HomeMy WebLinkAboutWQ0008118_Final Permit_19930709State of North Carolina
Department of Environment, Health and Natural Resources
Division of Environmental Management
512 North Salisbury Street • Raleigh, North Carolina 27604
James B. Hunt, Jr., Governor
July 9, 1993
Mr. Glen Simpson, Environmental Director
Central Transport, Inc.
P.O. Box 7007
High Point, NC 27264
Dear Mr. Simpson:
Jonathan B. Howes, Secretary
Subject: Permit No. WQ0008118
Central Transport, Inc.
Central Transport - Aurora
Wastewater Pump and Haul
Beaufort County
In accordance with your application received July 1, 1993, we are forwarding herewith Permit No.
WQ0008118, dated July 9, 1993, to Central Transport, Inc. for a wastewater pump and haul operation to
serve the Central Transport, Inc. truck cleaning facility in Aurora, North Carolina.
This permit shall be effective from the date of issuance until June 30, 1995 and shall be subject to
the conditions and limitations as specified therein. Please pay particular attention to the monitoring
requirements in this permit. Failure to establish an adequate system for collecting and maintaining the
required operational information will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable to you, you have
the right to request an adjudicatory hearing upon written request within 30 days following receipt of this
permit. This request must be in the form of a written petition, conforming to Chapter 150B of North
Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447,
Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding.
Regional Offices
Asheville Fayetteville Mooresville Raleigh Washington Wilmington Winston-Salem
704/251-6208 919/486-1541 704/663-1699 919/571-4700 919/946-6481 919/395-3900 919/896-7007
Pollution Prevention Pays
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015
An Equal Opportunity Affirmative Action Employer
One set of approved plans and specifications is being forwarded to you. If you need additional
information concerning this matter, please contact -Mr. John A. Kuske III at 919/733-5083.
ow
s
cc: Beaufort County Health Department
Washington Regional Office
McKim & Creed Engineers, P.A.
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES
RALEIGH
PUMP AND HAUL PERMIT.
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina
as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Central Transport, Inc,
Beaufort County
FOR THE
construction and operation of a 75,000 gallon per month wastewater pump and haul system for industrial
sewage disposal to serve the Central Transport, Inc. truck cleaning facility in Aurora, North Carolina with
no discharge of wastes to the surface waters, pursuant to the application received July 1, 1993 and in
conformity with the project plan, specifications, and other supporting data subsequently filed and
approved by the Department of Environment, Health and Natural Resources and considered a part of this
permit.
This permit shall be effective from the date of issuance until June 30, 1995 and shall be subject to
the following specified conditions and limitations:
1. This permit shall become voidable unless the subject pump and haul activities are carried
out in a manner which has been approved by this Division.
2. This permit is effective only with respect to the nature and volume of wastes described in
the application and other supporting data.
3. The facilities shall be properly maintained and operated at all times.
4. This permit is not transferable. In the event there is a desire for the facilities to change
ownership, or there is a name change of the Permittee, a formal permit request must be
submitted to the Division of Environmental Management accompanied by an application
fee, documentation from the parties involved, and other supporting materials as may be
appropriate. The approval of this request will be considered on its merits and may or may
not be approved.
5. No type of wastewater other than the industrial waste from the Central Transport, Inc.
truck cleaning facility shall be included in the pump and haul activities.
6. The permit shall become voidable unless the agreement between A&W Company,
Texasgulf Inc. and Central Transport, Inc. for the collection, transportation, and ultimate
disposal of the wastewater is in full force and effect.
7. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall cease operation of all pump and haul activities and
take such immediate corrective action, as may be required by this Division.
8. This pump and haul permit shall not be renewed.
9. The sewage and wastewater collected by this system shall be treated in the Texasgulf Inc.
wastewater recycle system.
10. The Washington Regional Office, telephone no. 919/946-6481, shall be notified at least
forty-eight (48) hours in advance of operation of the pump and haul activities so that an in-
place inspection can be made. Such notification to the regional supervisor shall be made
during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday,
excluding State Holidays.
11. The Permittee is liable for any damages caused by a spill or failure of the pump and haul
operations.
12. Adequate inspection, maintenance, and cleaning shall be provided by the Permittee to
insure proper operation of the subject facilities.
13. The Permittee or his designee shall inspect the pump and haul collection facilities to prevent
malfunctions and deterioration, operator errors and discharges which may cause or lead to
the release of wastes to the environment, a threat to human health, or a nuisance. The
Permittee shall keep an inspection log or summary including at least the date and time of
inspection, observations made, and any maintenance, repairs, or corrective actions taken by
the Permittee. This log of inspections shall be maintained by the Permittee for as long as
the pump and haul activities are being conducted and shall be made available upon request
to the Division of Environmental Management or other permitting authority.
14. Any duly authorized officer, employee, or representative of the Division of Environmental
Management may, upon presentation of credentials, enter and inspect any property,
premises or place on or related to the pump and haul collection facilities at any reasonable
time for the purpose of determining compliance with this permit; may inspect or copy any
records that must be kept under the terms and conditions of this permit; and may obtain
samples.
15. An accurate record of the pump and haul activities must be maintained by the Permittee,
indicating:
a) date wastewater is removed from the facility,
b) name of facility from which wastewater is removed,
c) name of facility receiving wastewater,
d) volume of wastewater removed, and
e) status of permanent disposal option.
These records shall be submitted to the Washington Regional Office of the Division of
Environmental Management on or before the fifteenth (15) day of the following month.
16. Failure to abide by the conditions and limitations contained in this permit may subject the
Permittee to an enforcement action by the Division of Environmental Management in
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
17. The issuance of this permit does not preclude the Permittee from complying with any and
all statutes, rules, regulations, or ordinances which may be imposed by other government
agencies (local, state, and federal) which have jurisdiction.
2
18. The Permittee shall provide for the installation and maintenance of an audible and visual
high water alarm.
19. A leakage test shall be performed on the collection manhole and caustic solution tank to
insure that no exfiltration occurs. The engineer's certification will serve as proof of
compliance with this condition.
20. A copy of the approved plans and specifications shall be maintained on file by the Permittee
for the life of the project.
21. No com l� cg. Notification:
The Permittee shall report by telephone to the Washington Regional Office, at telephone no.
919/946-6481, as soon as possible, but in no case more than 24 hours or on the next
working day following the occurrence or first knowledge of the occurrence of any of the
following:
a. Any process unit failure, due to known or unknown reasons, that render the
facility incapable of adequate wastewater treatment such as mechanical or electrical
failures of pumps, aerators, compressors, etc.
b. Any failure of a pumping station, sewer line, etc. resulting in a by-pass directly to
receiving waters without treatment of all or any portion of the influent to such
station or facility.
Persons reporting such occurrences by telephone shall also file a written report in letter
form within 15 days following fust knowledge of the occurrence. This report must outline
the actions taken or proposed to be taken to ensure that the problem does not recur.
22. Upon completion of construction and prior to operation of the subject pump and haul
activities, a certification must be received from a professional engineer certifying that the
permitted facilities have been installed in accordance with this permit, the approved plans
and specifications. Mail the Certification to the Permits and Engineering Unit, P.Q. Box
29535, Raleigh, NC 27626-0535.
23. The annual administering and compliance fee must be paid by the Permittee within thirty
(30) days after being billed by the Division. Failure to pay the fee accordingly may cause
the Division to initiate action to revoke this permit as specified by 15 NCAC 2H .0205
(c)(4).
Permit issued this the 9th day of July, 1993
CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Preston Howard, r.,
Division of Enviro t
By Authority of the Envi
Management Commission
C
Permit No. WQ0008118
July 9, 1993
Engineer's Certification
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction
of the project,
Project Name Location
for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation
of the construction such that the construction was observed to be built within substantial compliance and
intent of the approved plans and specifications.
Signature
Date
4
Registration No.
�i t��►
ae '
8 w A K P w at a wr.a,
a P
AK VON
�p
r �
ian
f
+^......' �t ---------
ew: �02"TAL W'ATMWWA!
' m P U N G Osw an
R
SUL UN
im
F ' im - r ` ' mL an
¢ `
xu
�G
UK - •S imam
ME
+ r x t
:a:i
JiY �
2ft' ftw
r r
� a �
.......
UK
A Ar
ell
An
�' lw intMLa
UK LU
k^ ..• ; It" AMELAN �r
Iwo
u -
+ t m' -
em w
ent13 in
G U x + r A At r �(
im y�