Loading...
HomeMy WebLinkAbout19870022 Ver 1_COMPLETE FILE_19870615DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402.1890 IN REPLY REFER TO Regulatory Branch June 15, 1987 SUBJECT: File No. SAWC087-N-007-0310 Mr. Alan Rohloff, President Belhaven Marina, Incorporated Belhaven, North Carolina 27889 Dear Mr. Rohloff: Reference your application for a Department of the Army permit to maintain and enlarge a basin, construct a bulkhead and construct a pier/boat launching facility on a canal off Tom's and Battalina Creeks and the Pungo Creek, Belhaven, Beaufort County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of general permit No. SAWC080- N-000-0291. Therefore, you may commence construction activity in strict accordance with applicable State authorization and the enclosed plan. Failure to comply with the State authorization or conditions of the general permit could result in a violation of Federal law. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Questions or comments may be addressed to Mr. Ken Jolly, telephone (919) 343-4632. Sincerely, Charles W. Hollis Chief, Regulatory Branch Enclosure 0. -2- Copies Furnished with enclosure: Director, Atlantic Marine Center National Ocean Service ATTN: MOA 232X1 439 West York Street Norfolk, Virginia 23510-1114 Mr. William Mills Water Quality Section Division of Environmental Management /North Carolina Department of , Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. Beverly Etheridge, Chief Wetlands Section Region IV Marine and Estuarine Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Mr. Randy Cheek National Marine Fisheries Service Habitat Conservation Division Pivers Island Beaufort, North Carolina 28516 Mr. Charles Jones Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 Mr. David Gossett Washington Regional Office North Carolina Division of Coastal Management Post Office Box 1507 Washington, North Carolina 27889 DELMA L. , GARY L. S LARRY D. KEECH 207 ALDERSON ROAD, WASHINGTON, N.C. 27889 J? W Y a O m co Of W N D jr a 1- U J u) Z 0 co cr a p Z " w w z = W N J U' W m O m ?- W U CANAL HIGH WATER MARK FAILED BULKHEAD -5.5' ASPHALT SILT CURTAIN BULKHEAD -5.5 M GRASS e' 33' 23' 25' ,2 ` W .~ W .ma L) 2j'. Proposed Bulkhead z a . 0a: b :U M ASPHALT Proposed Remove Fill By Drag/ine Excavation T o -5 113, •°I 7T_\ .5 And Haul To Upland Disposal Area. GRASS GATE FENCE 3e' P A N TEGO STREET i r y M P- NO SALE ?10A?EE fJ ~ PANTEGO ST. , N F% g CUT ELLS a j PUNGO W ty a? MAIN sT. TOWN OF BELHAVEN" W c / Q MATER SZ. cr l PANTEGO CREEK \_ k W O W O ? h TO TOMS CREEK and PUNGO RIVER o v 2'BOARDWALK -BULKHEAD GRASS W -V c- m = 3 n a) t < M X Z.4 M Wm N Z O x n N v CD O PROPOSED IMPROVEMENTS TO BULKHEAD and BOAT SLIP TOMS CREEK BOAT YARD Town of Belhaven Beaufort County SCALE:I"=30' DATE:4 / 3 /87 BY: HOOD RICHARDSON, P.A. WASHINGTON SQUARE MALL WASHINGTON, N. C. DELMA L. , GARY L. a LARRY D. KEECH 207 ALDERSON ROAD, WASHINGTON, N.C. 27889 TO TOMS CREEK and CANAL PUNGO RIVER - 0 v HIGH WATER MARK ' 2 BOARDWALK ASPHALT PIER R41L ON P/L/Nes s BULKHEAD o BULKHEAD f = GRASS A A n W 23'4° I 23' -4 m p MAXI MU a) ' N . . u CE W 'I' w J N Z Bulkhead za ; GRASS ° C ) a: C15 a: -- o .. O < M W -v L w w ASPHALT row z a 1---t n CD < W - a m 13, n m o x w rn r ? m it o im W m W ?N U' 0 GRASS Z x N n GATE - I N FENCE 36' -/ CD O PA N TEGO STREET PILINGS FAILED SPACING EXISTING h NEW BULKHEAD BULKHEAD W tV BULKHEAD O ? I I I N / I h I I A A TO BE EXCAVATED HORIZONTAL SCALE : I"= 20' VERTICAL SCALE: I 10' PROPOSED IMPROVEMENTS TO BULKHEAD and BOAT SLIP TOM'S CREEK BOAT YARD Town of Belhaven Beaufort County SCALE-.["=30' DATE-.4 / 3 /87 BY: HOOD RICHARDSON, P.A. WASHINGTON SQUARE MALL WASHINGTON, N. C. 87 -01-137' SHEET 2 of Launching Pier Dimensions _ INSIDE CLEAR A" WIDTH-? e• rM, L INSIDE OF PIER F O W I 'A" I F"C CLEAR WIDTH S" ANGLE IRON GUARD (INSIDE GUARD METHOD) Running clearance shown is the minimum recommended. Clearance can be increased by reducing the inside pier width or by Increasing the width of the boat hoist. Dock Dimensions MODEL NUMBER DIM "A" CLEAR WIDTH DIM "B" TIRE CLEARANCE DIM "C" PIER WIDTH DIM "D" LENGTH . DIM "E" WHEEL CTRS FTJIN. mm FTJIN. mm FTJIN. mm FTJIN. mm FTJIN. mm 10AMO 14'-0" 4267 3.0" 76 4'-6" 1372 32'-0" 9574 15'-8" 4773 15AMO 15'-0" 4572 3.0" 76 4'-6" 1372 37'-0" 11278 16'-8" 5008 25BFM 17'-0" 5182 4.0" 102 4'-6" 1372 43'-0" 13106 19'-0" 5791 35BFM 17'-0" 5182 4.0" 102 4'-6" 1372 50'-0" 15240 19'-0" 5791 608FM 20'-0" 6096 3.0" 76 4'-6" 1372 55'-0" 16764 22'-0" 6706 708FM 21'-0" 6401 3.5" 89 4'-6" 1372 55'-0" 16764, 23'-4" 7112 '100BFM 25'-6" 7772 4.75" 121 T-6" 1676 75'-0" 22860 29'-2" 8890 ' on 100 BFM ICW of machine should be at least 6" more than ICW of pier , I Wheel Loads (lbs....unequal loading) ; . MODEL NUMBER 10AMO 15AMO 25BFM 35BFM 60BFM 70BFM 10OBFM VERTICAL 9,950 15,250 22,000 29,500 50,000 57,000 85,000 LATERAL 1,300 1,500 2,500 3,300 5,600 6,400 10,000 Wood Piling Style. Pier (Suggested) ? W ANGLE i 3 rail SIDE VIEW END VIEW The above drawings constitute a suggested method of construction only. User must obtain approved plans from his own engineering firm to meet the specific requirements of his particular operation. ' Three 12" x 12" required for 30 through 60 ton operations. a-atT I L 1. T PLANK WALKWAY I/• rr?o" I Tate" i WATER LEVEL I WOOD PILING DRIVEN TO 25 TON BEARING ENLARGED END VIEW w? p ?n+71S4aR t . PROPOSED ELEVATION Permit Class Permit Number New STATE OF NORTH CAROLINA 109-87 Department of Natural Resoi=_---oy" nd Community Development Coa Rest?rces fission to,: . f 0 Majori6e rloprtient.in r"' vironmental Concestr uquant-to.. 3AX15 51 Excavattorii?brjp p'n`rsunt to NCGS 113-229 Issuedto Alan Rohloff, Pres Belhaven Marine, Inc., E. Front St., Belhaven, NC 27889 authorizing development in Beaufort county at Toms Creek (canal off of) Pantego_ and Tool ey Streets as requested in the permittee's application dated 4/14/87 including attached plats, 2, sheets 1-2 of 3 dated 4/3/87. This permit, issued on G/ ;Z Z I0 , is subject to compliance with the application (where consistent with the permit), all applica le regulations, special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void. (1) The bulkhead will be positioned at or landward of the mean high water (MHW) elevation contour and any regularly or irregularly flooded wetland vegetation. (2) A silt curtain will be positioned and maintained at the mouth of the basin until all excavation has been completed. To prevent unnecessary sediments from reaching adjacent waters, 24 hours will be allowed to elapse before the silt curtain is removed. (3) All excavated materials will be confined landward of the mean high water (MHW) elevation contour and any regularly or irregularly flooded vegetated wetlands. (4) Vegetated wetlands will not be excavated or filled. (5) Excavation will not exceed 6 feet below the elevation of mean low water (MLW). (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1990 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DNRCD and the Chairman of the Coastal Resources Commission. David W. Owens, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Pennittee Alan Rohl dff Belhaven Marine, Inc. ADDITIONAL CONDITIONS Permit #109-87 Page 2 of 2 (6) The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. (7) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. (8) The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction-related discharge. Increases such that the turbidity in the waterbody is 50 NTUs or less are not considered significant. NOTE: Every effort should be made by the permittee to insure that navigation in the canal is not impeded by boats docked for service at the launching pier. Caution should be taken to insure that petroleum products are not released to adjacent waters. NOTE: The proposed project is certified under General Water Quality Certification No. 1272 issued on November 10, 1978, for bulkhead construction. IN REPLY REFER TO Regulatory Branch DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402.1890 May 22, 1987 SUBJECT: File No. SAWC087-N-007-0310 Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Parker: Reference the application of Belhaven Marina, Incorporated, represented by Mr. Alan Rohloff, for a Department of the Army permit to maintain and enlarge a basin, construct a bulkhead and construct a pier/boat launching facility on a canal off Tom's and Battalina Creeks and the Pungo River, Belhaven, Beaufort County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: a. The bulkhead will be positioned at or landward of the mean high water (MHW) elevation contour and any regularly or irregularly flooded wetland vegetation. b. A silt curtain will be positioned and maintained at the mouth of the basin until all excavation has been completed. To prevent unnecessary sediments from reaching adjacent waters, 24 hours will be allowed to elapse before the silt curtain is removed. c. All excavated materials will be confined landward of the mean high water (MHW) elevation contour and any regularly or irregularly flooded vegetated wetlands. -2- d. Vegetated wetlands will not be excavated or filled. e. Excavation will not exceed 6 feet below the elevation of mean low water (MLW). f. The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. g. The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The-permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. h. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction-related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less are not considered significant. Questions or comments may be addressed to Mr. Ken Jolly, telephone (919) 343-4632. Sincerely, Charles W. Hollis Chief, Regulatory Branch Copies Furnished: Mr. William Mills Water Quality Section DPision of Environmental (Management North Carolina Department Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina of -3- 27611-7687 Mr. Charles Jones Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Post Office Box 25039 Raleigh, North Carolina Service 27611-5039 Mr. Randy Cheek National Marine Fisheries Service Habitat Conservation Division Pivers Island Beaufort, North Carolina 28516 Mr. William L. Kruczynski, Chief Wetlands Section Region IV Marine and-Estuarine Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. David Gossett Washington Regional Office North Carolina Division of Coastal Management Post Office Box 1507 Washington, North Carolina 27889 n, IN REPLY REFER TO Regulatory Branch DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402.1890 April 28, 1978 SUBJECT: File No. SAWC087-N-007-0310 Mr. Alan Rohloff, President Belhaven Marine, Incorporated East Front Street Belhaven, North Carolina 27889 Dear Mr. Rohloff: On February 6, 1986, we renewed general permit No. SAWCO80-N- 000-0291 (enclosed), which provides Federal authorization for construction activities that receive authorization from the State of North Carolina. A review of your application received April 15, 1987, for a Department of the Army permit to maintain and enlarge a basin, construct a bulkhead and construct a pier/boat launching facility on a canal off Tom's and Battalina Creeks and the Pungo Creek, Belhaven, Beaufort County, North Carolina, indicates it to be a candidate for Federal authorization under this general permit. Accordingly, the administrative processing of your application will be accomplished by the North Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished to the State. If your application must be withdrawn from this general permit process for any reason, you will be written and informed of its further management. If there are no unresolved differences of State-Federal positions or policy, the final action taken on your application by the State will result in your receiving written notice from us that your application has been successfully processed under our general permit. Only after receiving such confirmation should you begin work. Your application, pursuant to Section 10 of the River and Harbor Act, has been assigned No. SAWC087-N-007-00310 and will be coordinated by Mr. Ken Jolly. He is available to address questions or comments you may have at telephone (919) 343-4632. Sincerely, Charles W. Hollis Chief, Regulatory Branch -2- dr"- Copies Furnished (without enclosure): Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. William Mills Water Quality Section Division of Environmental Management foNatural rth Carolina Department of Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Charles Jones Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 Mr. David C. Francisco Rodman, Holscher, Franciso, and Peck Post Office Box 1747 Washington, North Carolina 27889 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Mr. Randy Cheek National' Marine Fisheries Service Habitat Conservation Division Pivers Island Beaufort, North Carolina 28516 Mr. William L. Kruczynski, Chief Wetlands Section Marine and Estuarine Branch Region IV U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. David Gossett Washington Regional Office North Carolina Division of Coastal Management Post Office Box 1507 Washington, North Carolina 27889 bell State of North Carolina Department of Natural Resources and Community Development Division of Coastal Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor S. Thomas Rhodes, Secretary April 28, 1987 Mr. John Sutherland, Chief Water Planning Section Division of Water Resources Raleigh, North Carolina 27611 Dear Mr. Sutherland: The attached copy of an application submitted by: David W. Owens Director Belhaven Marine, Inc. Applicant's Name Town of Belhaven, Toms Creek Beaufort Location of Project County X for a State permit to perform excavation and/or fill work in coastal North Carolina and for a CAMA major development permit... for a CAMA major development permit (only) ... ... is being circulated to State and Federal agencies having jurisdiction over the subject matter which might be affected by the project. Please indicate on the reverse side of this form your viewpoint on the proposed work and return it to me not later than 5/19/87 Sincerely, `ter Toh R. Parker, Jr., hief ` Major Permits Processing Section JRP:ap:2480 P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 x - y _... DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION Comments concer ng an application for State Federal CAMA Permit(s) from %?1+ /»r•d?/Y 1J,' ?OAilnn L' 1 n? 4' ?LF A. PERMIT: This office cannot comment on this project until after the close of the Section 401 Certification Public Comments Period. Th 'office has no objection to the issuance of the permit(s) for the proposed roject with the following conditions: zThat the activity be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge (increases of 25 NTU's or less are not considered significant). That the instream turbidity not be increased by more than 50 NTU's as a result of the proposed activity after a reasonable opportunity for dilu- tion and mixture. That turbidity levels in shall not be increased by more than 10 NTU's as a result of the proposed activity after a reason- able opportunity for dilution and mixture. B. CERTIFICATION STATUS: Certification is not required for this project. Certification is required for this project. Such action to process the certification has been initiated. Proposed Certification will be acted on or after , _A `he proposed project is certified under General.Certification A) No. 1179 issued on January 25, D) No. 1431 issued on October 16, 1977, for sewer line construction 1980, for boat ramp construction. No. 1272 issued on November 10, E) No. 1664 issued on September 8, 1978, for bulkhead construction. 1983, for Rip-Rap Placement. C) No. 1273 issued on November 10, F) No. 1665 issued on September 19, 1978, for discharges of liquid 1983, for incidental bridge effluent from diked upland disposal construction. areas, t - WATER QI1ALITY SECTION DIVISION OF ENVIRONMENTAL MANAGEMENT LAIC I>A TA D /CAMA/ 40 f REV DATE 05/05/8V ACTION > ADD FILE ) DFC:t'FtiFl40i PS'WD ? FORMAT i Nf' DFC AMA NL•"::XT RC D > 00215 AC:'T:1:ON ADD, ENTER THE DATA TO BE STORED I° RD DATA PR0..l4: n? 214 PRi: J: BEl...HAVE N MARINE. INC. COUNTY: BEAUFORT REC;ION 07. ASSIGNED TO: W,.1M w'*,-- ..1OINT OTC ("E; N .T.YPI*-- CERTIFICATION RECOMMENDATION DATEN YYMMDD 404 !" N : 401 REQ 1 S"tlt" Y RECEIVED: 87{421 CAMA ONLY: GC;: BULKHEAD DENY INITIAL REPORT: DF/CAMA : Y GC : I"IOLD : FINAL REPORT: 87050 RECEIVING STREAM: U T-BATTAi. ILA CRK CLAR: SC BASIN: TAR COMMENTS: SITE LOCATED ON PANTE: GO STREET AT BELHAVEN OLD MARINA SITE LOCATED ON EXISTING 40 FT CANAL. TRIBUTARY TO BATTr=1l..INA C'RK. PROPOSAL TO E::NI...ARGE:: EXISTING BASIN BY EXCAVATING. AREA 53 X 7 X 4 FT DEEP AND :I:NSTAL.L.. WOODEN BULKHEAD F'iJ1'.F'OSE:: OF PROJECT IS TO FACILITATE USE OF TRAVEL... LIFT NO SPRAY PAINTING OR SAND BLASTING TO BE DONE AT Ti-f:ES SITE COPIES: WARCI°°f'I:: N T Ai...-MIL..L..S-Gt:T SS'Ei:T'T j 41 v.. •V.. r. VWIN SAN L?A?YM/?i?YL'?\? FIELD INVESTIGATION REPORT 1. Applicant's name Alan Rohloff (Belhaven Marine Inc.) 2. Location of project site Beaufort CountV. Town of-Belhaven. Toms Creek photo # 12-19-84. 79-961 0-9 3. Investigation type: Dredge b Fill X CAHA X 4. Investigative procedure: (A) Dates of. site visit 4-8-87 (B) Was applicant present No 5. Processing procedure: Application received 4-14-87 Office_ Washington 6. Site description: (A) Local Land Use Plan Town of Belhaven Land classification from LOP' ons?ervation Development constrainto identified in LUP None (B) AEC(s) involved: Ocean Hazard Estuarine shoreline X Coastal wetlands Public trust waters Estuarine waters X Other (C) Water dependent: Yes X No Other (D) Intended use: Public Private Commercial X (E) Type of waste water treatment: Existing Town of Belhaven Planned None (E) Type of structures: Existing. -Marine sales office Planned Marine boat lift (G) Estimated annual rate of erosion N/A Source N/A 7. Habitat description: AREA (A) Vegetated wetlands: Dredged Filled Other None N/A _jiZA 8. (B) Non-vegetated wetlands: (C) Other: Highground + 371 sg.ft. (D) Total area disturbed: + 371 aft. Project summary The applicant is proposing to enlarge an existing hnat basin and to install a boat lift. Environmental settin The applicant is leasing the Radcliff Marine site on Pantego Street in the Town of Belhaven. The property has a dimension of 300' by 130' and is bordered by Pantego Street on the south and a 40' wide canal which connects to Toms Creek on the north. Radcliff Marine has historically been a marine sales business with some outboard motor repair. Located on the property is a sales building which is served by the Town of Belhaven sewage disposal system. The shoreline next to the canal is bulkheaded, and a concrete boat ramp exists. No wetland vegetation is present at the site, and the upland grounds are a mixture of lawn grasses and asphalt driveways. Project proposal The applicant is proposing the following: (1) The enlargement of the existing basin on the west side by 53' in length and by a width of 7'. The area will be excavated to a depth of -5.5' at NWL. Once the excavation is completed the new shoreline will be bulkheaded at the NWL. (2) Following the excavation a 53' long by 3' wide pier will be placed within the basin. This pier will be used for one of the wheels of a boat travel lift which is to be installed. The other wheel will run along the western highground side of the basin. (See attached plats) Environmental impacts The project as proposed will have a minimal environmental impact. No wetland vegetation will be excavated or filled. David L. Gossett - Washington Office - 21 April 1987 r 1,--4 ----- - - APPLICATION -?" } FOR PERMIT TO EXCAVATE AND/OR FILL t WATER QUALITY CERTIFICATION EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT yc?oti041, , parrtment of Administration ? ?? , (GS e tmen) State of North Carolina D De ?C'tp Department of Natural Resources and Community Development Department of th?, ?rmy ?? (GS 113-229, 143.215.3(a)(1), 143-215.3(c), 113A-118 Corps lmintt?Dlstrtct (33 CFR 209.320-329) Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. 1. Applicant Information A. Name Alan Rohloff President, Belhaven Marine Inc. B. Address East Front Street First Middle Belhaven, Street, P. 0. Box or Route N. C. 27889 1-800-682-9376 City or Town State 11, Location of Zip Code Phone Proposed Project; A. County Beaufort B. I. City, town, community or landmark Belhaven, intersect ion of Toole and Pante o Streets 2. Is Proposed work within city limits? Yes X No __ C. Creek, river, sound or bay upon which project is located or nearest named body of water to project Toms Creek, Battalina Creek, Pungo River. Ill. Description of Project A. 1. Maintenance of existing project Clean Basin 2. New work Move Bulkhead 8. Purpose of excavation or fill 1. Access channel NSA It•ngth?_width 2. Boat basin increase size --7T_dcpth N A length width depth 5.5 3. Fill area length 4. Other?ier for boat lift 53, "Width depth C. L Bulkhead length 70' length Max-width 3 depth ? • 5 ? Average distance waterward of MHW (shoreline) 7' behind HWM 2. Type of bulkhead construction (material) Wood D. Excavated material (total for project) 1. Cubic yards 125 Mineral soil E. Fill material to be placed below MHW (sec also VI. A)e of material 1 • Cubic yards one 2. Type of material N/A Land Type, Disposal Area, and Construction Equipment; A. Does the area to be excavated include any marshland, swamps or other wetland? Yes - No No. B.'Poes the di sposal area include any marshland swamPs or other wetland' . Yes NoN_o__ C. Disposal Area 1. Location Various upland lots in Belhaven. 2. Do you claim title to disposal area? D. Fill material source if fill is to be trucked in N/A E. How will e c tedmatcrial be entrapped and erosion controlled? Silt curtain across mouth o a sin. I I Ypc of equipment to be used line. G. Will marshland be crossed in transporting equipment to project site? If yes, explain No. / •••••..wcu Vsc VI f,H)c{,t N!4 440cs rm0c; A. 1. Private---N/A • 2. Commercial boat Lift 3. Housing Development or Industrial N/A 4. Other N/A 8. 1. Lot size(s) N/A 2. Elevation of lot (s) above mean high water N/A 3. Soil type and texture Mineral soils, ela 4. Type of building facilities or structures Portable boat lift. S. Sewage disposal and/or waste water treatment A. Existing 1V/A Planned N/A B. Describe N/A 6. 'Land Classifncation'(circle one) DEVELOPED TRANSITIONAL COMMUNITY RURAL CONSERVATI .OTHER VI. 'Pertaining tofill and water Quality; (See.CAMA Loaf Land Use Plan Synopsis) A- Does the proposed projeciinvolve the placement of fill materials below mean high water? Yes No B. 1. Will any runoff or discharge enter adjacent watersasiresult-of X area following project completion? Yes-No X prolect activity m planned use of the 2. Type of discharge N A 3. Location of discharge NIA VII. Present rate of shoreline erosion (if known): No ne . Vill. List permit numbers and issue dates of previous Department of Arm Co work in project area, if applicable: None Y Corps of Engineers or State permits for IX. Length of time required to complete project: 120 days. X. In addition to the complete application form, the following items must be provided: A. Attach a copy of the deed (with State application only) or other instrument under which claims title to the affected Pr applicant operty. OR if applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title plus written permission from the owner to carry out the project on his land. B. Attach an accurate work plat drawn to scale on 8A X 11" white paper (see instruction booklet for details). Note: Original drawings preferred - only high quality copies accepted. C. A copy of the application and plat must be served upon adjacent riparian certified mail or by publication (G.S. 113-229 (d))Enter date servedAnril 114 , 1987 gistered or D. List names and complete addresses of the riparian landowners with property adjoining applicant's. Such owners have 30 days in which to submit.comments to agencies listed below. Jimm Lee Cox, P. 0. Box 432 Belhaven N. C. 27810 eorge III, an ura er, Z11 E ?treeL, Belhaven, N. C. 27810 any ., an rry eee Alderson Road, Washington, Xl. Certification requirement: I certify that to the best of my knowledge, the r N • C • 2 7889 with the State of North Carolina's P oposed activity complies manner consistent with such program, cued coastal management program and will be conducted in a XII. Any permit issued pursuant to this cation and lac application will allow only the development described in this appli. P Applicants should therefore describe in the application and plat all anticipated devel- opment activities, including construction. excavation, filli1BY , and land cl ing LHAVE IN E, NC. TE aril 14, 1987 ; < Ap plicant's S' cure F-f W Y Q m O /D F- n Q N W Q H U J N Z a 3 C3 z W W 2 > Q W N J 0 W O CD W O DELMA L. , GARY L. d LARRY D. KEECH 207 ALDERSON ROAD, WASHINGTON, N.C. 27889 TO CANAL TOMS CREEK and PUNGO RIVER HIGH WATER MARK FAILED BULKHEAD a-s. s' ASPHALT - e SILT BULKHEAD CURTAIN a • -5.5 GRASS s' n 33 ' W W ' cra Proposed Buhtheo < z za. o ? : o ASPHALT Proposed Remove Fill By Droglk Excovo/ic» , ? And Hou/ To Up/ond T o -5.5' 13 Disposo/ Area. GRASS N GATE- FENCE I. 38' PA NTEGO STREET VAC/ i vY M P - Nv SZAl-4=- W ?ANTEGO sL ? h ?.t NT ELL L „ euNOO W ? MAIN sT. ?TOWN OF oa BELHAVEN *4 rL R ft. PA vrEco CREEK 2'BOARDWAL BULKHEAD 23' GRASS I I W ? W W O h 0 r m-V c- r O 3 = F. nm -< < O mx z r Am wm _iN C•1 z O X cl) i? N v CD O PROPOSED IMPROVEMENTS TO BULKHEAD and BOAT SLIP TOM'S CREEK BOAT YARD Town of Belhoven Beaufort County SCALE :i"=30' DATE=4 / 3 /87 BY: HOOD RICHARDSON, P.A. WASHINGTON SQUARE MALL WASHINGTON, N. C. DELMA L. , GARY L. 9 LARRY D. KEECH 207 ALDERSON ROAD, WASHINGTON, N.C. 27889 TO CANAL TOMS CREEK and P[/NGO R/V£R - 0 HIGH WATER MARK 2BOARDWALK 10 R4/L ON ASPHALT - P/f2 P/L/N6S BULKHEAD = 7BULKNEAD a ? GRASS A - m = D: a Z - w p w 23'4' Q v _ CD ? Q MAXI MUM a W N w O Ir Q H U 'W J fn ? o od z a6 It ! oo:U 3 ° . a 0D -U c ww w ASPHALT m rn - ] z _ a r c? cV -1 1. 13, n <0 o m ^ zx? w ? Wm GRASS _iro 0 Z O N x GATE FENCE ?. 1 ro 38' ? OD O PA N TEGO STREET PILINGS SPACING EXISTING FAILED NEW -BULKHEAD BULKHEAD BULKHEAD v W h I I w PROPOSED IMPROVEMENTS 11 TO A 4 A, I ,! BULKHEAD and BOAT SLIP To BE TOM'S CREEK BOAT YARD EXCAVATED Town of Belhaven Beaufort County SCALE :1"=30' DATE:4 / 3 /87 BY: HOOD RICHARDSON, P.A. HORIZONTAL SCALE: 1"= 20' WASHINGTON SQUARE MALL VERTICAL SCALE: 1"= 10' WASHINGTON, N. C. Launching Pier Dimensions I INaIOECLEwR Dock Dimensions A wlorn ? rMIN )"411101! OF P400 MODEL NUMBER DIM "A" CLEAR WIDTH DIM "8" TIRE CLEARANCE DIM "C" PIER WIDTH DIM "D" LENGTH ; DIM "E" WHEEL CTRS FT-/IN- mm FT./IN. mm FTJIN. mm FTJIN. mm FTJIN. mm 10AMO 14'-0" 4267 3.0" 76 4'-6" 1372 32'-0" 9574 15'-8" 4773 15AMO 15'-0" 4572 3.0" 76 4'-6" 1372 37'-0" 11278 16'-8" 5008 25BFM 17'-0" 5182 4.0" 102 4'-6" 1372 43'-0" 13106 19'-0" 5791 35BFM 17'-0" 5182 4.0" 102' 4'-6" 1372 50'-0" 15240 19'-0" 5791 608FM 20'-0" 6096 3.0" 76 4'-6" 1372 55'-0" 167641 22'-0- 6706 70BFM 21'-0" 6401 3.5" 89 4'-6" 1372 55'4" 16764 23'-4" 7112 '1008FM 25'-6" 7772 4.75" 121 5'-6" 1676 75'-0" 22860 29'-2" 8890 - on 100 BFM ICW of machine should be at least 6" more than ICW of pier MODEL NUMBER 10AMO 15AMO 25BFM 35BFM 60BFM 70BFM 100BFM VERTICAL 9,950 ' 15.250 22,000 29,500 50,000 57,000 85.000 LATERAL 1,300 1,500 2,500 3,300 5.600 6.400 10.000 Wood Piling Style. Pier (Suggested) to SPACES ar EACH SIDE VIEW END VIEW The above drawings constitute a suggested method of construction only. User must obtain approved plans from his own engineering firm to meet the specific requirements of his particular operation. Three 12" x 12" required for 30 through 60 ton operations. Wheel Loads (lbs-unequal loading) J ? ? W . rtis- x ANGLE 1 3 1 l J ?rar I r PLANK WALKWAY r?nr ; r¦ter ER LEVEL O PILING DRIVEN To as TON eEARINO ENLARGED END VIEW (IINaIOE GUARO METNOO) Running clearance shown Is the minimum recommended. Clearance can be increased by reducing the Inside pier width or by increasing the width of the boat hoist.