HomeMy WebLinkAboutWQ0014391_Final Permit_19971231State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
A. Preston Howard, Jr., P.E., Director
Mr. J. D. Goldston, III
Goldston-Apex Properties, LLC
4900 Highway 98 West
Wake Forest, North Carolina 27587
Dear Mr. Goldston:
A&44 V*
[D E N R
December 31, 1997
Subject: Permit No. WQ0014391
Goldston-Apex Properties, LLC
Goldston's Building Supply
Wastewater Drip Irrigation
Chatham County
In accordance with your modification request received December 22, 1997, we are forwarding
herewith Permit No. WQ0014391, dated December 31, 1997, to Goldston-Apex Properties, LLC, for the
construction and operation of the subject wastewater treatment and drip irrigation facilities. This permit
modification is to change the buffers originally specified to those applicable for drip irrigation sites.
This permit shall be effective from the date of issuance until November 30, 2002, shall hereby void
Permit No. WQ0014391, issued December 10, 1997, and shall be subject to the conditions and limitations
as specified therein. Please pay particular attention to the monitoring requirements in this permit. Failure
to establish an adequate system for collecting and maintaining the required operational information will
result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of
this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the
North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer
27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding.
One set of approved plans and specifications is being forwarded to you. If you need additional
information concerning this matter, please contact Rick Moore at (919) 7 � 5083 extension 527.
cere / 7
Preston Howard, Jr., P.E.
cc: Chatham County Health Department
Diehl and Phillips, PA; Mr. John Phillips, P.E.
Raleigh Regional Office, Water Quality Section
Raleigh Regional Office, Groundwater Section
Bob Cheek, Groundwater Section, Central Office
Technical Assistance and Certification Unit
Non -Discharge Compliance/Enforcement Unit
P.O. Box 29535, Raleigh, forth Carolina 27626-0535 • Telephone (919) 733-5083 FAX (919) 733-0719
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
RALEIGH
DRIP IRRIGATION SYSTEM PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Goldston-Apex Properties, LLC
Chatham County
FOR THE
construction and operation of a 2,500 GPD drip irrigation treatment and disposal facility consisting of a
3,000 gallon septic tank, a 2,000 gallon recirculation pump tank with dual 50 GPM pumps, an 800 ft2
recirculating sand filter, tablet chlorinator, a 300 gallon chlorine contact tank, a 339,400 gallon lined
storage lagoon, an irrigation pump station with dual 31 GPM pumps, and 22,080 linear feet of drip
irrigation lines (66,240 ft2 drip area) to serve Goldston's Building Supply with no discharge of wastes to
the surface waters, pursuant to the application received September 5, 1997, and in conformity with the
project plan, specifications, and other supporting data subsequently filed and approved by the Department
of Environment and Natural Resources and considered a part of this permit.
This permit shall be effective from the date of issuance until November 30, 2002, shall hereby void
Permit No. WQ0014391, issued December 10, 1997, and shall be subject to the following specified
conditions and limitations:
I. PERFORMANCE STANDARDS
1. Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a professional engineer certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting materials. Mail the Certification to the Non -Discharge
Permitting Unit, P.O. Box 29535, Raleigh, NC 27626-0535.
2. The Raleigh Regional Office, telephone number (919) 571-4700, shall be notified at least
forty-eight (48) hours in advance of operation of the installed facilities so that an in -place
inspection can be made. Such notification to the regional supervisor shall be made during
the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday,
excluding State Holidays.
3. The drip irrigation facilities shall be effectively maintained and operated at all times so that
there is no discharge to the surface waters, nor any contamination of ground waters which
will render them unsatisfactory for normal use. In the event that the facilities fail to
perform satisfactorily, including the creation of nuisance conditions or failure of the
irrigation area to adequately assimilate the wastewater, the Permittee shall take immediate
corrective actions including those actions that may be required by the Division of Water
Quality (Division), such as the construction of additional or replacement wastewater
treatment and disposal facilities.
4. The issuance of this permit shall not relieve the Permittee of the responsibility for damages
to surface or groundwaters resulting from the operation of this facility.
5. The residuals generated from these treatment facilities must be disposed in accordance with
General Statute 143-215.1 and in a manner approved by the Division.
6. Diversion or bypassing of the untreated wastewater from the treatment facilities is
prohibited.
7. The following buffers shall be maintained:
a) 100 feet between wetted area and any residence or places of public assembly under
separate ownership,
b) 50 feet between wetted area and property lines,
c) 100 feet between wetted area and wells,
d) 50 feet between wetted area and drainageways or surface water bodies,
c) 50 feet between wetted area and public right of ways,
f) 100 feet between wastewater treatment units and wells, and
g) 50 feet between wastewater treatment units and property lines.
8. A leakage test shall be performed on the septic tank, recirculation pump tank and irrigation
pump tank to insure that any exfiltration occurs at a rate which does not exceed twenty (20)
gallons per twenty-four (24) hours per 1,000 gallons of tank capacity. The engineer's
certification will serve as proof of compliance with this condition.
II. OPERATION AND MAINTENANCE REQUIREMENTS
1, The facilities shall be properly maintained and operated at all times. -
2. Upon classification of the facility by the Water Pollution Control System Operators
Certification Commission (WPCSOCC), the Permittee shall employ a certified wastewater
treatment plant operator to be in responsible charge (ORC) of the wastewater treatment
facilities. The operator must hold a certificate of the type and grade at least equivalent to or
greater than the classification assigned to the wastewater treatment facilities by the
WPCSOCC. The Permittee must also employ a certified back-up operator of the
appropriate type and grade to comply with the conditions of 15A NCAC 8A A202. The
ORC of the facility must visit each Class I facility at least weekly and each Class II, 111, and
IV facility at least daily, excluding weekends and holidays, and must properly manage and
document daily operation and maintenance of the facility and must comply with all other
conditions of 15A NCAC 8A .0202. Once the facility is classified, the Permittee must
submit a letter to the WPCSOCC which designates the operator in responsible charge
within thirty days after the wastewater treatment facilities are 50% complete.
3. A suitable vegetative cover shall be maintained.
4. Irrigation shall not be performed during inclement weather or when the ground is in a
condition that will cause runoff.
5. Adequate measures shall be taken to prevent wastewater runoff from the drip field.
6. The facilities shall be effectively maintained and operated as a non -discharge system to
prevent the discharge of any wastewater resulting from the operation of this facility.
7. The application rate shall not exceed a cumulative loading of 22.48 inches over any twelve
(12) month period at an instantaneous application rate not to exceed 0.4 inches per hour.
8. No type of wastewater other than that from Goldston's Building Supply shall be disposed
of on the drip irrigation area.
9. No traffic or equipment shall be allowed on the disposal area except while installation
occurs or while normal maintenance is being performed.
10. Public access to the land application sites shall be controlled during active site use. Such
controls may include the posting of signs showing the activities being conducted at each site.
11. Freeboard in the storage lagoon shall not be less than two feet at any time.
III. MONITORING AND REPORTING REQUIREMENTS
Any monitoring (including groundwater, surface water, soil or plant tissue analyses)
deemed necessary by the Division to insure surface and ground water protection will be
established and an acceptable sampling reporting schedule shall be followed.
2. Adequate records shall be maintained by the Permittee tracking the amount of wastewater
disposed. These records shall include, but are not necessarily limited to, the following
information:
a_ date of irrigation,
b. volume of wastewater irrigated,
c. field irrigated,
d. length of time field is irrigated,
e. continuous weekly, monthly, and year-to-date hydraulic (inches/acre) loadings for each
field,
f. weather conditions, and
g. maintenance of cover crops.
3. The effluent from the subject facilities shall be monitored by the Permittee at the point prior
to irrigation every March, July and November for the following parameters:
BOD5 TSS
Fecal Coliform pH
NH3 as N
4. Three (3) copies of all operation and disposal records (as specified in condition III 2) on
Form NDAR-1 shall be submitted on or before the last day of the following month. Three
(3) copies of all effluent monitoring data (as specified in condition 1113) on Form NDMR-1
shall be submitted on or before the last day of April, August and December. All
information shall be submitted to the following address:
NC Division of Water Quality
Water Quality Section
Non -Discharge Compliance/Enforcement Unit
Post Office Box 29535
Raleigh, North Carolina 27626-0535
5. A representative annual soils analysis (Standard Soil Fertility Analysis) shall be conducted
on each drip field and the results maintained on.file by the Permittee for a minimum of five
years. The Standard Soil Fertility Analysis shall include, but is not necessarily limited to,
the following parameters:
Acidity Manganese Potassium
Calcium Percent Humic Matter Sodium
Copper pH Zinc
Magnesium Phosphorus
Cation Exchange Capacity Base Saturation (by calculation)
6. Noncompliance Notification:
The Permittee shall report by telephone to the Raleigh Regional Office, telephone number
(919) 571-4700, as soon as possible, but in no rcase more than 24 hours or on the next
working day following the occurrence or first knowledge of the occurrence of any of the
following:
a. Any occurrence at the wastewater treatment facility which results in the treatment of
significant amounts of wastes which are abnormal in quantity or characteristic, such as
the dumping of the contents of a sludge digester, the known passage of a slug of
hazardous substance through the facility, or any other unusual circumstances;
b. Any process unit failure, due'to known or unknown reasons, that renders the facility
incapable of adequate wastewater treatment, such as mechanical or electrical failures of
pumps, aerators, compressors, etc.;
c. Any failure of a pumping station, sewer line, or treatment facility resulting in a by-pass
directly to receiving waters without treatment of all or any portion of the influent to
such station or facility; or
d. Any time that self -monitoring information indicates that the facility has gone out of
compliance with its permit limitations.
Persons reporting such occurrences by telephone shall also file a written report in letter
form within five (5) days following first knowledge of the occurrence. This report must
outline the actions taken or proposed to be taken to ensure that the problem does not recur.
IV. GROUNDWATER REQUIREMENTS
I. The interior surfaces of the lagoon shall be completely lined with a 30 mil thick liner.
Following installation and inspection of the lagoon liner, and prior to waste disposal
operations, certification of the liner's compliance with approved construction specifications
and the liner's integrity must be provided to the Groundwater Section, Permits and
Compliance unit, P.O. Box 29578 Raleigh, N.C. 27626-0578, by the project engineer.
2. The COMPLIANCE BOUNDARY for the disposal system is specified by regulations in
15A NCAC 2L, Groundwater Classifications and Standards. The Compliance Boundary is
for the disposal system constructed after December 31, 1983 is established at either (1) 250
feet from the waste disposal area, or (2) 50 feet within the property boundary, whichever is
closest to the waste disposal area. An exceedance of Groundwater Quality Standards at or
beyond the Compliance Boundary is subject to immediate remediation action in addition to
the penalty provisions applicable under General Statute 143-215.6A(a)(1).
In accordance with 15A NCAC 2L, a REVIEW BOUNDARY is established around the
disposal systems midway between the Compliance Boundary and the perimeter of the
waste disposal area. Any exceedance of standards at the Review Boundary shall require
remediation action on the part of the permittee.
3. Any additional groundwater quality monitoring, as deemed necessary by the Division, shall
be provided.
V . INSPECTIONS
1. Adequate inspection, maintenance, and cleaning shall be provided by the Permittee to
insure proper operation of the subject facilities.
2. The Permittee or his designee shall inspect the wastewater treatment and disposal facilities
to prevent malfunctions and deterioration, operator errors and discharges which may cause
or lead to the release of wastes to the environment, a threat to human health, or a nuisance.
The Permittee shall keep an inspection log or summary including at least the date and time
of inspection, observations made, and any maintenance, repairs, or corrective actions taken
by the Permittee. This log of inspections shall be maintained by the Permittee for a period
of three years from the date of the inspection and shall be made available upon request to
the Division or other permitting authority.
3. Any duly authorized officer, employee, or representative of the Division may, upon
presentation of credentials, enter and inspect any property, premises or place on or related
to the disposal site or facility at any reasonable time for the purpose of determining
compliance with this permit, may inspect or copy any records that must be maintained
under the terms and conditions of this permit, and may obtain samples of groundwater,
surface water, or leachate.
4
VI. GENERAL CONDITIONS
1. This permit shall become voidable unless the facilities are constructed in accordance with
the conditions of this permit, the approved plans and specifications, and other supporting
data.
2. This permit is effective only with respect to the nature and volume of wastes described in
the application and other supporting data.
3. This permit is not transferable. In the event there is a desire for the facilities to change
ownership, or there is a name change of the Permittee, a formal permit request must be
submitted to the Division accompanied by an application fee, documentation from the
parties involved, and other supporting materials as may be appropriate. The approval of
this request will be considered on its merits and may or may not be approved.
4. Failure to abide by the conditions and limitations contained in this permit may subject the
Permittee to an enforcement action by the Division in accordance with North Carolina
General Statute 143-215.6A to 143-215.6C.
5. The issuance of this permit does not preclude the Permittee from complying with any and
all statutes, rules, regulations, or ordinances which may be imposed by other government
agencies (local, state, and federal) which have jurisdiction.
6. A set of approved plans and specifications for the subject project must be retained by the
Permittee for the life of the project.
7. The annual administering and compliance fee must be paid by the Permittee within thirty
(30) days after being billed by the Division. Failure to pay the fee accordingly may cause
the Division to initiate action to revolve this permit as specified by 15A NCAC 2H .0205
(c)(4).
8. The Permittee, at least six (6) months prior to the expiration of this permit, shall request its
extension. Upon receipt of the request, the Commission will review the adequacy of the
facilities described therein, and if warranted, will extend the permit for such period of time
and under such conditions and limitations as it may deem appropriate.
Permit issued this the thirty-first day of December, 1997.
A
NORTH C OLINE iRQ s AL MANAGEMENT COMM1SS10N
A. Preston Howard, Jr., P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number WQ0014391
Permit No. WQ0014391
December 31, 1997
ENGINEER'S CERTIFICATION
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the
project,
Project Name
Location
for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation
of the construction such that the construction was observed to be built within substantial compliance and
intent of this permit, the approved plans and specifications, and other supporting materials.
Signature
Date
Registration No.