Loading...
HomeMy WebLinkAboutWQ0022801_Final Permit_20030715o��� �Rr��Q� 7 N. Paul Gregory, Jr., County Manager Perquimans County P.O. Box 45 Hertford, North Carolina 27944 Subject. Pump and Haul Permit WQ0022801 Perquimans Community Center Perquimans County Dear Mr. Gregory: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Mmek, P.E. Director Coleen Sullins, Deputy Director Division of Water Quality July 15, 2003 In accordance with your request received July 2, 2003, we are forwarding herewith an authorization to Perquimans County, for the operation of a pump and haul system. This authorization shall be effective from July 15, 2003 until midnight February 2, 2004 and shall be subject to the conditions and limitations as specified herein. If you have questions concerning this matter or if this office can be of assistance, please contact Mr. Al Hodge at (252) 946-6481. Sincerely, 4- /t L Jim Mulligan, Regional Supervisor Division of Water Quality Washington Regional Office cc: central files waro files ,/�4DPU Perquimans County Health Department John Christensen, Town of Hertford N C Division of Water nuality 1Fi17 MRII SerWap ('PntPr Releinh W 77R91PA617 (9191733.7015 ►tea NCDEP (;llEtnmpr SP.rvinp NORTH CAROLINA DIVISION OF WATER QUALITY DEPARTMENT OF ENVIRONMENT, AND NATURAL RESOURCES I_PAN Tlh C_1 PUMP AND HAUL PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Perquimans County 10 " 'I� Construction and operation of a 300 gallon per day Pump & Haul system to serve the Perqimaris Community Center with no discharge of wastes to the surface waters, pursuant to the application received July 2, 2003 and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until February 3, 2004, and shall be subject to the following specified conditions and limitations: This permit shall become voidable unless the subject pump and haul activities are carried out in a manner, which has been approved by this Division of Water Quality. 2. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The facilities shall be properly maintained and operated at all times. 4. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. Page 2 Perquimans County P&H WQ00022801 5, No type of wastewater other than that from the Perquimans Community Center shall be included in the pump and haul activities. 6. The permit shall become voidable unless the agreement between Perquimans County and Lassiter Septic Tank Service for the collection, transportation, and ultimate disposal of the wastewater is in full force and effect. 7. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall cease operation of all pump and haul activities and take such immediate corrective action, as may be required by this Division. 8. The wastewater collected by this system shall be treated in the Town of Hertford's wastewater treatment plant prior to being discharged into the receiving stream. 9. The Washington Regional Office, telephone no. (252) 946-6481 shall be notified at least forty- eight (48) hours in advance of operation of the pump and haul activities so that an in -place inspection can be made. Such notification to the Regional Supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. 10. The Pennittee is liable for any damages caused by a spill or failure of the pump and haul operations. 11. Adequate inspection, maintenance, and cleaning shall be provided by the Permittee to ensure proper operation of the subject facilities. 12. The Permittee or his designee shall inspect the collection facilities to prevent malfimctions and deterioration, operator errors and discharges that may cause or lead to the release of wastes to the environment, a threat to human health, or a nuisance. The Permittee shall keep an inspection log or summary including at least the date and time of inspection, observations made, and any maintenance, repairs, or corrective actions taken by the Permittee. This log of inspections shall be maintained by the Permittee for as long as the pump and haul activities are being conducted and shall be made available upon request to the Division of Water Qualityor other permitting authority. 13. Any duly authorized officer, employee, or representative of the Division of Water Quality may, upon presentation of credentials, enter and inspect any property, premises or place on or related to the Pump & Haul facilities at any reasonable time for the purpose of determining compliance with this permit; may inspect or copy any records that must be kept under the terms and conditions of this permit; and may obtain samples. Page 4 Perquimans County P&H WQ00022801 Persons reporting such occurrences by telephone shall also file a written report in letterform within 15 days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. 21. Upon completion of construction and prior to operation of the subject pump and haul activities, a certification must be received from a professional engineer certifying that the permitted facilities have been installed in accordance with this permit, the approved plans and specifications. Mail the certification to the Division of Water Quality, Washington Regional Office, 943 Washington Square Mall, Washington, N.C. 27889. Permit issued this the 15th day of July 2003 North Carolina Division of Water Quality for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 3 Perquimans County P&H WQ00022801 14. An accurate record of the pump and haul activities must be maintained by the Permittee, indicating: a) date wastewater is removed from the facility, b) name of facility receiving the wastewater, and d) volume of removed. These records shall be made available upon request to the Division of Water Quality or other permitting authority. 15. Failure to abide by the conditions and limitations contained in this permit may subject the Pennittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A through 143-215.6C. 16. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 17. The Permittee shall provide for the installation and maintenance of an audible and visual highwater alarm. 18. A leafage test shall be performed on the septic tank and dosing tank to ensure that any exfiltration occurs at a rate which does not exceed twenty (20) gallons per twenty-four (24) hour per 1,000 gallons of tank capacity. The engineer's certification will serve as proof of compliance with this condition. 19. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the project. 20. Noncompliance Notification The Pertnittee shall report by telephone to the Washington Regional Office, at telephone no. (252) 946-6481, as soon as possible, but in no case more than 24 hours or on the next worldng day following the occurrence or first knowledge of the occurrence of any of the following: a). Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater treatment such as mechanical or electrical failures of pumps, aerators, compressors, etc. b). Any failure of a pumping station, sewer line, etc., resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Permit No. WQ0022801 July 14, 2003 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, Perquimans Community Center Pump & Haul system, for the Permittee hereby state that, to the best of my abilities, due care and diligence were used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature: Registration No. Date