HomeMy WebLinkAboutWQ0004240_Final Permit_20010207State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
Michael F. Easley, Governor
William G. Ross Jr., Secretary
Kerr T. Stevens, Director
February 7, 2001
MAJGEN T.A. Braaten, Commanding General
U.S. Marine Corps
c/o Environmental Affairs Dept (LN)
PSC Box 8006
Cherry Point, NC 28533-0006
1 • •
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
Subject: Permit No. WQ0004240
U.S. Marine Corps — Bogue Field
MAJGEN T.A. Braaten, Commanding General
Wastewater Spray Irrigation
Carteret County
Dear MAJGEN Braaten:
In accordance with your application received June 27, 2000, we are forwarding herewith Permit No.
WQ0004240, dated February 7, 2001, to U.S. Marine Corps for the continued operation of the subject
wastewater treatment and spray irrigation facilities. This permit is being amended to increase the hydraulic
loading limit of the application fields from 13.5 inches per year to 36 inches per year per the Soil Scientist
Report dated November 10, 2000 and submitted to the Division of Water Quality on November 20, 2000.
This permit shall be effective from the date of issuance until December 31, 2005, shall void Permit No.
WQ0004240 issued September 24, 1997, and shall be subject to the conditions and limitations as specified
therein. Please pay particular attention to the monitoring requirements in this permit. Failure to establish an
adequate system for collecting and maintaining the required operational information will result in future
compliance problems -
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request
an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This
request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General
Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-
6714. Unless such demands are made this permit shall be final and binding.
If you need additional information concerning this matter, please contact
extension 502.
Kerr T. Stevens
cc: Carteret County Health Department
Wilmington Regional Office, Water Quality Section
Wilmington Regional Office, Groundwater Section
Groundwater Section, Central Office
Technical Assistance and Certification Unit
Non -Discharge Compliance/Enforcement Unit
Homewood at (919) 733-5083
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone (919) 733-5083 Fax (919) 715-6048
An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
RALEIGH
SPRAY IRRIGATION SYSTEM PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and
other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
U.S. Marine Corps
Carteret County
FOR THE
continued operation of a 3,400 GPD spray irrigation treatment and disposal facility. The facility consists of a
treatment lagoon with concrete baffles, a polishing lagoon, a new tablet chlorinator, a modified irrigation pump station
with high water alarms and dual pumps operating at 215 GPM, and a 4 acre spray field to serve the U. S. Marir
Corps' auxiliary landing field at Bogue Field, with no discharge of wastes to the surface waters, pursuant to t.
amendment request received June 27, 2000, and in conformity with the project plan, specifications, and other
supporting data subsequently filed and approved by the Department of Environment and Natural Resources and
considered a part of this permit.
This permit shall be effective from the date of issuance until December 31, 2005, shall void Permit No_ WQ0004240
issued September 24, 1997, and shall be subject to the following specified conditions and limitations:
I. PERFORMANCE STANDARDS
The spray irrigation facilities shall be effectively maintained and operated at all times so that there is no
discharge to the surface waters, nor any contamination of ground waters which will render them
unsatisfactory for normal use. In the event that the facilities fail to perform satisfactorily, including the
creation of nuisance conditions or failure of the irrigation area to adequately assimilate the wastewater, the
Permittee shall take immediate corrective actions including those actions that may be required by the
Division of Water Quality (Division), such as the construction of additional or replacement wastewater
treatment and disposal facilities.
The issuance of this permit shall not relieve the Permittee of the responsibility for damages to surface or
groundwaters resulting from the operation of this facility.
3. The residuals generated from these treatment facilities must be disposed in accordance with General
Statute 143-215.1 and in a manner approved by the Division.
4. Diversion or bypassing of the untreated wastewater from the treatment facilities is prohibited.
The following buffers shall be maintained:
a) 400 feet between wetted area and any residence or places of public assembly under separate
ownership,
b) 150 feet between wetted area and property lines,
c) 100 feet between wetted area and wells,
d) 100 feet between wetted area and drainageways or surface water bodies,
e) 50 feet between wetted area and public right of ways,
f) 100 feet between wastewater treatment units and wells, and
g) 50 feet between wastewater treatment units and property lines.
Some of the buffers specified above may not have been included in previous permits for this waste
treatment and disposal system. These buffers are not intended to prohibit or prevent modifications, which
are required by the Division, to improve performance of the existing treatment facility_ These buffers do,
however, apply to modifications of the treatment and disposal facilities which are for the purpose of
increasing the flow that is tributary to the facility. These buffers do apply to any expansion or
modification of the spray irrigation areas and apply in instances in which the sale of property would cause
any of the buffers now complied with, for the treatment and disposal facilities, to be violated. The
applicant is advised that any modifications to the existing facilities will require a permit modification.
H. OPERATION AND MAINTENANCE REQUIREMENTS
I. The facilities shall be properly maintained and operated at all times.
2. Upon classification of the facility by the Water Pollution Control System Operators Certification
Commission (WPCSOCC), the Penmittee shall employ a certified wastewater treatment plant operator to
be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate
of the type and grade at least equivalent to or greater than the classification assigned to the wastewater
treatment facilities by the WPCSOCC. The Permittee must also employ a certified back-up operator of the
appropriate type and grade to comply with the conditions of 15A NCAC 8G .0202. The ORC of the
facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily,
excluding weekends and holidays, and must properly manage and document daily operation and
maintenance of the facility and must comply with all other conditions of 15A NCAC 8G .0202.
3. A suitable year round vegetative cover shall be maintained.
4. Irrigation shall not be performed during inclement weather or when the ground is in a condition that will
cause runoff.
5. Adequate measures shall be taken to prevent wastewater runoff from the spray field.
6. The facilities shall be effectively maintained and operated as a non -discharge system to prevent the
discharge of any wastewater resulting from the operation of this facility.
7. The application rate shall not exceed a cumulative loading of 36 inches over any twelve (12) month period
at an instantaneous application rate which will not to cause runoff.
8. No type of wastewater other than that from Bogue Field shall be sprayed onto the irrigation area.
9. No traffic or equipment shall be allowed on the disposal area except while installation occurs or while
normal maintenance is being performed.
10. Public access to the land application sites shall be controlled during active site use. Such controls may
include the posting of signs showing the activities being conducted at each site.
11. Freeboard in the treatment lagoon and polishing pond shall not be less than two feet at any time.
III. MONITORING AND REPORTING REQUIREMENTS
Any monitoring (including groundwater, surface water, soil or plant tissue analyses) deemed necessary by
the Division to insure surface and ground water protection will be established and an acceptable sampling
reporting schedule shall be followed.
2. Adequate records shall be maintained by the Permittee tracking the amount of wastewater disposed. These
records shall include, but are not necessarily limited to, the following information:
a. date of irrigation,
b. volume of wastewater irrigated,
c, field irrigated,
d. length of time field is irrigated,
e. continuous weekly, monthly, and year-to-date hydraulic (inches/acre) loadings for each field,
f. weather conditions, and
g. maintenance of cover crops.
3. Influent flow shall be continuously monitored and daily average flow values shall be reported on Form
NDMR. Flow may be estimated from water use records provided water use is metered. Daily average
values shall be calculated by dividing monthly flow volume by the number of days in the month.
4. The effluent from the subject facilities shall be monitored by the Permittee at the point prior to irrigatic.._
every March, July, and November for the following parameters:
BOD5
TSS
Fecal Coliform
pH
NH3 as N
Sodium
Magnesium
Calcium
NO3-N
Sodium Adsorption Ratio by Calculation
Three (3) copies of all operation and disposal records (as specified in condition III 2) on Form NDAR-1
and three (3) copies of all effluent monitoring data (as specified in condition 1113 and I1I 4) on Form
NDMR-1 shall be submitted on or before the last day of the following month. All information shall be
submitted to the following address:
NC Division of Water Quality
Water Quality Section
Non -Discharge Compliance/Enforcement Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
6. A representative annual soils analysis (Standard Soil Fertility Analysis) shall be conducted on each spray
field and the results maintained on file by the Permittee for a minimum of five years. The Standard Soil
Fertility Analysis shall include, but is not necessarily limited to, the following parameters:
Acidity
Calcium
Copper
Magnesium
Cation Exchange Capacity
7. Noncompliance Notification:
Manganese Potassium
Percent Humic Matter Sodium
pH Zinc
Exchangeable Sodium Percentage Phosphorus
Base Saturation (by calculation)
The Permittee shall report by telephone to the Wilmington Regional Office, telephone number (910) 395-
3900, as soon as possible, but in no case more than 24 hours or on the next working day following the
occurrence or first knowledge of the occurrence of any of the following:
a. Any occurrence at the wastewater treatment facility which results in the treatment of significant
amounts of wastes which are abnormal in quantity or characteristic, such as the dumping of the
contents of a sludge digester; the known passage of a slug of hazardous substance through the facility;
or any other unusual circumstances.
b. Any process unit failure, due to known or unknown reasons, that render the facility incapable of
adequate wastewater treatment such as mechanical or electrical failures of pumps, aerators,
compressors, etc.
Any failure of a pumping station, sewer line, or treatment facility resulting in a by-pass directly to
receiving waters without treatment of all or any portion of the influent to such station or facility.
d. Any time that self -monitoring information indicates that the facility has gone out of compliance with
its permit limitations.
Persons reporting such occurrences by telephone shall also file a written report in letter form within five
(5) days following first knowledge of the occurrence. This report must outline the actions taken or
proposed to be taken to ensure that the problem does not recur.
IV. GROUNDWATER REQUIREMENTS
1. Any additional groundwater quality monitoring, as deemed necessary by the Division, shall be provided.
2_ The COMPLIANCE BOUNDARY for the disposal system is specified by regulations in 15A NCAC 2L,
Groundwater Classifications and Standards. The Compliance Boundary for the disposal system
constructed prior to December 31, 1983 is established at either (1) 500 feet from the waste disposal area,
or (2) at the property boundary, whichever is closest to the waste disposal area. An exeeedance of
Groundwater Quality Standards at or beyond the Compliance Boundary is subject to immediate
remediation action in addition to the penalty provisions applicable under General Statute 143-
215.6A(a)(1).
In accordance with 15A NCAC 2L, a REVIEW BOUNDARY is established around the disposal systems
midway between the Compliance Boundary and the perimeter of the waste disposal area. Any exeeedance
of standards at the Review Boundary shall require remediation action on the part of the permittee.
V. INSPECTIONS
1. Adequate inspection, maintenance, and cleaning shall be provided by the Permittee to insure propel
operation of the subject facilities.
2. The Permittee or his designee shall inspect the wastewater treatment and disposal facilities to prevent
malfunctions and deterioration, operator errors and discharges which may cause or lead to the release of
wastes to the environment, a threat to human health, or a nuisance- The Permittee shall keep an inspection
log or summary including at least the date and time of inspection, observations made, and any
maintenance, repairs, or corrective actions taken by the Pemnittee. This log of inspections shall be
maintained by the Permittee for a period of three years from the date of the inspection and shall be made
available upon request to the Division or other permitting authority.
3. Any duly authorized officer, employee, or representative of the Division may, upon presentation of
credentials, enter and inspect any property, premises or place on or related to the disposal site or facility at
any reasonable time for the purpose of determining compliance with this permit; may inspect or copy any
records that must be maintained under the terms and conditions of this permit, and may obtain samples of
groundwater, surface water, or leachate.
V1. GENERAL CONDITIONS
This permit shall become voidable unless the facilities are constructed in accordance with the conditions of
this permit, the approved plans and specifications, and other supporting data.
2. This permit is effective only with respect to the nature and volume of wastes described in the applicatic-
and other supporting data_
This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there
is a name change of the Permittee, a formal permit request must be submitted to the Division accompanied
by an application fee, documentation from the parties involved, and other supporting materials as may be
appropriate. The approval of this request will be considered on its merits and may or may not be
approved.
4. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an
enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-
215.6C.
5. The issuance of this permit does not exempt the Permittee from complying with any and all statutes, rules,
regulations, or ordinances which may be imposed by other government agencies (local, state, and federaI)
which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200,
erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General
Permit NCGOl00000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 2H
.0500.
6. A set of approved plans and specifications for the subject project must be retained by the Permittee for the
life of the project.
7. The annual administering and compliance fee must be paid by the Permittee within thirty (30) days after
being billed by the Division. Failure to pay the fee accordingly may cause the Division to initiate action to
revoke this permit as specified by 15A NCAC 2H .0205 (c)(4)-
The Permittee, at least six (6) months prior to the expiration of this permit, shall request its extension.
Upon receipt of the request, the Commission will review the adequacy of the facilities described therein,
and if warranted, will extend the permit for such period of time and under such conditions and limitations
as it may deem appropriate.
The subject wastewater treatment and disposal facilities shall be connected to an operational publicly
owned wastewater collection system within 180 days of its availability to the subject facilities, if the
subject wastewater treatment or disposal facilities are in noncompliance with the terms and conditions of
this non -discharge permit or the governing statutes or regulations. Prior to the initiation of these
connection activities, appropriate approval must be received from this Division.
Permit issued this the 71h day of February, 2001
NORT ROLINA MENTAL MANAGEMENT COMMISSION
Kerr T. Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number WQ0004240
0