Loading...
HomeMy WebLinkAbout19870288 Ver 1_COMPLETE FILE_19871209IN REPLY REFER TO DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 December 3, 1987 Regulatory Branch SUBJECT: File No. SAWC088-N-072-0015 Mr. Cecil Shaddeau and Ms. Delores S. Shaddeau 522 West 25th Street Norfolk, Virginia 23507 Dear Mr. and Ms. Shaddeau: m l V E 'n . r'z (l .t" 87 P E- :. :± ; a WATER 0N41 Reference your application for a Department of the Army permit to construct a 675-foot-long breakwater structure, including the excavation of approximately 40 cubic yards of material to place landward of a highground bulklhead on Albemarle Sound and a manmade canal adjacent to Lot No. 56, Sunset Drive, Holiday Island Subdivision, Perquimans County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of general permit No. SAWC080- N-000-0291. Therefore, you may commence construction activity in strict accordance with applicable State authorization and the enclosed plan. Failure to comply with the State authorization or conditions of the general permit could result in a violation of Federal law. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing arty such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Questions or comments may be addressed to Mr. Jeff Richter, telephone (919) 343-4636. Sincerely, Charles W. Hollis Chief, Regulatory Branch Enclosure -2- Copies Furnished with enclosure: Director, Atlantic Marine Center National Ocean Service ATTN: MOA 232X1 439 West York Street Norfolk, Virginia 23510-1114 Ms. Beverly Etheridge, Chief Wetlands Section Region IV Marine and Estuarine Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Ms. L. R. (Mike) Gantt U.S. Fish and Wildlife Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Mr. Randy Cheek National Marine Fisheries Service Habitat Conservation Division Pivers Island Beaufort, North Carolina 28516 Ms. Ann Miller State Property Section North Carolina Department of Administration 116 West Jones Street Raleigh, North Carolina 27603 Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Dave Griffin Elizabeth City Regional Office North Carolina Division of Coastal Management 108 South Water Street Elizabeth City, North Carolina 27909 Mr. William Mills Water Quality Section Division of Environmental Ma Bement th Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 t LOT',.5 6 O VACINITY MAP CECIL SHADDEAU LOTS OF CECIL SHADDEAU Lot 56 & 57 Section B Holiday island N r" proposed Proposed Existing Excavate Wetlands Scale 1" Bulkhead Breakwater Bulkhead! ?- 3 Area XXy,KXXp?c. 75' NOTE: to1beeexcivateshorelspoil pro Bp ea?aater glace p and site. S?SgT RWA Opp, ? t 0 etlads - : 5 - ds d Bulkhead et1aP? osed B?eakWater proF pYovo e MTE: This remnant high Around C LOT 56 owned by john T. Sherrill zF who has apprpved t11is pro j ec q Spoil Area a? See attached authorization- w 1 ?y ? q co Q wx LOT 5 7 IV Cross Section of Breadwater/Bulkhead 7RME?_8T Front View of Breadwater Salt treated material with openings to allow Taater to pass through breadwa.ter every 3 to 4 feet. (aoproximate)- ?-?r 2 of 2 Permit Class Permit Number New STATE OF NORTH CAROLINA 225-87 Department of Natural ,._ nt Community Development Caata.IeSByr"co ssion 4 l r for w Majo l nt;in? 4? rronmental Con t+ N S Excavatio` g.pfi"rsuant to NCGS 113-229 Issued to Cecil & Delores S. Shaddeau, 522 W. 25th St., Norfolk, VA 23507 authorizing development in Perguimans County at the Albemarle Sound, lot 56, Sunset Drive, Holiday Is. Subdivision as requested in the permit tee's application dated 8/3/87 including attached plats, 2, plan view l?and location dated received 8/28/87. This permit, issued on ///2- 34/ / v __2 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void. (1) In order to protect juvenile fin fish populations, no excavation or filling will be permitted between June 1 and September 30 of any year without the prior approval of the Division of Coastal"Management. (2) The breakwater structure will be positioned in strict accordance with permit plans. Absolutely no excavated or fill material will be placed landward of the breakwater structure. (3) The breakwater structure will be constructed so that not less than 30 percent of the structure will be open to' provide adequate water circulation and ingress and egress of aquatic organisms. (4) The bulkhead will be positioned on high ground, landward of the normal water elevation contour and any irregularly flooded vegetated wetlands. (5) All excavated materials will be confined landward of the high ground bulkhead. (6) No excavated or fill materials will be placed at any time in any vegetated This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This'petmit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 19% In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DNRCD and the Chairman of the Coastal Resources Commission. l David W. Owens, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee IV, wqp Cecil & Delores S. Shaddeau Permit #225-87 Page 2 of 2 ADDITIONAL CONDITIONS wetlands or waters of the State. (7) Vegetated wetlands will not be excavated or filled. (8) Excavation will not exceed 3 feet below the elevation of normal water. (9) The temporary placement or double-handling of excavated or fill materials within waters or vegetated wetlands is not authorized. (10) The disturbed areas will be properly graded and provided a ground cover sufficient to restrain erosion within thirty (30) days of project completion. (11) The activity will be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction-related discharge. NOTE: The proposed project is certified under General Water Quality Certification No. 1272 issued on November 10, 1978, for bulkhead construction. ma DEPARTMENT OF THE ARMY y WILMINGTON DISTRICT. CORPS 0:: EN-GiNEERS CR BOY, r+0 W ? ?L`.?t?:GTGt, NvRTH CARCLi`;.z 2cu32-'C9G November 13, 1987 Regulatory Branch SUBJECT: File No. SAWC088-N-072-0015 RECEIVED NOV 16 1987 Mfr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Dffice Bog 27687 Raleigh, North Carolina 27611-7687 Dear 'Mr. Parker: WATLR QUALITY SECTION OPERATIONS BRANCH Reference the application of Mr. Cecil Shaddeau and !9s. Delores Shaddeau for a Department of the Army permit to construct a 675-foot-long breakwater structure, including the excavation of approximately 40 cubic yards of material to place landward of a highground bulkhead on Albemarle Sound and a manmade canal adjacent to Lot No. 56, Sunset Drive, Holiday Island Subdivision, Perquimans County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and ,your -Field investigation report. We recommend that the following conditions be included in the State authorization: a. The breakwater structure will be positioned in strict accordance with permit plans. Absolutely no excavated or fill material .rill be placed landward of the breakwater structure. b. `The breakwater structure will be constructed so that not less than 30 percent of the surface area of the structure will be open to provide adequate water circulation and ingress and egress of aquatic organisms. C. The bulkhead will be positioned on high ground, landward of the nor-mal water elevation contour and any irregularly flooded vegetated wetlands. -2- d. N11 excavated materials vi.ll be confined landward of the high ground bulkhead. e. No excavated car fill materials will be placed at any time in any vegetated wetlands or waters of the State. f. Vegetated wetlands will not be excavated or filled. g. Excavation will not exceed 3 fr_•et below the elevation of normal water. h. The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. i. The activity will be conducted in such a wanner as to prevent a significant increase in turbidity outside the area of construction or construction-related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less are not considered significant. Questions or comients may be addressed to Mr. Jeff Richter, telephone (919) 343-4636. Sincerely, Charles K. Hollis Chief, Regulatory Branch i -•3- Copies Furnished: Mr. William Hills Slater Quality Section Division of Environmental nagenent I rth Carolina Department of Natural Resources and Community Development Post Office Boa 27687 Raleigh, North Carolina 27611-7687 Ms. L. K. (Nike) Gantt U.S. Fish and Wildlife Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Mr. Randy Cheek National Marine Fisheries Service Habitat Conservation Division Pivers Island Beaufort, North Carolina 28516 Hs. Beverly Etheridge, Chief Wetlands Section Region ID Marine and Estuarine Branch U.S. Environmental Protection agency 345 Courtland Street Atlanta, Georgia 30365 Mr. Dave Griffin Elizabeth City Regional Office North Carolina Division of Coastal Management 108 South Water Street Elizabeth City, North Carolina 27909 RECFIF DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402.1890 October 15, 1987 IN REPLY REFER TO Regulatory Branch SUBJECT: File No. SAWC088-N-072-0015 Mr. and Mrs. Cecil Shaddeau 522 West 25th Street Norfolk, Virginia 23507 O C T 19 1987 WATER (,UA01 v 4;LOON OPERATIONS BRAWH Dear Mr. and Mrs. Shaddeau: On February 6, 1986, we renewed general permit No. SAWCO80-N- 000-0291 (enclosed), which provides Federal authorization for construction activities that receive authorization from the State of North Carolina. A review of your application received September 22, 1987, for a Department of the Army permit to construct a 675-foot-long breakwater structure, including the excavation of approximately 40 cubic yards of material, and placing the excavated material landward of a high ground bulkhead on Albemarle Sound and a manmade canal, adjacent to Lot No. 56 on Sunset Drive, Holiday Island Subdivision, Perquimans County, North Carolina, indicates it to be a candidate for Federal authorization under this general permit. Accordingly, the administrative processing of your application will be accomplished by the North Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished to the State. -If your application must be withdrawn from this general permit :.process for any reason, you will be written and informed of its- further management. If there are no unresolved differences of State-Federal positions or policy, the final action taken on your application by the State-will result in your receiving written notice from us that your application has been successfully processed under.our general permit. Only.after receiving such confirmation should you begin work. Your application, pursuant to Section 10 of the River and Harbor Act, has been assigned.No. SAWC088-N-072-0015 and will be coordinated by Mr. Jeff Richter. Mr. Richter is available to address questions or comments you. may have at telephone (919)' 343-4636. Sincerely, Charles W. Hollis Chief, Regulatory Branch Enclosure -2- Copies Furnished (without enclosure): Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. William Mills Water Quality Section Division of Environmental Management North Carolina Department of atural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife. Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Mr. Randy Cheek National Marine Fisheries Service Habitat Conservation Division Pivers Island Beaufort, North Carolina 28516 Mr. William L. Kruczynski, Chief Wetlands Section Marine and Estuarine Branch Region IV U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. David Griffin Elizabeth City Regional Office North Carolina Division of Coastal Management 108 South Water Street Elizabeth City, North Carolina 27909 .r r ?? .,a SUr[ o State of North Carolina Department of Natural Resources and Community Development Division of Coastal Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor S. Thomas Rhodes, Secretary September 30, 1987 Mr. John Sutherland, Chief Water Planning Section Division of Water Resources Raleigh, North Carolina 27611 Dear Mr. Sutherland: The attached copy of an application submitted by: David W. Owens Director Cecil R. & Delores S. Shaddeau Applicant's Name Holiday Island Perquimans Location of Project County X for a State permit to perform excavation and/or fill work in coastal North Carolina and for a CAMA major development permit... for a CAMA major development permit (only) ... ... is being circulated to State and Federal agencies having jurisdiction over the subject matter which might be affected by the project. Please indicate on the reverse side of this form your viewpoint on the proposed work and return it to me not later than 10/21/87 Sincerely, Joh R. Parker, Jr., thief Major Permits Processing Section JRP:ap:2480 P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 An Equal Opportunity Affirmative Action Employer DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION uommencs erning an application '.for State F der CAMA rmit(s) ;from A. PERMIT: This office cannot comment on this project until after the close of the Section 401 Certification Public Comments Period. ?1(fThis office has no objection to the issuance of the permit(s) for the proposed project with the following conditions: That the activity be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge (increases of 25 NTU's or less are not considered significant). That the instream turbidity not be increased by more than 50 NTU's as a result of the proposed activity after a reasonable opportunity for dilu- tion and mixture. That turbidity levels in shall not be increased by more than 10 NTU's as a result of the proposed activity after a reason- able opportunity for dilution and mixture. B. CERTIFICATION STATUS: Certification is not required for this project. Certification is required for this project. Such action to process the certification has been initiated. Proposed Certification will be acted on or after The proposed project is certified under General Certification A) No. 1179 issued on January 25, D) No. 1431 issued on October 16, 1977, for sewer line construction 1980, for boat ramp construction. No. 1272 issued on November 10, E) No. 1664 issued on September 8, 1978, for bulkhead construction. 1983, for Rip-Rap Placement. C) No. 1273 issued on November 10, F) No. 1665 issued on September 19, 1978, for discharges of liquid 1983, for incidental bridge effluent from diked upland disposal construct ion. areas. r f WATER QUALITY SECTION DIVISION OF ENVIRONMENTAL MANAGEMENT r ? RECEIVED :: :. N I< a i ., SE P ( i r ... f r REV ATE 041 2910-?' ACTION > ADD FILE J t : r- 1 r , i i WD ACTION ft..D, i::w.ER DATA, L-,L: i.::. t^t`(lt)I. D IS 00287 t) DfOPERATIONS BRANCH PRO= : 023 P I.1..& ,.: L„••t.t.,• I t , ' +' .I:l COUN TY: Ri, I IN t .. ,...:. TYPE CERTIFICATION RECOMMENDAT ION < ,.. ;' , D ', 404 PN ,40i RE& ISSUE: ivi A (:.i N 1 Y: BULKHEADS DENY: INITIAL REPORT: D %{..iiMA : f GC; HOLD: L"A.{SAL REPORT: 8°0 0"t RECEIVIN G STREAM: U T....AL..B1:::MARi...E SOUND CLASS: ,;B BASIN: PAS COMMENTS : SITE L..isC .? ATI..:D AT HOLIDAY ISL.AN:i. SUBDIVISION NEAR NEAR : H ... ERTFORD PRC3P OSA L TO CONSTRUCT A HIGH GR OUND BULKHEAD AND 660 1...f OF WOODEN BREAKWA TER } l COPIES: tor:::,,t. t..,...la 1 RAI...--MIf..I...S BRYA N .y MEMORANDUM 02 ?O TO: BILL MOORE FROM: LuAnn Bryan SUBJECT: APPLICATION FOR CAMA MAJOR PERMIT AND/OR.DREDGE AND FILL PERMIT DATE: September 21, 1987 Attached is an application by CECIL R. AND DELORES S. SHADDEAU which was received by me on 9/4/87 1 am considering this application complete, have acknowindged receipt, and have begun processing. If you have any questions, do not hesitate to contact me. Y MEMORANDUM ?quN'AFA 0, TO: BILL MOORE >9?j c4 FROM: LuAnn Bryan SUBJECT: APPLICATION FOR CAMA MAJOR PERMIT AND/OR DREDGE AND FILL PERMIT DATE: September 21, 1987 Attached is an application by CECIL R. AND DELORES S. SHADDEAU which was received by me on- 914187 I am considering this i application complete, have acknowledged receipt,+and have begun processing. I If you have any questions, do not hesitate to contact me. y OFFICE OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. Applicant's name CECIL R. AND DELORES S. SHADDEAU 2. Location of project site Holiday Island Subdivision, lot 56,-sect. B, Sunset Circle, Albemarle Sound and a man made canal. Photo ref. #114-792, NA 15, 78 Photo ref. # 3. Investigation type: Dredge & Fill X CAMA X , 7 4. Investigation procedure: (A) Dates of site visit 9/3/87 (B) Was applicant present no 5. Processing procedure* Application received 9/4/87 Office Elizabeth City 6. Site description: (A) Local Land Use Plan erquimans County Land classification from LUP conservation Development constraints identified in LUP any developments in AEC's are subject to the permitting process of the CA c . (B) AEC(s) involved: Ocean hazard Estuarine shoreline X Coastal wetlands Public trust waters Estuarine waters Other (C) Water dependent: Yes X No Other (D) Intended use: Public Private X Commercial (E) Type of waste water treatment: Existing septic tank Planned -- (F) Type of structures: Existing single family residence Planned ------- -- - --- (G) Estimated annual rate of erosion 3.3' Source SCS SEI 7. Habitat description: (A) Vegetated wetlands: wetlands adjacent to breakwater Breakwater (B) Non-vegetated wetlands: (C) Other: AREA Dredged Filled Other 380 sq. ft. _?-- 675 sq. ft. (U) Total area disturbed: _1055 square feet. 8. Project summary The applicant proposes to construct a highground bulkhead to retain the excavated wetland materials for the poacement of a 660' breakwater at lot 56, section B, Holiday Island Subdivision in Perquimans County on the Albemarle Sound and a man made canal. CECIL R. AND DELORES S. SHADDEAU BIO REPORT PAGE 2 SITE DESCRIPTION The applicant's property is located in Perquimans County in Holiday Island Subdivision on Sunset Circle, lot 56, section B on a man made canal and the Albemarle Sound. The property has an existing house and a retaining wall along the wetland line. There is a small wetland peninsula which extends into the sound along the canal. This wetland peninsula area is vegetated with cypress trees and other "404" species. The applicant has removed all wetland vegetation between the existing retaining wall waterward to the canal's edge and the edge of the wetland peninsula. The applicant proposes to construct a high ground bulkhead along the "404" line as designated by the COE. This bulkhead will be used to retain the spoil materials which will be excavated along the man made canal approximately 190' X 2' in front of the proposed breakwater. The proposed 660' breakwater is to be constructed of salt treated timbers with openings every 3' to 4' to allow for water circulation. The height of the proposed breakwater is 1' above NWL. ANTICIPATED"IMPACTS The project as proposed will result in the filling of 675 square feet of canal and sound bottom with the placement of the breakwater. Additionally, 300 square feet of wetlands will be excavated to allow for the placement of the breakwater. along the man mande canal. Increased levels of turbidity will occur during construction, however, these effects will be short-termed and localized. Submitted by: LuAnn Bryan Date: September 21, 1987 REC ED f olc I1t1814 V PERMIT TO EXCAVATL ANU/OR FILL WAFER QUALITY CEPTlf CAIXWLC LASEMLNI IN LANDS COVI:RLD BY WA1 LK CA"AA PLKMIT FOR MAJOR UL 4 10-4 Department of Administr.ltion State of North Carolina Dep.tment of the Army (GS 141-12) Dep.1,Inicnt art Nrtur+I K, ...urces anJ Community Develupmenl Culp:ul Cn4incers, Wilmingtun-Untrct ((;!, 113.229, 143.215.3(.1)(1), 14? 21J.3(c), 113A-118 (33 CFK 2U9.32J•329) Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. 1. Applicant Information A. Name Cecil R Shaddeau and wife Delores S Shaddeau Last First ' Middle B. Address 522 West 25th Street, Norfolk, Virginia 23507 Street. P. O. Box or Route I 804-547-0840 Cily 411 '1 own State _ Zip Cude Phone If. Location of Proposed Project: A. County Perguimans B. 1. City, town, community of landmark Holiday Island Subdivision 2. Is proposed work within city limits? Yes No x C. Creek, river, sound or bay upon which prui'ect is located or nearest named budy of water to project Albemarle Sound Ill. De scription u•1 Project Construction of breakwater to A. I. Mainten.tnce of existing project 2. New wofk _prevent erosion B. Purpose of excavation or (ill 1. Access channel Ieng'th width depth 2. Boat basin length width depth' 3. fill a'-t csa ... `width depth ;. 4.BO her ate enl;th??.£t.width _..1Qft depth ftEta r, C. 1. QQ lr,ngth,,,6z.`__aW Average distance wateiward of MHW (shoreline) O 2. Type of bullhead construction (material) D. Excavated mateA.tl (total clay and sand 1. Cubic yards roX 35-40 -2. Type of material L. F ill materi.l it, be placed below MI IW (see also V1. A). 1. Cubi., yard) None 2.''1 ypc of material IV. Land Type, Uispusa) Area, and Construction Equipment: A. D1,e1 the XCJ Its be excavated include any rnarshland, swamps or other wetland? Yes ?.x_.. No. B. Due, tlic d„posal .area ut?lude any m.trshlaud, swamps ur other wetlan(1? Yes No x C. Disposal Area and 57 1; Location On to Lot 56 2.'...Do you claim title to disposal area? Yes 1). 1 ,11 malarial s„urce it 1,11 i% to he husked in E. liow will exiavatt•d Inalvrial be cnh.ry,ped and cn?siurt conuonell? e in ex Ing retaining wall I I already in lace to prevent erosion into wetlands I . I ype of ei.ltnl,n?enl to he usr?1 aC oe G. Will nt.ushl.tn,l he uossed in ii.u?spotting etluipnlent to pr:j?ct silo? II yes, explain No t,,s I It I V. I.siC'.i,?.r • A. I. inf...:r.. _ x 3. hou., P.v:-:ci.;r...aorInwisr.ial___...?_.???_.__._.._. .?.. __.?_ 4. Othrr? B. 1. Lt ;iz;;s? See attached diagram 2. Elev.-.:ion of lat(,).above mean h;gh water 5.2 to approximate 1 foot 3. Soil typA: rd texture _ clay and sand 4. Type of bt.;IGin$ faciiiiies or structures Dri v g dewC1 1,1„n& 5. Sewage disaosai arc:/or waste water treatment A. Existing..... x 8. Describe Existing 6. Land Classification (circle one) DEVELOPED TRANSITIONAL IX)MML:NITY' (I UitAL ) CONSERVATION OTHER (See C:AMA Local [.and Use Plan Synopsis) V1. Pertaining to 1741 .,v7 Water Quality: A. Does the proposed project involve the placement of fii; rnaterials below mesri high wwcr' Yrrs No 8. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the area lolluwui:.; proicct compir.tiuni' Yes-No x 2. Type of discharge 3. Location of discitarge.,,,,,,,?,„„ VII. Present rate of shoreline erosion (if known). ' 3 feet per year VI 11. List permit numb:rs and issue dates of previous Department of Army Corps of Frigineers or Star: perm ;% f+•: work in project area, if applicable: IX. Length of time required to complete project: 3-4 weeks X. In addition to the completed application form; the following items must be provided: A. Attach a copy of the deed (with State application only) or other instrument under which applicant claims title to the affected property. OR if applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title. plus written permission from the owner to carry out the project on his land. 8. Attach an accurate work plat drawn to scale on 8Y2 X 11" white paper (see instruction booklrt for details). Note: Original drawings preferred - only high quality copies accepted. C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or certified mail or by publication (G.S. 113.229 (d))Enter date served D. List names and complete addresses of the riparian landowners with proper[; edjainirig applicant's. Such owners have 30 days in which to submit comments to agenries listed below. Mr Gene Nelson 2 Holiday Island Property Owners Assn., Inc., P.O._Box 623, Hertford NC XI. Certification requirement: I certify that to the best of my knowledge, the proposed activity complies with-tie State of North Carolinals approved coastal management program and will be conducted in a manner consistent with such program. x h. i DA] tl. Any permit issued pursuant to this application will allow only the development described in this appli• cation and plat. Appli:anis should therefore describe in the application and plat all anticipated devel- opment activities, including yonstruction, excavation, filling, and land clearing. Applicant's Signature psi •az SFL RI 'VERSE SIDI (:OR !HAILING INSTRUCTIONS LOTS OF CECIL SHADDEAU Lot 56 & 57 Section B Holiday Island. ? N Proposed Proposed Existing Excavate Wetlands Scale 1" Bulkhea:d Breakwater Bulkhead I Area ?Cy,? )RICO, c 75' NOTE: existing to ater spoil Pz $ eaka place p and site. _ site , WATERWAY 1 4 - 5 ? ' , ? , - • ` X/ 751 T SUNSE 40 _ n X 1'- I? ?,7etlands ? - . 5 Ietland?.' ' ? - ? • - lkhead etlands. E?eakWater pr0-00se ;c\ pzopos 5 x a,\ r"*\`\ Q) v, -1 )`TOTE : This remnant high ground LOT 56 owned by John.T. Sherrill who has apnrpved this nrojec q? Spoil Area See attached authorization. CO _ 1 p LOT 57 XV? Cross Section of. Breadwater/Bulkhead D AU828'67 Front View of Breadwater EEL Salt treated material with openings to allow water to pass through breadwater every 3 to 4 feet. (approximate) r ? t ' SURVEY. FOR CECIL SHADDEAU LOTS 56-63,SEC. 8, HOLIDAY ISLAND BETHEL TS., PEROUIMANS CO., N.C. JAN. 7, 1986 SCALE, I "- 60' 00 40 t0 0 60 /t0 /60