Loading...
HomeMy WebLinkAbout19880117 Ver 1_COMPLETE FILE_19880101DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION s concerriing anf application,.-for State F?ederal CAMA Permit(s) from G2,'G'-fi,r..?r;.r?. A. PERMIT: This office cannot comment on this project until after the close of the Section 401 Certification Public Comments Period. T s office has no objection to the issuance of the permit(s) for the proposed project with the following conditions. L hat the activity be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge (increases of 25 NTU's or less are not considered significant). That the instream turbidity not be increased by more than 50 NTU's as a result of the proposed activity after a reasonable opportunity for-dilu- tion and mixture. That turbidity levels in shall not be increased by more than 10 NTU's as a result of the proposed activity after a reason- able opportunity for dilution and mixture. B. CERTIF ATION STATUS: Certification is not required for this project. Certification is required for this project. Such action to process the certification has been initiated. Proposed Certification will be acted on or after The proposed project is certified under General Certification A) No. 1179 issued on January 25, D) No. 1431 issued on October 16, 1977, for sewer line construction 1980, for boat ramp construction. B) No. 1272 issued on November 10, E) No. 1664 issued on September 8, 1978, for bulkhead construction. 1983, for Rip-Rap Placement. C) No. 1273 issued on November 10, F) No. 1665 issued on September 19, 1978, for discharges of liquid 1983, for incidental bridge effluent from diked upland disposal construction. areas. WATER QUALITY SECTION DIVISION OF ENVIRONMENTAL MANAGEMENT DIVISION OF ENVIRONMENTAL MANAGEMENT i DATE: April 29, 1988 T° TO: Bill Mills Operations Branch FROM: James H. Gregson Wilmington Regional Office THROUGH: A. Preston Howard, Jr. Wilmington Regional Office SUBJECT: Regional Office Review & Recommendations Application for Permit for Excavation and/or Fill Indigo Plantation, Inc. Brunswick County PROJECT DESCRIPTION: The applicant is proposing to continue the development of the area around the marina basin. ADJACENT WATER BODY: AIWW, Cottage Creek, CLASSIFICATION: SA, SC, Dutchmans Creek SA The project has been reviewed to determine impacts to water quality. The following comments are provided. The project as proposed will not require a 401 certification. Problems with stormwater management are still outstanding, a 30 ft. buffer does not exist between areas of MHW and areas of built upon surfaces. The applicant has been advised accordingly. We recommend that the CAMA permit not be issued until resolutions are complete. CC: DCM-Robert Stroud CF, WiRO Major Modification To Permit #41-85 OFFICE, OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. Applicant's name Indigo Plantation, Inc. 2. Location of project site Near Southport on AIWW between Dutchman and Cottage Creeks - New Photo 10-101 Grids K-S, 9-22 3. Investigation type: Dredge & Fill CAMA x 4. Investigative procedure: (A) Dates of site visit 3-23-88 4-11-88 (B) Was applicant present no no 5. Processing procedure: Application received cc 4/21/88 Office WiRO 6. Site description: (A) Local Land Use Plan Southport Land Classification from LUP Community Development constraints identified in LUP none (B) AEC(s) involved: Ocean Hazard Estuarine Shoreline X Coastal Wetlands Public Trust Waters Estuarine Waters Other (C) Water dependent: Yes No X Other (D) Intended use: Public Private*. x Commercial (E) Type of waste water treatment: Existing Connection to Municipal System Planned (F) Type of structures: Existing Single family homes, marina basin Planned Single family homes (G) Estimated annual rate of erosion Source. 7. Habitat description: AREA h Dredged Filled Other (A) Vegetated wetlands: N/A (B) Non-vegetated wetlands: N/A (C) Other: - High Ground tract To be graded (included in the above) (D) Total Area Disturbed: Appx. 116.54 acres Appx. 13.68 acres LjRX. 116.54 acres Project Summary The appiicants propose to continue the development (A the area around the marina basin permitted under- 041-85. Indigo Plantation Page 2 9. PROJECT DESCRIPTION This is a continuation of the development associated with the new Bald Head Island Ferry basin and mainland marina now under construction. The remainder of the development will be within approximately 116.54 acres of land. There has been a delineation of Corps "404" wetlands on the tract and all proposed developable areas are landward of the "404" sections. The adjacent waters are classified as SC in Cottage Creek and SA in the AIWW and Dutchman Creek. The marina basin is classified SC. The area is closed to shellfishing. Dutchman Creek is a designated primary nursery area. The applicants propose to develop the property by creating 3 multi-family areas and 91 single family lots. A total of 195 units will be constructed at a density of 1.6 units per acres. Approximately 13.68 acres will be converted to roads and parking. 10. ANTICIPATED IMPACTS The development along Dutchman Creek has the potential to create an impact on coastal resources. However, if a suitable stormwater plan is provided and CAMA estuarine shoreline guidelines are followed, no significant adverse impacts are anticipated. Submitted by: C. Robert Stroud, Jr. Date: April 22, 1988 Office: Wilmington Please type car print. Carefully descrjl?. ... 5-r t c ticipated development acovitjef„,?tr)CIWi `? true= tion, excavation, filling;,pavirigvland`cle'?ni`i t and stormwater control. If t?1rt.?4uested info iron is not relevant to your prOjict, write NrA shot ap- plicable). Items 1-4 and 8-9 must be comfYJ eted?O-P all projects.. I APPLICANT d. Describe the plannued use of the project. residential $.H.T_ support fa.iliti s o a li_" o R. H. T. Ferry visitors 4 LAND' AND WATER CHARACTERISTICS a. Size of entire tract 1 16.54 acres b. Size of individual lot(s) Aug. 1/ 3 Acre lot c. Elevation of tract above mean sea level or Na- tional Geodetic Vertical Datum 0 LQ 20+ i ,d. Soil type(s) and texture(s) of tract - E cos se-san y ays C. Vegetation on tract Salt-marsh f. Man-made features now on tracr_.--,-_-__ PXlstlnn rnna0_g-mar] , g. What is the CAMA Land Use Plan Classifica- tion of the site? (Consult the local land use plan.) Conservation Transitional developed r Community -Rural Other h.f? `i ?eti?'£ .2ctt/?°8frf?n??r government? i. t7ow are d acent waters classified? Cottage j. H??aW WlKnal archaeological survey been carried out for the tract? If so, by whom? a. Name nrlign Plantation, Address P_ n Rnx 10c39c3 CitySnn t tin r 4 State N_ C`- Zip.2aALJDaf phone(01(4)457-5000 X Landowner or Authorized agent b. Project name (if any Tndi go Plantation C. If the applicant is not the landowner, also give the owner's name and address. .JN/ A 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number b. Cite, town. cominunity, or landmark nnthport, N 8461 C. County d. Is proposed work within city limits 4r planning jurisdiction? _our hport , N_ yPs e. Name of body of water nearest nroierr A T__ W _ W _ Cntt-age C'raek 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or vier). 5 UPLAND DEVELOPMENT Complete this section if the project includes any land development. a. Type and number of buildings, facilities, or structures proposed 91-single family 1< 104 multi-family b. N mber of lots or pRa?r,cels 91 lots - 3 m t c. biiL% ?"iivF?t?i'tdtter of residential units and the units per acre.) 19 5 - 1_ F tin i t s 4d Sing1P family and Mn1fi-famil y arina fnr Rat r7 Tlc?A TgI ar1fgg mAi;nI AnA If you plan to build a marina, also complete 2nd attach Form DCM-MP-2. b. Is the proposed activity maintenance of an ex- isting project, new work, or both? Ala?r -nrk a!rtel1LlC?z^rC?31??lLSiT_nr?"mi t- ted marl na f c. Will the project he for community, private, or commercial use, P r i 11 a t r r r? c; ?a E n Y i a 1 r m Tn-Tl„ r 1?_- Cpmmarr . a l 'Size of area to be graded or disturbed 13 68 rnar3c and parking If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimen- tation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Divisign,pf Land Resources? Give the percentage of the tract within 75 feet of mean high water to be covered by iTT1- perme2ble surfaces, such as paverT:ent, bulldutF,s, rcxlftop5.-1$----------.--_------- List the materials, such a-, ma:l, payer stone, asj}r.11t, 01 concrete, to be fired fc'T paved surfaces. marl, asphalt, concrete b. Amount of material to be excavated from -gidewal k?, wood de ki no below water level in cubic yards h. If applicable, has a stormwater management c. Type of material plan been submitted to the Division of En- d. Does the area to be excavated include mar- vironmental Management? }t?G shland, swamps, or other wetlands? e. High ground excavation, in cubic yards i. Describe proposed sewage disposal andlor was.,, f. Dimensions of spoil disposal area water treatment, EacilitiesSouthpott .:r- g. Location of spoil disposal area Municipal System . -CV 7 h. Do you claim title to the disposal area?- 7 r_ j. Have these facilities lreceived'°state .or'locaf -' ` If not, attach a letter granting permission from approval)? Yes ` ,?•`^. the owner. Will a disposal area be available for future k. Describe existing treatment facilities: maintenance? If so, where? j. Does the disposal area include any marshland, swamps, or water areas? 1. Describe location and type of discharges to k. Will the fill material be placed below mean waters of the state (for example, surface runoff, high water sanitary wastewater, industrial/commercial I. Amount of fill in cubic yards effluent, "wash down"). none , m. Type of fill material n. Source of fill material o. Will fill material be placed on marsh or other m. Water supply source City of Southport wetlands? n. If the project is oceanfront development, p. Dimensions of the wetland to be filled describe the steps that will be taken to main- tain established public beach accessways or pro- q. How will excavated or fill material be kept on vide new access. site and erosion controlled? o. If the project is on the oceanfront, what will r. What type of construction equipment will be be the elevation above mean sea level of the used (for example, dragline, backhoe, or first habitable floor7 hydraulic dredge)? 6 EXCAVATION AND FILL INFORMATION (NONE) a. Describe below the purpose of proposed excava- tion or fill activities (excluding bulkheads, which are covered in Section 7). Length ..Width Depth Access channel (MLW) or (NWL) Boat basin Other (break- water, pier, boat ramp, rock jetty) Fill placed in f ;' Cu hel(,u U; Idl: arc,,. s. Will wetlands be crossed in transporting equip- ment to project site? If yes, explain steps that will be taken to.lessen environmental impacts. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap b. Average distance waterward of mean high water or normal water level c. Shoreline erosion during preceding 12 months, in feet d. Type of bulkhead material e. Amount of fill, in cubic yards, to be placed below mean high mater- f. Type of fill matctial 8 ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then for- ward a copy of the deed or other instrument under which the owner claims title, plus written permis- sion from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 112 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note: Original drawings are preferred and on- ly high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 16 high quality copies are provided by applicant. (Con- tact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or loca- tion map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormw•ater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit com- ments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. Name. Address A check for $100 made payable to the Department of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in ocean- front and inlet areas. A statement on the use of public funds. If the pro- ject involves the expenditure of public funds, at- tach a statement documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICATION AND PERMIS- SION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to condi- tions and restrictions contained in the permit. I certify that to the best of my knowledge, the pro- posed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit ap- plication and follow-up monitoring of project. This is the 9th day of March 1988 / Lan owner or Authorized agent Name-ac. Jim Pri- at tp Jr. Address FreyattP Pra ya tp & Peterson 177 N How, Street Southport, N. C. 28461 Name ?3rt,n?wi ck o rn y Board of Education Address-Hwy- 133, Sou thport, N C 28461 At-"- Suppri nten d.t-n J )r. k Kaufhold A list of previous state or federal permits issued for uorl on the } roject tract. Include permit numbers, erTTllttee, an,a i >uint; dates. ay, S -A State of North Carolina Department of Natural Resources and Community Development Wilmington Regional Office James G. Martin, Governor Bob Jamieson S. Thomas Rhodes, Secretary DIVISION OF ENVIRONMENTAL MANAGEMENT 49 May,& ', 1988 Mr. Daniel Cutler, Vice President Planning and Construction Bald Head Island, N. C. 28461 Subject: Determination of Compliance with Stormwater Regulations Project # 880303 Indigo Plantation Brunswick County Dear Mr. Cutler: The Wilmington Regional office received your revised Stormwater Management submittal for the subject project on May 23, 1988. Based on our review of the project documents, we have determined that the project complies with the Stormwater Regulations set forth in Title 15 NCAC 2H.1000. If you have any questions concerning this matter, please contact me at (919) 256-4161. Sincerely, Original Signed By 4, PRESTON HOWARD, J A. Preston Howard, Jr., P.E. Regional Supervisor APH:mb cc: Bill Mills WiRO, CF 225 Vlrightriville Avenue, Wilmington, N.C. 28-103-369( • Tclephonc 919 256-41ol An Equal Opportunity Affirmative Action Employer DIVISION OF ENVIRONMENTAL MANAGEMENT Submittal Form for Projects Using Density Limits for Stormwater Control PROJECT DATA Name of Project: Indigo Plantation Location (County, Township/Municipality, Address): Southport, BrUncwick C'.ounty Applicant Name : Ra I d Head i s I and Manaeen-en t, I nc. Mailing Address: P. O. Box 10999 Southport. N.C. 28461 Phone No.: 919-457-4758 Submittal Date: Brief Description (include map and appropriate drawings): Mixed residential subdivision w/the Marina located off Ninth Street in Smithnnrt Water Body Receiving Stormwater Runoff: Name of Water Body: Dutrhyan Creek, C'nttPZP Creek and IntrareastaI Waterway Classification of Water Body: SC and SA Total Area of Proposed Project (acres): 116.54 State/Federal Permits and Approvals Required: (Check Appropriate Blanks) CAMA Major 404 Permit mta i ned Other (specify): Sedimendation and Erosion Control Mtained DEM/DHS Sewage Disposal portions Obtained CALCULATION OF BUILT-UPON AREA (Built-upon area means that portion of an individual development that is covered by impervious or partially pervious cover including buildings, pavement, recreation facilities, etc. but not including decking.) a) Built-upon area: 28.35 b) Total project area: 116.54 % built-upon = built-upon / total project area * 100 % built-upon area = 4 % If the water body receiving stormwater runoff is classified as SA, is the % built-upon area < 25%? Yes X- No If the water body receiving stormwater runoff is classified other than SA, is the % built-upon area < 30%? Yes x No STORMWATER COLLECTION SYSTEM Is the only kind of stormwater collection system grass swales? Yes x No (Grassed-line swales should have a side slope of 3:1 (H:V) or less.) .If-.no, please provide a detailed description. BUFFER AREA Is the built-upon area at least 30 feet from mean high water of all surface waters? Yes x_ No If no, please provide a detailed description. Boat ramp, and docks and adi cent to SC wafers and marina (Note: Only boat ramps, public roads, public bridges and walkways to water related facilities are allowed within 30 feet of mean high water if the project is intended to meet stormwater control requirements through density limits.) DEED RESTRICTIONS AND PROTECTIVE COVENANTS Do the deed restrictions and protective covenants ensure that subdivisions maintain the development consistent with the plans and specifications approved by the division and include the State as a beneficiary of the restrictions? Yes _x_ No (Include a copy of the restrictions and covenants with this form.) CERTIFICATION I, _ Daniel E. Cutler , certify that the information included on this submittal form is correct, that the project will be constructed in conformance with this information, and that to # the best of my knowledge, the pr sed project complies with the requriement of 1 CAC 2 . 00 AA ILI Signature-Owner or Agent Date P. 0. Box 10999, Southport, N.C. 28461 Address If agent, please list owner's name and address below: DIVISION OF MANAGEMENT SIGN-OFF Regional office 24 88 Date LIndiv"idual Evaluating Forms/Plant ? B8 Da Ye Regional Water Quality Supervisor CC: Applicant/Region/Mills/CF Axe March 9, 1988 Mr. Preston Howard Water Quality Supervisor N. C. Department of Natural Resources and Community Development Division of Environmental Management 7225 Wrightsville Avenue Wilmington, North Carolina 28403 Dear Mr. Howard: Re: Indigo Plantation Stormwater Exemption Referring to the Indigo Plantation project discussed in our meeting of March 3, 1988, the material presented, namely, the site plan labeled "Harding Residence", represents the largest residence we have at Indigo; and hence, represents our "typical for residential built-upon area. We, Bald Head Island Management and Indigo Plantation, Inc., have complete control over the review process through a home owners organization and complete control over the Architectural Review process. The typical square footage will not exceed the standards represented in "The Typical" for impervious area usage. We will retain complete architectural and site plan control over the outcome of the entire project. This includes control over the square footage of all buildings and the impact of any and all impervious surfaces. If at any time this plan requires any changes, we will notify you for an update. Bald Head Island, North Carolina 28461 • 919-457-6763 • Toll Free (NO 1-800-72216450 Mr. Preston Howard Page 2 March 9, 1988 Please feel free to call us at any time, if you require any further assistance with this exemption. Regards, 4=7:? S. aw'- Daniel E. Cutler Vice President Planning and Construction DEC/cma cc: Mr. Bob Stroud - Coastal Management Mr. Ken Stewart - Alliance Mr. Dan Latta - McKim & Creed Engineers