HomeMy WebLinkAboutWQ0010164_Final Permit_19941123State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Environmental Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
LT!?FA4 •
� J
C) FE
November 23, 1994
Bennie J, Tripp, Vice President, General Manager
North Topsail Water & Sewer, Inc.
1798 New River Inlet Road
Sneads Ferry, North Carolina 28460
Subject; Permit No. WQ0010164
North Topsail Water & Sewer, Inc.
North Topsail Pump & Haul Facility
Onslow County
Dear Mr. Tripp:
In accordance with your application received October 14, 1994, we are forwarding herewith Permit
No. WQ0010164, dated November 23, 1994, to North Topsail Water & Sewer, Inc. for the construction
and operation of the subject wastewater pump and haul collection system.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the
conditions and limitations as specified therein.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of
this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the
North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer
27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding.
If you need additional information concerning this matter, please contact Mr. Michael D. Allen at
(919) 733-5083.
Sincerely,
A. Presto Howard P.E.
1 Jr.,
cc: Onslow County Health Department
Wilmington Regional Office
Carolina Benchmark Engineers -Surveyors -Planners, Inc.
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES
RALEIGH
WASTEWATER PUMP AND HAUL COLLECTION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
North Topsail Water & Sewer, Inc.
Onslow County
FOR THE
construction and operation of a concrete pad with a sump to collect washdown water, a 4 -inch collector
pipe leading to a 2,000 gallon underground concrete holding tank, a 25 GPM pump station with duplex
pumps, high water alarms, and approximately 150 linear feet of 4 -inch force main which will collect
wastewater from both the Riverview and Captain Jim Restaurants and the discharge of 1,500 GPD of
collected domestic wastewater into the North Topsail Water & Sewer, Inc.'s existing sewerage system,
pursuant to the application received October 14, 1994, and in conformity with the project plan,
specifications, and other supporting data subsequently filed and approved by the Department of
Environment, Health and Natural Resources and considered a part of this permit.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the
following specified conditions and limitations.
This permit shall become voidable unless the facilities are constructed in accordance with the
conditions of this permit, the approved plans and specifications, and other supporting data.
2. This permit is effective only with respect to the nature and volume of wastes described in the
application and other supporting data.
3. The facilities must be properly maintained and operated at all times.
4. The sewage and wastewater collected by this system shall be treated in the North Topsail Water &
Sewer, Inc. Wastewater Treatment Facility prior to being land applied by spray irrigation.
S. This permit is not transferable. In the event there is a desire for the facilities to change ownership,
or there is a name change of the Permittee, a formal permit request must be submitted to the
Division of Environmental Management accompanied by an application fee, documentation from
the parties involved, and other supporting materials as may be appropriate. The approval of this
request will be considered on its merits and may or may not be approved.
5. Construction of the sewers, pump station(s) and force main shall be scheduled so as not to
interrupt service by the existing utilities nor result in an overflow or bypass discharge of
wastewater to the surface waters of the State.
7. Upon completion of construction and prior to operation of this permitted facility, a certification
must be received from a professional engineer certifying that the permitted facility has been
installed in accordance with this permit, the approved plans and specifications, and other
supporting materials. Mail the Certification to the Water Quality Permits and Engineering Unit,
P.O. Box 29535, Raleigh, NC 27626-0535.
8. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a
minimum of five years from the date of the completion of construction.
9. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee
to an enforcement action by the Division of Environmental Management, in accordance with North
Carolina General Statute 143-215.6(a) to 143-215.6(c).
10. The issuance of this permit does not preclude the Permittee from complying with any and all
statutes, rules, regulations, or ordinances which may be imposed by other government agencies
(local, state, and federal) which have jurisdiction.
11. The Permittee shall provide for the pump station and force main the following items:
a. Pump on/off elevations located so that 2-8 pumping cycles may be achieved per hour in the
pump station,
b. An air relief valve located at all high points along the force main,
c. A screened vent for the wet well,
d. Fillets located in the wet well at the intersection of the flooring and sidewalis,
e, Three feet of cover (minimum) over the force main or the use of ferrous material where three
feet cannot be maintained,
f. Sufficient devices which will protect the pump station from vandals, and
g. Flood protection if the pump station is located below the 100 -year flood elevation.
12. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance
conditions, the Permittee shall take immediate corrective action, including those as may be required
by this Division, such as the construction of additional or replacement wastewater collection
facilities.
13. NONCOMPLIANCE NOTIFICATION:
The Permittee shall report by telephone to the Wilmington Regional Office, telephone number
(910) 395-3900, as soon as possible, but in no case more than 24 hours or on the next working
day following the occurrence or first knowledge of the occurrence of either of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable
of adequate wastewater transport, such as mechanical or electrical failures of pumps, line
blockage or breakage, etc.; or
b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving
waters without treatment of all or any portion of the influent to such station or facility.
Persons reporting such occurrences by telephone shall also file a written report in letter form within
15 days following first knowledge of the occurrence. This report must outline the actions taken or
proposed to be taken to ensure that the problem does not recur.
►a
14. A stormwater management plan must be submitted to and approved by the Wilmington Regional
Office in accordance with 15A NCAC 2H .1004.
Permit issued this the twenty-third day of November, 1994
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
A. Preston 14oward, Jr., P.E., Director
Division of Environmental Management
By Authority of the Environmental Management Commission
Permit Number WQ0010164
K
Permit No. WQ0010164
November 23, 1994
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the
project, -for the
Project Name Location
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation
of the construction such that the construction was observed to be built within substantial compliance and
intent of this permit, the approved plans and specifications, and other supporting materials.
Signature
Date
C!
Registration No.