Loading...
HomeMy WebLinkAbout19870259 Ver 1_COMPLETE FILE_198704090 ; .su?v G .0", ww+?"• State of North Carolina Department of Natural Resources and Community Development Division of Coastal Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor David W. Owens S. Thomas Rhodes, Secretary April 9, 19.87 Director Certified Mail Return Receipt Requested Mr. T. W. Poe, President Portside Homeowners Association Route 2, Box 678 Chocowinity, NC 27817 Dear Mr. Poe: This letter is in response to your application request for permits under the Coastal Area Management Act and the State Dredge and Fill Law to excavate an earthen plug and entrance channel at the mouth-of an existing canal system and add a culvert at a different location in the canal system to provide flushing. The project site is located on the Pamlico River at Portside in Beaufort County. Processing of your application under a joint state and Federal review, including onsite investigation by cooperating agencies, is. now complete. Based on the foregoing review, the Division of Coastal Management has made the following findings: 1) The project has been determined to be inconsistent with Coastal Resources Commission Rule 15 NCAC 7H.0208(b)(1)(H) which states that construction of finger canals will not be allowed. Canals shall be either straight or meandering with no right angle corners; 2) All evidence available to this office leads us to conclude that opening the canal will cause a significant adverse impact on adjacent estuarine resources; 3) The project is essentially the same project denied by condition in a permit for other work issued on April 24, 1985 to Mr. Warren Wtiic ar -, 4) The required Section 401 Water Quality Certification for the project covered in item 3, above, was denied by the Division of Environmental Management on July 5, 1984; 5) Processing of the required U. S. Army Corps of Engineers permit is in abeyance pending any further action on a court ordered canal pA Bm 27687, RakWih North Carolina 27611-7687 Tekphone 919-733-2293 An Equal Opportunity Affirmative Action Employer IV Mr. T. W. Poe Page 2 April 9, 1987 closure; and water quality issues as set forth by the Division of Environmental Management in the review referred to earlier; 6) Three additional state agencies, i.e., the Wildlife Resources Commission, the Division of Marine Fisheries and the Division of Water Resources have expressed concern in this review that there should be provided scientific evidence that the canal system connection will not degrade the water quality of the Pamlico River, and further, that all Corps legal action should be resolved prior to a favorable state permit action. Given the foregoing findings, it is necessary that your request for permits under the Coastal Area Management Act and the State Dredge and Fill Law be denied. This denial is made under N.C.G.S. 113A-229(e)(5), which provides for permit denial upon finding a significant adverse impact on estuarine resources, G. S. 113A-120(2), which requires CAMA permit denial when the project is found to be inconsistent with the State Dredge and Fill Law, and G. S. 113A-120(8), which requires denial of projects inconsistent with the State Guidelines for Areas of Environmental Concern. If you wish to appeal this denial, you are entitled to a quasi-judicial hearing to challenge the factual findings or legal conclusions regarding this denial. A hearing is similar to a trial, involving appearing before a hearing officer who listens to the evidence and arguments of both parties and then makes a recommendation to the Coastal Resources Commission. A decision by the Commission, adverse to you, may be appealed in the courts. Your request for such a hearing must be in the form of a written petition, complying with the requirements of Chapter- 150B of the General-Statutes of North Carolina, and must be filed with the Office of Administrative Hearings, P. 0. Drawer 11666, Raleigh, N. C.-, 27604. The request for a hearing must be submitted to the Office of Administrative Hearings within twenty days of receipt of this letter. A copy of this petition should be filed with this office. Enclosed, please find a petition which may be used for'your hearing request. If you request a hearing, you may have a choice of hearing officers, either a hearing officer of the Office of Administrative Hearings, or a hearing officer selected by the CRC (usually.a member of the CRC).: Unless you waive your right to a hearing before the Office of Administrative Hearings, the hearing will be conducted by a hearing officer of that agency. If you prefer to have your hearing before a hearing officer of the CRC, you must sign the "Waiver" contained in the enclosed petition form. ---Als , v-ised--t-hat-as-ong-as-ttris-State-permit -denial stands, your project must be deemed inconsistent with the N. C. Coastal Management program, thereby precluding issuance of Federal permits for this project. The Federal Coastal Zone Management Act of 1972 (CZMA) gives the right to appeal this finding to the U. S. Secretary of Commerce, within 30 days of receipt of this letter. Your appeal must be based on the grounds that the proposed activity is (1) consistent with the objectives or purposes of the Mr. T. W. Poe Page 3 April 9, 1987 CZMA, or (2) is necessary in the interest of national security, and thus, may be federally approved. If you have any questions concerning the appeal procedure, please contact Mr. Ralph Cantral, Assistant Director at 919/733-2293, P. 0. Box 27687, Raleigh, N. C. 27611. Sincerely,I vid W. Owens DWO/aw cc: Mr. Peter Tweedt, Director U. S. Department of Commerce Washington, D. C. Colonel Paul W. Woodbury Corps of Engineers Wilmington, N. C. Enclosure DIVISION OF ENVIRONMENTAL MANAGEMENT Water Quality Section March 30, 1987 M E M O R A N D U M To: John Parker ' Front: Bill Mills Subject: Application for CAMA Permit Portside Homeowner Beaufort County The Subject application has been reviewed for water quality impacts and the following comments are offered: 1. This proposal to remove the plug in the existing canal is essentially the same project originally proposed by Ormond Whichard in 1984. The 401 Water Quality Certification for the project was denied and that denial still stands. Appeal of the denial was filed by Whichard but to date has never been finally resolved. 2. It is recommended that no further action be taken on this application until resolution of the appeal by Mr. Whichard of the proposal. BM/k CC: Jim Mulligan Thomas Hilliard , J.. t, 1 1 ?°'i"'-. t., :.! „- : 'r%'::77 r 1" t'':t.!..! ?'..;i°; I ,'• .t. iit::. i°i!..'1"i l::. l.ii:,.i`?i::.Pti,?. f.,l.J[. i`! i -f ? 1:ii::. i?!?si- i.!;", .::.t:r.i. i..ii`% .,' i Y E" f::. ,L („i i`; I`d ..:_? .... ,.. Y) i.. Y- 'f I"i 1-t i., {°4 ? f !••1 !_}.'••.1... 1:r'.., i_J i::. 1`d 'i .f. I`? .'. .i. 1••i i... .. :.1°' }.1 i'i f ..! i' l;' 7 ...: T i"-. 5::. l.: ?::... 5r .i. I`•. i.s :.: , t :. i.?. ,°: I° : ? ...'i {....;. [..: t.± ...!. ? i... l.: i... t•?! :.. ,.. :.:.C? .. .-Y :.. .. { •? 1'° i I'!? : s ; ?... ?... +.' !..: i.., I ,...::!. i_: ;.. i.. :::• .: 1 'i ...... f'•r t... ... i..: i"....._ _. d:t .;. i`•t ... ? .,i. .. .. , •.: .. i -:. ,,, {..': -t:!. ( ?..i :: ,.. ..i"; i`; j. 'i i:). ,.. ?:: . . .'•I*.; frr ..i. i••{ [.:r [...[ (j i ,.. .:. i..:..i .f. i.. I :Y ?.2Ii , . +..:?..:I":•,: !'t?.:.c::!.. !.i.l':,-_s.J t..:;°i'i'?? ... .. f-i I'i ri. '•i•.1 : .. s? `?11.. ,, ..i'. ...j 'I IN i " i..'+r „ a.?. ? 1.. f ... ti-' r•S" t" d J i ,i . :. . t' 1::. i''?::' ; .;. : 1 :. ? l.! i" t::. *`-? +..: ::, ?-•.: i::•, i... ,:':i :.. :::. 1'[ - _J -{ (.: ::. 1 . i" .....: 1•-() . 1. ? 1 ?. 1 ::. 1''? .1. ::. !..J !'•! ?.. ! o l ,... U ... !J I::.D y ,:.. j_ V W LLS E C E 1 V E J 30'?7 , rVATER QUALITY SFCTi0;4 ?..... tit-* /Yf State of North Carolina Department of Natural Resources and Community Development Division of Coastal Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor David W. Owens S. Thomas Rhodes, Secretary Director 23 January 1987 Mr. Joh R: Parker, Jr., Chief Majo ermits Proc sing Section ,,,,Office of Coastal anagement Raleigh, North Caro 'na 31 Dear Mr. Parker: The attached copy of an application submitted by: Portside Homeowners Association Applicant's Name Portside Development Beaufort County Location of Project County X for a State permit to perform excavation and/or fill work in coastal North Carolina and for a CAMA major develop- ment permit... for a CAMA major development permit (only) ... has been reviewed by the Field Services Section and is being forwarded to you along with a Field Investigation Report for further application processing including circulation to State agencies having interest and/or jurisdiction over the subject matter which might be affected by the project. The recommendation of this Section is covered on the reverse side; attached; X will be forwarded later. S"ncerely, V. Charles S. Jones, ief Field Services Section CSJ:ap:3566 P.O! Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 An Equal Opportunity Affirmative Action Employer OFFICE OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1• Applicant's name Portside Homeowners Association 2. Location of project site Beaufort Count Portside Development off of Sk,,ll 6 Pamlico River, hphoto # 17-7742-72-598, N-22 0--17 3. Investigation type: Dredge 6 Fill, X CAMA X 4. Investigative procedure: (A) Dates of site visit 1-21-87 (B) Was applicant present No 5. Processing procedure: Application received 1-19-87 Office Washinqton 6. Site description: (A) Local Land Use Plan Beaufort County Land classification from LUP Coriseryatlon Development constraintq identified in LUP None (B) AEC(s) involved: Ocean Hazard Estuarine shoreline Coastal wetlands Public trust waters Estuarine waters X Other (C) Water dependent: Yes X No Other (D) Intended use: Public Private X Coo,ercial (E) Type of wastewater treatment: Existing Individual septic tanks Planned Additional septic tanks possible on unsubdivided land (E) Type of structures: Existing. Mobile homes Planned None ... (G) Estimated annual rate of erosion N/A Source N/A 7. Habitat description: AREA (A) Vegetated wetlands: Dredged Filled Other None _N/A N/A (B) Non-vegetated wetlands: (C) Other: Open water area + 4,000 sq.ft. (D) Total area disturbed: + 4,000 sq.ft. 8. Project aummary The applicant is proposing to permanently establish an opening of the Portside Canal System to the Pamlico River and to try to improve water circulation by the placement of a culvert within the canal system Environmental setting The Portside Canal System was developed in the early-1970's by Mr. Warren Whichard apparently without proper permits from the Corps of Engineers. The development consisted of a meandering finger canal system with adjacent lots on which were placed mostly mobile homes. As a result of various court actions, the Corps of Engineers has required the main ditch which connects the entire canal system to the Pamlico River be kept plugged. However, this has not been done, and at this time there is a + 20' wide navigable opening which connects the canal system to the Pamlico River. This opening has been present for well over 1 year. On 12 January 1984, Mr. Whichard applied for permits to open the canal system and those permits were denied due to comments from various agencies. At this time in addition to the canal being open to the Pamlico River, 74 platted lots occur around the canal system (see attached plats). As previously stated, most of these lots are developed with septic tank systems and mobile homes. Possible future development areas exist between the southern canal and SR 1116. This area has not yet been subdivided (see attached plats). The present canal system varies in length due to the number of T-canals and deadend canals. The width also varies from + 50' to + 100', and the depth varies from -2.5' NWL at the mouth to -6.0' throughout most of the canals. Most of the canal system is bulkheaded and no wetland vegetation is present. Project proposal The a licant (1) The excavation of a permanent navigable opening of the canal system at the point where the plug is supposed to be located. Proposed is the deepening of the + 20' wide, -2.5' deep at normal water level opening to a depth of -6.0' at N9L. The area to be excavated will be 200' in length with a width of 20'. The area will be excavated by a dragline on a barge, and all spoils will be placed landward of an adjacent bulkhead. (2) The placement of a 50' long by a 48" in width culvert underneath one of the development roads. The culvert will connect the canal system to another canal which is not part of the development. This canal is open to the Pamlico River. The purpose of this culvert is to improve water circulation within the Portside Canal System. (see attached plats) Environmental impact If the project is conducted as proposed, no wetland vegetation will be excavated or filled. The environmental concerns are those which have been previously raised which regard water quality of the canal system. David L. Gossett - Washington Office - 23 January 1987 APPLICATION FOR PERMIT TO EXCAVATE AND/OR FILL V % 1-11-e7 WATER QUALITY CERTIFICATION EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT Department of Administration State of North Carolina (GS 146.12) Department of Natural Resources and Community Development Department of the Army Corps of Engineers, Wilmington District (GS 113-229,14 3-215.3(a)(1), 143-215.3(c), 113A-118 (33 CFR 209.320.329) Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. 1. Applicant Information A. Name- ORTSIDE HOMEOWNERS ASSOCIATION -- T W Poe, President Last First Middle B. Address Rt R,,,r Aug Street, P. O. Box or Route Chocowinitir. NC 27817 946-1419 City or Town State Zip Code Phone if. Location of Proposed Project: A. County BEAUFORT B. 1. City, town, community or landmark PORTSIDE 2. Is proposed work within city limits? Yes No X C. Creek, river, sound or bay upon which project is located or nearest named body of water to project canals off Pamlico River 111. Description of Project A. 1. Maintenance of existing project 2. New work X B. Purpose of excavation or fill 1. Access channel length 200' width 20' d I 6, MLW C. D cpt t 2. liuat basin _ n/a length width depth n?a 3. 1 ill area length width depth 4. Other culvert length0 _?_.___-width y,? depth i I. Bulkhead length ---na Average distance waterward of MHW (shoreline) n/a 2. 'rype of bulkhead construction (material) n/a Excavated material,(total for project) 1. Cubic yards 720 2. Type of material sand fill material to be placed below MHW (see also VI. A) 1. Cubic yards none 2. Type of material n/a IV. Land Type, Disposal Area, and Construction Equipment: A. Does the area to be excavated include any marshland, swamps or other wetland? Yes No X 13. Does the disposal area include any marshland, swamps or other wetland? Yes No X C. Disposal Area 1. Location High ground yard areas 2. Do you claim title to disposal area?_ yes D. V ill material source if till is to be trucked in E. How will excavated material be entrapped and erosion controlled? natural basin in yards, geo-textile behind bulkheads I I ype of equipment to be used dragline G. Will marshland be crossed in transporting equipment to project site? If yes, explain no i,( tom{ -c?i -e 1 - V. Intended Use of Project Area (Describe) A. 1. Private Private boat access to 78 residential lots 2. Commercial 3. Housing Development or Industrial nnnp 4. Other none B. I. Lot size(s) 150' x200' 2. Elevation of lot(s) above mean high water 4,-5 , 3. Soil type and texture san loam 4. Type of building facilities or structures _ single family dwellings 5. Sewage disposal and/or waste water treatment A. Existing X Planned B. Describe septic tank 6. 'Land Classification' (circle one) DEVELOPED TRANSITIONAL COMMUNITY RURAL CONSERVATION OTHER (See CAMA Local nd Use Plan Synopsis) VI. Pertaining to Fill and Water Quality: A. Does the proposed project involve the placement of fill materials below mean high water? Yes No X B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the area following project com letion? Yes No X 2. Type of discharge n a 3. Location of discharge- a/a VII. Present rate of shoreline erosion (if known): unknown VIII. List permit numbers and issue dates of previous Department of Army Corps of Engineers or State work in project area if applicable: n/a Permits for IX. Length of time required to complete project: two weeks X. In addition to the completed application form, the following items must be provided: A. Attach a copy of the deed (with State application only) or other instrument under which applicant claims title to the affected property. OR if applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title plus written permission from the owner to carry out the project on his land. B. Attach an accurate work plat drawn to scale on 8!/2X 11" white paper (see instruction booklet for details). Note: Original drawings preferred - only high quality copies accepted. C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or certified mail or,.by publication (G.S. 113-229 (d))Enter date served see at?aehed letters D. List names and complete addresses of the riparian landowners with property adjoining applicant's. Such owners have 30 days in which to submit comments to agencies listed below. (Wya't.t. & D?sh^ Wood R Box 685 Chocowinitv NC 27817 ®JohnW.& Patricia M. Shut ?-?R l l O A 11 _ nc 1 nox G1?1A Kinston NC 28501 Kinston, NC 28501 Arthur & Jackie Tyndall Rt.2 Box 682 hoc winti , NC 2 817 7 xi. Jj? bttcay De Jo Any Whichard, P.O. Box ?72 Fhocow?nty, N.L. William H. Whichard t ron r urrement: certi that to the best of my knowledge, the proposed activity complies P.0. Box 746 with the State of North Carolina's approved coastal management program and will be conducted in a Washington, N. C . manner consistent with such program. X11. Any permit issued pursuant to this application will allow only the development described in this appli- cation and plat. Applicants should therefore describe in the application and plat all anticip devel- opment activities, including construction, excavation, filling, and land clearirr4_ DATE A/a 7 06 F•82 Rev. in/7o CFF t?G.VFDCC cenr Applicant's Signa ure I 1 H O \\ i O O ? \ g ;. _` D I ?r 1 1 41 O O O ® O O O tri o ,o..,,..:.M .....?? PROPOSED IMPROVEMENTS to EXISTING CANAL SYSTEM Portside Home.Owners Association Chocowinity Township Beaufort County November 6, 1986 By: Hood Richardson, P. A. Washington Square Mall Washington, I:. C. PAML/CO Groin R /VER FLOW - 4.5' ---.- Groin Bulkhead Property of (I l LOT Property of 1 li JOHN W.,JR. 8 BATRICIA M. High SHUTE Water 0.8.870, Mark P94 1 Canal Property of BOBBY D. 8 JO ANN W H (CHAR D D. 8.744, P. 49 I I v 1 0 N wASNINf{Tod ??v NCO t) ti ?.RG(? CNOGO?-jINIry ry VICINITY MAP"-no scale ry RUSSELL H. 8 CATHY LEDBETTER D.B. 789, P.224- Proposed 48"X 90' (-Corrugated Metal Culvert ? Bulkhead AI , ,(-6.0' Canal 7.0' - v a: E vi >> Property of (Hi h, o LOT Water Mark W YATT F. 8 DOSHA WOOD - 6.0' 0. 8.784,8 331 1 !? a U .A Pavement AI Sloped 3/1 With Granite Rip Rap Both Soil Sides J High Nbter Pro Level ConCreTe Culvert 48«x 90' Proposed Construction AXIAL CROSS SECTION Scale: Horizontal 11-c50' -Vertical 1"= 5' Ji NOTES, I. ELEVATIONS FROM HIGH WATER MARK. 2. SUPLUS SPOIL TO BE USED TO REPAIR EXISTING BULKHEADS AND AS FILL ON HIGH GROUND IN THE PORTSIOE MOBILE HOME PARK. Revised 12/8/86 Proposed To provwnents Existing Canal System Pbrtskie Home Owners Association CNOCOWINITY TOWNSHIFLWAUFORT COUNTY SCALEtl--100' DATE: 11/06/06 BY: H000 RICHARDSON, PA. WASHIGMN SQUARE MALL WAS14040TON. N.C. 86-01-298-3 1 -4.5 ' A Pier 1 4 3: 10 J ?- U- R/ A 1 ?l Property of -6.0 WARREN C. 6 WILLIAM HENRY W HI CHARD D. S. 731 , P. 34 / -5.5 Canal . -6.0 -5.0 l1 Bulkhead-5 0 _ Property of \\ -3. _ AI / Lot # 1,221 \ 0 -3.5 Canal ?. \ Groin - ?" ARTHUR F. S JACQUELINE l -? TYNDALL \ 3o Groin 1 ' Q.B. 737, P. 116 \ LL V Proposed 1!? v Excavation k Area t - Froperty of 'K C111 LOT# (2' 4 LESLIE EARL a \ OELLA ROUSE 1 0. 0. 709, P.920 t0 1 0 1 I- A I Oposed Excavation INAYELY / 600 ACUSIC AXIAL CROSS SECTION OF PROPOSED EXCAVATION AREA SCALE: Horizontal 1=5O'-Vortical 1-=S' NOTES: 1. Elevations from high water mark. 2. Surplus spoil to be used to repair existing bulkheads and to be placed on high ground In the Pbrtside Mobile Home Park. SITE II Groin I A I High I Water Mark l? tl I I 1 Proposed Improvements To Existing Canal System IF brtside Home Owners Association HOCOWINITY TOWNSHIP-BEAUFORT COUNTY SCALE:1"-100' DATE* 11/06/66 BY: HOOD RICHARDSON, PA. WASHINGTON SQUARE FALL WASHINGTON. N.C.