Loading...
HomeMy WebLinkAbout20061119 Ver 1_BIMS Comments_20060927Project Number: 20061119 Version: 1.0 Status: Received SW Plan ~ocaiion: _ _ ._ _.. Project Name: Raymond VonDrehle Project Type: Other Owner: Raymond VonDrehle f Details Inspection Date: A912 712 0 0 6 Enter Inspection Summary Staff visited the impact site and the restoration site on September 27, 2006. The impact site is a erennisl stream which will be flooded for pond creation- The impacts are 96 linear feet and thezefore do of require mitigation. The restoration site is located approximately 5 miles from the impact site. the roposed stream restoration is part of a restoration plan originally designed in response to a NOV from a different property owner/project in 2001. The NOV required restoration for unauthorized impacts for a subdivision. The stream restoration plan proposed was for approximately twice what was required for the iolation. Hased on observations of D1dQ staff, the restoration work was inadequate (too much sinuosity - erfect "S" shapes and not enough structure - stream is downcuttingl. The applicant is proposing to use '.. he sane design for the second part of the restoration- ommend approval with the following condition: The applicant shall provide a revised stream restoration plan to MAO and the plan must be approved by iTQ staff prior to construction of the stream restoration. All standard monitoring and buffer conditions shall apply. ~i ~r~su ens I ~ :;uu ! JI iir -_ Help ~ ; r r- Cancel ',Ready SID: INSM