HomeMy WebLinkAbout20061681 Ver 2_Triage Comments_20070117Dw~~ ~a~ -~/l;$I v2 • Date 17 0`1 •_
i
Plan Detail 7ncompleto - •
^ Pl"sase provide a location map for tho project.
Who Reviewed: ~ ,~ 1C V L~-~
^ Please show all scream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan. .
^. Flease show ell wetland impacts including fill slopes on the site plan. ~ •
Please indicate all buffer impacts on the site plan. ,~~~ ~~ ~/~~ (~JV ' rt7~~ ~ //-'' ~~~/4
^ Please indicate proposed lot layout ea ovalsye on the alto plan. Z~ ~,~j~ ~MpA e ~~
~' Please indicate the location of the protected buffers as a~verlays oa the site plan.
^ Please locate alI isolated. or non-isolated wotlands,streams and other waters of the State as overlays on the alto plan.
^ Please provide cross section details showing the provisions for aquatic life passages
^ Pieaso locato any planned•sewer lines on the site plan.
^ Pleaso provide fhe location of nay proposed stormwatar management practkAS ea required by QC
^ Ploaso provide detail for the stormwatea• managemart practices as required by C1C
' ^ Please specify tho percent of project imparviousneas aroa based on the estimaxed built-out conditions:
^ Pleaso iadieato all atrnmwat ~o~}tfalle on the alto pta~.
^ Ploaso indics,to the diflitse flow provision meas~ues do the site plan.
^ Please indicate whothrr ~or not the proposed impaats aheaay been conducted.
Avoidance•and/or Minimization Not Provided
The labeled as ~_ on tho plane does not appear to be necessary. Please oliminabe tho . or provido additional
information as to why it is nocessary for this project..
• . ^ This Office belioves that the labeled on the plans as can be moved, or reconfigured to avoid the impacts to the
• . Please revise tho pleas to avoid thq impacts.
^. ~ This'Office believ6s that the •labeled on tho plans as~ ~ can be moved or reconfigured to :minimize the impacts tp'tho
' . Pleaso roviso tho pleas to minimize the impacts.
^ The atormwetar discharges at the location on the plans labeled will. not provide diffuse flow thmugh the buffer because
. Please sovfse the plans and providq calculations to show that dii~iase flow wfll be achieved through the artirebuffx. If it
is not possible to achiave.dii'flaseflow through.the entiro bui~'then it may bo necessary to provide atormwator managean~t
practiets that rarnove nutriarts.bofnre the stonnwater can be discharged through the. buffer. .
Other
~..
^•. The application fee was insuf6ciart~bec~use over 150 fat of stroam and/or.over 1 acro of wetlaad'impacts were requested. Pleaso
provide ~ .' 'This additional f+eo mus# bo roce~vo¢ bofore your application can be roviewed. .
^ Please complete Suction(s) on tho apg~lication. -
^ Pleaso provide a signed copy of tho application.
^ Pleaseprovide _, copies of tho application, . copies of•the site pleas and other supporting information:
_ ^ • Pleasasubmit electronic C1~D files showixtg ~ ; vie email to ian.mcmiylaa(u~ncnnfil.net and Cl}' •
Mitigation
^ of compensatory mitigation is required for this projdct. ~ Pleaso provida'a cpmpaisatory mitigation plan, The
plan must conform to tharequireanents in 15 A NCAC 2H :0500 end must be appropriate to the type•of impacts proposed.
^ Please indicate which 404 Permit the USA would use to auth~o/r~ize this project. ~ .
S ~ ~ ..