Loading...
HomeMy WebLinkAbout19880070 Ver 1_COMPLETE FILE_19880101DIVISION OF ENVIRONMENTAL. MANAGEMENT WATER QUALITY SECTION Comments concerning an application for State Federal CAMA'Permit(s) from A. PERMIT: Thhis office cannot comment on this project until after the close of the Section 401 Certification Public Comments Period. B. This office has no objection to the issuance of the permit(s) for the proposed project with the following conditions.: _ That the activity be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge (increases of 25 NTU's.or less,are not considered significant) That the instream turbidity not be increased:by more than 50 NTU's as a result of the proposed activity after a reasonable opportunity for dilu- tion and mixture. That turbidity levels in shall not be increased by more than 10 NTU's as a...result of.the proposed activity after a reason- able opportunity for dilution and.mixture. CERTIFICATION STATUS: Certification is not required.. for this project. Certification is required for this project. - Such action to process the certification has been initiated. Proposed Certification will be acted on or after The proposed project is.certified. under General.Certification A) No. 1179 issued on January 25,, D) No. 1431 issued on October 16, 1977, for sewer line construction 1980, for boat ramp construction. B) No. 1272 issued on November 10, E) No. 1664 issued on September 8, 1978, for bulkhead construction. 1983, for Rip-Rap Placement. C) No. 1273 issued on November-10, F) No. 1665 issued on September 19, 1978, for discharges of liquid 1983, for incidental bridge effluent from diked upland disposal construction. areas.. /T Uf - WATER QUALITY SECTION' DIVISION OF ENVIRONMENTAL MANAGEMENT MEMORANDUM DATE: TO: FROM: THROUGH: DIVISION OF ENVIRONMENTAL MANAGEMENT 711SAW Bill Mills Operations Branch James H. Gregson Tt+60- Wilmington Regional Off' e ` A. Preston Howard, Jr. sy. Wilmington Regional Office RECEIVEn J IL! L ? 1 1989 SUBJECT: Regional Office Review & Recommendations Application for Permit for Excavation and/or Fill ?? Co lJ?;llao? yyl?/1ir, ?.tel.Gj ?'i???a e4i, Project Description: 7,& cr Cc?o-r.Y oJDcO? 7? -?t?'Lo0 a ura?"¢ .,24" .sue 4o Z, e Adjacent Water Body: 60wV-a Classif ication: JW Status :d pcA/ The project has been reviewed to determine impacts to water quality. The appropriate comments below have been checked: (X) The project will/ 6ii::;? require a 401 Water Quality Certification. ( ) The project complies with the General 401 Water Quality Certification # for (?C) The proposed project should be done in such a way as to not cause the turbidity outside the immediate construction area to exceed 7'' NTU. t ) This office has no objection to the project as proposed. JHG:kc cc : DCM _ JAn'1E s 4 "We4e CF, WiRO 1 r • DIVISION OF COASTAL MANAGEMENT *Lat:34°40' 42:`N, ._1 j FIELD INVESTIGATION REPORT Long:76057111"W 1. APPLICANT'S NAME Emerald Bay Villas/McNeill Realty & Construction Co. 2. LOCATION OF PROJECT SITE Town of Emerald Isle Bogue Sound, Carteret County; SEE 1978 AERIAL FRAME #981 @ G-20 3. INVESTIGATION TYPE: DREDGE & FILL_ 4. INVESTIGATIVE PROCEDURE: (A) DATES OF SITE VISIT 4-20-88 (B) WAS APPLICANT PRESENT NO . 58, Blk 1 CAMA X (ONLY) 6-14-88 NO 6-30-88 NO 5. PROCESSING PROCEDURE: APPLICATION RECEIVED June 9, 1988 OFFICE Morehead City 6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN LAND CLASSIFICATION FRO] DEVELOPMENT CONSTRAINTS (B) AEC(S) INVOLVED: OCEAN HAZARD COASTAL WETLANDS X ESTUARINE WATERS X (C) WATER DEPENDENT: YES X NO Town of Emerald Isle LUP 4 LUP IDENTIFIED IN LUP NONE ESTUARINE SHORELINE X PUBLIC TRUST WATERS X - O'T'HER (MULTI-RESIDENTIAL) (D) INTENDED USE: PUBLIC PRIVATE X COMMERCIAL (E) TYPE OF WASTE WATER TREATMENT: EXISTING under construction PLANNED onsite low pressure manifold sewer system (F) (G) under construction - EXISTING 4 two-story condominiums_ dots. & (2) 3 unit bldgs. plus 200' ANNUAL RATE OF EROSION N/A SOURCE marsh 7. HABITAT DESCRIPTION: AREA (A) VEGETATED WETLANDS DREDGED FILLED OTHER (pier footprint) saltmarsh cordgrass 160 sq.ft. (B) NON-VEGETATED WETLANDS: surface water 960 sq.ft. (C) OTHER: highground highground development TYPE OF STRUCTURES: PLANNED (2) 5 unit b 800 sq.ft. 1.2 ac. (D) TOTAL AREA DISTURBED: Approximately 1.24 acres * USGS 7.5 MIN TOPO, SALTER PATH, PHOTOREVISED 1983 FIELD INVESTIGATION REPORT - EMERALD BAY VILLAS/ MCNEILL REALTY & CONSTRUCTION CO. PAGE #2 8. PROJECT SUMMARY: McNeill Realty & Construction Co. proposes. to build a private pier in Bogue Sound at Emerald Bay Villas, a 16 unit, 4 building condominium site now under construction. The proposed pier will be 200' long x 4' wide with a T-head platform measuring 10' x 201. The water depth at the end of the pier is -1' on MLT. 9. NARRATIVE DESCRIPTION: McNeill Realty & Construction Co. has submitted a State application to develop a 2.02 acre tract of land located on Bogue Banks about 6.3 miles east of the B. Cameron Langston highrise bridge in Emerald Isle, just north of Highway 58, on Bogue Sound, in Carteret County. The highground development is known as Emerald Bay Villas. The project, which is currently under construction, is located landward of the CAMA 75' Estuarine Shoreline AEC. At the time of this writing, two of the four condominium buildings (A & B) nearest Asheville Street, with eight units, have almost been completed. The associated asphalt parking, swimming pool and retention basin have also been completed. As mentioned earlier, no development is proposed for the CAMA AEC which will remain permeable to the absorption of water. This represents a 75' wide x 200' long buffer zone with some 18,750 sq. ft. of natural vegetation between Bogue Sound and the highground development. This office has further calculated that approximately 30% of the highground property will be covered with concrete and asphalt surface areas. As the project plans shown, the centrally located retention pond will receive all runoff water. The applicant proposes, by way of this application, to construct a community access pier extending some 200' down the bank across a sand dune to the waters edge. The 4' wide pier will cross a fringe of saltmarsh cordgrass measuring approximately 40' wide before terminating in Bogue Sound an additional 200' from the MHW shoreline. The overall length of the pier includes a 10' x 20' wide T-head platform with a water depth at the end of the structure of -1' on MLT. The "SA" surface waters of Bogue Sound at this location are open to the harvesting of shellfish. 10. ANTICIPATED IMPACTS: The proposed 200' long pier has been presented as a private residential water access structure. The plans show no boat slips or mooring piles, etc. The extensive shallow water sand flats immediately offshore of this property do not appear to be covered with eelgrass or any noticeable oyster rocks. The proposed pier should not FIELD INVESTIGATION REPORT - EMERALD BAY VILLAS / MCNEILL REALTY & CONSTRUCTION CO. PAGE #3 conflict with traditional navigational use of the offshore banks channel located about 250' north of the end of the proposed pier. CAMA REVIEW: The proposed project appears to be consistent with the Emerald Isle Land Use Plan updated in June, 1986. The pier project also seems to be in compliance with the CAMA 7H Use Standards for dock construction. ------------------ PREPARED BY: JAMES L. MERCER DATE: JULY 6, 1988 .Please type or print. Carefully describe all an- ticipated development activities, including construc- tion, excavation, filling, paving, land clearing, and stormwater control. If the requested information is not relevant to your project, write N/A (not ap- plicable). Items 14 and 8-9 must be completed for all projects. ' APPLICANT a. Name McNeill Realty & Construction Co. Address 7413 Emerald Drive City Emerald Isle State NC Zip 28594 Day phone 354-2787 Landowner or X Authorized agent b. Project name (if any Emerald Bay Villas c. If the applicant is not the landowner, also give the owner's name and address. Bill & June Barger 403 Yates Street South Boston. VA 24592 .2 LOCATION OF 'PROPOSM a. Street address or secondary road number 2402 Emerald Drive b. City, town, community, or landmark Emerald Isle, NC c. County Carteret d. Is proposed work within city limits or planning jurisdiction? city limits e. Name of body of water nearest project Bogue Sound d. Describe the planned use of the project. Pier & "T" access to Bogue Sound ?J 'A a. Size of entire tract 2.02 acres b. Size of individual lot(s) N/A c. Elevation of tract above mean sea level or Na- tional Geodetic Vertical Datum as per TOPO Survey d. Soil type(s) and texture(s) of tract sand e. Vegetation on tract marsh grass f. Man-made features now on tract none g. What is the CAMA Land Use Plan Classifica- tion of the site? (Consult the local land use plan.) Conservation Transitional. Developed X Community Rural Other h. How is he tract zoned by local government? RMH i. How are adjacent waters classified? SA j. Has a professional archaeological survey been carried out for the tract? No If so, by whom? Complete this section if the project includes any upland development. a. Type and number of buildings, facilities, or structures proposed 4-2 story frame bldas a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier). Pier with "T" in conjunction with .E. . area If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an ex- isting pro ect, new work, or both? new wor?C c. Will the project be for community, private, or commercial use? private REVISED DATE:. (2 5 unit bldas & 2 3 unit bldgs) b. Number of lots or parcels 1 c. Density (Give the number of residential units and the units per acre.) 8 per acre d. Size of area to be graded or disturbed no disturbance e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimen- tation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? Yes f. Give the percentage of the tract within 75 feet of mean high water to be covered by im- permeable surfaces, such as pavement, buildings, or rooftops. -no ft e l (01 t 75 2.3(v ; - 2,3 - g. List the materials, such as marl, paver stone, asphalt, or concrretg to be used for paved b. Amount of material to be excavated from below water l l i bi d asp a t surfaces eve n cu c yar s . c. Type of material h. If applicable, has a stormwater management d. Does the area to be excavated include marsh- land, swamps or other wetlands? plan been submitted to the Ijvision of En- vironmental Management? Yes e. , High ground excavation, in cubic yards i. Describe proposed sewage disposal and/or waste f. g. Dimensions of spoil disposal area Location of spoil disposal area w ter treatment facilii' s low ? pressure mani o sewer system h. Do you claim title to the disposal area? j. Have these faciliJes received state or local le s If not, attach a letter granting permission from approval? k. Describe existing treatment facilities. i. the owner. Will a disposal area be available for future none eX 1 S 1 ng maintenance?? If so, where? 1. Describe location and type of discharges to j. Does the disposal area include any marshland, swamplland;lor water areas? - waters of the state (for example?,surface runoff, k. Will the fill material be placed below mean sanitary wastewater, industrial/commercial high water? effluent, or "wash do "" none, retention`asin on si e 1. Amount of fill in cubic yards m. Type of fill material m. Water supply source Public n. o. Source of fill material Will fill material be placed on marsh or other n. If the project is oceanfront development, wetlands? describe the steps that will be taken to main- p. Dimensions of the wetland to be filled tain established public beach accessways or pro- q. How will excavated or fill material be kept on vide new access. site and erosion controlled? no ocean ron eve opmen which are covered in Section 7). Length Width Depth Access channel (MLW) or (NWL) Boat basin Other (bpeak- water pier boat mp, rock jetty) Fill placed in wetland or below MHW Upland fill areas r. What type of construction equipment will be used (for example, dra line, backhoe, or hydraulic dredge)? none s. Will wetlands be crossed ' transporting equip- ment to the project site? o If yes, explain the steps that will be taken to lessen en- vironmental impacts. 8 ADDITIONAL INFORMATION" In addition to the completed application form, the following items must be submitted: A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. ?A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then for- ward a copy of the deed or other instrument under which the owner claims title, plus written permis- sion from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on 8 V2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for -a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 16 high quality copies are provided by the applicant. (Contact the U.S. Army Corps of Engineers regard- ing that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency per- sonnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit com- ments on the proposed project to the Division of Coastal Management. The applicant must advise the adjacent landowners of this opportunity by' sen- ding a copy of the permit application to them by registered or certified mail. This notification is re- quired by G.S. 113-229(d). Name Jim Batten Address 201 Emerald Drive Emerald Isle NC 28594 Name_ Emerald Ridge Association Address 313 Glasolow Road Name Address Car NC 27511 G`'? . Rey Iii. /A check for $100 made payable to the Depart- ment of Natural Resources and Community Development to cover the costs of processing the application. l2' 1 X528(. . A signed AEC hazard notice for projects in ocean- front and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, at- tach a statement documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 0 Any permit issued in response to this application will allow only the development described in the application. The project will be subject to condi- tions and restrictions contained in the permit. I certify that to the best of my knowledge, the pro- posed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I further certify that I am authorized to grant;, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to tliis permit ap- plication and follow-up monitoring of project. This is the 12 day of_ May 19__88 ' X - /- Landowner or Authorized agent Send the completed application materials to the Division of Coastal Management Office nearest you and the U.S. Army Corps of Engineers. See the map on the inside front cover for the appropriate DCM office and addresses and phone number. REVISED IDATE_?,-% inn, 1 Wl f- My EBRO& I