HomeMy WebLinkAboutWQ0018423_Final Permit_20080110Michael F. Easley, Governor
G] 7
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Q�
Coleen H. Sullins, Director
Division of Water Quality
January 10, 2008
BRR\NAN TAYLOR
3708 CULPS HILL COURT
RALEIGH, NC 27610
Subject: Permit No. WQ0018423
Brinnan Taylor SFR
Lot 4 Wake Road, Durham, NC
Drip Irrigation Facility
Chatham County
Dear Ms. Taylor:
In accordance with your application received November 16, 2007, we are forwarding herewith
Permit No. WQ0018423 dated January 3, 2008, to Brinnan Taylor for the construction and continued
operation of the subject single-family wastewater treatment and surface irrigation facilities.
This permit shall be effective from the date of issuance until June 30, 2010, shall void Permit No.
WQ0018423 issued July 27, 2005, and shall be subject to the conditions and limitations as specified therein.
Please pay particular attention to the monitoring requirements in this permit. Failure to establish an adequate
system for collecting and maintaining the required operational information will result in future compliance
problems. Note: Upon sale of this property, a change of ownership request shall be submitted in accordance
with Condition V, 3.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this
permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North
Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding.
If you need additional information concerning this matter, please contact Michael Rogers at (919)
715-6166.
Sincerely,
OD�� � ud*-:>
Coleen H. Sullins, Director
cc: Chatham County Health Department
Raleigh Regional Office, Aquifer Protection Section
Technical Assistance and Certification Unit
APS Central Files
LAU Files
NorthCarolina
Naturally,
Aquifer Protection Section 1636 Mail Service Center Raleigh, NC 27699-1636 Phone (919) 733-3221 Customer Service
Internet: http:llh2o.eu.state.nc.us 2729 Capital Boulevard Raleigh, NC 27604 Fax (9I9) 715-0588 1-877-623-6748
Fax (919)715-6048
An Equal Opportunity/Affirmative Acfion Employer — 50% Recycledl10% Post Consumer Paper
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
RALEIGH
SINGLE FAMILY RESIDENCE SURFACE IRRIGATION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended,
and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Brinnan Taylor
Chatham County
FOR THE
construction and operation of a 480 gallon per day (GPD) surface irrigation wastewater treatment and disposal
system consisting of a 1,200 gallon baffled septic tank, a 144 square foot (ft2) recirculating surface sand filter,.a
20 gallon per minute (GPM) ultraviolet disinfection unit, a 3,000 gallon storage/pump tank with a 15 GPM pump
and audible/visual high water alarms, and a 11,010 ft2 drip irrigation area with 3,670 linear feet of drip irrigation
line, 1,835 emitters and all associated piping, valves, and appurtenances to serve the Taylor residence (Lot 4)
located at Wake Road, Durham, NC 27713 with no discharge of wastes to the surface waters, pursuant to the
application received November 16, 2007, and in conformity with the project plan, specifications, and other
supporting data subsequently filed and approved by the Department of Environment and Natural Resources and
considered a part of this permit.
This permit shall be effective from the date of issuance until June 30, 2010, shall void Permit No.
WQ0018423 issued July 27, 2005, and shall be subject to the following specified conditions and limitations:
I. PERFORMANCE STANDARDS
Upon completion of construction and prior to operation of this permitted facility, a certification must
be received from a professional engineer certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting materials. If
this project is to be completed in phases and partially certified, you shall retain the responsibility to
track further construction approved under the same permit, and shall provide a final certificate of
completion once the entire project has been coin leted. Mail the Certification to the Land
Application Unit, 1636 Mail Service Center, Raleigh, NC 27699-1617,
2. The Raleigh Regional Office, telephone number (919) 791-4200, shall be notified at least forty-eight
(48) hours in advance of operation of the installed facilities so that an in -place inspection can be
trade. Such notification to the regional supervisor shall be made during the normal office hours from
8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays.
The surface irrigation facilities shall be effectively maintained and operated at all times so that there
is no discharge to surface waters, nor any contamination of groundwaters, which will render them
unsatisfactory for normal use. In the event that the facilities fail to perform satisfactorily, including
the creation of nuisance conditions or failure of the irrigation area to adequately assimilate the
WQ0018423 Page 1
wastewater, the Permittee shall take immediate corrective actions including those actions that may be
required by the Division of Water Quality (Division), such as the construction of additional or
replacement wastewater treatment and disposal facilities.
4. The issuance of this permit shall not relieve the Permittee of the responsibility for damages to surface
or ground waters resulting from the operation of this facility.
5. The sand media of the recirculating sand filter must comply with the Division's sand specifications.
The Engineer's Certification will serve as evidence that these specifications have been met.
A leakage test shall be performed on the septic tank and storage/pump tank(s) to insure that any
exfiltration occurs at a rate, which does not exceed twenty (20) gallons per twenty-four (24) hours per
1,000 gallons of tank capacity. The Engineer's Certification will serve as proof of compliance with
this condition.
7. If excavation into bedrock is required for the installation of the septic tank or sand filter, the pit shall
be lined with a 10-mil synthetic liner.
A sanitary tee and filter shall be installed on the effluent pipe of the septic tank. The Engineer's
Certification will serve as evidence that these specifications have been met.
The residuals generated from these treatment facilities must be disposed in accordance with General
Statute 143-215.1 and in a manner approved by the Division.
10. Diversion or bypassing of the untreated wastewater from the treatment facilities is prohibited.
11. The following buffers shall be maintained:
a. 100 feet between wetted area and any residence or places of public assembly under separate
ownership,
b. 50 feet between wetted area and property lines,
c. 100 feet between wetted area and wells,
d. 15 feet between wetted area and any swimming pools,
e. 50 feet between wetted area and drainage ways or surface water bodies,
f. 50 feet between wetted area and public right of ways,
g. 100 feet between treatment/storage units and any wells, and
h. 50 feet between treatment units and property lines.
Some of the buffers specified above may not have been included in previous permits for this waste
treatment and disposal system. These buffers are not intended to prohibit or prevent modifications,
which are required by the Division., to improve performance of the existing treatment facility. These
buffers do, however, apply to modifications of the treatment and disposal facilities that are for the
purpose of increasing the flow that is tributary to the facility. These buffers do apply to any
expansion or modification of the surface irrigation areas and apply in instances in which the sale of
property would cause any of the buffers now complied with, for the treatment and disposal facilities,
to be violated. The applicant is advised that any modifications to the existing facilities will require a
permit modification.
12. The pump tank(s) shall have functional audible and visual high water alarms that are external to any
structure.
13. The disposal system shall be connected to a rain or moisture sensor that shall indicate when
wastewater application is not appropriate in accordance with Condition 11, 4.
WQ0018423 Page 2
II. OPERATION AND MAINTENANCE REOUHIEMENTS
The facilities shall be properly maintained and operated at all times.
2. Upon classification of the wastewater treatment and surface irrigation facilities by the Water Pollution
Control System Operators Certification Commission (WPCSOCC), the Permittee shall designate and
employ a certified operator to be in responsible charge (ORC) and one or more certified operator(s) to
be back-up ORC(s) of the facilities in accordance with 15A NCAC 8G .0201. The ORC shall visit
the facilities in accordance with 15A NCAC 8G .0204 or as specified in this permit and shall comply
with all other conditions specified in these rules.
3. A suitable year round vegetative cover shall be maintained.
4. Irrigation shall not be performed during inclement weather or when the ground is in a condition that
will cause runoff.
5. Adequate measures shall be taken to prevent wastewater runoff from the irrigation field.
The application rate shall not exceed a cumulative loading of 25.98 inches over any twelve (12)
month period at an instantaneous application rate not to exceed 0.4 inches per hour.
The facilities shall be effectively maintained and operated as a non -discharge system to prevent the
discharge of any wastewater resulting from the operation of this facility.
No type of wastewater other than that from Brimmn Taylor residence (Lot 4) shall be emitted onto the
irrigation area.
No traffic or equipment shall be allowed on the disposal area except while installation occurs or while
normal maintenance is being performed.
10. The irrigation field shall be fenced with at least a two -strand wire fence.
11. Wastewater treatment units open to the atmosphere shall have restricted access and pump control
panels shall be locked.
12. The Permittee is responsible for the operation and maintenance of the entire treatment and disposal
system including, but not limited to, the following items:
a. The septic tank shall be checked annually and pumped out as needed. The septic tank effluent
filter shall be checked and cleaned at the same frequency of the septic tank.
b. The ultraviolet disinfection unit shall be checked every week. The lamp shall be cleaned and/or
replaced as necessary to ensure proper disinfection.
The storage, pump, and alarm systems shall be inspected monthly. The scum layer shall be
removed at the same interval as the septic tank is cleaned out.
d. The system shall be inspected monthly to make certain of the proper operation of the drip line,
that the vegetative grrowth allows a proper drip pattern, that the soil is assimilating the disposed
treated wastewater with no surface runoff, and that no objectionable odors are being generated.
WQ0018423 Page 3
III. MONITORING AND REPORTING REOUIREMENTS
1. Any monitoring deemed necessary by the Division to insure surface and ground water protection will
be established and an acceptable sampling reporting schedule shall be followed.
2. The Permittee shall maintain records of all maintenance performed on the system and irrigation area,
as required in Condition II, 12 for a minimum of five years. This information shall be provided to the
Division upon request.
3. Noncompliance Notification:
The Permittee shall report by telephone to the Raleigh Regional Office, telephone number (919) 791-
4200, as soon as possible, but in no case more than 24 hours or on the next working day following the
occurrence or first knowledge of the occurrence of any of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of
adequate wastewater treatment, such as mechanical or electrical failures of pumps, emitters, etc.;
or
b. Any failure of a pumping station or treatment facility resulting in a by-pass directly to receiving
waters without treatment of all or any portion of the influent to such station or facility.
Occurrences outside normal business hours may also be reported to the Division's Emergency
Response personnel at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting such
occurrences by telephone shall also file a written report in letterfonn within five (5) days following
first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken
to ensure that the problem does not recur.
IV. INSPECTIONS
Adequate inspection, maintenance, and cleaning shall be provided by the Permittee to insure proper
operation of the subject facilities.
2. Any duly authorized officer, employee, or representative of the Division may, upon presentation of
credentials, enter and inspect any property, premises or place on or related to the disposal site or
facility at any reasonable time for the purpose of determining compliance with this permit, may
inspect or copy any records that must be maintained under the terms and conditions of this permit,
and may obtain samples of groundwater, surface water, or leachate.
V. GENERAL CONDITIONS
This permit shall become void unless the facilities are constructed in accordance with the conditions
of this permit, the approved plans and specifications, and other supporting data.
2. This permit is effective only with respect to the nature and volume of wastes described in the
application and other supporting data.
3. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or
there is a name change of the Permittee, a formal permit request must be submitted to the Division
accompanied by documentation from the parties involved, and other supporting materials as may be
appropriate. The approval of this request will be considered on its merits and may or may not be
approved.
4. Upon the availability of a municipal or regional sewerage collection system, the subject wastewater
treatment facilities shall be abandoned and all wastewater discharged into the municipal or regional
sewerage system.
WQ0018423 Page 4
Failure to abide by the conditions and limitations contained in this permit may subject the Permittee
to an enforcement action by the Division in accordance with North Carolina General Statute 143-
215.6A to 143-215.6C.
6. The issuance of this permit does not preclude the Permittee from complying with any and all statutes,
rules, regulations, or ordinances, which may be imposed by other government agencies (local, state,
and federal), which have jurisdiction.
7. This permit may be revoked if the Permittee fails to abide by the conditions of the "Operation and
Maintenance Agreement" previously signed by the Permittee.
S. The Permittee shall retain a set of approved plans, specifications, and the operation and maintenance
manual for the subject facility for the life of the project.
The Permittee shall pay the annual administering and compliance fee within 30 days of being billed
by the Division. Failure to pay the fee accordingly may cause the Division to initiate action to revoke
this permit as specified by 15A NCAC 2T .0105(e)(2).
10. The Permittee, at least six (6) months prior to the expiration of this permit, shall request its extension.
Upon receipt of the request, the Commission will review the adequacy of the facilities described
therein, and if warranted, will extend the Permit for such period of time and under such conditions
and limitations, as it may deem. appropriate.
Permit issued this the 1001 day of January 2008
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
rk�� V
(/Z�)
Co een H. Sullins, Director
ivision of Water Quality
By Authority of the Environmental Management Commission
Permit Number WQ0018423
WQ0018423 Page 5
OPERATION AND MAINTENANCE AGREEMENT
SINGLE FAMILY RESIDENCE SURFACE IRRIGATION SYSTEM
DIVISION OF WATER QUALITY
Property Owner(s) (as appearing on the property deed):Sm m LAM) `agto
r%[A A i A, T —;rr _ ., Trh n m t.- k i i
Mailing Address: �71
V I. KY, 2700
1
Facility Address (if different than above):
Disposal Method- `�o SPRAY IIt MATION }zj DRIP IRRIGATION (Check One)
County: �`..��C�'+'�aC;i',, m Permit No. WQ&Ny
We agree to operate and maintain the wastewater treatment system as follows:
1. The Permittee is responsible for the operation and maintenance of the entire treatment and disposal
system including, but not limited to, the following items:
a. The septic tank shall be checked annually and pumped out as needed. The effluent Ater shall be
checked and cleaned at the same frequency of the septic tank.
b. The sand filter surface shall be raked and leveled every six (6) months and any vegetative gr-bwth
shall be removed by hand [accessible sand filters only]. n
c. Check one:
o The tablet chlorinator shall be checked every week. Tablets shall be added so as to provkel
proper chlorination.
The ultraviolet disinfection unit shall be checked every week. The lamp shall be cleaned,c
and/or replaced to ensure proper disinfection.
d. The storage, pump, and alarm systems shall be inspected monthly. The scum layer shall be
removed at the same time interval as the septic tank is pumped out.
e. The irrigation system shall be inspected monthly to make certain of proper operation, that
vegetative growth does not interfere with the system inspection or operation, that the soil is
assimilating the disposed treated wastewater with no surface runoff, and that no objectionable
odors are being generated.
2. Failure of the Permittee to properly operate this system is subject to a penalty up to $25,000 per day.
3, Failure to meet the permit conditions or violation of the State's surface or groundwater regulations
will require evacuating the dwelling and may void the permit.
NOTE: All persons .(owners) appearing on the legally registered property deed must sign this O&M
Agreement
IIWe understand the ab�quirements and agree to these terms as part of the issued permit.
Owner(s) Signature(s):y, Date: 12! •6D/07
Owner(s) Signature(s). Date:
SFR O&M (version 07/07)
Permit No. WQ0018423
January 10, 2008
ENGINEER'S CERTIFICATION
Partial Final
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,
Project Name
Location and County
for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of -the
construction such that the construction was observed to be built within substantial compliance and intent of this permit,
the approved plans and specifications, and other supporting materials.
Signature
Date
Registration No.
WQOOI 8423 Page 6