HomeMy WebLinkAboutWQ0015487_Final Permit_19981001State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
A. Preston Howard, Jr., P.E., Director
October 1, 1998
Mr. Carl Powell
Powell Industries
PO Box 65
Waynesville, North Carolina 28786
4 0 s
7
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
Subject: Permit No. WQOOI5487
Powell Industries
Chipper Mill
Wastewater Recycle System
Haywood County
Dear Mr. Powell:
In accordance with your application received June 15, 1998, we are forwarding herewith Permit No.
WQOO15487, dated October 1, 1998, to Powell Industries for the construction and operation of the subject
wastewater recycle system.
This permit shall be effective from the date of issuance until September 30, 2003, and shall be subject to
the conditions and Iimitations as specified therein. Please pay particular attention to the monitoring requirements in
this permit. Failure to establish an adequate system for collecting and maintaining the required operational
information will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This
request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes,
and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such
demands are made this permit shall be final and binding.
One set of approved plans is being forwarded to you. If you need additional information concerning this
matter, please contact, st_roai Cardiff. at (919) 733-5083 extension 509.
Sincere
11- . Preston Howard, Jr., P. .
cc: Haywood County Health Department
Gary D. McKay, P.E.
Asheville Regional Office, Water Quality Section
Technical Assistance and Certification Unit
Non -Discharge Compliance/Enforcement Unit
PO Box 29535, Raleigh, North Carolina 27626-0535 Telephone (919) 733-5083 Fax (919) 7330719
An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
RALEIGH
RECYCLE SYSTEM PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and
other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Powell Industries
Haywood County
FOR THE
construction and operation of a 336,000 -GPD wastewater recycle system consisting of two 25 -HP recirculation
pumps rated at 336,000 GPD, one 360,000 gallon recirculation pond (80 feet by 120 feet by 5 feet), and seventy-
five 6.0 -GPM spray heads to serve Powell Industries and the run-off from the 12 -acre log yard, with no discharge
of wastes to the surface waters, pursuant to the application received June 15, 1998, and in conformity with the
project plan, specifications, and other supporting data subsequently filed and approved by the Department of
Environment and Natural Resources and considered a part of this permit.
This permit shall be effective from the date of issuance until September 30, 2003, and shall be subject to
the following specified conditions and limitations:
1. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of
this permit, the approved plans and specifications, and other supporting data.
2. This permit is effective only with respect to the nature and volume of wastes described in the application and
other supporting data.
The facilities shall be properly maintained and operated at all times.
4. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is
a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality
(Division) accompanied by an application fee, documentation from the parties involved, and other supporting
materials as may be appropriate. The approval of the request will be considered on its merits and may or may
not be approved.
5. Upon completion of construction and prior to operation of this permitted facility, a certification must be
received from a professional engineer certifying that the permitted facility has been installed in accordance
with this permit, the approved plans and specifications, and other supporting materials. If this project is to be
completed in phases anq_partially certified, you shall retain the responsibility to track further construction
approved under the same ermit, and shall provide a final certificate of completion once the entire nroiect has
been completed. Mail the
27626-0535.
cation to the Non -Discharge Permitting Unit, P.O. Box 29535,Raleigh, NC
6. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the
Permittee shall take immediate corrective action, including those actions that may be required by this
Division, such as the construction of additional or replacement treatment or disposal facilities.
7. The Asheville Regional Office, telephone number (828) 251-6208, shall be notified at least forty-eight (48)
hours in advance of operation of the installed facilities so that an in-place inspection can be made. Such
notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00
p.m. on Monday through Friday, excluding State Holidays.
8. The residuals generated from these treatment facilities must be disposed in accordance with General Statute
143-215.1 and in a manner approved by the Division.
9. The issuance of this permit shall not relieve the Permittee of the responsibility for damages to surface or
groundwaters resulting from the operation of this facility.
10. The facilities shall be effectively maintained and operated as a non -discharge system to prevent the discharge
of any wastewater resulting from the operation of this facility.
11. Diversion or bypassing of untreated wastewater from the treatment facilities is prohibited_
12. Freeboard in the recirculation pond shall not be less than two feet at any time.
13. Any monitoring deemed necessary by the Division to insure surface and ground water protection will be
established and an acceptable sampling reporting schedule shall be followed.
14. Adequate inspection, maintenance, and cleaning shall be provided by the Permittee to insure proper operation
of the subject facilities.
15. The Permittee or his designee shall inspect the wastewater recycle facilities to prevent malfunctions and
deterioration, operator errors and discharges which may cause or lead to the release of wastes to the
environment, a threat to human health, or a nuisance. The Permittee shall maintain an inspection log or
summary including at Ieast the date and time of inspection, observations made, and any maintenance, repairs,
or corrective actions taken by the Permittee. This Iog of inspections shall be maintained by the Permittee for
a period of three years from the date of the inspection and shall be made available to the Division or other
permitting authority, upon request.
16. Any duly authorized officer, employee, or representative of the Division may, upon presentation of
credentials, enter and inspect any property, premises or place on or related to the recycle system at any
reasonable time for the purpose of determining compliance with this permit, may inspect or copy any records
that must be maintained under the terms and conditions' of this permit, and may obtain samples of
groundwater, surface water, or leachate.
17. The annual administering and compliance fee must be paid by the Permittee within thirty (30) days after
being billed by the Division. Failure to pay the fee accordingly may cause the Division to initiate action to
revoke this permit as specified by 15A NCAC 211.0205 (c)(4).
18. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an
enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-
215.6C.,
19. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules,
regulations, or ordinances which may be imposed by other government agencies (local, state, and federal)
which have jurisdiction.
20. A set of approved plans and specifications for the subject project must be retained by the Permittee for the
life of this project.
2
21. Noncompliance Notification:
The Permittee shall report by telephone to the Asheville Regional Office, telephone number (828) 251-6208,
as soon as possible, but in no case more than 24 hours or on the next working day following the occurrence or
first knowledge of the occurrence of any of the following:
a. Any occurrence at the wastewater treatment facility which results in the treatmentof significant amounts
of wastes which are abnormal in quantity or characteristic, such as the dumping of the contents of a basin
or tank, the known passage of a slug of hazardous substance through the facility, or any other unusual
circumstances;
b. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of
adequate wastewater treatment, such as mechanical or electrical failures of pumps, aerators, compressors,
etc.;
c. Any failure of a pumping station, sewer line, or treatment facility resulting in a by-pass directly to
receiving waters without treatment of all or any portion of the influent to such station or facility; or
d. Any time that self-monitoring information indicates that the facility is not in compliance with its permit
limitations.
Persons reporting such occurrences by telephone shall also file a written report in letter form within five (5)
days following first knowledge of the occurrence. This report must outline the actions taken orproposed to
be taken to ensure that the problem does not recur.
22. Upon classification of the facility by the Water Pollution Control Systems Operators Certification
Commission (WPCSOCC), the Permittee shall employ a certified wastewater treatment plant operator to be
in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of
the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment
facilities by the WPCSOCC. The Permittee must also employ a certified back-up operator of the appropriate
type and grade to comply with the conditions of 15A NCAC 8A .0202. The ORC of the facility must visit
each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends
and holidays, and must properly manage and document daily operation and maintenance of the facility and
must comply with all other conditions of 15A NCAC 8A.0202.
23. The Permittee, at least six (6) months prior to the expiration of this permit, shall request its extension. Upon
receipt of the request, the Commission will review the adequacy of the facilities described therein, and if
warranted, will extend the permit for such period of time and under such conditions and limitations as it may
deem appropriate.
Permit issued this the st day of October, 1998
NORTH LINA ENV O E TAL MANAGEMENT COMMISSION
{
,�-A. Preston Howard, Jr., P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number WQ0015487
Permit No. WQOOI5497
October 1, 1998
ENGINEER'S CERTIFICATION
Partial Final
1, as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,
Project Name
Location and County
for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of
the construction such that the construction was observed to be built within substantial compliance and intent of this
permit, the approved plans and specifications, and other supporting materials_
Signature
Date
Registration No.