Loading...
HomeMy WebLinkAbout20181215 Ver 1_WRC Comments_20181001Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 10/1/2018 10:21:22 AM (Message Start Event) Accept by Montalvo, Sheri A 10/1/2018 1:17:41 PM (NON -DOT - EAsting Project) The task was assigned to Montalvo, Sheri A. The due date is: October 4, 2018 5:00 PM 10/1/2018 10:21 AM Staff Review Does this application have all the attachments needed to accept it into the review process? r Yes r No ID#* Version* 1 20181215 Is this project a public transportation project?* r Yes r No Reviewer List:* Robb Mairs:eads\rlmairs2 Select Reviewing Office:* Wilmington Regional Office - (910) 796-7215 Submittal Type:* Application Attachments Does this project require a request for payment to be sent?* r Yes r• No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: r New Project r Pre -Application Submittal r More Information Response r Other Agency Comments r For the Record Only (Courtesy Copy) New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Project Contact Information Name: Maria Dunn Who is subrritting the information? Email Address: maria.dunn@ncWldlife.org Project Information Existing ID #: Existing Version: 20181215 1 20170001 (no dashes) Project Name: Tidal Bluffs Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yesr No r Unknown County (ies) Carteret Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach docurrent CMDF—Horizon East_NCWRC^.pdf 867.82KB Only pdf or Igrz files are accepted. Describe the attachments: V By checking the box and signing box below, I certify that: o I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act) • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the online form." Signature: J Submittal Date: Coastal Management ENVIRONMENTAL QUALITY August 28, 2018 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS £3ireaor Maria Dunn NC Wildlife Resources Commission Gregg Bodnar Major Permits Processing Coordinator CAMA Permit Application Review Horizon East LLC Tidal Bluff Court, Pelletier NC 28584 To construct a six slip docking facility to serve an existing six lot subdivision (Tidal Bluff) Please indicate below your agency's position or viewpoint on the proposed project and return this form by September 18, 2018. If you have any questions regarding the proposed project, please contact Gregg Bodnar, Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. ✓ This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE State of North Carolina I Environmental Quality i Coastal Management Morehead City office 1 400 Commerce Avenue I Morehead City. NC 28557 252 808 2808 0 North Carolina Wildlife Resources Commission n Gordon Myers, Executive Director ►1 VAt7 � ►7�ITtill TO: Gregg Bodnar Division of Coastal Management North Carolina Department of Environmental Quality mi FROM: Maria T. Dunn, Coastal Coordinator Habitat Conservation Division DATE: September 19, 2018 SUBJECT: CAMA Dredge/Fill Permit Application for Horizon East LLC, Tidal Bluff Court, Carteret County, North Carolina. Biologists with the North Carolina Wildlife Resources Commission (NCWRC) reviewed the permit application with regard to impacts on fish and wildlife resources. The project site is located off Norris Landing Road, adjacent Pettiford Creek Bay in Peletier, NC Our comments are provided in accordance with provisions of the Coastal Area Management Act (G.S. 113A-100 through 113A-128), as amended, Sections 401 and 404 of the Clean Water Act, as amended, and the Fish and Wildlife Coordination Act (48 Stat. 401, as amended, 16 U_S.C. 661 et seq.). The applicant proposes to construct a six -slip docking facility to serve a yet to be developed six lot subdivision. The facility's access would be 5' wide and cross 135' of Section 404 wetlands and 275' of coastal marsh before it extends 135' into the waterbody. Pier height would be 3' above wetland substrate. The 135' extension into the water body is within range of nearby piers, 83' and 240' in length. A 5' by 67.6' platform would have three 3' by 24' finger piers extending from it to create six slips, each with 13' by 13' lifts. Water depths in the proximity of the slips range from -2' to -2.2' NLW. The application states no submerged aquatic vegetation (SAV) was observed in the project area but did not detail if a survey was conducted. Petiford Creek at this location is classified SA by the Environmental Management Commission, is closed to shellfish harvesting, and is designated a primary nursery area (PNA) by the NC Division of Marine Fisheries. The NCWRC has reviewed the available material and is concerned with the establishment of a multi -slip facility in PNA designated waters that has water depths approximating -2' NLW. While it is appreciated that the subdivision is concentrating its water access to one area, our concerns could be lessened by observing the following: Mailing Address: Habitat Conservation • 1721 Mail Service Center • Raleigh, NC 27699-1721 Telephone: (919) 707-0220 • Fax: (919) 707-0028 The current position of the facility is well within the'/ width of the water body and established pierhead line. Extending the structure into deeper waters would minimize scour and hull scraping concerns. It is difficult to discern from the available information whether extending the facility further into the creek would provide this opportunity. — Depending on the style of lifts, stops should be incorporated into the system if deeper water depths cannot be obtained. — As proposed, there is one slip per lot. Future impacts to shallow water habitats could be address if the six -slip facility served as the only water access point and the remaining waterfront lots had deed or covenant restrictions- - This area does not appear to have a permit to perform maintenance dredging. Therefore, if the structure is permitted, constructed, and subsequent shoaling occurs, the NCWRC would view any request to dredge as a new dredging activity. Our agency does not support new dredging in PNA designated waters. We appreciate the opportunity to review and comment on this permit application. If you need further assistance or additional information, please contact me at (252) 948-3916 or at maria.dunnrd�ncwildlife. ar