Loading...
HomeMy WebLinkAboutWQ0011530_Final Permit_19950921State of North Carolina Department of Environment, Health and Natural Resources « • • Raleigh Regional Office James B. Hunt, Governor p E H N Flt B, Howes, Secretary Boyce A. Hudson, Regional Manager DIVISION OF ENVIRONMENTAL MANAGEMENT September 21, 1995 Mr. James M. Peden, Jr., President Peden General Contractors Post Office Box 40489 Raleigh, N. C. 27629 Subject: Permit No. WQ0011530 Peden General Contractors Gill Buick -Pontiac Site in Wendell, N. C. Wastewater Pump and Haul Wake County Dear Mr. Peden: In accordance with the application received on September S, 1995, we are forwarding herewith Permit No. WQ0011530, dated September 21, 1995, to Peden General Contractors for the subject wastewater pump and haul activities. This permit shall be effective from the date of issuance until November 30, 1995, and shall be subject to the conditions and limitations as specified therein. Please pay particular attention to the monitoring requirements in this permit. Failure to establish an adequate system for collecting and maintaining the required operational information will result in future compliance problems. Additionally, please be advised that any pumping and hauling activities prior to the issuance of this permit will subject Peden General Contractors to enforcement activities, in accordance with North Carolina General Statute 143-215.6. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Box 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. 3800 Barrett Drive, Suite 101, Raleigh, North Carolina 27609 Telephone 919-571-4700 FAX 919-571-4718 An Equal Opportunity Affirmative Action Employer 50% recycled/ 109 post -consumer paper Mr. James M. Peden, Jr. September 21, 1995 Page 2 If you need additional information concerning this matter, please contact Mr. Randy Jones of the Division's Raleigh Regional Office at 919/571-4700. Sincerely, s A. Preston Howard, Jr., Director Division of Environmental Management cc: Wake County Health Department Permits and Engineering Unit (Nancy Owens) file:WQ11530.P&H NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES RALEIGH PUMP AND HAUL PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Peden General Contractors Wake County FOR THE operation of a 100 GPD wastewater pump and haul activity which shall consist of the pumping and hauling of domestic wastewater from a temporary modular sales trailer located on the site of Gill Buick -Pontiac in Wendell, N. C., to the City of Raleigh WWTF (the wastewater will be either deposited in the approved location at the Readilite & Barricade, Inc. shop or hauled directly to the City of Raleigh Neuse WWTF); wastewater will be pumped out of a 1000 gallon tank with an operating visual an audible high water alarm with no discharge of wastes to the surface waters, pursuant to the application received on September 8, 1995, and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment, Health and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until November 30, 1995, and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the subject pump and haul activities are carried out in a manner which has been approved by this Division. 2. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. Page 1 of 6 Permit No. WQ0011530 (9/21/95) 3. The facilities shall be properly maintained and operated at all times. 4. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Environmental Management accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 5. No type of wastewater other than the domestic wastewater from the temporary modular sales trailer on the Gill Buick -Pontiac site in Wendell, N. C. shall be included in these pump and haul activities. 6. The permit shall become voidable unless the agreement between Peden General Contractors, Readilite & Barricade, Inc., and the City of Raleigh for the collection, transportation, and ultimate disposal of the wastewater is in full force and effect. 7. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall cease operation of all pump and haul activities and take such immediate corrective action as may be required by this Division. 8. The sewage and wastewater collected by this system shall be treated in the City of Raleigh Neuse Wastewater Treatment Facility prior to being discharged into the receiving stream. 9. The Permittee is liable for any damages caused by a spill or failure of the pump and haul operations. 10. Adequate inspection, maintenance, and cleaning shall be provided by the Permittee to insure proper operation of the subject facilities. 11. The Permittee or his designee shall inspect the pump and haul collection facilities to prevent malfunctions and deterioration, operator errors, and discharges which may cause or lead to the release of wastes to the environment, a threat to human health, or a nuisance. Page 2 of 6 Permit No. WQ0011530 (9/21/95) 12. The Permittee shall keep an inspection log or summary including at least the date and time of inspection, observations made, and any maintenance, repairs, or corrective actions taken by the Permittee. This log of inspections shall be maintained by the Permittee for as long as the pump and haul activities are being conducted and shall be made available upon request to the Division of Environmental Management or other permitting authority. 13. Any duly authorized officer, employee, or representative of the Division of Environmental Management may, upon presentation of credentials, enter and inspect any property, premises or place on or related to the pump and haul collection facilities at any reasonable time for the purpose of determining compliance with this permit; may inspect or copy any records that must be maintained under the terms and conditions of this permit; and may obtain samples. 14. An accurate record of the monthly pump and haul activities must be maintained by the Permittee, indicating: a) date wastewater is removed from the facility, b) name of facility from which wastewater is removed, C) name of facility receiving wastewater, d) volume of wastewater removed, and e) status of permanent disposal option. These records shall be submitted monthly to the Raleigh Regional Office on or before the fifteenth (15th) day of the following month. If no pump and haul activities occur during a particular month, a record must be submitted so stating. 15. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Environmental Management in accordance with North Carolina General Statute 143-215.6. 16. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 17. Noncompliance Notification: The Permittee shall report by telephone to the Raleigh Regional office, telephone no. 919/571-4700, as soon as possible, but in no case more than twenty-four (24) hours or on the next working day following the occurrence or first knowledge of the occurrence of any of the following: Page 3 of 6 Permit No. WQ0011530 (9/21/95) a. Any process unit failure, due to known or unknown reasons, that render the facility incapable of adequate wastewater treatment such as mechanical or electrical failures of pumps, aerators, compressors, etc. b. Any failure of a pumping station, sewer line, etc., resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Persons reporting such occurrences by telephone shall also file a written report in letter form within fifteen (15) days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. 18. The annual administering and compliance fee must be paid by the Permittee within thirty (30) days after being billed by the Division. Failure to pay the fee accordingly may cause the Division to initiate action to revoke this permit, as specified by 15A NCAC 2H .0205(c)(4). 19. Once these pump and haul activities are no longer required, the Permittee shall submit a letter to the Raleigh Regional Water Quality Supervisor requesting that the permit be voided and explaining what measures have been implemented to eliminate the need for the pump and haul activities. 20. It shall be the responsibility of Peden General Contractors, Inc. to ensure that the facilities associated with these pump and haul activities are inspected and pumped at the frequencies necessary to prevent overflows and nuisance odors from occurring. 21. An operating audible and visual high water alarm shall be maintained on the facilities from which the wastewater is being pumped. 22. Upon completion of construction and prior to operation of the subject pump and haul activities, a certification must be received from a North Carolina Professional Engineer certifying that the permitted facility has been installed in accordance with this permit and the approved documents. Mail the Certification to the Water Quality Permits a n d Engineering Unit, Post Office Box 29535, Raleigh, N. C. 27626- 0535. Page 4 of 6 Permit No. WQ0011530 (9/21/95) Permit issued this the 21st day of September, 1995. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION --kl - A. Preston Howard, Jr., P.E., Director Division of Environmental Management By Authority of the Environmental Management Commission Page 5 of 6 Permit No. WQ0011530 (9/21/95) P�rrrtit Na _ WQOOXXS3O Pump ani.d Haul Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full-time) the construction of the project, , for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. North Carolina Professional Engineer's Signature and Seal Date Page b of 5 Permit No. WQ0011530 (9/21/95)