Loading...
HomeMy WebLinkAboutVer _COMPLETE FILE_19880601. V IN REPLY REFER TO Regulatory Branch DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 May 25, 1988 SUBJECT: File No. SAWC088-N-016-0325 Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Parker: v i l..1 i . ......: i Reference the application of West Bay Corporation, represented by Mr. W. C. Gentry, for a Department of the Army permit to construct a pier and gazebo on Calico Creek, Charlestown Landing, Morehead City, Carteret County, North Carolina. The Federal agencies. have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: a. The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if the permitted structure is abandoned without having it transfered to a third party. b. The authorized structure and associated activity will not cause an unacceptable interference with navigation. Questions or comments may be addressed to Mr. Hugh Heine, telephone (919) 343-4725. Sincerely, Charles W. Hollis Chief, Regulatory Branch ... ,Vi. J -2- Copies Furnished: Mr. William Mills Water Quality Section Division of Environmental Management: North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Mr. Randy Cheek National Marine Fisheries Service Habitat Conservation Division Pivers Island Beaufort, North Carolina 28516 Ms. Beverly Etheridge, Chief Wetlands Section Region IV Marine and Estuarine Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. Charles Jones Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 IN REPLY REFER TO Regulatory Branch DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 May 17, 1988 SUBJECT: File No. SAWCO88-N-016-0325 West Bay Corporation West Ridge Center Highway 70 West Morehead City, North Carolina 28557 Gentlemen: u , L if 2 3 TO 3 c ;i On February 6, 1986, we renewed general permit No. SAWC080-N- 000-0291 (copy enclosed), which provides Federal authorization for construction activities that receive authorization from the State of North Carolina. A review of your application received May 10, 1988, for Department of the Army authorization to construct a pier and gazebo on Calico Creek, Charlestown Landing, Morehead City, Carteret County, North Carolina, indicates it to be a candidate for Federal authorization under this general permit. Accordingly, the administrative processing of your application will be accomplished by the North Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished to the State. If your application must be withdrawn from this general permit process for any reason, you will be informed regarding its further management. If there are no unresolved differences in State- Federal positions or policies, the final action taken on your application by the State will result in your receiving written notice from us that your application is consistent with the general permit and you may commence your activity. Only after receiving such confirmation should you begin work. Your application, pursuant to Section 10 of the River and Harbor Act, has been assigned No. SAWCO88-N-016-0325 and will be coordinated by Mr. David Baker. He is available at telephone (919) 343-4642. Sincerely, ChLAr us W. 1Ipi11*S Chief, Regulatory Branch Enclosure .A -2- 0 Copies Furnished (without enclosure): Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. William Mills Water Quality Section Division of Environmental Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Mr. Randy Cheek National Marine Fisheries Service Habitat Conservation Division Pivers Island Beaufort, North Carolina 28516 Ms. Beverly Etheridge, Chief Wetlands Section Marine and Estuarine Branch Region IV U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. Charles Jones Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 OFFICE OF COASTAL MANAGEMENT Lat:34°43'33"N FIELD INVESTIGATION REPORT Long:7604313611W FAST ; 1. P WANT'S NAME West Bay Corp./Charleston Landing/W. C. Gentry 2. CATION OF PROJECT SITE North 18th Street and Calico Creek, in -Morehead City, Carteret County. 3. INVESTIGATION TYPE: DREDGE & FILL CAMA X (ONLY) 4. -INVESTIGATIVE PROCEDURE: (A) DATES OF SITE VISIT 4-29-88 (B) WAS APPLICANT PRESENT NO 5. PROCESSING PROCEDURE: APPLICATION RECEIVED April 27, 1988 OFFICE Morehead City 6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Town of Morehead City LAND CLASSIFICATION FROM LUP Developed/conserv. DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP NONE (B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE X COASTAL WETLANDS X PUBLIC TRUST WATERS ESTUARINE WATERS X OTHER (C) WATER DEPENDENT: YES X NO (RESIDENTIAL) (D) INTENDED USE: PUBLIC PRIVATE X COMMERCIAL (E) TYPE OF WASTE WATER TREATMENT: EXISTING Municipal PLANNED (F) TYPE OF STRUCTURES: EXISTING 4 townhouse condos PLANNED 24 additional units to be constructed (G) ESTIMATED ANNUAL RATE OF EROSION -0- SOURCE marsh fringe 7. HABITAT DESCRIPTION: AREA (A) VEGETATED WETLANDS DREDGED FILLED OTHER (50 ft. (Footprint) Saltmarsh cordgrass (Fringe) 200 sq.ft. (B) NON-VEGETATED WETLANDS: Calico Creek: Pier 780 sq.ft. T-Head 300 sq.ft. Gazebo 160 sq.ft. (C) OTHER: NONE (D) TOTAL AREA DISTURBED: Approximately 1440 sq. ft. 8. PROJECT SUMMARY: The applicant proposes to construct a pedestrian pier in Calico Creek for the future owners of the 28 condominiums. The pier will measure 225' long x 4' wide with a T-Head platform measuring 50' long x 6' wide. In addition, a gazebo measuring l6' long x 10' wide will be constructed next to the T-Head platform. The water depth in Calico Creek is approximately 2' on MLW. L FIELD INVESTIGATION REPORT - WEST BAY CORP.- CHARLESTON LANDING W. C. GENTRY PAGE #2 9. NARRATIVE DESCRIPTION: Mr. W. C. Corporation, has submitted a CAMA Charleston Landing, an ongoing 28 project. This 2.9 acre tract of on Calico Creek, at the north end Morehead City. Gentry, representing West Bay' application on behalf of unit townhouse condominium land and project site is located of 18th Street, in downtown As proposed, the applicant would like to construct a private residential pier strictly for pedestrian use by the 28 individual unit owners. The proposed pier will be a total of 231' long x 4' wide and will terminate in a T-head platform measuring 50' long x 6' wide. A roof covered gazebo is planned for construction on the west side of the pier just inshore of the T-head platform. The gazebo will measure 16' long x 10' wide. The combined square footage and surface area for the T-head platform and gazebo is 300 sq. ft. plus 160 sq. ft., which equals 460 sq. ft. The project shoreline includes 329 linear feet of estuarine waterfront. The main leg of the pier will be situated approximately 100' from the eastern property line. The 4' wide main leg of the pier will traverse a 50' wide fringe of marsh grass dominated by salt marsh cordgrass. The offshore limits of the pedestrian pier will terminate in shallow waters averaging 12' to 2' deep on mean low tide. As the workplat drawings indicate, the pier, T-head platform and gazebo will be situated in front of a pronounced line of oyster beds which are often exposed on low tide. Additional resource information about the project vicinity indicates that this section of Calico Creek (that is upstream of 11th Street) is a designated primary nursery area as defined by the Division of Marine Fisheries. The surface waters of Calico Creek, however, are classified by the Division of Environmental Management as "SC". This classification is indicative of the wastewater treatment discharge located just above the 20th Street Bridge. 10. ANTICIPATED IMPACTS: The proposed pier will be used for pedestrian traffic and not for boat mooring purposes. The gazebo, T-head platform and pier have been positioned so as to avoid overshadowing or directly impacting those existing oyster reefs. The proposed pier should have no impact on public navigation or traditional use within Calico Creek. CAMA REVIEW: The proposed project appears to be consistent with the Land Use Plan for the Town of Morehead City. PREPARED BY: JAMES L. MERCER DATE: MAY 9, 1988 Please type or print. Carefully describe all an- ticipated development activities, including construc- tion, excavation, filling, paving, land clearing, and stormwater control. If the requested information is not relevant to your project, write N/A (not ap- plicable). Items 1-4 and 8-9 must be completed for all projects a. Name We_S4 ?? o Address W r_-if City State _C_ 9 7 Zip ZSS57 ay phone 7248D70 X_ Landowner or Authorized agent b. Project na[n1e (if any) C 4r y IeK I O L.QvI y?Ot c. If the applicant is not the landowner, also give the owne 's name ancl, address. 1- C.. 61C.All C Rv- SS a. trees a dress or se. b. City, town, oin ur)ity, or landmark M01e_n c?d Ui C. c. County C,--,f -I d. Is proposed work within city limits or planning jurisdiction? Vcs e. Name of body of water }nearest project fbtco r t M;:; a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or ' r). II 219 s,dcr. o.. , ,mow. S 10. l?? If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an ex- isting project, new work, or both? flf LD- c. Will the project be for community, private, or commercial usel e-. d. Describe the Tan1ned use of the (project. VCSia.l co w. r+,?.n?Tv iN? 4 4 `t w * J{ a. Size of entire tract 9 b. Size of individual lot(s) c. Elevation of tract above mean sea level or Na- tional Geodetic Vertical Datum a - -f to d. Soil type(s) and texture(s) of tract 5 o.K cl--AV e. Vegetation on tract 4e S h. How is the tract zoned by local government? j. Has a professional archaeological survey been f. Man made features now on tract a9 - c g. at is the AMA Land Use Plan Classifica- tion of the site? (Consult the local land use plan. . Conservation Transitional - - Developed Community Rural Other -.S i. How are adjacent waters classified? S C carried out for the tract? If so, by whom? NZ' Complete this section if the project includes any upland development. a. Type and number of buildings, fac?liti s, or struct res p oposed 28 K ?d rtllc_, 03 b. Number of lots or parcels c. Density (Give the number of residential units and the units per acre.) 28 > ? cLc Y IC d. Size of area to be graded or disturbed e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimen- tarion control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been su mitted to the Division of land R sources? C'S' an,ruvCQ anr? v?turnt +0 oe rf f. Give the percentage of the tract within 75 feet of mean high water to be covered by im- ?__?? _ rmeable surfaces, such as pavement, uildings, or rooftops. N B N E -. ? t.:.-r a fI i 1 g. List the materials, such as marl, paver stone, b. Amount of material to be excavated from asphalt, or concret , to b used for ve a e njccs ka ll surf a?(es. eo Or= r c below water level in cubi yards ,4ro?vE T /V/? e of material wld, P.OV ? ? - S-' AFC L l . yp - h. , ^I, If applicable, has a stormwater management d. Does the area to be excavated include marsh- land, swamps, or other wetlands? LO plan been submitted to the Division of En- vironmental Management? IM S-?' }1 r e. High ground excavation, in cubic yards 4 it f. Dimensions of spoil disposal area i. Describe proposed sewage disposal and/or waste g. Location of spoil disposal area 64 water eatment facilities. Cx, sti.,.r C; {y a S C-Ca t- h. Do you claim title to the disposal area? j. Have these facilities received state or local If not, attach a letter granting permission from approval? ?es the. owner. k. Describe gxisting treatment facilities F`Myc h i; A A W Jc ? S i. Will a disposal area be available for future -: ? sf c v CL e0 c ? maintenance? I /V In If so, where? j. Does the disposal area include any marshland 1. Describe location and type of discharges to , , swamplland,'or water areas? waters of the state (for examplevsurface runoff, k. Will the fill material be placed elow mean sanitary wastewater, industrial/corpme;ci l high water? i eff hag luent, or "wash dow "). ore co # s+ : Vr- I Amount of fill in cubic yards t Lr et L,0?, cr " m. Type of fill material °" n. Source of fill material m. Water supply source - C t rY' o. Will fill material be place on mash or other n. If the project is oceanfront development, wetlands) describe the steps that will be ,taken to main- p. Dimensions of the wetland to be filled tain established public b ch accessways or pro- q. How will excavated or fill material e kept on vide new access. site and erosion controlled? o. If the project is on the oceanfront, what will be the elevation above mea sea level of the first habitable floor? e 6 ?'oIJXVA Describe below the purpose of proposed excava- tion or fill activities (excluding bulkheads, which are covered in Section 7). Length Width Depth Acce!yl! (MLW) or (NWL) z; Other (break- water,.2ar, boat ramp, rock jetty) T-PIM Fill placed in wetland or below MHW Upland fill areas 5t r r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? _ 4LI, s. Will wetlands be crossed in transporting equip- ment to the project site?.LIZ If yes, explain the steps that will be taken to lessen en- vironmental impacts. IMELINE STABILIZATION ' a. Length of bulkhead or riprap /V/A b. Average distance waterward of mean high water or normal water level c. Shoreline erosion,. uring preceding 12 months, in feet d. Type of bulkhead material e. Amount of fill, in cubic yards, to be placed ow mean high water e of fill material ate 1988 L` 1_? A list of previous state or federal permits issued 8. ADDITIONAL.; INFORMATION for work on the project tract. Include permit In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then for- ward a copy of the deed or other instrument under which the owner claims title, plus written permis- sion from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on 8 Y2 x I1 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 16 high quality copies are provided by the applicant. (Contact the U.S. Army Corps of Engineers regard- ing that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency per- sonnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the -adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit com- ments on the proposed project to the Division of Coastal Management. The applicant must advise the adjacent landowners of this opportunity by sen- ding a copy of the permit application to them by registered or certified mail. This notification is re- quired by G.S. 113-229(d). Name 770W -Y 0,-- 12 (f Address Name TO hV 0,,-' el ry Address /36rfi S/DGS Name Address numbers, permittee, and issy???es. A check for $100 made payable to the Depart- ment of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in ocean- front and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, at- tach a statement documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). - 9 CERTIFICATION AND PERMIS- SION,TO EN tR'ON'LAND „ Any permit issued in response to this application will allow only the development described in the application. The project will be subject to condi- tions and restrictions contained in the permit. I certify that to the best of my knowledge, the pro- posed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit ap- plication and follow-up monitoring of project. ?-rr This is theft day of A. " ? 19??. X Lan owner or Authorized a ent Send the completed application materials to the Division of Coastal Management Office nearest you and the U.S. Army Corps of Engineers. See the map on the inside front cover for the appropriate DCM office and addresses and phone number. F r? PTT, - APR 2 ? 19$$ _J I I 1_11 Asa^«.aas.?.?'_.....< ,........-. _ • Form DCM-MP-2 MARINA DEVELOPMENT Attach this form to the Application for Permits to Develop in North Carolina's Coastal Area. Be sure to complete all other sections of that application which relate to this proposed project, including upland areas, even if duplicative. All shore-based facilities must be included in application and work plats. 1 MARINA CHARACTERISTICS b d h. i. Check below the type of marina proposed. Commercial Public _ Residential Will the marina be open to the general public? Nv If there is residential development associated with. the marina, how many units or. lots are planed? 2S Tbva Awls, es Check all of the types of service to be provided. Full service, including travel lift and/or rail Dockage, fuel, and marine supplies Dockage ("wet slips") only Number of slips Dry storage Number of boats Boat ramp(s) X Other (describe) es rah <<r Ch_eFF below the proposed type of siting. Land cut and access channel Open water with dredging for basin and/or channel _ 1X Open water, no dredging required Other (describe) Describe the typical boats to be served (for ex- ample, open runabout, c arter boats, sail boats, or mixed types). Typical boat length Maximum boat length Are any floating buildings planned? If so, describe. 2 1988 APR ---------------------- 2 MARINA OPERATIONS Check each of the following sanitary facilities wh"c will be included in the proposed project. Office toilets Toilets for patrons Number er Location Showers AUK . Boat holding tank pumpout Type and location b. Describe treatment type and location for all sanitary wastewater. C/rY 4-111 re6P ¢ c. Describe solid waste, fish ffal, and trash disposal. ? d. How will overboard dischar e f sewage from boats be controlled? e. Give the location and number of "No Sewage Discharge" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste, petroleum pro- ducts. g. Where will residyebosed of? h. Give the number of channel markers and "No Wake" signs proposed. Note: Regulatory signs such as these require ad- ditional approval by the N.C. Wildlife Resources Commission. 4 s i. Give the location of fuel handling facilities and describe the safety measu 'es2?nned to protect area water quality. j. Describe design measures that promote boat basin flushing or circulation and reduce water quality impacts. .? k. What will be the marina policy, overnight and live-board dockage? 1. Is the proposed marina located near any, shellfish leases? If so, give the name and address of the" leaseholder. in. If this project is an expansion of an existing marina, what types f services are currently provided!- n. How many slips are now available? -no-)r? orp m --nTF?, APR a i41988 --------------------- 5 i.+p'.?+w" s ; DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION Comments concern-ing.an application;for,State Federal CAMA Permit(s) from A. PERMIT: This office cannot comment on this project until after the close of the Section 401 Certification Public Comments Period. J This office has no objection to the issuance of the permit(s) for the proposed \ project with the following conditions: That the activity be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge (increases of 25 NTU's or less are not considered significant). That the instream turbidity not be increased by more than 50 NTU's as a result of the proposed activity after a reasonable opportunity for dilu- tion and mixture. That turbidity levels in shall not be increased by more than 10 NTU's as a result of the proposed activity after a reason- able opportunity for dilution and mixture. B. CERTIFICATION STATUS: __Certification is not required r this project. Certification is required for this project. Such action to process the certification has been initiated. Proposed Certification will be acted on or after The proposed project is certified under General Certification A) No. 1179 issued on January 25, D) No. 1431 issued on October 16, 1977, for sewer line construction 1980, for boat ramp construction. B) No. 1272 issued on November 10, E) No. 1664 issued on September 81 1978, for bulkhead construction. 1983, for Rip-Rap Placement. C) No. 1273 issued on November 10, F) No. 1665 issued on September 199 1978, for discharges of liquid 1983, for incidental bridge effluent from diked upland disposal construction. areas. nl; WATER QUALITY SECTION DIVISION OF ENVIRONMENTAL MANAGEMENT L Lr "' t *e# DIVISION OF ENVIRONMENTAL MANAGEMENT MEMORANDUM DATE : 5/C9 v/b'? TO: Bill Mills Operations Branch .?; FROM: James H. Gregson Wilmington Regional Office THROUGH: A. Preston Howard, Jr. A Wilmington Regional Office - SUBJECT: Regional Office Review & Recommendations Application for Permit for Excavation and/or Fill W aai( Q a-d Co-zlo •/ ' l "ZmA, L v,? y / A/. e 6-e? Project Description: 7Z-c Adjacent Water Body: &d,-co 6zG&.0 Classification: SC Status: ezoza The project has been reviewed to determine impacts to water quality. The appropriate comments below have been checked: (X) The project will/ ill no require a 401 Water Quality Certification. ( ) The project complies with the General 401 Water Quality Certification # for ( IY) The proposed project should be done in such a way as to not cause the turbidity outside the immediate construction area to exceed 0,t;' NTU. This office has no objection to the project as proposed. JHG:kc cc : DCM - James L • Me,PC6,e CF, WiRO OFFICE OF COASTAL MANAGEMENT Lat:34043133"N - FIELD INVESTIGATION REPORT Long:76043'36"W FAST TRACT 1. APPLICANT'S NAME West Bay Corp./Charleston Landing/W. C. Gentry 3. 4. 2. LOCATION OF PROJECT SITE North 18th Street and Calico Creek, in Morehead City, Carteret Countv. INVESTIGATION TYPE: DREDGE & FILL INVESTIGATIVE PROCEDURE: (A) DATES OF SITE VISIT 4-29-88 (B) WAS APPLICANT PRESENT NO 5. PROCESSING PROCEDURE: APPLICATION RECEIVED April 27, 1988 OFFICE Morehead City 6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Town of Morehead City LAND CLASSIFICATION FROM LUP Developed/conserv. DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP NONE (B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE X COASTAL WETLANDS X PUBLIC TRUST WATERS_ ESTUARINE WATERS X OTHER (C) WATER DEPENDENT: YES X NO (RESIDENTIAL) (D) INTENDED USE: PUBLIC PRIVATE X COMMERCIAL (E) TYPE OF WASTE WATER TREATMENT: EXISTING Municipal PLANNED (F) TYPE OF STRUCTURES: EXISTING 4 townhouse condos PLANNED 24 additional units to be constructed (G) ESTIMATED ANNUAL RATE OF EROSION -0- SOURCE marsh fringe 7. HABITAT DESCRIPTION: (A) VEGETATED WETLANDS (50 ft. Saltmarsh cordgrass (Fringe) T-Head Gazebo (B) NON-VEGETATED WETLANDS: Calico Creek: Pier (C) OTHER: NONE AREA DREDGED FILLED OTHER (Footprint) 200 sq.ft. 780 sq.ft. 300 sq. ft. 160 sq.ft. (D) TOTAL AREA DISTURBED: Approximately 1440 sq. ft. 8. PROJECT SUMMARY: Pier in Calico The pier will me measuring 50' 1o long x 10' wide The water depth The applicant proposes to construct a pedestrian Creek for the future owners of the 28 condominiums. Asure 225' long x 4' wide with a T-Head platform ng x 6' wide. In addition, a gazebo measuring 16' will be constructed next to the T-Head platform. in Calico Creek is approximately 2' on MLW. CAMA X (ONLY 46 FIELD INVESTIGATION REPORT - WEST BAY CORP.- CHARLESTON LANDING - W. C. GENTRY PAGE #2 9. NARRATIVE DESCRIPTION: Mr. W. C. Corporation, has submitted a CAMA Charleston Landing, an ongoing 28 project. This 2.9 acre tract of on Calico Creek, at the north end Morehead City. Gentry, representing West Bay application on behalf of unit townhouse condominium land and project site is located of 18th Street, in downtown As proposed, the applicant would like to construct a private residential pier strictly for pedestrian use by the 28 individual unit owners. The proposed pier will be a total of 231' long x 4' wide and will terminate in a T-head platform measuring 50' long x 6' wide. A roof covered gazebo is planned for construction on the west side of the pier just inshore of the T-head platform. The gazebo will measure 16' long x 10' wide. The combined square footage and surface area for the T-head platform and gazebo is 300 sq. ft. plus 160 sq. ft., which equals 460 sq. ft. The project shoreline includes 329 linear feet of estuarine waterfront. The main leg of the pier will be situated approximately 100' from the eastern property line. The 4' wide main leg of the pier will traverse a 50' wide fringe of marsh grass dominated by salt marsh cordgrass. The offshore limits of the pedestrian pier will terminate in shallow waters averaging 12' to 2' deep on mean low tide. As the workplat drawings indicate, the pier, T-head platform and gazebo will be situated in front of a pronounced line of oyster beds which are often exposed on low tide. Additional resource information about the project vicinity indicates that this section of Calico Creek (that is upstream of 11th Street) is a designated primary nursery area as defined by the Division of Marine Fisheries. The surface waters of Calico Creek, however, are classified by the Division of Environmental Management as "SC". This classification is indicative of the wastewater treatment discharge located just above the 20th Street Bridge. 10. ANTICIPATED IMPACTS: The proposed pier will be used for pedestrian traffic and not for boat mooring purposes. The gazebo, T-head platform and pier have been positioned so as to avoid overshadowing or directly impacting those existing oyster reefs. The proposed pier should have no impact on public navigation or traditional use within Calico Creek. CAMA REVIEW: The proposed project appears to be consistent with the Land Use Plan for the Town of Morehead City. PREPARED BY: JAMES L. MERCER DATE: MAY 9, 1988 Please-type or print. Carefully describe all an- ticipated development activities, including construc- tion, excavation, filling, paving, land clearing, and stormwater control. If the requested information is not relevant to your project, write N/A (not ap- plicable). Items 1-4 and 8-9 must be completed for all projects. ...p. e q a. Name S Address o City Mn eknA 114 4. State ?4_.l 7 Zip 2-8,5577 ay phone 724.8070 X , Landowner or Authorized agent b. Pro7,ect na a (if any) C hc._v (e5 0 UVI r%a c. If the applicant is not the landowner, also give the owne 's ame an address. WC66 C' 95- or b. City, town, co u or landmark M0 k. n,.,? m.c. c. County CG.?.fe,--t ' d. Is proposed work within city limits or planning jurisdiction? Vas e. Name offbbVy of water pearest project 11co v c fj. a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or nier). s.Acr, o.. v., AML s to to Describe the lanned use of the roject. VCS??YL??Q? CUhnvN..r??. a. Size of entire tract 2,9 b. Size of individual lot(s) _ c. Elevation of tract above mean sea level or Na- tional Geodetic Vertical Datum 0- . f to d. Soil type(s) and texture(s) of tract Sq voy c1__1V e. Vegetation on tract Ve-s f. Mamade features now on tract ' r a - rvC. I g. What is thhheCA1v1A Land Use Plan Classifica- tion of the site? (Consult the local land use plan. Conservation Transitional X_ Developed Community Rural Other h. How is the tract zoned by local government? F-S i. How are adjacent waters classified? S C j. Has a professional archaeologi al survey been carried out for the tract? If so, by whom? Complete this section if the project includes any upland development. a. Type and number of buildings, fatylities, or struct res p posed 28 Kevaa C'O% 4C_I ?03 b. Number of lots or parcels . A114 c. Density (Give the number of residential units and the units per acre.) 28 V, czc Y e- d. Size of area to graded or disturbed e. If the proposed project will disturb more than one acre of If you plan to build a marina, also complete land, the Division of Land Resources must receive an erosion and sedimen- and attach Form DCM-MP-2. tation control plan at least 30 days before land b. Is the proposed activity maintenance of an ex- disturbing activity begins. If applicable, has a isting project, new work, or both? MfuD- sedimentation and erosion control plan been C. Will the project be for community, private, or su mitted to the Divjsion of ?-?nd R sources? commercial use? f. Give the percentage of the tract within 75 feet r VOL V, er=n of mean high water to be covered by im- rmeable surfaces, such as pavement, uildings, or rooftops. N n N F- A. PR ' ? ; g. List the materials, such as marl, paver stone, asphalt, or concret , to bGS used for ve surfa es. CO re n d ad-50 G h. If applicable, has a stormwater management plan been submitted to the Division of En- vironmental Management? i. Describe proposed sewage dis sal and/or waste wat eatment facilities.x ZLJ2ye.- a _ ee ?e e j. Have these facilities received state or local approval? VC_-, k. Describe ggxrsting treatme t facilities Nlnvc hCi:A SAS, I icy, CQ S.CQ Cr 1. Describe location and type of dikcharges to waters of the state (for example?•surface runoff, sanitary wastewater, industrial/corpmI effluent, or "wash do C)ct a+ "IM et ?1a c? ?. h o .- m. Water supply source C t KY n. If the project is oceanfront development, describe the steps that will be ,taken to main- tain established public b ch accessways or pro- vide new access. _Q o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? ,N?.r? C ?O n Describe below the purpose of proposed excava- tion or fill activities (excluding bulkheads, which are covered in Section 7). N ?- Length Width Depth Access c nnel (MLW) or (NWL) Other (break- water, ier, boat ramp, rock jetty) r f m Fill placed in wetland or below MHW Upland fill areas /&' /' - _ ; us 5' -3 -3 b. Amount of material to be excavated from below water level in cubi yards _,&0A,/E c. Type of material /lL/r? d. Does the area to be excavated include marsh- land, swamps, or other wetlands? A10 e. High ground excavation, in cubic yards 4 f. Dimensions of spoil disposal area g. Location of spoil disposal area h. Do you claim title to the disposal area? If not, attach a letter granting permission from the owner. i. Will a disposal area be available for future maintenance?/ IvIn If so, where? j. Does the disposal area include any, marshland, swamplland,'or water areas? k. Will the fill material be placed elow mean high water? J?D 1. Amount of fill in cubic yards m. Type of fill material n. Source of fill material o. Will fill material be place on ma sh or other wetlands? 602 p. Dimensions of the wetland to be filled q. How will excavated or fill material be kept on site and erosion controlled?- IVI,4 r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? >. Will wetlands be crossed in transporting equip- ment to the project site?-AQ If yes, explain the steps that will be taken to lessen en- vironmental impacts. : ? HORELINE STABILIZATION a. Length of bulkhead or riprap A ,IA b. Average distance waterward of mean high water or normal water level c. Shoreline erosio uring preceding 12 months, in feet d. Type of bulkhead material e. Amount of fill, in cubic yards, to be placed ow mean high water e of fill material 1988 L_J L 8 ADDITIONAL: INFORMATION In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then for- ward a copy of the deed or other instrument under which the owner claims title, plus written permis- sion from the owner to carry out the project. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and iss ing dates. A check for $100 made payable to the Depart- ment of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in ocean- front and inlet areas. An accurate work plat (including plan view and A statement on the use of public funds. If the cross sectional drawings) drawn to scale in black project involves the expenditure of public funds st- ink on 8 Vz x 11 white paper. (Refer to Coastal , tach a statement documenting compliance with the Resources Commission Rule 7).0203 for a detailed North Carolina Environmental Policy Act description.) (N.C.G.S. 113A-1 to 10). Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line 9 r ;_ --ERT FIC UON. AND PERMIS- prints or other larger plats are acceptable only if 16 T R"ON LAND - high quality copies are provided by the applicant. (Contact the U.S. Army Corps of Engineers regard- Any permit issued in response to this application ing that agency's use of larger drawings.) A site or will allow only the development described in the location map is a part of plat requirements and it application. The project will be subject to condi- must be sufficiently detailed to guide agency per- tions and restrictions contained in the permit. sonnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. I certify that to the best of my knowledge, the pro- A stormwater management plan, if applicable, that posed activity complies with the State of North Carolina's approved Coastal Management Program may have been developed in consultation with the and will be conducted in a manner consistent with Division of Environmental Management. such program. A list of the names and complete addresses of the -adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit com- ments on the proposed project to the Division of Coastal Management. The applicant must advise the adjacent landowners of this opportunity by sen- ding a copy of the permit application to them by registered or certified mail. This notification is re- quired by G.S. 113-229(d). Name__ Ta?? 0,0-* /?'lo/l?`?`?E?QO Gi y Address I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit ap- plication and follow-up monitoring of project. ?* This is the/ day of .?il.. 19.O-V X Lan owner or Authorized a ent Name__ elry Send the completed application materials to the Address 6 rH S Division of Coastal Management Office nearest you and the U.S. Army Corps of Engineers. See the Natne map on the inside front cover for the appropriate Address DCM office and addresses and phone number. ?1_Ll_l APR2?19$B Form DCM-MP-2` MARINA DEVELOPMENT Attach this form to the Application for Permits to Develop in North Carolina's Coastal Area. Be sure 2 MARINA OPERATIONS to complete all other sections of that application which relate to this proposed project, including a. Check each of the following sanitary facilities upland areas, even if duplicative. All shore-based facilities must be included in application and work wh'c will be included in the proposed project. plats. Office toilets Toilets for patrons Number I MARINA CHARACTERISTICS Location Showers a. Check below the type of marina proposed. AUK . Boat holding tank pumpout Type and location Commercial Public Residential b. Will the marin open to the general public? b. Describe treatment type and location for all es sanitary wastewater. CITY 4-1,4re,9 ¢ c. If there is residential development associated S 11C_ with. the marina, how many units or, lots are planed? 2S Tbc??h Aw* es d. Check all of the types of service to be c. Describe solid waste, fish ffal and trash disposal. provided. Full service, including travel lift and/or rail d. How will overboard dischar e f sewage from Dockage, fuel, and marine supplies boats be controlled? Dockage ("wet slips") only Number of slips Dry storage Number of boats Boat ramp(s) / n 2 e. Give the location and number of 7o Sewage Discharge" signs ro osed 1,e,,, . Other (describe) es r??s1 p p . - e. Che below the proposed type of siting. - Land cut and access channel Open water with dredging for basin f. Describe the special design, if applicable, for and/or channel containing industrial type pollutants, such as Open water, no dredging required paint, sandblasting waste, a troleum pro- ducts Other (describe) . f. Describe the typical boats to be served (for ex- ample, open runabout, c tarter boats, sail boats, or mixed types). g. Typical boat length g ' Where will resid oe d osed of? /V h. Maximum boat length i. Are any floating buildings planned? if so describe. h. Give the number of channel markers and "No " , Wake signs proposed. Q _ Note: Regulatory signs such as these require ad- ditional approval by the N.C. Wildlife 2 APR 1988 Resources Commission. ---------------------- 4 • i. ' Give the location of fuel handling facilities and describe the safety measu es panned to protect area water quality. j. Describe design measures that promote boat basin flushing or circulation and reduce water quality impacts k. What will be the marina policy overnight and live-board dockage? 1. Is the proposed m pria located near any shellfish leases? If so, give the name and address of the leaseholder. in. If this project is an expansion of an existing marina, what types f services are currently provided? ..n. How many slips are now available? r" r---no-) r? 0 pr ni= APR a 1988 =OUIO 0-=L-1 5