Loading...
HomeMy WebLinkAboutWQ0003299_Final Permit_19930630State of North Carolina C-opartment of Environment,MINA'A Health and Natural Resources &'J + Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary ID E H N R A. Preston Howard, Jr., P.E., Director June 30, 1993 Mr. A. T. Rolan, Director of Water Resources Department of Water Resources, City or Durham 101 City Hall Plaza Durham, North Carolina 27701 Subject: Permit No. WQ0003329 Permit Amendment City of Durham North and South Durham Water Reclamation Facilities Cement Kiln Dust Sludge Stabilization Pilot Study Durham County Dear Mr. Rolan: On March 30, 1993, the Division of Environmental Management issued Permit No. WQ0003329 to the City or Durham for the continued operation of a Cement Kiln Dust Sludge Stabilization Program. Condition 111.5 of that permit required that all information required to meet the monitoring and reporting requirements, as specified in conditions III.2, 111.3, and IIIA, be submitted to the Assistant Chief of Operations. This condition is being administratively amended to change the address for the submittal of this information and to establish a deadline of March 1 of each year for the submittal of this information. The new address for the submittal of this information is: NC Division of Environmental Management Water Quality Section Facilities Assessment Unit PO Box 29535 Raleigh, NC 27626-0535 This permit shall be effective sixty days from the date of issuance until June 30, 1994. All other conditions and limitations as specified in Permit No. WQ0003329, issued March 30, 1993, are in full force and effect. Please pay particular attention to the monitoring requirements in this permit. Failure to establish an adequate system for collecting and maintaining the required operational information will result in future compliance problems. If this modification is unacceptable to you, you have the right to request an adjudicatory hearing on the modified portion of this permit upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit modification shall be final and binding. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper `YQ0003329 June 30, 1993 Page Two If you need additional information concerning this matter, please contact `-%. Carolyn D. Mc'Casldll at (919) 733-5083. cc: Durham County Health Department Raleigh Regional Office, Water Quality Raleigh Regional Office, Groundwater Groundwater Section, Jack Floyd Facilities Assessment Unit (no revised rating) XSince A. Preston Howard, E. 2 State of North Carolina Department of Environment, Health and. Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor William W. Cobey, Jr., Secretary Mr. Terry Roland Director of Water Resources City of Durham 101 City Hall Plaza Durham, North Carolina 27701 Dear Mr. Roland: George T. Everett, Ph.D. Director June 11, 1990 Subject: Permit No. WQ0003329 City of Durham Northside and Farrington Road WWTP Cement Kiln Dust Sludge Stabilization Pilot Study Durham County In accordance with an error brought to our attention on June 8, 1990, we are forwarding this Permit No. WQ0003329 as amended to expire on November 25, 1990, to the City of Durham for the operation of a Cement Kiln Dust Sludge Stabilization program. This Permit shall be. effective from the date of issuance until November 25, 1990, and shall be, subject to the conditions and limitations as specified therein. Please pay particular attention to the monitoring requirements in this Permit. Failure to establish an adequate system for collecting and maintaining the required operational information will result in future compliance problems. Please be advised that this permit is only for the operation of the Cement Kiln Dust Stabilized Sludge process and that land application, marketing or distribution is not approved without the written permission of the Director of the Division of Environmental Management. If any parts, requirements, or limitations contained in this Permit are unacceptable to you, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this to Permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Box 11666, Raleigh, NC 27604. Unless such demands are made this Permit shall be final and binding. If you need additional information concerning this matter, please contact Mr. Marr Hawes at 9191733-5083. ncerely, George T. Everett cc: Durham County Health Departme Raleigh Regional Office Robert S. DiFiore, Hazen and Sawyer, P.C. Pollution Prevention Pays P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES RALEIGH SLUDGE STABILIZATION In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO CITY OF DURHAM Durham County 0910719"t construction and operation of a 100 ton per day Cement Kiln Dust Sludge Stabilization Pilot Program to serve the City of Durham pursuant to the request received March 28, 1990 and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment, Health and Natural Resources and considered a part of this permit. This Permit shall be effective from the date of issuance until November 25, 1990, and shall be subject to the following specified conditions and limitations: I. PERFORMANCE STANDARDS 1. The Raleigh Regional Office, phone no. (919) 733-2314, shall be notified so that an in-place inspection can be made prior to commencing operation of the Cement Kiln Dust Stabilization process. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. 2. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the City of Durham shall take immediate corrective action, including those as may be required by this Division. II. OPERATION AND MAINTENANCEREOUIREMENTS 1. The Cement Kiln Dust Sludge Stabilization facilities shall be effectively maintained and operated at all times in such a manner as to produce a product which will meet the requirements of the Process to Further Reduce Pathogens. 111. MONITORING AND REPORTING REQUIREN NTS 1. Any monitoring deemed necessary by the Division of Environmental Management to insure surface and ground water protection will be established and an acceptable sampling reporting schedule shall be followed. 2. The City of Durham shall implement a monitoring program for the Cement Kiln Dust Sludge Stabilization Program at the time of operation. This program shall include a sludge analysis and EP Toxicity analysis to be conducted by the City of Durham and the results maintained on file by the City of Durham through out the life of the pilot program. The sludge analysis shall include but is not necessarily limited to the following parameters: Percent Total solids` pHA` Magnesium Chlorides Sulfate Phosphorus Potassium Lead Zinc Copper Nickel Cadmium Chromium Sodium Calcium Total Nitrogen Ammonia Nitrogen Nitrate/Nitrite Nitrogen Plant Available Nitrogen (by calculation) Temperature" daily samples shall be taken prior to processing, after initial mixing, and three (3) days after initial mixing. ** Temperature measurements shall be taken at varying depths in the processed sludge pile such that a representative temperature profile can be created to show a uniform temperature of 52 degrees Celsius. The temperature measurements shall be made initially after mixing, and for the first three days at intervals of three (3) hours for the first twelve (12) hours after an initial uniform reading of 52 degrees Celsius occurs. After the first three days and for the duration of the test the temperature shall be measured every twelve (12) hours after an initial uniform reading of 52 degrees Celsius. The sludge analysis shall be of a composite of all material processed for the first thirty days unless otherwise stated. Note the testing frequency for percent total solids, pH and temperature are not to be composite samples and shall be sampled as outlined above. The EP Toxicity analysis shall include the following parameters: Arsenic Barium Cadriiium Chromium Lead Mercury Selenium Silver Endrin Lindane Methoxychlor Toxaphene 2,4-D 2,4,5 -TP Silvex The EP Toxicity test shall be performed with a daily composite of three (3) random days for the first week of operation and thereafter monthly. 2 3. Three copies of all monitoring and reporting requirements as specified in conditions III 2,shall be submitted to the Assistant Chief of Operations at the following address: NC Division of Environmental Management Water Quality Section Permits and Engineering Unit PO Box 27687 Raleigh, NC 2761.1-7687 4. Noncompliance Notification: The Permittee shall report by telephone to the Raleigh Regional Office, telephone no. (919) 733-2314, as soon as possible, but in no case more than 24 hours or on the next working day following the occurrence or first knowledge of the occurrence of any of the following: a_ Any occurrence at the cement kiln dust sludge stabilization facilities which results in the treatment of significant amounts of sludge which are abnormal in quantity or characteristics. b. Any process unit failure, due to known or unknown reasons, that render the facility incapable of adequate sludge stabilization such as mechanical or electrical failures of equipment. c. Any time that self-monitoring information indicates that the facility is not in compliance with its permit limitations. Any occurrence of this shall cause the stabilized sludge to be reprocessed so that the Process to Further Reduce Pathogens can be met. Persons reporting such occurrences by telephone shall also file a written report in letter form within 15 days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. IV. INSPECTIONS 1. Adequate inspection, maintenance, and cleaning shall be provided by the Permittee to insure proper operation of the subject facilities. 2. The City of Durham or his designee shall inspect the cement kiln dust sludge stabilization facilities to prevent malfunctions and deterioration, operator errors and discharges which may cause or lead to the release of wastes to the environment, a threat to human health, or a nuisance. The City of Durham shall keep an inspection log or summary including at least the date and time of inspection, observations made, and any maintenance, repairs, or corrective actions taken by the City of Durham, This log of inspections shall be maintained by the Permittee for a period of three years from the date of the inspection and shall be made available upon request to the Division of Environmental Management or other permitting authority. 3 3. Any duly authorized officer, employee, or representative of the Division of Environmental Management may, upon presentation of credentials, enter and inspect any property, premises or place on or related to the disposal site and facility at any reasonable time for the purpose of determining compliance with this permit; may inspect or copy any records that must be kept under the terms and conditions of this Permit; or may obtain samples of sludge, processed sludge, groundwater, surface water, or leachate. V. GENERAL CONDMONS 1. This Permit is subject to revocation unless the cement kiln dust sludge stabilization facilities are operated in accordance with the conditions of this Permit, the approved plans and specifications. 2. This Permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The following facilities are approved sites for the operation of the Cement Kiln Dust Sludge Stabilization Pilot Program: Facility Permit Number County Volume of Sludge Farrington Road WWTP NC0047597 Durham 100 tons per day# Northside WWTP NC0023841 Durham 100 tons per dayt t The maximum amount of cement kiln dust stabilized sludge shall not exceed 100 tons per day for both Farrington Road WWTP and Northside WWTP. This maximum production rate is based on the use of only 1 processing unit serving both facilities. 4. Failure to abide by the conditions and limitations contained in this Permit may subject the Permittee to an enforcement action by the Division of Environmental Management in accordance with North Carolina General Statute 143-215.6. 5. The issuance of this Permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 6. No Cement Kiln Dust Stabilized Sludge shall be land applied without written authorization from the Director of Environmental Management, Cement Kiln Dust Stabilized Sludge may be disposed of at a sanitary landfill following approval from the Division of Solid Waste Management. 7. Within thirty (30) days of permit issuance the Permittee shall submit a map of the areas which are within WS -1 water sheds for the counties surrounding Durham County and including Durham County (the map should include landmarks such as state roads for the boundaries of the WS -1 watersheds); these areas will be prohibited from the application area of the Cement Kiln Dust Stabilized Sludge. Also a marketing plan which specifically outlines suggested application rates, limits the quantity to be applied per site based on heavy metal concentrations, areas in which the application of the Cement Kiln Dust Stabilized Sludge is prohibited, and 4 suggested uses to the Assistant Chief of Operations at the following address: NC Division of Environmental Management Water Quality Section Permits and Engineering Unit PO Box 27687 Raleigh, NC 27611-7687 Permit issued this the 1th day of June, 1990 ORTH CAROLINA E IRONMENTAL MANAGEMENT COMMISSION eorge T. Everett, D ct r Division of Environmental agement By Authority of the Environmental Management Cornrnission Permit No. WQ0003329 5