HomeMy WebLinkAbout19870194 Ver 1_COMPLETE FILE_19870501FIELD INVESTIGATION' REPORT Long: 1. Appli?cantlt Name Atlantic Beach Assoc. D/B/A Holiday Inn Locat on of project site Town of Pine Knoll Shores, ocean side of Hw 58;, 2.8 miles west of Atlantic Beach traffic light 3. Inves_ig tion type: Dredge & Fill_ 4. Invef tigatkive procedure: (A) Dates,,."` of site visit 4/27/87 (B) Was applicant present yes. CAMA x 5/4/87 yes 5. 'Processing procedure: Application received May 1, 1987 Office Morehead City 6. Site description: (A) Local Land Use Plan Pine Knoll Shores Land classification from LUP dev/commercial Development constraints identified in LUP none (B) AEC(s) involved: Ocean Hazard x Estuarine shoreline Coastal wetlands Public trust waters Estuarine waters Other (C) Water dependent: Yes No x Other (D) Intended use: Public Private Commercial hotel/conf ctr. (E) Type of waste water treatments Existing- x Planned expansion of package plant north side Hwy 58 (F) Type of structures: Existing Holiday Inn Planned motel expansion 96 rooms & conference ctr. 5 story. (G) Estimated annual rate of erosion 2 Source min beach erosion. factor 7.. Habitat description: (A) Vegetated Wetlands none AREA Dredged Filled _ Other (B) Non-vegetated wetlands: (C) Other: 170' ocean erodible AEC_ highground outside AEC .5 ac 3 5 ac: (D) Total area disturbed: a prox. 4 acres 8. !Project summary the a licant proposes to.expand_th_e Holiday Inn motel with a 5 story addition which will include 96 new rooms _ parking lot, swimming. pool and conference center. The waste water treatment plant will also be expanded on the north side of Hwy 58 9. Narrative description The existing Holiday Ihn Motel located in Pine Knoll Shores is a familiar landmark on the Salter Path Road heading west on NC Hwy 58. The project site is located approximately 2.8 miles west of the.Atlantic Beach stoplight on Bogue Banks in Carteret County. The owners of the Holiday Inn are the Atlantic Beach Associates. They have submitted a major LAMA application to completely expand the existing facility on the west side of the existing building next to the Atlantis Lodge. The applicants own approximately 10.6 acres-of which 4.9 acres are scheduled for development under the current CAMA application. This project, the site and the proposed development can be divided into four distinct geographical areas. Three of these areas are on the south side of Hwy 58 and one on the north side. The first zone of importance is located along the ocean beach and is known as the CAMA ocean erodible AEC. It extends 120' landward from the first line of stable dune vegetation. Sheet 1 of the work plat drawing demonstrates the location of this CAMA recession line. In addition, the position of this line on the property can be easily relocated since the applicant has taken specific measurements from the hard surface road right of way to the recession line. Development within this area consists of the following structures. Two 5' wide pedestrian boardwalks, each approximately 140' long. The primary dunes will-remain intact and undisturbed by construction of the walkways. on the east side of the project site at the point of the 120' recession line, the applicant proposes to construct a swimming pool with a concrete apron measuring a maximum of 40' wide by 70' long. This area, approximately 3000 sq. ft., is generally flat and within a previously disturbed area from construction that took place on the Holiday Inn back in 1972. The last item in this area will be an elevated, glass-enclosed walkway that will connect pedestrian traffic from the existing motel to the new building. The next zone scheduled for construction is, still within the ocean high hazard AEC and is determined as the next 50' wide area between the 120' recession line and the 170' recession line. This area contains approximately 24,000 sq. ft. and will be occupied by a 5 story motel building and one story conference center. The footprint of the proposed motel approximates 52' wide by 308' long. As the work plats show, asphalt parking lots will surround the building on the west and north sides. There are at present 108 paved parking spaces for the existing facility with 194 new parking spaces proposed. .The largest zone scheduled for construction is not within a CAMA AEC. This zone is located between the proposed motel and the existing paved road, Hwy 58. This area measures approximately 480' long by approximately 2201wide. Although the majority of this 2.4 acres will be taken up by asphalt parking, the project design does preserve about 49,000 sq. ft. of open green space that will have an absorptive, permeable value. In addition, the project design will include an underground stormwater catchment and collection system that will retain rainwater on the site. The project plan submitted to this office also includes measures. to control windblown sand and the containment of sedimentation during the construction phase of the project. The fourth and last zone to be developed within this project is located on the north side of hwy 58 behind the Handyhouse. Oak Leaf Drive.borders the disposal field on the west side. The applicant proposes to upgrade.the existing septic tank system and run a new 2" PVC pipe under the highway to an open field area. A series of two new disposal fields will be installed to accommodate the expanded motel. 10. Anticipated Impacts Construction within the 120' ocean erodible area appears to be permittabl.e without significant impact to the existing sand dunes .or supportive vegetation. The two wooden pedestrian accessways crossing the primary and frontal dune system will be accomplished on vertical piling without alteration to these physical features The proposed swimming pool has been situated as close to the actual 120.' recession line as possible. The same can be saidfor that portion of the glass-enclosed elevated walkway connecting the two buildings. Little to no impact is anticipated. In area two of the project, construction-standards pursuant to the North Carolina building code are critical to the stability and quality of the 5 story building and conference center. The proposed motel is consistent with local zoning enforced by the Town of Pine Knoll Shores. It has been noted that the project site is zoned commercial and among other items that will be dictated will be the number of parking spaces. Construction scheduled in area 8 and 4 as previously outlined in this report will take place with the coordinated efforts of the state and local review agencies. The stormwater management and retention plan that has been submitted with the project proposal should work well to prevent off-site impacts of any large volumes of water. CAMA Review The proposed Holiday Inn expansion program appears to be consistent with the goals-and.objectives of the Pine Knoll Shores Land Use Plan where-the highground property has been classified as developed and the ocean erodible AEC as conservation. No development constraints have been identified through the review of that document. 1 APPLICATION FOR PERMIT TO LXCAVATE AND/OR FILL WATER QUALITY CERTIFICATION EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT t apartment of Adrninlstr,tiun State of North Carolina Department of the Army t 4r,-121 Department of Natural Resources and Community Development Corps of Engineers, Wilmington District (GS 113-229, 143-215.3(a)(1), 143-215.3(c), 113A-118 (33 CFR 209.320.329) i'I?asr tit t rir print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. ,%pplicant Information \ Name 'i address Atlantic Beach Associates d/b/a Holiday Inn P. 0. Box 280 Last First Middle Street, P. O. Box or Route Atlantic Beach, North Carolina 28512 919/726-2544 City or Town State Zip Code Phone II. Location of Proposed Project: A. County Carteret 13. 1. City, town, community or landmark Pine Knoll Shores (N. C. 58) 2. Is proposed work within city limits? Yes X No Atlantic Ocean C. Creek, river, sound or bay upon which project is located or nearest named body of water to project Description of Project New work 2 i f i Holiday Inn Expansion A. . ng project 1. Maintenance o ex st B. Purpose of excavation or fill l N/A l th width n h 1 depth e g . Access c anne N/A l th width B i 2 depth eng oat bas . n width N/A th len Fill 3 depth . g . area --_ 4. Other length width depth C. 1. Bulkhead length N/A Average distance waterward of MHW (shoreline) 2. Type of bulkhead construction (material) D. Excavated material (total for project) t tj y 100 2 e of material T 1 C bi d Sand LJ L . yp . u c yar s ww--p - 1. I- ill material to be placed below MHW (see also VI. A) • -a--"' --- _- -- 1: Cubic yards 2. Type of material 1%'. Land Type, Disposal Area, and Construction Equipment: A. Dues the area to be excavated include any marshland, swamps or other wetland? Yes No X B. Does the disposal area include any marshland, swamps or other wetland? Yes No X C. Disposal Area 1. Location On same site 2. Do you claim title to disposal area? Yes D f ill material source if fill is to be trucked in On site (100 cy) L Fi- Hill excavated material be entrapped and erosion controlled? Siltation fences t ' ul cyuiprnent to be used Motor grader t; `,\tiill marshland be crossed in transporting equipment to project site? If yes, explain N/A V. Intended Use of Project Area (Describe) A. 1. Private 2. Commercial 96-room expansion - 3. Housing Development or Industrial 4. Other B. 1. Lot size(s) 4.96 acres total 2. Elevation of lot(s) above mean high water 10-20 feet 3. Soil type and texture Sand, sand-clay- 4. Type of building facilities or structures 96 rooms - 5-story structure S. Sewage disposal and/or waste water treatment A. Existing Planned _ Low pressure pipe B. Describe Approval through N. C. Department of Human Resources 6. Land Classification (circle one) EVELOPED TRANSITIONAL COMMUNITY RURAL CONSERVATION OTHER (See CAMA Local Land Use Plan Synopsis) VI. Pertaining to Fill and Water Quality: A. Does the proposed project involve the placement of fill materials below mean high water? Yes No X B. 1. Will any runoff or discharge enter adjacent waters as a result 6f project activity or planned use of the area following project completion? Yes_ No X 2. Type of discharge Rain water 3. Location of discharge On-site lagoon VI I. Present rate of shoreline erosion (if known): Unknown Vill. List permit numbers and issue dates of previous Department of Army Corps of Engineers or State permits for work in project area, if applicable: N/A IX. Length of time required to complete project: 1 Year X. In addition to the completed application form, the following items must be provided: A. Attach a copy of the deed (with State application only) or other instrument under which applicant claims title to the affected property. OR if applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title plus written permission from the owner to carry out the project on his land. B. Attach an accurate work plat drawn to scale on 8% X 11" white paper (see instruction booklet for details). Note: Original drawings preferred - only high quality copies accepted. C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or certified mail or by publication (G.S. 113-229 (d))Enter date served February 18, 1987 D. List names and complete addresses of the riparian landowners with property adjoining applicant's. Such owners have 30 days in which to submit comments to agencies listed below. Atlantis Lodge- A.C. HaL1 Atlantic Beach, NC 23512 Seahawk Motel Harry Bateman 200 13ray St Wilson,NC 27893 _Holiday Inn-Atlantic Beach, NC 28512 X1. Certification requirement: I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved coastal management program and will be conducted in a manner consistent with such program. X11. Any permit issued pursuant to this application will allow only the development described in this appli- cation and plat. Applicants should therefore describe in the application and plat all anticipated devel- opment activities, including construction, excavation, filling, and land clearing. . 3/31 /87 Ay plicaks Signature Millard Williams-General Manager c:ar -82 SEE REVERSE SIDE FOR MAILING INSTRUCTIONS JAMES G. MARTIN GOVERNOR JAMES E. HARRINGTON SECRETARY County a•w SIAlF?4 6 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Greenville, North Carolina 27835-1587 . April 23, 1987 • Carteret (16-87-05 SUBJECT: Encroachment Contract - Holiday Inn Millard Williams, General Manager Holiday Inn Atlantic Beach, North Carolina DIVISION OF HIGHWAYS GEORGE E. WELLS, P.E. STATE HIGHWAY ADMINISTRATOR Attached hereto, for your files, is a copy of the Right of. Way Encroachment Contract which has been properly executed.. This Contract covers the following: Installation of 10" steel casing (dry bore) to accomodate 4" Force Main or utilize existing 10" casing on NC 58 located at Pine Knolls Town limit. APPROVED SUBJECT TO: 1. If existing casing not utilized a $500.00 performance bond be submitted to District Office before installing new casing. 2. New casting will extend from ditch to ditch to protect maintenance activities (cleanout). 3. All disturbed areas to be dressed, seeded and a satisfactory vegetative cover established. Shirley, J.; E. WG' DIVISION ENGINEER GRSjr:LLJ:jcb Atta. cc: Manager of Right of Way (original of contract) District Engineer (copy of contract) ???- U 157 ?La ..Ls L i LTL7? ____------ An Equal Opportunity/ Affirmative Action Employer G, Frames and covers shall conform to ASTM, "Gray Iron Casting", and shall h,,. 'F_ a minimum clear opening of 22 inches pandd the combined weight l be - The cover shal he cover and frame shall be not less than 300 the, approvedWatertight covers shall be "Sanitary Sewers" sMHshow on RCRn2001Whorplans. R-1915, Dewey Brothers ti. Manhole steps shall be installed in all manholes more than 4 feet deep.. St•?ns shall be 16"O.D. and shall be Dewey Brothers MI-ST-18 for 1ricinch holes, ,'Fi-ST-13 "modified" for block manholes, polypropylene Grade 60 reinforcing rod for precast manholes, or an approved equal. 2K.3 CLEANOUTS for house service laterals or piprlddessshall be petvsdedi here grade and as sno?wn on the drawings.. The -extension to :,hove finished grade or where located andsplug inches below grade in casting for all cleanouts. Compaction--arr-o eanouts shall be to 95 percent density. 2K.9 BORING AND JACKING: At various locations where indicated or directed, the a of Contractor sha bore or jack encasement pipe under r p avedndeo adds i n lieu to mains u railroads nd cutting pavement. This generally will also apply through installe in eadshall State highway roads. Mains ther main indicated ng. stJackingland bored under the paving with casings will be paid for at the price beyond bide for the siz of the pavengnd Casgng installed and shall extend each thicknesses shall be as follows: Casing Size (Nominal) Wall Thickness (Inches) .188 Under 14" .250 .250 14" - 24" .312 30' .375 36" 2K.10 ADAPTERS: The Contractor will arrange with his pipe suppliers to provide proper `adapter units to connect different pipe materials. No separate payment will be made for adapters. 2K.11 PAVEMENT AND PROPERTY REPAIR AND REPLACEMENT: The Contractor shall restore al pavement, sidewalks, curbing and gutters, shrubbery, storm drains, fences, poles, sod or other property and surfaces removed or disturbed as a part of the work to a condition equal to that before the work began. No permanent the pavement shall be restored unless and until in the opinion hefpathe vemEnginePer, t thhe condition of the backfill is such,as to properly support repair for state highway pavements shall conform to the N. C. Department of Transportation requirements. Payment for pavement repair and concrete will be made as stated under the paragraph for measurement and payment. 2-K,12 DITCH CONCRETE: The Contractor shall prepare the area around or under pipeline to be encased with concrete including side forms. Concrete shall be 2,500 psi and-shall be placed and vibrated as provided in the section on concrete. Surface shall be screeded only. _ a•F!-i 2K_r ------------------------ 4 i Fyy S 5 E STATE OF NORTH CAROLINA ,. "I"OUTL N. C. 58 PROJECT' Force Main Crossing COUNTY OF; C:M1'ML'_V ' DU ATIJtlE!.IT, 9F,,TRANSPORTAT10N.. RIGHT OFD"WAY ENCROACHMENT AGREEMENT . l .. -AND- PRIMARY, AND. SECONDARY HIGHWAYS IULYDAY INN . !, Atlantic Beach, North' Carolina 'I THIS AGREEMENT,-made and entered into this the r day of J 19 by and between the Department of Transportation, party of the first part; and Millard hT amms, Q eral Manager, Holiday Inn, Atlantic Beach, N. C. party of the second part,:, W I T N E S S E T.H: THAT WHEREAS, the party of the second part desires to encroach on the right of way _ of the public road.designated as Route N. C. 58 , located at Pine Knolls tcwn limit . with the construction and/or erection o 10-inch casing, bored and -jacked in place for a saniLcaa seer force main or place force main in existin 1011 casin %:j7, WHEREAS,-it--is to the material advantage of the party of the second part to effect this encroachment, and the party of the.first part in the exercise of authority conferred upon it by statute, is willing to permit the encroachment within the limits of the right of way as indicated,-,subject to the.conditions of this agreement; NOW, THEREFORE, IT IS AGREED that the party of the first part hereby grants to the party of , he second part,.,the i`ight and privilege to make this encroachment as shown on attached,,(,1-pn sheet°?(s)-,(*specif)catiens and special provisions which are made a part hereof upon the following conditions, to wit: That the. installation, operation, and maintenance of the above described facility will be accomplished in ac cordance with the party of the first part'o latest POLICIES AND PROCEDURES FOR ACCOMMODATING UTILITIES ON HIGHWAY I OF-r?AY and such revisions and amendments there o as may e n e ec e e cfa e o this agreemen n- ozma on ae io these policies and procedures may be obtained from the Division Engineer or State Utility Agent of the party of the first part. -' That'the said party of the second part binds and obldgates himself to install and maintain the encroaching facility in such safe and proper condition that it will not interfere with or endanger travel upon said highway, nvr obstruct nor interfere with the proper maintenance thereof, to reimburse the party of the first part for the cost -incurred for any repairs or maintenance to its roa(faays and structures necessary due to the installation and ex istence of the facilities of the party of the second part, and if at any time the party of the first part shall require the removal of or changes in the location of the said facilities, that the said party of the second part binds himself, his successors and assigns, to Flo remove or alter the said facilities, in order to conform _ to the said requirement, without any cost to ttlo party of the first part. That the party of the secomi part agrees to provide during construction and any subsequent vulintonanre proper signet signs! lights, flagmen and other warning devices for the protection of traffic in conformance with the latest ?- '- •rllt... T..ff.to t-nfznl_Doricea IAr_;itz.4kto-llnd 1(14hways and Amendments or Supplements thereto. Infor- .. 4 , I, 7vawaaJ6t 1147 ul papn'laul. •I, 6013r1103sul )0 6ulIJ011 Itn)2t 01 jolJd•tutilidde sy1 Aq 0111OU u0A16 tq plnoyt JSVU16UI UOISIAla 1,7vaw7Jodo0 a41 p t t J•, •+,' r. I94I pOplAOJd IuswsoJ6r 7u0w4ot0nuo 07 't6uimtjp Jo tuold uo uMo4% •g 7ouut3 uollrwJOjul yvnt poyotltr 7004% oltltdas o uo umogt oq.Itnw 7u0uilJtds4 047 Aq poJlnboJ 04 e.__-J Arw Icy] uol7onJ7tuo- Jo po47aw 041 JO VOM s41 10 soumjoJJad 041 01 it tuoltt3lil"dt Jo suolslAoJd Ioloadt Auy. 'IuOw%1vdo0 041 Jo tuolltol)I"ds put spJrputlt 041 100+1 fltys"416uoJ7s put ItIJOItw 01 tr tluvwestouo *did IIV '9 I •luowlJtdap oyl Aq.paJlnboJ 0slmJ0410 it Jo gull Atm jo !4611 o47 01 POpuolxo rq plnoyt tluOA IIY 'S '%uolloot+111) uitsdolt jo 001 puoAsq 15 Put tuOllost Inn ul aull 4311P 01 gull 4171P WoJJ puolx0 Iloyt tlusWotroujl •11 opol A1ojoS 21J33o11 IruolloN 047 Vl Ina lot %nurJralO OI WJOJu0-J Isnm %AemprOJ If* OAOgr talg12 Put taJIM Pta4J*AO j0 4o2VtJt9IO Ig7IJJ9A rrnr,VIW r{ •AtM4614 041 Jo su1lJaluvO 041 o7 ItwJou slglssod to Jtau to eq plnoyt s6ultto,2 (IY •L " 'Jasul6u3 uolsinld 047 01 71awasJ6e 1u2w42907v0 jo uolttlwgnt oI JolJV { 46101/11 ui u6ltoa 0Jn1OnJ1g 10 Ptah 047 Aq pOAoJddr tq 7snw 0Jn72nJ3s 06ru1rJp Joylo Jo a6piJq a o1 Suawyorllr Auy •{ S1H3N384l1 3Y *M1935- • r _ t7urA ja uo11ro0T •y1 070 'Ina uodo '6ul>fot( put bulJOq - 6vlttoJO Jo poylmu of ss u0I103ou '16ulstoJ2 punoJ6Jopun uo 'CI L _ __... _ fL?G?sT of ??A? I !o? NAQ?ES ? - L? M,?J. r.1 ? w! T4 'ON -PIPES •v _i.3 Pb2TLA*1D lr?"_5'fEE? C1?5??SG;? 6aQED ?EM?nI'?--(?•.ei4TrLfcNOS _.. r?.ID/o?i..]ACaCEfl_+u? CASING DETAIL NO SCALE pipe 4 j _;.IMtI N____o-..1.88 ?--`YAL.LS?! tCKh1E33 _ -- 1 _ . 1 ' f x F?6,? j -3 L lrl.c,_ 58 __- : - - S,nLTE.>2 P4't?-l 2t? , _ ? ?.??:??.? I _?lE.J-io,. case DETAIL BORING jACKING I CASING FOR FORCE AI SCALE I 30' HOLIDAY INN CONVENTION CENT'Ef ATLANTIC BEACH , N.C. uc??ov vnni ncel=hl Si AC'Cn!`IAT' G. Frames and covers'shall conform to ASTM, "Gray Iron Casting", and shall have a minimum clear opening of 22 inches diameter and the combined weight of the cover and frame shall be not less than 300 pounds.' The cover shall be marked "Sanitary Sewers" or as shown on the plans. Watertight covers shall be NEENAH R-1915, Dewey Brothers MHRCR-2001W or approved equal. H.' Manhole steps shall'be installed in all manholes more than 4 feet deep., `Steps shall be 16" 0-.D. and shall be Dewey Brothers MI-ST-18 for brick manholes, MH-ST-18 "modified" for block manholes, polypropylene. coated 1/2-inch steel Grade 60 reinforcing rod for precast manholes,,or an approved equal.. 2K.8 CLEANOUTS for house service laterals or pipelines shall be provided where and as shown `on *the drawings. The extension to grade sha-11 be set six inches above finished grade or where located in pavement or driveway shall be set 6 inches below grade in casting as shown on the drawings. Provide cap and plug for all cleanouts. Compaction--ar-ound Gleanouts shall be- to 95 percent density. 2K.9 BORING AND JACKING: At various locations where indicated or directed, the Contractor shall ore or jack encasement pipe under paved roads in lieu of cutting pavement. This generally will also apply to mains under railroads and State highway roads. Mains where Indicated shall be installed in steel casings bored under the paving with the main thread through the casing. Jacking and casings will be paid for at the price per foot bid for the size and length installed and shall extend 6 feet beyond each side of the paving. Casing thicknesses shall be as follows: Casing Size (Nominal) Wall Thickness (Inches) Under 14" 14" - 24" 30" 3611 .188 .250 .312 .375 2K.10 ADAPTERS: The Contractor will arrange with his pipe suppliers to provide proper adapter apter units to connect different pipe materials. No.separate payment will be made for adapters. 2K.11 PAVEMENT AND PROPERTY REPAIR AND REPLACEMENT: The Contractor shall restore-a pavement, sidewalks, curbing and gutters, shrubbery, storm drains, fences, poles, sod or other property and surfaces removed or disturbed as a part of the work to a condition equal. to that before the work began. No permanent pavement shall be restored unless and until in the opinion of. the Engineer, - the condition of the backfill is such..as to properly support the pavement. Pavement repair for state highway pavements shall conform to the N. C. Department of Transportation requirements. Payment for pavement repair and concrete. wi 11 be made as stated under the paragraph for measurement and payment. 2K.12 DITCH CONCRETE: The Contractor shall prepare the area around or under pipeline o e encased with concrete including side forms.. Concrete shall be 2.,500 psi and shall be placed and vibrated as provided in the section on concrete. Surface shall be screeded only. P. . FQR_ n 2K- 1 .- -. s DIVISION OF ENVIRONMENTAL MANAGEMENT Water Quality Section June 29, 1987 M E M O R A N D U M TO: John Parker FROM: W/111 Mills &fD SUBJECT: Application for CAMA Permit Atlantic Beach Associates/Holiday Inn Carteret County The Subject application has been reviewed for water quality impacts and the following comments are offered: 1. The proposed project does not require a 401 Water Quality Certification. 2. In order to protect water quality in Bogue Sound, no runoff should be allowed to enter DOT's roadside ditch system in response to a storm event of less than a 2 year intensity. (The revised stormwater plan of 6/19/87 should meet this requirement.) BM/dkb cc: Preston Howard N MEMORANDUM DATE: TO: FROM: THROUGH: DIVISION OF ENVIRONMENTAL MANAGEMENT June 22, 1987 Bill Mills Operations Branch David H. Cotton J Wilmington Regional Office A. Preston Howard, Jr. po Wilmington Regional Offic R .111A, - 0 N l - 1,y8? OP4? ?oN Iry SEAT S gRANc , /v SUBJECT: Regional Office Review & Recommendations Application for Permit for Excavation and/or Fill Atlantic Beach Associates/Holiday Inn Carteret County The applicant is proposing to expand the Holiday Inn Motel with a 5 story addition, a conference center, swimming pool and parking area. The wastewater is being handled by DHR in Raleigh. The project has been reviewed to determine impacts to water quality. The following comments are offered: 1. A 401 Certification is not required. 2. That to protect the water quality in Bogue Sound, no runoff enter DOT's roadside ditch system in response to a storm event of less than a 2-year intensity. Note: The revised stormwater control plan sealed and dated 6/19/87 should meet this requirement. This office has no objections to the project provided the revised stormwater control plan is followed. DHC:kc cc: DCM - Jim Mercer CF, WiRO x FIELD INVESTIGATION REPORT Long: 1. Applicant's Name Atlantic Beach Assoc. D/B/A Holiday inn 2. Location of project site Town of Pine Knoll.Shores, ocean side of Hwy 58, 2.8 miles west of Atlantic Beach traffic light 3. Investigation type: Dredge & Fill CAMA x 4. Investigative procedure: (A) Dates of site visit 4/27/87 5/4/87 (B) Was applicant present yes yes 5. Processing procedure: Application received May 1, 1987 Office Morehead City 6. Site description: (A) Local Land Use Plan Pine Knoll Shores Land classification from LUP dev/commercial Development constraints identified in LUP none (B) AEC(s) involved: Ocean Hazard x Estuarine shoreline Coastal wetlands Public trust waters Estuarine waters Other (C) Water dependent: Yes No x Other (D) Intended use: Public Private Commercial hotel/conf ctr. (E) Type of waste water treatment: Existing x Planned expansion of package plant north side Hwy 58 (F) Type of structures: Existing Holiday Inn Planned motel expansion 96 rooms & conference ctr. 5 story (G) Estimated annual rate of erosion 2 Source min beach erosion factor 7. Habitat description: AREA (A) Vegetated Wetlands Dredged Filled Other none (B) Non-vegetated wetlands: (C) Other: 170' ocean erodible AEC highground outside AEC (D) Total area disturbed: Ci n - .5. D ac, approx. 4 acres 8. Project summary the applicant proposes to expand the Holiday Inn motel with a 5 story addition which will include 96 new rooms, parking lot, swimming pool and conference center. The waste water treatment plant will also be expanded on the north side of Hwy 58 a 9. Narrative description The existing Holiday Inn Motel located in Pine Knoll Shores is a familiar landmark on the Salter Path Road heading west on NC Hwy 58. The project site is located approximately 2.8 miles west of the Atlantic Beach stoplight on Bogue Banks in Carteret County. The owners of the Holiday Inn are the Atlantic Beach Associates. They have submitted a major CAMA application to completely expand the.existing facility on the west side of the existing building next to the Atlantis Lodge. The applicants own approximately 10.6 acres of which 4.9 acres are scheduled for development under the current CAMA application. This project, the site and the proposed development can be divided into four distinct geographical areas. Three of these areas are on the south side of Hwy 58 and one on the north side. The first zone of importance is located along the ocean beach and is known as the CAMA ocean erodible AEC. It extends 120' landward from the first line of stable dune vegetation. Sheet 1 of the work plat drawing demonstrates the location of this CAMA recession line. In addition, the position of this line on the property can be easily relocated since the applicant has taken specific measurements from the hard surface road right of way to the recession line. Development within this area consists of the following structures. Two 5' wide pedestrian boardwalks, each approximately 140' long. The primary dunes will'remain intact and undisturbed by construction of the walkways. On the east side of the project site at the point of the 1201. recession line, the applicant proposes to construct a swimming pool with a concrete apron measuring a maximum of 40' wide by 70' long. This area, approximately 3000 sq. ft., is generally flat and within a previously disturbed area from construction that took place on the Holiday Inn back in 1972. The last item in this area will be an elevated, glass-enclosed walkway that will connect pedestrian traffic from the existing motel to the new building. The next zone scheduled for construction is still within the ocean high hazard AEC and is determined as the next 50' wide area between the 120' recession line and the 170' recession line. This area contains approximately 24,000 sq. ft. and will be occupied by a 5 story motel building and one story conference center. The footprint of the proposed motel approximates 52' wide by 308' long. As the work plats show, asphalt parking lots will surround the building on the west and north sides. There are at present 108 paved parking spaces for the existing facility with 194 new parking spaces proposed. The largest zone scheduled for construction is not within a CAMA AEC. This zone is located between the proposed motel and the existing paved road, Hwy 58. This area measures approximately 480' long by approximately 2201wide. Although the majority of this 2.4 acres will be taken up by asphalt parking, the project design does preserve about 49,000 sq. ft. of open green space that will have an absorptive, permeable value. In addition, the project design will include an underground stormwater catchment and collection system that will retain rainwater on the site. The project plan submitted to this office also includes measures to control windblown sand and the containment of sedimentation during the construction phase of the project. The fourth and last zone to be developed within this project is located on the north side of hwy 58 behind the Handyhouse. Oak Leaf Drive borders the disposal field on the west side. The applicant proposes to upgrade the existing septic tank system and run a new 2" PVC pipe under the highway to an open field area. A series of two new disposal fields will be installed to accommodate the expanded motel. 10. Anticipated Impacts Construction within the 120' ocean erodible area appears to be permittable without significant impact to the existing sand dunes or supportive vegetation. The two wooden pedestrian accessways crossing the primary and frontal dune system will be accomplished on vertical piling without alteration to these physical features. The proposed swimming pool has been situated as close to the actual 120' recession line as possible. The same can be said for that portion of the glass-enclosed elevated walkway connecting the two buildings. Little to no impact is anticipated. In area two of the project, construction standards pursuant to the North Carolina building code are critical to the stability and quality of the 5 story building and conference center. The proposed motel is consistent with local zoning enforced by the Town of Pine Knoll Shores. It has been noted that the project site is zoned commercial and among other items that will be dictated will be the number of parking spaces. Construction scheduled in area 3 and 4 as previously outlined in this report will take place with the coordinated efforts of the state and local review agencies. The stormwater management and retention plan that has been submitted with the project proposal should work well to prevent off-site impacts of any large volumes of water. CAMA Review The proposed Holiday Inn expansion program appears to be consistent with the goals-and objectives of the Pine Knoll Shores Land Use Plan where the highground property has been classified as developed and the ocean erodible AEC as conservation. No development constraints have been identified through the review of that document. ate, 1 I?G g?1 v , • 4 APPLICAT ION FOR PERM11 10 LXC:AVATE AND/OR FILL WATER QUALITY CERTIFICATION I:ASf-MUNT IN (. ANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT •r?rtwnl of Adr•4iniuritwn State of North Carolina Department of the Army Department of Natural Resources and Community Development Corps of Engineers, Wilmington District (GS 113-229, 143.215.3(a)(1), 143-215.3(c), 113A-118 (33 CFR 209.320-329) 1•;,„, 1•,114. Or IIf if It and fill in all blanks. If information is riot applicable, so indicate by placing N/A in blank. r s,,trh4 ant Information Atlantic Beach Associates d/b/a Holiday Inn Name P. 0. BQx 280 Last First Middle li. Address Street, P. O. Box or Route Atlantic Beach, North Carolina 28512 919/726-2544 City or Town State Zip Code Phone it. Location of Proposed Project: A. County Carteret l3. I. City, town, community or landmark Pine Knoll Shores (N. C. 58) 2. Is proposed work within city limits? Yes X No C Creel:, river, sound or bay upon which project is located or nearest named body of water to project Atlantic Ocean lit. Description of Project A. 1. Maintenance of existing project 2- New work Holiday Inn Expansion B Purpose of excavation or fill 1. Access channel N/A length width depth 2. liu,(t basin N/A length width depth i. I ill area N/A length width depth 4. Other length width depth - -t ?_ C. 1. Bulkhead length N/A Average distance waterward of MHW (shoreline) 2. Type of bulkhead construction (material) i D. Excavated material (total for project) t t+ . 100 1. Cubic yards 2. Type of material Sand - ?Tt ?'1 .I??Zc= L E.. f ill material to be placer] below MHW (see also VI. A) -- --------------`----- I, Cubic yards 2. Type of material l? L.rrtd 1 ype, Disposal Area, and Construction Equipment: A D44es (tie area to be excavated include any marshland, swamps or other wetland? Yes No X ti Does the disposal area include any marshland, swamps or other wetland? Yes No X Disposal Area 1. Location On same site 2. Do you clairn title to disposal area? Yes D I tll Material source if fill is to be trucked in _ On site (1.00 cy) i l i 4k ti ill excavaled material be entrapped and erosion controlled? Sil t a t+ I r4luipmcnl to be used 1`1otor > rnder < ??4I1 ni,rrshland be crossed in transporting equipment to project site? If yes, explain N/A 1! .tntended, Use of Project Arca (Describe) A. 1. Private 2. Commercial 96-room expansion 3. Housing Development or Industrial 4. Other B. 1. Lot size(s) 4.96 acres total 2. Elevation of lot(s) above mean high water 10-20 feet 3. Soil type and texture Sand, sand-clay • 4. Type of building facilities or structures 96 rooms - 5-story structure S. Sewage disposal and/or waste water treatment A. Existing Planned __ Low pressure pipe B. Describe Approval through N. C.-Department of Human Resources 6. Land Classification (circle one) EVELOPED TRANSITIONAL COMMUNITY RURAL CONSERVATION OTHER (See CAMA Local Land Use Plan Synopsis) VI. Pertaining to Fill and Water Quality: A. Does the proposed project involve the placement of fill materials below mean high water? Yes No X B. 1. Will any runoff or discharge enter adjacent waters as a result 6f project activity or planned use of the area following project completion? Yes-No X 2. Type of discharge Rain water 3. Location of discharge On-site. lagoon VII. Present rate of shoreline erosion (if known): Unknown VIII. List permit numbers and issue dates of previous Department of Army Corps of Engineers or State permits for work in project area, if applicable: N/A IX. Length of time required to complete project: 1 Year. X. In addition to the completed application form, the following items must be provided: A. Attach a copy of the deed (with State application only) or other instrument under which applicant claims title to the affected property. OR if applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title plus written permission from the owner to carry out the project on his land. B. Attach an accurate work plat drawn to scale on 8%s X 11" white paper (see instruction booklet for details). Note: Original drawings preferred - only high quality copies accepted. C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or certified mail or by publication (G.S. 113-229 (d))Enter date served February 18, 1987 D. List names and complete addresses of the riparian landowners with property adjoining applicant's. Such owners have 30 days in which to submit comments to agencies listed below. Atlantis Lod, A.C. Qa I 1 Atlantic Bea;-2i, NC 28512 Seahawk Motel- Harry Bateman 200 Sray St wilson,NC 27893 Holiday Inn-Atlantic Beach, NC 23512 XI. Certification requirement: I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved coastal management program and will be conducted in a manner consistent with such program. X11. Any permit issued pursuant to this application will allow only the development described in this appli- cation and plat. Applicants should therefore describe in the application and plat all a ticipated devel- ot)ment activities, including construction, excavation, filling, and lard clearing. ";1 3/31 /87 ARpliea'ot's Signature Millard Williams-General Manager s? H2 ?'' I" 's SEE REVERSE SIDE FOR MAILING INSTRUCTIONS STATE OF NORTH CAROLINA DEPARTMENT. OF TRANSPORTATION Greenville, North Carolina 27835-1587 JAMES G. MARTIN GOVERNOR JAMES E. HARRINGTON SECRETARY County April 23, 1987 Carteret (16-87-05) SUBJECT: Encroachment Contract - Holiday Inn Millard Williams, General Manager Holiday Inn Atlantic Beach, North Carolina DIVISION OF HIGHWAYS GEORGE E. WELLS, P.E. STATE HIGHWAY ADMINISTRATOR Attached hereto, for your files, is a copy of the Right of. Way Encroachment Contract which has been properly executed. This Contract covers the following: Installation of 10" steel casing (dry bore) to accomodate 4" Force Main or utilize existing 10" casing on NC 58 located at Pine Knolls Town limit. APPROVED SUBJECT TO: 1. If existing casing not utilized a $500.00 performance bond be submitted to District Office before installing new casing. 2. New casting will extend from ditch to ditch to protect maintenance activities (cleanout). 3. All disturbed areas to be dressed, seeded and a satisfactory vegetative cover established. G. A hirley, Jf?. ; 'P .E. DIVISION ENGINEER GRSjr:LLJ:jcb Atta. F TO-F-HIR-fl cc: Manager of Right of Way (original of contract) District Engineer (copy of contract) b.jr?1 '? •? 8 7 U La -------------------- a G. Frames and covers shall conform to ASTM, "Gray Iron Casting", and shall a minimum clear opening of 22 inches diameter and the combined weight of the cover and frame shall be not less than 300 pounds. The cover shall be "Sanitary Sewers" or as shown on the plans. Watertight covers shall be R-1915, Dewey Brothers MHRCR-2001W or approved equal. H. Manhole steps shall be installed in all manholes more than 4 feet deep.. `t ps shall be 16"'O.D. and shall be Dewey Brothers MI-ST-18 for brick manholes, '-;i-ST-18 "modified" for block manholes,. polypropylene coated 1/2-inch steel ;jade 60 reinforcing rod for precast manholes, or an approved equal. 2K.8 CLEANOUTS for house service laterals or pipelines shall be provided where and as snow ,vn on the drawings. The extension to grade shall-be set six inches ::))vs' finished grade or where located in pavement or driveway shall be set 6 inches below grade in casting as shown on the drawings. Provide cap and plug for all cleanouts. Compactio-n--ar-ow4-c-?eanouts shall be to 95 percent density. 2K.9 BORING AND JACKING: At various locations where indicated or directed, the Contractor sha bore or jack encasement pipe under paved roads in lieu of cutting pavement. This generally will also apply to mains under railroads and State highway roads. Mains where indicated shall be installed in steel casings bored under the paving with the main thread through. the casing. Jacking and casings will be paid for at the price per foot bi-d for the size and length installed and shall extend 6 feet beyond each side of the paving. Casing thicknesses shall be as follows: Casing Size (Nominal) Under 14" 14" - 24" 30" 36" Wall Thickness (Inches) .188 .250 .312 .375 2K.10 ADAPTERS: The Contractor will arrange with his pipe suppliers to provide proper adapter units to connect different pipe materials. No separate payment will be made for adapters. 2K.11 PAVEMENT AND PROPERTY REPAIR AND REPLACEMENT: The Contractor shall restore al pavement, sidewalks, curbing and gutters, shrubbery, storm drains, fences, poles, sod or other property and surfaces removed or disturbed as a part of the work to a condition equal to that before the work began. No permanent pavement shall be restored unless and until in the opinion of the Engineer, the condition of the backfill is such.as to properly support the pavement. Pavement repair for state highway pavements shall conform to the N. C. Department of Transportation requirements. Payment for pavement repair and concrete will be made as stated under the paragraph for measurement and payment. 2,x-12 DITCH CONCRETE: The Contractor shall prepare the area around or under pipeline to e encased with concrete including side forms. Concrete shall be ?_,500 psi and shall be placed and vibrated as provided in the section on concrete. Surface shall be screeded only. -' ' 2 K'. ?, i ----------------------- ' STATE OF NORTH CAROLINA f?CJYE N. C. 58 PROJECT i'orce Vlain Crossing COUNTY OF DUA T,' E',T, OF TRiVISPORTATION RIGHT OF" WAY ENCROACHMENT AGREEMENT -AND- PRIMARY AND..SECONDARY-HIGHWAYS HOLYUAY INN Atlantic Beach, North' Carolina THIS AGREEMENT, made and entered into this the day of , 19 , by and between the Department of Transportation, party of the first part; and Millard Williams, General Manager, Holiday Ing,, Atlantic Beach, N. C. party of the second part, W I T N E S S E T H: THAT WHEREAS, the party of the second part desires to encroach on the right of way _ of the public road designated as Route N. C. 58 located at- Pine Knolls tcm, limit with the construction and/or erection o _10-inch casing, bored and jacked in place for a sanitary sewer force rllain- or place force main in existing 10" casing ..i WHEREAS, it..is to the material advantage of the party of the second part to effect this encroachment, and the party of the first part in the exercise of authority conferred upon It by statute, is willing to permit the encroachment within the limits of the right of'way as Indicated,,subject to the.conditions of this agreement; NOW, THEREFORE, IT IS AGREED that the party of the first part hereby grants to the party of the second part, the right and privilege to make this encroachment as shown on "attached,,f`.an sheet'fs),rspeclfications and special provisions which are made a part hereof upon the, following conditions, to wit: That the installation, operation, and maintenar.ce of the above described facility will be accomplished in ac- cordanca with the party of the first part's latest POLICIES AND PROC,•EDURE.S FOR ACCO)01()DATING UTILITIES ON 11IGHWAY RIGHTS-OF-MAY and such revisions and amendmente thereto as may be in effect a the date o this agreement. n- Torglt TI n es ?o these policies and procedures may be obtained from the Division Engineer or State Utility Agent of the party of the firet part. That'the said party of the second part binds and obligates himself to install and maintain the encroaching facility in such safe and proper condition that it will not interfere with or endanger travel upon said highway, not obstruct nor interfere with the proper maintenanc4t thereof, to reimburse the party of the first pert for the cost incurred for any repairs or malnte»ot,ce to its soadaays and structures necessary due to the installation and ex- istence of the facilities of the party of the second pert, and if at any time the party of the first part shall require the removal of or changes in the location of the raid facilities, that the said party of the second part binds himself, his successors and assigns, to promptly remove or alter the said facilities, in order to conform to the said requircaont, without any cost to the party of the first part. That the party of the eecond part agrees to provide during construction And any subsequent mnintonenre proper Signs signal lights, flagmen and other weIrning davices for thn protection of traffic in conform-ince with the latest ? -- -S - ?.j T../fin G„trnL Devicen _it,r_:itzette_gnd llfghwa a end /wendments or Supplements thereto. lnfor- __`? I too 0, 1 7v0waou60 1141 ul papnpul r ! J ' It l 1 I 11 11sul )o bullrsls Itn a of jolid-lut:-llddo oyl Aq ssllou uoAl6 sq plnoyt iaaul6ui uoItIA10 I,lutuwl/od•0 oyi a i •tSu1.•eup jo sue d uo u.io s.0 I V 9 louvo3 vollewjo)ul gent A 1041 psplAOrd luswooi6t 1u0w41#0J5uo 01 ps43011t longs oltrrdat t uo u..04t oq ltmo luowlied00 141 Aq ps-inbor oq ti 1rg1 u0111nu15v0" fo po412-w 141 .o yJa+ 041 )0 0?uew,o)I3d o41 of is tv011t71flsads uo tuolalAOA loloods Aug ,•( ' •1uw3jrdo0 041 )0 Suollr?I)l3adv put tpjtp w 1s 541 loam hays 416usJlt put ltlj;i ?rw 01 tr tlutwesr:iu• 0414 IIY '9 - -' • •3u40w1reda0 041 Ag p..fjnbou otl? e41o sr fo oull Air+ 10 14811 041 01 pspuolxo eq plnogt s1uoA [IV 'S •, •su0lloot 1111 ul todols )o vol pvoAOq S put tuol3Das 1n3 ul lull 4711p 01 lull 4o11p wor) puslw• lltys tlus.eiv?ul •y apo3 A1919S D1u1 »13 (tu011eH 041 ui lno lot rsour,tolo 01 wuo)uoo ltnw SAr-pros Ile tAOge roigtl.put toil„ pony, eo )o t•ouorrol2 1rI1 LOA mrn.lulN •A0•+y 614 041 )0 au11Jt1ua3 041 01 ivwjou 0191tsod se .eau to •q plno41 soulsson l1Y •T 'uaau16v3 .0111^10 041 01 luau'a*Al lua•uyoto? vt )o uoitslwgns of uolid 146101oY ul u61to0 slnlonjlS )a ptall 841 Aq panojddr •q lsnw t1nl3nuls t6vultup jo41o 10 06pi,q o of 1v-yoollo Avy •l S1H1w3Ytn 3Y 1ri3N39 6%U*A 10 c ' ? 2?G, aT of i •---__ Gec?oto t3?w1EEw1 PIPES :v -J.3_Po2TLA?4o in ,Tc 174 "M. ? ? i I lfl `fEBL c-A-5% i 6o2ED i Acploa jAc-4ea l"vee CASING DETAIL r r tlJ NO SCALE O _ -- - ?-_ -? _ --- - -- a -- _i 1• { i N_?o...f 88 "ova L, L, -Tt_-! IcK W f- 1 1 E?(tST__lo"CAS?? ? ?r.1e../-to"cas?•JG E../ FM PETAIL r, BORING 81 JACKING ICS" CASING FOR FORCE MAIN - - ------------_- SCALE I"=30' HOLIDAY INN CONVENTION CENTEF ATLANTIC BEACH , N.C. w t G. Frames and covers shall.conform to ASTM, "Gray Iron Casting", and shall have a minimum clear opening of 22 inches diameter and the combined weight of the cover and frame shall be not less than 300 pounds.' The cover shall be marked "Sanitary Sewers" or as shown on the plans. Watertight covers shall be NEENAH R-1915, Dewey Brothers MHRCR-2001W or approved equal. H.' Manhole steps shall be installed in all manholes more than 4 feet deep.. Steps shall be 16" O-.D, and shall be Dewey Brothers MI-ST-18 for brick manholes, MH-ST-18 "modified" for block manholes, polypropylene coated 1/2-inch steel Grade 60 reinforcing rod for precast manholes, or an approved equal.. 2K.8 CLEANOUTS for house service laterals or pipelines shall be provided where and as sFown on the drawings. The extension to grade shall be set six inches above finished grade or where located in pavement or driveway shall be set 6 inches below grade in casting as shown on the drawings. Provide cap and plug for all cleanouts. Compaction--r-o eanouts shall be to 95 percent density. 2K,9 BORING AND JACKING: At various locations where indicated or directed, the Contractor s a ore or jack encasement pipe under paved roads in lieu of cutting pavement. This generally will also apply to mains under railroads and State highway roads. Mains where indicated shall be installed in steel casings bored under the paving with the main thread through the casing. Jacking and casings will be paid for at the price per foot bid for the size and length installed and shall extend 6 feet beyond each side of the paving. Casing thicknesses shall be as follows: • - Casing Size (Nominal) Wall Thickness (Inches) Under 14" 188 14" - 24" .250 30" .312 36" .375 2K.10 ADAPTERS: The Contractor will arrange with his pipe suppliers to provide proper allp ter units to connect different pipe materials. No .separate payment wil•1 be made for adapters. 2K.11 PAVEMENT AND PROPERTY REPAIR AND REPLACEMENT: The Contractor shall restore a pavement, sidewalks, curbing and gutters, shrubbery, storm drains, fences, poles, sod or other property and surfaces removed or disturbed as a part of the work to a condition equal to that before the work began. No permanent pavement shall be restored unless and until in the opinion of the Engineer, the condition of the backfill is such.as to properly support the pavement. Pavement repair for state highway pavements shall conform to the N. C. Department of Transportation requirements. Payment for pavement repair and concrete.will be made as stated under the paragraph for measurement and payment. 2K:12 DITCH CONCRETE: The Contractor shall prepare the area around or under pipeline -To be encased with concrete including side forms. Concrete shall be 2,500 psi and shall be placed and vibrated as provided in the section on concrete. Surface shall be screeded only. ?(TF)F- STATE OF NORTH CAROLINA AQUTC Ii. C. 53 PROJECT Force 1`1_iiii Crossing COUNTY OF C1UZ1'EPL,r , OF TRA"ISfOR7A710N . RIGHT OF WAY ENCROACHMENT AGREEMENT i -AND- PRIMARY,AND'SECONDARY-HIGHWAYS HuLTDAY INN `f Atlantic Beach, North' Carolina THIS AGREEMENTS' made and entered into this the day of 19 by and between the Department of Transportation, party of the first part; and Millard 'dilliams,_GMeral Manager, Holiday Inn, Atlantic Beach, N C. party of the second part,:, W I T N E S S E T H: ..THAT WHEREAS, the party of the second part desires to encroach on the right of way of the public road designated as Route N. C. 58 located at- Pine Knolls town limit with the construction and/or erection o 10-inch casing, bored and -jacked in place for a sanitary seFier force main or place force main in existing 1011 casing ..,:WHEREAS,' it..is to the material advantage of the party of the second part to effect this encroachment, and the party of the first part in-the exercise of authority conferred upon it by statute, is willing to permit the encroachment within the limits of the right of 'way as indicated,.sub,ject to the.condi,tions of this agreement; NOW, THEREFORE, IT IS AGREED that the party of the first part hereby grants to the party of-the second Part.,the "right and privilege to make this encroachment as shown on "attached,it'An -sheet'-fs),?'specificatlons and special provisions which are made a part hereof upon tile, following conditions, to wit: That the installation, operation, and maintenance of the above described facility will be accomplished in ac- cordanca with the party of the first part's latest POLICIES AND PROCEDURES FOR ACCO?04ODATING UTILITIES ON HIGHWAY RIGHTS-OF-MA and such revisions and amendments thereto as may E-0 -in effect n the e o this agreement. n- or7aa on as ?o these policies and procedures may be obtained from the Division Engineer or State Utility Agent of the party of the first part. That'the said party of the second part binds and obligates himself to Install and maintain the encroaching facility In such safe and proper condition that it will not Interfere with or endanger travel upon said highway, nor obstruct nor interfere with the proper maintenance thereof, to reimbur80 the party of the first pert for the cost ._-incurred for any repairs or maintenance to its roadaays and structures necessary due to the installation and ex- istence of the facilities of the party of the second pert, and if at any time the party of the first part shall require the removal of or changes in the location of the maid facilitiea, that the said party of the second part binds himself, his successors and assigns, to promptly remove or alter the said facilities, in order to conform to the said requirendnt, without any cost to tLe party of the first part. net the party of the second p+trt agrees to proviele during construction and any subsequent mntntanance prc.per signsi signal lights, flagmen and other warning dovicea for the protection of traffic in conform•lnce with the latest n u r..ret. L+ntrnl. bavicen.lnr_uIrfeie_pnd Ilighwaye and kw ndmenta or Supplements thereto. Infor- lutwa?J6t 1141 u1 papnlsul 1. 1.) fo 6u17J41s ltnl?t 01 JolJd•lutsllddt oy1 Aq 0311ov u•Al6 •q pinny{ iasvleul u01tIA14 t,luswlJOdsp lyi I Q i t6ul.tlp Jo sueld uO u.oVt.s 1ouv1`3 vollrwjoivl ysnt' 7t41 PsPfAOJd lutwoe.l6t 3usw4sroJSu9 01 p•47411t Ise pn ?f A1` ys sltlydas • uo uAayt oq 7srxu luawl ltdsa t41 Ag Aq sJlboJ 1`q ,. ? 71`41 uollbnJltuob io P041aw 041 Jo +lic- 041 /o ?1uswloi Jad s41 of to IvolleDlllDadt JO suoltlAold I•iosds Avy ••[ 'luav7Jtdso 041 /o suollYt'31l1-?ads put 'P" Put" 941 107w lleys 416uOJls pvt 16IJa1tW 01 se tluswsttlue sdld 11 • -1usw1Jedsp 0y1 Aq pvJlnb OJ 6sp.,i0g1o it JO oull At. to 14811 041 01 p•pu•lxt 0q pfnoyl a u0A lly •5 11 'tuOlla0% 1111 ul todolt jo vol puoAoq ?5 put suol7os7 1n3 ul lull 4771P 01 lull 4711P woJ) puslw0 11e49 s3u0wsse?lu? •? , 0po) A1s11`S :.IJl?911 leuolltW 047 ul 7nO 101 1.1utJt•17 01 wJo)VOJ lsnw %Ae.poOJ lit %AOgt tolg1`7 put soil. pesyJSAO 10 {•)u1Jt•l) 1e711JOA I.Wh,UJ W f •At.y614 041 to sullJaluai s47 01 IswJOU •Igltsod if Jtau it •q pfnoyl s6Jltso)5 Ily -T Jaau16v1 uolslAlfl 041 01 7091140J61 lu4w43toJ?-v• 10 voltslwgns of JolJd I V81•I•y ul u61sup sJn1OnJ7S /o ptalf 041 Aq puAoJdde sq Isnw oJnlvnJlt t6tultip J0410 Jo 06plJq 0 03 iv•w4Dt771 Auy 1' ' S1NISt1Yin 3y lyylN)7 HENRY VON OESEN CONSULTING ENGINEERS AND PLANNERS 805 NORTH THIRD STREET P.O. DRAWER 2087 April 27, 1987 Mr. David Cotton N. C. Div. of Env. Management 7225 Wrightsville Avenue Wilmington, NC 28403 3155 AND ASSOCIATES Telephone (919) 763-0141 WILMINGTON, NORTH CAROLINA 28402 Re: Erosion Control & Stormwater Control Holiday Inn Convention Center Atlantic Beach, N. C. Dear David: Mr. Bob Mercer (CAMA/Morehead City) suggested we submit the attached plans for your review. The plans are for a five-story convention center adjacent to the existing Holiday Inn complex. The site is presently undeveloped and therefore would need manage- ment of the stormwater for the completed project. In developing a plan we reviewed 15 NCAC 2B.0200 and .0217 for compliance. The project is on the ocean side of the island and behind the dune system. The drainage from the property generally flows toward the sound side of the island which is classified as SA. However, the site is 1,000+ feet from those waters and portions of that regulation do not apply. Attached is a topo of the area to be developed. This site is unique in several reasons and the stormwater system planned was developed around these unique features. The road (NC 58) does not have a drainage ditch or swale within the DOT right of way. The soils in this area are loose beach sand and therefore very porous. Drainage from the existing Holiday Inn site and the proposed site does not leave the property boundary. There are two natural recharge areas in which the stormwater enters, but does not leave. The first natural basis has a bottom elevation of 4.3 MSL and stays dry most of the year. The second natural basin is similar expept the base level is 5.8 MSL. The storm- water culvert crossing NC 58 is at 5.61, but I could not see where the water from this site had ever gotten high enough to form a channel to the existing culvert. Our plan is to use the first natural basin as a stormwater retention and recharge area. We would prefer to leave the vegetation as it is naturally. The capacity of the basin is approximately 20,165 cubic feet. In order to determine the inflow, we decided to see what the level would be during a 100-year storm of a five- minute duration. The level would be around 8.5 feet or 13,737 cubic feet. As a safety precaution, an overflow was set at r Mr. David Cotton April 27, 1987 Page 2 Elevation 9.0 to prevent any unfeseeable overflow from the area during hurricanes and prevent any washover of NC 58. NC 58 would be used for evacuation. However, it appears that from the calcu- lations, this natural recharge basin could handle most of the expected flows from the new and existing facilities. Enclosed are the calculations and prints of the system, and the erosion control plan. Once graded, runoff from the site is not expected. Very truly yours, HENRY VON OESEN AND ASSOCIATES, INC. Donald R. Butler, P. E. DRB/GGB Enc. cc: Mr. Millard Williams Mr. Jack Covington Permit Class- New STATE OF NORTH CAROLINA Department of Natural Resotuces and Community Development F' and Coastal Res ources`Comraission for ® Major. Development in an Aiea of Environmental Concern' pursuant to.NQ_GS4l'1 3A.} ].8 x 3 Excavation and/or_fillingpursuant to NCGS 113-229 Permit Number Issued to Atlantic Beach Associates, dba/Holiday Inn, Atlantic Beach, NC 28512 authorizing development in Carteret County at the Atlantic Ocean, Pine Knoll Shores as requested in the permittee's application dated 3/31 /87 including attached plat, 1, force main detail dated received 5/1/87 and bluelines 4 dated 4/20/87. This permit, issued on, is subject to compliance with the application (where consistent with the permit), all applicab (e regulations, special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine; imprisonment or civil action; or may cause the permit to be null and void. (1) All work will take place in accordance with the work plat drawings and must conform with the local, state and federal building code requirements. (2) The foundation pilings of the structure must be located landward of the first line of stable natural vegetation a distance of 120'. This must be established by DCM representatives from the Morehead Regional Office immediately prior to any structural piling placement. The line must be re-established if construction is not initiated within 60 days and/or if there is a major shoreline change prior to construction beginning. (3) All construction must comply with building requirements in Chapter 34, Volume 1 and/or Section 39, Volume 1B of the Building Code. (4) All foundations and structures must be designed to be stable during applicable fluctuations in ground elevation and wave force during a 100 year storm. (5) In accordance with 15 NCAC 7H.0308(a), no seawall, bulkhead, ripraprevetments (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance; as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1990 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DNRCD and the Chairman of the Coastal Resources Commission. David W. Owens, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Atlantic Beach Associates ADDITIONAL CONDITIONS Permit #135-87 Page 2 of 2 or other permanent shoreline stabilization will be allowed in the future should the structure become threatened from erosion. (6) In order to protect water quality in Bogue Sound, no runoff shall be allowed to enter DOT's roadside ditch system in response to a storm event of less than a 2 year intensity. The revised stormwater plan, dated 6/19/87 has been approved by the Division of Environmental Management, DNRCD, to meet this requirement and compliance with all aspects of that plan is hereby made a condition of this permit. NOTE: Revegetation of any bare sand areas around the walkways should be initiated during the next growing season to reduce erosion. NOTE: In order to protect hatchling sea turtles, all lights on the building face, including balcony lights on the ocean side of all structures should be eliminated. Where ocean side lighting is required, alternatives include shading, screening, or replacing fixtures with modern alternative light: sources. Parking lots, streets, tennis courts, walkways, dune crossovers, pools, and other areas requiring lights should be illuminated with l?', > fixtures located close to the ground to minimize casting direct lil.g on the beach and dunes. NOTE: An erosion and sedimentation control plan will be required for this project. This plan must be filed at least thirty (30) days prior to beginning any land disturbing activities. This plan should be submitted to the Department of Natural Resources and Community Development, Land Quality ` Section, 7225 Wrightsville Avenue, Wilmington, NC 28403. Permit Class Permit Number New STATE OF NORTH CAROLINA _ 135-87 Department of Natural Resources-and Community Development Coastal Resources Commission 4L 77- for ® Major. Development in ari Are4 Hof Environmental Concern ;pursuant-to.NQUS ;k,"I3AAA Excavation andlor-filling pursuant to NCGS 113-229 Issued to Atlantic Beach Associates, dba/Holiday inn, Atlantic Beach, NC 28512 authorizing development in Carteret County at the Atlantic Ocean Pine Knoll Shores . as requested in the permittee's application dated 3/31/87 including attached plat, 1, force main detail dated received 5/1/87 and bluelines 4, dated 4/20/87. This permit, issued on 1/ is subject to compliance with the application (where consistent with the permit), all applrcab a regulations, special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine; imprisonment or civil action; or may cause the permit to be null and void. (1) All work will take place in accordance with the work plat drawings and must conform with the local, state and federal building' code requirements. r' (2) The foundation pilings of the structure must be located landward of the first line of stable natural vegetation a distance of 120', This must be established by DCM representatives from the Morehead Regional Office immediately prior to any 'structural piling placement. The line must be re-established if construction is not initiated within 60 days and/or if there is a major shoreline change prior to construction beginning. (3) All construction must comply with building requirements in Chapter 34, Volume 1 and/or Section 39, Volume 1B of the Building Code. (4) All foundations and structures must be designed to be stable during applicable fluctuations in ground elevation and wave force during a 100 year storm. (5) In accordance with 15 NCAC 7H. 0308(a) , no seawall, bulkhead, ri prap revetments (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1990 Signed by the authority of the Secretary of DNRCD and the Chairman of the Coastal Resources Commission. David W. Owens, Director Division of Coastal Management This permit and its conditions are hereby accepted. In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee ?-?e, „? Y,y 'F ?? f ??,yC? ?'d?}?: ?`. ?4ni• ( ??' ,r3: t' ;: Y C. ?? " `??{'? Ci ?. T. 4? fa ?,