HomeMy WebLinkAbout20181072 Ver 1_More Info Received_20180829Strickland, Bev
From: jimmy@swassociatesinc.com
Sent: Wednesday, August 29, 2018 3:18 PM
To: Annino, Amy M
Subject: RE: [External] RE: DWR 18-1072 - Ainsworth, 5222 Peninsula Dr
Amy
The three access corridors should be about 750 square feet.
Thank You
Jim
From: Annino, Amy M [mailto:amy.annino@ncdenr.gov]
Sent: Wednesday, August 29, 2018 2:55 PM
To: jimmy@swassociatesinc.com
Subject: RE: [External] RE: DWR 18-1072 - Ainsworth, 5222 Peninsula Dr
Thank you for your response. Please indicate what the total square footage of all 3 access corridors will be.
Amy Annino
Environmental Specialist —Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ — Division of Water Resources
828 296 4656 office
amy.annino(cancdenr.gov
2090 U.S. Hwy. 70
Swannanoa, N.C. 28711
<5 -Nothing Compares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: jimmy@swassociatesinc.com [mailto:jimmy@swassociatesinc.com]
Sent: Wednesday, August 29, 2018 2:35 PM
To: Annino, Amy M <amy.annino@ncdenr.gov>
Subject: [External] RE: DWR 18-1072 -Ainsworth, 5222 Peninsula Dr
Amy
Below are the answers to your questions in the order they were given.
1. The only trees 3" diameter or larger that are planned to be removed are the leaning/damaged trees that are
noted.
2. 1 am hoping that only 2 access corridors will be needed and we can only disturb the area the rip rap is going to
be placed. However I did revise page 3 of 3 to show a 3rd access corridor. It is attached to this email.
3. We are not going to grade the shore line.
4. Only 3 trees are planning to be removed.
5. Would like to remove the root balls.
6. We plan on a layer of wood chips with a cover layer of pine needles.
If you need anything else or I need to submit any more documents please let me know to continue the application.
Thank You
Jim
From: Annino, Amy M [mailto:amy.annino@ncdenr.gov]
Sent: Wednesday, August 29, 2018 1:07 PM
To: limmy@swassociatesi nc.com
Subject: DWR 18-1072 - Ainsworth, 5222 Peninsula Dr
On August 1, 2018, the Division of Water Resources (Division) received your application dated July 27, 2018, requesting
a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your
application is incomplete and cannot be processed. The application is on hold until all of the following items are
addressed:
1. Will any trees 3 inches or larger be removed from the 2 proposed access corridors through the 50 foot Catawba
Buffer?
2. Please clarify if there will be an additional access corridor along the length of the shoreline to apply rip rap.
3. Do you propose to grade the shoreline to a gentler slope in any locations?
4. Any tree with a diameter of 3 inches or larger that is removed from the buffer must be replaced. Does this
change your current total of 3 trees proposed for removal?
5. The 3 damaged trees you are proposing to remove appear to have partially upended root balls. Will you be
removing the root balls or just removing the trees?
6. How do you intend to stabilize disturbed areas on the bank above the shoreline after rip rap has been applied?
Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the
proper consideration of the application. Please provide a response by September 28, 2018.
Regards,
Amy Annino
Environmental Specialist —Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ — Division of Water Resources
828 296 4656 office
amy.annino(a)ncdenr.gov
2090 U.S. Hwy. 70
Swannanoa, N.C. 28711
x
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
No
IAt
61, (44,S7
Pe �& l'D
Please approximately sketch the following information on this plan (provide dimensions for each
Item, such as 10 ft x 100 ft)*:
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
6. Location of construction access corridors
FORM: SSGP 10-2013 Page 3 of 3