HomeMy WebLinkAboutWQ0016169_Final Permit_19981120NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
�9PA WATER QUALITY SECTION
NCDENR November 20, 1998
Reverend Keith Gilliam
JAME9B.HUNTJR Whitnel Pentecostal Church
GOVERNOR Post Office Box 5584
Lenoir, North Carolina 28645
-�, l' {
Subject: Permit Number WQ0016169
WAYNE MC0EV]TT VW '
Pump and Haul
SECRETARY Whitnel Pentecostal Church
Caldwell County
Dear Reverend Gilliam:
A. PRESTON HOWARD,
JR., PE.
In accordance with the application received November
P]RECTOR 19, 1998, please find herewith Permit No. WQ001616.9, dated
November 20, 1998, to Whitnel Pentecostal Church.+
This permit shall be effective from the date of
issuance until -May 20, 1999, and shall be subject to the
"* conditions and limitations as specified therein. Please pay
particular attention to the monitoring requirements in this
permit. Failure to establish an adequate system for
collecting and maintaining the required operational
4 information will result in future compliance problems.
1f any parts, requirements, or limitations contained in
this permit are unacceptable, you have the right to seek an
adjudicatory hearing by filing a request within 30 days
following receipt of this permit. The request must be in
the form of a written petition, conforming to Chapter 150B
of North Carolina General Statutes, and filed with the
-- �y Office of Administrative Hearings, P. 0. Box 27447, Raleigh,
N. C. 27611-7447. Unless such are made, this permit shall
,.be final and binding
One set of approved plans and specifications is being
forwarded to you. if you need additional information
concerning this matter, please contact Jim Reid at 828/251-
6208.
Sincerely,
,
_� •-..�,'_�,w;,.,_',;. A. Preston Howard, Jr., P.E.
.. Enclosure
- xc: Caldwell Cc �tv HealthTTDepart�m�•ent
Non -Discharge Permits Unit PZ BOX 2953S, RALEIGH, NORTH CAROLINA 27626-OS35
PHONE 919-733-5083 FAX 919-733-9919
AN EQUAL OPPORTUNITY /AFFIRMATIVE ACTION EMPLOYER - SO% RECYCLED/1 0q POST -CONSUMER PAPER
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
RALEIGH
PUMP AND HAUL PERMIT WQ0016169
In accordance with the provisions of Article 21 of Chapter 143,
General Statutes of North Carolina as amended, and other applicable
Laws, Rules, and Regulations
PERMISSION IS HERESY GRANTED TO
Whitnel Pentecostal Church
Caldwell County
construction and operation of a pump and haul system to serve the new
church building with no discharge oewastes to the surface waters,
pursuant to the application received November 19, 1998 and in conformity
with the project plan, specifications, and other supporting data
subsequently filed and approved by the Department of Environment and
Natural Resources and considered a part of this permit.
This permit shall be effective from the date of issuance until May
20, 1999 and shall be subject to the following specified conditions and
limitations:
1. This permit shall become voidable unless the subject pump and haul
activities are carried out in a manner which has been approved by
this Division. `
2. This permit is effective only with respect to the nature and volume
of wastes described in the application and other supporting data.
3. The facilities shall be properly maintained and operated at all
times.
4. This permit is not transferable. In the event there is a desire
for a change in facility ownership, or there is a name change of
the Permittee, a formal permit request must be submitted to the
Division of Water Quality accompanied by an application fee,
documentation from the parties involved, and other supporting
materials as may be appropriate. The approval of this request will
be considered on its merits and may or may not be approved.
5. No type of wastes other than that from the Whitnel Pentecostal
Church shall be included in the pump and haul activities.
6. The permit shall become voidable unless the agreement between
Whitnel Pentecostal Church and Philip's Septic Tank Service for the
collection, transportation, and ultimate disposal of the waste is
in full force and effect.
7. In the event that the facilities fail to perform.satisfactorily,
including the creation of nuisance conditions, the Permittee shall
cease operation of all pump and haul activities and take such
immediate corrective action as may be required by this Division.
8. This Pump and Haul Permit shall not be renewed. E
9. The sewage and wastewater collected by this system shall be treated
in the City of Lenoir's Lower Creek Wastewater Treatment Plant
prior to being discharged into the receiving stream.
10. The Asheville Regional Office, telephone number 828/251-6208, shall
be notified at least forty-eight (48) hours in advance of operation
of the pump and haul activities so that an in-place inspection may
be made. Such notification to the regional supervisor shall be
made during the normal office hours from 8:00 a.m. until 5:00 p.m.
on Monday through Friday, excluding State Holidays.
11. The Permittee is liable for any damages caused by a spill or
failure of the pump and haul operations.
12. Adequate inspection, maintenance, and cleaning shall be provided by
the Permittee to insure proper operation of the subject facilities.
13. The Permittee or his designee shall inspect Whitnel Pentecostal
Church's collection facilities to prevent malfunctions and
deterioration, operator errors and discharges which may cause or
lead to the release of wastes to the environment, a threat to human
health, or a nuisance. The Permittee shall keep an inspection loc
or summary including at least the date and time of inspection, T
observations made, and any maintenance, repairs, or corrective
actions taken by the Permittee. This log of inspections shall be
maintained by the Permittee for as long as the pump and haul
activities are being conducted and shall be made available upon
request to the Division of Water Quality or other permitting
authority.
14. Any duly authorized officer, employee, or representative of the
Division of Water Quality may, upon presentation of credentials,
enter and inspect any property, premises or place on or related to
Whitnel Pentecostal Church's collection facilities at any
reasonable time for the purpose of determining compliance with this
permit; inspect or copy any records that must be kept under the
terms and conditions of this permit; and may obtain samples.
15. An accurate record of the monthly pump and haul activities must be
maintained by the Permittee, indicating:
a) date wastewater is removed from the facility,
b) name of facility from which wastewater is removed,
c) name of facility receiving wastewater,
d) volume of wastewater removed, and
e) status of permanent disposal option.
These records shall be submitted to the Asheville Regional Office
on or before the fifteenth (15) day of the following month.
16. Failure to abide by the conditions and limitations contained in
this permit may subject the Permittee to an enforcement action by
the Division of Water Quality in accordance with North Carolina
General Statute 143-215.6.
17. The .issuance of this permit does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or
ordinances which may be imposed by other government agencies
(local, state and federal) which have jurisdiction.
18. The Permittee shall provide for the installation and maintenance
of an audible and visual highwater alarm.
19. A leakage test shall be performed on the septic tank and dosing
tank to insure that any exfiltration occurs at a rate which does
not exceed twenty (20) gallons per twenty-four (24) hour per 1,000
gallons of tank capacity. The engineer's certification will
serve as proof of compliance with this condition.
20. A copy of the approved plans and specifications shall be
maintained on file by the Permittee for the life of the project.
21. Non -Compliance Notification:
The Permittee shall report by telephone to the Asheville Regional
Office, at telephone number 828/251-6208, as soon as possible, but
in no case more than 24 hours or on the next working day following
the occurrence or first knowledge of the occurrence of any of the
following:
a. Any process unit failure, due to known or unknown reasons,
that render the facility incapable of adequate wastewater
treatment such as mechanical or electrical failure of pumps.
aerators, compressors, etc.
b. Any failure of a pumping station, sewer line, etc. resulting
in a by-pass directly to receiving waters without treatment
of all or any portion of the influent to such station or
facility.
Persons reporting such occurrences by telephone shall also file a
written report in letter form within 15 days following first
knowledge of the occurrence. This report must outline the actions
taken or proposed to be taken to ensure that the problem does not
recur.
22. Upon completion of -construction and prior to operation of the
subject pump and haul activities, a certification must be received
from a professional engineer certifying that the permitted
facilities have been installed in accordance with this permit, the
approved plans and specifications. Mail the certification to the
Permits and Engineering Unit, Post Office Box 29535, Raleigh, N.
C. 27626-0535.
23. The annual administering and compliance fee must be paid by the
Permittee within thirty (30) days after being billed by the
Division. Failure to pay the fee accordingly may cause the
Division to initiate action to revoke this permit as specified by
15 NCAC 2H.0205 (c)(4).
Permit issued this the 20th day of November, 1998.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
. Preston Howard, Jr., P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number WQ0016169
Whitnel Pentecostal Church
, 199
Caldwell County
Engineer's Certification
T,
M
as a duly registered
Professional Engineer in the State of North Carolina, having been
authorized to observe (periodically/weekly/full time),the construction
of the project,
Whitnel Pentecostal Church Connelly Springs Rd, Lenoir
(Project) (Name of Location)
for the Permittee hereby state that, to the best of ray abilities, due
care and diligence was used in the observation of the construction
such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
Signature
Date
Registration No.