Loading...
HomeMy WebLinkAboutWQ0022804_Final Permit_20031024OF W A r�9 Michael F. Easley, Governor William G. Moss Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E., Director Division of Water Quality October 24, 2003 KEVIN O'NEAL 6208 FA'YETTEVILLE STREET DURHAM, NC 27713 Subject: Permit No. WQ0022804 Chatham Development Corporation Heritage Pointe SFR 41 Surface Irrigation Facility Chatham, County Dear Mr. O'neal: In accordance with your permit application received June 12, 2003 and additional information received August 26, 2003, we are forwarding herewith Permit No. WQ0022804 dated October 24, 2003, to Chatham Development Corporation for the construction and continued operation of the subject single family wastewater treatment and surface irrigation facilities. This permit shall be effective to the date of issuance until September 30, 2008, and shall be subject to the conditions and limitations as specified therein. Please pay particular attention to the monitoring requirements in this permit. If the effluent quality complies with the expectations of the Advantex system performance over a reasonable period of time, the Permittee may submit a permit modification request to suspend the monitoring requirements in this permit. Failure to establish an adequate system for collecting and maintaining the required operational information will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-671.4- Unless such demands are made this permit shall be final and binding. One set of approved plans and specifications is being forwarded to you. If you need additional information concerning this matter, please contact Toni Wyche at (919) 733-5083 extension 546. cc: Chatham County Health Department Raleigh Regional Office, Water Quality Section Technical Assistance and Certification Unit Jerry Dalton, Dalton Engineering & Associates, P.A. Water Quality Central Files NDPU Files Non -Discharge Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 DENR Customer Service Center An Equal Opportunity Action Employer Sincerely, Alan W. Klimek, P. E. Internet http:lfi2o.enr.state.nc.usindpu Telephone (919) 733-5083 Fax (919) 715-6048 Telephone 1 800 623-7748 50% recycled/ 10% post -consumer paper A0. WGDUi �� NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH SINGLE FAMILY RESIDENCE SURFACE IRRIGATION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Chatham Development Corporation Chatham County FOR THE construction and continued operation of a 480 gallon per day (GPD) surface drip irrigation wastewater treatment and disposal system consisting of a 1,500 gallon baffled septic tank with effluent filter, dual recirculating 20 square foot Advantex — AX20 Filter with VeriComm control panels, a 7 GPM ultraviolet disinfection unit (International Water -Guard model IWG 1 -LV -WW -3) capable of sterilizing flow rates up to 10 GPM as long as the effluent quality treated by the unit does not exceed 15 mg/1 BOD and 15 mg/1 TSS, a 2,500 gallon storage and dosing tank, a 20 GPM pump operating at 110 feet of TDH, audio and visual high water alarms, rain sensor, and 12,960 square feet of drip irrigation area with approximately 4,320 linear feet of drip Iine containing 2160 emitters to serve the Heritage Pointe Subdivision Lot No. 41, and all associated piping and appurtenances with no discharge of wastes to the surface waters, pursuant to the application received June 12, 2003, and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until September 30, 2008, and shall be subject to the following specified conditions and limitations: I. PERFORMANCE STANDARDS Upon completion of construction and prion to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting materials. If this project is to be completed in phases and partially certified, you shall retain the responsibility to R .— track further construction a Proved under the same permit, and shall provide a final certificate of completion once the entire project has been completed. Mail the Certification to the Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. 2. The Raleigh Regional Office, telephone number (919) 571-4700, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in-place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m- until 5:00 p.m. on Monday through Friday, excluding State Holidays. 3. The surface irrigation facilities shall be effectively maintained and operated at all times so that there is no discharge to surface waters, nor any contamination of ground waters which will render them unsatisfactory for normal use. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions or failure of the irrigation area to adequately assimilate the wastewater, the Permittee shall take immediate corrective actions including those actions that may be required by the Division of Water Quality (Division), such as the construction of additional or replacement wastewater treatment and disposal facilities. 4. The issuance of this permit shall not relieve the Permittee of the responsibility for damages to surface or ground waters resulting from the operation of this facility. 5. The media of the Advantex AX20 Filter must comply with Orenco Systems, Ine. specifications. The Engineer's Certification will serve as evidence that these specifications have been met. G. A Ieakage test shall be performed on the septic tank and storage/pump tank(s) to insure that any exf Itration occurs at a rate which does not exceed twenty (20) gallons per twenty-four (24) hours per 1,000 gallons of tank capacity. The Engineer's Certification will serve as proof of compliance with this condition. 7. If excavation into bedrock is required for the installation of the septic tank or sand filter, the pit shall be lined with a 10 -mil synthetic liner. S. A sanitary tee and filter shall be installed on the effluent pipe of the septic tank. The Engineer's Certification will serve as evidence that these specifications have been met. 9. The residuals generated from these treatment facilities must be disposed in accordance with General Statute 143-215.1 and in a manner approved by the Division. 10. Diversion or bypassing of the untreated wastewater from the treatment facilities is prohibited. 11. The following buffers shall be maintained: a. 100 feet between wetted area and any residence or places of public assembly under separate ownership, b. 50 feet between wetted area and property lines, c. 100 feet between wetted area and wells, d. 50 feet between wetted area and drainage ways or surface water bodies, e. 50 feet between wetted area and public right of ways, £ 1.00 feet between treatment/storage units and any wells, and g. 50 feet between treatment units and property lines. 12. The pump tank(s) shall have functional audible and visual high water alarms that are external to any structure. 13. The disposal system shall be connected to a rain or moisture sensor that shall indicate when wastewater application is not appropriate in accordance with Condition II(4). II. OPERATION AND MAI_NTENANCE REQUIREMENTS 1. The facilities shall be properly maintained and operated at all times. 2 2. Upon classification of the wastewater treatment and surface irrigation facilities by the Water Pollution Control System Operators Certification Commission (WPCSOCC), the Permittee shall designate and employ a certified operator to be in responsible charge (ORC) and one or more certified operator(s) to be back-up ORC(s) of the facilities in accordance with 15A NCAC 8G .0201. The ORC shall visit the facilities in accordance with 15A NCAC 8G .0204 or as specified in this permit and shall comply with all other conditions specified in these rules. 3. A suitable year round leaf litter shall be maintained. 4. Irrigation shall not be performed during inclement weather or when the ground is in a condition that will cause runoff. 5. Adequate measures shall be taken to prevent wastewater runoff from the irrigation field. 6. The application rate shall not exceed a cumulative loading of 21.85 inches over any twelve (12) month period at an instantaneous application rate not to exceed 0.49 inches per hour. 7. The facilities shall be effectively maintained and operated as a non -discharge system to prevent the discharge of any wastewater resulting from the operation of this facility. 8. No type of wastewater other than that from the Heritage Pointe Lot No. 41 shall be emitted onto the irrigation area. 9. No traffic or equipment shall be allowed on the disposal area except while installation occurs or while normal maintenance is being performed. 10. The irrigation field shall be fenced with at least a two -strand wire fence. 11. Wastewater treatment units open to the atmosphere shall have restricted access and pump control panels shall be locked. 12. The Permittee is responsible for the operation and maintenance of the entire treatment and disposal system including, but not limited to, the following items: a. The septic tank shall be checked annually and pumped out as needed. The septic tank effluent filter shall be checked and cleaned at the same frequency of the septic tank. b. The ultraviolet disinfection unit shall be checked every week. The lamp shall be cleaned and/or replaced as necessary to ensure proper disinfection. c. The storage, pump, and alarm systems shall be inspected monthly. The scum layer shall be removed at the same interval as the septic tank is cleaned out. d. The system shall be inspected monthly to make certain of the proper operation of the drip line, that the vegetative growth allows a proper drip pattern, that the soil is assimilating the disposed treated wastewater with no surface runoff, and that no objectionable odors are being generated. III. MONITORING AND REPORTING REQUIREMENTS 1. Any monitoring deemed necessary by the Division to insure surface and ground water protection will be established and an acceptable sampling reporting schedule shall be followed. 2. The effluent from the subject facilities shall be monitored by the Permittee at a point prior to irrigation every March, July, and November for the following parameters: BODS TSS Fecal Coliform pH NH3 as N 3. Three (3) copies of all monitoring data (as specified in, condition 111 2) on Form NDMR shall be submitted monthly on or before the last day of the following month. All information shall be submitted to the following address: NC Division of Water Quality Water Quality Section Non -Discharge Compliance/Enforcement Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 4. The Permittee shall maintain records of all maintenance performed on the system and irrigation area, as required in Condition I1(12) for a minimum of five years. This information shall be provided to the Division upon request. 5. Noncompliance Notification: The Permittee shall report by telephone to the Raleigh Regional Office, telephone number (919)571 - 4700, as soon as possible, but in no case more than 24 hours or on the next working day following the occurrence or first knowledge of the occurrence of any of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater treatment, such as mechanical or electrical failures of pumps, spray heads / emitters, etc.; or b. Any failure of a pumping station or treatment facility resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at telephone number (800) 858-4368 or (919) 733-3300. Persons reporting such occurrences by telephone shall also file a written report in letterform within five (5) days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. IV. INSPECTIONS Adequate inspection, .maintenance, and cleaning shall be provided by the Permittee to insure proper operation of the subject facilities. 2. Any duly authorized officer, employee, or representative of the Division may, upon presentation of credentials, enter and inspect any property, pretnises or place on or related to the disposal site or facility at any reasonable time for the purpose of determining compliance with this permit, may inspect or copy any records that must be maintained under the terms and conditions of this permit, and may obtain samples of groundwater, surface water, or leachate. V. GENERAL CONDITIONS This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 4 2. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 4. Upon the availability of a municipal or regional sewerage collection system, the subject wastewater treatment facilities shall be abandoned and all wastewater discharged into the municipal or regional sewerage system 5. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143- 215.6A to 143-215.6C. 6. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 7. This permit may be revoked if the Permittee fails to abide by the conditions of the "Operation and Maintenance Agreement" previously signed by the Permittee. A set of approved plans, specifications and the operation and maintenance manual for the subject project must be retained by the Permittee for the life of the project. 9. The annual administering and compliance fee must be paid by the Permittee within 30 days after being billed by the Division. Failure to pay the fee accordingly may cause the Division to initiate action to revolve this permit as specified by 15A NCAC 211.0205 (c)(4). 10. The Permittee, at least six (6) months prior to the expiration of this permit, shall request its extension. Upon receipt of the request, the Commission will review the adequacy of the facilities described therein, and if warranted, will extend the Permit for such period of time and under such conditions and Iimitations, as it may deem appropriate. Permit issued this the 240' day of October, 2003 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION e� � Z-�), <f��f 'Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0022804 Permit No. WQ0022804 October 24, 2003 ENGINEER'S CERTIFICATION Partial Final L , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, Project Name Location and County for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of this permit, the approved plans and specifications, and other supporting materials. Signature Date Registration No. Ii iA tL 0 015, J ;r' �� RLT �fJ DAA\ LAliF 0))MM l 3 �O 0 l - J C I C TopoZone - The Web's Topographic Map http://topozone.ronVprint.asp?z=17&n=3957514.41055752&e=6832... topozone Ca;fff*I` w Map aEacamp Lm N 0 0.1 0.2 0.3 0.4 0.5 km M G 0 0.1 0.2 0.3 0.4 0.5 mi Map center is 350 44' 47"N, 7811 58' 23°W ND27) New Hill quadrangle O W M=-8.515 Projection is UTM Zone 17 NAD83 Datum G=1.185 4.-V &, go LU ow 2 OPERATION AND MAINTENANCE AGREEMENT SINGLE FAMILY RESIDENCE WASTEWATER TREATMENT SYSTEM DIVISION OF WATER QUALITY Owner: C'%,oih M J-Vg1bQtncg 7- (11,6/z 10. Address: 6o?aR TO-Ve7hVI/Ic —Paoa). C`tn /D-'{ _7?wXan, _ h/t-.1; Disposal Method: SPRAY IRRIGATION DRIP IRRIGATION (Circle One) County: Permit No. I agree to operate and maintain the wastewater treatment system as follows: 1) The Permittee is responsible for the operation and maintenance of the entire treatment and disposal system including, but not limited to, the following items: a) The septic tank shall be checked annually and pumped out as needed. The effluent filter shall be checked and cleaned at the same frequency of the septic tank. b) Check one: o The tablet chlorinator shall be checked every week. Tablets shall be added so as to provide proper chlorination. o The ultraviolet disinfection unit shall be checked every week. The lamp shall be cleaned and/or replaced to ensure proper disinfection. c) The storage, pump, and alarm systems shall be inspected monthly. The scum layer shall be removed at the same time interval as the septic tank is pumped out. d) The irrigation system shall be inspected monthly to make certain of proper operation, that vegetative growth does not interfere with the system inspection or operation, that the soil is assimilating the disposed treated wastewater with no surface runoff, and that no objectionable odors are being generated. 2) Failure of the Permittee to properly operate this system is subject to a penalty up to $25,000 per day. 3) Failure to meet the permit conditions or violation of the State's surface or groundwater regulations will require evacuating the dwelling and may void the permit. I understand the above requireme s and afire o then terms as part of the issued permit. Owner Signature: Date: VC. Notary Signature: _ P�ld �.� Notary Seal: A K N0 Off, Date: ] Q 3 SFR O&M 04/01 Commission Expiration: 0 ` NOTARY e3 PUBLIC._ Z17