Loading...
HomeMy WebLinkAboutWQ0020216_More Information Requested_20010803CERTHUD MAIL RETURN RECEWr RE VESTED Mr. Larry Guido Guido Properties, LLC. PO Box 2608 Highlands, NC 28741 Dear Mr. Guido: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D, Acting Director Division of Water Quality Water Quality Section August 3, 2001 Subject: Additional Information Request Application Number WQ0020216 R. F C2: IV E D Guido Properties, LLC.e�:ATiOhl Pressure Sewer Macon County „ c; The Asheville Regional Office has completed a preliminary review of the subject application_ Additional information is required before we can continue our review. In the meantime, however, please address the following items no later than eptember 3, 2001: IV. Treatment Facility Information: 1. The Town of Franklin's wastewater treatment plant is located --- 25 miles from the Great Things development, and utilizes less than desirable roads for the hauling of waste products. The Highlands wastewater treatment plant is located less than S miles from the Great Things development. The Division of Water Quality cannot approve the hauling of wastewater for disposal to the Town of Franklin when there is a domestic wastewater treatment plant that is substantially closer. You must provide an amended Page 3. of the application, an amended flow acceptance letter, and an amended haulers agreement referencing the hauling of septage to the Town of Highlands wastewater treatment plant. If you have any question regarding this request, please do not hesitate to contact me at 828-251-6208. Sincerely, Kevin Barnett Environmental Specialist cc: Bronce Perterfield, P.E., Pesterfield Engineering, P.A. NDPU Files — Add Info V Town of Franklin — Public Works Director Town of Highlands -- Public Works Director Macon County Health Department N- C. division of Water Oualitv 1617 Mail Service Center Raleigh, NC 27699-1617 !9191733-7015 NCDENR Customer Service 5 .... _. .. ....... -.:.e`g .. k:. .. Michael F. Easley, Governor fir, �r William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources DtOa Gregory J. Thorpe, Ph.D. Acting Citector Division of Water Quality s February 13, 2002 Mr. Victor Czar, P. E., City Engineer City of Sanford Engineering Department Post Office Box 3729 Sanford, North Carolina 27331 r}�uC WATER QUALITY ,;ECTION F F 8 2 1 2002 NON -DISCHARGE PERMITTING SUBJECT: Permit No. WQ0020247 City of Sanford Reuse Water Pump Station and Force Main Project No. E-SRG-T-00-0102 Dear Mr. Czar: In accordance with your application received June 20, 2001, we are forwarding herewith Permit No. WQ0020247, dated February 13, 2002, to the City of Sanford for the construction and operation of the subject water reuse facilities. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. If any parts, requirements, or limitations contained in this permit are unacceptable to you, you have the right to an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such demands are made, this permit shall be final and binding. Upon completion of construction and prior to operation of this permitted facility, a Certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the approved plans and specifications. Mail the Certification to the Non -Discharge Branch, 1617 Mail Service Center, Raleigh, North Carolina 27699-1617. (Engineer's Certification Form is attached.) One (1) set of final approved plans and specifications is to be forwarded to you, one (1) set retained for the Construction Inspection Unit, and one (1) set retained for the SRG file. A copy of the approved plans and specifications shall be maintained on file by the Owner for the life of the project. �� A F7F.0 �}. Construction Grants and Loans Section 1533 Mail Service Center Raleigh, NC 27699-1633 (919) 733-6900 Customer Service E -Mail Address wvvw nccgl.net FAX (919) 715-6229 1 800 523.7748 -2 - If there are any questions concerning this matter, please contact Mr. Cecil G. Madden, Jr., P. E. at (919) 715-6203. Sincerely, /Acting J. Thorpe, h.D. Director RPT/dr Attachment to All Cc: Hazen and Sawyer (Charlotte Office — Attention: James Struve, P. E.) Lee County Health Department Raleigh Regional Office, Water Quality Section Non -Discharge Unit Daniel Blaisdell, P. E. Robert P. Teulings, Ph.D. Don Evans CIU DMU SRG NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH REUSE DISTRIBUTION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO City of Sanford Lee County FOR THE construction and operation of a 700 GPM pump station for reuse water at the City of Sanford's Big Buffalo Creek Wastewater Treatment Plant with duplex submersible pumps, high-water alarm system, a chlorine feed line to the pump station wet well, and approximately 21,300 linear feet (LF) of 12 -inch force main for delivery of treated effluent of reuse quality to the Sanford Municipal Golf Course for irrigation, pursuant to the application received on June 20, 2001, and in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This Permit shall be effective from the date of issuance until rescinded, and shall be subject to the following conditions and limitations: 1. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 2. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The facilities must be properly maintained and operated at all times. -2- 4. The effluent collected by this system shall be treated in the City of Sanford's Big Buffalo Creek Wastewater Treatment Plant to reuse quality standards prior to being pumped to the Sanford Municipal Golf Course for irrigation. 5. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality (Division) accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 6. Construction of the pump station and force mains shall be scheduled so as not to interrupt service by the existing utilities, nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 7. Upon completion of construction and prior to operation of this permitted facility, a Certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting materials. If this project is to be completed in phases and partially certified, you shall retain the responsibility to track further construction approved under the same permit, and shall provide a final certificate of completion once the entire project has been completed. Mail the Certification to the Non -Discharge Branch, 1617 Mail Service Center, Raleigh, North Carolina 27699-1617. (Engineer's Certification Form is attached.) 8. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the project. 9. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes 143-215.6A to 143-215.6C. 10. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 11. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater collection facilities. 12. The facilities shall be constructed in accordance with the requirements of the North Carolina Sedimentation Pollution Control Act. -3- 13. Any abandoning of the existing facilities must be done in accordance with the requirements of the Division of Water Quality's Raleigh Regional Office. NONCOMPLIANCE NOTIFICATION: 14. The Permittee shall report by telephone to the Raleigh Regional Office, telephone number (919) 571-4700, as soon as possible, but in no case more than 24 hours or on the next working day following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Persons reporting such occurrences by telephone shall also file a written report in letter form within five (5) days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Permit issued this the 13th day of February, 2002. NORTH CAROLINA ENVIRONM NTAL MANAGEMENT COMMISSION Gr ry J. Thorpe, P .D. eting Director cion of Water QualiVy Authority of the Environmental Management Commission Permit No. WQ0020247 City of Sanford Reuse Water Pump Station and Force Main ENGINEER'S CERTIF'ICAT'ION 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of a reuse water pump station and force main serving the City of Sanford, located in Lee County, state that to the best of my abilities, due care and diligence was used in the observation of the following construction: A 700 GPM pump station at the City of Sanford's Big Buffalo Creek Wastewater Treatment Plant with duplex submersible pumps, high-water alarm system, a chlorine feed line to the pump station wet well, and approximately 21,300 linear feet (LF) of 12 -inch force main for delivery of treated effluent of reuse quality to Sanford Municipal Golf Course for irrigation. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature: Date: Registration No.: Mail this Certification to: DENR/DWQ Non -Discharge Branch 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Permit No. WQ0020247