HomeMy WebLinkAbout19870288 Ver 1_COMPLETE FILE_19871209IN REPLY REFER TO
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890
WILMINGTON, NORTH CAROLINA 28402-1890
December 3, 1987
Regulatory Branch
SUBJECT: File No. SAWC088-N-072-0015
Mr. Cecil Shaddeau and
Ms. Delores S. Shaddeau
522 West 25th Street
Norfolk, Virginia 23507
Dear Mr. and Ms. Shaddeau:
m l V E 'n
.
r'z (l .t" 87
P E- :. :±
; a
WATER 0N41
Reference your application for a Department of the Army permit
to construct a 675-foot-long breakwater structure, including the
excavation of approximately 40 cubic yards of material to place
landward of a highground bulklhead on Albemarle Sound and a
manmade canal adjacent to Lot No. 56, Sunset Drive, Holiday
Island Subdivision, Perquimans County, North Carolina.
Your proposal has been reviewed and found to be consistent
with the provisions and objectives of general permit No. SAWC080-
N-000-0291. Therefore, you may commence construction activity in
strict accordance with applicable State authorization and the
enclosed plan. Failure to comply with the State authorization or
conditions of the general permit could result in a violation of
Federal law.
If any change in your work is required because of unforeseen
or altered conditions or for any other reason, plans revised to
show the change must be sent promptly to this office and the North
Carolina Division of Coastal Management prior to performing arty
such change or alteration. Such action is necessary as revised
plans must be reviewed and the authorization modified.
Questions or comments may be addressed to Mr. Jeff Richter,
telephone (919) 343-4636.
Sincerely,
Charles W. Hollis
Chief, Regulatory Branch
Enclosure
-2-
Copies Furnished with enclosure:
Director, Atlantic Marine Center
National Ocean Service
ATTN: MOA 232X1
439 West York Street
Norfolk, Virginia 23510-1114
Ms. Beverly Etheridge, Chief
Wetlands Section
Region IV
Marine and Estuarine Branch
U.S. Environmental Protection Agency
345 Courtland Street
Atlanta, Georgia 30365
Ms. L. R. (Mike) Gantt
U.S. Fish and Wildlife Service
Post Office Box 25039
Raleigh, North Carolina 27611-5039
Mr. Randy Cheek
National Marine Fisheries Service
Habitat Conservation Division
Pivers Island
Beaufort, North Carolina 28516
Ms. Ann Miller
State Property Section
North Carolina Department of
Administration
116 West Jones Street
Raleigh, North Carolina 27603
Mr. John Parker
Division of Coastal Management
North Carolina Department of
Natural Resources and
Community Development
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Mr. Dave Griffin
Elizabeth City Regional Office
North Carolina Division of
Coastal Management
108 South Water Street
Elizabeth City, North Carolina 27909
Mr. William Mills
Water Quality Section
Division of Environmental
Ma Bement
th Carolina Department of
Natural Resources and
Community Development
Post Office Box 27687
Raleigh, North Carolina 27611-7687
t
LOT',.5 6
O
VACINITY MAP
CECIL SHADDEAU
LOTS OF CECIL SHADDEAU
Lot 56 & 57
Section B
Holiday island
N
r"
proposed
Proposed
Existing
Excavate
Wetlands
Scale 1"
Bulkhead
Breakwater
Bulkhead! ?-
3 Area XXy,KXXp?c.
75'
NOTE:
to1beeexcivateshorelspoil pro Bp ea?aater
glace p and site.
S?SgT RWA Opp, ? t
0 etlads - : 5
- ds
d Bulkhead et1aP? osed B?eakWater
proF
pYovo e
MTE: This remnant high Around
C LOT 56 owned by john T. Sherrill
zF who has apprpved t11is pro j ec
q Spoil Area a? See attached authorization-
w 1 ?y ? q
co
Q
wx
LOT 5 7 IV
Cross Section of Breadwater/Bulkhead 7RME?_8T
Front View of Breadwater
Salt treated material with
openings to allow Taater to
pass through breadwa.ter every
3 to 4 feet. (aoproximate)-
?-?r 2 of 2
Permit Class Permit Number
New STATE OF NORTH CAROLINA 225-87
Department of Natural ,._ nt Community Development
Caata.IeSByr"co ssion
4
l r
for w
Majo l nt;in? 4? rronmental
Con t+ N S
Excavatio` g.pfi"rsuant to NCGS 113-229
Issued to Cecil & Delores S. Shaddeau, 522 W. 25th St., Norfolk, VA 23507
authorizing development in Perguimans County at the Albemarle Sound, lot 56, Sunset
Drive, Holiday Is. Subdivision as requested in the permit tee's application dated 8/3/87 including
attached plats, 2, plan view
l?and location dated received 8/28/87.
This permit, issued on ///2- 34/ / v __2 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may subject
permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void.
(1) In order to protect juvenile fin fish populations, no excavation or filling
will be permitted between June 1 and September 30 of any year without the
prior approval of the Division of Coastal"Management.
(2) The breakwater structure will be positioned in strict accordance with permit
plans. Absolutely no excavated or fill material will be placed landward
of the breakwater structure.
(3) The breakwater structure will be constructed so that not less than 30 percent
of the structure will be open to' provide adequate water circulation and
ingress and egress of aquatic organisms.
(4) The bulkhead will be positioned on high ground, landward of the normal
water elevation contour and any irregularly flooded vegetated wetlands.
(5) All excavated materials will be confined landward of the high ground bulkhead.
(6) No excavated or fill materials will be placed at any time in any vegetated
This permit action may be appealed by the permittee
or other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This'petmit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification
not covered hereunder requires further Departmental
approval.
All work must cease when the permit expires on
December 31, 19%
In issuing this permit, the State of North Carolina
agrees that your project is consistent with the North
Carolina Coastal Management Program.
Signed by the authority of the Secretary of DNRCD and
the Chairman of the Coastal Resources Commission.
l
David W. Owens, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
IV,
wqp
Cecil & Delores S. Shaddeau Permit #225-87
Page 2 of 2
ADDITIONAL CONDITIONS
wetlands or waters of the State.
(7) Vegetated wetlands will not be excavated or filled.
(8) Excavation will not exceed 3 feet below the elevation of normal water.
(9) The temporary placement or double-handling of excavated or fill materials
within waters or vegetated wetlands is not authorized.
(10) The disturbed areas will be properly graded and provided a ground cover
sufficient to restrain erosion within thirty (30) days of project completion.
(11) The activity will be conducted in such a manner as to prevent significant
increases in turbidity outside the area of construction or construction-related
discharge.
NOTE: The proposed project is certified under General Water Quality Certification
No. 1272 issued on November 10, 1978, for bulkhead construction.
ma DEPARTMENT OF THE ARMY
y WILMINGTON DISTRICT. CORPS 0:: EN-GiNEERS
CR BOY, r+0
W ? ?L`.?t?:GTGt, NvRTH CARCLi`;.z 2cu32-'C9G
November 13, 1987
Regulatory Branch
SUBJECT: File No. SAWC088-N-072-0015
RECEIVED
NOV 16 1987
Mfr. John Parker
Division of Coastal Management
North Carolina Department of
Natural Resources and
Community Development
Post Dffice Bog 27687
Raleigh, North Carolina 27611-7687
Dear 'Mr. Parker:
WATLR QUALITY SECTION
OPERATIONS BRANCH
Reference the application of Mr. Cecil Shaddeau and
!9s. Delores Shaddeau for a Department of the Army permit to
construct a 675-foot-long breakwater structure, including the
excavation of approximately 40 cubic yards of material to place
landward of a highground bulkhead on Albemarle Sound and a manmade
canal adjacent to Lot No. 56, Sunset Drive, Holiday Island
Subdivision, Perquimans County, North Carolina.
The Federal agencies have completed review of the proposal as
presented by the application and ,your -Field investigation report.
We recommend that the following conditions be included in the
State authorization:
a. The breakwater structure will be positioned in strict
accordance with permit plans. Absolutely no excavated or fill
material .rill be placed landward of the breakwater structure.
b. `The breakwater structure will be constructed so that not
less than 30 percent of the surface area of the structure will be
open to provide adequate water circulation and ingress and egress
of aquatic organisms.
C. The bulkhead will be positioned on high ground, landward
of the nor-mal water elevation contour and any irregularly flooded
vegetated wetlands.
-2-
d. N11 excavated materials vi.ll be confined landward of the
high ground bulkhead.
e. No excavated car fill materials will be placed at any time
in any vegetated wetlands or waters of the State.
f. Vegetated wetlands will not be excavated or filled.
g. Excavation will not exceed 3 fr_•et below the elevation of
normal water.
h. The temporary placement or double handling of excavated or
fill materials within waters or vegetated wetlands is not
authorized.
i. The activity will be conducted in such a wanner as to
prevent a significant increase in turbidity outside the area of
construction or construction-related discharge. Increases such
that the turbidity in the waterbody is 50 NTU's or less are not
considered significant.
Questions or comients may be addressed to Mr. Jeff Richter,
telephone (919) 343-4636.
Sincerely,
Charles K. Hollis
Chief, Regulatory Branch
i
-•3-
Copies Furnished:
Mr. William Hills
Slater Quality Section
Division of Environmental
nagenent
I rth Carolina Department of
Natural Resources and
Community Development
Post Office Boa 27687
Raleigh, North Carolina 27611-7687
Ms. L. K. (Nike) Gantt
U.S. Fish and Wildlife Service
Post Office Box 25039
Raleigh, North Carolina 27611-5039
Mr. Randy Cheek
National Marine Fisheries Service
Habitat Conservation Division
Pivers Island
Beaufort, North Carolina 28516
Hs. Beverly Etheridge, Chief
Wetlands Section
Region ID
Marine and Estuarine Branch
U.S. Environmental Protection agency
345 Courtland Street
Atlanta, Georgia 30365
Mr. Dave Griffin
Elizabeth City Regional Office
North Carolina Division of
Coastal Management
108 South Water Street
Elizabeth City, North Carolina 27909
RECFIF
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890
WILMINGTON, NORTH CAROLINA 28402.1890
October 15, 1987
IN REPLY REFER TO
Regulatory Branch
SUBJECT: File No. SAWC088-N-072-0015
Mr. and Mrs. Cecil Shaddeau
522 West 25th Street
Norfolk, Virginia 23507
O C T 19 1987
WATER (,UA01 v 4;LOON
OPERATIONS BRAWH
Dear Mr. and Mrs. Shaddeau:
On February 6, 1986, we renewed general permit No. SAWCO80-N-
000-0291 (enclosed), which provides Federal authorization for
construction activities that receive authorization from the State
of North Carolina.
A review of your application received September 22, 1987, for
a Department of the Army permit to construct a 675-foot-long
breakwater structure, including the excavation of approximately 40
cubic yards of material, and placing the excavated material
landward of a high ground bulkhead on Albemarle Sound and a
manmade canal, adjacent to Lot No. 56 on Sunset Drive, Holiday
Island Subdivision, Perquimans County, North Carolina, indicates
it to be a candidate for Federal authorization under this general
permit. Accordingly, the administrative processing of your
application will be accomplished by the North Carolina Division of
Coastal Management. Comments from Federal review agencies will be
furnished to the State.
-If your application must be withdrawn from this general permit
:.process for any reason, you will be written and informed of its-
further management. If there are no unresolved differences of
State-Federal positions or policy, the final action taken on your
application by the State-will result in your receiving written
notice from us that your application has been successfully
processed under.our general permit. Only.after receiving such
confirmation should you begin work.
Your application, pursuant to Section 10 of the River and
Harbor Act, has been assigned.No. SAWC088-N-072-0015 and will be
coordinated by Mr. Jeff Richter. Mr. Richter is available to
address questions or comments you. may have at telephone (919)'
343-4636.
Sincerely,
Charles W. Hollis
Chief, Regulatory Branch
Enclosure
-2-
Copies Furnished (without enclosure):
Mr. John Parker
Division of Coastal Management
North Carolina Department of
Natural Resources and
Community Development
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Mr. William Mills
Water Quality Section
Division of Environmental
Management
North Carolina Department of
atural Resources and
Community Development
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Ms. L. K. (Mike) Gantt
U.S. Fish and Wildlife. Service
Post Office Box 25039
Raleigh, North Carolina 27611-5039
Mr. Randy Cheek
National Marine Fisheries Service
Habitat Conservation Division
Pivers Island
Beaufort, North Carolina 28516
Mr. William L. Kruczynski, Chief
Wetlands Section
Marine and Estuarine Branch
Region IV
U.S. Environmental Protection Agency
345 Courtland Street
Atlanta, Georgia 30365
Mr. David Griffin
Elizabeth City Regional Office
North Carolina Division of
Coastal Management
108 South Water Street
Elizabeth City, North Carolina 27909
.r
r
?? .,a SUr[ o
State of North Carolina
Department of Natural Resources and Community Development
Division of Coastal Management
512 North Salisbury Street • Raleigh, North Carolina 27611
James G. Martin, Governor
S. Thomas Rhodes, Secretary
September 30, 1987
Mr. John Sutherland, Chief
Water Planning Section
Division of Water Resources
Raleigh, North Carolina 27611
Dear Mr. Sutherland:
The attached copy of an application submitted by:
David W. Owens
Director
Cecil R. & Delores S. Shaddeau
Applicant's Name
Holiday Island Perquimans
Location of Project County
X for a State permit to perform excavation and/or fill
work in coastal North Carolina and for a CAMA major
development permit...
for a CAMA major development permit (only) ...
... is being circulated to State and Federal agencies having jurisdiction
over the subject matter which might be affected by the project.
Please indicate on the reverse side of this form your viewpoint on
the proposed work and return it to me not later than 10/21/87
Sincerely,
Joh R. Parker, Jr., thief
Major Permits Processing Section
JRP:ap:2480
P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293
An Equal Opportunity Affirmative Action Employer
DIVISION OF ENVIRONMENTAL MANAGEMENT
WATER QUALITY SECTION
uommencs
erning an application '.for State F der CAMA
rmit(s) ;from
A. PERMIT:
This office cannot comment on this project until after the close of the Section
401 Certification Public Comments Period.
?1(fThis office has no objection to the issuance of the permit(s) for the proposed
project with the following conditions:
That the activity be conducted in such a manner as to prevent significant
increases in turbidity outside the area of construction or construction-
related discharge (increases of 25 NTU's or less are not considered
significant).
That the instream turbidity not be increased by more than 50 NTU's as a
result of the proposed activity after a reasonable opportunity for dilu-
tion and mixture.
That turbidity levels in shall not be increased
by more than 10 NTU's as a result of the proposed activity after a reason-
able opportunity for dilution and mixture.
B. CERTIFICATION STATUS:
Certification is not required
for this project.
Certification is required for
this project. Such action to
process the certification has
been initiated. Proposed
Certification will be acted on
or after
The proposed project is certified
under General Certification
A) No. 1179 issued on January 25, D) No. 1431 issued on October 16,
1977, for sewer line construction 1980, for boat ramp construction.
No. 1272 issued on November 10, E) No. 1664 issued on September 8,
1978, for bulkhead construction. 1983, for Rip-Rap Placement.
C) No. 1273 issued on November 10, F) No. 1665 issued on September 19,
1978, for discharges of liquid 1983, for incidental bridge
effluent from diked upland disposal construct ion.
areas. r f
WATER QUALITY SECTION
DIVISION OF ENVIRONMENTAL MANAGEMENT
r ?
RECEIVED
::
:.
N I< a
i ., SE P
(
i
r
... f r REV ATE 041 2910-?'
ACTION > ADD FILE J
t : r- 1 r , i i WD
ACTION ft..D, i::w.ER DATA, L-,L: i.::. t^t`(lt)I. D IS 00287 t) DfOPERATIONS BRANCH
PRO= : 023 P I.1..& ,.: L„••t.t.,• I t , ' +' .I:l COUN TY: Ri, I IN
t
..
,...:.
TYPE CERTIFICATION RECOMMENDAT ION < ,.. ;' , D ',
404 PN ,40i RE& ISSUE:
ivi A (:.i N 1 Y: BULKHEADS DENY: INITIAL REPORT:
D %{..iiMA : f GC; HOLD: L"A.{SAL REPORT: 8°0 0"t
RECEIVIN G STREAM: U T....AL..B1:::MARi...E SOUND CLASS: ,;B BASIN: PAS
COMMENTS :
SITE L..isC
.?
ATI..:D AT HOLIDAY ISL.AN:i. SUBDIVISION NEAR
NEAR : H ...
ERTFORD
PRC3P
OSA
L TO CONSTRUCT A HIGH GR OUND BULKHEAD AND 660 1...f OF WOODEN BREAKWA TER
}
l
COPIES: tor:::,,t. t..,...la 1 RAI...--MIf..I...S BRYA N
.y
MEMORANDUM
02 ?O
TO: BILL MOORE
FROM: LuAnn Bryan
SUBJECT: APPLICATION FOR CAMA MAJOR PERMIT AND/OR.DREDGE AND FILL PERMIT
DATE: September 21, 1987
Attached is an application by CECIL R. AND DELORES S. SHADDEAU
which was received by me on 9/4/87 1 am considering this
application complete, have acknowindged receipt, and have begun processing.
If you have any questions, do not hesitate to contact me.
Y
MEMORANDUM
?quN'AFA
0,
TO: BILL MOORE >9?j c4
FROM: LuAnn Bryan
SUBJECT: APPLICATION FOR CAMA MAJOR PERMIT AND/OR DREDGE AND FILL PERMIT
DATE: September 21, 1987
Attached is an application by CECIL R. AND DELORES S. SHADDEAU
which was received by me on- 914187 I am considering this
i
application complete, have acknowledged receipt,+and have begun processing. I
If you have any questions, do not hesitate to contact me.
y OFFICE OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. Applicant's name CECIL R. AND DELORES S. SHADDEAU
2. Location of project site Holiday Island Subdivision, lot 56,-sect. B, Sunset Circle,
Albemarle Sound and a man made canal. Photo ref. #114-792, NA 15, 78 Photo ref. #
3. Investigation type: Dredge & Fill X CAMA X , 7
4. Investigation procedure: (A) Dates of site visit 9/3/87
(B) Was applicant present no
5. Processing procedure* Application received 9/4/87 Office Elizabeth City
6. Site description: (A) Local Land Use Plan erquimans County
Land classification from LUP conservation
Development constraints identified in LUP any
developments in AEC's are subject to the permitting process of the CA c .
(B) AEC(s) involved: Ocean hazard Estuarine shoreline X
Coastal wetlands Public trust waters
Estuarine waters Other
(C) Water dependent: Yes X No Other
(D) Intended use: Public Private X Commercial
(E) Type of waste water treatment: Existing septic tank
Planned --
(F) Type of structures: Existing single family residence
Planned ------- -- - ---
(G) Estimated annual rate of erosion 3.3' Source SCS SEI
7. Habitat description:
(A) Vegetated wetlands:
wetlands adjacent to
breakwater
Breakwater
(B) Non-vegetated wetlands:
(C) Other:
AREA
Dredged Filled Other
380 sq. ft. _?--
675 sq. ft.
(U) Total area disturbed: _1055 square feet.
8. Project summary The applicant proposes to construct a highground bulkhead to
retain the excavated wetland materials for the poacement of a 660' breakwater
at lot 56, section B, Holiday Island Subdivision in Perquimans County on the
Albemarle Sound and a man made canal.
CECIL R. AND DELORES S. SHADDEAU
BIO REPORT
PAGE 2
SITE DESCRIPTION
The applicant's property is located in Perquimans County in Holiday Island
Subdivision on Sunset Circle, lot 56, section B on a man made canal and the
Albemarle Sound. The property has an existing house and a retaining wall along
the wetland line. There is a small wetland peninsula which extends into the
sound along the canal. This wetland peninsula area is vegetated with cypress
trees and other "404" species. The applicant has removed all wetland vegetation
between the existing retaining wall waterward to the canal's edge and the edge
of the wetland peninsula.
The applicant proposes to construct a high ground bulkhead along the "404"
line as designated by the COE. This bulkhead will be used to retain the spoil
materials which will be excavated along the man made canal approximately 190' X 2'
in front of the proposed breakwater. The proposed 660' breakwater is to be
constructed of salt treated timbers with openings every 3' to 4' to allow for
water circulation. The height of the proposed breakwater is 1' above NWL.
ANTICIPATED"IMPACTS
The project as proposed will result in the filling of 675 square feet of canal
and sound bottom with the placement of the breakwater. Additionally, 300 square
feet of wetlands will be excavated to allow for the placement of the breakwater.
along the man mande canal. Increased levels of turbidity will occur during
construction, however, these effects will be short-termed and localized.
Submitted by: LuAnn Bryan Date: September 21, 1987
REC ED
f olc I1t1814 V
PERMIT TO EXCAVATL ANU/OR FILL WAFER QUALITY CEPTlf CAIXWLC
LASEMLNI IN LANDS COVI:RLD BY WA1 LK CA"AA PLKMIT FOR MAJOR UL 4 10-4
Department of Administr.ltion State of North Carolina Dep.tment of the Army
(GS 141-12) Dep.1,Inicnt art Nrtur+I K, ...urces anJ Community Develupmenl Culp:ul Cn4incers, Wilmingtun-Untrct
((;!, 113.229, 143.215.3(.1)(1), 14? 21J.3(c), 113A-118 (33 CFK 2U9.32J•329)
Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank.
1. Applicant Information
A. Name Cecil R Shaddeau and wife Delores S Shaddeau
Last First ' Middle
B. Address 522 West 25th Street, Norfolk, Virginia 23507
Street. P. O. Box or Route
I 804-547-0840
Cily 411 '1 own State _ Zip Cude Phone
If. Location of Proposed Project:
A. County Perguimans
B. 1. City, town, community of landmark Holiday Island Subdivision
2. Is proposed work within city limits? Yes No x
C. Creek, river, sound or bay upon which prui'ect is located or nearest named budy of water to project
Albemarle Sound
Ill. De scription u•1 Project Construction of breakwater to
A. I. Mainten.tnce of existing project 2. New wofk _prevent erosion
B. Purpose of excavation or (ill
1. Access channel Ieng'th width depth
2. Boat basin length width depth'
3. fill a'-t csa ... `width depth
;.
4.BO her ate enl;th??.£t.width _..1Qft depth ftEta r,
C. 1. QQ lr,ngth,,,6z.`__aW Average distance wateiward of MHW (shoreline) O
2. Type of bullhead construction (material)
D. Excavated mateA.tl (total clay and sand
1. Cubic yards roX 35-40 -2. Type of material
L. F ill materi.l it, be placed below MI IW (see also V1. A).
1. Cubi., yard) None 2.''1 ypc of material
IV. Land Type, Uispusa) Area, and Construction Equipment:
A. D1,e1 the XCJ Its be excavated include any rnarshland, swamps or other wetland? Yes ?.x_.. No.
B. Due, tlic d„posal .area ut?lude any m.trshlaud, swamps ur other wetlan(1? Yes No x
C. Disposal Area and 57
1; Location On to Lot 56
2.'...Do you claim title to disposal area? Yes
1). 1 ,11 malarial s„urce it 1,11 i% to he husked in
E. liow will exiavatt•d Inalvrial be cnh.ry,ped and cn?siurt conuonell? e in ex Ing retaining wall
I
I already in lace to prevent erosion into wetlands
I . I ype of ei.ltnl,n?enl to he usr?1 aC oe
G. Will nt.ushl.tn,l he uossed in ii.u?spotting etluipnlent to pr:j?ct silo? II yes, explain No
t,,s I It I
V. I.siC'.i,?.r
• A. I. inf...:r.. _ x
3. hou., P.v:-:ci.;r...aorInwisr.ial___...?_.???_.__._.._. .?.. __.?_
4. Othrr?
B. 1. Lt ;iz;;s? See attached diagram
2. Elev.-.:ion of lat(,).above mean h;gh water 5.2 to approximate 1 foot
3. Soil typA: rd texture _ clay and sand
4. Type of bt.;IGin$ faciiiiies or structures Dri v g dewC1 1,1„n&
5. Sewage disaosai arc:/or waste water treatment A. Existing..... x
8. Describe Existing
6. Land Classification (circle one) DEVELOPED TRANSITIONAL IX)MML:NITY' (I UitAL )
CONSERVATION OTHER (See C:AMA Local [.and Use Plan Synopsis)
V1. Pertaining to 1741 .,v7 Water Quality:
A. Does the proposed project involve the placement of fii; rnaterials below mesri high wwcr' Yrrs No
8. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the
area lolluwui:.; proicct compir.tiuni' Yes-No x
2. Type of discharge
3. Location of discitarge.,,,,,,,?,„„
VII. Present rate of shoreline erosion (if known). ' 3 feet per year
VI 11. List permit numb:rs and issue dates of previous Department of Army Corps of Frigineers or Star: perm ;% f+•:
work in project area, if applicable:
IX. Length of time required to complete project: 3-4 weeks
X. In addition to the completed application form; the following items must be provided:
A. Attach a copy of the deed (with State application only) or other instrument under which applicant
claims title to the affected property. OR if applicant is not claiming to be the owner of said property,
then forward a copy of the deed or other instrument under which the owner claims title. plus written
permission from the owner to carry out the project on his land.
8. Attach an accurate work plat drawn to scale on 8Y2 X 11" white paper (see instruction booklrt for
details). Note: Original drawings preferred - only high quality copies accepted.
C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or
certified mail or by publication (G.S. 113.229 (d))Enter date served
D. List names and complete addresses of the riparian landowners with proper[; edjainirig applicant's.
Such owners have 30 days in which to submit comments to agenries listed below.
Mr Gene Nelson 2
Holiday Island Property Owners Assn., Inc., P.O._Box 623, Hertford NC
XI. Certification requirement: I certify that to the best of my knowledge, the proposed activity complies
with-tie State of North Carolinals approved coastal management program and will be conducted in a
manner consistent with such program.
x h.
i
DA]
tl.
Any permit issued pursuant to this application will allow only the development described in this appli•
cation and plat. Appli:anis should therefore describe in the application and plat all anticipated devel-
opment activities, including yonstruction, excavation, filling, and land clearing.
Applicant's Signature
psi •az SFL RI 'VERSE SIDI (:OR !HAILING INSTRUCTIONS
LOTS OF CECIL SHADDEAU
Lot 56 & 57
Section B
Holiday Island.
? N
Proposed
Proposed
Existing
Excavate
Wetlands
Scale 1"
Bulkhea:d
Breakwater
Bulkhead
I Area ?Cy,? )RICO, c
75'
NOTE: existing
to ater
spoil Pz $ eaka
place p and site.
_ site
,
WATERWAY 1 4 - 5 ? ' , ? , - • ` X/ 751
T
SUNSE 40 _ n X 1'- I? ?,7etlands ? - . 5
Ietland?.' ' ? - ? • -
lkhead etlands. E?eakWater
pr0-00se ;c\ pzopos 5
x a,\ r"*\`\
Q) v, -1 )`TOTE : This remnant high ground
LOT 56 owned by John.T. Sherrill
who has apnrpved this nrojec
q? Spoil Area See attached authorization.
CO _ 1 p
LOT 57
XV?
Cross Section of. Breadwater/Bulkhead
D
AU828'67
Front View of Breadwater
EEL
Salt treated material with
openings to allow water to
pass through breadwater every
3 to 4 feet. (approximate)
r ?
t
' SURVEY. FOR CECIL SHADDEAU
LOTS 56-63,SEC. 8, HOLIDAY ISLAND
BETHEL TS., PEROUIMANS CO., N.C.
JAN. 7, 1986
SCALE, I "- 60'