HomeMy WebLinkAboutWQ0012501_Final Permit_19960821State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
August 21, 1996
Mr. R. M. Poplin, Environmental Engineer
Vulcan Materials Company, Inc.
4401 North Patterson Street
Winston-Salem, North Carolina 27105
Subject: Permit No. WQ0012501
Vulcan Materials Company, Inc.
Scales Building
West Mecklenburg Quarry
Commercial Wastewater
Drip Irrigation Facility
Mecklenburg County
Dear Mr. Poplin:
In accordance with mistakes which were found in the original permit, we are forwarding herewith
Permit No. WQ0012501, dated August 21, 1996, to Vulcan Materials Company, Inc. for the construction
and operation of the subject wastewater treatment and drip irrigation facilities. The only modifcations
being made to this permit at this time are the corrections that this is a drip irrigation facility, not a spray
irrigation facility, and that it is not a single family permit.
This permit shall be effective from the date of issuance until July 31, 2001, shall hereby void
Permit No. WQ0012501 issued August 9, 1996, and shall be subject to the conditions and limitations as
specified therein. Please pay particular attention to the monitoring requirements in this permit. Failure to
establish an adequate system for collecting and maintaining the required operational information will result
in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of
this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the
North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer
27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding.
One set of approved plans and specifications is being forwarded to you. If you need additional
information concerning this matter, please contact Rick Moore at (919) 733-5083 extension 527.
Sincerely,
Ca
A. Presto oward, Jr., P
cc: Mecklenburg County Health Department
Mooresville Regional Office, Water Quality Section
Training and Certification Unit
Facilities Assessment Unit
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone (919) 733-5083 FAX (919) 733-0719
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES
RALEIGH
DRIP IRRIGATION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
' : u �►`I-C����I►`lDl�l:��]:�'LeI.7V1111��]ICi7
Vulcan Materials Company, Inc,
Mecklenburg County
FOR THE
construction and operation of a 150 GPD drip irrigation wastewater treatment and disposal system
consisting of a 1,000 gallon baffled septic tank, a 50 ft2 surface sand filter, a tablet chlorinator, a 825
gallon storage/pump tank, and a 10,000 ft2 drip irrigation area to serve 6 employees in the scales building
at the Vulcan Materials Company, Inc. weigh station, with no discharge of wastes to the surface waters,
pursuant to the which were found in the original permit and in conformity with the project plan,
specifications, and other supporting data subsequently filed and approved by the Department of
Environment, Health and Natural Resources and considered a part of this permit.
This permit shall be effective from the date of issuance until July 31, 2001 shall hereby void Permit
No. WQ0012501 issued August 9, 1996, and shall be subject to the following specified conditions and
limitations:
I. PERFORMANCE STANDARDS
1. Upon completion of construction and prior to operation of this permitted facility, a
certification roust be received from a professional engineer certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting materials. Mail the Certification to the Water Quality
Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626-0535.
2. The Mooresville Regional Office, telephone number (704) 663-1699, shall be notified at
least forty-eight (48) hours in advance of operation of the installed facilities so that an in -
place inspection can be made. Such notification to the regional supervisor shall be made
during the normal office hours from 8:00 a-m. until 5:00 p.m. on Monday through Friday,
excluding State Holidays.
3. The drip irrigation facilities shall be effectively maintained and operated at all times so that
there is no discharge to the surface waters, nor any contamination of ground waters which
will render them unsatisfactory for normal use. In the event that the facilities fail to
perform satisfactorily, including the creation of nuisance conditions or failure of the
irrigation area to adequately assimilate the wastewater, the Permittee shall take immediate
corrective actions including those actions that may be required by the Division of Water
Quality, such as the construction of additional or replacement wastewater treatment and
disposal facilities.
4. The issuance of this permit shall not relieve the Permittee of the responsibility for damages
to surface or groundwaters resulting from the operation of this facility.
5. The sand media of the surface sand filter must comply with the Division's sand
specifications. The engineer's certification will serve as evidence that these specifications
have been met.
6. A leakage test shall be performed on the septic tank and dosing tank to insure that any
exftltration occurs at a rate which does not exceed twenty (20) gallons per twenty-four (24)
hours per 1,000 gallons of tank capacity. The engineer's certification will serve as proof of
compliance with this condition.
7. If excavation into bedrock is required for the installation of the septic tank or sand filter, the
pit shall be lined with a 10 mil synthetic liner.
8. A sanitary tee shall be installed on the effluent pipe of the septic tank. The engineer's
certification will serve as evidence that these specifications have been met.
9. The residuals generated from these treatment facilities must be disposed in accordance with
General Statute 143-215.1 and in a manner approved by the North Carolina Division of
Water Quality.
10. Diversion or bypassing of the untreated wastewater from the treatment facilities is
prohibited.
11. The following buffers shall be maintained:
a) 100 feet between wetted area and any residence or places of public assembly under
separate ownership,
b) 50 feet between wetted area and property lines,
c) 100 feet between wetted area and wells,
d) 50 feet between wetted area and drainageways or surface water bodies,
e) 50 feet between wetted area and public right of ways,
f) 100 feet between treatment/storage units and any wells, and
g) 50 feet between treatment units and property lines.
II. OPERATION AND MAINTENANCE REQUIREMENTS
The facilities shall be properly maintained and operated at all times.
2. A suitable vegetative cover shall be maintained.
3. Irrigation shall not be performed during inclement weather or when the ground is in a
condition that will cause runoff.
4. Adequate measures shall be taken to prevent wastewater runoff from the drip field.
5. The facilities shall be effectively maintained and operated as a non -discharge system to
prevent the discharge of any wastewater resulting from the operation of this facility.
6. Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of
the wastewater treatment facilities. The operator must hold a certificate of the type and
grade at least equivalent to or greater than the classification assigned to the wastewater
treatment facilities by the Certification Commission. The Permittee must also employ a
certified back-up operator of the appropriate type and grade to comply with the conditions
of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at
least weekly and each Class II, III, and IV facility at least daily, excluding weekends and
holidays, and must properly manage and document daily operation and maintenance of the
facility and must comply with all other conditions of Title 15A, Chapter 8A, .0202.
7. The application rate shall not exceed a cumulative loading of 10.4 inches over any twelve
(12) month period. The instantaneous rate of application shall not be such that it allows
any runoff of wastewater.
8. No type of wastewater other than that from the Vulcan Materials Company, Inc.'s West
Mecklenburg Quarry's scales building shall be applied onto the irrigation area.
9. No traffic or equipment shall be allowed on the disposal area except while installation
occurs or while normal maintenance is being performed.
10. The drip irrigation field shall be fenced with at least a two strand wire fence.
11. The Permittee is responsible for the operation and maintenance of the entire treatment and
disposal system including, but not limited to, the following items:
a. The septic tank shall be checked every six (6) months and pumped out as required.
b. The tablet chlorinator shall be checked every week. Tablets shall be added so as to
provide proper chlorination.
c. The storage system, pump system, and alarm system shall be inspected monthly. The
scum layer shall be removed at the same interval as the septic tank is cleaned out.
d. The drip system shall be inspected monthly to make certain of the emitters proper
operation, that the soil is absorbing the disposed treated wastewater with no surface
runoff, and that no objectionable odors are being generated.
12. The restroom facilities located at the Vulcan Materials Company, Inc.'s West Mecklenburg
Quarry's scales building shall be for employees only, based on the information provided in
the application package. Therefore, the public shall be restricted from these areas.
III. MONITORING AND REPORTING REQUIREMENTS
Any monitoring deemed necessary by the Division of Water Quality to insure surface and
ground water protection will be established and an acceptable sampling reporting schedule
shall be followed.
2. The Permittee shall maintain records of all maintenance performed. on the system and
irrigation area, as required in Condition II 11 for a minimum of five years. This
information shall be provided to the Division of Water Quality upon request.
3. Noncompliance Notification:
The Permittee shall report by telephone to the Mooresville Regional Office, telephone
number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the
next working day following the occurrence or first knowledge of the occurrence of any of
the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility
incapable of adequate wastewater treatment, such as mechanical or electrical failures of
pumps, emitters, etc.; or
b. Any failure of a pumping station or treatment facility resulting in a by-pass directly to
receiving waters without treatment of all or any portion of the influent to such station or
facility.
Persons reporting such occurrences by telephone shall also file a written report in letter
form within five (5) days following first knowledge of the occurrence. This report must
outline the actions taken or proposed to be taken to ensure that the problem does not recur.
IV. GROUNDWATER REQUIREMENTS
1. Any groundwater quality monitoring, as deemed necessary by the Division, shall be
provided.
2. The COMPLIANCE BOUNDARY for the disposal system is specified by regulations in
15A NCAC 2L, Groundwater Classifications and Standards. The Compliance Boundary is
for the disposal system constructed after December 31, 1983 is established at either (1) 250
feet from the waste disposal area, or (2) 50 feet within the property boundary, whichever is
closest to the waste disposal area. An exceedance of Groundwater Quality Standards at or
beyond the Compliance Boundary is subject to immediate remediation action in addition to
the penalty provisions applicable under General Statute 143-215.6A(a)(1).
In accordance with 15A NCAC 2L, a REVIEW BOUNDARY is established around the
disposal systems midway between the Compliance Boundary and the perimeter of the
waste disposal area. Any exceedance of standards at the Review Boundary shall require
remediation action on the part of the permittee.
3. No land application of waste activities shall be undertaken when the seasonal high water
table is less than three feet below land surface.
V . INSPECTIONS
I . Adequate inspection, maintenance, and cleaning shall be provided by the Permittee to
insure proper operation of the subject facilities.
2. Any duly authorized officer, employee, or representative of the Division of Water Quality
may, upon presentation of credentials, enter and inspect any property, premises or place on
or related to the disposal site or facility at any reasonable time for the purpose of
determining compliance with this permit, may inspect or copy any records that must be
maintained under the terms and conditions of this permit, and may obtain samples of
groundwater, surface water, or leachate.
VI. GENERAL CONDITIONS
1. This permit shall become voidable unless the facilities are constructed in accordance with
the conditions of this permit, the approved plans and specifications, and other supporting
data.
2. This permit is effective only with respect to the nature and volume of wastes described in
the application and other supporting data.
3. This permit is not transferable. In the event there is a desire for the facilities to change
ownership, or there is a name change of the Permittee, a formal permit request must be
submitted to the Division of Water Quality accompanied by an application fee,
documentation from the parties involved, and other supporting materials as may be
appropriate. The approval of this request will be considered on its merits and may or may
not be approved.
4. Failure to abide by the conditions and limitations contained in this permit may subject the
Permittee to an enforcement action by the Division of Water Quality in accordance with
North Carolina General Statute 143-215.6(a) to 143-215.6(c).
5. The issuance of this permit does not preclude the Permittee from complying with any and
all statutes, rules, regulations, or ordinances which may be imposed by other government
agencies (local, state, and federal) which have jurisdiction.
6. This permit may be revoked if the Permittee fails to abide by the conditions of the
"Operation and Maintenance Agreement" previously signed by the Permittee.
7. A set of approved plans and specifications for the subject project must be retained by the
Pemn ttee for the life of the project.
8. The annual administering and compliance fee must be paid by the Permittee within thirty
(30) days after being billed by the Division. Failure to pay the fee accordingly may cause
the Division to initiate action to revoke this permit as specified by 15A NCAC 2H .0205
(c)(4).
9. The Permittee, at least six (6) months prior to the expiration of this permit, shall request its
extension. Upon receipt of the request, the Commission will review the adequacy of the
facilities described therein, and if warranted, will extend the Permit for such period of time
and under such conditions and limitations as it may deem appropriate.
10. Clearing of the drip irrigation site should be kept at an absolute minimum and shall be
limited to hand removal of small bushes, trees and undergrowth. Larger, more established
trees (>6 inches in diameter) shall be left on -site. Should any mechanical equipment be
required to remove existing vegetation, access shall only be allowed to equipment having
rubber tires.
Permit issued this the 21st day of August, 1996.
NORTH CAROLINA ENVIRONMENTAL MANAGE7MENT COMMISSION
A. Preston Award, Jr., P.5, Director /
Division o ater Quality
By Authority of the Environmental Management CoJmmission
Permit Number WQ0012501
Permit No. WQ0012501
August 21, 1996
ENGINEER`S CERTIFICATION
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the
project,
Project Name
Location
for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation
of the construction such that the construction was observed to be built within substantial compliance and
intent of this permit, the approved plans and specifications, and other supporting materials.
Signature
Date
Registration No.
N