HomeMy WebLinkAbout19880214 Ver 1_COMPLETE FILE_19880101w J' 40t
DIVISION OF;:WVIRONMENTAL MANAGEMENT
HATER IUALITY SECTION
Comments concerning an application,for State Federal CAMA Permit(s) from r
'.
A. PERMIT:
B.
This office cannot comment on this project until after the close of the Section
401 Certification Public Comments Period.
4s office has no objection to the issuance of the permit(s) for the proposed
rojZThat ect with the following conditions :
the activity be conducted in such a manner as to prevent
significant
increases in turbidity outside the area of construction or construction-
related discharge (increases of 25 NTU's or less are not considered
significant).
That the instream turbidity not be increased.by more than 50 NTU's as a
result of the proposed activity after a reasonable opportunity for dilu-
tion and mixture.
That turbidity levels in shall
by more than 10 NTU's as a result of the proposed activity
able opportunity for dilution and mixture.
CERTIFICATION STATUS:
Certification is not required
for this project.
Certification is required for
this project. Such action to
process the certification has
been initiated. Proposed
Certification will be acted on
or after .
__.?_/The proposed project is certified
under General Certification
A) No. 1179 issued on January 25,
1977, for sewer line construction
B) No. 1272 issued on November 10,
1978, for bulkhead construction.
not be increased
after a reason-
D) No. 1431 issued on October 16,
1980, for boat ramp construction.
No. 1664 issued on September 8,
.1983, for Rip-Rap Placement.
C) No. 1273 issued on November 10, F) No. 1665 issued on September 19,
1978, for discharges of liquid 1983, for incidental bridge
effluent from diked upland disposal construction.
areas.
ku??=--? t %%/GUS J K
WATER QUALITY SECTION
DIVISION OF ENVIRONMENTAL MANAGEMENT
. ? *
,f
i'•lKDATA DF/CAMA/40i REV DATE 0807/88
ACTION i ADD FILE ? I?I"(.=Ai"iA401 !',?WD ) I"'O1';!"tAT ) NI':DI° C(tMA !'•ll:::XT RCD a 0046 1
ACTION ADD, ENTER THE DATA TO BE ST ORED F RD DATA
I••'i'ti LT ..
O : }y:li:t .(t 4:} ?.? 1 ?' \. J : 0 ?i ?1 l... i..E Y . JANE 7
{' ? I::. ?:i3.ON : Q
ASSIGNED TO: WJM JOINT NOTICE: N
YPi::: CERTIFICATION RECOMMEND D A CE:: ' YYMMDD
404 I:'N : 401 RED : ISSUE: Y RECEIVED: :38080,::
CAMA ONLY: GC: f :I:P"'.1 AI::' DENY: INITIAL REPORT:
DF/C:i5MW `r` SE::C`,P : t'WI°: RE::Q : N HOLD: FINAL REPORT: GBOW"r'
RECEIVING STREAM: i1LBE::MARI...E:: SOUND CLAS S: '::1::; BASIN: PAS
COMMENTS:
"'' _.riT'iii::t. AT CAMDEN POINT SHORES AT END ,± I::' SR i100
PROPOSAL TO CONSTRUCT 130 t...l" OF ROCK RI PIRAP ALONG SH ORELINE
4 ONE ACRE DEVELOPED
COPIES: i,lARisT--C I: NT'I Ai...'-'t i J: l-.I.. E - DC M
R E C E I V F D
A G 18 1988
'r
Gp.
MEMORANDUM
A. ` r
TO: Bill Moore 'q
FROM: David R. Griffin
SUBJECT: APPLICATION FOR CAMA MAJOR PERMIT AND/OR DREDGE AND
FILL PERMIT
DATE: August 3, 1988
Attached is an application by JANE C. O'MALLEY
which was received by me on 7/22/88 I am
considering this application complete, have acknowledged receipt,
and have begun processing.
If you have any questions, do not hesitate to contact me.
/yl1
MEMORANDUM
TO: Bill Moore
FROM: David R. Griffin
SUBJECT: APPLICATION FOR CAMA MAJOR PERMIT AND/OR DREDGE AND
FILL PERMIT
DATE: August 3, 1988
Attached is an application by JANE C. O'MALLEY
which was received by me on 7/22/88 I am
considering this application complete, have acknowledged receipt,
and have begun processing.
If you have any questions, do not hesitate to contact me.
/yl1
OFFICE OF COASTAL MANAGEMENT Lat:36 10'20"N
FIELD INVESTIGATION REPORT Long:75 5712511W
1. APPLICANT'S NAME JANE C. O'MALLEY-
2. LOCATION OF PROJECT SITE 147 Edgewater Road, Camden Point
Shores, Albemarle Sound, Camden. Photo ref. 124-729. G-8
rSMa
6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Camden
LAND CLASSIFICATION FROM LUP rural-residential
DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP none
(B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE X
COASTAL WETLANDS PUBLIC TRUST WATERS X
ESTUARINE WATERS X O'T'HER
(C) WATER DEPENDENT: YES X NO OTHER
(D) INTENDED USE: PUBLIC PRIVA3 X COMMERCIAL
(E) TYPE'OF WASTE WATER TREATMENT: EXISTING septic tank and drain
EXISTING residence
(G) ESTIMATED ANNUAL RATE OF EROSION 3' SOURCE personal
obsgrvation
7. HABITAT DESCRIPTION:
AREA r
(A) VEGETATED WETLANDS DREDGED FILLED OTHER
(B) NON-VEGETATED WETLANDS:
(C) OTHER:
shallow-water habitat 400 sq. ft.
.(D) TOTAL AREA DISTURBED: 400 square feet
8. PROJECT SUMMARY: Applicant proposes to rip rap 130' of.shoreline
at her residence in Camden Point Shores. Camden. adiacent Albemarle
5. PROCESSING PROCEDURE: APPLICATION RECEIVED 7/22/88
. OFFICE Elizabeth City
JANE C. O'MALLEY
BIO REPORT
PAGE 2
SITE REPORT
The applicant currently owns an approximate 1/2 acre lot off
Edgewater Road in Camden Point Shores, Camden, adjacent to the
Albemarle Sound. A two-story residential structure is currently
located on the highground portion of the lot. Lawngrasses'
vegetate the lot which slopes gradually to. the waters of the
Albemarle Sound. Along the water's edge, cypress trees and
Phragmites dominate a border 11404" wetlands area. This shoreline
area is experiencing severe erosion from wave action in the
Albemarle Sound. The adjacent shoreline to the southeast is rip
rapped with concrete.and concrete bags.
The app?icant,seeks to protect her shoreline from erosion by
rip rapping her 130' of shoreline with cement and concrete,
similar to that of her neighbors. This is to be placed an
average of 3' waterward of MHW. No backfilling is,planned.
ANTICIPATED IMPACTS
The rip rapping of 130' of 11404" wetland shoreline will
cause the loss of approximately 400 sq. ft. of shallow' water
habitat. The rip rap will present a barrier between the "404"
wetlands and the adjacent waters of the Albemarle Sound.
CAMA REVIEW
No restraints are identified for this project in the
rural-residential classification of the 1981 Camden LUP.
Submitted by: David R. Griffin
Date: August 2, 1988
REG IVE.U
Please type or print. Carefully describe all an- au` Z I 88 escribe the planned use of the project.
ticipated development activities, including constru -
tion, excavation, filling, paving, land clearing, and
stormwater control. If the requested information is
not relevant to your project
write N/A (not a
-
,
p
plicable). Items 1-4 and 8-9 must be completed for 4 LAND AND WATER
all projects.
CHARACTRS'TICS
?.
1 ..APPLICANT .
a. Size of entire tract /DD X eDo A av
x
a. Name 1
34N
nt ni fY1AL_S V b. Size of individual lot(s) w6 ,Y /. S'Q
_
Address )e c. Elevation of tract above mean sea level or Na-
Cit}(:41naww .?fi •?-nS?ate /JG tional Geodetic Vertical Datum ,.'iiTo . '3/
,?
Zip ?' ? '?-r -? Day phone 721 3:3? - d. Soil type(s) and texture(s) of tract
S J?
`
D
d
_ Landowner or Authorized agent
b. Pra1 ect name (if any)
3 nVi
i /2 T ,
?.tJ T? ;
? -
-
e. Vegetation on tract
CRryl n `
°' 'r S'
c. If the applicant is not the landowner, also give f. Man-made features now on tract
-
H
'
the owners name. and address. 1-
s
Q C
g, What is the CAMA Land Use Plan Classifica-
tion of the site? (Consult the local land use
plan.)
Conservation Transitional
..
2,0CATON OF PROPOSED Developed Community
Rural Oth
PROJECT er
h. How is the tract zoned by local government?
a. Street address or secondary road number RIB s; o:>w'v AL_
How are adjacent waters classified?
j, Has a professional archaeological survey been
b. Ci , town, co m?ity, or landmark carried out for the tract?
If so
by whom?
M ?? o ? ..5hvf'?s
,
c. County
d. Is proposed work within city (limits or planning 5 UPLAND DEVELOPMENT
jurisdiction? ,..
e. Nam of body of water nearest project
414
w
E- S
X 8 Complete this section if the project includes any
_
,
,QZ J
na, ` upland development.
r. a. Type, and number of buildings, facilities, or .
3 DESCRIPTION AND PLANNED'? structures proposed
USE OF PROPOSED PROJECT
a. Describe all development activities you propose b. Number of lots or parcels
c. Density (Give the number of residential units
(for example, building a home, motel, marina, and the units per acre.)
bulkhead, or pier).
R ie.A 42 d. Size of area to be graded or disturbed
e. If the proposed project will disturb more than
If you plan to build a marina, also complete one acre of land, the Division of Land
Resources must receive an erosion and sedimen-
and attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an ex- tation control plan at least 30 days before land
disturbing activity begins. If applicable
. has a
isting project, new work, or both? ,
sedimentation and erosion control plan been
&;142.9e
c. Will the project be for community, private, or submitted to the Division of. Land Resources?
commercial use?
` f. Give the percentage of the tract within 75 feet
OR i vT? of mean high water to be covered by im-
permeable surfaces, such as pavement,
buildings, or rooftops.
g. List .the materials, such as marl, paver stone, b. Amount of material to be excavated from .
asphalt, or concrete, to be used for paved below water level in cubic yards
surfaces. c Type of material
h. If applicable, has a stormwater management
plan been submitted to the Division of En-
vironmental Management?
i. , Describe proposed sewage disposal and/or waste
water treatment facilities.
j. _ Have these facilities received state or local_
approval?
k. Describe existing treatment facilities.
1. Describe location and type of discharges to
waters of the state (for example;-surface runoff,
sanitary wastewater, industrial/commercial
effluent, or "wash down").
d. Does the area to be excavated include marsh-
land, swamps, or other wetlands?
e. High ground excavation, in cubic yards
f. Dimensions of spoil disposal area
g. Location of spoil disposal area
m. Water supply source
n. -If the project is oceanfront development,
describe the steps that will be taken to main-
tain established public beach accessways or pro-
vide new access.
o. If the project is on the oceanfront, what will
be the elevation above mean sea level of the
first habitable floor?
<6 tkCAMVIATIO?I AND FILL _-
3
1` . I TF`UI?ATION
a. Describe below the purpose of proposed excava-
h. Do you claim title to the disposal area?
If not, attach a letter granting permission from
the owner.
i. Will a disposal area be available for future
maintenance??
If so, where?
j. Does the disposal area include any marshland,
swamplland,lor water areas?
k. Will the fill material be placed below mean
high water?
1. Amount of fill in cubic yards
m. Type of fill material
n. Source of fill material
o. Will fill material be placed on. marsh or other
wetlands?
p. Dimensions of the wetland to be filled
q. How will excavated or fill material be kept on
site and erosion controlled?
r. What type of construction equipment will be
used (for example, dragline, backhoe, or
hydraulic dredge)?
s. Will wetlands be crossedvin transporting equip-
ment to, the project site? If yes, explain
the steps that will be taken too lessen en-
vironmental impacts.
tion. or fill activities (excluding bulkheads,
which are covered in Section 7).
Length Width Depth
Access channel
(MLW) or (NWL)
Boat basin
Other (break-
water, pier,
boat ramp,
rock jetty)
Fill placed in
wetland or below
MHW
Upland fill
areas
kr7 SIiORELINETABIL?A'TION
a. Length of bulkhead or rip rap .13,_,-?)
b. Average distance waterward of mean high water
or normal water level %c, / '
c. Shoreline erosion durin-,g preceding 12 months,
in feet % f
d. Type of bulkhead material
?e. Amount of fill, in cubic yards, to bp placed
below mean high water
f. Type of fill material
2
1? ?-V 1
3 ADDITIONA
In addition to the completed application form,
following items must be submitted:
ii ?a list of previous state or federal permits issued
work on the project tract. Include permit
bets, permittee, and issuing dates.
A copy of the deed (with state application only) or
other instrument under which the applicant claims
title to the affected property. If the applicant is not
claiming to be the owner of said property, then for-
ward a copy of the deed or other instrument under
which the owner claims title, plus written permis-
sion from the owner to carry out the project.
A check for $100 made payable to the Depart-
ment of Natural Resources and Community
Development to cover the costs of processing the
application.
A signed AEC hazard notice for projects in ocean-
front and inlet areas.
An accurate work plat (including plan view and A statement on the use of public funds. If the
cross sectional drawings) drawn to scale in black project involves the expenditure of public funds, at-
ink on 8 Vi x 11 white paper. (Refer to Coastal tach a statement documenting compliance with the
Resources Commission Rule 7J.0203 for a detailed North Carolina Environmental Policy Act
description.) (N.C.G.S. 113A-1 to 10).
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
gERTIFICATIOI`?1. AND I'EMIS-:
^
prints or other larger plats are acceptable only if 16 S:ION_ ;TO ;-ENTER ON LAND ,
high quality copies are provided by the applicant. y??rs??-4
(Contact the U.S. Army Corps of Engineers regard- Any permit issued in response to this application
ing that agency's use of larger drawings.) A site or will allow only the development described in the
location map is a part of plat requirements and it application. The project will be subject to condi-
must be sufficiently detailed to guide agency per- tions and restrictions contained in the permit.
sonnel unfamiliar with the area to the site. Include
county road (SR) numbers, landmarks, and the like. I certify that to the best of my knowledge, the pro-
A stormwater management plan, if applicable, that posed activity complies with the State of North
Carolina's approved Coastal Management Program
may have been developed in, consultation with the and will be conducted in a manner consistent with
Division of Environmental Management. such program.
A list of the names and complete addresses of the I further certify that I- am'quthorized to grant
and
adjacent waterfront (riparian) landowners. These ,
'
do in fact, grant p' permission to representatives of
individuals have 30 days in which to submit com-
state and 'fedetaf review agencies to enter on the
ments on the proposed project to the Division of aforementioned lands in connection `with
Coastal Management. The applicant must advise
the adjacent landowners of this opportunity by sen- evaluating information related to this permit ap-
ding a copy of the permit application to them by poication and follow-up monitoring of project.
registered or certified mail. This notification is re-
This is h
da
of
?
quired by G.S. 113-229(d). e
y.
••
,
1 L?
N
e /
/J ,
am X
Address !Z# I ?? -
,. • a downer or Authorized agent
,?
Name ?' _ Send the completed application materia to the
Address ` -' a - Division of Coastal Management Office nearest you
and the U.S. Army Corps of Engineers. See the
Name map on the inside front cover for the appropriate
Address DCM office and addresses and phone number.
1207
168 r
1 bw0 '.1 .J .x FAt 1.7
-. t .i? Aw7
w...R..,?!,:,..
L, it 6
M 1317. n t Sligo''' 1791 Good Mope cll.;«: ?Ganltlltk
\, 1 it .A {^IL `7 !ice 1241
y ?. yy\' y!
V \?`•.. 7]\``` 11VL 22,0jq{
V
!L[ v 11 ?y
\, q /J 1210 31 - 12.5`-' \ It k/?fY? !.O••
G°In carn« 1749 ': \iit
Lzz Gowe7
1204
10 Im
7 \ 12" .3 Maple COINlOCK
Shaw 1A 168 BAY It
I i 1201 1207 .? ?'• ? ?
13122 11 trS > 1759- • ?° \
Airport \ I v,itt,
14
i Y ?
2.) FAP it
!?Q a:ro e t :!: I•o ttt? 177 1.9 :i% t Lp ).'•? .
12-
LL4k
lot-• r e ??..
7 1 h ec. ? ; .? - \.O }' 1 ISalw Waterh1y
i l 115!
1207 t? ` 33r \` Se N
1-4_ 1147 !7 ) Mastinrps_ V \' tlt? Ita 1.B s 1g !b ?,,? <y 9 l b! ?? ??
•e q Comer i 1 - e 19 - 38
L? itn7gi,7 y - P
11)s 11yL - - W
Bekross t \
X707 ?• 12!9 ) - !'•1 I`'??(.W '?1.,- \ b. \
p 2 1171
•? ? t5? 1 s t. ?? ' i u
1.145 3w ,ra . 2• e. 4. 29.7 11?4 ' . 1 n t 17? .. 7 ? , n ta104
i; '\•
Indiantattim
DEN
4)e 4 1 t '
A on
.a / 1111 no) _ P 1 17 >d a\
343 1114 1140 3
>•7 .6 11]4 1; 1179 - - ;?(
/ .i
117E a. :?•.6 A 1l?1 t.e 11?! r ?• G
1 fAS' lot 1 Ille
2 1110!
O ?. - • . 1113 - a A
.• ? , ?,? ?. 1299 Sinlihs Comer y.? -
127 1129 Bartle"
1313
1 n. i 3e +?
II
'nog - q trw.. J
'bh fAS nw 1 - ' i` I v i? 1.x
.'9 \ t ' /tJJ 8411"t. 7 PAS
,porl 1 .? _ \ llel .8 ?0 s a 1 I10e ??.•/ 1
S. . • • tr \; I.I 343 // '?; ',•
120 •.}. 1111 Philadelphia 1!
7.2
?D? Q o
y
uql Ili t _? nn ?? 'A ''Alder Branch _ '•
n7Q i \0 \ t !103 319 v?
1179 Old Trop I \
1.5
D 411Lr. nt17e' \`I 179 .1 ; y \.9 \-_ 110. 2900 1o]
f 1107
J 1129 9 0 1101 `? ` ` (•
3
NEW 1153
11 t
1100
lu. n R_ `' ?cUN ARE ? not
I 31 WNksville \ Oro ^.? . ? !
10
34
s1u .r . t l _:? ?\ l
Cit.
1 I C A qty
FLST` r? It < F t `
LUA
11Q1 v s
11!7 r ,? s- I _ ?'7 O c
-4 34
s
,. CAMDE
of y
x111 ? ?, ll? •1 -
CO"HTV
?C_ r o ss 5 -c r; or. ? p 2c ru 3OL 2 2 %
OCM • M;
C, 1h?Cl? Po i oT Sf-I?? L S l U?? 07'7?1r1?
•• To "C ? as : t3T? & 5r i n w?63c,?t?sc C E: ?L
14`7 ?3ox r
CAh10 > x ?o x ?T S ho 2cE?s , A), C . a `"1 ` j,,?,, x ?Yl ,
L o-1- /<} 7 (aaa;T; dss Ile
r
SH I LOH TOWNSHIP
CAMDEN COUNTY , .NORTH ''CAROLINA 4
SCALE 1 = 40
BEING ALL OF LOT 147 EDGEWATER CAMDEN ISLAND CORPORATION'.'
SUBDIVISION RECORDED IN M.B. 2 , PAGE 91 .1 Mir
h. --'
• ?. Q??N. CAR .,
•
IST
SEAL
Il J.
y
L-2690>
'.?? tigy0 3U?V?.o'?,
Np , 9 •
A?15 e4.@e ??cD
J-,o) VIP
Syo? NOTC: ALL IMPROUCM6NTS
PROPOSBp 1?z9/Ss
N G8. 29 W I•P,_ _
100_00
.t s l