Loading...
HomeMy WebLinkAboutWQ0014391_Final Permit_20161102Water Resources ENVIRONMENTAL QUALITY PAT MCCRORY Govemor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director November 2, 2016 BOB KELLINGTON — REGIONAL MARKET MANAGER BUILDERS FIRSTSOURCE — RALEIGH, LLC 23 RED CEDAR WAY APEX, NORTH CAROLINA 27523 Dear Mr. Kellington: Subject: Permit No. WQ0014391 Builders FirstSource — Apex Yard WWTF Wastewater Irrigation System Chatham County In accordance with your permit major modification request received May 10, 2016, and subsequent additional information received August 12, 2016 and November 1, 2016, we are forwarding herewith Permit No. WQ0014391 dated November 2, 2016, to Builders FirstSource — Raleigh, LLC for the continued operation of the subject wastewater treatment and irrigation facilities. The modifications to the subject permit are as follows: • Increasing the flow from 2,500 gallons per day (GPD) to 3,750 GPD based on a five day work week. • Increasing the net acreage from 1.52 acres to 3.6 acres by adding new zones 02-1A, 02-2A, 02- 3A, 024A, 02-113, 02-213, 02-313, and 024B. • Changing the names of existing fields 01, 02, 03, and 04 to 01-1 A, 01-2A, 01-3A, 01-4A, 01- 1B, 01-213, 01-3B, and 01-413. Replacing the existing recirculating gravel filter and irrigation system by converting the existing 2,000 gallon pump tank to the second septic tank, adding a 3,000 gallon recirculation tank, 3,000 gallon dosing tank, four E-Z Treat treatment pods, and an ultraviolet disinfection unit. Please note the Permittee has been changed from Goldston Apex Properties, LLC to Builders FirstSource — Raleigh, LLC, and the lease agreement between Goldston Apex Properties, LLC and Builders FirstSource — Raleigh, LLC has been attached to this permit. This permit shall be effective from the date of issuance until October 31, 2021, shall void Permit No. WQ0014391 issued May 2, 2008, and shall be subject to the conditions and limitations as specified therein. Please pay particular attention to the monitoring requirements listed in Attachments A and B for they may differ from the previous permit issuance. Failure to establish an adequate system for collecting and maintaining the required operational information shall result in future compliance problems. State of North Carolina I Environmental Quality I Water Resources I Water Quality Permitting I Non -Discharge Permitting 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919 807 6464 Mr. Bob Kellington November 2, 2016 Page 2 of 3 Please note the following permit conditions have been removed since the last permit issuance dated May 2, 2008: ➢ Old Condition 11.3. — This condition has been removed because there are no groundwater monitoring wells associated with this facility. ➢ Old Condition I11.16. — This condition has been removed because the facility will no longer have a recirculating sand filter upon construction of the modified permitted facilities. Please note the following permit conditions are new since the last permit issuance dated May 8, 2008: Condition I.1. — This condition requires the Permittee the submit an Engineering Certification upon completion of construction of the modified permitted facilities. ➢ Condition I.2. — This condition requires the Permittee to contact the Raleigh Regional Office for a start-up inspection of the modified permitted facilities. ➢ Condition IL 5. — This condition requires that the irrigation system be connected to a rain sensor. Condition II.10. — This condition requires that the Permittee shall ensure any landowner who is not the Permittee and owns land within the compliance boundary shall execute and file with the Chatham County Register of Deeds. ➢ Condition 11.11.c. — This condition includes the required setbacks for the new irrigation zones. ➢ Condition II.I Ld. — This condition includes the required setbacks for the new wastewater treatment facilities. ie Condition VIX — This condition states that this permit is subject to revocation or unilateral modification upon 60 days' notice from the Division Director. i> Condition VI.9. — This condition explains that unless the Division Director grants a variance, expansion of the permitted facilities contained herein shall not be granted if the Permittee exemplifies any of the criteria in 15A NCAC 02T .0120(b). ➢ Attachment A — This attachment has been modified to include two Points Prior to Irrigation (PPIs). PPI 001 has been modified to include Total Residual Chlorine (50060) and Total Nitrogen (00600). PPI 001 shall be sampled under the permitted modifications have been constructed and an Engineering Certification submitted. PPI 002 is new to the permit and includes effluent limits for Ammonia, BODs, Fecal Coliform, and Total Suspended Solids. The flow limit has also been increased to 3,750 GPD. PPI 002 shall become effective after the permitted modifications have been constructed and an Engineering Certification submitted. y Attachment B —This attachment has been modified to include zones 02-1A through 02-413. If any parts, requirements or limitations contained in this permit are unacceptable, the Permittee has the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request shall be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings at 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. Mr. Bob Kellington November 2, 2016 Page 3 of 3 One set of approved plans and specifications is being forwarded to you. If you need additional information concerning this permit, please contact Alice M. Wessner at (919) 807-6425 or alice.wessner@ncdenr.gov. Sincerely, �1 S. Jay Zimmerman, P.G., Director d Division of Water Resources cc: Chatham County Health Department, Anne Lowry, REHS, Environmental Health Director, anne.lowr Qohathamnc.org (Electronic Copy) Raleigh Regional Office, Water Quality Regional Operations Section (Electronic Copy) Gary MacConnell, PE — MacConnell & Associates, PC gsmmacassoc9bellsouth.net (Electronic Copy) Beth Buffington — Protection and Enforcement Branch (Electronic Copy) Digital Permit Archive (Electronic Copy) Central Files THIS PAGE BLANK NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY RALEIGH WASTEWATER IRRIGATION SYSTEM PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Builders FirstSource — Raleigh, LLC Chatham County FOR THE operation of an existing 2,500 gallon per day (GPD) wastewater treatment and irrigation facility to be expanded to a 3,750 GPD (150 employees at 25 GPD based on a five day work week) facility consisting of the: continued operation of: a 3,000 gallon septic tank; a 299,000 gallon synthetically lined storage pond; an irrigation pump station with two 31 GPM pumps and an effluent flow meter; a 3.6 acre drip irrigation area consisting of two zones (Zone 1- 01-IA through 01-413 and Zone 2-02-1A through 02-413); and all associated piping, valves, controls and appurtenances; the continued operation and subsequent abandonment of: two 50 GPM pumps currently housed in the 2,000 gallon pump tank that is to be converted into a 2,000 gallon septic tank; an 800 square foot (ftz) recirculating sand filter; a flow splitter; a tablet chlorinator; a 3 00 gallon chlorine contact tank; and all associated piping, valves, controls and appurtenances; the continued operation and subsequent conversion of: a 2,000 gallon pump tank to a 2,000 gallon septic tank with an effluent filter; and all associated piping, valves, controls and appurtenances; and the construction and operation of a 3,000 gallon pump tank; a 3,000 gallon dosing tank with two 29 GPM pumps; an indexing valves; four EZ Treat Model 1200 recirculating media filter pods; an ultraviolet (UV) disinfection unit; an additional 2.07 acres of irrigation area (increasing the total acreage to 3.6) consisting of eight zones (i.e., Zones 02-01A through 02-04B); and all associated piping, valves, controls and appurtenances to serve the Builders FirstSource — Apex Yard WWTF, with no discharge of wastes to surface waters, pursuant to the application received May 10, 2016, and subsequent additional information received by the Division of Water Resources, and in conformity with the project plans, specifications, and other supporting data subsequently fled and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until October 31, 2021, shall void Permit No. WQ0014391 issued May 2, 2008, and shall be subject to the following specified conditions and limitations: WQ0014391 Version 4.0 Shell Version 151201 Page 1 of 10 I. SCHEDULES 1. Upon completion of construction and prior to operation of the modified permitted facility, a certification (attached) shall be submitted from a licensed North Carolina Professional Engineer certifying that the modified permitted facility has been installed in accordance with this permit, Division approved plans and specifications, and other supporting documentation, including the location of all monitoring wells as applicable. If this project is to be completed in phases and partially certified, the Permittee shall retain the responsibility to track further construction approved under the same permit, and shall provide a final certificate of completion once the entire Rroiect has been completed. Mail the Certification to the Division of Water Resources, Water Quality Permitting Section, 1617 Mail Service Center, Raleigh, NC 27699-1617. [15A NCAC 02T .0116(a)] 2. The Raleigh Regional Office, telephone number (919) 791-4200, shall be notified at least 48 hours in advance (excluding weekends and holidays) of operation of the installed facilities such that an in -place inspection can be made. Notification to the regional supervisor shall be made from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. [15A NCAC 02T .0108(b)(2)] 3. No later than six months prior to the expiration of this permit, the Permittee shall request renewal of this permit on official Division forms. Upon receipt of the request, the Division will review the adequacy of the facilities described therein, and if warranted, will renew the permit for such period of time and under such conditions and limitations as it may deem appropriate. Please note Rule 15A NCAC 02T .0105(d) requires an updated site map to be submitted with the permit renewal application. [15A NCAC 02T .0105(d)] II. PERFORMANCE STANDARDS The subject non -discharge facilities shall be effectively maintained and operated at all times so there is no discharge to surface waters, nor any contravention of groundwater or surface water standards. In the event the facilities fail to perform satisfactorily, including the creation of nuisance conditions due to improper operation and maintenance, or failure of the irrigation areas to adequately assimilate the effluent, the Permittee shall take immediate corrective actions including Division required actions, such as the construction of additional or replacement wastewater treatment or irrigation facilities. [G.S. 143- 215.1, 143-213.3(a)] 2. This permit shall not relieve the Permittee of their responsibility for damages to groundwater or surface water resulting from the operation of this facility. [15A NCAC 02B .0200, 02L .0100] 3. Effluent quality shall not exceed the limitations specified in Attachment A. [15A NCAC 02T .0108(b)(1), 02T .0505(b)] 4. Application rates, whether hydraulic, nutrient or other pollutant, shall not exceed those specified in Attachment B. [15A NCAC 02T .0505(c)] 5. The irrigation system shall be connected to a rain or moisture sensor, which shall indicate when effluent application is not appropriate in accordance with Conditions 111.4. and 1II,5, of this permit. [15ANCAC 02T .0108(b)(1)] 6. This disposal system was individually permitted on or after December 30, 1983; therefore, the compliance boundary is established at either 250 feet from the effluent disposal area, or 50 feet within the property boundary, whichever is closest to the effluent disposal area. An exceedance of groundwater standards at or beyond the compliance boundary is subject to remediation action according to 15A NCAC 02L .0106(d)(2) as well as enforcement actions in accordance with North Carolina General Statute 143-215.6A through 143-215.6C. [I5A NCAC 02L .0106(d)(2), 02L .0107(b)] WQ0014391 Version 4.0 Shell Version 151201 Page 2 of 10 7. In accordance with 15A NCAC 02L .0108, the review boundary is established midway between the compliance boundary and the effluent disposal area. Any exceedance of groundwater standards at the review boundary shall require action in accordance with 15A NCAC 02L .0106. [15A NCAC 02L .0106, 02L .0108] 8. The Permittee shall apply for a permit modification to establish a new compliance boundary prior to any sale or transfer of property affecting a compliance boundary. [15A NCAC 02L .0107(c)] 9. In accordance with 15A NCAC 02L .0107(d), no wells, excluding Division approved monitoring wells, shall be constructed within the compliance boundary except as provided for in 15A NCAC 02L .0107(g). [15A NCAC 02L .0107] 10. Except as provided for in 15A NCAC 02L .0107(g), the Permittee shall ensure any landowner who is not the Permittee and owns land within the compliance boundary shall execute and file with the Chatham County Register of Deeds an easement running with the land containing the following items: a. A notice of the permit and number or other description as allowed in 15A NCAC 02L .0107(f)(1); b. Prohibits construction and operation of water supply wells within the compliance boundary; and c. Reserves the right of the Permittee or the State to enter the property within the compliance boundary for purposes related to the permit. The Director may terminate the easement when its purpose has been fulfilled or is no longer needed. [15A NCAC 02L .0107(f)] 11. The facilities permitted herein must be constructed according to the following setbacks: The setbacks for irrigation sites permitted under 15A NCAC 02H .0200 (i.e., Zones 01-IA through 01413) shall be as follows (all distances in feet): i. Any habitable residence or place of public assembly under separate ownership: 100 ii. Surface waters: 50 iii. Any well with exception of monitoring wells: 100 iv. Any property line: 50 v. Public right of way: 50 [15A NCAC 02H .02190)] b. The setbacks for storage and treatment units permitted under 15A NCAC 02H .0200 (i.e., the 3,000 gallon septic tank; the 2,000 gallon pump tank to be converted to a 2,000 gallon septic tank; the 299,000 gallon synthetically lined storage pond; and the irrigation pump station) shall be as follows (all distances in feet): Any well with exception of monitoring wells: ii. Any property line: [15A NCAC 02H .02190)] 100 50 WQ0014391 Version 4.0 Shell Version 151201 Page 3 of 10 c. The setbacks for irrigation sites permitted under 15A NCAC 02T .0500 (i.e., Zones 02-1A through 024B) shall be as follows (all distances in feet): i. Any habitable residence or place of public assembly under separate ownership: 100 ii. Any habitable residence or place of public assembly owned by the Permittee: 15 iii. Any private or public water supply source: 100 iv. Surface waters: 100 v. Groundwater lowering ditches: 100 vi. Surface water diversions: 25 vii. Any well with exception of monitoring wells: 100 viii. Any property line: 50 ix. Top of slope of embankments or cuts of two feet or more in vertical height: 15 x. Any water line from a disposal system: 10 xi. Subsurface groundwater lowering drainage systems: 100 xii. Any swimming pool: 100 xiii. Public right of way: 50 xiv. Nitrification field: 20 xv. Any building foundation or basement: 15 [5A NCAC 02T .0506(a)] d. The setbacks for storage and treatment units permitted under 15A NCAC 02T .0500 (i.e., the 3,000 gallon pump tank; the 3,000 gallon dosing tank; and the four EZ treat pods) shall be as follows (all distances in feet): i. Any habitable residence or place of public assembly under separate ownership: 100 ii. Any private or public water supply source: 100 iii. Surface waters: 50 iv. Any well with exception of monitoring wells: 100 v. Any property line: 50 [15A NCAC 02T .0506(b)] III. OPERATION AND MAINTENANCE REQUIREMENTS 1. The facilities shall be properly maintained and operated at all times. The facilities shall be effectively maintained and operated as a non -discharge system to prevent the discharge of any wastewater resulting from the operation of this facility. The Permittee shall maintain an Operation and Maintenance Plan, which at a minimum shall include operational functions, maintenance schedules, safety measures and a spill response plan. [ 15A NCAC 02T .0507] 2. Upon the Water Pollution Control System Operators Certification Commission's (WPCSOCC) classification of the subject non -discharge facilities, in accordance with 15A NCAC 08G .0200 the Permittee shall designate and employ a certified operator in responsible charge (ORC) and one or more certified operator(s) as back-up ORC(s). The ORC or their back-up shall visit the facilities in accordance with 15A NCAC 08G .0200, and shall comply with all other conditions specified in the previously cited rules. [15A NCAC 02T .0117] 3. A suitable year round vegetative cover shall be maintained at all times, such that crop health is optimized, allows for even distribution of effluent and allows inspection of the irrigation system. [15A NCAC 02T .0108(b)(1)] WQ0014391 Version 4.0 Shell Version 151201 Page 4 of 10 4. Adequate measures shall be taken to prevent effluent ponding in or runoff from the irrigation sites listed in Attachment B. [15A NCAC 02T .0108(b)(1)] 5. Irrigation shall not be performed during inclement weather or when the ground is in a condition that will cause ponding or runoff. [15A NCAC 02T .0108(b)(1)] 6. All irrigation equipment shall be tested and calibrated at least once per permit cycle. Calibration records shall be maintained at the facility for a period of no less than five years, and shall be made available to the Division upon request. [ i. 5A NCAC 02T .0108(b)(1)] 7. Only effluent from Builders FirstSource — Apex Yard WWTF shall be irrigated on the sites listed in Attachment B. [G.S. 143-215.1 ] 8. No automobiles or machinery shall be allowed on the irrigation sites except during equipment installation or while maintenance is being performed. [15A NCAC 02T ,0108(b)(1)] 9. Public access to the irrigation sites and wastewater treatment facilities shall be prohibited. [ 15A NCAC 02T .0505(q)] 10. The residuals generated from the wastewater treatment facilities shall be disposed or utilized in accordance with 15A NCAC 02T .1100. The Permittee shall maintain a residual management plan pursuant to 15A NCAC 02T .0508. [15A NCAC 02T .0508, 02T .1100] 11. Diversion or bypassing of untreated or partially treated wastewater from the treatment facilities is prohibited. [15ANCAC 02T .05050)] 12. Freeboard in the 299,000 gallon synthetically lined storage pond shall not be less than two feet at any time. [15A NCAC 02T .0505(d)] 13. A gauge to monitor waste levels in the 299,000 gallon synthetically lined storage pond shall be provided. This gauge shall have readily visible permanent markings, at inch or tenth of a foot increments, indicating the following elevations: maximum liquid level at the top of the temporary liquid storage volume; minimum liquid level at the bottom of the temporary liquid storage volume; and the lowest point on top of the dam. [ 15A NCAC 02T .0108(b)(1)] 14. A protective vegetative cover shall be established and maintained on all earthen embankments (i.e., outside toe of embankment to maximum allowable temporary storage elevation on the inside of the embankment), berms, pipe runs, erosion control areas, and surface water diversions. Trees, shrubs, and other woody vegetation shall not be allowed to grow on the earthen dikes or embankments. Earthen embankment areas shall be kept mowed or otherwise controlled and accessible. [15A NCAC 02T .0108(b)(1)] 15. The drip irrigation field shall be mowed (or vegetation cut in a manner to ensure that drip lines are not disturbed) regularly during the growing season (April 1 through October 31"). [15A NCAC 02T .0108(b)(1)] WQ0014391 Version 4.0 Shell Version 151201 Page 5 of 10 IV. MONITORING AND REPORTING REQUIREMENTS I . Any Division required monitoring (including groundwater, plant tissue, soil and surface water analyses) necessary to ensure groundwater and surface water protection shall be established, and an acceptable sampling reporting schedule shall be followed. [15A NCAC 02T A108(c)] 2. A Division certified laboratory shall conduct all laboratory analyses for the required effluent, groundwater or surface water parameters. [15A NCAC 02H .0800] 3. Flow through the treatment facility shall be continuously monitored, and daily average flow values shall be reported on Form NDMR. Flow may be estimated from water use records, provided the Permittee's water use is metered. Daily average flow values shall be calculated by dividing the monthly metered water usage by the number of days in the month. [15A NCAC 02T .0105(k), 02T .0108(c)] 4. The Permittee shall monitor the effluent from the subject facilities at the frequencies and locations for the parameters specified in Attachment A. [15A NCAC 02T .0108(c)] 5. The Permittee shall maintain adequate records tracking the amount of effluent irrigated. At a minimum, these records shall include the following information for each irrigation site listed in Attachment B: a. Date of irrigation; b. Volume of effluent irrigated; c. Site irrigated; d. Length of time site is irrigated; e. Continuous weekly, monthly, and year-to-date hydraulic (inches/acre) loadings; £ Continuous monthly and year-to-date loadings for any non -hydraulic parameter specifically limited in Attachment B; g. Weather conditions; and h. Maintenance of cover crops. [15A NCAC 02T ,0108(c)] 6. Freeboard (i.e., waste level to the lowest embankment elevation) in the storage lagoon shall be measured to the nearest inch or tenth of a foot, and recorded weekly. Weekly freeboard records shall be maintained at the facility for a period of no less than five years, and shall be made available to the Division upon request. [15A NCAC 02T .0108(c)] 7. Three copies of all monitoring data (as specified in Conditions IV.3. and IVA.) on Form NDMR for each PPI and three copies of all operation and disposal records (as specified in Conditions IV.5. and IV.6.) on Form NDAR-I for every site in Attachment B shall be submitted on or before the last day of the following month. If no activities occurred during the monitoring month, monitoring reports are still required documenting the absence of the activity. All information shall be submitted to the following address; Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 [ 15A NCAC 02T .0105(1)] WQ0014391 Version 4.0 Shell Version 151201 Page 6 of 10 A record shall be maintained of all residuals removed from this facility. This record shall be maintained at the facility for a period of no less than five years, and shall be made available to the Division upon request. At a minimum, this record shall include: a. Name of the residuals hauler; b. Non -Discharge permit number authorizing the residuals disposal, or a letter from a municipality agreeing to accept the residuals; c. Date the residuals were hauled; and d. Volume of residuals removed. [15A NCAC 02T .0108(b)(1)] 9. A maintenance log shall be maintained at this facility. This log shall be maintained at the facility for a period of no less than five years, and shall be made available to the Division upon request. At a minimum, this log shall include: a. Visual observations of the plant and plant site; and b. Record of preventative maintenance (e.g., changing of equipment, adjustments, testing, inspections and cleanings, etc.). [15ANCAC 02T .0 108(b)(1)] 10. An annual representative soils analysis (i.e., Standard Soil Fertility Analysis) shall be conducted on each irrigation site listed in Attachment B. These results shall be maintained at the facility for a period of no less than five years, and shall be made available to the Division upon request. At a minimum, the Standard Soil Fertility Analysis shall include the following parameters: Acidity Exchangeable Sodium Percentage Phosphorus Base Saturation (by calculation) Magnesium Potassium Calcium Manganese Sodium Cation Exchange Capacity Percent Humic Matter Zinc Copper pH [15A NCAC 02T .0108(c)] 11. Noncompliance Notification: The Permittee shall report by telephone to the Raleigh Regional Office, telephone number (919) 791- 4200, as soon as possible, but in no case more than 24 hours, or on the next working day following the occurrence or first knowledge of the occurrence of any of the following: a. Treatment of wastes abnormal in quantity or characteristic, including the known passage of a hazardous substance. b. Any process unit failure (e.g., mechanical, electrical, etc.), due to known or unknown reasons, rendering the facility incapable of adequate wastewater treatment. c. Any facility failure resulting in a by-pass directly to receiving surface waters. d. Any time self -monitoring indicates the facility has gone out of compliance with its permit limitations. e. Ponding in or runoff from the irrigation sites. Any emergency requiring immediate reporting (e.g., discharges to surface waters, imminent failure of a storage structure, etc.) outside normal business hours shall be reported to the Division's Emergency Response personnel at teIephone number (800) 662-7956, (800) 858-0365, or (919) 733-3300. Persons reporting such occurrences by telephone shall also file a written report in letter form within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to betaken to ensure the problem does not recur. [15A NCAC 02T .0105(1), 02T .0108(b)(1)] WQ0014391 Version 4.0 SheIl Version 151201 Page 7 of 10 V. INSPECTIONS 1. The Permittee shall provide adequate inspection and maintenance to ensure proper operation of the wastewater treatment and irrigation facilities. [15A NCAC 02T .0108(b)] 2. The Permittee or their designee shall inspect the wastewater treatment and irrigation facilities to prevent malfunctions, facility deterioration and operator errors resulting in discharges, which may cause the release of wastes to the environment, a threat to human health or a public nuisance. The Permittee shall maintain an inspection log that includes, at a minimum, the date and time of inspection, observations made, and any maintenance, repairs, or corrective actions taken. The Permittee shall maintain this inspection log for a period of five years from the date of the inspection, and this log shall be made available to the Division upon request. [15A NCAC 02T .0108(b)] 3. Any duly authorized Division representative may, upon presentation of credentials, enter and inspect any property, premises or place on or related to the wastewater treatment and irrigation facilities permitted herein at any reasonable time for the purpose of determining compliance with this permit; may inspect or copy any records required to be maintained under the terms and conditions ofthis permit, and may collect groundwater, surface water or leachate samples. [G.S. 143-21.5.3(a)(2)] VI. GENERAL CONDITIONS 1. Failure to comply with the conditions and limitations contained herein may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statutes 143-215.6A to 143-215.6C. [G.S. 143-215.6A to 143-215.6C] 2. This permit shall become voidable if the permitted facilities are not constructed in accordance with the conditions of this permit, the Division approved plans and specifications, and other supporting documentation. [ 15A NCAC 02T .0110] 3. This permit is effective only with respect to the nature and volume of wastes described in the permit application, Division approved plans and specifications, and other supporting documentation. No variances to applicable rules governing the construction or operation of the permitted facilities are granted, unless specifically requested and approved in this permit pursuant to 15A NCAC 02T .0I 05(n). [G.S. 143-21.5.1] 4. The issuance of this permit does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other jurisdictional government agencies (e.g., local, state, and federal). Of particular concern to the Division are applicable river buffer rules in 15A NCAC 02B .0200; erosion and sedimentation control requirements in 15A NCAC Chapter 4 and under General Permit NCGO10000; any requirements pertaining to wetlands under 15A NCAC 02B .0200 and 02H .0500; and documentation of compliance with Article 21 Part 6 of Chapter 143 of the General Statutes. [15A NCAC 02T .0105(c)(6)] 5. In the event the permitted facilities change ownership or the Permittee changes their name, a formal permit modification request shall be submitted to the Division. This request shall be made on official Division forms, and shall include appropriate property ownership documentation and other supporting documentation as necessary. The Permittee of record shall remain fully responsible for maintaining and operating the facilities permitted herein until a permit is issued to the new owner. [15A NCAC 02T .0104] 6. The Permittee shall retain a set of Division approved plans and specifications for the life of the facilities permitted herein. [15A NCAC 02T .0108(b)(1)] 7. The Permittee shall maintain this permit until all permitted facilities herein are properly closed or permitted under another permit issued by the appropriate permitting authority. [15A NCAC 02T .01050)] WQ0014391 Version 4.0 Shell Version 151201 Page 8 of 10 8. This permit is subject to revocation or unilateral modification upon 60 days' notice from the Division Director, in whole or part for the requirements listed in 15A NCAC 02T .0110. [ 15A NCAC 02T .0110] 9. UnIess the Division Director grants a variance, expansion of the permitted facilities contained herein shall not be granted if the Permittee exemplifies any of the criteria in 15A NCAC 02T .0120(b). [15A NCAC 02T .0120] 10. The Permittee shall pay the annual fee within 30 days after being billed by the Division. Failure to pay the annual fee accordingly shall be cause for the Division to revoke this permit. [I 5A NCAC 02T .0105(e)(3)] Permit issued this the 2"d day of November 2016 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ,rS. Jay Zimmerman, P.G., Director Division of Water Resources By Authority of the Environmental Management Commission Permit Number WQ0014391 WQ0014391 Version 4.0 Shell Version 151201 Page 9 of 10 Permit No. WQ0014391 Wastewater Irrigation System Builders FirstSource — Raleigh, LLC November 2, 2016 Builders FirstSource — Apex Yard W WTF Chatham County ENGINEERING CERTIFICATION ❑ Partial ❑ Final In accordance with 15A NCAC 02T .0116, I,_ _ , as a duly registered Professional Engineer in the State of North Carolina, having the Permittee's authorization to ❑ periodically ❑ weekly ❑ fully observe the construction of the permitted facility, hereby state to the best of my abilities that due care and diligence was used in the observation of the construction, such that the facility was built within substantial compliance and intent of this permit, the Division -approved plans and specifications, and other supporting documentation. ❑ Any variation to this permit, the Division -approved plans and specifications, and other supporting documentation has been documented in the attached as -built drawings, and shall serve as the Permittee's minor modification request to amend the permit accordingly. Provide a brief narrative description of any variations: THE COMPLETED ENGINEERING CERTIFICATION, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHALL BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES WATER QUALITY PERMITTING SECTION NON -DISCHARGE PERMITTING UNIT By U.S, Postal Service: By Courier/Special DeiivM: 1617 MAIL SERVICE CENTER 512 N. SALISBURY ST. RALEIGH, NORTH CAROLINA 27699-1617 RALEIGH, NORTH CAROLINA 27604 WQ0014391 Version 4.0 Shell Version 151201 Page 10 of 10 ATTACHMENT A — LIMITATIONS AND MONITORING REQUIREMENTS PPI 001— WWTF Effluent (Pre -Construction) Permit Number: WQ0014391 Version: 4.0 EFFLUENT CHARACTERISTICS EFFLUENT LIMITS MONITORING REQUIREMENTS PCs Code Parameter Description Units of Measure Monthly Average Monthly Geometric Mean Daily Minimum Daily Maximum Measurement Frequency Sample Type 00310 BOD, 5-Day (20 °C) mg/L 3 x Year Grab 50060 Chlorine, Total Residual mg/L Weekly Grab 31616 Coliform, Fecal MF, M-FC Broth, 44.5 °C #/100 mL 3 x Year Grab 50050 Flow, in Conduit or thru Treatment Plant GPD 2,500 -- — Monthly Estimate 00610 Nitrogen, Ammonia Total (as N) mg/L 3 x Year Grab 00625 Nitrogen, Kjeldahl, Total (as N) mg%L T — - 3 x Year Grab 00620 Nitrogen, Nitrate Total (as N) mg/1. 3 x Year Grab 00600 Nitrogen, Total (as N) mg/L 3 x Year Grab 00400 pH so Weekly Grab 00665 Phosphorus, Total (as P) mg/L 3 x Year Grab 00530 Solids, Total Suspended mg/L 3 x Year Grab 3 x year sampling shall be conducted during March, July and November. WQ0014391 Version 4.0 Attachment A Page 1 of 2 PPY 002 -- WWTF Effluent (Post -Construction) EFFLUENT CHARACTERISTICS EFFLUENT LIMITS MONITORING REQUIREMENTS PCs Code Parameter Description p Units of Measure Monthly Average Monthly Geometric Mean Daily Minimum Daily Maximum Measurement Frequency Sample Type 00310 ROD, 5-Day (20 °C) mg/L 30 200 — �Y 3 x Year Grab 31616 Coliform, Fecal MF, M-FC Broth, 44.5 °C #/100 mL 3 x Year Grab 50050 Flow, in Conduit or thru Treatment Plant GPD 3,7502 Monthly Estimate 00610 Nitrogen, Ammonia Total (as N) mg/L 15 3 x Year Grab 00625 Nitrogen, Kjeldahl, Total (as N) mg/L —_ _ - _ f 3 x Year Grab 00620 Nitrogen, Nitrate Total (as N) mg/L 3 x Year Grab 00600 Nitrogen, Total (as N) mg/L 3 x Year Grab 00400 pH su Weekly Grab 00665 Phosphorus, Total (as P) mg/L 3 x Year Grab 00530 Solids, Total Suspended mg/L 30 3 x Year Grab 1. 3 x year sampling shall be conducted during March, July and November. 2. The average daily flow of 3,750 GPD is based upon a five day work week. WQ0014391 Version 4.0 Attachment A Page 2 of 2 ATTACHMENT B - APPROVED LAND APPLICATION SITES AND LIMITATIONS Builders FirstSource - Raleigh, LLC Permit Number: WQ0014391 Version: 4.0 IRRIGATION AREA INFORMATION APPLICATION LIMITATIONS Field Owner Lessee County Latitude Longitude Net Dominant Parameter Hourly Yearly Units Acreage ,Soil Series Rate Max Goldston Apex Builders WhB - White Store-Polkton 01-1A Properties, LLC FirstSource - Chatham 35.7386030 -78.957513° 0.19 complex, 2 to 6 /o slopes 01284 - Non -Discharge Application Rate 0.4 22.48 inches Raleigh, LLC 01-1B Goldston Apex Builders FirstSource - Chatham 35.738409' -79.957513' 0.19 WhB Polkton 01284 -Non-Discharge Application Rate 0.4 22.48 inches Properties, LLC Raleigh, LLC plea, to 6% complex, 2 to 6 /o slopes Goldstonn Apex Builders WhB -White Store-Polkton 01-2A Properties, LLC FirstSource - Chatham 35.738203' -78.957513° 0.19 complex, 2 to 6% slopes 01284 -Non-Discharge Application Rate 0.4 22.48 inches Raleigh , alei h, LLC 01-2B Goldston Apex Builders FirstSource - Chatham 4 35.738109 -78.957513' 0.19 WhB --White Store-Polkton 01284 - Non -Discharge Application Rate 0.4 22.48 inches Properties, LLC Raleigh, LLC complex, 2 to 5% slopes Goldston Apex Builders WhB - White St Polkton 01-3A Properties, LLC FirstSource - Chatham 35.738009° 78.957513' 0.19 complex 2 to b%slopes 01284 - Non -Discharge Application Rate 0.4 22.48 inches Raleigh, LLC Goldston Apex Builders WhB - White Stare-Polkton 01-3B Properties, LLC FirstSource - Chatham 35.737797° -78.957513 ° 0.19 complex, 2 to 6% slopes 01284 - Non -Discharge Application Rate 0.4 22.48 inches Raleigh, LLC 01-4A Goldston Apex Builders FirstSource - Chatham 35.7376030 -78.9575130 0.19 WhB -White Store-Polkton 01284 - Non -Discharge Application Rate 0.4 22.48 inches Properties, LLC Raleigh, LLC complex, 2 to 6/o slopes Goldston Apex Builders WhB - White Store-Polkton 01-4B Properties, LLC F rstSource - Chatham 35.737403' -78.957513' 0.19 complex, 2 to 6% slopes 01284 - Non -Discharge Application Rate 0.4 22.48 inches Raleigh, LLC 02-1 A Goldston Apex Builders FirstSource - Chatham 35.739527' -78.957463' 0.18 WhB - White St Polkton 01284 - Non -Discharge Application Rate 0.2 18.11 inches Properties, LLC Raleigh, LLC complex, 2 to 6%slopes 02-113 Goldston Apex Builders FirstSource - Chatham 35.739517° -78.957737o 0.22 WhB -White Store-Polkton 01284 - Non -Discharge Application Rate 0.2 18.11 inches Properties, LLC Raleigh, LLC complex, 2 to 6% slopes Goldston Apex Builders WhB -White St 02-2A Properties, LLC FirstSource - Chatham 35.7395831 -78.9571871 0.28 ore-Polkton complex, 2 to 6% slopes 01284 - Non -Discharge Application Rate 0-2 18.11 inches Raleigh, LLC 02-2B Goldston Apex Builders FirstSource - Chatham 35.739139' -78.9571601 0.23 WhB -White Store-Polkton 01284 - Non -Discharge Application Rate 0.2 18.11 inches Properties, LLC Raleigh, LLC complex, 2 to 6% slopes 02-3A Goldston Apex Builders FirstSource -- Chatham 35.738999° -78.957460 ° 0.32 WhB - White Store-Polkton 01284 -Non-Discharge Application Rate 0.2 18.11 inches properties, LLC Raleigh, LLC complex, 2 to 6% slopes 02-3B Goldston Apex Properties, LLC Builders FirstSource - Chatham 35.7387570 -78.9571970 0.25 WhB -White Store -Polk -ton complex, 2 to 6% slopes 01284 - Non -Discharge Application Rate 0.2 18.11 inches Raleigh, LLC WQ0014391 Version 4.0 Attachment B Page 1 of 2 02-4A Goldston Apex p Properties LLC Builders FirstSource — Chatham 35,7389030 -78,9577640 0.28 WhB — White Stone-Polks --- 01284 Non -Discharge Application Bate 0.2 18.11 inches Raleigh, LLC complex 2 to 6 /o slopes 02-4B Goldston Apex Properties, LLC Builders FirstSource — Chatham 35.738699Q -78,957904 o 0.32 WhB — White Store-Polkton 2 0 01284 — Non -Discharge Application Rate 0.2 18.11 inches p Raleigh, LLC complex, to 6/o slopes Totals 3.6 1 1 t�l WQ0014391 Version 4.0 Attachment B Page 2 of 2 cxlsnu" DFudmy 70 BE CLOSED COSTING DRrVEWAV SED "Vr INC CR&L 41" PROPOSED DLOG. RETAMING MAUL ME VYSI DEI PROPOSED 6, CHIN UN FE4CE AROUND NARE PERIMETER -RETURN UN 01-01 r ELM D4TD AND ZONE ZONE 04-03 "-,ss -7' —iXwiw 2' 11 SUPP4y RETURN AND I W UNES SK R"CATE8 r ----------------------------- D1_135 BUILDERS lIkSTSOUNCE ZONEWETLANDS 'EMSMiG r SJPnY I R"N ONES„ 0, p4c To TREATWENT STCS'Em NOTES Dftlw 2.Cw GAIaN po TAM TO SE TO 5ECONOW CONVERTED SEF'11C TANK THE FUWS WILL BE . "CIRCULATION 7. AND AN EAROU..""E FILTER tAR MAIL70 XKg%A-300 BE INAM w apiL EFFUMINTTAIDN TANK END Or THE EWSTIW RECIRCUL FENf 2, SEE SHEET C­ 1 01 FOR GENREAL NOTM % LEGEND At.V�CENf BOUNDARY BOUNI)ARY Impp" OCKTDURS - ;N= FIELD 2 --- - - - - - - - - - - - - - - CONTOURS - INTERMEDIATE OIAN r= (SEPTIC) AREA INITIAL DRIP Upes - - - - - - - - - - - - - - - MANX LINIM (NO ENNTTERS� RK REM LIPS f RETURN MANIFOLD — — — — — — — — — — BUILDING SErEACH F"ff OF WAY SOB. 0"NG EM". STRFAM f WuppLy LINES Emm SUPPLY L"FDLD A SOLENOID VALVE SALL CHECK VALVE CD CLEAN 0Lrr CIP OONTROI_ PANE3, EZRT E-Z IWA7 RWRC. TAW 4 E-Z E-Z TREAT POD FILTER For FIELD DOSING TANK 37 SEPTIC TANK HU IN hyoRw= UNIT Wkwa= UNIT HE 01 7 T�IL- z GRAPH:C SCAL9; I!* 0 25 50 1100 1 1 FENCE I. NO.. IDATE FIELD 1 CAP By OTHERS RECEIVED '1777`10WR SEP Fle m n., GSM I QSM DRAVIN BY: CHECKED BY: AUGM 10. 2016 MacCONNELL & Associates, P. C. 903 NORTH HARRISON AVE., SUITE i III CARY, NORTH CAROLINA 27513 F. O. BOX 120 LICENSE MORFUSMLLE, NORTH rAROLINA 2766u NQ- C-1 am TEL:(919I4067.12.9 rAX7(919)3l9-6EI0 BUILDERS FIRST SOURCE WASTEWATER EXPANSION CHATHAM COUNTY, NC 12 PROPOSED SITE PLAN PROJECT l4lAiBER DRAWING NU14BE A .55301.00 C-102 R