~ / \ III \ ~ r ( I / ~ , \ , r_~p ~ (i / I 1 I / ~ ti ~ ~ \ 1 ~ ~ / ~ , / 1 \ CJ / 1 I I I I ~ ~ ~ , ~ I I I I ~ ~ ~ 1 v IIII;III11 - - J I I / 1 1 ~ - I \ 1 ~ ~I III 1 . I Jr 1, ~0 1 ti~ ~ I~ \ / , 1 1 / 1 l \ 0 ~ ~ + I 1 _ _ ~ I } ' ~ ~ ~ ~ ~ ~ - 1 1 111 ~ 1111 ~ vv11 1 / / / 1 v ~ A- - / / 1 / ~ v ~ t v ~ \ 1 1 \ - ~ ~ ~ ~ ~ ~ 1 / 111 1 I / ~ I r - ~ 1 • ~ 1 ~ - ~ 1} \ , ~ / 1 ~O I / ( I \ 1 - ~ / r 1 1 ~ - I ICI ( / v v / v \ 1 \ \ _ ~ ~ ~ ~ I - ~ 11 1 I 1 1~ v ~t-~,:,~_ ~ i I I I I ~ 1 111 h1 1 ~ / 1\ \ 1 t 1 v - ~ l 1 1 ~ ~ ~ ~ v~ ~vI 1 ' ~ J ~ I / ~ ~ I y ~ \ ~ 1 / ~ / ~vn111 I 0/ v / / \ 1 V } V I ~ ~ I I ~ / - ~ _ - / - v VA I I ~l ~ I / -1~ / 1 , , /1)/111111 III I 1 1/ / /~l ` l v / / / / / ~ \ 1 / , I II V / 1 i/ 111111111 / ~1 l AA\ /i-v l l / l l~1 / l ~ ~ \ \ 1 \ 1 1 / \ /i~ f' ~ t, - SIGNAL 1 \ I I I I _ ~ ~ I J ~ II III w.- ~ , / / / I I / I / v / / ~ / / ~ i / / / / / / I / / v I ~ ~ v _ _ l / ~ / v \ / I 1 1 ~ I I I I ~ C1~ 1 II / - ~ ~ / / ~ / / ~ /l/ ll 1/ I / ! l V 1 / ~ - / l l ~l l l ~ / ~i/ /il/ / .,1, / A ~ / / l / ~ ~ / 1 v / ~ / 1 t ~ ~ - , 1 / / / /l ( / / V ~ ~ 1 A I I I ' / V l~ r I ~ / ~ ~ 1 A \ I i ~ I ~ I/ I ~ / ~ I - / ~ ~ ~ I / 1 / - - / 1 / i ~ i~' ~ - / I I / / / ~ , / ~ I , v / / / ~ f r I I I I ~i' l ~ / \ , l I / //i / i~ / / I \ , ~ / I ~ / I ~ I c / / I I ,I 1 ( / ( ~ ~ 1 \ ~ ~ ~ r ~ I I I / h/ ' 1 ~ I ~ ~ 1 ~ v } i I , ~ 1 ~ I I I III ~ ! I I / 1 / , v t~ ~ ~ I / I a~ ~ \ / ~ / l I / / A \ / ~ ~ _ / I 7 I I 1 ~ v v I ~r ~ I 1 ! ~ v I ~ I I v ( / 1 1 /1 //i////~ 1 v 1 ! ~ I / / / I I / / / \ 1 / ~ ~ ` v ~ I I 1 ~ I I q l Gj / / / -J / \ ~ / / I 1 I \ v ~ ~ / v ~ I I , ~ ////i /r ~ ~ ~ I l I l r v~ ~ l / l I I I I v ~ 1 v V I I v~ / I / I VAA 111\ 1 1 ~/i ~/i~1 I / /r ~ + r I / 1 ((1111r 1 v~ , ~ \ 1 III ' I 1 ~ / / r ~ I I \ \ ~ ~ ~ ~ ~ ~ ¦ I / / 1 V 1 I / I l r 1 I I \ I I~ I I 1, ~ ~ ~ ~ ~ ~ / t !I Il I - ~ _ ~ ! ~ i / ~ / ~ I 111 II I ~ / I / vA , / \ I I I II I~ ~ ~~--/mar ~ ~ / - 1 1 I I I I I ~ ~ ~ ` ` - - _ r1~~ ~ v ¦ l I V l I / ~ll l , ll/ 111 I I I I \ ~ 11 / I\ 11111111 I ~ ~ 1 I I ( l ~ / I I / AV I Illl V 1 ~ 1 ~ 1 ~ ~ i v ' / I Ill v \ I ~ v / ~ v. , ~ / / \ \V AVAVA I 'CJ ~ - 1 / ' v / _ ~ ~ / / 1V 1 VA V / v ~ 1 1 / / / ~ I I l l I I / i'I / V`- ~ III I / 1 ~ jl r/l/ i A\1\ 1 X / ! I / , 11 I J 1 ~ v1~ I I I I vv~~ ~v / 1 / I I v / ~ , 1 \ \\~AVA A / I I I r ~ I 1 } / v 1 / / ~ I I / I I / it lu v1~ v1 vv~ '~'1 ~v ~I , , 1 I , \ 111 11 \VAAVv 1 V ~ ~ I I ` ` v / 1 v~ ~ ~ v / - _ / ~ ( \ ~ I I \ \ \ / / \ \ / 1\ 1 A~V ~ 1 v / ~ A / , i r ~ I l / I I I I ~ / I ~ / ¦ I 1 / 11 liJ ~ lil/ ~ v v~~1 i ~ / / I _ i l l I I l / \1. 1 \ \ \\V~ J V v 1 I I~ ~ ~v ~ / v ~ / V v~ / ~ 1 1111 1 1 \ VA Vv \ V A~ ~ ~ 1 1 I I v ` ~ ~ / ~ v , V ~ v - - - r ~ i / / I I J I / I - ! l ~c \ \ / I / I _ _ _ _ _ / / I / / / / 1 i~ ~ / / J I i _ i / 11 I v vvv v I 1 1 1 1 1111 v vv 1 ~O v ~ 1 ~ v , 1 _ 111 v v v v~v v\ I I v 1+ v`_ - ` ~ i I I / I 1 V 11 ~ ~ r / I V ~ / / / 1 1 ~ I r ~ ~ 1 III ~ / ~ / l ~ 1 I 11 1 v vv I - v 'v ~ 1 I ~ v / v / / 1 v ~ - i 1 ( 111 v v vvv vvv v vvv \v I v 1 I ~ ~ - v / ~ I 1. r v II I _ ~ 1 i i I / ll/ r 111 } / ~ ~ / ~ ~ ! I L.: ~ V ~ I J II fll ~ - _ ~ - - , i I / 11 l ~ /jll I 1 1 v vvv vv v 1 1 ~ - v v/ / - 1(h1 v v~ v v v 1 v~ 1 ~ \ ¦ v , ~ - I 1 v v v ~ - / r0 1 v v v v v v ~v 1 1 v I / 11111 v v v v / I 1 ~ ¦ 1 v ~ lip ~ ~ JJ` l~ ~ A \ \ ~ ~ 11 I I I + ~ / / J I 1j ~ r A V I I" ~ - -_r_ ~ } l~ 11 I 1 v ,vvv vvvv vv v vvv III ~ , ~ 1 P~ ~ % ~ / 1%111 V A 1 Av vv v\ \ I 11 r l ~ ~ 111 ~O / v v v ~ ~ II III,. / v v l l/i ~l//l l II III _ ~ Ila~:'1~~ ~ ~ ~ I -I f ~ ~ /l / I 1j / I II I 1 AA I l 1 / ~ ~ - J ~ I 1, ~ ~ III ~ / / 1 ~ l //li / l I ~ II I ~ ~ I IIII l / I v ~ i r 11 111 /I 11 V A\~ \V A A ~ ~ I 1 1 1 / ~ ~/~~v l l I 1 v V A v - I I V I 1 ~ - / / 11 ~ I 1 I I A \ V A AA ~ ~ ~ - 1 1 A V 1 / ` ~ ~ ~ - l/ 7- ~ ' ~ i i~ ~1 _ _ _ ~I l ~ ~ / II Jl /~~1 \ ~ ~ ~ I A ~ ~ l /l/ ~ //l/ I l 11 1 1I i 1I 1 l \v A \ vA ~ v~ ~ w \ V 1 1 I 1 ll ~v 11 I ~ 1 v v v v ~ v 1 ~ A ~~,,1 ~ 1 / ~ ~ A ~ / t / v ~i~ 11 11% ~ ~ /I I II~ ~ ` / I } I IIl / l ~ i ' ~ ~ l I ~ ` q I ` 11 l ~ l/l I / I 1 I I I 1. 11 v v v v vv ~ ~ A V ~ 1 1 I I - ~ - ~ ~ ` ~ / _ ' ~ ~ / l ~ I ~ ~ ~ / I / l I \ ~ ~ ~ ~ 1 ~ ~ l 1 / / l ' / I / I ~I ~ ~ ~ 1 ~ ~ ~ / /l l ljl 1 I I I I 1 1 1 1 A~ v v~v vvv, ~ _ I V A 1 1 r _ ~~v~ , l / ~ - I : 11 1 1 / 1 V I v V A \ V Vv / ~ v i I A \ 1~ l / / ~ ~ / ~ ~ v , / / / i _ I ~ ! ~ ~ ~ / I / / / / ~ / I I / / / ~ ~ ~ y V ~ ~ ~ ~ A + I 1\ _ / / / / ~ V / II V ~ ~ ~ ~ / 1 I ~ 1j1 I 1 I / / vvv ~ vv ~ \ - III VA 1 1 l r , ~o~ l - ~ ~ - - - , ~ ~ ~ V A ~ ~ ~ ~ \ / / / ~ / / / / /ll I I \ ~ ~ ~ ~ ~ \ / / / / / I J 1 \ II I / r ~ I v vI ~ I ~ - ~ ~ 1 1 I r ~ / ~ I I 1 / 11 \ II I ~ V 1 ~ ~ 1 11 1 1 VA 1 / j ~ ~v`~v ~ ~ , ~ I r l 1 1 I/ v l I v / I / I / l~l ~ dJ~ l 1 \ A } / l l/ 11 ~ lJl I rr__ ~ I I I V I(/ I/I 11 v V 11 I 1 I I A 1A / / l ~ I `vvv /I ~ ~ / 11 I I I / I V 1v v v I 1~ 1 I 1 V r 11 - ~lll / l 1 I ~ lII I ~ i _c 1 ~ I / l ~ n~ ~ 111 l/l I .,i I I I \ 1 I ~ I 1 \ \ \ CJ \ I I 1 1 \ \ \ \ 1 1 I 1 - ~ _ /I ~ - ~ I / t \v v~ I 1 / ~~,I 1 v ~ I / ( tom, v ~ / I / ~ \ Ill II 1 \ I I I I TJ / 1 11 11 1 / I I 1 1 vv v / I v, 1 \ v A~ \ ~ I 1 I l -v _ / _ , - ~ ~ ~ \ \ I I I I ~ I I I l / l l~ /j/ l ~ i ~ 11 I I / - I I I I V ~ / / / / / ~ i , ~ A II I I 1 1 1 1 I ~ ~ ~ ~ A II 11 I 1 I I ~ / /j// / / 1~~ V A III I I \ I I I 1 1 1 I I I / ! % / I \ l ~ ~ \ \ \ 1 'r~ \ \ ~ \ _ _ , I II I i i I / ~ ~ A I I / I I r / / / 1 11 l I I I / I / I I I ! / ~ ~ \ V A II I I i 1 / ~ ~ I / 1 1 i A l I / / I I I I I I lll l/// / ~i~ / 1 A V A_ i II I I / i ` ~ I I I / ~ i V I I l 1 / ~ ~ ~ 1 I I / / ~ r I v \ III I / ~ I I I II / / / vA III l ~ 1 1 V _ ~ ~ v v ~ ~ II ~~A vv~~ A - - _ - / r v I I ~ / / / "J~ Q I / F - \ I I 1 / ~ , I I I / / / A III I 1 / l ~ ~ ~ I II / / / _ _ _ ~ v I I , / ~ I } I / / ~ / \ \ 111 ~ I 1 I I - 1 / / I / ~ II 11 //1: / \ ~ 1 \ 1 / ( ~1 I~ ~ / ` ~ mot. v l l , , / + I 1 / 1, / / / ! l~ v I 1 I 11 I v 1 ~ l: qR _ , v , ~ 1 , I I ~ / v 2 ~ - - \ ~ 11 , 11 111 / , I 1 I I r / / \ 2 \ ~ ~ If ( ~ ~ ~ I ~ ~ II lily ~ WATT a I , - \ I / ' \ II / / r ! 1 ~ I I g l = I ! ~ '~sr RQrJ 'yam _ ~ ~ / v v ~ v/ v 'v I~ I ~ / I l/l 11 / ~R9 ~ - A / I 1 / / ~ ! i ~ ~ / / ' I ~ V ~ / i I I~'. I ~ / 11 1 1 \ ~ ~ ~ I 1 / I I ~ ~ / / I V ~ ~ ~ ~ / 1 ~ i 11 / 1 I ~ ~ ~ ~ r / ~ l ~ ~ ~ 1 ~ / ~ ~ ~ / I I r 1 / i ~ ' i - - - ~ \ , ~ ~ ~ ~ 1 / ~ I / 11 / ~ / \ ~ ~ I I I ~ i~ ~ V ~ ~ V / ~ / ~ ~ i ~ ~i 1 / / / i / \ \ \ ~ ~ ~ ~ v v ~ / 1 / I I , J i i1 ~ ~ ~ i,i } n~• ~ ~ \ N~~ \ \ IIII / l l / ' ~ ~ / % + 'V ~ \ \ \ ~ \ I II / I I l ~ / / / ~ v v v ~ l A v I I I l l I ~ (V /~/i /l 1 \ ~ \ ~ V / J I I / J fl i ~ /Il~ 11 I \ \ V A \ 1 ~ ~ \ ~ } IIII / I I I / ~ / / f l/! / I \ I 1 I / r / , / / ~ / ~ , \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I ( ( / / / / ~ ~ ih. A v A A V A I I ! r / / 0 1~ V A v v A\ V A \ \ V A ~ / 1 II / - J / / ~ ~ 1 / i i I I I I I 1 / 1 / / / / / ~ ~ ~ ~ i ~ \ \ \ \ \ V v I \ \ \ V A A I I I / ~ ~ ~ V A\ v v v 1 1 1 1 \ I I I I / 1 v v ~ I 1 v v ~ A \ V A 1 \ \ ~ ~ / ~ I I ~ ~I / ~ l l i I/ I \ V A ~ ~ ~ II ~ / I / l I l 1 1\ 1 ~ / 1 I I I I I / I lI I I 1 l ~ ~ I 11 i 1 I ~ I l 1 1 1 1 I 1 1 ~j v v v I ! 1 1 1 1 v ~I I ~ I r ~ ~ 1 v y v v v ~ 11 ~ I ~ v I I ~ ~ (O ~ 1 r 1 1, , 11 ice} Ji i ~ ~r I I 11 i / I i / IIII IIII ~ I ~ ~ I A i l I I I I ~ \ _ = ~ ~ _ ~ I ill ~ i ~ i ~ IIl .~Jl,l Jlll i ~//\V~. ~ 7N ~ 1 1 I l ~ ~ ~ v'"' 1 1 V I I I v v I 1 1 ~ 1 v I V A v V~ v v - \ V / / / v , I 11 1 1 1 l v v A v v / A v v v / / / v v '•,1 al I I I I I I I~ v \ \ \ . ! / / \ ~ it III ~ ~ I / •~Pv ~ ~ ~ vvvv / III I I I ~ / / J ~ V v_. ~ I I I l l. 1 1 ~ / / / v f I I , / /i 2 _ / / / I , / ail II ? I I I `v v` ~ - / !II l - / 11 0 t / _ , ~ II ~ A ~ I 1 I l / I ill ' V v A v\ / / I I ! .at I I I I III . i v vv v v vvvv v v v ~ v v __i/ / ( I I I I I I I 1 ~ 1 1 1 I( (I / / 1 I( 1 / I I IIII ~ Av vv vv vv vv v v v v v v vvv ` vv\v vvv \ / / t I I III ~ , , / / / / I I 1 ( I I ! \ ( ! / / / I I I I I I l l 1 1 / ! I I / / l ' ~ ~ ~ I III / \ 0 v vA ~ \ v v v A i ` / I ( III I I I 1 / / / / / ! I I I I / I / / I / / / l I I I 1 1 / l / l l 11 vV 1 1 1 I / I / ( / 1 111 I ~ ~ / / I I I I 1 I I / ~'ii/ I/ III I r ~ 1 V v\ vA V v v a/ i III 1 ~ V v v v vvvv v v v v v ~ `v I l I I I I I vv ~ / / / l l l 1 v~ 1 1 1 1 I I I j 11 l I A A v \ \VAA \ v v v v v v v ` ~r y i I I I i I i i 1 I i i ~ °o N I W O J O Q U ~ V7 ~ U ~ I I~ Q ~ i ~ O i i L) 0 0 l 1 4~~° P~ A e U ~ N V~ 6 a A r W ,T~~Qrp m N 8 ~ N \ yv ° n N A n ~ B.M. 1965, P . 37 ~ ~ ~ ° m ; ~1 ~J'~P`6 ~ ~ ~ o n a^J ,`p~ 1 Nn' Q 0 Nm PIN N0. 074516-84- 0 s K u N~ xN[8n ~ ua~~ 6 ~ P - u~u ~ 2 ~ e Zq~NO Or MpQ J ~P Q~ U1 4~QP ~g r [ m ~ 2 to 2or z No ] O 0 J y ~ 2~~ _ ~ - d`q"d a ~o ~ g n N- Np ~ N W ti N U of Fk o N O, ~ A y d~aJ " tav~ a~ d~rmon+ b. ~ ' ^ \ ~ ~ 8 0 N - ;o~,; - - - _ _ ~ ~ e ~ o - ~ ~ nffVV- n a \ \ \ ~ \ \ \ \ I 4~n~. eM, ~ q' SIJ t'9• A'.9. 0 ~ ~I ~ 4 . X51 '-i~y'a~y!~y~ ~ 1 e e noadrm~dra~EE i i Ng m \ \ \ \ \ \ J ~ ~ M a e a.ea~ms't ~~1iyy~ a ' f~9 rnmwis - ~ ,Y ~ N/,~ IH*'~A %c'116'S0E'NOA i y~ OE 1fA NVl '„~4 1, I ry r f1~9167d A SO •NI ANI W 'ON076 a A ~wis 4 N°m e 0 ~ ~ ~ ~ ~ \ ~S d \ \ \ \ \ ~ hi".;,,tyh, ~l~s ~i,:..,~fi/, ~p 0 3~ 1 .d°$ D.R. NORTON. INC. ~ n .~~Y 6 r ~~n ,p ~u •doi o ~ - +t;,}' d~~ 'r ~,G,r Rexrr o .~'~~~N'1~ D.B. 9506, PC 2724 6re~ MqA Nw o \ \ \ No ~ ~ ~ ~ N ~ ~ ~ ~ W MS o \ \ ~ \ ~ \ \ ~ \ ~ \ \ \ - ~ - , o ~ N ~ C' 3 / B.M. 7002, PC 1441 ~so® Zz ¢ ~ e ND M RS .e ~ \ \ ~ \ \ \ ~ k ~ \ \ \ ~ -S ~ \ \ \ \ o B ~ \ ~ \ J ~ O ~ t,~a1 ~ p& ryo a Eo PlNNO. 0745.11-85-6182 doaAC,ez y 3Jw NA = d - '~,y i0 ti Q~ 0 U~M1 ry ~Z N~ F ~ .x. l ~ 1~ y/.t `~,r n~ ~ ~ p U W so as a ,co• a ~sce~ ,c tii ~ ~ ery • Q~~ iF•ro nei t ~ r WOZ a p p v~E•doi ~ ~ v ~ g ~N N ~ N p - ~IJ 6 4f~ 41 I~Y F' ~ ~ ~ E61 GO ~ CL N 1 i'1. p 01 Nq U'h0 - Q dd ~1 r~ ~`n° g ii No a ~ y15 R t k y Z m ~Ja ~ d r e r u 6 aUFFE ~ ~ N n1 ER aN t a N ~6 ~ i[ O~ ~ B~fF NO ~ y n Z ~ [ W~ q h ~ 4[ 4 N ~ 9 J Q n ~ N - - i ~d ode ~ ?4~~ - N4 Na E i„ ~i ~ Q, ~ . n d o~ && Pc ion B~ h UW^ .OZ ~ e~ h ,nh 'u~ (C n~ N~ ~ ZN 3 N ° w EB ~ N n~ e~ u~ i I i I ~ i i K'hs O~+s ~w L pr 45 .i rc ~ i I 'N~ i i QC9 „S N NS N'~ S Nr~ Rm mc~~ ° t ~n by 3 I ~ . sz ~ , - ~ 0~ r re m s` $ ~ 3 x_s ~$s Nro mlua 3 fi b~ ~2, g~e I a u I ci u I d~hNe ~v x ~o i o \ ~ .3 b I ~ .o bm ~ •,`.~J 'b N~°h n ~S ~~b 4 2 .y ° UW~ ~ Nh . \ z ° ~ Gi - P h hN?Y.~ i1/ n r< 8 v ~ S m ua~N~e WnmN"e p~loi „,n I~`^~ _ 2a'^~u,~ ~ci ~b_ ~^~oa: ~ g ~ ~ ~ a ~ ~,v - ~ ~C ~ p. ~ g/ vi ~ J ~ p ~X o~~oaa nti''ah O o~ b^ 22~ ^ u ^ n ^ [m m mWa ~a ~ h ~ .n iN 0 Q^ ~ h 0 0;0 ~O pi 0 I Omi° ° J q° U A J ~ ~Nb W rn ca~ a° .+a~Jm° N2 NS N I ~ .~WW mo ~ mo m~ rno im °io ~m 'i 4~(~loi •~~y' vs ] W o,0 ° ~ a Q 2 S b~ ImCS 2 m~ 2 2 Op~ 2 00 ~ VOI ZN~OS J J ~ d _ C~~Id NuQ- o° ° 2 ~ a ~"b ~ a2 ~ ax ~ ?x z ?x mi 2h OQ $ ° / ~ ?x op iz pm c~ ~ ° mB m'a m'a ms W0p N ~ ~ ~ ~ ~ a ~ I ~ ~ F Q~C ~Q~ ~ O F W n W,", ~ S~ ~a ~ 5 ~P o ti k'a r o . ~ o m ~ p0• N m~ ~ 2 W n l~ N 22 n N `qm ~ Oqi° J p 6 h ~m 0~ ~ ` - o~ y4 o F 1 p N ~ ^ ~ e o /d ?v4/^P~ N t8 3 ~ ~ 0(5 Q= N Nh m~ 1~ S I I p mGi ~ d° ~ `$S n J Q1N a ~ s~ , z t ~ ~y !v' 1 ~1 $ i o e m ais ~ ~ro ~W ~ tau p . ~+S N I h h N b O ~ U t5 ui ~ll~ rn n men ~no~~ N ~ o ~ d~ 0 6~ 6~ ~ aa`~ e e~/ J ~ ~ m M w ti 0 ~ a Q~ m~ m~ ~ Ol 'M ~ N Y~. 0 m~ AO ~0 ~i ~ ~~'~',~e^ e ~ ~ , n x ;tee Um~.rO, Z 0 ~ Ix ~ ~ ci . i ~ a • • rq d ~P ~m ~ & 2x m~ p3 N ~ m ~ Z ~ ~n a ~ - N M ~ °q m ~ .Y Wx m W~'q N SS 4 .l J q+f n ,O i O O pZ ~ v „ rn F _ i z ro I yy 16' RCP ~ N n a DA 01 = '3` ~ , a n o ?8 m o i n Ot mW tl ~U REF R TD SHEET 1.1 FOR ~ ~ ' ~ L' - DNTINUAT~D DF N ~ INV N )•JI ~ ~k . N x QQ 5 W ~ (Vq~~ Z ~ ZZ ZH O WN ALL D VE - I T.A4. r,a ~ 1 1 z ~ v, d bi as ~o ~ ~ w„ N c r o m FES ~ ; I~ N INV ~ N c oQOW N 0 a N F w RIDGEMONT MW/J'%J' ~ OvrN=N o '3Z3~'p,.~ 4 ~4 ~i nN ~ unun > z_ N li fi ow c N EASEMENT ( ~ < w ~ N ~ - O ~t G ,I N ~ ~ Y ~ F SUBDIVISION N sNOE PI tER a o m o ~I ~ x n N BASIN hf. E f 4,P 0 ~R NA ` NLL ~ n ~ r; to ~ ~ v 8 < ~ R qN y; A N 8 GP5 ESE NT ( E M R r ~~N`[~ ~i .l~''~? 2 Y rl s oaroe2~°w q~ I ~ Ro r~,. ro ~ ,48465' CRI n 098 N' 9 ~ N 91 ~ 4r ,y 5 COMBINED z D ~{..a ~ ' CRID fACIOR !VR ~n ~ J N ~ Q a' ~ W Q { g ~ C~•,f~6.2345.0 ~ ~ ~ ~ n INV DOT•3P1.6 ~ C N + YI ~ N v ~ ~ a n J~ v7 N C ID ~ RDS. s4 ~ Is' RCP .756,371. 7 ~ m~ 8 ea' B- 1,886. J t ~,~~r ~ wn ~ n w ~ ~ v a' AAA n ~ ~ I 'B .0 AV n~ ~'r~ ~ A u~01 nN n.4 t m I. J~. N h 6 ' b-D ~ ~ 00 ~ ~ ~ ~ CKC g _ o x n ~Z^ ww m e I. t0 Gn N a to ~X m ~ ~ N ti~~ n ~ j W ~i O tt ~ N ~r M I ~ ~ 2Q~ SEDa1EN1 Brp i4 J6 if OF la' flCP ' W+ ~ O I,JR n W oC W,~ ~ J~ O Wv ~ n ~ o'f m Q W Oi ww o z z~ 0 m i 4 CI S6A ~ ~ `n ~ N ~r M ~ iw•~23.0 n m nm LL a " ~ N N~ ~ W ~ INV, OU} • J1Y.1 n m 1 ; N N h ~ h J` ~ ~ . ~ ~ ~ gN~,mh m W ~'c~~u`° d a d N a ~~U ~b rA n M r'1 ~.jm Vj i+ 4 M g O O Wb b~O, ~ ~ ~N N~ O Iy O rv + M u' M W N ~mC1~ 0 in 1 WrW b VI f O COOi2 w sr OY D ~1` B N ~n ~ n f~ 4n I~ n n~ n I~ n 2 1 J i < ~ D 3 . iD 1 0 ~ a R ~ 4x N N °n a raj ~ W N N n ~y N ry ~ ` 3 ~ Ww ~ WW ~ ~ ~ ~ 4?DO WX F w, w ~ I a~ ~ ~ ~0, ~ ~.N. ttw q i U '~n0 N r ~ ~~NNNTh ti 4 m J~ 0~ T U M Q ~n 10 :.~e ~ pkL EM 7N g Wrc~ w ~~J~~~ Wtt~ j p~,;~pd'ltip ~ ~ ~ cd 1 B a5 PGW ~a~. D ~aW m 4nU~?~ z EET UST C q B ~ PATE r w 0~~~2 ~0 61~ I ¢ Z - ~ u', to C1 - ur N ~ W I W s ^ n 1 NW ~^r a ~ ~n ~ N N ~ ~ O ~ a V . a n ~ r` ~r ob I MI N ~n O r7 ~ 4 m ~ u~ m N ~ w M n M ~D r m wwp o, aQQ N PA ~ N 'p ~ ~ ~ ~ Y ~y G~ M O I a 2 ~ a w N M GARY a ed1 nN Ag ~ APHI 7Y ~ Gn M e°~ -e 31RJQ ~ Q N I~ aal 3~ OOtI pa H N f Y N ~ a W G al9 , r ~ .G m 8 o ~ 45. P a • a ~ D8~ ~ p ~ a z_ ~ ~,E, < N _ o a, a a a n a a a d o ~ ~ a < n ~ ~ ¢F- CP ~ UST ~ 7J w< a ~ ~ ~ ~ ~ N a R a ° D A w a ~ n ~'n ~n ~n 1E to to rn t: ~M tM ~ 3 ~n ~n b 00 0 df18 , 3dA1 . ~I ~ ,4b'gSOZ ,Bf,8f.10 ~ I ~ ~ N h h ~ J N ~ m h b ~aeo=•. ~a~~~Q W b b q~ Q ~ N N ~ O ~ ~m 01I w [iOQ12 2 i a (VACANT) y 1 I I 'o i I I i i I I I 0 0 N W O J ~ Q U ~ ~ 0 U Q ~ O , I O O 0 i I 0 i v i ~2C z U ~ 4 ~p2 ~ ~ i U~ 4~~ 2 R d~ r \ 4~iO nN r rA C! ~ m ~ A N ~ WQ'~~' ~ m N8 R 8 B.M. 1965, P 37 ~ ~ N ~ e ar,/~ ~o~ i ~ N~ D ua~~ 6u u W ~Q~~ Y _ N~ NP PIN N0. 0745.16-84- 0 S u N vi _ _ a ~ r Za~No r`gn ~ 6 - MOQ ~ P Y~ W, Q~QP ~ N~ m 0~ ~ No ~0 mx O ~W Q~ +'Y N8 ~ N o,,+ yM ~ f ~ - -A - ~"gryd o' e°o o $ N- a~ 3, ~ xa~ a0N ~N~ Nm ~ w l~ 0 y O - - U1 any c ti~2~"~9 1h ~k U~ N • ~d'' ry N" a ~ dvm ~u ~O ~e.~ ~ ~ \ ~ ~ ~ o N' i'k 0 a- ~ - III vpdp~wy'' "r 4. suLq- n•s- a > ~ ~ ~ ~ ~ ~ M \ ~ \ \ \ N~ ~ ° ,+oo ~ ~ \ ~ ~ ~ ~ Q ~ 4 'r, ± h ~ Noaavdva~Ml~,s~s ~ ' ~ U~ '~'','b,~',:~ yt," + o~ a.zz Msc~~.l I rdNlmv~ac e M ff m \ ~ \ \ \ J N t ~ - ;~4w d ~h'~ I~w"n~=wf~sof•Na I f. ~ irAnNl ~ "v"~;:' "i'U~ 3115 li~.,~i o ~ ervr$'e D.R HOR10N, INC. nalsa.o y .NlnNl Ww ~7r+ms a~ _ ,Y~Iyt~ l v r L~ .3e~,k~ 5'. ai< o \ \ \ \ ~ N \ \ \ \ \ \ \ ~ ~ ~ ~,~4,„ d3b~ ~,.t:~~ Sy r~ ye ~`~~++rory D.B. 9506, PC 2724 a~ n~ N tt e i' o + ~ d' B.M. 200$ PC 1447 sss'o® z Z ~ e n MY e \ \ \ ~ \ \ \ ~ \ \ R ~ ~ ~ ~ ~ ~ ~ ~ N~ ~ ~ ~ ~ ~ ~ ~ 3 A o ~ O ~ ~~'~`',i• Q~ + ~vo ti Ea PIN N0. 0745.12-85-6182 d7llAf b Z ~ N - ~ - ? ~ C hry OrW M p ~ ~ ~ ~ ~ ~ ~ 0 0 I \ \ J ~ZD'OZ! g ~l \ ZZ 9 ~ \ ~ ,£0' 6 \ \ ~ ~6f'B! ~ \ \ .L ' fl / V 'i~M h e, ~ M1i O W~ N~ F f"~x o -1~ 9 ~ m d c' y+ r -Lno nnl ~ w u N N ~ I '`ry'ry~0ry C QM If-NI nNI ~ ~ woi a^/ ~ ~~^Q "p.Qy' 0 f•d01 OP OU ~S N J a h + ~ M ~ d I~d'`A+^+" Q ~^0 Q NQ fN O~ N d N~ $ ` ~I p - a~ qW ~ m (Y' ~I - dar o ~ ~ o ~ ~a ~ ~ r e ~ e~ S P m ~ ~ ~ t~ ~ R pN a 2[ p i - N 4'ryo " e yh, f e foA ~ ~ + ~ ^a+ I r5 N 0 ,~•9u`~ NO1 - ~ W~ [W ~ Q & ~ g" h h M n ,Od ~M 2n 2 ~ 22 2 n I^ Z S PC 10+ ,7Z - $ n N ~ M r U lU ^ ~ b ~p ~ b 6 b 6 m~ m~ I I N - r 8 d n N~ N~ T +~'a o & ~C+a o 0 0 l - F tt ry S I ? V` 1' 4 ' In I I ~ V F N 3 N 3 "1 ~ ~ M . Z 5 w ~E \ ~ eO ~ mn Vf I I I I I I k'NR i i ~ms n 2 4 Z a t r a I~ N ai I M J Q O ~ S N h O N S N h S N h C h S ~ 0~ 0 ~ O O 3~ K ~ ~O I m m 0 ~ W m0$ ~m66e O ~h e- r ~ ~ S "p~ NS h JW~ ~CAmom I ~ I Jli Nb I ~ oorb ~a~~N~ UWO N~ o a} a q. 0 m l ti. O m 0 O ' b ~ h u ~ "f ° n F V m b w l ~ ~ n M ~ m 34 N WR N m X1101 n w w a w w w0~~ J~ U Q' Q 1. N n S" .n mQ0 ~`n O" z 0 ^ n w2 0 4 r O Q~ m b M O n ~ p v O v O C W~ U' I ~ _ .r) cn.~ ~ z< W~ o ~ [ oyi J Cf 0 a n O J a 0 N Z^ m M I I 4 ~ A q ~ a m 0 ~ C n rn ~ l q ~ q q N S N~ m ~ 0 ' 2 m Z O m 2 S O ^ x ~ T W A x w~ C i ~ om`~ 'i ~ro~ ~0 Q~ ~~°mo,b l o d o o ix ~o, n 0o a .a x ~ a N m a 22 ?2 ?x roQ ~h OQ a~~ 'O ~ ?x o& ~x Om t~,'~w~' m~ ms ms ms ~o N ~m~ ~o ~ ~ R c~ ~C~ ~a ~ ~ e~ ~ i 3a ~ o - r o"' ry ~ ~ o '"N N iw mo nn \l~N ~ ep ~x W w a r J ~ ~ h ~ n ~ ~ ~ n ~ry 00 0 ~ 40 o d yT~. ~ 5 Ql (5 ^~0 ~ NM ~1Q Ong FI I Om m~ O 0 = I I JW NS m Q1N j S h h O v~ dO ~ ~ ~ ~d x dp ~y 1 ~ ~ '~d m p 2~~ 1 tli~ ~~r~m flu ~OpNb Q ~ OrS N 4 MNb Qi O t~ h ~ ~0 ~~vp2 y> ~~ff ~d 8`? 01 h N~~ " i ~~pn» N wpyn m~ ~Q ]m r n o ~(p ~ v .C1N U O"~m 0 Q ~ ~ a ~ X01 "1 ~ ~ N Y~.220 ~ mt~ a0 ~0~ x ~Oi C1 0 ~ a 0 2 y ~ '7 3'`^ ~ m a& i 2 O ~ m 2 O. ~ ~ Wo ¢i2 2~ n 01 ~ U I N ~T; , ~0 ~i b' y 1 d.~I ~ryh 1 Q 2 d~ dg 7 ~d oa. G ~ WW d I ~ Ap' L n C~ N m pK 0 N rca MI [~:q OJ ~ w m W a O n e w -Z~~ N ~ ~p ~ a . o =mar roo 3rw ~1,~ n 4 Z v f+~ n ~ ~0 v1 at F _ ~ ~ ~ oz ~ e n~~ " Z m ° n rn m.,. 8 m~ D REF R TO SHEET 1.1 FOR INV N ~ •Jt ' Mt',rt~ ~ 'a< 2~ W N NZ ONTINUATIO OF N ~ INV e)-JI ' N ~ WN ALL DR VE - I -St1. .111 r,a ' ~ N ~ t ~N o ~Z ~ ~ N y _ Y of a~ < $o `D ~ + LL^ N ~ ~ Z } FES J Wm ^ f` 3 Yj m N INV ) N ~ O o a N N ~ a N ~F~ 3~~ i „ N N O ti MONT ~ RIDGE a unurr W $>z N fik3' o,~ ~ N ~ W ^ ~ Y ' ~ F SUBDIVISION n EASEMENT( 0:<w~N ti'( c ~ O NoR sNOE PI TER d ~ m o y tl ~ * N Y 3 a5 eASIN np. E ~ ~ ~,^.'1 + N 8 5 Fc, a 4^N ~ s° r N S r 8 v ~ ~ ~ ~P F)M z " ^ n S 040827"W t RO r ~ ~ 'N ~ Y ,48J.65' CRI ~ N ~ N r N ~``n O~ 0.9999]5 N~ ~ tt a COM81NE0 z ~ , ~i g CRIO FACT(N7 hg' w ~n a F~ . OPT-$~6.1 J1S0 R~ i ~ ~ .8 INY Ol1Y•321.8 N 10 ~ O5. s2 LP ts' RcP~ .756,372. 7 S BA' e- 7,886. J t ~w rn S, a_ ~a t " m ~ rn 1 ~ 'PP ~p GE) ' .n ~ O ~ A N AP , . ; v7 ; O n N ~i a 0 "N m r ;a N 6 ' b-b O w h~ ro S n ~ ~ ~ G~ ~ .h S'hEE 8 P Q~ n ~r ~ Q ~ e r` +o N a w " 3 W- o rc rc j S GnM ~ PtL ~ t n QW n c0 i ~ ~ ° ~ ~ ~ T JS bf OP 15 PCP 3'n O t.3x 4 m u° m n 0 4~ n < ~ ~ ~ N O~ CI Y$6A < ~ ~ ~ ~ N ~r M yy~~ TOP .323.0 O~ w~ ~ ~ "t INV. OJT • JI0.7 Of { ~ NW J 4 Di ~ ' hNNUgj 0, Nh~ h d $ z~ ~ U ~r- O b m 4~ n 0.4 I` N a ..o ~ g p ~ . ~v.:~h X 4M1 r'1 ~ N N ~ O x 3 ~ V) N wN M ~ M >C10132 a 1 n~ 0 O m O 2 (7~ O N a n N Y nao .,r n ..n 4 n n ~ t 1 8 a ~ ~ ~ 1 ?00 c0 a ~ n ~ 0 u ~ 4n ~ ~ W A ~ W u ~ 8. ~ ~x + N ~ N N M z. ~ N ~ ~ 2+00 W ~ ~3 F as o°a w w~ rcw p~ 4 = m N v1 bnpp U!g~ ~ ~wNrybh n ~ m u ~ ~ti~ ~ 4 ~n~'''an~ ~ G ' 4n ~ ~ EMENi . N ~ F- Pgb ~rcw n ~ z E I 48 ~aw ~ ~afrovi p q+ a~ m <~OAq^p D 0' ~ 100' S P ~W_ a s z EEi Si ~ o: ~ S W ~ m~~~2 gv N $ ~o mm ~ Q C pA E~ N ~ s r N ~.Z~ O- yr N '.0. 1 ~ ~N w N N W O Q, t 0. Q~ z', ~ wr a N W" ro N w 0 . N N N~ N OD a N W'" uM O ti ~J y~l d ~n [p ~ Wn ^1 N ~ P ~ n m ~ U~ O ~ ~ ~ p~ Q1 n N j W 01 ~ ~ r N a N m ~ } ~ ul l0 ~ l0 O .o lip M ~ n N ? I b n a ! ~ M ~ ~ApY 6~ a N ~y ~ rn „ „N A4 ~ A PH 0~ ~ 341x0 ~ 0 3N1 e ~ oo~l m t J1 N H N 8 N N a ~ .G N 8 ~ M o ~ PG. 419 Y < ~ a .G ro ~ B 145, R a ~ v N " n aw D~ ~ N0~ z- ro ~ a N o m a0 a < a H CP L DWO' ~1 t 73 ~ m w a ~ » T ~ vt ut N v R ? ~ 5 a '0 a ~ ILA o a TED A GU m a ~ t~ Er ~n ~h ~n ~x ~n ~ 3; ~n M ~h ~ b 00 ~ lll8 , 3dA1 0 ,44'9SOL ,Bf,Bf.lO n i 1 a j "~NNh II d Nhmul) b fir.: cu via W bb OginV Z N N~ O j >¢iro~o" O O m 2 2 , R (VACANT 0 0 0 0 O 9" OR 10" 1 1/8' 5/16" NOTES: ER-1 3 16' GENERAL NOTES: 1. WHERE ADEAD-END STREET REQUIRES A GUARDRAIL SECTION, 1 5/16' 1. STEEL BEAM TYPE GUARD RAILS SHALL BE INSTALLED AT THE END OF ALL DEAD-END STREETS, EXCEPT CUL-DE-SAC STREETS END OF ROADWAY MARKER (ER-1, 24"x24", RED) SIGNS ARE 1--- II WHICH HAVE BEEN IMPROVED WITH A PERMANEM TURN-AROUND. REQUIRED. h 2. SIGNS ARE TO BE PLACED BEHIND THE GUARDRAIL (SEE Q~ ti-t t/a"~I T . 7A PA M NT S D 50 0 & B) EVENLY SPACED WITH ONE SIGN PLACED AT VE E 0 ~ \.~y 1'-9' APPROx. t2'-6" MAx. 2' FOR POSTLBOLT /B. ~-p 2. FOR STREETS 26' IN WIDTH THE GUARD RAIL SHALL CONSIST OF TWO(2) 12'-6" SECTIONS OR ONE(1) 25' SECTION, THREE (3) STEEL THE CENTERLINE LOCATION AND ADDITIONAL SIGNS AT 1 P~ SIGN POST DETAIL OF BOLT POSTS, AND TWO (2) TERMINAL SECTIONS. FOR STREETS GREATER THAN 25' IN WIDTH THE GUARD RAIL SHALL SPAN THE 5/8' DIA z ~ pp~ gpLT t2 1/y" ENTIRE WIDTH OF THE STREET. ~ ~~R P 6' O.C. {MINIMUM OF 3 SIGNS, MAXIMUM OF 5 SIGNS). PROPERTr UNE (ER-1) yyP 1 1/4' SPLICE BOLT + 4 REQUIRED 4 1/4' + 1/+ 15/16" DIA z TREET BARRICADE wcr1~ SS V" BEAM ttPE CUARD RAIL 2• 2• 1/16 DEEP RECESS -+IS/8` 3. GUARD RAIL SHALL CONSIST OF RAIL ELEMENTS FABRICATED TO DEVELOP CONTINUOUS BEAM STRENGTH AND INSTALLED AS SHOWN. e TERMINAL \ 4. MINIMUM THICKNESS OF GUARD RAIL SHALL BE 12 GAGE U.S. STANDARD. 3' END ROAD FILL SECTION ~ THE RAIL ELEMENT INCLUDING SPLICES, SHALL HAVE A MINIMUM ULTIMATE TENSILE STRENGTH OF 80,000 CBS. 0 0 o v I GUARD RAIL m N GUARD RAIL PARTS FURNISHED SHALL BE INTERCHANGEABLE WITH SIMILAR PARTS REGARDLESS OF THE SOURCE OF MANUFACTURER. i SIGN LOCATION DETAIL ••••~•~~•~~n::;;,, CROSS i POST POST ~ETAIL OF NUT THE HOLES FOR CONNECTING BOLTS SHALL BE PUNCHED OF DRILLED BURNING WILL NOT BE PERMUTED. MAX. 12 -6 CENTER TO ENTER OF PO5T5 ' OS 2 a ........wr.. OF P T 5. THE GUARD, BOLTS, NUTS, STEEL POSTS. AND ALL OTHER METAL PARTS SHALL BE GALVANIZED TO CONFORM TO THE REQUIREMENTS .e!K w T; TYPICAL ELEVATION Ct13/16" MIN. FOR THE COATING CLASS, 2 50 OUNCES PER SQUARE FOOT OF THE CURRENT SPECIFICATIONS FOR ZINC-COATED GALVANIZED IRON, ANO DIA HOLE ) ( ) T GUARD RAIL CLAMP (TYPICAL) •rt ~•:•r. •r• STEEL SHEETS, COILS, AND CUT LENGTHS, IN ACCORDANCE WITH ASTM 123A. ""°1wy. o CROSS J 0 i 3 1/+. W 6 x .5 6. IF THE AVERAGE SPECTER COATING AS DETERMINED FROM THE REQUIRED SAMPLES IS LESS THAN TWO (2) OUNCES OF SPECTER PER ° SECTION o OF POST ~ ER-i SEE STD- 1 1/6 1 11/32 'I -?I t~--6' 2:1 SLOPE (MIN. 3') N0. 50.08A a SQUARE FOOT, OR IF ANY ONE SPECIMEN HAS LESS THAN 1.8 ONCES OF SPECTER PER SQUARE FOOT OF DOUBLE EXPOSED SURFACE, THE POST o (14 CADGE) • TENSION SCREWS STEEL GUARD waL ~~PROPERtt LINE CC 13/16' MIN. ~ LOT SAMPLED SHALL BE REJECTED, THE FINISHED SHEETS SHALL BE OF FIRST CLASS COMMERCIAL QUALITY, FREE FROM INJURIOUS DEFECTS, ° i - o - 2 5/16• ~ s~ Du. HOLE ~ SUCH AS BLISTERS FLUX AND UNCOATED SPOTS. ~ ~ , Jl •1I~ - ° =11 III-Ill =11 I • 12' DIA HOLE EDGE OF PAVELIENT 3 1/4• h m TO BE FILLED 7. THE GUARD RAIL SHALL BE INSPECTED TO DETERMINE THAT THE MATERIAL, DIMENSIONS, AND WORKMANSHIP ARE IN ACCORDANCE ° o I I -II ~ i n::,.,,....... ° S y NEUTRAL AXIS WITH CONC. a R N WITH THIS PLAN. ° a ; POST o tv 0 0 Z N 1 1/s" 3/+" z z t/2' POST 8. WHERE A DEAD-END STREET REQUIRES GUARD RAIL, END OF ROADWAY MARKER SIGNS SHALL ALSO BE REQUIRED. 0 0 - ° I i ° s ; N BOLT SLOT Z O, DEAD-END STREET BARRICADE •s ~ .I (SEE STD. 50.O8A & 50.088 ER-1 . ° ° BASE o o 3 1/4 s sf SPIKE BOLT , ~ ) ( ) SLOT v ~ I ° - - ~ - ° v i ° ° W a: M ' 1=111=11 ~ ~I11= ' I ~ ° - REVISIONS 2 5/1 ' z 1 1 I REVISIONS 29/32 /8 N0. DATE DESCRIPTION SPLICE BOLT SLOT n ~ N0. DATE DESCRIPTION f, REVISIONS I I ~I i :.I I~ i I I u RENSIONS N0. DATE DESCRIPTION ~ ~ a N0. DATE DESCRIPTION 1 N BASE 0 D TAI F P ~T T SFCTIO THRU RP!L El EMENT - (SLEEVE) ° f, e - e .ti APPROVED ~A« APPROVED DATE ~ ~ u ~ APPROVED DATE ; ~ APPROVED DATE CHARLOTTE -MECKLENBURG CHARLOTTE -MECKLENBURG DEAD END STREET BAR R I CAD E CHARLOTTE -MECKLENBURG END 0 F ROADWAY MARKER CY.'ARLOTTE -MECKLENBURG END OF ROADWAY MARKER ER-1 LAND DEVELOPMENT DEAD END STREET BARRICADE T R V LAND DEVELOPMENT p. N , LAND DEVELOPMENT LAND DEVELOPMENT STANDARDS 50.07A STANDARDS GENERAL NOTES 076 50. STANDARDS ER-1 B 50.08A STANDARDS GUARD RAIL CLAMP INSTALLATION 50.086 0 0 0 p a 0 WATER QUALITY REVERSED SLOPE ORIFICE 3' DIA. m I.E. 593.00 SEE PLAN FOR LENGTH & WIDTH OF PONI SEE PLAN FOR 6" 30' 'H & WIDTH OF POND ICAL TRASH RACK Top boord shdl NOTES: 4 REBARRWELDIN TOP OF WALL EL 601.50 w 6" SPACING p / r/4 REBAR WELDING 6" be 1'-0" above w/ s" SPACING AT BASE TOP OF WALL EL 604.00 tht tap of tht 1. A MINIMUM OF 24" FROM OUTSIDE DIAMETER OF PIPE TO SIDE AND 6" VERTICAL OR APPR. PRE-F~ AND 6" VERTICAL SPACING 4`z4" Post h'phest orifKx. OR APPR. PRE-FABRICATED. 6" p'pt OF TRENCH MUST BE ALLOWED FOR COMPACTION OF FILL TOP of CONC. 51 TOP OF CONC. STRUCTURE ~4 REBAR WELDED 2'x4' boord MATERIAL. BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED EL 598.50 rEL 598.50 - 0.5` 1.0` Spacing b/t IMMEDIATELY AFTER THE PIPE IS LAID. THE FILL AROUND THE ENERGY DISSIPATOR Doords PIPE SHALL BE PLACED IN LAYERS NOT TO EXCEED 6". UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED STONE LEVEL Two 2 1o"m of SPREADER TWO (2) 10"t ORIFICES IE=597.00 - SLOTTED BOARDS SLOTTED BOARDS TO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS BEEN Two 2 s'o oRl TWO (2) 6"0 ORIFICES IE=595.50 AROUND RISER AROUND PIPE Fill oround born' PLACED. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY wsE 593.00 WSE 593.Q0 with 3" - 4' ttoM _ (even with top) THE USE OF MECHANICAL TAMPS ONLY. EACH AND EVERY LAYER - - = 2 OF BACKFILL SHALL BE PLACED LOOSE AND THOROUGHLY COMPACTED _ _ _ - - - - POND BOTTOM OUTFAL POND BOTTOM=587.00 1 IIII_IIII=III~IIII=1111=1111= °ti~' NVERT 11111111=1111111°_ INTO PLACE. ~ - .L. 592.50 2, ALL BACKFILL MATERIAL SHALL HAVE AN IN PLACE COMPACTED DENSITY OF 959:. BOTTOM STRUCTUI BOTTOM OF STRUCTURE 3. STANDARD PROCTOR. THE FINAL 2' BELOW FINISHED GRADE SHALL BE 100%. 180 L.F. GRASS EL 590.: EL 590.50 10' WIDE VEGETATED LEVEL SPREADER OUTLET STRUCTURE 1-TINDAIL G60-84R CONCRETE FILL CONCRETE FILL SHELF ON 6:1 SLOPE AROUND POND PERIMETER. MOIE: FOR USE DURING CONSTRUCTION. RETROFIT 4. ALL TRENCHING OPERATIONS SHALL MEET OSHA STANDARDS. 1-TINDALL Gso-32R USE WETLAND PLANTS NOTE: PRE-FABRICATED EQUIVALENTS MUST BE APPROVED. SHAH BE REMOVED AFTER SITE IS STABILIZED. 5. BACKFILL MATERIAL BENEATH ROADWAY SHALL BE SELECT BACKFILL MATERIAL. PER NCDENR BMP MANUAL A TRASH R (N. T.S.) N.T.S. N.T.S. T- SEE PLAN FOR =L= I r LENCTN do WIDTH OF I SEE PLAN FOR !NCTH do WIDTH OF POND ' -III- TOP OF WALL EL 601.50 2 TOP BANK 1 =1111=1 iECK DAM =1 II: STONE CHECK DAM I~~I III r ICI ~I ENERGY 111=1 OUTSIDE DIAMETER III_ DISSIPATOR =III III. 15 - ORIFICE HDOD - TO BE FABRICATED =1111 - _ OUT OF 1/B" (MIN) ALUMINUM ' 1 1=1 STONE LEVEL -I I I ~ I~ SPREADER ° _ _ _ _ - - - - ` _ PLAT AND BRACED AS NECES9A~;Y, Ii= I I- o° O N D ~ iv - ~ _ _ _ SHOP DRAWINGS SHAt L. BE =J11 11 o Q I=1 Ilk _ o ~ w.S.E. 593.D0 - - - ' - SUBMITTED TO ENGINE,cR FOR D - ~ APPROVAL. - - °oo ~ 0000 'III, VARIES I I - ° o O ,O 0~ FOREBAY REVISIONS (15' MIN) I _ - _ - - - - °a°o° U. °o°o°o OOOO POND D: N0. DATE DESCRIPTION 24' 24" ~ , ~ 0 0 o O O OTT 1 o 0 o B 0 D00 POND NTRA T R SHALL LEANOUT RELEASE w D 0 BOTTOM ,OO CO C 0 C TR T RE ~ ACCUMULATED SEDIMENT WHEN S UC U 1 5/99 ADD NOTES TO DWG. cllll=1111=Illlcll WAT R I NLY t'- "DEEP. ~ a E SO 0 0 PIPE SHALL BE PLACED 1 .F. RA 80 L G SS SLOTTED BOARD ARD ' ON SUITABLE MATERIAL APPROVED DATE LEVEL SPREADER DAM RETROFIT. 'IT. REMOVE AFTER SITE IS STABILIZED. ER SITE D 1/3 ORIFICE CHARLOTTE -MECKLENBURG DIAMETER (6" MAX) LAND DEVELOPMENT I (3" MIN) r a n ~T„ n? ~ F, n A 1 1+ l n l n r ~ T. N. R SECTION THRU DETENTION / SEDIMENT POND DUR OND DURING-SONSTRUCTION STANDARDS r U K ~ I U K IVI U KHI IV I r t~ (N.T.S.) r~~,i~. 20.25 0 r~ I A (N.T.S.) ~ O O RETAINING WALL I ~ EVEL SPREADER 0 y'-p' OOO OOO ~ STRUCTURE 1A -TOP EL. 595.00 O 0 OO 0 O 0 OO 0 8' MIN. DIA RIP-RAP 0 ~~~0 X00 ~ STRUCTURE 1D -TOP EL. 625.00 (SURGE STONE) ~ ~O O O ° CLEANOUT CAP O o o , 0~ 0~ 0 O 0 6 C.Y. RIP-RAP 0 O > > 0 6" PVC (SDR 26) O ~ O D= 6 in. ~ O N , ~ ~ so T-FITTING ° THICKNESS = 14 in. ~J~ ° ~ ' ' PO ORIFICE INVERT 593.00 W.S.E. 593.00 0 0 O , :E:. ~ 00 00 0 000 `Illl~'1~~~7 ' ~llll~'l~ o = z O 0 O ~ \ M N f CAP ~ ~ o° 6 0 o ~ Ill \~l \ ~ lI \l~ I//.~/ lll, O O O O LENGTH AS REO'D IN FIELD 00 ~4 0 ~ ~ TO KEY INTO SIDE SLOPES O OF DITCH RILL 3" DIA. HOLE IN 6" PVC CAP *4-0 fFICES 0 TYPICAL SECTION NorE: OO ~/g BOTTOM OF\~ O O ~ O HOLE IN RETAINING WALL MUS~ ~ O 0 STRUCTURE °O LARGE ENOUGH FOR THE 6" P' NING WALL MUST BE o O o 0 a PVC ~ i FOR THE 6" PVC O° O (SDR 26) PIPE. SEAL HOLE B ~wTM 0 USING WATER-PROOF MATERIAI SEAL MOLE BY PROOF MATERIALS. RIP-RAP LEVEL SPREADER DETAIL arnEr 0 0 ~ 0 0 0 0 0 O 0 N.T.S. O ~ ~O O ~ a ~ ~ o o° O N.7.S. ~ w w n. N.7.S. J ~ ? o_ * 1A DETENTION POND OUTLET 30" RCP: 4 - 15"~ ORIFICES LE. 592.00 ~ * 1D 30" RCP OUTLET: 4 - 15"+b ORIFICES I.E. 623.00 PLAN SEE PLAN VIEW OF DETAILS SEE LEVEL SPREADER _ FOR ORIFICE LOCATIONS SECTION DETAIL 1NlET PIP~I• .'D" ' s:~.~ y~ _ USE (1) TINDALL G60-48B ~ _ = SEE PLAN VIEW FOR PRECAST MANHOLE WITH =1~' RIP RAP INFORMATION 12" CONC. FILL ON BOTTOM CROSS-SECTION GEOTEXTILE LINER NOTE: C• M Y¦ A C I A L I N V¦¦ T Y t N T ~ Y N¦ ORIFICES MUST NOT BE LOCATED IN DIRECTION OF FLOW FROM THE INLET PIPE. CHARLOTTE, N.C. 28277 ~ (704) 642.7773 • ENERGY DISSIPATOR DETAIL FOR ANY ADDITIONAL INFORMATION CONCERNING THIS DATE (N. T.S.) PROJECT CONTACT REGISTERED SIGNING ENGINEER MISCELLANEOUS STANDARDS 5/2s/oa SCALE o Y AS NOTED ~ I V 0 DRAWN BY a C / I C.L.P. C 0 CHECKED BY 0 ~ PROJECT N0. ~ MALLARD CREEK TOWNSHIP NORTH CAROLINA 2 4 D o 7 8 0 1 N ~ ISSUED FOR LAND DEVELOPMENT APPROVAL SHEET N0. c os c.L.P. GRAY ENGINEERING CONSULTANTS, INC. THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF o Z 132 PILGRIM ROAD SERVICE AND THE PROPERTY OF GRAY ENGINEERING CONSULTANTS, INC. E AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN ~ GREENVILLE, SOUTH CAROLINA 29607 AUTHORIZED BY GRAY ENGINEERING CONSULTANTS, INC. IN WRITING, ~ NO. DATE BY REVISION PHONE: (864) 297-3027 FAX: (864) 297-5187 SHEET OF ~ ~ i ~~~!~5~ -656- _ t ~}b a~ 0°j 'L 1 I ~ 1 ~ ~ / ~a 40p ryhry ~ RIM=621.20 R ~ ~ 11 ~h y ~ OUT=613.33 ~fi I N=613.53 r ~ ~ Y ~ ~ ~ . xrvy ~2 / V ~ R W ~ •un ~ r ~ ~ ~ ( \ q<T ~ ~ ~ ~ D q, . ~ ~ ~Qc / ~ I i x ~ ~ ~ ? o"~^ / ~ bso--1, s~ ART - d a ~ ~ N ~ • . ~ ~ - = 21.50 ..0, / ~ ti M ELEV 632.59 RIM 6 ~ / } a F TB ~ Q ~ I ~ ~ ~ ~ ~ ~ ; a"% , / / ~ I Y O,Q RIM=625.91 OUT=617.63 D' ~ ~ i ~ ~ s ~ - ~ ~ ~ Fti OUT-621.56 ~ i / ~N ~ II ~ ~ ~ ~ e ~ FS rF NGVD29 ~ ~ ~ ~ ~ _ _ . / ~ A 0 I =621.61 i i, ~ x---, 658 / ~ ~ ~ qs Tp ~ - - I I I ~ ~ ~ ~ co 6 l ~ ti4 r G i ~ I ~ - / ti S ~ L - ~ _ i ~ ~ o PIKE IN BASE PP ~ RR S ~ ~ ~ I~ Stormwater Mon ement Device Mointenonce Plon: P~'' 0V"" C~ V ~ ~ ~ UJ,~tcP S ~ i j , _ i i ~ qr ~ ~ i ~ Is / _ ~ / ~ 46 ~ SQ RIM=628.12 ~ V A N o P 1 / ~ 1. Grassing & Mowing , P'C ~ ''Q' F / ~ IQ ~ / DID ~ ~ ~ ' ~ ~ qj OUT=623.69 _ ~ i/ \ ` a. Owner to mainioin proper vegetative cover on side slopes, 3~ S~ p > > \ ~ top o} dom, and vegetated shelves. ~~~~3~ e ~ ~ I~ ~ ~ / -650 ~ ~ , ~ ~ _ 4 ~ \ 1 ~ ij / )1 T ~ ~ ~ 6' ~ vii ti• 3 \ 4 , / / / ~ ~ j b. Owner to mow grass in detention oreo of leost 3 times a yeor. `J ~ \ \ ~ ~ I 2. Tree and Brush Mointenonce ~ ~ ~ ~ ~ a I ~7 Q / ~ ~ / A ~ ~ ~ RIM=618.01 J o. Owner must keep all trees & brush out of detention oreo p, ~ / / including the bottom of pond, side slopes, and the top of the dom. bU,T=612.94 ~ ~ The vegetated shelf shall be maintained to help wetlond plonts flourisA. ~ ~ IN=613.11 ~ ~i1 ( ~ ~ 3. Trosh Mointenonce I o. Owner must remove all trash accumulated in the detention pond, Cjy ~ / ~ I outlet structure, and outfoll pipe areas. 'fin ~R / ~ I II r ' n R~ 4. Outlet Structure & Pipe Outio P otectio \ ~ ~ ~ _ _ _ _ M ~ ~f a. Owner io inspect outlet structure and pipe ouitoll every 6 months T~ RF \ ~ ~ ~ A V P`~~,~ V Lam- ~ ~ ~ /(7~8 ~ ~ ~ ~ f \ \ ~ / - - _ / ~ G \ / Any erosion/structural problems are to be repaired immediately. C~ Fk ~ ~ I ~ ~ ~ • i ~ ( ~ ( CA I ~ti1j v' ~ ~ ~ ~ \ a ~ 6 a ~ A 0~ ~ 4~ y ~ ~ ~i I~~~ ~ / i ~A~~ V A w 4~ 0 V A ~ ~ fie-- A .~.a- V ~ I ~ ~ MAINTENAN E STATEMENT: rS ~ \ 1 C ~ \ \ I ~ EROSION CONTROI MEASURES WILL BE MAINTAINED Oj o '.I AT ALL TIMES. IF FULL IMPLEMENTATION OF THE VV ~ ~ h )I APPR VED PLAN DOES NOT PROVIDE FOR RAW ~ I o ~y. ~ ~ ~ ' - - ~ \ V ~ ~ ~ ~ i ~ _ ~ ~ DEMOLISH EXISTING ~ ~ ~ - - ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ _ - - - - DISK ~ I EFFECTIVE EROSION CONTROL, ADDITIONAL ~ \ I EROSION CONTROL AND SEDIMENT CONTROL ~j ~ ~ ?4" RCP STORM PIPE ~ ~ ~ - ~ ~ ~ ~ ~ ~ ~ ~ ~ / ~ ~ S - 6 ~ ~ ~ ~ ~ ~ ~ I / ~ ISK ~p ~ ~ ~ ~ ~ ~ ~ ~ \ \ II MEASURES SHALL BE IMPLEMENTED TO CONTROL J' ~ ISK ~ I I OR TREAT THE SEDIMENT SOURCE. \ / ~ 1 i ~ ~ ~ ~ ~ ~ I II/ ~ ~ ~ 'O 1 I R TAININ WA L NOTE: / ~ \ ~ \ II / E G L ~a . --o~-_~ ~ ~ "5~ ~ .P / / / i ~ ~ ~ ~ ~ I ~ II TOP OF WALL (T/w) AND BOTTOM OF WALL (B/W) ELEVATIONS / i \ \ 1 ~ / ~ ( ARE GROUND ELEVATIONS AND DO )9Qj CONSIDER FOOTING ~ 68_ A1P v - _~y - ~ ~ ~ / ~ ~ ~ ~ -~l I ~ , / - III ~ ~ ~ ~ / i ~ ~ ~ I II DEPTH OR COVER OVER FOOTINGS. THE CONTRACTOR IS / A ~A~~ y~ III KV ~ - t~l ~ / I ~a.~s~. III ~ v ou \ I~ l raao ry II I \ I ~ ~ ~ _ , - V~ ~ ~ DEMOLISH .EXISTING = ~ ~ ~ A II II/ RESPONSIBLE FOR FIELD VARIANCES IN WALL HEIGHTS. THE RETAINING \ NTT PA \ \ ~ ` ~ I III ~ WALL IS ALSO TO BE RAISED 6' WHERE ADJACE 0 wNG TO a°~'~~ ~ I ~ ~ ~ ~ L ~ ~ ' ~ , i ~ \ \ ~ ~ \ I , ' 15 RCP'STORM PIPE ~ i' i \ ~ ~ ~ ~ \ I PROVIDE "CURBING". THE JOINT BETWEEN THE PAVING AND THE WALL VI I N ITY MAP NO SCALE C ~ ~ ~ ~ \ I I III IS TO BE WATERTIGHT. THE WALL IS TO BE PER THE DETAILS ~~~,aa' ~ ~ A 6 6 l ~ I I# REvBAR ~ ~ - A l ~ / 1 I ~ _ ,a~ 1 ~lil ~ V A I I I ~ ~ i . _ A \ C ~ I ~ ~ _ - _ 1 1 g \ ~ PROVIDED BY THE ARCHITECT. , ~ 1 ~ ~ v ~ I I ~ ~ ~ - ~ A ~ 2 I. i ~ ~ 'I ~ . ~ ~ \ V ~\VA A ~ ~ . ~ , ~ , / ~ ~ ~ 1 11 0 \ Q~ ~ I Ir THE, CONTRACTOR IS TO PROVIDE SAMPLES OF FACE FINISH TO OWNER ~ - ~ ~ ~ n ~ FOR APPfiOVAL PRIOR TO CONSTRUCTION. 1 ~I I ~ v I ~ ~ \ ~ A ~ II \ V 1 V ? / ' S ABLIZE SLOE \ \VA ~ ~ ~ / ~ ~ ~ ~ ~ ~ ~ ~ 111I~ ~ ~ ~ II ~ r ~ ~ I 1 \ \ A ~ I ~ ~ / / ~ CMLDS STO. 30.16) ~ ~ ~ / / ~ 2 a TRACT ~ ~ , ~ ~ v' ~ ~ ~ / /EROSION CONTROL MATTING. ~ ~ ~ ~ ~ ` ~ 11 1 Illlll~ '2 N J \ ~ II i Y - l 111111 v ~ v ~~Y ~ - _ ~ ~ ~ ~ / ~ \ V ~ ~ /V / CURLER II SHALL BE USED ~ ~ ~ ~ ~ - ~ s 6 0 44 \ ~ ~ \ \ ~ If / ~ , / ~ _ ~ 1 1 ll cRASSINC NaTE: 6 ~ 0 ~ ` - f \ 1 1 I 1 ~ / I IIII I I . ALL AREAS NOT COVERED BY BUILDINGS ~ ~ \ ~ V ~ ~ / V A ~ / ON .ALL SLOPES GREATER ~ 1 ~ - ~ „ / ~ \ \ \ \ \ / /THAN 4 FT. HIGH rI ~ I ~ / ~ , ~ ~ / ~ - 1 ` II AND PAVEMENT SHALL RECEIVE TOPSOIL / ~ - ~ \ ~ 1111111 ~ ~ ~ ~ ~ ~ \ I 1 II ~ - AND BE GRASSED IN ACCORDANCE WITH STORM DRAIN SCHEDULE S T R U C T U R E ~ ~ STABILIZE SLOPE \ \ , ~ ; ~ ~ ~ c ~ \ {CMLDS STD.- 30.16) SPREAD TOPSOIL AND .GRASS I 3 ( ~ ~ - SPREAD TOPSOIL AND GRASS - - ~ ~ ' I INV OUT 600.09 P IFICATIONS. DO NOT GRASS ~ CRASS = ~ ~ i~ \ 1 ~ t111 1 STATE S EC V A ~ ~ \ _ ll t~~~ ~ ..J (CMLDS ~3O.~T) ~ ~I 1 EROSION CONTROL MATTING' (CMLDS. Ip30.17) V ~ I ~ I I ~ A ~ y.- ~ \ ~ t' RC AREAS TO RECEIVE LANDSCAPING. \ ~ ~ 3 ~ I II1~ ~ PIPE INVERT ELEVATION TOP INLET w ~ 6,1B ~ 1 ~ ~ ~ I 11 11\ STABILIZE. SLOPE ~ CURIEX II SHALL BE USED \ 6' ~p DEMOLISH EXISTING ~ ~ ~ I ~ ~ , , ) J \ I (CMLDS STD. 30.16) ~ 1 ~ ~ ON ALL SLOPES GREATER \ \ 3 N 24" CLAY STORM PIPE.. ~ ~ ( ~ ` ~ ) \ ~ 1 111111 FROM TO LENGTH DUl SLOPE INFL.END EFFL.END 010 V10-MAX N0. TYPE COVER WEIR BTM. DEPTH DRAINAGE INV INS 0,1.6 II 111 . EROSION CONTROL MATTING ~ ` THAN 4 fT. HIGH ~ \ \ \ \ ( \ \ ~ ~ I l I ~ _ INLET SE IMENT TRAP SE IMENT TRAP 111 1 11111 1 SLOPE PROTECTION N01E. (FT.) (IN) ~ (CFS) (FPS) ELEV. ELEV. ELEV. AREA ~ ~ ~ A ~ A ~ 'h~ .1B ~ V ~i ~ ~ 6 ~ ~ ~ / I I \ - TYP. AT ~ STRUCT~)1 CURLExll SHALL BE USED ~ ~ A ~ ~ V A ~ ~ i I ~ III ~ 'h \ ~ ~ N CMLDS 30,09. ON ALLSLOPES GREATER ~ ~ \ V A V A ~ -m ~ \ _ , , % ~ ~ ~ ~ ~ \ ~ ~ ) IT ~ STRUCTURES / S. 1 11 111 THE CONTRACTOR SHALL PROVIDE JUTE MATTING 11111 1 OR APPROVED EQUIVALENT ON ALL SLOPES 3:1 OR S X30,09) / 11 11 R AT R A P ND SLOPES SHALL HAVE JUTE ~ 1A 16 14 3.13 592.50 592.00 27.00 14.80 1A O.S. 598.50 593.00 590.50 6.00 20.61 AC L I 1 ~ 11111 11 G E E. LL 0 / \ I1 1 MATTING OR APPROVED EQUIVALENT. 1A E.D. 592.00 - - I I I I ~ I ~ I s / ~ 11111 1 - - V1 1111 ~I I ~o / - ~ ~ / / l l • ~ 1 I 1 / I l~ 111 _ 1 1 111111 11B 10B 22 18 0.68 82725 627,10 0.40 4.91 118 "H,G." 631.25 627.25 4.00 O.OfiAC IIII l l a v v v v\ \ ~ - ~1 1111 2C 1 1 ~ \I 1111 111 FFI N T • tOB 9B 42 18 0.83 827.10 828.75 1.08 5.43 10B "H.G." - 831.25 827.10 4,15 0.10AC 11\ CONSTRUCTION TRA C 0 E. 9.1B 9B 37 18 122 827,20 828.75 9.24 8,58 8.18 "W,I" 832.83 832.00 627.20 4.80 1.39 AC 5,1D ~ \ \ \ A \ H6A ~ ~ , ~ ~ ~ ®9 / ~ ~ ~ CONSTRUCTION TRAFFIC AT DRIVE WITH STONE ~ ~ " " .75 4.50 0.24 AC I l \ 1 1\ ~ 7~ ~ ~ ~ 6B~ , ro I\ ~6 11111 MUD-MAT ONLY. OTHER DRIVES SHALL NOT BE 22 1d 1,59 628.75 626.40 11.90 7.50 88 H.G. - 831.25 826 i `D I 4 11 - AT I IN TA 8B 7B 296 18 2.08 626.40 620.25 12.77 8.57 86 "H.G" - 831.25 626.40 4.85 0.13AC _ - \ 1 1~ ~ 1~1 ~ USED UNLESS A STONE MUD M S S LLED. IIII ~ v ~ ~\V ~ \ V A - . - 7.2B 7.1 B 32 18 1.58 621.00 620.50 9.11 7.43 7.26 "W.I " 625.83 825.00 621.00 4.00 1.37 AC - - 1~ \ 111 *PROVIDE SIGN AT EACH PROPOSED EXIT DURING 2 . .2 .21 AC d ~ ~ 1 7.18 7B 20 18 1.25 820.50 620.25 10.51 6.65 7,1B "H.G " - 825.75 6 050 5 5 0 IJ~ - 3 ~ V ~ V ~ ~ V \ ~ I I ~ ~ ~ ~ ~ IN T I TT P A ~ V~ I I I 1 ~ ~ ~ J I / ~ \ V LE SED MEN RA \ ~ ~ ~ ~ I ~ 2 6j / \ 1 ~1 CONSTRUCTION. 7B 6B 199 24 1.63 620.25 617.00 23.94 9.20 IB "H.G." - 625.75 620.25 5.50 0.10 AC _ d ~ 1 111 " ~ Q ~ TYP. AT STRUCTURES ~ ~ ~ I ~ I \ \ ~ ~ ~ I I ~ ALI, ~ \ \ \ III / ~ 1 ~ A ~ 1 ( A I~ ~ ~ ~ . v - - - _ ` J 1 \ 1` \ 6.18 66 162 24 0.56 612.50 611.60 13.30 9.20 6.1B "W.I. 617.33 B16.50 612.50 4.00 2.00 AC L ~ ~ ~ ~ (CMLDS X30.09) A ( ~ ~ A f, ~ i ~ ~ ~ ~ ~ ~ 11 88 5B 21. 811.80 9.40 0.00 AC _ ~l , ~ \ 1 ~ t 175 24 3.03 611.60 808.30 37.24 12.53 88 "M.H." 6 00 - I ~ a V 1 ~ 1 0 l w 1 v III I~ ~ I ~ \\V ~ m 1 \ V ~ I~ 1 ~ ~ ~ ~ , \ ~ \ 5.2B 58 38 18 9.21 812.00 608.50 7.05 18.04 5.18 "11V.1 " 818.83 818.00 812.00 6.00 1.06 AC ~ _ ~ ~ I ) ~ 5.1 B 58 g8 18 0.51 809.00 606.50 4.66 4.25 5.18 "W.I " 613.83 813.00 609.00 4.00 0.70 AC III ~ ~BH4~ f ~ I I Co W 6, ~ ~ ~ \ \ I~ ~ ~ ~ ~ ~I P III I / ) ~U \ \ I I \ ~ i I 1 ~ I ~ _ - ~ \ 1 \ 1 ~ 5B 4B 189 30 1.69 806.30 603.10 49.61 10.87 56 "H.G." - 618.00 606.30 11.70 0.10 AC hl I 1 A I I ~ ~ I v vA~lll I ~ ~ / ~ v ~ A \ \ ~C NE\ ~ ~ / ~ o v ~ ~ II \ V ~ ~ _ ~ )I ~ ~ 1 I ~ ~ l M ~ v \IlI I ~I ~ _ _ _ 614 ~ 1 1 ~ ~ 428 4B 11. 4.~ "W.I " 816.83 61 B.00 612.00 6.00 0.87 AC _ ~ - ~ _ ~ 1 V A / 55 18 3.64 612.00 610.00 5.79 34 l I i 11 / ~ / / ~ ~ / ! ~0 1 ~~lll I \ ~ - _ ~ ~ 6 2 I 4.1 B 4B 137 18 0.51 606.50 605.80 4.79 4.25 4.16 "W.I " 611.33 610.50 606.50 4.00 0.72 AC II ~ ~ ~ I ~ ~ ~ ~ ~ ~ I ~ N V ~ r. II \ l ~ I/ ~ ~ ~ ~ l i I Illy I I I~ V l ~ i 1 / II ~ \ \ - -6 ~ . 11 \ ~ ~ 4B 3B 4 "H.G." 615.50 603.10 12.40 0.20 AC ~ 16 89 30 3.37 603.10 600.10 61.51 15.34 B - 1 ~ \ ~ ~ - - - ~ I 1 1 1 3.36 3.2B 47 18 0.70 601.33 601.00 2.00 4.96 3.36 "H.G." - 805.33 801.33 4.00 0.30 AC e / \ ~ / / / / ~ ~ / / (11 II III ~ / A I ~ / l / i ~ / ~ l / ~ ~111~ III ~ 1 wR- E R- E ~ 8i ~ I I 1 11 32B 3B 177 18 0.51 601.00 600.10 3.46 4.24 3.2B "H.G" - 605.33 601.00 4.33 0.22 AC ~ 2 / I ~ I / ~ ~ / ~ / ~ IIII I IIII ~ _ A II ~ / ~ O V ~ / / / ~ / / / / / ~ ~ I ~ \ R N ~ / ~ / ~ ~ I / i / / i ~ ~ / / III ~ ~ - N ~ ~ 1 3.16 3B 316 38 3.77 612.00 600.10 56.26 18.31 3.18 "W.I " 621.83 621.00 612.00 9.63 6.46 AC I 1 ~ i 'l l / i ~ I ~ ~ PREAD TOPSOIL AND GRASS i i / ~ ~ I ~I I I I ~ I ~ / `0 / ~ ~ ~ ~ / / ~ ~ I I 1 _ ~ ~ N 1 3B 2B 206 10 2.09 600.10 595.80 121.23 14.62 3B "M. H " 614.50 - 800.10 14.40 0.00 AC \ I 28 1 B 75 40 9.07 595.80 589.00 127.75 30.48 1B "W.I " 804.33 803.50 b95.60 7.70 0.98 AC I ~ , ~ ~ I \ ~ < < (CMLDS ~30.1~~ , ~ ~ , _ - , I~ I I III ~ / I I ~ 1 ~ ~ _ ~ 11 I 1B U.W.O. 689,00 ~ ~ \1 - - - - ~ / ~ / ~ A ~ ~ ~ i / ~ ~ ~ III I ~tl ~ 52 / 5,1B ~ 111 1 1I \ ~ / i / / A ~ ~ / ~ ~ ~ 9 _ I ~I I~ A / 'h / ) / i , ~ ~ ~ BHZ ~ III ~ ~ ~ / / / 3 ~ ~ 1 1 ~ ~ 3C 2C 20 18 0.75 610.90 610.75 0.80 5.15 3C "H.G." 614.90 810.90 4.00 0.12 AC 1 ` 11 " - I ~ / / ' / / ~ ~ I I I / ~ / ~ ~ - PWR-n.5 I ~I I ~ v I ~ INLET.SEDIMENT_TRAP ~ / i ~ I I II I I 11 \1 1 1 ~ 2C 1C 57 18 0.61 610.75 810.40 2.53 4.66 2C "H.G. - 614.90 610.75 4.15 0.26 AC B / / \ 1 11 1.2C 1C 31 18 10.00 610.50 607.40 2.00 16.60 1.1C "WING" 615.83 615.00 610.50 4.50 0.30 AC TYP. AT ~ STRUCTURES I II ~ ~ l / ~ ~ V I I I ~ / ~ ~ , ~ ~ - ~ AR-NE i I ~ I / l I ii ~ / ~ ~ l II i (cMLas #3o:OS) 11, , I ~ I) I I I I 11 ~ 6~ I ~ ~ II ~ I I ~ ~ / 1 11 ~ I ~ / / / 1 1 1.iC 1C 108 30 9.78 812.00 601.63 29.00 26.14 1.1C "M.H.-NC" 618.50 - 612.00 6.50 EXIST I ~ i I i i ~ < <r ~ _ II l i I 6 4 / / I I I ~ ~ ~ ~ II ~ ~ / / I ~ - 29.00 568.00 '1 1~ \ / / 1 a ! / 1C "M.H.-NC" 617.00 - lI ~ ~ l / 11 r ~ I 1 I , ~ / ~ ~ / ~ , ~ ~ I SPREAD TOPSOIL AND 'GRASS /ll / / / l / / I l i IIII ~I1 ~ ~ - II / / ~ 1 ~ 1 ~ \ BD 5D 243 21 2.42 840.24 834.35 23.28 11.21 8D "M,H.~NC" 848.00 - 840.24 7.76 3.50 AC I , ~ ~ 11~t / ~ I~ ~ 1 ~ (CMLDS g3o.n) 1 H.. 838.80 834.80 4.00 0.82 AC ~ / ~ 1 8 \ ~ 5.10 5D 43 18 0.58 834.80 834,35 4.12 4.53 L1D G - ~ I ~ ~ ~ l ~ ~ 1 I I 1 ~ ~ ~ ~ / ~ ~ ~l I I ~ ~ / I I \ / i / .o an / l ~ ~ I I ~ii~~~v\l I ~ _ / I~I~ I II ~ 1 / / ~ / I ~ I 1 I ~ D 4 "H. - 838.80 834.35 4.25 0.14 AC ~ ~ / 11 \ 5 D 283 21 1.92 834.35 829.30 28.33 9.86 5D G ' I - - o I ~ ~ ~v ~ ~ - 6~ I 11 I ~ A\ ~ ~ I / - ~ ~ it ~ ~ ~ - ~ 4- = - / ~ ~ / ~l / / ~ ~ ~ ~ I I 1 ~,v ~ _ - I I ~ ~I f ~ \ / I / 1 1 ~ \ 4.10 4D 36 18 0.56 629.50 629.30 1.00 4,43 4.10 "H.G " 533.50 629.50 4.00 0.15 AC i ll~ / / , ~ / ~ l > > vv 1 i ~ - ~ ~ I III II ~ J o lI ~ ~ / r ~ l i l I ~ vv~ ~ l ~ ~ _ ~ ~ ~ ll 1 I I A V / 66 ~ / / ~ ~ ~ ~ \C VII / - - ~ ~ I .III ~ 1 1 I I 4D 3D 30 1.82 629.30 624.50 30.72 11.27 4D "H.G." 633.50 629.30 4.20 0.21 AC SPREAD ..TOPSOIL .AND GRASS ^ , , ~ I ~ \ I 2s4 - / ~I / / ~ ~ / ~ ~ / ~ ~ 1 V~ ry 11 / / ~ ~ ~ 6 - - - - III ~ ~ ~ 1 I ~ ~1~~ - i / ~ ~ ~ i I 1 \ ~ ~ ~ ~ v~ v I III CMLDS 30.17 ) 1 1 8.10 3D 24 18 0,83 824,70 2.4 5.4 8 4,70 4.20 0.37 AC ~ ~ ~ ~ 1 ~Z\ ~ 3D 2D ee 30 1.06 824,60 823.80 3b,18 8.57 8D "H.0" - 828.90 024,60 4.40 0.30 AC I ~ 1 I 1 ~ ~ / i ~ l _J -~l1 ~ I I ~ ~ ~ / 11 1 N T T TR D 1D 19 30 421 823.80 623.00 35.18 17.15 1D "M.H. 630.00 - 823.80 820 0,00 AC 9 ~ ~ ~ I I LE SEDIMEN AP Il ~ l ~ ~ ~ ~ i / ~ I ~ , I V1 ~ v~~\ ~ ti - III III v N I ~ ~ ~ / ~ v v 11 ~ ~ ~ l III ll / ~ I ~ / ~ vv~ v ~ 6 - I 1 \ ~ / i I \ TYP. AT ~ STRUCTURES 1D E.D. - - 35.18 - - I ~ ~ I \ I ~ l ~ ~ vv ~ I I I ~ II _ ~ ~ ~ ~ / ~ (r< 1v ~ vv v ~ v o-- ~ ~ v IIII 1 I ~I ~ ~A ~ iv ~ _ ~o ll i i l v , ~ I V ~ / y ~ _ v III 11 ~ V A ~ - I / 1I E 1 (CMLDS #30.09) I~ l ~ ~ ~ 4 lB ( 1 ~ 3E 2E 50 18 0.80 601.40 601.00 3.26 5.32 3E "WING" 606.73 605.90 601.40 4.50 0.49 AC ll ~ i ~ ~ / /I ~ s ~1~\ i v ~ Ili I ~ ~1 ll ll b 1 I ~ ~ / l i ~ / P Z`3.5 II ~ IIA~, ~ I ~I x,61 ~ N ~ / IIII I ~ ~ A / 1 ~ ~ 2E 1E 110 18 2.13 601.00 598.86 8.25 8.87 ZE "G.L-NC" - 804.50 801.00 3.50 0.75 AC V III ~ ~ i ~ r~~ -N / v 11 C ~ V ~ ~ ~ 1111 ~I ~1 \ ~ / I I r ~ / ~ ~f ~ ~ E ) I ( \.r I ( ~ ~ v ~ ~i~ I Il 1 ~ 1 . 6 ~ 1.1E 1E 89 18 0.94 599.50 598.88 0.53 5.77 1.1E "H.G.-NC" - 802.75 599.50 3.25 O.OBAC STABILIZE SLOPE I I , , / \ i ~ / ~ ~J I I ) ^ ~ ~ ~ \ ~ ~ \ 1~ I ~ ~ ~ l 111 - _ / ~ /v/ ~I v- / i~a / J ( I / A ~ A ~ / ~ I II 1 A\~ (CMLDS STD. 30.16) III ~ / < < \ ~ ~ / ~ ~ ~ ~ I I / A V ~ ~ A C \ I I I 4.~B 1E "M.H.-NC" 803.60 598,88 4.94 - - 1 ~ ll ~ f\ l 1 ~ l ~ I A EROSION CONTROL MATTING l l i / / ~ ~ ~ ~ ~ l ~A i ~ / I ~ I I ~ 616 V ~ ~ -,1 I 1 III A I - ~ / ~ ~ \ ~ I ~ ~ ~ / ~ \ ~ ~ I I ~ 1 I ~ A 3.3 1 2F 1 F 51 i8 4.90 595.50 593.00 2.39 13.16 1F "WING" 600.33 599.50 595.50 4.00 0.38 AC / 1\1 Ct1RLEX 11 SHALL 6E USED II - ~ ~ / / I ~ ~ / ~ I(1\1, ~ Sc ) V / I ~ ~ ~ IIII ~ 1 I I \ ~ I ~ ll / > ~ ~ ~ / l ~ I 1 ~ I III I ~ ~ ~ / / / 1 ~ 1 ~ L ~ ~ I 11~ ON ,ALL SLOPES GREATER / > I ~ , _ J ~ ~ A ~ III I ~A ~ ~ I ~ I 1F H.W. 803.60 598.88 4.84 - III / i f ~ V ' ~ ~ ~ ~ I ~ ~ ~t l III I THAN 4 FT. HIGH ~ ~ / / ~ / ~ / ~ ~ I ~ INLET SEDIMENT TRAP ~ ~ A ~ ~ IIII INLET SEDIMENT TRAP 1I 1 ~ i ~ / / ~ 1 ~ A , ~ / / I Z ~\V(~ = ~ ( I ~ V I IIII TYP. AT A L STRUCTURES ~ A\\ 4B ~ , ~ / ~ ~ / V 63~--~ S ~ ~ ~ TYP. AT AL~'STRUCTURES \ o III \ 4B ~ / ~ ` I i v I Ill ~ / / J ~ ~ ~ / ~ ~ I I V A ~ 1 VIII CMLDS 30.09 ~ / ~ / ~ < (CMLDS X30.09) ~ A ~ ~ ~ I ~ ~ ) ~ / \ I - ~ 1 1 ~ STORM DRAINAGE NDTES; STRUCTURE LEGEND ~ / I~ I( 63 ~ i ~ / / ~ ~ ~ ~ ~ ~ 1 ~I, A ~ / - STONE CHECK DAMS:, v~ ~ J I ~ ~ ~ ~ ~ ~.~~Illi.l i id ~ ~ ~ ~ ~ ~ ~ ~ , n,,,, • uirin uu rr /nw nn ern nn nc\ / n 1 1 ~ n1 tr, I _ ~ _ , r~i riu nr,nuc~ nn~rn nn~ rcr TUerrn o~oc ~ rurr uc rnur oer rnP cued ~ vrorcv n~ ~ PiPC _ ~ DwERS~oN orrcH ~ 1 _ / (cMLDS #3a.1D) ' 1 ' ~ a '111111 111 A ~I~I~ n I \1 . I a~ INV OUT=597.23 ~ . „ ~ ~ • . . _ . _ YY.I. - rruR IINLC I ~~m~w ~ I V. cv.v~~ - L i - i _ s = ~.oo~ MAN. ~ i - - ~ I I ~ ` ~ ~ ° III ~ 111 1 1. _ ~ i I ~ III \ \ _ I PIPGNGSDUEATL FIELDHVARIANCESROXIMATE. CONTRACTOR IS RESPONSIBLE FOR COST OF "H.G." - HOODED GRATE INLET (CMLDS STD. 20.02) 1 1 IE ~ 1 ~ "M.H." -STORM DRAIN MANHOLE CMLDS STD. 20.08 \ ( 1 1 \ 2. PIPE SYSTEM HAS BEEN SIZED FOR A l0 YEAR STORM (7.0 IN/HR), USING THE RATIONAL METHOD. ( ) r„ ~ 1 1 ~ I IIII 1 II o~A1 ~ ~ WIDTH=3' ~ /~j / ~ ~ / 2~ ~ ~ II III \ / E.LP. I I 11 3. ALL PIPES ,SHALL BE REINFORCED CONCRETE PIPE (RCP), CLASS III, UNLESS TWO FEET OF COVER "O.S." -OUTLET STRUCTURE (SEE POND DETAIL) ~ i \ • ,DEPTH = 2' / , ~ ~ I / i b2 ~ / / ~ / ~ ~ ~ ~ 1B )I / ~ E- - ~ / / ~ A~ 1 1 I 1 I CAN BE MA1'ITAINED OVER THE TOP OF THE PIPE, THEN CORRUGATED POLYETHLYENE P[PE "E.D." -ENERGY DISSIPATOR ~ ~ 1 1 (CPP) SMO~"4 INTERIOR OR CORRUGATED METAL PIPE (CMP) WITH MANNING No. =0. 013 OR SMOOTHER "H.W." -HEADWALL (CMLDS STD. 20.17) / - - _ ~ 1 ~ / / / I ~ 2 ~ ~ \ ~ ~ ~ 1 ` s• ~ I I RIM= 601.21:.'. IS ACCEPTAIlLE• THE MAXIMUM COVER ALLOWED OVER CCP IS IS'. USE OF PIPE OTHER THAN yy_ _ NDERWATER OUTLET ~ ~ I I I `I INV OUT=598.66 RCP IN RI(HT-OF-WAY IS SUBJECT TO APPROVAL OF STATE D. 0. T. OR LOCAL AUTHORITY. U. 0 U ~ ~ I\ ~ i 2 I ~ ~ ~ ~ a ~11~ ~ ~ / ! ~ ~ ~ iii I ~ ~ ~ ~ ~ _ / D \ ~ ~ i l ~ ~ I ~ II 1 4. P1PE SECTION 2A-lA MUST BE RCP D-RING. ND SUBSTITUTES, "H.G.-NC" HOODED GRATE (NCDOT STD. 840.01) ~ q- / ~ / ~ / ~ i ~ ~ / ~ / ~ \ TOP ~ 4.00 „ A I I I - 6 SPREAD TOPSOIL AND GRASS \I I "WING" -WING OPENING (4'-0" NCOOT STD. 840.06) CMLDS 30.17 ~ ~ / I I ~ "G.L-NC" -GRATE INLET (TYPE "B" NCDOT STD. 840.27) 11 i ~ III 1 \ 1 ( I~ ) ~ I / / / I ~ "M.H.-NC" -STORM DRAIN MANHOLE (NCDOT STD. 840.34) \ ~ ~ I \ 1,1 11 ~ ~ ~ ~__~1 ~ ~ , i ~ - ~ I IIII Ix I E.I~.~ / ~ V V ~ 1 / / ~i ~ ~ L V ~ 1 1\~ 1 \ \ / / ~ ' I 1 III - ~ 1 I ~ ~ ~ ~ ,__~l~ / ~ , ~ ~ ~ VIII 11 ~ ~ ~ \ ~ ~ ~ ~ ~ 1 ~ 1 - ~ 1 1 1 11 \ ~ ~ 1111 BARRICADE AT ROAD E ~ \ I V ~ ~ ~ ~ ~ ~ ~ ~ ~ III II 1 ~ ~ I A ~ \1` ~ / ~ / ~1 r: 1 II I l 1 ~ ~ I ;1 1 1111 (cMLDS X50.07,50.08) 6~ ) A ~ - I 1 II ~ ~ I ~ ~~+I J _ ~ ~ , i ~ ~ ~ ~ ~ VIII ~ 11~ I I a-r r fin. I / A - - ~ ~ ~ I l ~ ~ ~ ~ ~ ~ 4~III i it I 11 A ~ - v / Al ~ I 1 1 1 \ ~ / ~ I ,I•, 1 II 1 I l ~ ( - - ~ - E1. X32• ~ - 4' ~ ~ ~ / ~ ~ ~ ~ ~ ~ rn ~ ~ I I ~ 1 1 I ~ ~ ~ ~ J~ - ~ F BERM 61 ~ ~ / / ~ ~ ~ ~ ~ ~ ~ o I I II ~ ~ ~ ~ I .1~ , 1 1 1 ~ / 6 1 1111 I II ~ r~ _ ~ ~ / / 6 ~ A ~ o ~ _IIII ~ ~ ~ 1111111 MERGENCY SPILLWAY i / - - ~ ~ ~ ~ 0 _ JII ~ i ~ - ~ ~ ~ gyp,-- ~ ~ ~ , ~6 III 630= 1'~ , ~ - i i~~ - i ~ ~ / / , r / ~ O~- ~ / / \ I \ / / 40' WIDE ®EL. 600.00 1~ ~ I ~ / / ^r,\ - - Il ~ ~~J ~ - ~~-6 i ~ 111. ~ ' ~ - - ~ % % ~ - - ~ ~ ~ / ~ f i ~ i ~ 0~ III A I i ~ 1 ~ / I 1 1111111 11 / I 1 1 CALED ~ / r l / ~ 1 ~ 1 1 BUILD EST Tlesw6l 1 1111 - _ ~ ~ , ,1 ~ 1 D LINE ~ I I 1 1 1 11v / ~ , , 111 II 1 / ~ ~ CAUTION ~ 609 ~ ~ . _ , ~ 1~~ ~ , ~ ~ ~ _ - _ ~ - _ ~ 1 62~ ~ ~ - j / _ - - - ~ ~ ' ~ ~ ` - 6~0 INLET SEOII'AENT TRAP / / ~ / ~ ~ ~ - - , ' TYP. AT STRUCTURES II ~ \ vv A ~ ~ IIQ11 5~ ~ 1 1 \ ~ 1 ~ R INA N CALL CENTER 1 I \ \ , ~y 1111111 NORTH CA OL 0 E / / / V A ~ ~ ~ I 1 / i Ur ~ ~ _ - - (cM~as #30.00 i I I I \ \ \ ~ ~ 11 130 C.Y. RIP-RAP ~ ' ~ ~ ~ I I I 1 -&1 --STABILIZE SLOPE 1 I 1 ~-i 1~~ 1 d50=6"-1.25' THICK \ '-''~i ~ 1 3 DAYS BEFORE DIGGING CALL g ~ , \ • ` 1111111 PLACED AS SHOWN (cMLDS STD. 30.16) ~ i I 1 ~~~i,~~ ~ r 's;{~• I TOLL FREE 1-800-632-4949 \ ~ ~ ~ ~ OR / I IO 1 1111111 . e 6`~ ~5 ~ EROSION CONTROL MATTING ~ I 6 `0 R X II SHAL BE U ED I CU LE L S 1, q 1 1 , ~ / ~ ~ 1 1 \ 1 11 A ONE CALL SYSTEM FOR COMMUNITY AND JOB SAFETY. 1, ~ -~11 1 1 I 1 STABILIZE SLOPE ON ALl SLOPES GREATER / 1 ~ I , A~ ~~I ~ l / 1 1111 1 \ --~~i I 1 CMLDS S . 30. 6 THAN _4 FT.: HIGH... ~ ~ ~ / / r 1 ~ ~ 1 ( ~ ~ ~ / / I 1 1111111 EROSION CONTROL MATTING THE UTILITIES SHOWN ARE SHOWN fOR THE CONTRACTOR'S CONVENIENCE ONLY. / ~ l - li 1 \ ? f ~ , - - -jl ~ ? / / \ 1 CURLER II SHALL BE USED THERE MAY BE OTHER U11LI11ES NOT SHOWN ON THESE PLANS. THE ENGINEER 1 ~ i / / ~ 1 1 1111111 R AT R ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS SHOWN AND IT SNAIL BE THE / \ 1 ~ ~ IF 1 1 1 1 I ON ALL SLOPES G E E CONTRACTOR S RESPON961LITY TO VERIFY THE LOCATIONS OF ALL UTILITIES ~ / 1 \ ~ ~/l"''~ ~ ~ I 1111111 THAN 4:.FT. HIGH. WITHIN THE LIMA'S Df THE WORK. ALL DAMAGE MADE TO EXISTING UTILITIES 1 / ~ ~ ~ r \ F 11 BY THE CONTRACTOR SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. o ~ El. VARIES ~ ~ I I / 1 ~ ~ i ~ ~ 11 8 I 1 111111 / 11 A ~ 1, I ~ 111 / ~ ~ / 5 i ~ ~ 11 / 11 \ ~ ~ 1 1 1 III II SAFETY NOTE TO CONTRACTOR III=IIII= ~ ~ EL. 5s2.ao WET ~ T.. ~ 16N D ~ l ~ / 1 ~ 1 i I ~ 1 1 III 11 i , / THE CONTRACTOR SHALL SHORE TRENCH EXCAVATION AND USE LEGEND: •IIII- I_ (cMLDS #203 1 \ I ~ ~ / 1 1 111111 / ~ ~ 1 1 P• 1 1 1 PIPE BOX TO COMPLY WITH ALL OSHA SAFETY REGULATIONS. ' . b ~ DRAINAGE~A~'- ~ 20.61 \A ~ ~ / ~ BURY ENDS ~ I ~ 1 EB ~1 11 1 1 1111111 IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO PROVIDE JOB / SITE SAFTEY AND COMPLY WITH ALL SAFETY REQUIREMENTS. ~ / = XI T. IR N PIN 5 REBAR OR AS NOTED , N , AVG. DEPT~I / i i - ~ SA REO D = 73, 0 S.F/ I 1 11 ~1 ~ 1111 I1 THE CONTRACTOR IS RESPONSIBLE FOR HIS MEANS AND METHODS / / 1 1 OF CONSTRUCTION N.P.S. = NO POINT SET NOTE: ' EL. 590.00 • SA PRO D-- 00 ~.F. - _ Y ~ R~ I 11 I 111111 Teo L.F. cRASSeD LEVEL sPREAUE 1. EPOS 1 1 11 CREST ELEVATION 592.00. =POWER TELEPHONE POLE ALL DITCHES TO HAVE aussEO PMA4AT LINER W.S.E. 593. / THIS MINIMUM SIZE. IIII =IIII . • • • •IIII =IIII = Mi5TAl1ED PER NANUFACNRER'S RECOMNENDA?ONS _ ~ \ Z P~ / ~ 1 I h / / 5 / ~ 1 1 LINED WITH PYRAMAT EROSION SHADED DITCHES ARE vnuE MI" TOP Of WALL = J 1.50 \ EP =EDGE OF PAVEMENT TO HAVE LINER. \ ~ V = 215,050~C.~. A\\~ I I E~ / 1 1 1 1 11111 CONTROL FABRIC. SEE DETAIL .OF ~ I ~ 1 ~ X90 / V II I 111111 LEVEL SPREADER. , HW =HEAD WALL ~ ~ \ ~ 1 / , I I 1 D Z~ I 11 1 1111\1 $ N/F =NOW OR FORMERLY 1. APPLY LIME, FERTILIZER AND SEED BEFORE LAYING THE NET OR MAT. IF OPEN-WEAVE ~ F D ZOf~ \ NETTING IS USED, LIME MAY BE INCORPORATED BEFORE INSTALLING THE NET AND FERTILIZER APPROXIMATE LIM~ II 1 I X11 1 1111\1 ® =WATER MANHOLE AND SEED SPRAYED ON AFTERWARD. ~ ~ AE SCALED FROM F E NO ~ I 1 1 1 ~~a ~ ~ I ~I ~ I 11~~\1 ,SIP PDE =PERM. DRAINAGE EASEMENT 2. START LAYING THE NET FROM THE TOP OF THE CHANNEL OR SLOPE AND UNROLL IT DOWN ~ \ ~ ~ II 1 I ~ ~ I ~ I ~ 1~1\ 11 ~1VA ~ P~ ~ ~ I ~ 1 I THE GRADE. ALi(14l NETTING TO LAY LOOSELY ON THE SOIL BUT WITHOUT WRINKLES-DO NOT FIELD E~ ~1~A ~ \ \ R/W =RIGHT-OF-WAY Nor sTRErcH ~~~V ~ v ~ I ~ ~ ~ 1~ ~ 1 \ I ~ ~ ~ v ~ v 11 11 ~ 1 v ~ I V I ~ ~ ~ - ~ =CENTERLINE ~ ~ ~ ~ A ~ 3. TO SECURE THE Nf.?, BURY THE UPSLOPE END IN A SLOT OR TRENCH NO LESS THAN 6' DEEP, ~ ~ , \ ~ 1 ~ ~ v vv\ ~v ~ ~1 111 vv ~ v ~ vv ~ 1 ~ I COVER WITH SOIL, AND TAMP FIRMLY. STAPLE THE NET EVERY 12° ACROSS THE TOP END AND ~ ~ - ~ ~ ~ \ ~ ~ DI =DROP INLET EVERY 3' AROUND THE EDGES AND BOTTOM. WHERE 2 STRIPS OF NET ARE LAID SIDE BY SIDE, ~ ~ ~ \ \ \ \ v vv ~ v ~~.P~ I v v~ ~ THE ADJACENT EDGES SHOULD BE OVERLAPPED 3° AND STAPLED TOGETHER. EACH STRIP OF ~ ~ \ ? =CATCH BASIN NETTING SHOULD ALSO BE STAPLED DOWN THE CENTER, EVERY 3'. DO NQT STRETCH THE NET ~ ~ \ \ \ ~ \ \ 1 ~ ~ ~ ~ O• M M! A O I A L INV T Y ~ N T R Y N~ ~ \ \ V BlA / = WHEN APPLYING STAPLES. \ ~ \ \ \ \ \ V AI I / S ~Z \ \ \ \ ~ • CHARLOTTE, N.C. 28277 • (704) 542.7773 « QS SANITARY SEWER MANHOLE \ \ \ \ = 4. TO JOIN 2 STRIPS, CUT A TRENCH TD ANCHOR THE END OF THE NEW NET. OVERLAP THE \ ~ \ \ \ \ \ \ ~ \ v Iv 1 ~ 5 vvvv vv ~ ~ MEASUREMENT OF RECORD END OF THE PREVIOUS ROLL 18", AND STAPLE EVERY 12" JUST BELOW THE ANCHOR SLOT. \ \ \ \ \ \ \ \ \ \ \ 1 ~ I FOR ANY ADDITIONAL INFORMATION CONCERNING THIS DATE ~ \ \ \ TCE =TEMPORARY CONSTRUCTION EASEMENT \ \ 1 \ - ~ ~ ~ PROJECT CONTACT REGISTERED SIGNING ENGINEER GRADING, DRAINAGE, AND EROSION CONTROL PLAN 5/2s/o4 \ \ 11 ~ I ~ o LEVEL SPREADER X-SECTION ~ ~ ~ v vv v CM =CONCRETE MONUMENT s~ ~ s~ ~ ~ \ \ , ~ , ! ~ ~ ~ SCALE 47-191-04 =TAX MAP NO. (N.TS.) \ 0 ~I II \ I OSSIN ui s~r~r c ~ u ~ a =FIRE HYDRANT ~ 'S'Y \ DRAWN BY II ~ , ~ ' rn o =OVERHEAD UTILITY LINE 600 6 ~ / a 01 ~ C.L.P. \ ( \ (C / 0 C~ \ ~ ~ o ISSUED FOR LAND DEVELOPMENT PERMIT SS- =SANITARY SEWER LINE ~ \ ~ - / C /06 C.L.P. ~ \ ~ \ _ _ ~ CHECKED BY ~ / ~ 1 ST =STORM SEWER LINE ~ ~o I 1 I ~vvv~ / / / I ~ ~ lz = TREELINE ~ ~ ~ a REVISED MASS GRADING PROJECT N0. ~ I v ~ ~ ~ I B ~;T C.L.P. I _ _ _ ~v ~~Vv ~ ~ ~ ~ MALLARD CREEK TOWNSHIP NORTH CAROLINA 2 a o 0 7 8 - ~ 4 °o OS SHEET N0. N A ~~11 C.L.P. ISSUED FOR PRELIMINARY PRICING GRAY ENGINEERING CONSULTANTS INC. / ' THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF z 132 PILGRIM ROAD SERVICE AND THE PROPERTY OF GRAY ENGINEERING CONSULTANTS, INC. E AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN ~ GREENVILLE, SOUTH CAROLINA 2960 AUTHORIZED BY GRAY ENGINEERING CONSULTANTS, INC. IN WRITING. ~ N0. DATE BY REVISION PHONE: (864) 297-3027 FAX: (864) 297-5187 SHEET OF '~7 ''I~ 7 ' s. , ;~1~~ l ; i li' , .5'i'irl~,~ I _ _ - ~ f \ v ~ v v v v v " v i III I r \ \ \ \ \ \ r J l l l / it . / \ \ \ 1 / / / ! ' I I 1 \ \ I , III Ir A~~.,~ \ t ~ \ t ~ I I l ii / I v v I I `v I l r ! / / v I I III I i ~ A \ v ~ . F S° ~ A 1 ~ j / I III ~ / / ri/ / / r I I I 1 I v v 1 ~v !I 1 1 ! / / v I 1 1 I 1! ' I i ! 1 1 / I I ! I I 1 I III I I I ! I I 1 1 1 v/ l 1 I l! / ~ \ I I III I I/ / ~ ~ ~ ~ ~ ~ ~ v v v v \ 1 A \ ~ ~ I 11I Il 1 / / / I ~ ~ ~ \ ~ A \ \ ~ A V A V A \ / ~ ~ I I I ~ i i ii / / ! / / I I / ! I I I I ! / / ~ - I IIII I/ / ~ ~ ~ \ \ \ \ \ \ \ / / I I I /ice i~ ~i / / ~ / ~ ~ ~ ~ ~ \ V \ ~ \ \ V A \ \ 1\ \ / III I I ~~~i' i i / / / I I I l ! I I 1 I / / / / IIII I I / _ _ l / / ! I r e l I ! I I I l/ ,-v I 1 1 1 1 I I I I I / ~ ~ v v A v v V ~ ~ v v 1\ ~ I ~ ~ ~ ~ ~ ~6- ~ v v v v ~ v v vv vv v ~ v ~ ~ / IIII II 1 ~ ~ / / / 1 I 1 ~ //.c l / ! l l l I I / / / I I 1j11 IIII 1// / v 1 1 ~ v I I I - ~ v I~p 1 1 A ~ v v v ~ I I " ~ ~ ~ ~ / ! l I/ l l/ l l l / I I! 1 I I I / ~ \ V ~ \ ~ C~J~ I I I \ \ \ \ ~ ~ I1 1 I I ---iii," ~ ~ ~r I I v v ~ ; ~ ~ 0 j' ~ ~ ~ ~ 1 i v v l1 11 I ~ , - , , , / / / ~ , , 1 , i I I , , ~ v I 1 / ` v ~ I ~ ~ / ~ ~ i l I / ~ \ \ VA ~ 1 1~ III I I I ~ _ - I / A i t ~ I , i i ~ i I I I I / 1 ~ I ~ / i / / / / / ~i / ~ _ ~ / / / 1 / l I ! l ! ! l / 1 1 1 A i / ~ ~ i \ ~ l I / / / I I 1 ~ I I ' ~ ~ 1~ / ~ ~ i / / ~ i ~ 1.. ~ / ~ i ~ ' ~ ~ / l I l l I I / l l 1 1 v v~ ~ i ~ii~i i// l I / / ! / I 1 ~ \ 1 A - \ l I l I I 1 I 1 \ V ~ i' ~ I i ~ i ~ l I r I /l I l / 1 VV A ~ ~ ~ ,i~~ ~ i I _ i ' / ~ , ' ~ ~ ~ \ \ i i i i~ / / l l! ! l l V A A~ i v v ~ ~ ~ / / ! ! \ V ~ V A ~i d I l / / / 1 1 1 % 1) A V I ~ / ~i i i i i i / l I I I/ A V._ ~ v vv ~ ~ ~ / / / ! ! ! ! ~ \ V A A V~ \ ~ v v / ~ - / / ~ / / / ~ ~A \V ` ~ CJ \ 1~ ` / / / ~ ~ / ~ / Y/ ~ 1 \ \ V` \ i - - - ' ~ / i i / . / l/ / _ / l I / 1, ~ \ V A ~ 1 A ~ / / i / / / / ~ ~ / / / AV A ~ ~ / ~ ~ i i ~ ~ l l I I ! l V A A\ V~ ! ~ i / v v i l / / i / ~ A\ / ~ i 1i I \1\~ / / i' _ ~ ~ ~ ' i ~ l l / / l/ V A v i ~ v ~ v /iii- //i ~ / ~ ~ \V ~ % ~ ~ '"1.1~ A~ ~ ~ ~ / i i / / / / \ ~ ~ ~ / i~ / l l l i~ i i- / ~ / l i i / / / A III y~~ 1A~ i ' ~ i ~ i - - i ~ / / A ~ ! i ~A ~ / i ~ / - ~ i / ~ ~V ~ i ~ ~ / i ~ ~ i ~ ~ / l l l / / A V \ \ - i - v A / / ~ ~ ~ / / / ' ~ A ~ A V _ / / / i / ~ / / / ~ ~ ` / / I \ \ / / ~ ~ i ~ / / ~ / / / ~ A A \ \ v A ' / / ~ ~ / ~ / ~ / / / / / v A V A \ \ / ~ ~ ~ v v ~v v v / ~ / / / / ~ / A i i ~ - / / i III/ ,I~ / / I I I1~~ ~ i i / / \ / / / ~ ~ ~ / / / / / / / V A A V A \ V / / ' ~ ~ ~ ~ ~ ~ v \ A A \ / / ~ 1 / l/ l I / V / / ~ ~ v ` v v v \ - i I I Il/ ~ i~ II I Il 1 / / ~ ~ / / / i ~ / l l l / i A\ V A A / / v v~ V A \ / ~ 1 ~ / i / / \ / \ / , , ' ~ ~ ' , - - - - - 1 I . ~ / r / III I I I 1 1 1 l l i ~ ~ ~ / , - ~ ~ /i I I III 1 f J r/ / / ' i / l / l / / l / l I / / i 1 \ \ \ \ \ l l / / i ~ ~ ~ \ \ \ \ \ \ \ I V / ~ \ .•~i i I III ~ 1 I ~ ~ ~ / / ~ / / i / l / l / / l l l I / / ~ / 1 1 V A \ ( / / / 1 \ \ v \ _ ~ \ \ \ \ ~ / / / / ~ / ~ l / l ! I I ! l / / 1 1 1 V! ! / / / ~ ~ ~ v v vv ~ v v v v I I~ i i ~V / ~ ~ I I II 1 I I ~ 1 / ~ ~ ~ ~ i I III ? 11 I / / _ / / / 1 1 l V v v - ~ / / / ~ ~ l / ! ! ! / / ~ / I A \ \ I I l ! ! ~ v v \ \ V A A III / / ' ~-1 v ~ I I III ? I I1 / / / ~ / / i i / ~ \ /i ~ "J \ I ~ - - ' I / / / ~ i ~ ~ //i I I III AA 1 I / / ~ / ' / - / v / _ _ / ~ / / / 1 \ 1 _ / / \ \ \ / / / I l~/ / 1 1 \ / / I v v v v v V v I 1 / / ~ ~ ' / / I v 1 1 I I I' / / / / I / I / / / / / / I I I, III ` 1 ~ / / ~i ~ /l ~ I ? 11 1 v 1 i l l / / / / / / / / / / t 1 \ \ \ \ / / / / ! ! / \ ~ ~ \ \ \ \ \ \ \ \ \ / / I / / / ~ \ 1 / I A ~ v y - ~ ~ ~ ~ / / / / I 1 v / ~ \ V v I I ~ U / II I i ? 1 ~ I - / / I / v ~ / / v v A \ v v v ~ / / ~ i ~ ~ ~ ~ / / / / / / / / / 1 I I \ \ \ \ _ / / / / / \ \ \ \ \ \ / ~ / / i/ v ~ l l ~ v A V A 111 / ~ l / / ~ iil /l/ / III I i~ i ? ? 1111 1 11 v I I I / ~ ~ ~ I l / I I II ~ / 1 1A V / / ~ ~ l I/ / / / /llI 1 1 II ~ ~ 1 ~ ~ ~ A 1 i / ~ ~ ~ ~ ~ / / / / / / / / ~ 1 \ V A / / / ~ ~ \ V~ V A \ \ V A v ~ / v v v ! r ! v v v v v / / / / / ~ 11 ' / IIII I I l ~ 1 I ~ ~ ~ V A 1 ~ f / ~ / / I I _ _ ~ V A V - _ ~ / ~ ~ / / / / / / I \ \ \ \ \ I / / / ~ ~ \ \ \ \ \ \ \ \ \ / / / / ~ ~ I I i - _ ~ ? I 1 ~V~ V A ~ / / ~ ~ ir~~ ~I ~ ~ ~ / i % III I~' i ? l ~ \VA~ ` ~ ~A - _ ~ ~ / / / / / i i ' ~ ~ ~ . ' ~ / ~ / / / / / \ \ \ \ \ \ l / / / / / / / \ \ \ \ \ \ \ \ \ \ / / / \ \ I / ~ ~ ~ i / / / / ~ \ v A \ V / / / ~ \ V A V A ~ \ \ 1 / / / ~ ~ % (r__~ III I I ~ ~ ~ V A V A ~ ~ ' i / i / / / / / \ V / / / ~ V A \ V A \ A / / / / / ~ CJ I - \ _ / ~ / / / / ~ ~ I III I ~ i I \V~A ~ ~ ' ~ A \ ? I I ~ ~ ~ ~ ~ ~ ~ 1 \ 1 / i ~ i i / i ' i / / / / / l \ \ \ J / / / / / \ \ \ \ \ \ \ \ \ l / / ~ i i / / / / v ~ v v ~ / A \ \ \ A \ \ V I 1 1 ..3 / I~~J / I I II - / ~ \V~ ~ ~ \ \ / ~ / I / ~ ~ ~ ~ ~ V ~ I ~ ~ I I ~ / I I I ~ ~ - - _ I ~ ~ ~ ~ ~ 1 I 1 I I / ~ ~ ~ / ~ i i / ~ / / / / A A V A A / / / \ \ \ \ \ \ V I / / `~J ~ I I I ~ ~rs~ - ~ ~ / 1 ~ ~ ~ ~ v ~ ~ v ~ v I / ~ ~ / ~ - - / / / / V A v v ~ / / ~ V A 1 1 I I / / ~ / \ \ \ I I I ~ ! ! ~ / / / / / ~ v v ~ v / / ~ A \ \~vv v v 1 11 I / ~ / v - / / \ V I I 1 Ir~ /j I 1 - , ~ v ~ ~ ~ v 1 v / - / v v ~ I I v v ~ / / II I _ ? v ~ ~ ~ ~ I I \ ~ ~ A / / /U ~~ll III ~ I V ? vv~ ~ \ ~ I ~I I I 1 I ~ v ~ / A 1 1 I I! v / v v ~ ~ / ~ v v ~ 1 1 1 I I I I \ / / 1 1 1 \ ~ ` ~ rl~ ~ III 1 t I ? A ~v ~ A ~ ~ ~ I I, A 1 yy~~ ~ ~ / / I ~ / / ~ ~ ~ ~ ~ I I I I I I I \ \ \ I ! \ ~ ~ / \ \ \ 1 1 1 1 1 1 l 1 I, A 1 1 1 I v vv v v A\ V ~ v v / v ~ I A 1 1 1 V '~V ~ ~ / I I / III / / ? ~ A v ` ~ ~ I A \ ~ V V I v v \ / v / ~ 1 A 1\ 11 I \ I\ I! v vv v v\ v v l I /`v ~v v / I I I I A 1\ I I 1 A I I I ~ v v\ v v ! v v ~ I 1 I I ~ 1 ' I l 1 I A \ 1 1~ ! ~ v vv ~ ! I 1 \ I I I I \ \ ~ \ I I 1 I I ~ l I I ~ ~ v i ~ / 1 I I I - / lrll I rl , / I / ~ 1 ~ ~ I / \ ~ ? I 1 \ 11 ~ ` \ ` 1 ~ I r / !II A \ ~ I I V l ~ v / 1 I I ( \ v v ~ / 1 I l I I I t 1 1 1 ~ v v A V ~ ~ ` ~ ~ / l l I I I I r 111 / I i I / 1 ~ \ \ 1 ~ \ \ \ \ \ \ \ V ~ \ \ \ ~ ~ ~ ~ / / I ! I I ~ v A v \ v v y V v v \ ~ ~ 0 / , ~ / ~ / / ! ! I I I ll1 I / 1 / ~ ~ • ~ 1 ~ \ \ \ ` \ i 'i ~ \ \ I /I ~ / i 11 ? \ \ \ \ V A V A \ .f. 1 / llI 1 1 ~ ~ / I I i I ~ 1 ~ ~ v v v~ v v v v v / / / I ~ ~ ~ j ~ I ~ v ~ ~ \ \ ~ \ - / ~ / i /i'/iii l/ !\I ~ / ~ / / l / A ~ \ I / / ~ ~ V ~ / / I ~ ! / ~ I I ~ ` \ \ ~ ~ ~ ~ ~ \ 1 i ' I ~ ~ I I / ~ ~ ~ ~ V ~ ~ ~ \ l ~ i / I / ~ ~ ~ \ \ ~ V \ 1 + / i ~ r II I l I I ! / A ~ ~ + ~1 ~ ~ ~ ~ v ~v ~ d' ~ ~ r/ / ll / / I ~ ~ ~ . v ~~v 1 / / I / ~ ~ ~ / ? I v ~ v ~ ~ Q~~U / l/ / - i ~ I - / 1 ~ ~ ` ~ ~ ~ ~ t 11 ~ / ~ ~ I I v1 ~ I / ~ v ~ ~ / ~I l v ~ \ \ ~ ~ ~ ~ ~ ~ ~ ~ \ / / / iii , i~ /i ~-l \ \ \ l Il /ll I ~ ~ i I I i 1 1 V A A ~ \ ~ ~ ~ \ ~ ~ ~ ~ it , / / / , / /i \ \ ~ ~ / i 1 \ \ \ \ 11 /l ~ I / i / I l ~ A~ ~ / I 1 ~ / / i ~ 1 / 1/ 1 / ~ / ~11 ~ Illl I I V / I V i/// / \ I I~ i _ i/ ~ I ~1 ~ ~:r V / I I l ~ ( / 1 ~ i ~ l II ~ ~ ~ % / ~ 1 A 1 r ~ ~ / I ~ 1 - - ' y r~// / 1 / / ~ - ~ - / / / 1 I ~ / / L I i/ / I \ I I ~v ~~v vvv v v ~ ~ ~ ~ II ~ 1 v v v 1 I _ ~ v~ ~ ~1 1 1 ~I 1 I Av ~ - ~ ~ ~ ~ ~ ~ V~ - V v V A A \ I 1~i,-` VA \ ~,§ky' / / ~ / I 1 i ~ / I / I I b ~ / 11 I / / I I ~ "'tea \ ~ ~ ~ ` ~ ` V v \ v 1 I / l r~ vv \ z9 - ~ ~ ~ - V 1 1 \ ~ 1 ~ ~ ~ v V A 1 I i ~ \ \VA 1 ~ _ i - - , ~ _ A / I / / / / ~ I _ / f td / I 1 ~ ~ a29---_" ~ / ~ / ~ I I I i I I ~ v ~Q \ _ ~~v ~ ~ ~ ~ \\\V v v I ~ - I / / A V 1 /~~~AA I IAA \ ~ A v v I \ 1V ~ \ l ~ A ,i } / / /l/ / /j/ / I I v I I I I I v ~ - - - \ \ \ \ l \ 1 % I \ 1 I I - ~ v v A ~ l 1 v ~ ~ I A I I 1 1 ~ i~ vv \ v' I 11 / / I I I I ~ 11 I / / / / I I / I / i. ~ _ v v V v A ~ 1 I / ~ V v I I I / ~ v ! V A v v A ~ I I 1 / AA \ I v - v ~ v ~ V 1 I / V I I I / I I I I / I I I III ~ / / ' ~ ~ / / / / I I 1 I~ ~ I I Ill ~ I ~ ~ / / ~ ~ / / - - I1 111 \ ~ / I ---v ~ I / I V ~ \ \ \ 1;1 l 1 I ~ / \ \ V I I I ~ II - v_ _ ~ I! I! V A V A ~ 1 ~ I I v A A I ~ 1 1 ~ l ~ / / / i ~ / ~ + - ~9 I - ) 1 ~ ~ V 1 1 \ \ / / I / ~ t 1 / ~ \ v 1 1~ 1 I I I V ~ v v A \ 1 I t I v I II ~ `fit. / vv ~ v - - _ ~ ! I / / ~ \ 1 I ~ 1 I ~ v / ~ / I / ~ I / / ~ ~ r 1 l 11 ~/l /l(~~~ I ~ I ~ ~ /1!!/~ vv~ ~ ~ ~ / ! / / 1 \ 1 \ 1 1 1~ I 1 1 ~ I III ~ A \ \ 1 A I/ / ~ ! I v I II I ! / / % ~ l 1 / I ~ / ~ ~ I ~ / i I I ~ A 1 , I / / l / / ~ / / ! ~ / , / I 1 I 1 ! ~t1! r.I ~,v~ ~ _ ~ i , , ! vv 1 1 1 ~ , v I II ~ ~ ~ v I. ! II ! I I I II 1 v. (~,~Cl / ~ / I I ~ ~ ~ V ~ ~ I i ! / A ~ ~ ~ I / / ~ / / / / / ~ ~ ~ 1 i I / ~ - ~ / I 6v I vv.v v ~v~ / /I Ii I ~ / / / / i ~ ~ ~ ~ ~ I I I / V _ 1 ~ I / ~ / / I / ~ ~ ~ A \ i I ~ _ - A 1 1 v` v v~ v I - - I l 1 ~ vv v v 1 1 III ~ v ! ~ vvy vv Iv` / 1 1 1 I - ~ _ ' - ~ ~ ! 1 A 1\ V A\ I I1 v~ A v v \ V v 1 1 I II I I I j / ~ ~ ~ ~ V A - N I ~ ~ \ 11 I I / / / / / / I ~ ~ I. I ~ I _ Ir I Q ~ ~ ~ V ~ I ~ ~ - I 1 U' A ~ v A 1 I - ~ ~ I 1 v v~ v ~V1,. I I I I I - I 1 \ I 1 / A v v~ \ v 1 I I I I / / ~ / 1 / ~ ~ ~ ~ A V l I i I ~ ~ ~ I I/ / ~ 0 ~ ~ ~ I 11 ~ _ / / ~ / I I A I I I 1 ~ I v vvv v v v v 1 1 I II % ~ ! I 1 1. V ~l \VAV A 1 II I II ;I I I Il( I 11 ~ % 11 V I ~ ~ ti I I I I _ ~ V I I / 11 ~ _ - ~i/~ i ~ ~ / 1 1 I ~ ~ \ \ I I ~i~ ~ - / ~ / , - ~ ~ ! ~ 1 1 I I I I I I 1 ~ - \ vA V A A \ \ I \ III II / l / I I ~ / ~ ~ / V I i ~ ~ ~ ~ III I ~ ~ ~ 1 / ~ ~ ~ l I//;~l/ l \ I 1 ~ ~lil I ~ / I ~ _ . ii, ~ / ~ ~ ~ / ! 1 I ~ I ~ \ VA A A \ 1 I I I I / 111 / l llll ill l~ ~ l / ~ l I ~ ~ ~ \ ~ I - ~ / ll / ~ j// 1 / ~ Ill I ~ ~ I~ III 1 ~ v v ~ / 11 ! I I I I 1 ~ V A\VAAV A VA/ III 111 I I 11 ii ~ - _ _ \ I( l i l 1, ~ v ~ ! v v~ - _i I I v v AA V A V III I .1~ ,y ~ V I ,v IIII I / v` vvvvvvvv vvv 11111 ~ v V \ v ~ v v II I I / ~ - - _ _ `;dill - - ~ I V I I 1 ~ V v \ V I! 1 \ ~ V I 1' \ I I I I I I ~ v~ v \ _ I v v~VAV A\ I I V Ill ll_ 1 - - ~I v A ~ ~ ~v~~ 'f'! I' 1 I I \ V~ \ vvvv V 111111 11 1 ~ / ~ I , ' - r ~ ~ ~ ~ , ' 11 / ~ I _ ;lll ~ / ~ / V ~ I I 1 ~ A \ `"1 v A\ I II ~ ~ ~ ~ ~ / ~ ~ I~ I 1 1 v ~ ~ ~ V 1.111 111v 1 I ~ - I . / / `11 1 ~ I / / l ' ~ - I / / - / i / v / A V / ~ ~ / ~ v~ v I cl I I I 1 JA V I AAVAVAA VA 111 \ ~ A / v v I: 1 ~ V AV I\ 1 ~ / - - - - A V ~ / / i ' l / v ~ v v / ai I I I ~ A \ ! \ VAVAA\ 11 111 I l 1111 i l/ l I I l l l I I ~ / ~ ~ / v v v 1 ~ I I \ ~ VAVA\~ 1A\ / ~ _ ~ ~ v l ( ~ ~ / v ,1 I I I '"1 v I \VAA\ 1 1 / ~ v ~ ~ ~ ~V AV v \ ~ V ~ I I / A \ VA V\ ;1 A \ \111 ~ - / / / ~ - N \ / ~ / / 1111 ~ / / 1 / I ~ Ill \ / + / / / I l / I ~ / ' I I I ~ \ ~ \ \ \ V ~ ~ v v I ! I VA VA\ V A VA 1\ ~ ~ / i , / A A \ ~ \ l 1111 / ~ ~ / I I / ~ I J ~ N / / / ~ ~ / r - / v - A- / - / ~ ~ I I I \ VAA\VA ~ ~ 1 rte.., ! v I / ~ ~ I v AA 111 AI / ! v ~ % / ~ % ! I ~ I 11~ II I I 1111\ l/ , I I I / / 1 I I I I / ~~v, 1 l I ! A I IIII 1 / I - - _ / _ ~ ~ ~ ~i~~ ~ y ~ I I VI I 1 / i ~ ~ ` lllill 1 1 I I I / I Il 111 ~ lI / r / V ~ i i' ~ ~ ~ / I I I /!ofi / V v ~ / / / / ~ ~ ~ I I i / ~ I 111 I / / ' ~ ~v~ ! II / 1 Ill 1 ! ! v / ~ v / / I / ~ /1/ I / / ~ / I i ~ \ 1 / / I I I l l!f / l l - i ~ - ~ ~ ~ I I / l ~ ~ / / ~ ~ ) l ~ ~ ~ l I 11 / ~ / 1 / A 1 I / / ~ \ V I r /i / / / I ~ l / _ ~ \ ~ I 1 / 1 1 A 1 1 / ~ I 1 I I _ I ~ v v /i~// ! / / / 1 / / ~ ~ v V / II ~ / i 1 \ \ 1 V 1 I ' / ~ A ~ V I i / ~ I 1 A / ~ , / 1 ~ / I ~ ~ 1 I r / ' - / ! v / I / ! ~ ~ / ~l v ~ ~ ~il / ~ ~ A /r//~i/i l I l / Gj11 ~ / Q) 1 1 1 IIII / 1 / ~ v I / ~ I 11 I I I I I I ~ / I I 1 ~ / I I 1 ~~/i// I ( ~ I / ~ / / ~ / / ~ I I ~ / ~ / / / ~ v ~ ~ I ~ ~ ///i~ I i ~ / ~ ~ I i 1 i/ /r l ! l 1 ~ 4 / I 11 1 I I 1 ~ / / / / ~ ~ ~ I ~ l l l l I I I I I r ~ I I / 1 ~ / / ) i / i / ~ I / / / - , /~i ~i / / / I v ~ ~ / / ~ I ~ / / l l v / / / ~ ~~/i i~ / i l4 / I 1 ' ~ 1 I / ~ / r' 11 ~lll / \ ~ II II I I I I ~ - lip / \ 1 1' / 1 I / ~ ~ - ~i~/ i / / l - I 1 / -I •Gj / ~ ! ! ~ ~ ~ / ! ~ 1 / l / l /~j /j/ / ~ i i / / / / 1 ~ ! ~ v ~ ~ / / I ~ / / ( / / / / I I / / / / / i / / ~ - ~ i I i + I I I r l 1 1~ 11 II 1 , ~ - - ~ ~r I i I I ~ - ! I 1 \ l ~ i/ I / II / / / i / Q ~ / AVA / II 1111// ~ i / i 1 l rl '~1 - ' 1 1 _ v II ~ I 11 / ~ r I I I 1 ~ ~ _ / I V 1 I I I ~ / I I ~ / ~ A II I / i / I / / _ ! ~ ! / / / I II III III t( _i ! / I v / ! I II 1 v _ / / v ! ~ I ~ ~ 111 111VA~v ~ ~ / / / I C ~ I\ v I I ~ ~r ~ 1 I ~ ~ / - I 1 0 I ~ ~ / VV A vv ~ ! ~ _ / \ V / / \ ~ r v1 I I I - / /I I - - ~ / ~ ~ I 1 !1 ! / v ~ ~ v ~ / 1 I ~ > I t l / ~ v vvv 1 ! v l i l / I ~ (~,~1 ! I / v v v 111 11 ~ ~ I I I i I ~ ~ 1 111 _ ~ _ ~ ~ 1~1 ~ ~ I 1 11 - _ ~ I ~ _ - I 1 Z v~ 1\~ I / / / ~ ` v / I v 1 / I ~ / ~ \ 1~1111~ / ~l I - ~ ~ ~ ~1 ~ ~ l 1 1 ~l v 1 - ~ 1 1 II1 Ill ~ 1 ~ ~ ~ / _ _ ~ ~ ~ ~1 1 I ~ ~ I _ I ~ ~ _ v ~ VA l/// ~ 1 !I ~ v / / v ~ I ~ / ~ ~ I ~ ~ v 1 III ~ 1~ v l1 ~ / I I , ~ ~ r _ 1 ~ v ~ / 1 IIII ° III 1 1t ~ V I I I / I I ~ ~ v ~ I / v "1 ~ - ~ I 1 v ~i ~ ~ 1 v I ~ ~ ~ 1 v vv / ~ 1 / ~ ! v A ~ ~ / ~ I! / I Ill I ~I_/ ` Ill)III I 1 1 r / / ~ ~ ~ ~ ~ ~ I I I I III \ I / I 1 r_~ I I / / / ~ J ~ ~ ~ ~ ~ ~ \ / ~ ~ ~ ~ ~ 1 1 ~ I 111 1 ~ \ ~ v, ! / l I ~ ~ v \ ! ~ \ \ VA ~ ~ / ~ ! / L _ - - - - - - - I I ' C1 / ~ ~ \ ~ ~ I I IIII IIII I 1 ~ l I \ ~ r I t 1 I f / \ ~ 11 I ~ ~ ~ \ ~ 1 ~i i / _ I ~ / r \ 11 ~ 1 ~ / / 0 U~ I I I I I / VIII I \ III :IIII ~ \ I IIII I ~ l 1 r l / l I r I / ~I I ~ ~ ~ \ I ~ / - ~ V ~ ~ /~j / ! ~ I I ~CJ ~ / / / it I I I v III 11 1 I / / I ~ ;A ~ , ~ , v I I IIII ~ i 1 I i \ I I 1 I I ~ ~ ~ I~ V Illlf I \ I / l~ ~ ) ~ I~ I I I I ~ i V I I I v ~ I l / I ~ ~ / I 1 ~ I '1 ~ A / _ v Q v 1 I ~ / I J / / ~ v v ~ / ~ v ~ A I I! / ~ / / / I IIII ' ~ i 1 11 11 ~ ~ I I ~ I / I I I I I ~ / ~ I 1 1 ~ II I \ Illlll I ~ 1/ 1 ~ V 1 I ~ ~ I I / ! 1 / ~ v~ _~i v vv I v I ~ V ~ / ~ vv~ v I / / A - • ~ 11 /l l ~ ~ - vv ~ ~ ! -Y 1v / ! I \ I / 1 !jl / ~ / / I I ~ Illlillll I / I / ` i /I I , ~ / I l / / ~ ~ ~ v~ 1 1 I ~ ~ VIII I l / v / 1 1 1 ~ / l I I ~ ~ 1 1 l v v _ _ / ~ / / I v ~v °1 / ~ ~ 11 / 2i I I I II E I / \ ~ > / / ~ ~ ~ I I I IIII / P ~ I lI ~ / l l / / 1 I ~ ~ ~ 1 1 ~ ' v ~ vv / ~ ! 111 ~j, v ~ / II i ~ v ~ ~ I I l / I / 1 ~ I ~.I I ~ ~ i ,~~n i / ~ A/'~? ~ /1 _ _ 1 1 I1 II IIII I r ~1 1 1'I i / " / ' - IOt 1111 I II ~ III ~ 1 A_ ~ 11 ~ ~ r / l ' r t ~v ~ V I 00 - - - - - - 1111 1111,1111 i I / i I ll / I l/ i / \ \V I Cil 11 III 11111 ~ I 'f- I / ~ \ v1 n i / Al1II I~ i l r - 1 11 ~ I I I / I I i ~jlllll 1 ~ ,III ~ I ~ I / - V J 1 I II ~ 1U I I ~ 1 I I I11 ~ 1 il~~ I 1 1 I l ~ ~ V A ~l v v~ / A ~I / i i 1 I 1~1 1 ~ I ~ I / I I 1 1 I I I ~ ~ ~ _ ~ ~A l A v~ - ' ~ ~ I I•~ ~ ~ I 1 11 / / / ~ i / 1 I 1 I I :11 I Ov 1 l 1 ~r r Cil i ~ ~ A V ~ ~ ~ l ~ / 11 / / / ~ / l / I I 1 ~ ~ ~ l I l l l l / I 11111 I V A ~j1111 / I 1~1 1 I V 1 I ~ ~ ~ / ~ - ~ 11 II1 III ~ II~ I V 1 1 1 ~1 III I ~ 1 V I I 1 / ~ ~ i , \ ~ ~ ~ ~ ~ r~ I I I l 1 1 11 l / / I I I I I I i 111 ~ 1 III II 111 I 11 1 I 1 I ~ r / l ~ r ~ v ~ ~ ~ 1 II 111111 1 ~ ~ 11111 ~ 1 III I I 1 1 1 1 i ~ / ~ ~ r / t ~A CJ 1 l / / l I I ~ / / ~ ~ A / / I / 1 1 I v 1 I I I III I!l ~~I / / / i I l / I I 1 I I I \ I 11 ; ~ I 1 I 1II \ / / ~l 1 11 V I I I l I I I >:r r, / / ~ 1 1 I II I A I 1 I I I I ~I v ~ A ~ t\ I 1 1 l ~ ~ ~ ~ ' I 1111111 ~ I II ~ ~ 1 \ 1 \ \ \ 1 I ~ I Ill \ ~ ~ i I 1 ~ v~ I 11, / / / I A v I I ~ ~ I / II l / , ' I I I v , v I 1 I I I lI / / I I I r1111 1 I II V~11~~11 \ I 1 ~~~il ~ I 1111 ~ 1I 1 I 1 I I II 11 ~ ~ ~v -7I A\ 1 I 1 1 l/ ~ 1 1 1 i ~1 I I I ~ ` ~ 1 I , I ? 1 ~1 v I ~ I / / r ' I I i ;III ~A \ i l I 111 I I n I ~ I, ~ , l I I I 1 111 l lI lI 1 , 11111 1 1\ ~ I ~ ~ I v V l I I ~ 1 III : 1 I I H I i i 1 1 I~ ~ I~ I i 11 I I I I ~ 1 ~ v I I ~ I I ~1 ~I r 1 II l I r i I II II i ~ ~ i I ~ 1 / I I ~ / I I \ v + / I I I CA) Al I II ~ 1 II , I 11 I I 1 I 11 l 11 I V I / II 1 / / I ~1 II I l i I 11 III i I, 11 111 I 1 1 / ~ I II 1 1 ~ I i I I I III ~ I I 11 III 1 I ~ 1 11 ~ I I 1 1~ 11 / A I II 1 A I ~ ~ ~ ! /11 ~ I I Ilr1/ ~ I ~ 11 / / I 1 I I; 111 1 i 111 ~ I 11111 ~ I v1 I ~~11 iii 1 1 I A 1 I v I VIII 1il I 111 . ~,I,11 I ~ ~ II v ,1,- 1 , I~~I 1 1 1 ~ ~ I n v i ,II ~,1 1 ill 1 l llll 1' I v 1„ I I I I ~ ~ , -9/oZC-' L 1 1 111, II II\\ 1~-= ~~A I I I ~ ~ - I III ~ I U 1\ I I l~ ~ 111 I 1 1 v v VAS i i I I ! II I 1 111 1 ~ I 1 1 1 1 I I ~ vv v v v i i - i i I I I 1 4~ I l l ~ l I V "1 1~ ~ 1111 I I~~ ~ I11~ I I I I it I ~ I I ~ VZ) HlVd, 11 11 I JI I I l l ~ ~ i ~ I 1 1 I~ ~ ~ ~ A I 11 l 1 i + I I I 0 I~ ~ i ~1 1 1 1 , A lit 1 7CJ Al Ih II III I .C7 Cj I I Ill 11 i I III ~ i ~ r ~i ll 1 1 1 ~ ~ ~ I I I ~ \ 1 I I I A 1~ I I I 11 1 i I I 1 1 v ~ r I v v vv 0 L I v I I / I / I I \ 1 + ~ 1 I I - 1 1 ~ ~ 1 A V A A / AV / / v vv a~ \v - _ A I 1 / / / I / 1 / / i A v v vvv v v I---- ~ V 1 1 I I l l// I I I l l 1 1 I i it \ V ~ \ V 1 ~ -1 I ~'i I ~I 1 V A V A ~ 1 ~ / \ v A 1 1 I l l l l 1 1 1 I / v~ v / 1 1 I ! I I I l 1 / ~l I l// i v v~ I 1 I l / / ~ / / / I I / / / / ~ vv vvv \ ~ ~ ~ ~ v_ ~ ~ v A 1 V A I I I I l I I l 1 / I / l l l / 1 I~ 1 a i l 1 l I I I 1 \ \ ~ / / 1; 1 I `'~I I 1 \ ~ \ I / II II V 1111 11 ~ ~ ~ \ 1 1 1 III fA ~ II I / l I 11 \ 111 I I \ \ ~ r 111 11 I ~ r:1 II 111VA 1111 1111 1 ~ A 1 1 II i 111 1 n 11111 1j I I V A \ ' l i I / i _ AA v vv A ~ I I I 1 I I 1 I / / l / i I 1 1 l l i ~ v v v~ v ~ ~ ~ ~ v A 1 1 1 1 1 v I / 1 I I I ( I l 11II 11~ ICI I 0 I I `1 1 1j I I I V A\ 1 / ~ ` r i / / I ' I I l / i ~A vv v ~ v ~ v \ 1 V v f I I I I I I I I I / i / / ' ~i I I I I I 1 1 i \ vvv v \ v ~ v 1 v\ 1 v v 11 i 1 1 1 1 1 1 1 1 1 1// / / 1 fC / I I \VA I I II ' ~ ~ / / 1 I : 1111 1 r~ ~ I I l 1\ ~ ~ ~ III I 1 _ _ ~ ~ A 1 1 \ ~ ~ / / / / / I I I / ~l V A~ V A VA l 1 1 / / / / 11 l / / v v ~ \ I / I I I / /