Loading...
HomeMy WebLinkAboutWQ0013220_Final Permit_19961202State of North Carols, ,j Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary e�� DEHNR DIVISION OF WATER QUALITY -� December 2, 1996 Mr. Ralph Clark, Town Manager Town of Clayton Post Office Box 879 Clayton, N. C. 27520 Subject: Permit No. WQ0013220 Town of Clayton Walnut Creek Subdivision Wastewater Pump and Haul Johnston County Dear Mr. Clark: In accordance with the application received on December 2, 1996, we are forwarding herewith Permit No. WQ0013220, which is dated December 2, 1996, to the Town of Clayton for the operation of the subject wastewater pump and haul activities. This permit shall be effective from the date of issuance until January 31, 1997, and shall be subject to the conditions and limitations as specified therein. The Town of Clayton should be advised that the Division of Water Quality views this situation as one in which homes are being sold for occupation prior to an appropriate sewer collection system being operational. While the circumstances involved with pump and haul requests are evaluated on an individual basis, the Division typically reserves pump and haul permits of this type for cases of environmental emergencies; therefore, the Town of Clayton should not perceive the issuance of this permit as an acknowledgement that such future requests will be granted. Please pay particular attention to the monitoring requirements in this permit. Failure to establish an adequate system for collecting and maintaining the required operational information will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Box 27447, Raleigh, NC 27611-7447. Unless such demands are made, this permit shall be final and binding. 3800 Barrett Drive, Suite 101, w, FAX 919-571-4718 Raleigh, North Carolina 27609 Nif C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/10% post -consumer paper Mr. Ralph Clark December 2, 1996 Page 2 If you need additional information concerning this matter, please contact Mr. Randy Jones of the Division's Raleigh Regional Office at 919/571-4700. Sincerely, A. Preston oward, Jr., Director Division of Water Quality cc: Johnston County Health Department file:WQ13220.P&H NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES RALEIGH PUMP AND HAUL PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Town of Clayton Johnston County FOR THE operation of an approximately 720 GPD wastewater pump and haul activity which shall consist of the pumping and hauling of domestic wastewater from a maximum of two (2) homes in Walnut Creek subdivision to the Town of Clayton's WWTF; wastewater will be pumped from manhole #5 (which will be blocked), which is included in sewer collection system permit WQ0011959, which was issued on 2/26/96, and will be hauled either to the Town of Clayton's WWTF or to the pump station on Barbour Mill Road, with no discharge of wastes to the surface waters, pursuant to the application received on December 2, 1996, and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment, Health and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until January 31, 1997, and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the subject pump and haul activities are carried out in a manner which has been approved by this Division. 2. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. Page 1 WO0013220 (12/2/96) 3. The facilities shall be properly maintained and operated at all times. 4. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 5. No type of wastewater other than the domestic wastewater from the two (2) residences in Walnut Creek Subdivision shall be included in these pump and haul activities. 6. This permit shall become voidable unless the agreement between the Town of Clayton and Davis' Septic Tank Cleaning, for the collection, transportation, and ultimate disposal of the domestic wastewater is in full force and effect. 7. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall cease operation of all pump and haul activities and take such immediate corrective action as may be required by this Division. 8. The sewage and wastewater collected by this system shall be treated in the Town of Clayton's Wastewater Treatment Facility prior to being discharged into the receiving stream. 9. The Permittee is liable for any damages caused by a spill or failure of the pump and haul operations. 10. Adequate inspection, maintenance, and cleaning shall be provided by the Permittee to insure proper operation of the subject facilities. 11. The Permittee or his designee shall inspect the pump and haul collection facilities to prevent malfunctions and deterioration, operator errors, and discharges which may cause or lead to the release of wastes to the environment, a threat to human health, or a nuisance. 12. The Permittee shall keep an inspection log or summary including at least the date and time of inspection, observations made, and any maintenance, repairs, or corrective actions taken by the Permittee. This log of inspections shall be maintained by the Permittee for as long as the pump and haul activities are being conducted and shall be made available upon request to the Division of Water Quality or other permitting authority. Page 2 WQ0013220 (12/2/96) 13. Any duly authorized officer, employee, or representative of the Division of Water Quality may, upon presentation of credentials, enter and inspect any property, premises or place on or related to the pump and haul collection facilities at any reasonable time for the purpose of determining compliance with this permit; may inspect or copy any records that must be maintained under the terms and conditions of this permit; and may obtain samples. 14. An accurate record of the monthly pump and haul activities must be maintained by the Permittee, indicating: a) date wastewater is removed from the facility, b) name of facility from which wastewater is removed, C) name of facility receiving wastewater, d) volume of wastewater removed, and e) status of permanent disposal option. These records shall be submitted monthly to the Raleigh Regional Office on or before the fifteenth (15th) day of the following month. If no pump and haul activities occurred during a month, submit a notice so stating. 15. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6. 16. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 17. The Permittee is responsible for ensuring that the manhole that is to be blocked and from which the pumping will occur is inspected as often as is necessary to ensure that a high wastewater level does not occur, resulting in an overflow. The manhole must be inspected a minimum of daily. 18. The Town of Clayton is responsible for ensuring that pumping and hauling occurs from the blocked manhole as often as is necessary to prevent any overflow and to ensure that odors do not become a problem. Page 3 WQ0013220 (12/2/96) 19. Noncompliance Notification: The Permittee shall report by telephone to the Raleigh Regional Office, telephone no. 919/571-4700, as soon as possible, but in no case more than twenty-four (24) hours or on the next working day following the occurrence or first knowledge of the occurrence of any of the following: a. Any process unit failure, due to known or unknown reasons, that render the facility incapable of adequate wastewater treatment such as mechanical or electrical failures of pumps, aerators, compressors, etc. b. Any failure of a pumping station, sewer line, etc., resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Persons reporting such occurrences by telephone shall also file a written report in letter form within fifteen (15) days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. 20. The annual administering and compliance fee must be paid by the Permittee within thirty (30) days after being billed by the Division. Failure to pay the fee accordingly may cause the Division to initiate action to revoke this permit, as specified by 15A NCAC 2H .0205(c)(4). 21. When these pump and haul activities are no longer necessary, the Town of Clayton shall provide the Division's Raleigh Regional Office with a written explanation of why the pump and haul activities are no longer necessary and a request that this permit be voided. 22. This pump and haul operation is limited to the wastewater from the two (2) homes in Walnut Creek Subdivision. 23. The pumped wastewater will be hauled either to the Town of Clayton's WWTF or to the pump station on Barbour Mill Road, as stipulated by the Town; however, the Division of Water Quality reserves the right to require that alternate measures be implemented, should problems arise with the pump and haul activities. Page 4 WQ0013220 (12/2/96) Permit issued this the 2nd day of December, 1996. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION A. Preston Howard, Jr., P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit No. WQ0013220 Page 5 WQ0013220 (12/2/96) G